86
VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Embed Size (px)

Citation preview

Page 1: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

VISUAL & THEORETICALPRESENTATION

OFTHE MAKING &

TECHNOLOGY OF LOW COST LATRINES

{ BAMBOO LEACH PIT TYPE }

Page 2: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

INTRODUCTION :The old practice of defecating in the open on road side,

bank of rivers, canals, tanks etc. is unhygienic in the extreme. This is the cause of more than 50 diseases like diarrhoea, dysentery, cholera, typhoid, hepatitis, more

infection etc.

There are now several options open to users to improvesanitation and dispose of human excreta, bearing in

mind the socio-economic and financial constraints of people in

rural areas. These have been developed using low cost

technology and locally available material and resources.

Page 3: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Not only will these innovative approaches cut down the morbidity rate but it will put the waste matter to

productive use e.g. making compost manure and gas domestic purpose.

The low cost waterseal latrines provide a solution in dry latrines and sewage system.

Sewage and Septic Tank, generally regarded as the ideal solution for disposal of human excreta. However the sewage system involves a huge investment and is both expensive and time consuming. It also consumes more water which developing countries cannot afford. It further depends on factors like electricity, machine

and trained labour, which are difficult to access in rural areas.

Contd.

Page 4: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Contd.

Septic tank is another alternative, but is again beyond the reach of people, for it is very expensive. Moreover, it has additional problems like, periodic cleaning and disposal of liquid sludge which in turn

breeds mosquitoes, creating health hazards.

The double pit latrine [ low cost water sealed latrines ] is

an economical, long lasting and an appropriate technology

for safe disposal of human excreta until a time when provision of a sewage system can be offered to the

user. Construction of this type of latrines involves a

technology which can easily be taught to masons. After

a short training period these masons would be well equipped to construct this latrine on their own.

Page 5: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

The low cost sanitation programme has been given considerable importance by the Government , Voluntary Agencies and International Agencies

because of its immense potential in improving the existing unsanitary conditions. The low cost water sealed latrines is the most frequently used type of

model in low cost sanitation schemes.

Contd.

Page 6: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

AFPRO Task Force launched a program to develop innovative Low Cost technology for

improvement for rural sanitation. An initiative to promote Low Cost Appropriate Technology for

promotion of Sanitary Latrines very needed and wanted by women in rural and tribal villages of the North Eastern States, has been undertaken

by ATF in collaboration with EED Partners.

LOW COST SANITARY LATRINES FOR RURAL AREAS.

Page 7: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

The aim of the program entitled “Health & Sanitation” is to make available simple Low Cost

Technologies to promote sanitary latrines in which rural women are involved. Use of Alternate

construction material, bamboo strips together and folded in a circular fashion and plastering small quantity of cement on both the inner and outer

surfaces of the structure are then lowered into the pits. This technology further reduces the cost of

the unit. Women of the house hold can be involved in knitting the structure.

Contd.

Page 8: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Contd.

The double leach pit latrines with leach pits made of bamboo knitted structure instead of conventional bricks

is an economical, long lasting and appropriate technology

for safe disposal of human excreta. Construction of this

type of latrines involves a technology which can easily be

taught to masons. After a short on the job training these

masons could be well equipped to construct these latrines on

their own. The involvement of Voluntary Agencies in

motivating and promoting the acceptance of this innovation was

very essential. As a strategy for the promotion of low cost

technology ATFG with the help of PIO’s undertook construction of demonstration latrines near community

Halls, Schools, Churches and Vocational Training Centres in

six districts of Manipur, one each in the states of Arunachal Pradesh, Nagaland , Mizoram and Tripura.

Page 9: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

AFPRO Task Force till date conducted on the job training courses for masons involved in

dissemination of technology on the techniques for construction and demonstration of low cost sanitation. It is for the first time that such

demonstration cum trainings on low cost sanitation for promotion of water sealed latrines with leach

pits made of bamboo knitted structure was conducted in the remotest rural areas of North Eastern States of Arunachal Pradesh, Manipur, Nagaland , Mizoram and Tripura. During these

demonstration cum trainings 29 nos. of low cost water sealed Units were constructed and 54 nos

local masons [ Meteis, Kukis, Nagas and Bengalis ] were imparted the techniques of Low Cost Bamboo Leach Pit type latrines. 400 nos Low Cost Latrines have been constructed by 16 Voluntary Agencies.

