Appendix D Appendix D Visual Impact Assessment

Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

Appendix D

Appendix D

Visual Impact Assessment

Page 2: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

MBG Landscape Architecture Pty Ltd Landscape Architecture Urban Design

Page 3: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report i

Document Control

Rev No Date Details

A 10-02-16 Draft for review

B 29-04-16 Final Draft

C 6-05-16 Final Issue

D 30-05-16 Revised Final Issue

Page 4: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

ii M2 Macquarie Park Art Installation – Visual Impact Assessment Report

Contents Contents ........................................................................................................... ii

01 Introduction ....................................................................................... 1

02 Methodology ..................................................................................... 1

03 Site Context ..................................................................................... 1

04 Proposed Site Improvements ................................................. 3

05 Visibility of Proposal and Key Viewpoints ........................... 6

06 Visual Impact Assessment ....................................................... 9

07 Summary ....................................................................................... 12

APPENDICIES

Page 5: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1

01 Introduction

Transurban, the operator of The Hills M2 motorway, is planning to restore a degraded roadside area adjacent to the M2 motorway at Macquarie Park that was used as a construction site during an upgrade of the motorway in 2012. The site is located opposite the Herring Road intersection with the M2 and is bounded by Khartoum Road to the east, Shrimpton’s Creek to the west and Lane Cove National Park to the north.

The main aspect of the restoration involves minor modifications and revegetation with native bushland species to restore ecological integrity to this parcel of land adjoining the National Park. To achieve this Transurban has partnered with Landcare Australia to carry out the ecological restoration of the site.

In conjunction with the ecological restoration Transurban are also planning to incorporate an iconic art installation that makes a positive and memorable contribution to the motorway landscape and local community of Macquarie Park.

This report has been prepared as part of a Review of Environmental Factors (REF) for the proposed works to assess the visual impact of the public art installation and the associated site improvements.

02 Methodology

The visual impact assessment has been undertaken in accordance with the methodology described in Roads & Maritime Services (RMS) Environmental Impact Assessment Practice Note EIA-N04 – Guideline for Landscape Character and Visual Impact Assessment (Version 2-0, 2013), Section 6.

The tasks required for the assessment are broadly as outlined below:

•Ā Describe design proposal and associated works

•Ā Describe existing site conditions and context

•Ā Assess visibility of proposal and identify key viewpoints

•Ā Assess visual impacts •Ā Summarise findings and impact mitigation strategies (if required)

03 Site Context

The Macquarie Park site is an area in the order of 8ha located opposite the Herring Road off-ramp immediately to the north of the M2 motorway, between Khartoum Road to the east, Christie Road to the west and Lane Cove National Park along the northern boundary. Immediately to the south of the motorway is the Macquarie Park commercial precinct and Macquarie University campus. To the east is a medium density residential precinct serviced by Khartoum Road and Fontenoy Road.

Part of the overall site was used as a construction compound as part of the motorway upgrade in 2013. This was an area of approximately 1 hectare, adjoining the motorway that was cleared, filled and leveled to facilitate construction support activity. The margins of the compound comprise relatively steep embankments with relatively heavy weed infestation. The wider 8ha site also carries significant weed cover in the understory layers.

Page 6: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

2 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

On completion of the motorway upgrade works, the compound site appears to have been cultivated, topsoiled and seeded as part of a revegetation process. The entire site drains into the Lane Cove River that occurs a few hundred metres to the north.

Figure 1 Location Plan

Page 7: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 3

04 Proposed Site Improvements

There are two main aspects to the proposed site improvements. The first involves rehabilitation of the site to re-establish native bushland plant communities and the second is the installation of a landmark artwork.

04.1 Site Rehabilitation The site rehabilitation work will be undertaken by Landcare Australia generally seeks to achieve the following objectives:

•Ā Rehabilitate the M2 Macquarie Park Motorscapes Project site of approximately 5 ha improve native bushland condition and ecological functionality;

•Ā Reduce current off-site impacts on adjoining properties, particularly Lane Cove National Park, through weed control, revegetation, vertebrate pest management, creek riparian zone stability and improvements to site drainage;

•Ā Introduce an indigenous vegetation community comprising Hornsby Enriched Sandston Exposed Woodland and appropriate selected species of the STIF critically endangered ecological community;

•Ā Establish and protect bushland vegetation communities, inclusive of a healthy groundcover stratum as a natural stabiliser of the soil surface through an intensive maintenance programme;

•Ā Improve water quality in Shrimptons and Industrial Creeks which drain the site;

•Ā Manage known areas of soil contamination;

•Ā Undertake community engagement activities;

•Ā Complete the majority of works within 12 months; and

•Ā Deliver the works safely and cost effectively.

Further details of the site landscape and rehabilitation works will be developed in conjunction with detailed design development of the preferred artwork installation, in order to achieve a co-ordinated design outcome and spatial setting for the artwork. Further consideration will also be given to relocating two large existing motorway advisory signs on the northern edge of the eastbound carriageway.

04.2 Artwork Installation In relation to the artwork installation, Transurban are in the process of further evaluation of a preferred artwork that was selected following an ideas competition for the site. The competition was run in October and November of 2015 and sought ideas from designers and artists that showcased innovative solutions that could demonstrate ecological, social and economic sustainability and that were both meaningful and relevant to the setting and could also be readily implemented. Figure 2. shows the general site structure approach and preferred location for the artwork installation.

The general site for the artwork has been selected to maximize visibility from the motorway for eastbound and westbound motorists. The site nominated is approximately 50 metres long by 15metres wide and is set back approximately 5metres from the top of the existing drainage swale embankment running along the northern edge of the motorway.

Page 8: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

4 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

Figure 2 Site Structure Plan

Figure 3 View east from Christie Road Bridge

Notional development envelope for artwork installation Relocation of existing advisory signs to be considered

M2 Eastbound M2 Westbound Herring Road on-ramp

Westbound sightline into site Eastbound sightline into site

Indicative artwork installation site 50m x 15m (nom) Old construction compound site subject to rehabilitation

Page 9: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 5

04.3 Preferred Artwork Selection The outcome of the ideas competition was the selection of three preferred ideas, which then went through a further feasibility assessment prepared by Urban Art Projects (UAP) for Transurban that considered materials and finishes, structural feasibility, fabrication and installation issues, anticipated maintenance requirements and cost. From this process one, ‘Kinetica’ (refer Figure 4 below) was selected as the preferred option. However, for the purposes of this visual impact assessment, all three of the proposed ideas were considered. The UAP Feasibility Study incorporating details of all the three preferred ideas is included in Appendix A. Details of the three original submissions are also included in Appendix B.

Figu

re 4

Win

ning

Ent

ry –

‘Kin

etic

a’

Page 10: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

6 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

An extract from from the UAP Feasibility Study of the preferred artwork ‘Kinetica’ is provided below to further explain the artwork and provide a summary description of matters considered by the feasibility study.

‘Concept Design Intent A playful graphic narrative of the Australian flora on scale, depicting the cycle of nature. Bold in scale and colour Kinetica will have a visual presence in the landscape.

Recommended Materials and Finishes •Ā Laser cut corten steel, laser cut aluminium plate

•Ā Automotive/Powdercoat exterior grade paint finish

•Ā Mechanical fixings, motor for Waratah element.

•Ā Solar panels & LED lighting fixtures

Structure The structural delivery of the work deemed feasible. The visual aesthetic of the concept will continue to develop significantly in future phases, however because the basis for this design is a 2d graphic image, this development is expected to help preserve and improve the original visual intent rather than challenge it.

Fabrication & Installation Conceptually based around movement, the proposal of moving elements is deemed to be not appropriate based on cost and maintenance implications and visibility given the speed of most artwork viewers. Some movement can be retained, but can be reduced and simplified. Initial concept included identical elements on rear facing artwork, this is not recommended, due to lack of sight lines.

Anticipated Maintenance •Ā Annual inspection for structure and moving parts

•Ā Recommended re-paint on site after 15-year period

•Ā Recommended refurb of moving parts on 10-year cycle

•Ā Annual cleaning recommended ‘ The installation would include approximately nine individual sculptures ranging from approximately 2 metres to 10.5 metres tall and will be illuminated for night time effect and visual interest. The artwork proposal is essentially, a conceptual idea at this time and is subject to further detail design development and site planning considerations in relation to sight lines from the M2 motorway and other road safety considerations.

Figure 5 Illustrative night view of preferred artwork from eastbound carriageway (Source: UAP Feasibility Study 11-03-2016)

Page 11: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 7

The following images, (UAP Feasibility Study 11-03-2016) provide conceptual, illustrative views of the preferred sculpture in relation to the eastbound and westbound carriageways of the motorway. Note that the proposed bushland regeneration around the artwork is not illustrated.

Figure 6 Illustrative view of preferred artwork from eastbound carriageway

Figure 7 Illustrative view of preferred artwork from westbound carriageway

Page 12: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

8 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

05 Visibility of Proposal and Key Viewpoints

The visibility of the site is the extent of adjoining areas that the proposal will be visible from, this is illustrated in the Visual Envelope Map in Figure 8 below. The project site is primarily visible from the M2 motorway and partially visible from the upper floors of a number of commercial buildings and serviced apartments located to the south of the motorway and a medium density residential precinct adjoining the north eastern boundary.

In relation to the commercial properties south of the motorway, access to these properties was not possible, however it is likely that views from the upper floors (the site is not visible from street level) would be dominated in the foreground by the M2 motorway, tolling gantries, road signage, lighting and the constant traffic on the motorway with background views over Land Cove National Park and the suburb of West Pymble to the north. These facilities are reasonably well screened from the motorway by existing vegetation and, over time, it is anticipated that views of the site from these buildings will further diminish as constructed landscape buffer zones between these buildings and the motorway mature.

Figure 8 Visual Envelope Map & Key Viewpoint Locations

Page 13: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 9

The medium density residential precinct adjoining the site to the north east consists primarily of three storey apartment buildings serviced by Khartoum Road, Leisure Close, Durham Close and Carlisle Close. The artwork installation site is not visible from these properties areas due to extensive vegetation cover. However, the north eastern areas of the site, including Industrial Creek, adjoining the residential boundary will be visible from the perimeter driveway of the apartment complex accessed from Leisure Close and the apartments facing the project site. These areas will be subject to site rehabilitation works including, primarily, creek bank stabilization, weed removal and revegetation.

