Vortex Downhole Tools Case Study Texas A&M Lab Testing Coal Bed Well Downhole VX Removes More Water from Wellbore with Same Gas Rate 130’ vertical flow loop. The downhole VX was able to enhance the ability of the flow regime to lift water up the tubing by up to 12.5%. The downhole VX also reduced the pressure drop due to friction by up to 15%. Texas A&M Field Testing Downhole VX Removes Water from Wellbore 1,200’ wellbore. The downhole VX was able to lift the water with only 56% of the gas-volume/critical- velocity up the 2 3/8 tubing... Accepted industry liquid lifting theory shows that for a wellhead pressure of 20 psig (34.7 psia), and 2 3/8 tubing, the Turner equation gives a minimum lift velocity of 49 ft/sec which corresponds to a flow rate of 0.201 MMSCFD which is equal to 0.162 lb/sec mass rate. During Texas A&M testing, 10 gallons of water was injected and .09 lb/sec was the minimum mass flow rate with which the well would unload. This mass flow rate corresponds to approximately 0.11 MMSCFD and a minimum lift velocity of 26.72 ft/sec.

Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

  • Upload
    vudieu

  • View
    227

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

Vortex Downhole Tools Case Study

Texas A&M Lab Testing – Coal Bed Well – Downhole VX Removes More Water from

Wellbore with Same Gas Rate – 130’ vertical flow loop. The downhole VX was able to

enhance the ability of the flow regime to lift water up the tubing by up to 12.5%. The downhole

VX also reduced the pressure drop due to friction by up to 15%.

Texas A&M Field Testing – Downhole VX Removes Water from Wellbore – 1,200’

wellbore. The downhole VX was able to lift the water with only 56% of the gas-volume/critical-

velocity up the 2 3/8 tubing...

Accepted industry liquid lifting theory shows that for a wellhead pressure of 20 psig (34.7 psia),

and 2 3/8 tubing, the Turner equation gives a minimum lift velocity of 49 ft/sec which

corresponds to a flow rate of 0.201 MMSCFD which is equal to 0.162 lb/sec mass rate.

During Texas A&M testing, 10 gallons of water was injected and .09 lb/sec was the minimum

mass flow rate with which the well would unload. This mass flow rate corresponds to

approximately 0.11 MMSCFD and a minimum lift velocity of 26.72 ft/sec.

Page 2: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

Field installations overview:

The downhole VX tools have been successfully applied in a wide range of

installations ranging from shallow high permeable coal-bed wells to deep tight gas

wells. Wells ranging from high water rates to very low water rates. Vertical wells

and also wells with horizontal laterals. Please let us know your production

characteristics by completing a ‘Downhole Input Form’ so that we can determine if

a Downhole VX tool is right for you. This form can be found on our website at

www.vortexflowllc.com under the Forms section.

Page 3: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Moderate Depth New Well and Stacked Tools”…Uinta Basin – Downhole DXR and mid-

hole DXR lowers bottom-hole pressure and flattens decline curve on a well that is flowing

steadily – 7,000’ producing well. This installation shows how the DXR tools can benefit even a

newly completed and steadily flowing well. This well has been producing gas at well above the

critical gas rate. This DXR tool installation was done to see if a DX tool could enhance tubing

throughput and well production even in a well without a liquid loading problem by lowering the

flowing bottom-hole pressure and flattening the decline curve. After installation of the first DXR

tool, the well decline curve was significantly flattened. After installation of a second mid-hole

DXR, the oil production improved from 3 BOD to 6 BOD…indicating a further reduction of the

flowing bottom-hole pressure. The results illustrate how one DXR tool can enhance a well’s

production from day one of its life and how a second tool can further enhance well performance!