Contd.

Page 10: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

The double leach pit latrines with leach pits made The double leach pit latrines with leach pits made of bamboo knitted structure instead of conventional of bamboo knitted structure instead of conventional bricks is an economical, long lasting and appropriate bricks is an economical, long lasting and appropriate

technology for safe disposal of human excreta. technology for safe disposal of human excreta. Construction of this type of latrines involves a Construction of this type of latrines involves a

technology which can easily be taught to masons. technology which can easily be taught to masons. After a short on the job training these masons could After a short on the job training these masons could be well equipped to construct these latrines on their be well equipped to construct these latrines on their

own. own.

STEP BY STEP PROCEDURE FOR CONSTRUCTION

OF LOW COST LATRINES

[ BAMBOO LEACH PIT TYPE ]

CONSTRUCTION OF SEPTIC TANK

Page 11: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PLAN OF LOW COST LATRINE – BAMBOO LEACH PIT TYPE

100 cms

PIT DIA120 cms

8.75 cms 11.25

cms9”

50 cm 50 cm

135 cms

100 cms

PVC PipesPIT DIA120 cms

10 cms

7.5 cms

Page 12: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

STEP 1 : Selection of Site

Select the site for the construction of Low Cost Latrine -Select the site for the construction of Low Cost Latrine -Bamboo Leach Pit types based on the following criteria :Bamboo Leach Pit types based on the following criteria :

Site should not be selected in low lying areas ( area where runoff water collects during rainy season ).

Low lying areas for construction of leach pits to Low lying areas for construction of leach pits to be avoided as the decomposition process would get be avoided as the decomposition process would get disturbed and possibility of collapsing the pit.disturbed and possibility of collapsing the pit.

Site should be close to the house to avoid Site should be close to the house to avoid inconvenience for users.inconvenience for users.

Page 13: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Site should be away from the Drinking water Site should be away from the Drinking water sources. Normally the distance should be 9 m to sources. Normally the distance should be 9 m to 10 m away from leach pits i.e 9 times the depth of 10 m away from leach pits i.e 9 times the depth of the leach pit.the leach pit.

Water table should not be shallow, atleast 3 times Water table should not be shallow, atleast 3 times more than the depth of the leach pit.more than the depth of the leach pit.

Measured from bed level of the pit. Site should be Measured from bed level of the pit. Site should be away from trees to prevent structured disturbances away from trees to prevent structured disturbances to the leach pit by root propagation.to the leach pit by root propagation.

Contd.

Page 14: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

STEP 1 : Selection of Site

Select the site for the construction of Low Cost Latrine – Bamboo Leach Pit types based on the following criteria :

Site should not be selected in low lying areas ( area where runoff water collects during rainy season ).

Low lying areas for construction of leach pits to be avoided as the decomposition process would get disturbed and possibility of collapsing the pit.

Site should be close to the house to avoid inconvenience for users.

Site should be away from the Drinking water sources. Normally the distance should be 9 m to 10 m away from leach pits i.e 9 times the depth of the leach pit.

Water table should not be shallow, atleast 3 times more than the depth of the leach pit.

Measured from bed level of the pit. Site should be away from trees to prevent structured disturbances to the leach pit by root propagation.

Page 15: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

LAYOUT OF SQUATING PLATFORM

Page 16: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Clear the vegetation & top loose soil at the construction site.

Step 2 : Marking of Squatting Platform.

Level the cleaned site

Mark an outer rectangle on the ground using a rope for the squatting platform where Length = 4’ 6” [ 11.25 cms ] and Breadth = 4” [ 10 cms ]

Mark an inner rectangle on the ground using a rope where Length = 3’ ½” [8.75 cms] Width = 3” [ 7.5 cms] as shown in the figure.

