WA104 Cryogenics Design Status

David Montanari / Johan BremerMay 21, 2015

Rev. 1

Page 2: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 2

Outline

• P&IDs• Meeting on LAr filtration• Test of Copper beds• Cold shields thermal design and testing• Summary

May 21, 2015

Page 3: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 3

Cryogenics Design Status

• The WA104 Cryogenics has been preliminarily divided between CERN and Fermilab:– CERN Proximity Cryogenics (LAr filtration, Ar Condenser, LAr recirculation pump and associated piping

and instrumentation).– Fermilab External Cryogenics (LAr/LN2 receiving facilities, LAr/LN2 transfer lines and GAr/GN2 returns).– WA104 Internal Cryogenics (inside the cryostat).

• Preliminary P&IDs have been drawn (based on the previous IICARUS configuration) to facilitate the discussion.

• Exact division of responsibilities is being discussed.• Deliverables (with cost and schedule) are being prepared and will be discussed.• Interface documents for the various parts will need to be prepared and discussed.• Components need to be sized (will start with existing values).• 3D modeling can then start.• Components will be skid mounted and cold tested, ready for installation and final

connections on the field.• Pipe sections may be prefab and cold tested, ready for installation and final connections

on the field.• Need to look at available components and decide what can be reused (LAr pumps, maybe

vessels?).

May 21, 2015

Page 4: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 4May 21, 2015

PRELIMINARY P&ID

Page 5: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 5May 21, 2015

PRELIMINARY P&ID

Page 6: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 6May 21, 2015

PRELIMINARY P&ID

Page 7: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 7

Meeting on LAr filtration (Apr 16, 2015)

• There are safety concerns about the use of Oxysorb.• It is agreed that commercially available products nowadays can purify LAr

(from O2) producing very pure LAr right after the filters, to the measureable limit of the purity monitors.

• The purity of the LAr inside the cryostat depends on the design of the cryostat, the ullage, the cabling, the purification of the GAr at the top, the piping, etc. and how well the outgassing is mitigated.

• At Fermilab copper beds have produced adequate level of purity for the needs of the experiments.

• We are making preparations to test the copper beds at CERN with the small ICARUS prototype.

• Test will provide feedback on achievable purity, absorption capacity, regen time and size of the vessels needed for ICARUS.

• If the test is successful it will be possible to replace the Oxysorb with the copper beds.

May 21, 2015

Page 8: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 8

Test of LAr purity with copper beds

• Filter cartridge has been identified.• Filter material has been identified: BASF CU-0226 S 14 x 28 Mesh (same as

LAPD/LBNE 35 ton).

• Information about the absorption capacity is available.• Collecting information about regen time and where to perform it.• Investigating if possible to do activation/regen at Fermilab.• If desired, the same setup could be used to test other filtering materials.

May 21, 2015

~70 cm

10 cm

Page 9: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 9

Cold shield thermal design (D. Santandrea / F. Cacherat at Cryolab)

• Thermal design of the cold shield has bee completed. • Parts for the test are being fabricated at CERN workshop (Al 1050A).• If the test is successful, the mechanical design (by others) can start.

May 21, 2015

∆T ≤ 500 mK L ≤ 472 mm• 4.0 mm of thickness• Orthogonal radiation flux: 20 W/m2

• Uniform inner radius temperature

Page 10: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 10May 21, 2015

Cold shield test setup (D. Santandrea / F. Cacherat at Cryolab)

Page 11: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 11

Lateral cooling loop (Half view)

May 21, 2015

D

C

B

A

AB: bottom collectorCD: top collectorCryostat length 20 mLength of the panels 472 mmNumber of panels = 42Mass flow total = 84 g/sPressure inlet 3.5 barTemperature inlet 84 K

Hypothesis: Expansion valve for each lateral loop inlet 87 K, 2.7626 bar, 10% quality

Page 12: WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1

WA104 Cryogenics Design Status 12

Summary• Preliminary P&IDs have been drawn and will serve as basis for the

discussion on responsibilities and deliverables between Fermilab, CERN and WA104. Sizing of components and 3D modeling can then start.

• We are making preparations to test the copper beds at CERN to evaluate absorption capacity and size of the LAr filters that would be needed for the ICARUS cryostat.

• The thermal design of the cold shields has been performed and will soon be tested at the Cryolab. If successful the mechanical design of the cold shields (by others) can start.

May 21, 2015