There are two key viewpoints that have been identified for impact assessment, both of these are from the motorway, one from the eastbound carriageway and one from the westbound carriageway. This project is somewhat different from most that undergo a visual impact assessment as the whole intention is to provide a landmark artwork installation that requires maximum visibility for the most number of viewers possible in order for a meaningful and successful outcome to be achieved.

06 Visual Impact Assessment The visual impact of the proposal is determined by evaluating the sensitivity to change of the view and the magnitude of the proposal in that view.

Magnitude is the expression of change in a view created by the interaction between the proposal and the existing environment. Assessment issues include:

-Ā changes to landform; -Ā changes to vegetation patterns; -Ā the nature, density and scale of existing attributes and proposed works.

Visual sensitivity depends on a range of user group characteristics and the author’s knowledge or public perception of the quality of particular land uses and landscape settings. Characteristics considered in this assessment include:

-Ā the perceived cultural value of the visual environment and elements within it; -Ā user groups (residents, workers, motorists); -Ā frequency (the number of viewers or the frequency of views for an individual); -Ā duration of views, and -Ā the distance of the proposed works from viewers.

The visual impact is calculated using the landscape character and visual impact grading matrix provided in RMS Practice Note EIA–N04 (refer Figure 9 below).

VIEWPOINT 1

Figure 9 EIA-N04 Landscape character and visual impact grading matrix.

Page 14: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

10 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

Viewpoint 01: View from westbound carriageway

Viewpoint 01 depicts the motorist view on the westbound carriageway approaching the Herring Road exit to Talavera Road. Two images are indicated, image 01a, which is approximately 300 metres from the site, and image 01 b, which is about 150 metres from the site. The viewpoints are consistent with a typical motorway landscape of continual traffic movement, noise walls, motorway signage and various landscapes each side of the motorway.

Viewpoint Magnitude Sensitivity Impact

O1 Low The magnitude of the landscape rehabilitation works in these views will be minor given the extensive vegetation cover in the views. The rehabilitations works proposed beyond the extent of the old compound site will not be visible. Similarly the magnitude of the artwork envelope is generally consistent with typical motorway landscapes that include various roadside structures, signage and road furniture

Low High volume and with short duration views are experienced by motorway users. There is low sensitivity to change, as the background views of vegetation will remain constant.

Low

Figure 10 Viewpoint 01a - westbound

Figure 11 Viewpoint 01b - westbound

Approximate artwork installation envelope

Approximate artwork installation envelope

Page 15: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 11

Viewpoint 02: View from eastbound carriageway

Viewpoint 02 depicts the motorist view on the eastbound carriageway entering from the Christie Road on-ramp to the motorway. Two images are indicated, image 02a, which is approximately 325 metres from the site, and image 02 b, which is approximately 250 metres from the site. The viewpoints are consistent with a typical motorway landscape of continual traffic movement, noise walls motorway signage and various landscapes each side of the motorway.

Viewpoint Magnitude Sensitivity Impact

O2 Low As for viewpoint 01, the magnitude of the landscape rehabilitation works in these views will be minor given the extensive vegetation cover in the views. As Similarly the magnitude of the artwork envelope is generally consistent with typical motorway landscapes that include various roadside structures, signage and road furniture

Low High volume and with short duration views are experienced by motorway users. There is low sensitivity to change, as the background views of vegetation will remain constant.

Low

Figure 12 Viewpoint 02a – eastbound

Figure 13 Viewpoint 02b – eastbound

Approximate artwork installation envelope

Approximate artwork installation envelope

Page 16: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

12 M2 Macquarie Park Art Installation – Visual Impact Assessment Report

Minor visual impacts

Other visual impacts associated with the project are primarily related to the construction phase of the project, and directly related to site disturbance, providing construction access from the motorway and weed removal throughout the site. The site will be fenced off from the motorway and therefore the construction activity on the old construction compound site will be largely screened from view. The majority of work being undertaken here is related to site revegetation, all of which will provide a significant visual improvement over the existing prevailing site conditions.

At the north eastern corner of the site, the rehabilitation works will involve removal of exotic weeds, creek bank stabilisation works, mulching and planting of indigenous species as part of the revegetation process. Existing native trees and understorey plants will be retained and protected. The majority of exotic vegetation removal occurs in the ground storey layer. The removal alone of the extensive weed cover and installation of a mulch layer will provide a significant visual improvement, which will be further improved by planting of indigenous species throughout the rehabilitation areas.

Overall visual impact

The proposed works to the M2 Macquarie Park site are considered to be generally consistent with the overall M2 Motorway landscape.

The proposed landscape and bushland regeneration works will significantly improve the visual amenity of the site through simply restoring vegetation cover that once existed and so, there is no negative visual impact, only a positive one.

In terms of the artwork installation, there will be an impact to existing views from the motorway, however the scale and magnitude of the selected preferred artwork, as well as the two other preferred artworks is considered to be consistent with the scale and frequency of various roadside infrastructure elements and structures. As with the site restoration works, it is considered that there will be no appreciable negative impacts, only a positive one.

Viewpoint Magnitude Sensitivity Impact

O1 Low

Low

Low

O2 Low

Low

Low

Overall Impact Low

Page 17: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report 13

07 Summary

The site regeneration and artwork installation will only bring positive outcomes for the overall motorway landscape and wider community.

An important consideration for on-going design development of the selected artwork, is further assessment of the location on site in relation to sightlines into the site and setbacks from the motorway along with resolution of the overall scale and detailing of the installation and the selection of plant species and surface finishes around the final installation. It will need to be of a scale that will enable it become a memorable landmark along the motorway. There is a risk that the artwork, if not of a suitable scale, could become lost within the landscape and the scale of the motorway and the various motorway infrastructure elements that exist within the road corridor.

It is recommended that additional design studies been developed to test the visibility and presence of the final selected artwork, through a series of photomontages and models, to ensure that the right balance is achieved to enable the installation to be appreciated in a meaningful way and without any road safety impacts. This should also consider relocation of the two existing roadside advisory signs, which in their current location will impede views of the artwork.

Page 18: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report

APPENDICIES

APPENDIX A –

UAP Feasibility Study

Page 19: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,
Page 20: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

TRAN

SURB

ANFE

ASIB

ILIT

Y ST

UDY

UAP

REF

EREN

CE: C

4174

B11

MAR

CH 2

016

M2 FE

ASIBI

LITY S

TUDY

Page 21: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

of 2

4

CO

NC

EPT

DES

IGN

INTE

NT

An ic

onic

repr

esen

tatio

n of

nat

ive

Aust

ralia

n gu

m le

aves

, pod

and

bl

osso

ms

evok

e a

sens

e of

nat

ural

bea

uty

and

won

der w

ith m

etal

lic s

oft

refle

ctio

ns b

y da

y an

d w

arm

ligh

ting

elem

ents

of t

he s

tam

en a

t nig

ht.

REC

OM

MEN

DED

MAT

ERIA

LS A

ND

FIN

ISH

ES

Ro

lled

stai

nles

s st

eel r

od &

CH

S, p

olis

hed

Pa

nelli

sed

polis

hed

stai

nles

s st

eel

Sp

ring

stee

l rod

STR

UCT

UR

ETh

e st

ruct

ural

del

iver

y of

the

wor

k is

con

side

red

to h

ave

a m

ediu

m le

vel

of ri

sk, h

owev

er it

is e

xpec

ted

this

risk

can

be

min

imis

ed th

roug

h de

sign

ad

just

men

ts w

hich

do

not h

ave

a gr

eat i

mpa

ct o

n th

e vi

sual

inte

nt.

FAB

RIC

ATIO

N &

INST

ALLA

TIO

NFa

bric

atio

n an

ticip

ated

to ra

nge

betw

een

mid

- hi

gh le

vel c

ompl

exity

. It

is a

lso

note

d th

at th

e ar

tist h

as b

een

high

ly c

olla

bora

tive

and

prov

ided

ad

ditio

nal w

orks

to a

ssis

t with

the

proj

ect’s

dev

elop

men

t, ou

tsid

e of

his

in

itial

sco

pe.

ANTI

CIP

ATED

MAI

NTE

NAN

CE

An

nual

cle

anin

g re

com

men

ded

EXEC

UTI

VE

SUM

MA

RY

CO

NC

EPT

DES

IGN

INTE

NT

A pl

ayfu

l gra

phic

nar

rativ

e of

the

Aust

ralia

n fa

una

on s

cale

, dep

ictin

g th

e cy

cle

of n

atur

e. B

old

in s

cale

and

col

our K

inet

ica

will

hav

e a

visu

al

pres

ence

in th

e la

ndsc

ape.

REC

OM

MEN

DED

MAT

ERIA

LS A

ND

FIN

ISH

ES

La

ser c

ut c

orte

n st

eel,

lase

r cut

alu

min

ium

pla

te

STR

UCT

UR

ETh

e st

ruct

ural

del

iver

y of

the

wor

k de

emed

feas

ible

. The

vis

ual a

esth

etic

how

ever

bec

ause

the

basi

s fo

r thi

s de

sign

is a

2d

grap

hic

imag

e, th

is

deve

lopm

ent i

s ex

pect

ed to

hel

p pr

eser

ve a

nd im

prov

e th

e or

igin

al v

isua

l in

tent

rath

er th

an c

halle

nge

it.

FAB

RIC

ATIO

N &

INST

ALLA

TIO

N

Conc

eptu

ally

bas

ed a

roun

d m

ovem

ent,

the

prop

osal

of m

ovin

g el

emen

ts

is d

eem

ed to

be

not a

ppro

pria

te b

ased

on

cost

and

mai

nten

ance

im

plic

atio

ns a

nd v

isib

ility

giv

en th

e sp

eed

of m

ost a

rtw

ork

view

ers.

Som

e

conc

ept i

nclu

ded

iden

tical

ele

men

ts o

n re

ar fa

cing

art

wor

k, th

is is

not

re

com

men

ded,

due

to la

ck o

f sig

ht li

nes.

