Walk Bridge Replacement Project A Sustainable Project for Norwalk & the Northeast Corridor Sarah Walker, AICP ENV SP HNTB Corporation

Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Walk Bridge Replacement Project

A Sustainable Projectfor Norwalk &

the Northeast Corridor

Sarah Walker, AICP ENV SPHNTB Corporation

Page 2: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Summary of Presentation1. Project Setting

2. Project Challenge

3. Innovative Construction Approach

4. Construction Coordination Plans

Page 3: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Walk Bridge

Page 4: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Walk Bridge: Regional & Local Significance

125,000 passengers & 175 trains daily

Page 5: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Selected Project Design: Vertical Lift Span

• Shortest construction schedule• Lowest construction risks • Shortest period of navigational

restrictions• Least natural resources impacts• Least social & economic impacts

to Norwalk

Challenge: Maintain Commuter Rail Service & Minimize Community Impacts

Page 6: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Integrated Design and Construction Process

• Historic Building Protection

• Business Coordination

• Marine Use

• Transportation

• Maritime Aquarium Coordination

Historic Building

Protection

Project Sustainability

Safety and Security Plans

Community-Based Protection Plans

Resource-Based Protection Plans

Construction Manager/General Contractor

Page 7: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Innovative Construction Approach

Construction Manager/General

Contractor Alternative Delivery

DESIGNER CM/GC

PM Consultant

Independent Cost Estimator

ConnDOT

Page 8: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Benefits of CM/GC Process• Provides advice to

designer

• Identifies innovative construction solutions

• Coordinates planning & construction operations

• Promotes collaboration & efficiency

Page 9: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Examples of Designer-CM/GC Collaboration

Wetland Mitigation Design Bridge Component Salvage

Page 10: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Construction Coordination Plans

• Historic Building Protection

• Business Coordination

• Marine Use

• Transportation

• Maritime Aquarium

Historic Building

Protection

• Noise and Vibration

• Air Quality

• Water Quality Control

• Materials Management

Resource Protection

Coordination Plan Types

Community Protection

Safety and Security

Page 11: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Community-Based Plan: Historic Building Protection • Section 106 MOA Stipulation

• Protection expanded to include Zone of Influence buildings

Page 12: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

Historic Building Protection Plan

• Initial Building Condition Surveys

• Preventative Measures

• Test Pile Program Monitoring

• Pre-Construction Building Surveys & Follow-Up

Page 13: Walk Bridge Replacement Project - American Public ......HNTB Corporation Summary of Presentation 1. Project Setting 2. Project Challenge 3. Innovative Construction Approach 4. Construction

The New Walk Bridge - A Sustainable Solution Restore rail

infrastructure

Improve service safety & reliability

Expand & enhance service

Upgrade tracks to support local & express service CTDOT’s Goals for New York to New

Haven Corridor