9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion at VMT Scope of Work Participants Schedules and timelines Field activities Focus Areas for final report Planned activities Questions and answers 9/20/2012 Board Meeting PWSRCAC

VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

1

VMT Corrosion SurveyStatus Report

TOEM CommitteePWSRCAC Staff

Tom Kuckertz, Linda Swiss, and Anna Carey

Corrosion at VMT

• Scope of Work• Participants• Schedules and timelines• Field activities• Focus Areas for final report• Planned activities• Questions and answers

9/20/2012 Board Meeting PWSRCAC

Page 2: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

2

Scope of Work

• Extent to which corrosion issues are successfully addressed at VMT

• Cathodic protection at VMT• Procedures and abatement efforts at VMT• Adequacy of inspection schedules • Use of appropriate standards and best

practices• Permitted extants of corrosion

9/20/2012 Board Meeting PWSRCAC

Scope was refined into achieving a set of the following objectives

• Evaluate corrosion control at Valdez Marine Terminal– Only for systems that can cause oil pollution

• Emphasis on procedures• Review condition of

– Corrosion control efforts– Tanks, piping, berths and related equipment

• Recommend changes, if any, that should be considered

9/20/2012 Board Meeting PWSRCAC

Page 3: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

3

Project Participants

• Dr. Rust Inc.• PWSRCAC Staff• Alyeska Staff

9/20/2012 Board Meeting PWSRCAC

Dr. Rust Inc

• Bob Heidersbach– Direct contractor to PWSRCAC– Pipes and corrosion inhibitors

• Kash Prakash– Tanks– Coatings– Berth facilities

• Bob Guise– Cathodic protection

9/20/2012 Board Meeting PWSRCAC

Page 4: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

4

Dr. Rust, Inc. In ActionBob Guise, Bob Heidersbach & Kash Prakash

9/20/2012 Board Meeting PWSRCAC

Bob Heidersbach aka Dr. Rust

9/20/2012 Board Meeting PWSRCAC

Page 5: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

5

PWSRCAC Staff

• Tom Kuckertz • Linda Swiss• Anna Carey• Donna Schantz• Mark Swanson

9/20/2012 Board Meeting PWSRCAC

Alyeska Staff

• Barry Roberts• Steve Lacatena• Clay Forsyth• Doug Fleming• Tawna Beer-Burns, Coffman• Cecilia Sanchez, Baker Hughes

9/20/2012 Board Meeting PWSRCAC

Page 6: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

6

Why is corrosion a bigger concern with age

• As oilfields age, corrosivity increases• Inspection and corrosion control efforts need

to be increased in aging fields/terminals• Decreased production often leads to

decreased funding for maintenance and inspection at the same time that the need for these efforts increases.

• Alyeska reports that maintenance and inspection funding has increased.

9/20/2012 Board Meeting PWSRCAC

Scheduling and Timeline• Pre-visit Activities – Prior to July 31, 2012

– Requests for and analysis of documentation• Anchorage Activities – July 31-August 3, 2012

– Documents review -- Alyeska’s Anchorage office• Valdez Field Work – August 6 – 9, 2012

– Monday – Admin, safety, security, document requests, facilities access requests

– Tuesday – Look at Berth 4, tanks, CP, piping, fire foam systems– Wednesday – Look at Berth 5 and other VMT locations, – Thursday – Exit briefing

• Draft report – September 2012• Final Report – Revise and review – October thru December 2012• Final report – Proposed for acceptance -- January 2013

9/20/2012 Board Meeting PWSRCAC

Page 7: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

7

• Covered by Alyeska MP-166.3.21, VMT Facility Underwater Inspections

Berths Structural Integrity

9/20/2012 Board Meeting PWSRCAC

Cathodic ProtectionBerth Platform Legs--OK

9/20/2012 Board Meeting PWSRCAC

Page 8: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

8

• Fire suppression foam

• AFFF + H2O known to be corrosive

• No longer a corrosionconcern

• “Spiders” in tanks have experienced some corrosion

– Now part of Alyeska T-500 tank inspection protocol (2012 paragraph additions)

AFFF— Aqueous Film Forming Foam

9/20/2012 Board Meeting PWSRCAC

Corrosion Under Insulation (CUI) is of Widespread Industrial Concern

Alyeska reported CUI on eight 20-inch pipes over water on Berths 4 and 5 during week prior to fieldwork in Valdez. Worst case has 70%wall loss.

9/20/2012 Board Meeting PWSRCAC

Page 9: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

9

A test grid is used to measure and quantify wall loss

Note how corrosion appears to be confined to uncoated welds, a standard practice in the oil industry when the welds were made

9/20/2012 Board Meeting PWSRCAC

Repairs to Berth 4 and 5 piping effected by addition of sleeves and/or recoating

Worst case, shown here, required specially fabricated sleeves. Most of the other affected pipes merely required cleanup and recoating

9/20/2012 Board Meeting PWSRCAC

Page 10: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

10

Many instances of insulation damage that could allow water to accumulate under it were encountered.

9/20/2012 Board Meeting PWSRCAC

Water under insulation in coupon pull site

9/20/2012 Board Meeting PWSRCAC

Page 11: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

11

Some places subject to routine inspection had uncorrected water intrusion?

9/20/2012 Board Meeting PWSRCAC

A Coupon-Pull Access Box Full of Water

9/20/2012 Board Meeting PWSRCAC

Page 12: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

12

A cathodic protection voltage reading is taken during fieldwork

9/20/2012 Board Meeting PWSRCAC

Cathodic Protection Test Point

9/20/2012 Board Meeting PWSRCAC

Page 13: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

13

Tank 13 floor is recoated as part of a recent API 653 Inspection

9/20/2012 Board Meeting PWSRCAC

Focus Areas for Final ReportFinal Report Still Being Developed

• Corrosion under insulation• Inspectability of piping• Corrosion monitoring• Protective coatings• Cathodic protection• Water intrusion and corrosion reporting

9/20/2012 Board Meeting PWSRCAC

Page 14: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

14

Activities Timeline

• Interim report prepared• Internal review of interim report – Sept• Draft final report from contractor – Oct• Alyeska and PWSRCAC review of final

report – Oct/Nov• Internal and Committee review of draft

final report – Oct/Nov• Final report from contractor – Dec• Board acceptance – Jan, 2013

9/20/2012 Board Meeting PWSRCAC

Questions & Answers?

9/20/2012 Board Meeting PWSRCAC

Page 15: VMT Corrosion Survey Status Report...2012/09/20  · 9/15/2012 1 VMT Corrosion Survey Status Report TOEM Committee PWSRCAC Staff Tom Kuckertz, Linda Swiss, and Anna Carey Corrosion

9/15/2012

15

End of Presentation

9/20/2012 Board Meeting PWSRCAC