ANTI

CIP

ATED

MAI

NTE

NAN

CE

An

nual

insp

ectio

n fo

r str

uctu

re a

nd m

ovin

g pa

rts

Re

com

men

ded

re-p

aint

on

site

aft

er 1

5 ye

ar p

erio

d

Re

com

men

ded

refu

rb o

f mov

ing

part

s on

10

year

cyc

le

An

nual

cle

anin

g re

com

men

ded

CO

NC

EPT

DES

IGN

INTE

NT

mem

bers

will

pro

vide

a la

rge

scal

e ar

twor

k th

at re

spon

ds to

a

tran

sitio

ning

per

spec

tive.

REC

OM

MEN

DED

MAT

ERIA

LS A

ND

FIN

ISH

ES

LE

D st

rip li

ghtin

g

STR

UCT

UR

ETh

e st

ruct

ural

del

iver

y of

the

wor

k ha

s a

high

leve

l ris

k. T

here

is

aest

hetic

det

rimen

tally

due

to th

e co

ncep

t’s re

lianc

e on

sim

plic

ity a

nd

eleg

ance

. The

eng

inee

ring

risk

coul

d al

so h

ave

cost

impl

icat

ions

, ext

ra

FAB

RIC

ATIO

N &

INST

ALLA

TIO

N

Rolle

d st

eel w

ith in

terlo

ckin

g co

ncea

led

bolte

d co

nnec

tions

.

ANTI

CIP

ATED

MAI

NTE

NAN

CE

Re

com

men

ded

re-p

aint

on-

site

aft

er 1

5 ye

ar p

erio

d

An

nual

cle

anin

g re

com

men

ded

INTE

RLE

AVES

KIN

ETIC

ASO

LAR

WEA

VE

Page 22: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 4

of 2

4

CO

NC

EPT

DES

IGN

AR

TIST

PRO

POSE

D M

ATER

IALS

3

x le

af fo

rms

- com

bina

tion

of s

tain

less

ste

el c

hs &

rod

Po

d - c

ombi

natio

n of

sta

inle

ss s

teel

chs

& ro

d

Fl

ower

Ste

m -

com

bina

tion

of s

tain

less

ste

el c

hs &

rod

Fl

ower

Cup

- co

mbi

natio

n of

sta

inle

ss s

teel

chs

& ro

d

Fl

ower

Sep

als

- com

bina

tion

of s

tain

less

ste

el c

hs &

rod

Fl

ower

Sta

men

Fila

men

ts -

com

bina

tion

of s

tain

less

ste

el c

hs &

rod

LED

light

ing

& so

lar p

anel

s

SUIT

ABIL

ITY

OF

MAT

ERIA

LSTh

e m

ajor

ity o

f the

wor

k is

pro

pose

d fo

r fab

ricat

ion

in s

tain

less

ste

el,

the

mat

eria

l is

suita

ble

for a

wor

k w

ith lo

ng li

fesp

an w

ith m

inim

al

mai

nten

ance

. Sta

inle

ss s

teel

neg

ates

the

need

for a

n ad

ditio

nal c

oatin

g w

hich

may

be

a po

sitiv

e fro

m a

n en

viro

nmen

tal p

ersp

ectiv

e, o

nly

limite

d

DES

IGN

DEV

ELO

PM

ENT

UAP

REC

OM

MEN

DED

MAT

ERIA

LS

Pod

- pan

ellis

ed s

tain

less

ste

el fo

rmed

to s

hape

, red

ucin

g m

ater

ial

Fl

ower

ste

m -

pane

llise

d st

ainl

ess

stee

l for

med

to s

hape

, red

ucin

g

Se

pals

- pa

nelli

sed

stai

nles

s st

eel f

orm

ed to

sha

pe, r

educ

ing

mat

eria

l

Fl

ower

sta

men

- pa

inte

d sp

ring

stee

l rod

LE

D lig

htin

g - c

usto

m fa

bric

ated

sol

ar li

ghts

, to

avoi

d w

iring

bei

ng

MAT

ERIA

LS A

ND

FIN

ISH

ES

INTE

RLE

AVES

CO

NC

EPT

DES

IGN

AR

TIST

PRO

POSE

D M

ATER

IALS

La

ser c

ut a

lum

iniu

m

Re

cycl

ed ti

mbe

r

Re

cycl

ed w

indm

ill c

ompo

nent

s

LE

D lig

htin

g &

sola

r pan

els

SUIT

ABIL

ITY

OF

MAT

ERIA

LS

not a

dvis

ed o

n th

is s

cale

due

to li

mita

tions

of p

roce

ss &

com

pone

nt s

ize.

Re

cycl

ed w

indm

ill c

ompo

nent

s no

t rec

omm

ende

d du

e to

risk

to li

fesp

an

a cl

addi

ng m

ater

ial,

risk

is re

late

d to

ava

ilabi

lity

and

sour

cing

lim

itatio

ns.

and

light

wei

ght t

o al

low

pos

sibl

e ki

netic

mov

emen

t - h

eavi

er m

ater

ials

m

ay li

mit

the

pote

ntia

l of m

ovem

ent u

nles

s a

pow

er s

ourc

e is

als

o in

corp

orat

ed. S

truc

tura

l ste

el w

ill n

eed

to b

e in

corp

orat

ed.

DES

IGN

DEV

ELO

PM

ENT

UAP

REC

OM

MEN

DED

MAT

ERIA

LS

Ro

lled

stee

l/alu

min

ium

she

et to

form

cur

ves

of w

arra

tah

leaf

pet

als

La

ser c

ut c

orte

n st

eel f

or 2

x b

anks

ia fo

rms

N

ew b

earin

gs &

hub

s fo

r lon

gevi

ty a

nd m

aint

enan

ce

Re

duct

ion

of k

inet

ic e

lem

ents

to k

ey it

ems

only

, to

pres

erve

inte

nt a

nd

limit

mai

nten

ance

KIN

ETIC

A

CO

NC

EPT

DES

IGN

AR

TIST

PRO

POSE

D M

ATER

IALS

Ro

lled

mild

ste

el 2

00 d

iam

eter

chs

Fl

exib

le L

ED s

trip

ligh

t & s

olar

pan

els

SUIT

ABIL

ITY

OF

MAT

ERIA

LS

appr

opria

te b

end

with

out d

efec

ts. L

ED IP

ratin

g is

sui

tabl

e, IP

ratin

g 65

-66

wou

ld a

lso

be s

uita

ble,

pot

entia

lly a

t im

prov

ed p

rice

poin

t. M

ater

ials

are

ap

prop

riate

how

ever

sec

tion

size

is u

nder

-est

imat

ed.

DES

IGN

DEV

ELO

PM

ENT

UAP

REC

OM

MEN

DED

MAT

ERIA

LS

Se

lect

ed m

ater

ials

sui

tabl

e fo

r ins

talla

tion

Ro

lled

mild

ste

el tu

be, a

ppro

x 35

6mm

dia

met

er c

hs w

ith lo

ng li

fe p

aint

SOLA

R W

EAV

E

Page 23: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 5

of 2

4

STR

UCT

UR

AL O

VER

VIE

W, A

S P

ER C

ON

CEP

T D

ESIG

NTh

e st

ruct

ural

del

iver

y of

the

wor

k is

con

side

red

to h

ave

a m

ediu

m le

vel

of ri

sk, h

owev

er it

is e

xpec

ted

this

risk

can

be

min

imis

ed th

roug

h de

sign

ad

just

men

ts w

hich

do

not h

ave

a gr

eat i

mpa

ct o

n th

e vi

sual

inte

nt.

The

desi

gn o

f the

con

cept

allo

ws

for a

larg

e de

gree

of c

ross

-bra

cing

th

roug

h its

det

ail a

nd m

ater

ialit

y. It

is e

xpec

ted

that

adj

ustm

ents

wou

ld

Tube

siz

es m

ay n

eed

to b

e in

crea

sed

and

furt

her e

mbe

ddin

g at

gro

und

may

be

idea

l. Th

e po

sitio

ning

/for

m o

f the

leav

es w

ill n

eed

to a

djus

t to

touc

h th

e gr

ound

at m

ore

than

two

poin

ts.

Thes

e ad

just

men

ts a

re c

onsi

dere

d lo

w ri

sk o

f det

ract

ing

from

the

conc

ept i

nten

t, an

d it

is e

xpec

ted

the

visu

al im

pact

/gen

eral

aes

thet

ic w

ill

be a

chie

vabl

e.

MAT

ERIA

L TO

NN

AGE

ARTW

OR

K L

OAD

EST

IMAT

E

ENG

INEE

RIN

G P

REL

IMIN

AR

IES

INTE

RLE

AVES

STR

UCT

UR

AL O

VER

VIE

W, A

S P

ER C

ON

CEP

T D

ESIG

N

The

stru

ctur

al d

eliv

ery

of th

e w

ork

deem

ed fe

asib

le. T

he w

ork

is la

rge

scal

e an

d al

l com

pone

nts

depe

nd o

n a

cent

ral v

ertic

al s

truc

tura

l mem

ber.

adju

stm

ent a

s th

e de

sign

is d

evel

oped

furt

her.

All e

lem

ents

will

hav

e a

the

initi

al d

esig

n. P

lace

men

t of m

otor

is re

com

men

ded

at g

roun

d le

vel.

in fu

ture

pha

ses,

how

ever

bec

ause

the

basi

s fo

r thi

s de

sign

is a

gra

phic

im

age,

this

dev

elop

men

t is

expe

cted

to h

elp

pres

erve

the

orig

inal

vis

ual

inte

nt ra

ther

than

cha

lleng

e it.

MAT

ERIA

L TO

NN

AGE

ARTW

OR

K L

OAD

EST

IMAT

E

KIN

ETIC

A

STR

UCT

UR

AL O

VER

VIE

W, A

S P

ER C

ON

CEP

T D

ESIG

N

The

stru

ctur

al d

eliv

ery

of th

e w

ork

has

a hi

gh le

vel r

isk.

stab

ilise

the

arch

es w

ith la

rge

in g

roun

d fo

otin

gs. T

he in

terc

onne

ctin

g

the

conc

ept i

nten

t, flu

idity

of m

ovem

ent o

f the

form

and

its

play

on

pers

pect

ive

will

be

reta

ined

.

