Appendix D
Appendix D
Visual Impact Assessment
MBG Landscape Architecture Pty Ltd Landscape Architecture Urban Design
M2 Macquarie Park Art Installation – Visual Impact Assessment Report i
Document Control
Rev No Date Details
A 10-02-16 Draft for review
B 29-04-16 Final Draft
C 6-05-16 Final Issue
D 30-05-16 Revised Final Issue
ii M2 Macquarie Park Art Installation – Visual Impact Assessment Report
Contents Contents ........................................................................................................... ii
01 Introduction ....................................................................................... 1
02 Methodology ..................................................................................... 1
03 Site Context ..................................................................................... 1
04 Proposed Site Improvements ................................................. 3
05 Visibility of Proposal and Key Viewpoints ........................... 6
06 Visual Impact Assessment ....................................................... 9
07 Summary ....................................................................................... 12
APPENDICIES
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 1
01 Introduction
Transurban, the operator of The Hills M2 motorway, is planning to restore a degraded roadside area adjacent to the M2 motorway at Macquarie Park that was used as a construction site during an upgrade of the motorway in 2012. The site is located opposite the Herring Road intersection with the M2 and is bounded by Khartoum Road to the east, Shrimpton’s Creek to the west and Lane Cove National Park to the north.
The main aspect of the restoration involves minor modifications and revegetation with native bushland species to restore ecological integrity to this parcel of land adjoining the National Park. To achieve this Transurban has partnered with Landcare Australia to carry out the ecological restoration of the site.
In conjunction with the ecological restoration Transurban are also planning to incorporate an iconic art installation that makes a positive and memorable contribution to the motorway landscape and local community of Macquarie Park.
This report has been prepared as part of a Review of Environmental Factors (REF) for the proposed works to assess the visual impact of the public art installation and the associated site improvements.
02 Methodology
The visual impact assessment has been undertaken in accordance with the methodology described in Roads & Maritime Services (RMS) Environmental Impact Assessment Practice Note EIA-N04 – Guideline for Landscape Character and Visual Impact Assessment (Version 2-0, 2013), Section 6.
The tasks required for the assessment are broadly as outlined below:
•Ā Describe design proposal and associated works
•Ā Describe existing site conditions and context
•Ā Assess visibility of proposal and identify key viewpoints
•Ā Assess visual impacts •Ā Summarise findings and impact mitigation strategies (if required)
03 Site Context
The Macquarie Park site is an area in the order of 8ha located opposite the Herring Road off-ramp immediately to the north of the M2 motorway, between Khartoum Road to the east, Christie Road to the west and Lane Cove National Park along the northern boundary. Immediately to the south of the motorway is the Macquarie Park commercial precinct and Macquarie University campus. To the east is a medium density residential precinct serviced by Khartoum Road and Fontenoy Road.
Part of the overall site was used as a construction compound as part of the motorway upgrade in 2013. This was an area of approximately 1 hectare, adjoining the motorway that was cleared, filled and leveled to facilitate construction support activity. The margins of the compound comprise relatively steep embankments with relatively heavy weed infestation. The wider 8ha site also carries significant weed cover in the understory layers.
2 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
On completion of the motorway upgrade works, the compound site appears to have been cultivated, topsoiled and seeded as part of a revegetation process. The entire site drains into the Lane Cove River that occurs a few hundred metres to the north.
Figure 1 Location Plan
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 3
04 Proposed Site Improvements
There are two main aspects to the proposed site improvements. The first involves rehabilitation of the site to re-establish native bushland plant communities and the second is the installation of a landmark artwork.
04.1 Site Rehabilitation The site rehabilitation work will be undertaken by Landcare Australia generally seeks to achieve the following objectives:
•Ā Rehabilitate the M2 Macquarie Park Motorscapes Project site of approximately 5 ha improve native bushland condition and ecological functionality;
•Ā Reduce current off-site impacts on adjoining properties, particularly Lane Cove National Park, through weed control, revegetation, vertebrate pest management, creek riparian zone stability and improvements to site drainage;
•Ā Introduce an indigenous vegetation community comprising Hornsby Enriched Sandston Exposed Woodland and appropriate selected species of the STIF critically endangered ecological community;
•Ā Establish and protect bushland vegetation communities, inclusive of a healthy groundcover stratum as a natural stabiliser of the soil surface through an intensive maintenance programme;
•Ā Improve water quality in Shrimptons and Industrial Creeks which drain the site;
•Ā Manage known areas of soil contamination;
•Ā Undertake community engagement activities;
•Ā Complete the majority of works within 12 months; and
•Ā Deliver the works safely and cost effectively.
Further details of the site landscape and rehabilitation works will be developed in conjunction with detailed design development of the preferred artwork installation, in order to achieve a co-ordinated design outcome and spatial setting for the artwork. Further consideration will also be given to relocating two large existing motorway advisory signs on the northern edge of the eastbound carriageway.
04.2 Artwork Installation In relation to the artwork installation, Transurban are in the process of further evaluation of a preferred artwork that was selected following an ideas competition for the site. The competition was run in October and November of 2015 and sought ideas from designers and artists that showcased innovative solutions that could demonstrate ecological, social and economic sustainability and that were both meaningful and relevant to the setting and could also be readily implemented. Figure 2. shows the general site structure approach and preferred location for the artwork installation.