Uinta Basin - New Well

1

100

10,000

7/29

/200

4

8/5/

2004

8/12

/200

4

8/19

/200

4

8/26

/200

4

9/2/

2004

9/9/

2004

9/16

/200

4

9/23

/200

4

9/30

/200

4

10/7

/200

4

10/1

4/20

04

10/2

1/20

04

10/2

8/20

04

Tubing psig Casing psig Oil BOPD Gas MCFPD Water BWPD

Vortex tool

installed

8/19/04

Installed plunger,

problems running

with paraffin

First production

following fracture

stimulation

Full Open on

Choke 8/9/04 Pre - Vortex

Decline Curve

Pre- Vortex

Decline

Curve(s)

Mid Hole DXR

tool installed

10/14/04

Page 4: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Moderate Depth, High Perm, Moderate Water and Low Pressure”…Australia – Coal

Well – Downhole DX Reduces Multi-Phase Friction, Lowers Flowing Bottom Hole Pressure

on a Well that is flowing steadily – Increases Rate significantly – 3,000’ producing well. This

installation shows how the DX tools can benefit even a steadily flowing well. This well has been

producing gas at well above the critical gas rate. This DX tool installation was done to see if a

DX tool could enhance tubing throughput and well production even in a well without a liquid

loading problem. Based on nodal analysis, the flowing bottom-hole pressure for this well was

reduced 40 PSI. The results illustrate how a DX tool can enhance a well’s production from day

one of its life!

FV 25

0

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

1,300

1,400

7/8/

2004

7/15

/2004

7/22

/2004

7/29

/2004

8/5/

2004

8/12

/2004

8/19

/2004

8/26

/2004

9/2/

2004

9/9/

2004

9/16

/2004

9/23

/2004

9/30

/2004

10/7/2

004

10/14/2

004

10/21/2

004

10/28/2

004

MC

FD

an

d B

WD

Gas Production Water Production CP TP

Vortex DX

Installation

Date 8/18/04

Page 5: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Moderate Depth, High Perm, Moderate Water and Low Pressure”…Price, UT – Coal

Well – Downhole DX Reduces Multi-Phase Friction, Lowers Flowing Bottom Hole Pressure

on a Well that is flowing steadily – Increases Rate 10% – 3,000’ producing well. This

installation shows how the DX tools can benefit even a steadily flowing well. This well has been

producing gas at well above the critical gas rate. This DX tool installation was done to see if a

DX tool could enhance well production even in a well without a liquid loading problem. Based

on nodal analysis, the flowing bottom-hole pressure for this well was reduced by 13 PSI. The

results illustrate how a DX tool can enhance a well’s production from day one of its life!

Page 6: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Deep, Tight, Low Water and High Pressure”…Green River Basin – WY – Frontier

Formation – Downhole DX Provides Stable Production on Newly Completed Well – Shows

No Signs of Liquid Holdup in Wellbore – 11,000’ producing well. Through 38 weeks, the well

is producing without any signs of liquid loading as it bucks 350 – 400 PSIG at surface. Based on

nodal analysis, this well is producing steadily with only 70% of the calculated critical gas rate.

Champlin

11,100' SW Wyoming

1

10

100

1,000

10,000

11

-Ma

y-0

3

25

-Ma

y-0

3

8-J

un

-03

22

-Ju

n-0

3

6-J

ul-0

3

20

-Ju

l-03

3-A

ug

-03

17

-Au

g-0

3

31

-Au

g-0

3

14

-Se

p-0

3

28

-Se

p-0

3

12

-Oct-0

3

26

-Oct-0

3

9-N

ov-0

3

23

-No

v-0

3

7-D

ec-0

3

21

-De

c-0

3

4-J

an

-04

18

-Ja

n-0

4

1-F

eb

-04

15

-Fe

b-0

4

29

-Fe

b-0

4

14

-Ma

r-04

28

-Ma

r-04

MC

F/D

ay

FT

P/F

CP

0

4

8

12

16

20

24

Ho

urs

on

/BO

PD

/BW

PD

Mcf/d Ftp Fcp Bopd Bwpd Hrs ON

680 MCFD is Estimated Rate

for Onset of Liquid Loading -

8/5/03Now down to 426 MCFD

…only 62% of the

calculated critical rate

Page 7: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Deep, Tight, Low Water and High Pressure”…Ft. Worth Basin – TX – Barnett Shale Well

– Downhole DXI Removes Water from Wellbore – Stabilizes Production – 8,000’ deep

producing well. Prior to the installation of the downhole DXI, the well would operate with

casing pressure in excess of 1,000 PSI. This well would then load up severely once per week.