The

wor

k ha

s a

high

radi

us o

f gyr

atio

n, a

nd th

e m

embe

r siz

e of

200

mm

is

opt

imis

tic g

iven

the

span

of 5

1m. P

relim

inar

y st

udie

s su

gges

t thi

s m

embe

r siz

e is

like

to b

e cl

oser

to 3

56m

m.

The

long

sle

nder

item

is v

ulne

rabl

e to

win

d in

duce

d vi

brat

ion.

It is

a ri

sk

chan

ge th

e vi

sual

aes

thet

ic d

etrim

enta

lly d

ue to

the

natu

re o

f the

des

ign

the

conc

ept’s

sim

plic

ity a

nd e

lega

nce.

MAT

ERIA

L TO

NN

AGE

ARTW

OR

K L

OAD

EST

IMAT

E

SOLA

R W

EAV

E

Page 24: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

3D V

ISUA

LISA

TIO

NPL

AN &

ELE

VATI

ON

MAT

ERIA

LS &

MAI

NTE

NAN

CE

INTE

RLEA

VES

Page 25: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 7

of 2

4

CO

NC

EPT

DES

IGN

INTE

NT

The

icon

ic g

um n

ut is

a h

ighl

y ch

arge

d sy

mbo

l of t

he A

ustr

alia

n Bu

sh

rem

indi

ng u

s of

the

rege

nera

tive

forc

es o

f nat

ure

and

our s

hare

d cu

stod

ians

hip

of th

e la

nd. E

voca

tive

of th

e su

rrou

ndin

g hi

lls a

nd ri

ver

natu

re. U

sing

sof

t met

allic

refle

ctio

ns b

y da

y an

d w

arm

ligh

ting

elem

ents

at

nig

ht, t

he a

rtw

ork

seam

less

ly in

tegr

ates

into

the

site

.

CO

NC

EPT

APP

RO

ACH

The

prop

osed

con

cept

Inte

rleav

es h

as a

rela

tivel

y hi

gh le

vel o

f fab

ricat

ion

com

plex

ity a

nd m

ediu

m v

olum

e of

mat

eria

l. U

AP w

ere

prov

ided

with

an

addi

tiona

l com

pone

nt b

y Ar

tist M

atth

ew H

ardi

ng, “

Pod”

, for

con

side

ratio

n an

d po

tent

ial i

ncor

pora

tion

into

the

desi

gn. T

he c

onst

ruct

ion

met

hod

for

all e

lem

ents

con

sist

s of

3 o

r 4 c

hs la

yers

.

a

rolle

d ou

ter e

dge

chs

m

id ra

nge

chs

late

ral m

embe

rs fo

rmed

thro

ugh

jigs

and

wel

ded

sm

alle

r dia

met

er ro

d fo

rmed

thro

ugh

jigs

/ rol

led

and

wel

ded

Prop

osed

flow

er e

lem

ents

con

sist

of a

n ar

ray

of s

olar

pan

els

inte

grat

ed

into

the

form

, whi

ch p

lay

on th

e id

ea o

f pho

tosy

nthe

sis.

Lig

htin

g pl

ays

an

inte

gral

role

as

Inte

rleav

es b

loom

s at

nig

ht. I

nitia

l con

cept

pro

pose

d th

at

Inte

grat

ed la

ndsc

apin

g to

com

plim

ent t

he a

rtw

ork

into

the

site

is o

f hig

h im

port

ance

to th

e ar

tist.

The

spin

e de

sign

of t

he le

aves

cou

ld c

aptu

re

wat

er ru

noff

and

feed

into

sur

roun

ding

rock

sw

ales

pro

vidi

ng a

hav

en fo

r na

tive

faun

a.

PR

OP

OSE

D D

EVEL

OP

MEN

T

UAP

reco

mm

end

redu

cing

the

com

plex

ity in

fabr

icat

ion

met

hodo

logy

an

d re

duci

ng th

e ov

eral

l vol

ume

of m

ater

ial.

In tu

rn a

cos

t sav

ing

in

fabr

icat

ion

time

and

mat

eria

l.

This

is to

be

achi

eved

by

repl

acin

g th

e flo

wer

ste

m /

cup

and

sepa

ls fr

om

rods

and

tube

s to

pan

ellis

ed p

olis

hed

stai

nles

s st

eel.

The

body

of t

he p

od

wou

ld b

e fa

bric

ated

als

o of

pan

ellis

ed p

olis

hed

stai

nles

s st

eel w

ith th

e fro

nt fa

ce m

aint

aini

ng th

e or

igin

al ro

ds a

nd tu

bula

r fab

ricat

ion

proc

ess.

M

atth

ew H

ardi

ng a

nd B

en S

torc

h ag

reed

with

this

app

roac

h.

with

sol

ar c

ells

sim

ilar t

o ga

rden

var

iety

ligh

ts. T

his

inte

grat

ion

of li

ghtin

g al

low

s fo

r eas

e of

mai

nten

ance

and

lack

of w

iring

.

incr

ease

sta

bilit

y an

d cr

ossb

raci

ng.

Addi

tiona

l LED

ligh

ting

inco

rpor

ated

into

the

oute

r edg

e of

the

flow

er a

t

CON

CEPT

SU

MM

ARY

INTE

RLE

AVES

Page 26: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 8

of 2

4

INTE

RLE

AVES

Page 27: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 9

of 2

4

INTE

RLE

AVES

Page 28: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

0 of

24

INTE

RLE

AVES

Page 29: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

1 of

24

INTE

RLE

AVES

Page 30: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

2 of

24

ELEV

ATIO

NS,

PLA

N &

GEN

ERAL

DIM

ENSI

ON

SIN

TER

LEAV

ES

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

7,300

4,400

PLA

N V

IEW

FRO

NT

ELEV

ATIO

NSI

DE

ELEV

ATIO

N

Page 31: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

3 of

24

APPR

OXIM

ATE

SITE

LO

CATI

ON

INTE

RLE

AVES

25,000

20,600

PLA

N V

IEW

N

NO

TE :D

IMEN

SIO

NS

TO R

OAD

SID

E K

ERB

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

Page 32: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

4 of

24

MAT

ERIA

LS &

AN

TICI

PATE

D M

AIN

TEN

AN

CE

1. S

TAIN

LESS

STE

EL C

HS

Lo

w m

aint

enan

ce

Cl

eani

ng &

pol

ishi

ng re

com

men

ded

on a

n as

nee

ds

basi

s, a

nnua

lly a

s a

min

imum

2. P

AIN

TED

SP

RIN

G S

TEEL

RO

D

Low

mai

nten

ance

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

, an

nual

ly a

s a

min

imum

re

-pai

nt a

fter

15

year

s. C

olou

r fad

e w

ill o

ccur

due

be w

arra

ntab

le a

nd th

e re

d w

ill s

till b

e hi

gh im

pact

vi

sual

ly

3. S

OLA

R P

ANEL

INTE

GR

ATIO

N

prod

uct h

owev

er ty

pica

l life

span

of a

ppro

xim

atel

y 25

ye

ars

4. L

IGH

TIN

G

LED

in g

roun

d lig

htin

g, IP

65 o

r hig

her r

atin

g re

com

men

ded

LE

D lig

htin

g w

ithin

flow

er b

ase

to s

truc

ture

to li

ght

stam

en a

t nig

ht

in

tent

for t

hese

uni

ts to

be

cust

om m

anuf

actu

red

for e

ase

of m

aint

enan

ce a

nd re

plac

emen

t, ho

wev

er

will

als

o ha

ve ty

pica

l lon

g lif

espa

n of

LED

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

An

nual

insp

ectio

n re

com

men

ded

Page 33: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

KINE

TICA

3D V

ISUA

LISA

TIO

NPL

AN &

ELE

VATI

ON

MAT

ERIA

LS &

MAI

NTE

NAN

CE

Page 34: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

7 of

24

CO

NC

EPT

DES

IGN

INTE

NT

natu

ral e

lem

ents

of w

ind

and

sun,

the

artw

ork

is a

dyn

amic

, col

ourf

ul

and

kine

tic p

rom

otio

n of

rene

wab

le e

nerg

y, re

juve

natio

n an

d gr

owth

. Its

bol

d pr

esen

ce w

ill v

isua

lly lo

cate

the

wor

k w

ithin

the

site

, whi

lst a

lso

refe

renc

ing

its n

atur

al s

urro

undi

ngs.

CO

NC

EPT

APP

RO

ACH

The

conc

ept o

f Kin

etic

a w

as p

rese

nted

as

a 2

dim

ensi

onal

gra

phic

re

pres

enta

tion

of A

ustr

alia

n flo

ra w

ith a

n va

riety

of l

aser

cut

pai

nted

or

ano

dise

d al

umin

ium

form

s. P

ropo

sed

elem

ents

cou

ld in

corp

orat

e re

cycl

ed w

indm

ill c

ompo

nent

s an

d re

cycl

ed ti

mbe

rs.

El

emen

ts p

ropo

sed

to b

e id

entic

al b

oth

on th

e fro

nt a

nd re

ar fa

ces.

Ba

nksi

a - p

ropo

sed

to h

ave

eyes

with

the

larg

er fo

rms

to b

e bl

ink

slow

ly fo

ur ti

mes

dai

ly.

m

otio

n.

ro

tate

mec

hani

cally

in a

slo

w c

ontr

olle

d m

otio

n.

PR

OP

OSE

D D

EVEL

OP

MEN

TU

AP re

com

men

d:

a re

duce

d nu

mbe

r of e

lem

ents

for b

udge

tary

pur

pose

s, a

s th

e co

ncep

t de

velo

ps fu

rthe

r the

re m

ay b

e op

port

unity

to in

crea

se e

lem

ents

fo

rms

to h

ave

grea

ter w

idth

to p

rovi

de s

tabi

lity

and

stru

ctur

e fo

r fo

otin

gs

fo

rms

are

to b

e m

anuf

actu

red

from

lase

r cut

mild

ste

el, r

olle

d an

d

el

emen

ts a

re n

ot d

uplic

ated

on

the

rear

sid

e as

they

are

not

see

n fro

m

a ke

y vi

ew

Ba

nksi

a el

emen

ts to

be

stat

ic. C

ompl

exity

in m

echa

nics

of b

linki

ng

eyes

, the

abi

lity

to re

cogn

ise

by p

assi

ng c

omm

uter

s, m

aint

enan

ce

to

be

rolle

d an

d m

echa

nica

lly d

riven

in o

ppos

ing

dire

ctio

ns in

a s

low

co

ntro

lled

mot

ion.