Page 17: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 2 : Marking of Squatting Platform.

Clear the vegetation & top loose soil at the construction site.

Level the cleaned site.

Mark an outer rectangle on the ground using a rope for the squatting platform where Length = 4’ 6” [ 11.25 cms ] and Breadth = 4” [ 10 cms ]

Mark an inner rectangle on the ground using a rope where Length = 3’ ½” [ 8.75 cms ] Width = 3” [ 7.5 cms ] as shown in the figure.

Page 18: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 3 : Marking for Junction Chamber. 3 : Marking for Junction Chamber.

Mark a rectangle on the ground using a rope for the Junction chamber where Length = 20” [ 50 cms ] and Breadth = 25” [ 62.5 cms.]

Page 19: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 4 : Marking for the Leach Pit. 4 : Marking for the Leach Pit.

Measure 54” [ 4 ft.6 inches or 135 cms ] from the centre of the back face of the squatting platform.

Measure 50 cm on either side.

Mark circles of 120 cms diameter on the ground using a rope and peg for leach pit such that the periphery of the circle touches the 50 cms mark.

Page 20: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 4 : Marking for the Leach Pit.Step 4 : Marking for the Leach Pit.

Measure 54” [ 4 ft.6 inches or 135 cms ] from the centre of the back face of the squatting platform.

Measure 50 cm on either side.

Mark circles of 120 cms diameter on the ground using a rope and peg for leach pit such that the periphery of the circle touches the 50 cms mark.

Page 21: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 5 : Excavation for Foundation of 5 : Excavation for Foundation of Squating PlatformSquating Platform

Excavate the soil on the marked area [ between the outer & inner rectangles of 6 ” width ] to a depth of 4 inches for foundation.

Page 22: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PREPARATION OF SQUATING PLATFORM

Page 23: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 6 : Compacting the Excavated Pit / Placing stones / bricks in Foundation.

Sprinkle water on the excavated pit and place stones into the excavated portion up to Ground Level for foundation base.

Use excavated soil as binding material.

Compact the stone packing by using rammer.

Page 24: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 6 : Compacting the Excavated Pit / Placing stones / bricks in Foundation.

Sprinkle water on the excavated pit and places stones into the excavated portion up to Ground Level for foundation base.

Use excavated soil as binding material.

Compact the stone packing by using rammer.

Page 25: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONSTRUCTION OF BRICK WALL FOR

SQUATTING PLATFORM IN PROGRESS

Page 26: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 7 : Erection of Walls for Squatting Platform

Place bricks for construction of squatting platform.

The walls to be raised to 15” - 18” [ 5 rows of bricks ] above the foundation base.

Use Cement Mortar of 1 : 5.

Provide an opening of 4” [ 10 cms ] towards the junction Box [ Back face ] of the squatting platform as shown in the figure.

This provision is made for the inserting the trap [ water seal ]

Page 27: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 7 : Erection of Walls for Squatting Platform

Place bricks for construction of squatting platform.

The walls to be raised to 15” - 18” [ 5 rows of bricks ] above the foundation base.

Use Cement Mortar of 1 : 5.

Provide an opening of 4” [ 10 cms ] towards the junction Box [ Back face ] of the squatting platform as shown in the figure.

This provision is made for the inserting the trap [ water seal ].

Page 28: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONSTRUCTION OF BRICK WALL FOR SQUATTING PLATFORM IN

PROGRESS

Page 29: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONSTRUCTION OF BRICK WALL FOR

SQUATTING PLATFORM IN PROGRESS

Page 30: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONSTRUCTION OF BRICK WALL FOR

SQUATTING PLATFORM IN PROGRESS

Page 31: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 8 : Placement of Pan & Trap [ Water seal ]

Measure & Mark 9” [ 22.5 cms ] from the wall of the Squatting Platform

Place the pan in the centre of the squatting platform 9” away from the wall of the squatting platform in such a way that the trap fits into the space provided [ 4” space ] and ensure that it is horizontal.