The general site for the artwork has been selected to maximize visibility from the motorway for eastbound and westbound motorists. The site nominated is approximately 50 metres long by 15metres wide and is set back approximately 5metres from the top of the existing drainage swale embankment running along the northern edge of the motorway.
4 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
Figure 2 Site Structure Plan
Figure 3 View east from Christie Road Bridge
Notional development envelope for artwork installation Relocation of existing advisory signs to be considered
M2 Eastbound M2 Westbound Herring Road on-ramp
Westbound sightline into site Eastbound sightline into site
Indicative artwork installation site 50m x 15m (nom) Old construction compound site subject to rehabilitation
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 5
04.3 Preferred Artwork Selection The outcome of the ideas competition was the selection of three preferred ideas, which then went through a further feasibility assessment prepared by Urban Art Projects (UAP) for Transurban that considered materials and finishes, structural feasibility, fabrication and installation issues, anticipated maintenance requirements and cost. From this process one, ‘Kinetica’ (refer Figure 4 below) was selected as the preferred option. However, for the purposes of this visual impact assessment, all three of the proposed ideas were considered. The UAP Feasibility Study incorporating details of all the three preferred ideas is included in Appendix A. Details of the three original submissions are also included in Appendix B.
Figu
re 4
Win
ning
Ent
ry –
‘Kin
etic
a’
6 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
An extract from from the UAP Feasibility Study of the preferred artwork ‘Kinetica’ is provided below to further explain the artwork and provide a summary description of matters considered by the feasibility study.
‘Concept Design Intent A playful graphic narrative of the Australian flora on scale, depicting the cycle of nature. Bold in scale and colour Kinetica will have a visual presence in the landscape.
Recommended Materials and Finishes •Ā Laser cut corten steel, laser cut aluminium plate
•Ā Automotive/Powdercoat exterior grade paint finish
•Ā Mechanical fixings, motor for Waratah element.
•Ā Solar panels & LED lighting fixtures
Structure The structural delivery of the work deemed feasible. The visual aesthetic of the concept will continue to develop significantly in future phases, however because the basis for this design is a 2d graphic image, this development is expected to help preserve and improve the original visual intent rather than challenge it.
Fabrication & Installation Conceptually based around movement, the proposal of moving elements is deemed to be not appropriate based on cost and maintenance implications and visibility given the speed of most artwork viewers. Some movement can be retained, but can be reduced and simplified. Initial concept included identical elements on rear facing artwork, this is not recommended, due to lack of sight lines.
Anticipated Maintenance •Ā Annual inspection for structure and moving parts
•Ā Recommended re-paint on site after 15-year period
•Ā Recommended refurb of moving parts on 10-year cycle
•Ā Annual cleaning recommended ‘ The installation would include approximately nine individual sculptures ranging from approximately 2 metres to 10.5 metres tall and will be illuminated for night time effect and visual interest. The artwork proposal is essentially, a conceptual idea at this time and is subject to further detail design development and site planning considerations in relation to sight lines from the M2 motorway and other road safety considerations.
Figure 5 Illustrative night view of preferred artwork from eastbound carriageway (Source: UAP Feasibility Study 11-03-2016)
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 7
The following images, (UAP Feasibility Study 11-03-2016) provide conceptual, illustrative views of the preferred sculpture in relation to the eastbound and westbound carriageways of the motorway. Note that the proposed bushland regeneration around the artwork is not illustrated.
Figure 6 Illustrative view of preferred artwork from eastbound carriageway
Figure 7 Illustrative view of preferred artwork from westbound carriageway
8 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
05 Visibility of Proposal and Key Viewpoints
The visibility of the site is the extent of adjoining areas that the proposal will be visible from, this is illustrated in the Visual Envelope Map in Figure 8 below. The project site is primarily visible from the M2 motorway and partially visible from the upper floors of a number of commercial buildings and serviced apartments located to the south of the motorway and a medium density residential precinct adjoining the north eastern boundary.
In relation to the commercial properties south of the motorway, access to these properties was not possible, however it is likely that views from the upper floors (the site is not visible from street level) would be dominated in the foreground by the M2 motorway, tolling gantries, road signage, lighting and the constant traffic on the motorway with background views over Land Cove National Park and the suburb of West Pymble to the north. These facilities are reasonably well screened from the motorway by existing vegetation and, over time, it is anticipated that views of the site from these buildings will further diminish as constructed landscape buffer zones between these buildings and the motorway mature.
Figure 8 Visual Envelope Map & Key Viewpoint Locations
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 9
The medium density residential precinct adjoining the site to the north east consists primarily of three storey apartment buildings serviced by Khartoum Road, Leisure Close, Durham Close and Carlisle Close. The artwork installation site is not visible from these properties areas due to extensive vegetation cover. However, the north eastern areas of the site, including Industrial Creek, adjoining the residential boundary will be visible from the perimeter driveway of the apartment complex accessed from Leisure Close and the apartments facing the project site. These areas will be subject to site rehabilitation works including, primarily, creek bank stabilization, weed removal and revegetation.
There are two key viewpoints that have been identified for impact assessment, both of these are from the motorway, one from the eastbound carriageway and one from the westbound carriageway. This project is somewhat different from most that undergo a visual impact assessment as the whole intention is to provide a landmark artwork installation that requires maximum visibility for the most number of viewers possible in order for a meaningful and successful outcome to be achieved.
06 Visual Impact Assessment The visual impact of the proposal is determined by evaluating the sensitivity to change of the view and the magnitude of the proposal in that view.