CON

CEPT

SU

MM

ARY

KIN

ETIC

A

Page 35: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

8 of

24

KIN

ETIC

A

Page 36: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 1

9 of

24

KIN

ETIC

A

Page 37: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

0 of

24

KIN

ETIC

A

Page 38: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

1 of

24

KIN

ETIC

A

Page 39: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

2 of

24

ELEV

ATIO

NS,

PLA

N &

GEN

ERAL

DIM

ENSI

ON

SK

INET

ICA

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

41,0

00

2,240

PLA

N V

IEW

FRO

NT

ELEV

ATIO

NSI

DE

ELEV

ATIO

N

6,25

0

7,200

3,600

915

10,500

4,300

Page 40: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

3 of

24

APPR

OXIM

ATE

SITE

LO

CATI

ON

KIN

ETIC

A

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

41,0

00

19,500

24,500

PLA

N V

IEW

N

NO

TE :D

IMEN

SIO

NS

TO R

OAD

SID

E K

ERB

Page 41: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

4 of

24

1. P

AIN

TED

MIL

D S

TEEL

Lo

w m

aint

enan

ce

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

, an

nual

ly a

s a

min

imum

re

-pai

nt a

fter

15

year

s. C

olou

r fad

e w

ill o

ccur

due

to

war

rant

able

and

the

colo

urs

will

stil

l be

high

impa

ct

and

high

con

tras

t vis

ually

2. C

ORT

EN S

TEEL

- B

ANK

SIA

BAC

KIN

G P

ANEL

Low

mai

nten

ance

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

, an

nual

ly a

s a

min

imum

3. M

OTO

R A

ND

MO

VIN

G C

OM

PO

NEN

TRY

To

be

insp

ecte

d an

nual

ly a

s a

min

imum

Re

com

men

datio

n fo

r war

rata

h el

emen

t to

be c

hain

dr

iven

with

mot

or b

ased

at g

roun

d le

vel f

or e

ase

of

acce

ss

ap

prox

imat

ely

a 10

yea

r cyc

le

4. L

IGH

TIN

G

LED

in g

roun

d up

light

ing

allo

wed

, IP6

5 or

hig

her

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

An

nual

insp

ectio

n re

com

men

ded

MAT

ERIA

LS A

ND

MAI

NTE

NAN

CEK

INET

ICA

Page 42: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

SOLA

R WE

AVE

3D V

ISUA

LISA

TIO

NPL

AN &

ELE

VATI

ON

MAT

ERIA

LS &

MAI

NTE

NAN

CE

Page 43: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

7 of

36

CO

NC

EPT

DES

IGN

INTE

NT

Rem

inis

cent

of a

sun

flar

e, th

e ar

twor

k is

fuel

led

by th

e su

ns li

ght

and

resp

onsi

ve e

nviro

nmen

t tha

t we

inha

bit.

Furt

her,

it ca

ptur

es th

e su

rrou

ndin

g so

lar e

nerg

y an

d co

nver

ts it

into

wov

en s

trip

s of

ligh

t for

a

dyna

mic

nig

ht ti

me

pres

ence

. Its

del

icat

e w

oven

nat

ure

allo

ws

a m

ultip

le

of p

ersp

ectiv

e vi

ews

that

cha

nge

as o

ne tr

ansi

tions

abo

ut th

e w

ork.

CO

NC

EPT

APP

RO

ACH

An e

xpan

sive

inst

alla

tion

prop

osed

as

an o

vera

ll le

ngth

of n

ear 1

25 x

11

.5m

hig

h of

ferin

g co

mm

uter

s a

chan

ging

per

spec

tive

upon

app

roac

h an

d fro

m e

ither

dire

ctio

n.

Desi

gned

to b

e an

icon

ic e

xam

ple

of re

new

able

ene

rgy

art i

n pr

actic

e.

pres

ence

in th

e ni

ght t

ime

envi

ronm

ent.

Pow

ered

by

Tesl

a Po

wer

wal

l bat

tery

sto

rage

sys

tem

s or

sim

ilar s

elf

cont

aine

d un

its.

PR

OP

OSE

D D

EVEL

OP

MEN

T

light

ing.

Idea

lly tr

ansf

orm

ers

wou

ld b

e lo

cate

d be

low

gro

und

leve

l in

elem

ents

are

10m

leng

ths,

leng

ths

inst

alle

d to

be

cons

ider

ed fo

r eas

e of

m

aint

enan

ce.

Engi

neer

ing

prel

imin

arie

s ha

ve ra

ised

con

cern

s ab

out w

ind

indu

ced

impl

icat

ion

of c

ross

-bra

cing

and

stif

fene

rs th

at m

ay b

e ne

cess

ary

to ru

n to

gro

und.

CON

CEPT

SU

MM

ARY

SOLA

R W

EAV

E

Page 44: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

8 of

36

SOLA

R W

EAV

E

Page 45: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 2

9 of

36

SOLA

R W

EAV

E

Page 46: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

0 of

36

SOLA

R W

EAV

E

Page 47: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

1 of

36

SOLA

R W

EAV

E

Page 48: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

2 of

36

ELEV

ATIO

NS,

PLA

N &

GEN

ERAL

DIM

ENSI

ON

SSO

LAR

WEA

VE

124,

160

17,1

00

11,425

PLA

N V

IEW

FRO

NT

ELEV

ATIO

NSI

DE

ELEV

ATIO

N

16,2

0044

,750

63,2

30

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

Page 49: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

3 of

36

APPR

OXIM

ATE

SITE

LO

CATI

ON

SOLA

R W

EAV

E

ALL

DIM

ENSI

ON

S IN

MIL

LIM

ETRE

S - D

O N

OT

SCAL

E

ALL

DIM

ENSI

ON

S IN

DICA

TIVE

ON

LY, P

ENDI

NG

FU

RTH

ER D

ESIG

N D

EVEL

OPM

ENT

44,7

5024,000

21,000

PLA

N V

IEW

N

NO

TE :D

IMEN

SIO

NS

TO R

OAD

SID

E K

ERB

16,2

0063

,230

Page 50: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

4 of

36

1. P

AIN

TED

MIL

D S

TEEL

Lo

w m

aint

enan

ce

Cl

eani

ng re

com

men

ded

on a

n as

nee

ds b

asis

, an

nual

ly a

s a

min

imum

inte

grity

will

be

war

rant

able

and

the

colo

ur w

ill s

till b

e hi

gh im

pact

vis

ually

2. S

OLA

R P

ANEL

S AN

D T

ESLA

PO

WER

WAL

L

prod

uct h

owev

er ty

pica

l life

span

of a

ppro

xim

atel

y 25

ye

ars

3. L

IGH

TIN

G

how

ever

opt

ion

is fe

asib

le. I

P Ra

ting

of 6

5 or

abo

ve is

Re

com

men

ded

that

tran

sfor

mer

s ar

e ho

used

in

belo

w g

roun

d ca

bine

t, fo

r eas

e of

acc

ess

Co

nsid

erat

ion

of L

ED s

trip

leng

ths

to a

llow

over

life

of w

ork

An

nual

insp

ectio

n re

com

men

ded

MAT

ERIA

LS A

ND

MAI

NTE

NAN

CESO

LAR

WEA

VE

Page 51: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

UAP F

ACTO

RY

11 M

arch

201

6 / T

rans

urba

n - M

2 Fe

asib

ility

Stu

dy/ 3

6 of

36

UAPC

OMPA

NY.C

OM

CO

NTA

CTS

TRAN

SUR

BAN

JASO

N H

ENN

ING

DIR

ECT

MO

BILE

+61

405

324

292

EMAI

L jh

enni

ng@

tran

surb

an.c

om

MAT

THEW

BR

ENN

ANH

ead

of S

usta

inab

ility

DIR

ECT

MO

BILE

+61

437

677

472

EMAI

L m

bren

nan@

tran

surb

an.c

om

DAN

IEL

NO

AEEN

MO

BILE

+61

405

231

143

EMAI

L dn

oaee

n@tr

ansu

rban

.com

UAP

SAM

UEL

MAY

ZE

DIR

ECT

+61

7 36

30 6

329

MO

BILE

EM

AIL

sam

uel.m

ayze

@ua

pcom

pany

.com

CR

AIG

HIR

THLe

ad D

esig

ner

DIR

ECT

EMAI

L cr

aig

hirt

h@ua

pcom

pany

.com

Page 52: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report

APPENDIX B

Design entries selected for further development and assessment

1. ‘Kinetica’

2. ‘Interleaves’

3. ‘Solar Weave’

Page 53: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report

1. ‘Kinetica’

Page 54: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

Re

ge

ne

rati

on

. R

eb

irth

. U

niq

ue

. R

esi

lie

nt.

C

olo

urf

ul. F

un

.

Co

nte

mp

ora

ry. D

eco

nst

ructe

d. R

eco

nst

ructe

d. K

ine

tic.

Th

e d

isp

lay

of

pu

blic

art

in

any

env

iro

nm

ent

is a

val

uab

le

met

ho

d o

f cr

eati

ng

a d

eep

er a

pp

reci

atio

n a

nd

un

der

stan

din

g

of

its

con

text

ual

mea

nin

g.

Kin

etic

a is

an

ar

two

rk

des

ign

ed

to

com

plim

ent

Lan

dca

re A

ust

ralia

’s r

egen

erat

ion

co

nce

pt

pla

n a

nd

th

e M

2 M

oto

rway

wh

ilst

pay

ing

tri

bu

te t

o A

ust

ralia

’s

love

of

con

tem

po

rary

art

an

d n

atu

re.

