Inspection Report C0150025 Permit Number: TECHNICAL Tuesday, October 30, 2012 10/30/2012 3:00:00 PM Inspection Type: Inspection Date: End Date/Time: Last Inspection: 10/30/2012 11:30:00 AM Start Date/Time: Sunny, Clear 70F Inspector: Weather: April Abate, Accepted by: 3281 InspectionID Report Number: 2352 NORTH 7TH STREET, UNIT B, GRAND JUNCTION CO 81501 BEAR CANYON MINE CASTLE VALLEY MINING LLC CASTLE VALLEY MINING LLC EMERY Site: County: Permitee: Operator: Address: Underground Surface Loadout Processing Reprocessing 10,991.83 40.46 Current Acreages Total Permitted Total Disturbed Phase I Phase II Phase III Wednesday, October 31, 2012 The purpose was to reconn some of the hydrologic monitoring stations feeding the Fish Creek area where mining is currently taking place. Report summary and status for pending enforcement actions, permit conditions, Division Orders, and amendments: Date 60 Inspector's Signature: Note: This inspection report does not constitute an affidavit of compliance with the regulatory program of the Division of Oil, Gas and Mining. April Abate, Federal State County Fee Other Mineral Ownership Types of Operations ACTIVE PERMANENT COAL PROGRAM Permit Type: Permit Status: Inspector ID Number: April Abate Digitally signed by April Abate DN: cn=April Abate, o=Division of Oil, Gas, & Mining, ou=Coal Regulatory Program, [email protected], c=US Date: 2012.11.05 10:05:38 -07'00'

vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Inspection Report

C0150025Permit Number:TECHNICAL

Tuesday, October 30, 2012

10/30/2012 3:00:00 PM

Inspection Type:Inspection Date:

End Date/Time:Last Inspection:

10/30/2012 11:30:00 AMStart Date/Time:

Sunny, Clear 70F

Inspector:

Weather:

April Abate,

Accepted by:

3281InspectionID Report Number:

2352 NORTH 7TH STREET, UNIT B, GRAND JUNCTION CO 81501BEAR CANYON MINE

CASTLE VALLEY MINING LLCCASTLE VALLEY MINING LLC

EMERY

Site:

County:

Permitee:Operator:

Address:

Underground

Surface

Loadout

Processing

Reprocessing

10,991.8340.46

Current Acreages

Total PermittedTotal Disturbed

Phase IPhase IIPhase III

Wednesday, October 31, 2012

The purpose was to reconn some of the hydrologic monitoring stations feeding the Fish Creek area where mining is currently taking place.

Report summary and status for pending enforcement actions, permit conditions, Division Orders, and amendments:

Date

60

Inspector's Signature:

Note: This inspection report does not constitute an affidavit of compliance with the regulatory program of the Division of Oil, Gas and Mining.

April Abate,

Federal

State

County

Fee

Other

Mineral Ownership Types of Operations

ACTIVE PERMANENT COAL PROGRAMPermit Type:

Permit Status:

Inspector ID Number:

April AbateDigitally signed by April Abate DN: cn=April Abate, o=Division of Oil, Gas, & Mining, ou=Coal Regulatory Program, [email protected], c=US Date: 2012.11.05 10:05:38 -07'00'

Page 2: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Page 2 of 3

Inspection Continuation SheetC0150025Permit Number:TECHNICALTuesday, October 30, 2012

Inspection Type:Inspection Date:

REVIEW OF PERMIT, PERFORMANCE STANDARDS PERMIT CONDITION REQUIREMENTS

1. Substantiate the elements on this inspection by checking the appropriate performance standard. a. For COMPLETE inspections provide narrative justification for any elements not fully inspected unless element is not appropriate to the site, in which case check Not Applicable. b. For PARTIAL inspections check only the elements evaluated.2. Document any noncompliance situation by reference the NOV issued at the appropriate performance standard listed below.3. Reference any narratives written in conjunction with this inspection at the appropriate performace standard listed below.4. Provide a brief status report for all pending enforcement actions, permit conditions, Divison Orders, and amendments.