Cut & Attach a piece of pipe to the trap so that it reaches to the edge of the brick wall.

Page 32: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

With the help of spirit level ensure again of proper leveling of Pan and trap.

The pan to be supported by placing bricks under it.

Pack the empty space between the trap / pipe by packing with broken bricks / stone or by applying Cement Concrete 1 : 3 : 6.

Contd.

Page 33: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PLACEMENT OF THE PAN & TRAP [ WATERSEAL ]

Page 34: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 8 : Placement of Pan & Trap [ Water seal ]

Measure & Mark 9” [ 22.5 cms ] from the wall of the Squatting Platform

Place the pan in the centre of the squatting platform 9” away from the wall of the squatting platform in such a way that the trap fits into the space provided [ 4” space ] and ensure that it is horizontal.

Cut & Attach a piece of pipe to the trap so that it reaches to the edge of the brick wall.

With the help of spirit level ensure again of proper leveling of Pan and trap.

The pan to be supported by placing bricks under it.

Pack the empty space between the trap / pipe by packing with broken bricks / stone or by applying Cement Concrete 1 : 3 : 6.

Page 35: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

EARTH FILLING [ INNER PORTION OF THE SQUATTING

PLATFORM ]

Page 36: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 9 : Earth Filling \ Packing of Squatting Platform.

Pack the empty space between the pan and the platform wall firmly by filling the inside of the squatting platform with soil ensuring that the Pan and trap remain in position.

Sprinkle water and allow it to set overnight.

Place a layer of rubbles mixed with sand and level up to the top by compacting .

Page 37: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 9 : Earth Filling \ Packing Step 9 : Earth Filling \ Packing of Squatting Platform. of Squatting Platform.

Pack the empty space between the pan and the platform wall firmly by filling the inside of the squatting platform with soil ensuring that the Pan and trap remain in position.

Sprinkle water and allow it to set overnight.

Place a layer of rubbles mixed with sand and level up to the top by compacting .

Page 38: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

FINISHING TOUCHES TO SQUATTING PLATFORM FLOOR

Page 39: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 10 : Plastering of Squatting Platform

Prepare Plain Cement Concrete 1 : 3 : 6 and pour it over the top of the basement and compact it to a thickness of 3 inches [ 75 mm ].

Place two bricks on either side of the pan for foot rest.

Finish the floor base using cement mortar keeping the slope towards the pan from all the sides.

Page 40: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 10 : Plastering of Squatting Platform.Step 10 : Plastering of Squatting Platform.

Prepare Plain Cement Concrete 1 : 3 : 6 and pour it over the top of the basement and compact it to a thickness of 3 inches [ 75 mm ].

Place two bricks on either side of the pan for foot rest.

Finish the floor base using cement mortar keeping the slope towards the pan from all the sides.

Page 41: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONSTRUCTION OF

JUNCTION BOX [ CHAMBER ]

Junction Box chamber is constructed , surrounding the opening provided for placement of pan with trap

[ water seal ] in the squatting platform

Construction Procedure :

Step : 1 Excavation of the Foundation for Junction Chamber [ Box ]

Excavate the soil on the marked area [ Length = 25” & width = 20” ] to a depth of 2” to 3” for foundation.

Page 42: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 2 Step : 2 Compacting the Excavated Compacting the Excavated portion – placing stones / bricksportion – placing stones / bricks

in foundation.in foundation.

Sprinkle water on the excavated pit and place stones into the excavated portion up to Ground Level for foundation base.

Use excavated soil as binding material.

Compact the stone packing by using hammer.

Page 43: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 2 Compacting the Excavated

portion – placing stones / bricksin foundation.

Sprinkle water on the excavated pit and place stones into the excavated portion up to Ground Level for foundation base.

Use excavated soil as binding material.

Compact the stone packing by using hammer.

Page 44: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 3 : Connecting PVC Pipes

Two pieces of 3 ” dia PVC Pipes of equal lengths [ 5 m length] are placed and fixed from the bottom of the Junction box [ from the two edges ( corners ) ] to the Bamboo leach pits.