Th

is b

od

y o

f w

ork

is

an o

utr

ageo

us

fusi

on

of

colo

ur

and

fo

rm,

dep

icti

ng

th

e re

silie

nce

an

d c

om

ple

xiti

es

invo

lved

in

th

e re

pro

du

ctio

n

and

lif

e cy

cle

of

Au

stra

lia’s

n

ativ

e fl

ora

. P

arti

ally

co

nst

ruct

ed

of

alu

min

ium

, th

ese

flo

ral

form

s u

nif

y in

du

stry

an

d

nat

ure

, en

com

pas

sin

g t

he

gro

wth

of

the

Mac

qu

arie

P

ark

area

wh

ilst

pro

mo

tin

g s

ust

ain

able

infr

astr

uct

ure

. T

he

juxt

apo

siti

on

o

f o

rgan

ic

and

sh

arp

lin

es

also

as

sist

s in

th

is a

mal

gam

atio

n.

No

t o

nly

is

Au

stra

lia’s

fl

ora

un

den

iab

ly u

niq

ue

in it

s ap

pea

ran

ce b

ut

also

in

its

abili

ty t

o w

ith

stan

d e

xtre

me

clim

atic

co

nd

itio

ns.

In

fact

, man

y o

f A

ust

ralia

’s n

ativ

e fl

ora

can

no

t ex

ist

in

the

abse

nce

of

fire

. Kin

etic

a ex

plo

res

this

cyc

le in

a

con

tem

po

rary

, ab

stra

ct a

nd

qu

irky

man

ner

- t

he

colo

urf

ul a

rms

rota

te in

slo

w, c

ircu

lar

mo

tio

ns

on

ce

agai

n r

ein

forc

ing

th

is n

oti

on

of

cycl

es, b

rin

gin

g t

his

ev

er s

o p

layf

ul

wo

rk t

o l

ife.

E

yes

blin

k at

slo

w

inte

rval

s, w

atch

ing

ove

r m

oto

rist

s as

th

ey p

ass

and

it

is t

hro

ug

h p

erso

nif

icat

ion

th

at t

hes

e q

uir

ky f

orm

s su

dd

enly

b

eco

me

a re

pre

sen

tati

on

o

f an

ev

er

chan

gin

g,

ever

g

row

ing

, so

ciet

y o

n

the

mo

ve.

Mo

vem

ent

also

as

sist

s in

p

rom

oti

ng

th

e id

ea

of

ren

ewab

le e

ner

gy.

Kin

etic

a is

a w

ond

erla

nd o

f ab

stra

cted

, dec

ons

truc

ted

an

d r

eco

nst

ruct

ed n

atio

nal

fav

ou

rite

s in

teg

rate

d i

n

an e

xplo

sio

n o

f co

lou

r. B

old

sh

ades

of

red

, g

reen

,

yello

w a

nd

blu

e ar

e a

resp

on

se t

o A

ust

ralia

’s c

olo

urf

ul

lan

dsc

ape,

g

ener

atin

g

a se

nse

o

f fa

mili

arit

y w

hils

t h

arm

on

izin

g w

ith

th

e n

atu

ral

surr

ou

nd

s.

In c

reat

ing

a

sen

se o

f h

arm

ony

an

d f

amili

arit

y th

rou

gh

an

oth

erw

ise

exci

tin

g a

nd

co

nte

mp

ora

ry b

od

y o

f w

ork

, K

inet

ica

is

des

ign

ed

to

up

lift

and

in

spir

e m

oto

rist

s ra

ther

th

an

dis

trac

t th

em.

Th

is w

ide

vari

ety

of

colo

ur,

shap

e an

d

form

als

o c

reat

es a

n u

plif

tin

g s

ense

of

div

ersi

ty t

hu

s ap

pea

ling

to

all

wal

ks o

f lif

e, y

ou

ng

, o

ld,

pas

t, p

rese

nt

and

fu

ture

gen

erat

ion

s.

Kin

etic

a is

a n

on

dis

crim

inat

ory

b

od

y o

f w

ork

des

ign

ed t

o a

pp

eal t

o o

ne

and

all

in s

pit

e o

f g

end

er, r

ace,

rel

igio

n o

r p

olit

ical

ag

end

a.

Re

gis

trati

on

No

.: M

210

4

M2

| M

acq

uar

ie P

ark

| L

and

care

Au

stra

lia

1

M2

| M

acq

uar

ie P

ark

| L

and

care

Au

stra

lia

Page 55: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

Fig

ure

4. W

AR

ATA

H

Fig

ure

1. K

inet

ica

gro

up

sho

t in

situ

wit

h s

cale

.

Fig

ure

3. G

OL

DE

N W

AT

TL

E

Fig

ure

2. B

AN

KS

IA

Fig

ure

5. G

UM

LE

AV

ES

Se

lf-S

ust

ain

able

& E

co-F

rie

nd

lyS

ola

r en

erg

y w

ill

po

wer

b

oth

th

e sl

ow

-tu

rnin

g

arm

s, b

linki

ng

eye

s an

d L

ED

lig

hts

. S

ola

r p

ow

er

dra

ws

pu

re,

clea

n e

ner

gy

fro

m t

he

sun

, re

du

cin

g

gre

enh

ou

se

gas

em

issi

on

s an

d

ou

r re

lian

ce

on

fo

ssil

fuel

s. T

imer

s w

ill c

on

tro

l th

e re

spo

nsi

ven

ess

of

the

LE

D li

gh

ts a

s th

e su

n r

ises

an

d s

ets

mak

ing

th

is w

ork

sel

f-su

stai

nab

le.

Lo

cati

on

Pla

nT

he

inst

alla

tio

n w

ill b

e vi

sib

le t

o p

assi

ng

tra

ffic

an

d

nei

gh

bo

uri

ng

pro

per

ties

, an

d w

ill c

om

ple

men

t th

e en

viro

nm

enta

l ass

ets

of

the

loca

tio

n. T

he

M2

site

is

sep

arat

ed

fro

m

the

Mac

qu

arie

P

ark

com

mer

cial

an

d r

esid

enti

al c

entr

e b

y th

e H

ills

M2

Mo

torw

ay,

wh

ich

fo

rms

the

sou

ther

n s

ite

bo

un

dar

y. T

he

site

is

bo

un

ded

in

th

e ea

st

by

Kh

arto

um

R

oad

. Im

po

rtan

tly,

Lan

e C

ove

Nat

ion

al P

ark

adjo

ins

the

maj

ori

ty o

f th

e n

ort

her

n b

ou

nd

ary

and

a n

atu

re

rese

rve

is

on

th

e w

este

rn

bo

un

dar

y.

A

smal

l n

um

ber

of

med

ium

den

sity

res

iden

tial

pro

per

ties

al

so a

djo

in t

he

no

rth

ern

bo

un

dar

y.

Art

wo

rkA

pp

roxi

mat

ely

8-1

0 x

Fre

e-st

and

ing

Scu

lptu

res

Mat

eri

als,

Tre

atm

en

ts &

Co

lou

rs1.

Mat

eri

als

Th

e sp

ecif

ied

mat

eria

ls f

or

this

pro

ject

are

bas

ic

met

als.

A

b

len

d

of

recy

cled

m

etal

&

tr

eate

d

alu

min

ium

is

the

sele

cted

mat

eria

l fo

r th

is p

roje

ct

as

it

is

rob

ust

an

d

allo

ws

flex

ibili

ty

for

colo

ur

trea

tmen

t. T

he

mai

n s

culp

ture

s w

ill c

om

pri

se o

f la

ser

cut

shee

t m

etal

(1

0-2

0m

m

thic

knes

s).

Co

ncr

ete

will

b

e u

sed

to

se

t th

e ar

t p

iece

s p

erm

anen

tly

into

pla

ce.

LE

D li

gh

tin

g w

ill a

lso

be

stra

teg

ical

ly p

lace

d in

an

d

aro

un

d

the

scu

lptu

res/

seat

ing

to

b

e ill

um

inat

ed

afte

r h

ou

rs,

for

the

full

effe

ct o

f th

e la

ser

cutt

ing

.

Th

e L

ED

lig

hti

ng

will

be

inst

alle

d/f

ixed

in

to t

he

gro

un

d a

nd

wit

hin

th

e st

ruct

ure

to

cre

ate

a so

ft,

sub

tle

amb

ien

ce i

n c

oh

esio

n w

ith

th

e co

nce

ptu

al

them

e o

f re

juve

nat

ion

an

d g

row

th.

2. T

reat

me

nts

As

this

bo

dy

of

wo

rk w

ill b

e p

lace

d o

utd

oo

rs, t

hey

w

ill

nee

d

to

wit

hst

and

al

l th

e el

emen

ts

of

the

nat

ura

l en

viro

nm

ent.

Th

e ex

teri

or

of

the

scu

lptu

re

and

sea

ts w

ill h

ave

a p

olis

hed

sp

ray

pai

nt-

like

glo

ss

fin

ish

to

avo

id a

ny o

r m

uch

oxi

dat

ion

/co

rro

sio

n. A

n

ano

dis

ing

tre

atm

ent

may

be

nee

ded

to

hel

p f

urt

her

p

rote

ct

the

surf

ace.

A

fu

rth

er

varn

ish

w

ill

be

app

lied

to

h

elp

p

rote

ct

the

artw

ork

fr

om

va

nd

alis

m, s

uch

as

gra

ffit

i.

3. C

olo

urs

/Pat

tern

sA

wid

e ra

ng

e o

f b

rig

ht

and

eva

nes

cen

t co

lou

rs w

ill

be

use

d t

o d

epic

t th

e ab

un

dan

ce o

f th

e cu

ltu

rally

d

iver

se p

eop

le w

ith

in t

he

com

mu

nit

y.

Ult

imat

ely,

th

e co

lou

r p

alet

te f

or

this

bo

dy

of

wo

rk w

ill a

im t

o

insp

ire,

at

trac

t an

d

emb

ark

the

view

er

on

an

im

agin

ativ

e an

d c

reat

ive

wh

imsi

cal j

ou

rney

.

Fab

rica

tio

n /

In

stal

lati

on

/ M

ain

ten

ance

1. F

abri

cati

on

En

gin

eeri

ng

& P

lan

nin

gA

map

pin

g o

ut

and

fin

al m

od

el o

f th

e w

ork

s m

ust

be

calc

ula

ted

to

en

sure

all

the

pie

ces

of

the

wo

rk t

og

eth

er a

s a

wh

ole

. T

his

will

th

en

allo

w

corr

ect

step

s fo

r th

e la

ser

cutt

ing

an

d

inst

alla

tio

n o

f th

e m

etal

pie

ces.