Magnitude is the expression of change in a view created by the interaction between the proposal and the existing environment. Assessment issues include:
-Ā changes to landform; -Ā changes to vegetation patterns; -Ā the nature, density and scale of existing attributes and proposed works.
Visual sensitivity depends on a range of user group characteristics and the author’s knowledge or public perception of the quality of particular land uses and landscape settings. Characteristics considered in this assessment include:
-Ā the perceived cultural value of the visual environment and elements within it; -Ā user groups (residents, workers, motorists); -Ā frequency (the number of viewers or the frequency of views for an individual); -Ā duration of views, and -Ā the distance of the proposed works from viewers.
The visual impact is calculated using the landscape character and visual impact grading matrix provided in RMS Practice Note EIA–N04 (refer Figure 9 below).
VIEWPOINT 1
Figure 9 EIA-N04 Landscape character and visual impact grading matrix.
10 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
Viewpoint 01: View from westbound carriageway
Viewpoint 01 depicts the motorist view on the westbound carriageway approaching the Herring Road exit to Talavera Road. Two images are indicated, image 01a, which is approximately 300 metres from the site, and image 01 b, which is about 150 metres from the site. The viewpoints are consistent with a typical motorway landscape of continual traffic movement, noise walls, motorway signage and various landscapes each side of the motorway.
Viewpoint Magnitude Sensitivity Impact
O1 Low The magnitude of the landscape rehabilitation works in these views will be minor given the extensive vegetation cover in the views. The rehabilitations works proposed beyond the extent of the old compound site will not be visible. Similarly the magnitude of the artwork envelope is generally consistent with typical motorway landscapes that include various roadside structures, signage and road furniture
Low High volume and with short duration views are experienced by motorway users. There is low sensitivity to change, as the background views of vegetation will remain constant.
Low
Figure 10 Viewpoint 01a - westbound
Figure 11 Viewpoint 01b - westbound
Approximate artwork installation envelope
Approximate artwork installation envelope
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 11
Viewpoint 02: View from eastbound carriageway
Viewpoint 02 depicts the motorist view on the eastbound carriageway entering from the Christie Road on-ramp to the motorway. Two images are indicated, image 02a, which is approximately 325 metres from the site, and image 02 b, which is approximately 250 metres from the site. The viewpoints are consistent with a typical motorway landscape of continual traffic movement, noise walls motorway signage and various landscapes each side of the motorway.
Viewpoint Magnitude Sensitivity Impact
O2 Low As for viewpoint 01, the magnitude of the landscape rehabilitation works in these views will be minor given the extensive vegetation cover in the views. As Similarly the magnitude of the artwork envelope is generally consistent with typical motorway landscapes that include various roadside structures, signage and road furniture
Low High volume and with short duration views are experienced by motorway users. There is low sensitivity to change, as the background views of vegetation will remain constant.
Low
Figure 12 Viewpoint 02a – eastbound
Figure 13 Viewpoint 02b – eastbound
Approximate artwork installation envelope
Approximate artwork installation envelope
12 M2 Macquarie Park Art Installation – Visual Impact Assessment Report
Minor visual impacts
Other visual impacts associated with the project are primarily related to the construction phase of the project, and directly related to site disturbance, providing construction access from the motorway and weed removal throughout the site. The site will be fenced off from the motorway and therefore the construction activity on the old construction compound site will be largely screened from view. The majority of work being undertaken here is related to site revegetation, all of which will provide a significant visual improvement over the existing prevailing site conditions.
At the north eastern corner of the site, the rehabilitation works will involve removal of exotic weeds, creek bank stabilisation works, mulching and planting of indigenous species as part of the revegetation process. Existing native trees and understorey plants will be retained and protected. The majority of exotic vegetation removal occurs in the ground storey layer. The removal alone of the extensive weed cover and installation of a mulch layer will provide a significant visual improvement, which will be further improved by planting of indigenous species throughout the rehabilitation areas.
Overall visual impact
The proposed works to the M2 Macquarie Park site are considered to be generally consistent with the overall M2 Motorway landscape.
The proposed landscape and bushland regeneration works will significantly improve the visual amenity of the site through simply restoring vegetation cover that once existed and so, there is no negative visual impact, only a positive one.
In terms of the artwork installation, there will be an impact to existing views from the motorway, however the scale and magnitude of the selected preferred artwork, as well as the two other preferred artworks is considered to be consistent with the scale and frequency of various roadside infrastructure elements and structures. As with the site restoration works, it is considered that there will be no appreciable negative impacts, only a positive one.
Viewpoint Magnitude Sensitivity Impact
O1 Low
Low
Low
O2 Low
Low
Low
Overall Impact Low
M2 Macquarie Park Art Installation – Visual Impact Assessment Report 13
07 Summary
The site regeneration and artwork installation will only bring positive outcomes for the overall motorway landscape and wider community.
An important consideration for on-going design development of the selected artwork, is further assessment of the location on site in relation to sightlines into the site and setbacks from the motorway along with resolution of the overall scale and detailing of the installation and the selection of plant species and surface finishes around the final installation. It will need to be of a scale that will enable it become a memorable landmark along the motorway. There is a risk that the artwork, if not of a suitable scale, could become lost within the landscape and the scale of the motorway and the various motorway infrastructure elements that exist within the road corridor.