CommentEvaluated Not Applicable Enforcement

1. Permits, Change, Transfer, Renewal, Sale

2. Signs and Markers

3. Topsoil

4.a Hydrologic Balance: Diversions

4.b Hydrologic Balance: Sediment Ponds and Impoundments

4.c Hydrologic Balance: Other Sediment Control Measures

4.d Hydrologic Balance: Water Monitoring

4.e Hydrologic Balance: Effluent Limitations

5. Explosives

6. Disposal of Excess Spoil, Fills, Benches

7. Coal Mine Waste, Refuse Piles, Impoundments

8. Noncoal Waste

9. Protection of Fish, Wildlife and Related Environmental Issues

10. Slides and Other Damage

11. Contemporaneous Reclamation

12. Backfilling And Grading

13. Revegetation

14. Subsidence Control

15. Cessation of Operations

16.a Roads: Construction, Maintenance, Surfacing

16.b Roads: Drainage Controls

17. Other Transportation Facilities

18. Support Facilities, Utility Installations

19. AVS Check

20. Air Quality Permit

21. Bonding and Insurance

22. Other

Page 3: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Page 3 of 3

Inspection Continuation SheetC0150025Permit Number:TECHNICALTuesday, October 30, 2012

Inspection Type:Inspection Date:

Located CK-1 stream monitoring location near the Mohrland portal discharge location. Collected GPS and elevation data, and photo of location. Located FC-6 water monitoring location. Collected GPS and elevation data, and photo of location. This was no defined channel at this sampling location. According to the MRP, water is only observed during storm events or during spring run off. Located FC-4 and collected GPS and elevation data, and photo. FC-4 is a spring-fed stream location that flows perennially from downstream of the spring. Castle Valley is currently conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring SBC-21 is due for weekly monitoring starting in November 2012. The mine has commited to weekly monitoring of several spring and stream sites while mining in the Wildhorse Ridge area. However, no commitment to establish the frequency of the deliverable email to the Division was established in the plan. The Division suggested the Permittee amend their MRP to note that the weekly data collection information will be submitted to the Division on a monthly basis. The most logical place to add this commitment is page 7-60A of the MRP where the company commits to emailing the weekly reports to the Division. A single-page revision indicating that the reports will be submitted monthly will suffice. Several unmapped springs near FC-4 were also observed. None of these springs appeared to be developed. Jaren indicated that Norwest had performed a spring and seep survey of the area. This area has been fairly extensively inventoried for springs and seeps by the Division, the Forest Service and consultants in the past. Castle Valley is planning on collecting at least one year's worth of data prior to reassessing the weekly monitoring protocol in place. The Division would like the opportunity to continue to look at the other Fish Creek and spring locations in the Wild Horse area, as the weather permits.

4.d Hydrologic Balance: Water Monitoring

Noticed a coal stockpile at the base of the Mohland road where the paved road becomes a dirt road. This stockpile was on the property of CoOp. One front-end loader was noted near the stockpile, but otherwise, no other activity was noted. This stockpile was at the base of Ben Johnson Canyon, just outside the Hiawatha Mine permit area (C/007/0011). According to discussions with inspection staff at DOGM, this is a loadout operated by Genwal, not under DOGM permit because ino crushing or screening was performed.

7. Coal Mine Waste, Refuse Piles, Impoundments

Discussed the unpaid fine N10096 that Bear Canyon has outstanding with the Division. Jaren indicated that he would look into it with his accounting department. As a result, a check was cut today 10/31/2012 and was mailed to the Division.

22. Other

Page 4: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�1.��Water�Monitoring�location�CK�1.�

Page 5: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�2.��Water�Monitoring�location�FC�6.�

Page 6: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�3.�FC�6�looking�south���no�defined�channel.��Water�reportedly�flows�in�response�to�spring�runoff�and�storm�events.�

Page 7: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�4.��Water�Monitoring�Location�FC�4.�

Page 8: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�5.��FC�4�is�a�spring�fed�perennial�stream�location.��During�the�October�2012�visit,�the�spring�was�flowing�at�10�gal/minute.�

Page 9: vwinspectionReport2 - Utah · 2012-11-05 · conducting weekly monitoring at the following locations: FC-3, FC-4, FC-6, FC-7, FC-8 now that they are mining beneath the area. Spring

Figure�6.��Coal�stockpile�at�the�base�of�Ben�Johnson�Canyon�along�the�Mohrland�Road.