Est

imat

ed

tim

e o

f co

mp

leti

on

: 5 w

eeks

Las

er C

utt

ing

of

Alu

min

ium

Sh

eet

Met

alT

his

pro

cess

is q

uic

k an

d e

asy

step

. Est

imat

ed

tim

e

of

com

ple

tio

n: 3

wee

ks

Ro

llin

g a

nd

Co

lou

r P

rep

arat

ion

Th

e m

etal

sh

eets

will

th

en b

e p

roce

ssed

th

rou

gh

a

rolle

r to

ach

ieve

th

e w

avy

pet

al-l

ike

effe

ct o

f th

e en

d r

esu

lt. A

ll m

etal

pie

ces

will

nee

d t

o b

e tr

eate

d

ind

ivid

ual

ly.

Th

e en

gin

eeri

ng

ste

ps

to t

his

pro

ject

w

ill e

nsu

re w

hat

ste

ps

nee

d t

o b

e ta

ken

. Est

imat

ed

ti

me

of

com

ple

tio

n: 8

wee

ks

Co

lou

r w

ill

be

app

lied

vi

a a

spra

y p

ain

tin

g-l

ike

pro

cess

an

d g

loss

var

nis

hin

g.

Est

imat

ed

tim

e o

f co

mp

leti

on

: 6 w

eeks

2. I

nst

alla

tio

nT

his

bo

dy

of

wo

rk c

om

pri

ses

of

app

roxi

mat

ely

8 t

o

10 l

arg

er-t

han

-lif

e sc

ulp

tura

l p

iece

s. T

he

bo

dy

of

sc

ulp

ture

s w

ill

no

t b

e fu

nct

ion

al.

Th

e m

ain

sc

ulp

tura

l p

iece

(W

arat

ah)

will

co

nta

in 3

lay

ered

m

oti

f p

iece

s an

d w

ill n

eed

inte

nsi

ve a

nd

cal

cula

ted

la

bo

ur.

Th

e fi

nis

hed

p

iece

s w

ill

nee

d

to

be

tran

spo

rted

an

d p

erm

anen

tly

inst

alle

d w

ith

bo

lts

and

co

ncr

ete

bas

es

to

ho

ld

each

p

iece

. L

oca

l fa

bri

cato

rs

can

b

e so

urc

ed.

Est

imat

ed

ti

me

o

f co

mp

leti

on

: 2 w

eeks

.

LE

D L

igh

tin

gTo

co

mp

lete

th

e sc

ulp

tura

l in

stal

lati

on

will

be

the

inse

rtio

n

of

spec

ial

LE

D

ligh

tin

g,

wh

ich

w

ill

stra

teg

ical

ly

be

pla

ced

ar

ou

nd

an

d

in

the

mai

n

scu

lptu

re p

iece

to

illu

min

ate.

Th

is s

ecti

on

of

the

pro

ject

req

uir

es e

lect

rica

l in

stal

lati

on

& p

roce

sses

. E

stim

ate

d t

ime

of

com

ple

tio

n: 2

wee

ks

3. M

ain

ten

ance

Th

ese

fin

al

wo

rks

will

b

e o

f lo

w-m

ain

ten

ance

. D

ura

ble

an

d

sust

ain

able

m

ater

ials

w

ill

be

use

d

wh

ich

are

ro

bu

st a

nd

eas

ily m

ain

tain

ed.

Min

imal

g

raff

iti r

emo

val a

nd

gen

eral

cle

anin

g d

uti

es a

re t

he

on

ly e

xcep

tio

ns.

Est

imat

ed

Tim

e f

or

Pro

ject

: 8-1

0 m

on

ths

Re

gis

trati

on

No

.: M

210

422

M2

| M

acq

uar

ie P

ark

| L

and

care

Au

stra

lia

Lay

er

1

Lay

er

2

Lay

er

3

Las

er-

cut

de

taili

ng

Slo

wtu

rnin

g

mo

tio

n

Flip

pin

gm

oti

on

to

re

veal

Las

er-

cut

de

taili

ng

Eye

s o

pen

an

d c

lose

fo

ur

tim

es d

aily

giv

ing

th

e w

ork

a h

um

oro

us

per

ple

xity

. E

yelid

s ar

e a

ran

ge

of

colo

urs

wh

en

clo

sed

on

ce a

gai

n

sup

po

rtin

g t

he

idea

o

f d

iver

sity

an

d f

un

. T

he

reve

rse

sid

e o

f th

is

pie

ce w

ill b

e id

enti

cal

in b

oth

ap

pea

ran

ce

and

fu

nct

ion

.

Arm

s tu

rn in

a s

low

, co

ntr

olle

d c

ou

nte

r cl

ock

wis

e m

oti

on

g

ener

atin

g t

he

no

tio

n

of

cycl

es a

nd

an

eve

r ch

ang

ing

, eve

r g

row

ing

, so

ciet

y o

n

the

mo

ve.

Th

e re

vers

e si

de

of

this

p

iece

will

be

iden

tica

l in

bo

th a

pp

eara

nce

an

d f

un

ctio

n.

Th

ree

laye

rs o

f p

etal

s w

ill t

urn

in

slo

w, c

on

tro

lled

mo

tio

ns

on

ce

agai

n g

ener

atin

g t

he

no

tio

n o

f cy

cles

an

d a

n e

ver

chan

gin

g,

ever

gro

win

g s

oci

ety

on

th

e m

ove

. T

he

two

ou

ter

laye

rs w

ill s

pin

co

un

ter

clo

ckw

ise

wh

ilst

the

mid

dle

la

yer

will

sp

in c

lock

wis

e to

cr

eate

a v

isu

ally

stu

nn

ing

ce

nte

rpie

ce. T

he

reve

rse

sid

e o

f th

is p

iece

will

be

iden

tica

l in

b

oth

ap

pea

ran

ce a

nd

fu

nct

ion

.

Th

e ic

on

ic g

um

leav

es

are

stat

ion

ary

pie

ces

wh

ich

are

em

bel

lish

ed

by

pat

tern

ed h

ole

s p

un

ched

th

rou

gh

th

eir

surf

aces

. Th

ey a

re t

he

sim

plic

ity

in a

mo

ng

st

this

bo

dy

of

wo

rk. T

he

reve

rse

sid

e o

f th

is p

iece

w

ill b

e id

enti

cal i

n

app

eara

nce

.

Page 56: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report

2. ‘Interleaves’

Page 57: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

1G

um

nu

ts a

nd

gu

m le

ave

s are

ico

nic

sym

bo

ls o

f th

e A

ust

ralia b

ush

. In

man

y w

ays

the

ir

shap

e a

nd

fo

rm h

ave

be

co

me

co

mm

erc

ialize

d a

nd

sti

gm

ati

ze

d a

s lo

w c

ult

ure

, re

leg

ate

d

to t

ou

rism

, m

ark

eti

ng

, co

ttag

e c

raft

s an

d c

hild

ren

sto

rie

s. T

his

art

wo

rk s

ee

ks

to r

e-

ele

vate

th

eir

sta

tus,

no

t o

nly

as

po

ten

t sy

mb

ols

of

ou

r n

ati

on

s ch

ara

cte

r an

d u

niq

ue

e

co

log

y a

nd

ge

olo

gy,

bu

t im

po

rtan

tly a

s a p

ote

nt

sym

bo

l fo

r re

ge

ne

rati

on

, re

info

rcin

g

ou

r co

nn

ecti

on

to

lan

d a

nd

pla

ce

; se

rvin

g a

s ag

en

t fo

r e

co

log

ical ch

an

ge

; h

allm

ark

of

share

d c

ust

od

ian

ship

, in

ve

nti

ve

th

inkin

g a

nd

su

stain

ab

le a

cti

on

.

We

are

pro

po

sin

g a

pu

blic a

rt in

stallati

on

, w

hic

h is

mo

nu

me

nta

l, c

reate

a s

eri

es

of

form

ally c

oh

ere

nt

wo

rks,

evo

cati

ve

of

natu

ral an

d o

rgan

ic f

orm

s, w

hic

h a

re u

tilize

d a

s p

art

of

the

pla

nn

ed

flo

ra r

eg

en

era

tio

n a

nd

bio

-filt

rati

on

syst

em

.

Ae

sth

eti

cally t

he

flo

win

g s

inu

ou

s cu

rve

s o

f th

e g

um

le

af

are

syn

on

ym

ou

s w

ith

th

e

rollin

g c

on

tou

rs o

f S

yd

ney’s

hills

an

d r

ive

r valleys.

Th

e a

rtw

ork

be

co

me

s a m

eta

ph

or

for

the

re

ge

ne

rati

ve

qu

aliti

es

of

the

Au

stra

lian

bu

sh. T

he

in

clu

sio

n o

f th

e g

um

nu

t m

ay

sym

bo

lize

th

e r

eg

en

era

tive

qu

ality

of

hu

man

sp

irit

; to

ris

e f

rom

th

e a

she

s o

f h

ard

ship

s an

d e

lem

en

ts o

r ad

ve

rsit

y. F

rom

th

e s

ee

d o

f o

ur

ide

as

we

ge

rmin

ate

th

e f

ruit

s o

f o

ur

lab

ou

r; f

rom

th

e in

ne

r vit

ality

of

the

qu

iesc

en

t se

ed

hid

de

n p

ote

nti

al aw

ait

s fa

vo

rab

le

co

nd

itio

ns

for

alc

he

my a

nd

gro

wth

.

Ou

r m

ain

fo

cus

is t

o m

ag

nif

y t

he b

eau

ty o

f n

atu

re r

ath

er

than

try

ing

to

co

py it,

to

en

cou

rag

e p

eo

ple

to

rem

em

ber

wh

at

we o

we t

o n

atu

re, th

at

we c

an

’t liv

e w

ith

ou

t it

,.

Pu

rpo

sefu

lne

ss:

Th

ese

wo

rks

are

no

t m

ere

ob

jects

in

th

e lan

dsc

ap

es

bu

t sh

elt

er, b

ow

er

or

have

n f

orm

s w

hic

h o

ffe

r w

ind

bre

aks

an

d p

rote

cti

on

fo

r th

e r

eg

en

era

tio

n o

f n

ati

ve

flo

ra.