Since installation of the DXI tool, the casing pressure is consistent and averages only 575 PSI –

indicating no liquid loading. The flowing bottom-hole pressure has been reduced by

approximately 400 PSI. This well is able to consistently produce without loading with only 75%

of the calculated critical gas rate necessary to continually lift liquid.

G S

1

10

100

1,000

10,000

6/1/

03

6/16

/03

7/1/

03

7/16

/03

7/31

/03

8/15

/03

8/30

/03

9/14

/03

9/29

/03

10/1

4/03

10/2

9/03

11/1

3/03

11/2

8/03

12/1

3/03

12/2

8/03

Mcfd

/ B

bls

/ p

sig

/ M

Mcf

SICP MCFD Cum Gas Water FTP Ave Daily Rate per Mo

12/10/04 Vortex DX Installed

Page 8: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Deep, Tight, Low Water and High Pressure”…Ft. Worth Basin – TX – Barnett Shale Well –

Downhole DXI Removes Water from Wellbore – Stabilizes Production – 8,000’ deep producing

well. Prior to the installation of the downhole DXI, the well would operate with casing pressure in

excess of 1,000 PSI and had recently shown classic signs of liquid loading – erratic gas production,

reduced water production and increased casing pressure. Since installation of the DXI tool gas

production has been stabilized and the decline rate flattened. Water production has also been more

consistent – indicating less liquid loading. Upon installation of a second DXR tool that was set in

middle of the tubing, the decline rate further flattened and became more stable.

DS

0

100

200

300

400

500

600

700

800

900

1,000

10/1

/200

3

10/8

/200

3

10/1

5/200

3

10/2

2/200

3

10/2

9/200

3

11/5

/200

3

11/1

2/200

3

11/1

9/200

3

11/2

6/200

3

12/3

/200

3

12/1

0/200

3

12/1

7/200

3

12/2

4/200

3

12/3

1/200

3

1/7/

2004

1/14

/200

4

1/21

/200

4

1/28

/200

4

2/4/

2004

2/11

/200

4

2/18

/200

4

2/25

/200

4

3/3/

2004

3/10

/200

4

3/17

/200

4

3/24

/200

4

3/31

/200

4

Mcfd

/ B

bls

/ p

sig

/ M

Mcf

-

10

20

30

40

50

60

70

80

90

100

SICP MCFD Cum Gas Cond. FTP Water

Vortex DXI

Installed

12/14/03

2/11/04 Mid

Hjole Insert

Tool Installed

Onset of Liquid

loading causing

significant

production

problems

Liquid

Loading

has been

mitigated!

Page 9: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Shallow, High Perm, Low Water and Low Pressure”…Powder River Basin – WY – Coal Bed

Well – Downhole DX Removes Water from Wellbore – 750’ producing well. Within five weeks (the

first time the fluid level was taken), the water level had been reduced from 16’ above the bottom of the

tubing to 0’. This well has been able to continue to lift water from the wellbore through the 2 3/8 tubing

with only 65 – 70 MCFD.