It is recommended that additional design studies been developed to test the visibility and presence of the final selected artwork, through a series of photomontages and models, to ensure that the right balance is achieved to enable the installation to be appreciated in a meaningful way and without any road safety impacts. This should also consider relocation of the two existing roadside advisory signs, which in their current location will impede views of the artwork.
M2 Macquarie Park Art Installation – Visual Impact Assessment Report
APPENDICIES
APPENDIX A –
UAP Feasibility Study
TRAN
SURB
ANFE
ASIB
ILIT
Y ST
UDY
UAP
REF
EREN
CE: C
4174
B11
MAR
CH 2
016
M2 FE
ASIBI
LITY S
TUDY
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
of 2
4
CO
NC
EPT
DES
IGN
INTE
NT
An ic
onic
repr
esen
tatio
n of
nat
ive
Aust
ralia
n gu
m le
aves
, pod
and
bl
osso
ms
evok
e a
sens
e of
nat
ural
bea
uty
and
won
der w
ith m
etal
lic s
oft
refle
ctio
ns b
y da
y an
d w
arm
ligh
ting
elem
ents
of t
he s
tam
en a
t nig
ht.
REC
OM
MEN
DED
MAT
ERIA
LS A
ND
FIN
ISH
ES
Ro
lled
stai
nles
s st
eel r
od &
CH
S, p
olis
hed
Pa
nelli
sed
polis
hed
stai
nles
s st
eel
Sp
ring
stee
l rod
STR
UCT
UR
ETh
e st
ruct
ural
del
iver
y of
the
wor
k is
con
side
red
to h
ave
a m
ediu
m le
vel
of ri
sk, h
owev
er it
is e
xpec
ted
this
risk
can
be
min
imis
ed th
roug
h de
sign
ad
just
men
ts w
hich
do
not h
ave
a gr
eat i
mpa
ct o
n th
e vi
sual
inte
nt.
FAB
RIC
ATIO
N &
INST
ALLA
TIO
NFa
bric
atio
n an
ticip
ated
to ra
nge
betw
een
mid
- hi
gh le
vel c
ompl
exity
. It
is a
lso
note
d th
at th
e ar
tist h
as b
een
high
ly c
olla
bora
tive
and
prov
ided
ad
ditio
nal w
orks
to a
ssis
t with
the
proj
ect’s
dev
elop
men
t, ou
tsid
e of
his
in
itial
sco
pe.
ANTI
CIP
ATED
MAI
NTE
NAN
CE
An
nual
cle
anin
g re
com
men
ded
EXEC
UTI
VE
SUM
MA
RY
CO
NC
EPT
DES
IGN
INTE
NT
A pl
ayfu
l gra
phic
nar
rativ
e of
the
Aust
ralia
n fa
una
on s
cale
, dep
ictin
g th
e cy
cle
of n
atur
e. B
old
in s
cale
and
col
our K
inet
ica
will
hav
e a
visu
al
pres
ence
in th
e la
ndsc
ape.
REC
OM
MEN
DED
MAT
ERIA
LS A
ND
FIN
ISH
ES
La
ser c
ut c
orte
n st
eel,
lase
r cut
alu
min
ium
pla
te
STR
UCT
UR
ETh
e st
ruct
ural
del
iver
y of
the
wor
k de
emed
feas
ible
. The
vis
ual a
esth
etic
how
ever
bec
ause
the
basi
s fo
r thi
s de
sign
is a
2d
grap
hic
imag
e, th
is
deve
lopm
ent i
s ex
pect
ed to
hel
p pr
eser
ve a
nd im
prov
e th
e or
igin
al v
isua
l in
tent
rath
er th
an c
halle
nge
it.
FAB
RIC
ATIO
N &
INST
ALLA
TIO
N
Conc
eptu
ally
bas
ed a
roun
d m
ovem
ent,
the
prop
osal
of m
ovin
g el
emen
ts
is d
eem
ed to
be
not a
ppro
pria
te b
ased
on
cost
and
mai
nten
ance
im
plic
atio
ns a
nd v
isib
ility
giv
en th
e sp
eed
of m
ost a
rtw
ork
view
ers.
Som
e
conc
ept i
nclu
ded
iden
tical
ele
men
ts o
n re
ar fa
cing
art
wor
k, th
is is
not
re
com
men
ded,
due
to la
ck o
f sig
ht li
nes.
ANTI
CIP
ATED
MAI
NTE
NAN
CE
An
nual
insp
ectio
n fo
r str
uctu
re a
nd m
ovin
g pa
rts
Re
com
men
ded
re-p
aint
on
site
aft
er 1
5 ye
ar p
erio
d
Re
com
men
ded
refu
rb o
f mov
ing
part
s on
10
year
cyc
le
An
nual
cle
anin
g re
com
men
ded
CO
NC
EPT
DES
IGN
INTE
NT
mem
bers
will
pro
vide
a la
rge
scal
e ar
twor
k th
at re
spon
ds to
a
tran
sitio
ning
per
spec
tive.
REC
OM
MEN
DED
MAT
ERIA
LS A
ND
FIN
ISH
ES
LE
D st
rip li
ghtin
g
STR
UCT
UR
ETh
e st
ruct
ural
del
iver
y of
the
wor
k ha
s a
high
leve
l ris
k. T
here
is
aest
hetic
det
rimen
tally
due
to th
e co
ncep
t’s re
lianc
e on
sim
plic
ity a
nd
eleg
ance
. The
eng
inee
ring
risk
coul
d al
so h
ave
cost
impl
icat
ions
, ext
ra
FAB
RIC
ATIO
N &
INST
ALLA
TIO
N
Rolle
d st
eel w
ith in
terlo
ckin
g co
ncea
led
bolte
d co
nnec
tions
.