The pipes to be inserted into the leach pits in opening provided for pipe space.

The pipe should be atleast 6 inches inside the leach pit.

Page 45: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Contd.

The pipe should be imbedded into the ground and covered with earth.

Opening of one of the PVC pipes inside the Junction Box is closed temporarily with a wooden peg to render the leach pit non functional.

The wooden peg can be removed as and when required

Page 46: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 3 : Connecting PVC Pipes

Two pieces of 3 ” dia PVC Pipes of equal lengths [5 meters length] are placed and fixed from the bottom of the Junction box[ from the two edges (corners) ] to the Bamboo leach pits.

The pipes to be inserted into the leach pits in opening provided for pipe space.

The pipe should be atleast 6 inches inside the leach pit.

The pipe should be imbedded into the ground and covered with earth.

Opening of one of the PVC pipes inside the Junction Box is closed temporarily with a wooden peg to render the leach pit non functional.

The wooden peg can be removed as and when required .

Page 47: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 4 : Erection of walls for Junction Box [ Chamber ]

Place bricks for construction of Junction Box [ Chamber ].

The walls to be raised to 10” to 12” [ 3 rows of bricks ] above the foundation base on three sides of the Junction Chamber [ the fourth side being the common wall of squatting platform ].

Use Cement Mortar of 1 : 5.

Page 48: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 4 : Erection of walls for Junction Box [ Chamber ]

Place bricks for construction of Junction Box [ Chamber ].

The walls to be raised to 10” to 12” [3 rows of bricks] above the foundation base on three sides of the Junction Chamber [ the fourth side being the common wall of squatting platform].

Use Cement Mortar of 1 : 5.

Page 49: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 5 : Placing Cement Concrete in Foundation

Prepare Plain Cement Concrete of 1 : 3 : 6 for floor foundation [cement concrete base] and compact to a thickness of 2 inches [50 mm] to 3 inches [75 mm].

Finish the floor base using cement mortar keeping the slope towards the drain pipes.

Plaster the inner walls of the Junction Box with cement mortar.

Page 50: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 5 : Placing Cement Concrete in Foundation

Prepare Plain Cement Concrete of 1:3:6 for floor foundation [cement concrete base] and compact to a thickness of 2 inches [50 mm] to 3 inches [75 mm].

Finish the floor base using cement mortar keeping the slope towards the drain pipes.

Plaster the inner walls of the Junction Box with cement mortar.

Page 51: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step 6 :

Pre - fabricated lid is provided to cover the Junction Box. This lid is cast in Ferro cement using 6 mm dia ms rod. Mild steel rods of 20” length and 25” width are cut and assembled using binding wires to mould the shape of Junction Box cover and then plastered

with cement concrete.

Page 52: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PREPARATION OF BAMBOO STRIPS FOR KNITTING LEACH

PITS

Page 53: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PREPARATION OF BAMBOO STRUCTURE FOR KNITTING OF LEACH

PITStep : 1

Collect 14 nos. of Bamboos of approximately 35 ft length and 2 inches dia each.

Cut the Bamboos & Prepare bamboo strips for knitting of Leach Pits. ¾th inches width for Vertical Strips & ½” width for Horizontal Strips.

Mark a circle of 100 cms dia on the ground .

Page 54: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Contd.

Divide the Circle into 18 equal parts.

Erect the Vertical bamboo strips on each part.

Knit Circular Leach Pits of 1 meter dia & 1 meter depth [height] with the strips.

While knitting provisions are kept for opening \ holes, 15 to 18 nos. of 1” [25 mm] dia. to enhance the leaching effect.

Prepare two such Bamboo skeletal

Provide a 3 inches dia opening 3 inches from the top of the bamboo structure for inserting drain pipes.