Page 10: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed
Page 11: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Moderate Depth, High Perm, Low Water and Low Pressure”…San Juan Basin – CO –

Coal Bed Well – Downhole DX Removes Water from Wellbore – Increases Production –

2,827’ deep producing well. Prior to the 5/03 installation of the downhole DX, the well had

approx 302’ of fluid at the bottom of the wellbore (see pressure survey below) or about 129 PSI

of extra pressure on the reservoir. This well was producing gas up the backside and utilized an

eductor to bring 250 MCFD up the tubing. The tubing was being used for fluid control. The

well typically produced 1,200 MCFD. After installation the well has been producing up to 2,400

MCFD. The fluid level is now only 0’ and the gradient of the fluid column indicates that it is

now mostly vapor and less water. The new production level was maintained for an extended

period of time after the DX tool installation.

JB G

1

10

100

1,000

10,000

01-Feb-03 03-Mar-03 02-Apr-03 03-May-03 02-Jun-03 03-Jul-03 02-Aug-03 01-Sep-03 02-Oct-03

MC

F/d

Line Press Rate Installed

Page 12: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

JB G - Pressure Survey - 04/03

-2,850

-2,800

-2,750

-2,700

-2,650

-2,600

-2,550

-2,500

-2,450

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7

Gradient, PSI/FT

De

pth

, F

T

JB G - Pressure Survey - 08/03

-2,850

-2,800

-2,750

-2,700

-2,650

-2,600

-2,550

-2,500

-2,450

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7

Gradient, psi/ft

Dep

th,

ft

Page 13: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Moderate Depth, High Perm, Low Water and Low Pressure”…San Juan Basin – CO –

Coal Bed Well – Downhole DX Removes Water from Wellbore – Increases Production –

3,014’ deep producing well. Prior to the installation of the downhole DX, the well had approx

100’ of fluid at the bottom of the wellbore. This water placed an additional 43 psi on the

reservoir. This well was producing gas up the backside and utilized an eductor to bring 170

MCFD up the tubing. The tubing was being used for fluid control. The well typically produced

1,700 MCFD. After installation the well has been producing more consistently and at an

estimated 150 MCFD above the prior decline curve.

RF

0

300

600

900

1,200

1,500

1,800

2,100

2,400

2,700

3,000

31-Jan-03 02-Mar-03 01-Apr-03 02-May-03 01-Jun-03 02-Jul-03 01-Aug-03 31-Aug-03 01-Oct-03

MC

F/d

0

20

40

60

80

100

120

140

160

180

200

psi

gRate Installed Line Press 3-inch Eductor

Page 14: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Shallow Depth, High Perm, High Water and Low Pressure”…Powder River Basin – WY

– Coal Bed Well – Downhole DX Replaces PCP Pump and Increases Gas and Water

Production – 568’ deep installation. Total depth of the well is 623’. Prior to the installation of

the downhole DX, the well produced 180 MCFD and 60 BWD. 14 weeks after installation, this

well continues to flow effectively without using any additional LOE (electricity, maintenance

and repair) costs.

PCP Pump used prior to downhole DX.

Page 15: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

5-23-56-76 CO

0

30

60

90

120

150

180

210

240

270

300

3/27 4/

34/

104/

295/

135/

205/

27 6/3

6/10

6/17

6/24 7/

17/

117/

187/

25 8/1

8/8

8/16

8/23

8/30 9/

69/

229/

2910

/7

10/15

10/23

10/30

11/6

11/18

Mcfp

d o

r B

wp

d

0

10

20

30

40

50

60

70

80

90

100

Eff

ecti

ve F

OP

(ft

) o

r S

urf

. P

ressu

re (

psia

)

Gas Rate Water Produced Surface Flowing Pressure (Psia)

VX Downhole Tool

Installed 5/28/03PCP pump for w ater due to gas lock

problems w /ESP, gas f low up annulus

Page 16: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

Intermitted Well Flow Case Study

“Deep, Tight, Low Water and Moderate Pressure”…Piceance Basin – Tight Gas Well –

Downhole DXR enhances the effectiveness of an automated intermitter, Lowers Flowing

Bottom Hole Pressure and increases rate 150 MCFD – 8,000’ producing well. This

installation shows how the DXR tools can benefit even a well that is producing at a rate below

the minimum rate to continually flow 24/7 with a DXR tool in place. In this case, the DXR

enhanced a well that was produced with an automated intermitter. The automated intermitter

starts the ‘on’ cycle given a casing/tubing differential and then shuts-in upon the gas rate

reaching a predetermined minimum gas rate of about 275 MCFD. In this manner a well is able

to maximize its production time.