ANTI
CIP
ATED
MAI
NTE
NAN
CE
Re
com
men
ded
re-p
aint
on-
site
aft
er 1
5 ye
ar p
erio
d
An
nual
cle
anin
g re
com
men
ded
INTE
RLE
AVES
KIN
ETIC
ASO
LAR
WEA
VE
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 4
of 2
4
CO
NC
EPT
DES
IGN
AR
TIST
PRO
POSE
D M
ATER
IALS
3
x le
af fo
rms
- com
bina
tion
of s
tain
less
ste
el c
hs &
rod
Po
d - c
ombi
natio
n of
sta
inle
ss s
teel
chs
& ro
d
Fl
ower
Ste
m -
com
bina
tion
of s
tain
less
ste
el c
hs &
rod
Fl
ower
Cup
- co
mbi
natio
n of
sta
inle
ss s
teel
chs
& ro
d
Fl
ower
Sep
als
- com
bina
tion
of s
tain
less
ste
el c
hs &
rod
Fl
ower
Sta
men
Fila
men
ts -
com
bina
tion
of s
tain
less
ste
el c
hs &
rod
LED
light
ing
& so
lar p
anel
s
SUIT
ABIL
ITY
OF
MAT
ERIA
LSTh
e m
ajor
ity o
f the
wor
k is
pro
pose
d fo
r fab
ricat
ion
in s
tain
less
ste
el,
the
mat
eria
l is
suita
ble
for a
wor
k w
ith lo
ng li
fesp
an w
ith m
inim
al
mai
nten
ance
. Sta
inle
ss s
teel
neg
ates
the
need
for a
n ad
ditio
nal c
oatin
g w
hich
may
be
a po
sitiv
e fro
m a
n en
viro
nmen
tal p
ersp
ectiv
e, o
nly
limite
d
DES
IGN
DEV
ELO
PM
ENT
UAP
REC
OM
MEN
DED
MAT
ERIA
LS
Pod
- pan
ellis
ed s
tain
less
ste
el fo
rmed
to s
hape
, red
ucin
g m
ater
ial
Fl
ower
ste
m -
pane
llise
d st
ainl
ess
stee
l for
med
to s
hape
, red
ucin
g
Se
pals
- pa
nelli
sed
stai
nles
s st
eel f
orm
ed to
sha
pe, r
educ
ing
mat
eria
l
Fl
ower
sta
men
- pa
inte
d sp
ring
stee
l rod
LE
D lig
htin
g - c
usto
m fa
bric
ated
sol
ar li
ghts
, to
avoi
d w
iring
bei
ng
MAT
ERIA
LS A
ND
FIN
ISH
ES
INTE
RLE
AVES
CO
NC
EPT
DES
IGN
AR
TIST
PRO
POSE
D M
ATER
IALS
La
ser c
ut a
lum
iniu
m
Re
cycl
ed ti
mbe
r
Re
cycl
ed w
indm
ill c
ompo
nent
s
LE
D lig
htin
g &
sola
r pan
els
SUIT
ABIL
ITY
OF
MAT
ERIA
LS
not a
dvis
ed o
n th
is s
cale
due
to li
mita
tions
of p
roce
ss &
com
pone
nt s
ize.
Re
cycl
ed w
indm
ill c
ompo
nent
s no
t rec
omm
ende
d du
e to
risk
to li
fesp
an
a cl
addi
ng m
ater
ial,
risk
is re
late
d to
ava
ilabi
lity
and
sour
cing
lim
itatio
ns.
and
light
wei
ght t
o al
low
pos
sibl
e ki
netic
mov
emen
t - h
eavi
er m
ater
ials
m
ay li
mit
the
pote
ntia
l of m
ovem
ent u
nles
s a
pow
er s
ourc
e is
als
o in
corp
orat
ed. S
truc
tura
l ste
el w
ill n
eed
to b
e in
corp
orat
ed.
DES
IGN
DEV
ELO
PM
ENT
UAP
REC
OM
MEN
DED
MAT
ERIA
LS
Ro
lled
stee
l/alu
min
ium
she
et to
form
cur
ves
of w
arra
tah
leaf
pet
als
La
ser c
ut c
orte
n st
eel f
or 2
x b
anks
ia fo
rms
N
ew b
earin
gs &
hub
s fo
r lon
gevi
ty a
nd m
aint
enan
ce
Re
duct
ion
of k
inet
ic e
lem
ents
to k
ey it
ems
only
, to
pres
erve
inte
nt a
nd
limit
mai
nten
ance
KIN
ETIC
A
CO
NC
EPT
DES
IGN
AR
TIST
PRO
POSE
D M
ATER
IALS
Ro
lled
mild
ste
el 2
00 d
iam
eter
chs
Fl
exib
le L
ED s
trip
ligh
t & s
olar
pan
els
SUIT
ABIL
ITY
OF
MAT
ERIA
LS
appr
opria
te b
end
with
out d
efec
ts. L
ED IP
ratin
g is
sui
tabl
e, IP
ratin
g 65
-66
wou
ld a
lso
be s
uita
ble,
pot
entia
lly a
t im
prov
ed p
rice
poin
t. M
ater
ials
are
ap
prop
riate
how
ever
sec
tion
size
is u
nder
-est
imat
ed.