Page 55: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 1

Collect 14 nos. of Bamboos of approximately 35 ft length and 2 inches dia each. Cut the Bamboos & Prepare bamboo strips for knitting of Leach Pits. ¾th inches width for Vertical Strips & ½” width for Horizontal Strips. Mark a circle of 100 cms dia on the ground . Divide the Circle into 18 equal parts. Erect the Vertical bamboo strips on each part. Knit Circular Leach Pits of 1 meter dia & 1 meter depth [height] with the strips. While knitting provisions are kept for opening \ holes, 15 to 18 nos. of 1” [25 mm] dia. to enhance the leaching effect. Prepare two such Bamboo skeletal. Provide a 3 inches dia opening 3 inches from the top of the bamboo structure for inserting drain pipes.

Page 56: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

KNITTING OF LEACH PITS WITH BAMBOO STRIPS

Page 57: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PREPARATION OF CEMENT MORTAR [ 1 : 5 ]

Page 58: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 2 Plastering of the Outer Surface of the Bamboo Leach Pit.

Prepare Cement Slurry [Cement mixed with water].

Apply one coat of Cement Slurry over the bamboo Skeletal using a Paint brush.

Prepare Cement mortar of 1 : 4 mix [ 1 Cement & 4 Sand]

Apply Cement mortar on the outer surface to a thickness of half [ ½ ] an inch.

Fine plaster the Bamboo leach pits outer surface

Page 59: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PLASTERING THE OUTER SURFACE OF THE BAMBOO KNITTED LEACH

PIT IN PROGRESS

Page 60: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

COMPLETED BAMBOO KNITTED LEACH PIT FULLY PLASTERED

[ OUTER SURFACE ]

Page 61: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 2 Plastering of the Outer Surface of the Bamboo Leach Pit.

Prepare Cement Slurry [Cement mixed with water].

Apply one coat of Cement Slurry over the bamboo Skeletal using a Paint brush.

Prepare Cement mortar of 1 : 4 mix [1 Cement & 4 Sand]

Apply Cement mortar on the outer surface to a thickness of half [ ½ ] an inch.

Fine plaster the Bamboo leach pits outer surface

Page 62: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 3 Excavation of the Pit.

Excavate the soil on the marked circular area to a depth of 1 m with a diameter of 1.20 meter [120 cms].

Page 63: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

DIGGING OF PIT

Page 64: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 4 Placing of Bamboo Leach Pits.

Lower the plastered Bamboo Leach Pits into the pits.

Check the levels & alignments of Bamboo Pit.

Connect the piece of PVC Pipes from Junction Chamber to the leach pit.

Page 65: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PLASTERED BAMBOO STRUCTURE LOWERED AND

FITTED INSIDE THE DUGGED PIT

Page 66: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 4 Placing of Bamboo Leach Pits.

Lower the plastered Bamboo Leach Pits into the pits.

Check the levels & alignments of Bamboo Pit.

Connect the piece of PVC Pipes from Junction Chamber to the leach pit.

Page 67: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CHECKING ALIGNMENT OF BAMBOO STRUCTURE

Page 68: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

LEVELLING OF STRUCTURE

Page 69: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CONNECTION OF PVC PIPE FROM THE JUNCTION CHAMBER TO THE

LEACH PIT

Page 70: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PLASTERING THE INNER SURFACE OF THE BAMBOO KNITTED LEACH

PITS

Page 71: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 5 Plastering of Inner Surface of Bamboo Leach Pit.

Apply Cement mortar of 1 : 4 mix on the inner surface to a thickness of ½”

inch.

Step : 6 Filling of Annular Space.

The Annular space between the leach pit & wall be filled \ packed by using sand or

earth.

Page 72: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CASTING OF THE LEACH PIT LID

[ COVER ]

A lid to the leach pit is provided to cover the pit. This lid is cast in Ferro cement using 6 mm dia Mild Steel Rods. Mild Steel rods are cut into specified lengths and assembled [placed] using binding wires to mould the shape of the lid, and then plastered in plain cement concrete.

The detailed procedure for casting the leach pit lid cover is given below in steps.

Page 73: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Step : 1 Fabrication of elements of

Leach Pit CoverThe following table gives the details of each elements for the Leach Pit Cover :

Vertical Element

L0

Horizontal Element

Lo

Dimensions

Dimensions Nos.