Based on the chart shown below, the bottom-hole pressure for this well was reduced by 200-250

PSI to a stable 500 PSI. Gas rate appears to have been improved by 150 MCFD.

The red line represents the casing pressure, the purple line the tubing pressure, the green line the

instantaneous gas rates (measured 3x per hour) and the blue line represents daily gas production.

Page 17: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Deep, Tight, Low Water and High Pressure”…Green River Basin – WY – Downhole DXI

Removes Water from Wellbore – Stabilizes Production – 12,000’ deep producing well. Prior to the

installation of the downhole DXR, the well was operating on a timer and was produced in three cycles

per day and ‘on’ for about 18 hrs per day. A DXR tool was installed and the cycles were kept the same.

Production has been increased by 10 -15% from the pre DXR trend line. This production would likely

improve to a greater degree with an automated intermitter in place (as is discussed in the Piceance Basin

well). Additionally, as this well is significantly greater than 7,500’ deep, a second tool stacked mid-hole

would also likely improve the results seen to date.

Falcon

0

100

200

300

400

500

600

700

800

900

1,000

01/01/0

4

01/08/0

4

01/15/0

4

01/22/0

4

01/29/0

4

02/05/0

4

02/12/0

4

02/19/0

4

02/26/0

4

03/04/0

4

03/11/0

4

03/18/0

4

03/25/0

4

04/01/0

4

04/08/0

4

04/15/0

4

04/22/0

4

04/29/0

4

05/06/0

4

05/13/0

4

05/20/0

4

05/27/0

4

06/03/0

4

06/10/0

4

06/17/0

4

06/24/0

4

07/01/0

4

07/08/0

4

07/15/0

4

07/22/0

4

07/29/0

4

08/05/0

4

0

5

10

15

20

25

30

35

40

45

50

MCFD Condensate Water

7/11/04 DXR

Installation

Page 18: Vortex Downhole Tools Case Study - vortextools.comvortextools.com/VtxTechnicalReports/Downhole_Vortex_Tools_Case...Vortex Downhole Tools Case Study Texas A&M Lab Testing – Coal Bed

“Deep, Tight, Low Water and High Pressure”…Ft. Worth Basin – TX – Barnett Shale Well –

Downhole DXI Removes Water from Wellbore – Stabilizes Production – 8,000’ deep producing

well. Prior to the installation of the downhole DXI, the well was operating on a timer and was produced

for about 12 hrs per day. A DXI tool was installed and the well was taken off of the timer. However,

the gas production was less than 40% of the critical gas rate and the well was not able to flow effectively

24/7. But, when the well was put back on the same timer schedule with the DXI tool in place,

production came up above the pre-installation decline trend nicely. Production now appears to be 20%

above the trend line.

M T

1

10

100

1,000

10/1

/200

3

10/8

/200

3

10/1

5/200

3

10/2

2/200

3

10/2

9/200

3

11/5

/200

3

11/1

2/200

3

11/1

9/200

3

11/2

6/200

3

12/3

/200

3

12/1

0/200

3

12/1

7/200

3

12/2

4/200

3

12/3

1/200

3

1/7/

2004

1/14

/200

4

1/21

/200

4

1/28

/200

4

2/4/

2004

2/11

/200

4

2/18

/200

4

2/25

/200

4

Mc

fd / B

bls

/ p

sig

/ M

Mc

f

SICP MCFD Cum Gas Water Cond. FTP

DXI Tool Installed 12/15/03

Well produced on

intermitted time again

Production 20

MCFD …20%

above decline

trend.