DES
IGN
DEV
ELO
PM
ENT
UAP
REC
OM
MEN
DED
MAT
ERIA
LS
Se
lect
ed m
ater
ials
sui
tabl
e fo
r ins
talla
tion
Ro
lled
mild
ste
el tu
be, a
ppro
x 35
6mm
dia
met
er c
hs w
ith lo
ng li
fe p
aint
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 5
of 2
4
STR
UCT
UR
AL O
VER
VIE
W, A
S P
ER C
ON
CEP
T D
ESIG
NTh
e st
ruct
ural
del
iver
y of
the
wor
k is
con
side
red
to h
ave
a m
ediu
m le
vel
of ri
sk, h
owev
er it
is e
xpec
ted
this
risk
can
be
min
imis
ed th
roug
h de
sign
ad
just
men
ts w
hich
do
not h
ave
a gr
eat i
mpa
ct o
n th
e vi
sual
inte
nt.
The
desi
gn o
f the
con
cept
allo
ws
for a
larg
e de
gree
of c
ross
-bra
cing
th
roug
h its
det
ail a
nd m
ater
ialit
y. It
is e
xpec
ted
that
adj
ustm
ents
wou
ld
Tube
siz
es m
ay n
eed
to b
e in
crea
sed
and
furt
her e
mbe
ddin
g at
gro
und
may
be
idea
l. Th
e po
sitio
ning
/for
m o
f the
leav
es w
ill n
eed
to a
djus
t to
touc
h th
e gr
ound
at m
ore
than
two
poin
ts.
Thes
e ad
just
men
ts a
re c
onsi
dere
d lo
w ri
sk o
f det
ract
ing
from
the
conc
ept i
nten
t, an
d it
is e
xpec
ted
the
visu
al im
pact
/gen
eral
aes
thet
ic w
ill
be a
chie
vabl
e.
MAT
ERIA
L TO
NN
AGE
ARTW
OR
K L
OAD
EST
IMAT
E
ENG
INEE
RIN
G P
REL
IMIN
AR
IES
INTE
RLE
AVES
STR
UCT
UR
AL O
VER
VIE
W, A
S P
ER C
ON
CEP
T D
ESIG
N
The
stru
ctur
al d
eliv
ery
of th
e w
ork
deem
ed fe
asib
le. T
he w
ork
is la
rge
scal
e an
d al
l com
pone
nts
depe
nd o
n a
cent
ral v
ertic
al s
truc
tura
l mem
ber.
adju
stm
ent a
s th
e de
sign
is d
evel
oped
furt
her.
All e
lem
ents
will
hav
e a
the
initi
al d
esig
n. P
lace
men
t of m
otor
is re
com
men
ded
at g
roun
d le
vel.
in fu
ture
pha
ses,
how
ever
bec
ause
the
basi
s fo
r thi
s de
sign
is a
gra
phic
im
age,
this
dev
elop
men
t is
expe
cted
to h
elp
pres
erve
the
orig
inal
vis
ual
inte
nt ra
ther
than
cha
lleng
e it.
MAT
ERIA
L TO
NN
AGE
ARTW
OR
K L
OAD
EST
IMAT
E
KIN
ETIC
A
STR
UCT
UR
AL O
VER
VIE
W, A
S P
ER C
ON
CEP
T D
ESIG
N
The
stru
ctur
al d
eliv
ery
of th
e w
ork
has
a hi
gh le
vel r
isk.
stab
ilise
the
arch
es w
ith la
rge
in g
roun
d fo
otin
gs. T
he in
terc
onne
ctin
g
the
conc
ept i
nten
t, flu
idity
of m
ovem
ent o
f the
form
and
its
play
on
pers
pect
ive
will
be
reta
ined
.
The
wor
k ha
s a
high
radi
us o
f gyr
atio
n, a
nd th
e m
embe
r siz
e of
200
mm
is
opt
imis
tic g
iven
the
span
of 5
1m. P
relim
inar
y st
udie
s su
gges
t thi
s m
embe
r siz
e is
like
to b
e cl
oser
to 3
56m
m.
The
long
sle
nder
item
is v
ulne
rabl
e to
win
d in
duce
d vi
brat
ion.
It is
a ri
sk
chan
ge th
e vi
sual
aes
thet
ic d
etrim
enta
lly d
ue to
the
natu
re o
f the
des
ign
the
conc
ept’s
sim
plic
ity a
nd e
lega
nce.
MAT
ERIA
L TO
NN
AGE
ARTW
OR
K L
OAD
EST
IMAT
E
SOLA
R W
EAV
E
3D V
ISUA
LISA
TIO
NPL
AN &
ELE
VATI
ON
MAT
ERIA
LS &
MAI
NTE
NAN
CE
INTE
RLEA
VES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 7
of 2
4
CO
NC
EPT
DES
IGN
INTE
NT
The
icon
ic g
um n
ut is
a h
ighl
y ch
arge
d sy
mbo
l of t
he A
ustr
alia
n Bu
sh
rem
indi
ng u
s of
the
rege
nera
tive
forc
es o
f nat
ure
and
our s
hare
d cu
stod
ians
hip
of th
e la
nd. E
voca
tive
of th
e su
rrou
ndin
g hi
lls a
nd ri
ver
natu
re. U
sing
sof
t met
allic
refle
ctio
ns b
y da
y an
d w
arm
ligh
ting
elem
ents
at
nig
ht, t
he a
rtw
ork
seam
less
ly in
tegr
ates
into
the
site
.