Nos. Length

Length

LOL1L2L3L4

12222

110 cms110 cms95 cms83 cms63 cms

LOL1L2L3

1222

110 cms98 cms82 cms47 cms

• Use 6 mm dia rods for preparing the elements

• Cut the mild steel rods at the requisite length as indicated to form these elements

Page 74: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PREAPARATION OF REINFORVEMENT FOR PIT COVER

Page 75: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CASTING OF PIT COVER [ BEGINNING ]

Page 76: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CASTING OF PIT COVER [ LAST STAGE ]

Page 77: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

ASSEMBLING OF ELEMENTS OF LEACH PIT COVER.

Select a plain ground for preparing the lid skeletal.

Mark a circle of 1.10m [ 110 cms ] on the ground by using a rope & peg.

Place the central rod of dimension Lo [ 110 cms ] in a Horizontal position coinciding with the centre of the circle.

Place the rods [ Elements ] L1 , L2 & L3 to the top and bottom of the Central Horizontal Elements Lo at a uniform spacing of 15 cms each elements extending to the ring.

Page 78: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Place the other Central rod of dimension L0 [ 110 cms ] in Vertical position coinciding with the centre of the circle and tie the interactions of Horizontal & Verticals rods with the binding wires.

Contd.

Place and tie the rods [ Elements ] L1 , L2 , L3 & L4 to the right & left of the central vertical elements L0 at a uniform spacing of 10 cms. Each elements extending to the ring.

Page 79: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

ASSEMBLING OF ELEMENTS OF LEACH PIT COVER.

Select a plain ground for preparing the lid skeletal.

Mark a circle of 1.10m [ 110 cms ] on the ground by using a rope & peg.

Place the central rod of dimension Lo [ 110 cms ] in a Horizontal position coinciding with the centre of the circle.

Place the rods [ Elements ] L1 , L2 & L3 to the top and bottom of the Central Horizontal Elements Lo at a uniform spacing of 15 cms each elements extending to the ring.

Place the other Central rod of dimension L0 [ 110 cms ] in Vertical position coinciding with the centre of the circle and tie the interactions of Horizontal & Verticals rods with the binding wires.

Place and tie the rods [ Elements ] L1 , L2 , L3 & L4 to the right & left of the central vertical elements L0 at a uniform spacing of 10 cms. Each elements extending to the ring.

Page 80: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CASTING OF LEACH PIT COVER

Place stone pieces of uniform sizes [ ½` ] under each intersection before application of cement concrete.

Prepare plain cement concrete 1:2:4 [1 cement : 2 sand : 4 stone aggregate of ½` to ¾` dia and pour it over the assembly & compact to a thickness of 1 ½` inches [ 37.5 mm ]

Cure the lid by sprinkling water or by covering with a wet gunny bag for7 days.

Page 81: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

Contd.

Lift and place the lid [ cover ] over the leach pit.

Provide handles to lid covers [ using 6 mm dia bars ].

Page 82: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

CASTING OF LEACH PIT COVER

Place stone pieces of uniform sizes [ ½` ] under each intersection before application of cement concrete.

Prepare plain cement concrete 1:2:4 [1 cement : 2 sand : 4 stone aggregate of ½` to ¾` dia and pour it over the assembly & compact to a thickness of 1 ½` inches [ 37.5 mm ]

Cure the lid by sprinkling water or by covering with a wet gunny bag for7 days.

Lift and place the lid [ cover ] over the leach pit.

Provide handles to lid covers [ using 6 mm dia bars ].

Page 83: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

PICTURE SHOWING SQUATTING PLATFORM, JUNCTION CHAMBER &

LEACH PITS

Page 84: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

FRONT VIEW OF LOW COST LATRINE WITH BAMBOO KNITTED

LEACH PIT STRUCTURE

Page 85: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }
Page 86: VISUAL & THEORETICAL PRESENTATION OF THE MAKING & TECHNOLOGY OF LOW COST LATRINES { BAMBOO LEACH PIT TYPE }

DEVELOPED AND

PRESENTED BY

AFPRO TASK FORCE – GUWAHATI