Th

e a

rtw

ork

s st

ren

gth

en

th

e c

on

ne

cti

on

wit

h t

he

re

ge

ne

rati

ng

envir

on

me

nt,

a

fun

cti

on

ing

scre

en

be

twe

en

th

e e

ncro

ach

me

nts

of

the

urb

an

up

on

th

e n

atu

ral.

Mate

riality

: T

he

scu

lptu

ral fo

rms

will b

e f

ab

ricate

d f

rom

sta

inle

ss s

tee

l tu

be

in

a s

ke

leta

l st

ructu

re,

the

re

fle

cti

ve

qu

aliti

es

of

this

mate

rial allo

w it

to m

orp

h a

nd

ab

stra

ct

its

envir

on

me

nt,

cre

ati

ng

in

tere

st a

nd

pla

yfu

lne

ss.

Lig

ht:

Th

e s

ke

leta

l st

ructu

res

off

er

the

pla

y o

f lig

ht,

mo

iré

patt

ern

s an

d a

tre

llis

of

shad

ow

s.

Day a

nd

nig

ht

lig

ht

will h

ave

an

ele

me

nta

l in

tera

cti

on

wit

h t

he

wo

rk, cre

ati

ng

vis

ual

en

gag

em

en

t w

ith

in t

he

sim

ple

be

au

ty o

f th

e f

orm

s.

Th

e in

ten

tio

n w

ou

ld b

e t

o u

se h

idd

en

so

lar

pan

els

th

at

co

uld

be

ho

use

be

hin

d t

he

art

wo

rk o

n t

he

eart

h m

ou

nd

s to

dri

ve

su

stain

ab

le L

ED

lig

hti

ng

mo

un

ted

wit

hin

th

e

scu

lptu

ral fo

rms

Scale

:T

he

scale

is

de

sig

ne

d t

o b

e a

s la

rge

as

feasi

ble

, th

is w

ork

wo

uld

be

a b

old

, st

ron

g

state

me

nt

ab

ou

t th

e r

ela

tio

nsh

ip o

f th

e o

rgan

ic a

nd

th

e in

org

an

ic-

pla

ye

d o

ut

in t

he

ju

xta

po

siti

on

of

the

hard

man

-mad

e m

ate

rial la

ng

uag

e a

nd

th

e fl

uid

, o

rgan

ically

infl

ue

nce

d f

orm

s.

M2

106

Tra

nsu

rba

n S

yd

ne

y H

ills

M2

Mo

torw

ay

Cu

ltu

ral

Bio

lin

k R

ese

rve

In

terl

ea

ve

s

Page 58: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

2M

210

6In

terl

ea

ve

s -

Tra

nsu

rba

n S

yd

ne

y H

ills

M2

Mo

torw

ay

Cu

ltu

ral

Bio

lin

k R

ese

rve

“Ou

r m

ain

fo

cus

is t

o m

ag

nif

y t

he b

eau

ty o

f n

atu

re r

ath

er

than

try

ing

to

co

py it,

to

en

cou

rag

e p

eo

ple

to

rem

em

ber

wh

at

we o

we t

o n

atu

re, th

at

we c

an

’t liv

e w

ith

ou

t it

.”

Lig

ht:

Usi

ng

su

stain

ab

le s

ola

r L

ED

lig

hti

ng

, th

e s

ke

leta

l st

ructu

res

off

er

the

pla

y o

f lig

ht,

m

oir

é p

att

ern

s an

d a

tre

llis

of

shad

ow

s.

Page 59: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

M2 Macquarie Park Art Installation – Visual Impact Assessment Report

3. ‘Solar Weave’

Page 60: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

Sola

r W

eave

M2

Mac

quar

ie P

ark

Icon

ic A

rt In

stalla

tion

Idea

s Com

petit

ion

Sola

r Wea

ve is

a 1

25m

long

scul

ptur

e co

nsist

ing

of 8

50 L

ED

lum

inai

res fi

xed

to a

ligh

twei

ght s

truc

tura

l fra

me.

The

LED

lum

i-na

ries a

re p

ower

ed b

y so

lar c

ells

whi

ch c

onve

rt th

e su

n's e

nerg

y in

to e

lect

ricity

.

Sol

ar W

eave

is a

larg

e sc

ale

rene

wab

le e

nerg

y in

stalla

tion.

The

resu

ltant

bla

nket

of l

ight

at n

ight

bot

h ac

ts as

a lo

cal s

igni

fier a

s w

ell a

s an

icon

ic e

xam

ple

of re

new

able

ene

rgy

art i

n pr

actic

e.

Sol

ar W

eave

hop

es to

eng

age

with

the

loca

l com

mun

ity a

nd

thro

ugh

enga

gem

ent r

aise

aw

aren

ess o

f cur

rent

app

licat

ions

and

fu

ture

pos

sibili

ties o

f ren

ewab

le e

nerg

y in

frastr

uctu

re.

Whe

ther

it b

e th

roug

h fu

rthe

r res

earc

h w

ith M

acqu

arie

Uni

ver-

sity

or lo

cal c

orpo

rate

par

tner

ship

s, th

e M

acqu

arie

Par

k co

mm

u-ni

ty is

the

idea

l tes

ting

grou

nd fo

r thi

s ins

talla

tion

due

to it

s bu

sines

s and

edu

catio

nal m

akeu

p.

Sol

ar W

eave

aim

s to

alig

n w

ith T

rans

urba

n’s su

stain

abili

ty p

illar

s an

d str

ateg

y fo

cusin

g on

redu

cing

thei

r ene

rgy

cons

umpt

ion

by

10%

by

2023

.

Bui

ldin

g up

on T

rans

urba

n’s re

cent

initi

ativ

es a

nd L

ED so

lutio

ns

for t

he B

olte

Brid

ge in

Mel

bour

ne a

nd th

e La

ne C

ove T

unne

l, So

lar W

eave

seek

s to

cont

inue

this

body

of w

ork

and

fuse

toge

ther

cr

eativ

ity a

nd te

chni

cal i

nnov

atio

n. West

boun

d Tr

affic N

ight

View

Sola

r W

eave

M21

291

Page 61: Visual Impact Assessment - Transurban...M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1 01 Introduction Transurban, the operator of The Hills M2 motorway,

Site

Sec

tion

M2

West

boun

dM

2 Ea

stbou

ndSh

rub

&

Gro

undc

over

Re

vege

tate

d Ra

ised

Land

form

Vege

tate

d Bi

ofiltr

atio

n Ba

sin

Recy

cled

plas

tic fl

ex tu

bes

Flex

ible

sola

r cell

arr

ay

LED

lum

inai

re

Ren

ewab

le e

nerg

y ar

t, as

des

crib

ed b

y La

nd A

rt G

ener

ator

Initi

a-tiv

e, is

a fa

irly

new

gen

re th

at in

corp

orat

es re

new

able

ene

rgy

into

th

e de

sign

of th

e ar

twor

k.

Sol

ar W

eave

con

sists

of a

num

ber o

f rec

ycle

d pl

astic

tubu

lar

elem

ents,

eac

h affi

xed

with

a se

ries o

f flex

ible

sola

r cel

l arr

ays

inte

rspe

rsed

with

LED

lum

inai

res a

t reg

ular

inte

rval

s. Al

l col

lect

ed

pow

er fr

om th

e so

lar a

rray

s are

stor

ed in

a c

entr

al b

atte

ry h

ousin

g fo

r use

at n

ight

.

The

spec

ified

LED

lum

inai

re w

ill h

ave

a lu

x le

vel s

uita

ble

to it

s m

otor

way

adj

acen

cy a

nd th

e po

sitio

ning

of t

he lu

min

aire

s will

m

inim

ise th

e ris

k of

gla

re to

mot

orist

s and

redu

ce ‘l

ight

spill

’.

The

over

all h

eigh

t and

setb

ack

of th

e in

stalla

tion

allo

ws f

or a

cle

ar

disti

nctio

n be

twee

n ro

adw

ay li

ghtin

g an

d th

e sc

ulpt

ural

LED

lig

htin

g. Th

e in

stalla

tion

has n

o fla

shin

g lig

hts.

Sol

ar W

eave

is a

n ab

strac

ted

linea

r for

m su

gges

tive

of m

ovem

ent

and

fluid

ity. C

once

ptua

lly, i

t dra

ws o

n th

e La

ne C

ove

Riv

er a

nd

com

es fr

om a

n ab

strac

tion

of b

oth

wat

er ri

pplin

g &

land

topo

gra-

phy.

The

Lane

Cov

e N

atio

nal P

ark,

adj

oini

ng th

e m

ajor

ity o

f the

no

rthe

rn b

ound

ary,

is a

372

hect

are

natio

nal p

ark

whi

ch tr

acks

the

Lane

Cov

e R

iver

. The

river

win

ds th

roug

h a

peac

eful

bus

hlan

d va

lley

and

is hi

dden

aw

ay fr

om th

e su

rrou

ndin

g ne

ighb

ourh

oods

. So

lar W

eave

seek

s to

give

the

wat

erw

ay a

noth

er p

rese

nce,

an

abstr

acte

d an

d sy

mbo

lic g

estu

re, c

eleb

ratin

g th

e sig

nific

ance

of t

his

loca

l fea

ture

. W

hilst

the

insta

llatio

n sit

s out

side

the

spec

ified

foot

prin

t it

cons

ciou

sly re

mai

ns w

ithin

the

zone

allo

cate

d fo

r sm

all s

hrub

and

gr

ound

cove

r spe

cies

. The

over

all p

erm

eabi

lity

of th

e in

stalla

tion

will

allo

w fo

r the

scul

ptur

e an

d pl

ant l

ife to

eng

age

with

one

an

othe

r ove

r tim

e. A

s the

veg

etat

ion

mat

ures

it w

ill b

egin

to

conc

eal a

nd g

row

ove

r the

bas

e of

the

insta

llatio

n al

low

ing

it to

be

read

as e

mbe

dded

into

the

natu

ral l

ands

cape

, as i

f the

se c

urvi

linea

r ‘ri

pple

s’ w

ere

flow

ing

in a

nd o

ut o

f the

gro

und.

Eastb

ound

Tra

ffic D

ayVi

ew

Site

Pla

nD

etai

l

Sola

r W

eave

M21

292

050

100m