CO
NC
EPT
APP
RO
ACH
The
prop
osed
con
cept
Inte
rleav
es h
as a
rela
tivel
y hi
gh le
vel o
f fab
ricat
ion
com
plex
ity a
nd m
ediu
m v
olum
e of
mat
eria
l. U
AP w
ere
prov
ided
with
an
addi
tiona
l com
pone
nt b
y Ar
tist M
atth
ew H
ardi
ng, “
Pod”
, for
con
side
ratio
n an
d po
tent
ial i
ncor
pora
tion
into
the
desi
gn. T
he c
onst
ruct
ion
met
hod
for
all e
lem
ents
con
sist
s of
3 o
r 4 c
hs la
yers
.
a
rolle
d ou
ter e
dge
chs
m
id ra
nge
chs
late
ral m
embe
rs fo
rmed
thro
ugh
jigs
and
wel
ded
sm
alle
r dia
met
er ro
d fo
rmed
thro
ugh
jigs
/ rol
led
and
wel
ded
Prop
osed
flow
er e
lem
ents
con
sist
of a
n ar
ray
of s
olar
pan
els
inte
grat
ed
into
the
form
, whi
ch p
lay
on th
e id
ea o
f pho
tosy
nthe
sis.
Lig
htin
g pl
ays
an
inte
gral
role
as
Inte
rleav
es b
loom
s at
nig
ht. I
nitia
l con
cept
pro
pose
d th
at
Inte
grat
ed la
ndsc
apin
g to
com
plim
ent t
he a
rtw
ork
into
the
site
is o
f hig
h im
port
ance
to th
e ar
tist.
The
spin
e de
sign
of t
he le
aves
cou
ld c
aptu
re
wat
er ru
noff
and
feed
into
sur
roun
ding
rock
sw
ales
pro
vidi
ng a
hav
en fo
r na
tive
faun
a.
PR
OP
OSE
D D
EVEL
OP
MEN
T
UAP
reco
mm
end
redu
cing
the
com
plex
ity in
fabr
icat
ion
met
hodo
logy
an
d re
duci
ng th
e ov
eral
l vol
ume
of m
ater
ial.
In tu
rn a
cos
t sav
ing
in
fabr
icat
ion
time
and
mat
eria
l.
This
is to
be
achi
eved
by
repl
acin
g th
e flo
wer
ste
m /
cup
and
sepa
ls fr
om
rods
and
tube
s to
pan
ellis
ed p
olis
hed
stai
nles
s st
eel.
The
body
of t
he p
od
wou
ld b
e fa
bric
ated
als
o of
pan
ellis
ed p
olis
hed
stai
nles
s st
eel w
ith th
e fro
nt fa
ce m
aint
aini
ng th
e or
igin
al ro
ds a
nd tu
bula
r fab
ricat
ion
proc
ess.
M
atth
ew H
ardi
ng a
nd B
en S
torc
h ag
reed
with
this
app
roac
h.
with
sol
ar c
ells
sim
ilar t
o ga
rden
var
iety
ligh
ts. T
his
inte
grat
ion
of li
ghtin
g al
low
s fo
r eas
e of
mai
nten
ance
and
lack
of w
iring
.
incr
ease
sta
bilit
y an
d cr
ossb
raci
ng.
Addi
tiona
l LED
ligh
ting
inco
rpor
ated
into
the
oute
r edg
e of
the
flow
er a
t
CON
CEPT
SU
MM
ARY
INTE
RLE
AVES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 8
of 2
4
INTE
RLE
AVES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 9
of 2
4
INTE
RLE
AVES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
0 of
24
INTE
RLE
AVES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
1 of
24
INTE
RLE
AVES
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
2 of
24
ELEV
ATIO
NS,
PLA
N &
GEN
ERAL
DIM
ENSI
ON
SIN
TER
LEAV
ES
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
7,300
4,400
PLA
N V
IEW
FRO
NT
ELEV
ATIO
NSI
DE
ELEV
ATIO
N
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
3 of
24
APPR
OXIM
ATE
SITE
LO
CATI
ON
INTE
RLE
AVES
25,000
20,600
PLA
N V
IEW
N
NO
TE :D
IMEN
SIO
NS
TO R
OAD
SID
E K
ERB
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
4 of
24
MAT
ERIA
LS &
AN
TICI
PATE
D M
AIN
TEN
AN
CE
1. S
TAIN
LESS
STE
EL C
HS
Lo
w m
aint
enan
ce
Cl
eani
ng &
pol
ishi
ng re
com
men
ded
on a
n as
nee
ds
basi
s, a
nnua
lly a
s a
min
imum
2. P
AIN
TED
SP
RIN
G S
TEEL
RO
D
Low
mai
nten
ance
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
, an
nual
ly a
s a
min
imum
re
-pai
nt a
fter
15
year
s. C
olou
r fad
e w
ill o
ccur
due
be w
arra
ntab
le a
nd th
e re
d w
ill s
till b
e hi
gh im
pact
vi
sual
ly
3. S
OLA
R P
ANEL
INTE
GR
ATIO
N
prod
uct h
owev
er ty
pica
l life
span
of a
ppro
xim
atel
y 25
ye
ars
4. L
IGH
TIN
G
LED
in g
roun
d lig
htin
g, IP
65 o
r hig
her r
atin
g re
com
men
ded
LE
D lig
htin
g w
ithin
flow
er b
ase
to s
truc
ture
to li
ght
stam
en a
t nig
ht
in
tent
for t
hese
uni
ts to
be
cust
om m
anuf
actu
red
for e
ase
of m
aint
enan
ce a
nd re
plac
emen
t, ho
wev
er
will
als
o ha
ve ty
pica
l lon
g lif
espa
n of
LED
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
An
nual
insp
ectio
n re
com
men
ded
KINE
TICA
3D V
ISUA
LISA
TIO
NPL
AN &
ELE
VATI
ON
MAT
ERIA
LS &
MAI
NTE
NAN
CE
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
7 of
24
CO
NC
EPT
DES
IGN
INTE
NT
natu
ral e
lem
ents
of w
ind
and
sun,
the
artw
ork
is a
dyn
amic
, col
ourf
ul
and
kine
tic p
rom
otio
n of
rene
wab
le e
nerg
y, re
juve
natio
n an
d gr
owth
. Its
bol
d pr
esen
ce w
ill v
isua
lly lo
cate
the
wor
k w
ithin
the
site
, whi
lst a
lso
refe
renc
ing
its n
atur
al s
urro
undi
ngs.
CO
NC
EPT
APP
RO
ACH
The
conc
ept o
f Kin
etic
a w
as p
rese
nted
as
a 2
dim
ensi
onal
gra
phic
re
pres
enta
tion
of A
ustr
alia
n flo
ra w
ith a
n va
riety
of l
aser
cut
pai
nted
or
ano
dise
d al
umin
ium
form
s. P
ropo
sed
elem
ents
cou
ld in
corp
orat
e re
cycl
ed w
indm
ill c
ompo
nent
s an
d re
cycl
ed ti
mbe
rs.
El
emen
ts p
ropo
sed
to b
e id
entic
al b
oth
on th
e fro
nt a
nd re
ar fa
ces.
Ba
nksi
a - p
ropo
sed
to h
ave
eyes
with
the
larg
er fo
rms
to b
e bl
ink
slow
ly fo
ur ti
mes
dai
ly.
m
otio
n.
ro
tate
mec
hani
cally
in a
slo
w c
ontr
olle
d m
otio
n.
PR
OP
OSE
D D
EVEL
OP
MEN
TU
AP re
com
men
d:
a re
duce
d nu
mbe
r of e
lem
ents
for b
udge
tary
pur
pose
s, a
s th
e co
ncep
t de
velo
ps fu
rthe
r the
re m
ay b
e op
port
unity
to in
crea
se e
lem
ents
fo
rms
to h
ave
grea
ter w
idth
to p
rovi
de s
tabi
lity
and
stru
ctur
e fo
r fo
otin
gs
fo
rms
are
to b
e m
anuf
actu
red
from
lase
r cut
mild
ste
el, r
olle
d an
d
el
emen
ts a
re n
ot d
uplic
ated
on
the
rear
sid
e as
they
are
not
see
n fro
m
a ke
y vi
ew
Ba
nksi
a el
emen
ts to
be
stat
ic. C
ompl
exity
in m
echa
nics
of b
linki
ng
eyes
, the
abi
lity
to re
cogn
ise
by p
assi
ng c
omm
uter
s, m
aint
enan
ce
to
be
rolle
d an
d m
echa
nica
lly d
riven
in o
ppos
ing
dire
ctio
ns in
a s
low
co
ntro
lled
mot
ion.
CON
CEPT
SU
MM
ARY
KIN
ETIC
A
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
8 of
24
KIN
ETIC
A
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 1
9 of
24
KIN
ETIC
A
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
0 of
24
KIN
ETIC
A
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
1 of
24
KIN
ETIC
A
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
2 of
24
ELEV
ATIO
NS,
PLA
N &
GEN
ERAL
DIM
ENSI
ON
SK
INET
ICA
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
41,0
00
2,240
PLA
N V
IEW
FRO
NT
ELEV
ATIO
NSI
DE
ELEV
ATIO
N
6,25
0
7,200
3,600
915
10,500
4,300
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
3 of
24
APPR
OXIM
ATE
SITE
LO
CATI
ON
KIN
ETIC
A
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
41,0
00
19,500
24,500
PLA
N V
IEW
N
NO
TE :D
IMEN
SIO
NS
TO R
OAD
SID
E K
ERB
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
4 of
24
1. P
AIN
TED
MIL
D S
TEEL
Lo
w m
aint
enan
ce
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
, an
nual
ly a
s a
min
imum
re
-pai
nt a
fter
15
year
s. C
olou
r fad
e w
ill o
ccur
due
to
war
rant
able
and
the
colo
urs
will
stil
l be
high
impa
ct
and
high
con
tras
t vis
ually
2. C
ORT
EN S
TEEL
- B
ANK
SIA
BAC
KIN
G P
ANEL
Low
mai
nten
ance
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
, an
nual
ly a
s a
min
imum
3. M
OTO
R A
ND
MO
VIN
G C
OM
PO
NEN
TRY
To
be
insp
ecte
d an
nual
ly a
s a
min
imum
Re
com
men
datio
n fo
r war
rata
h el
emen
t to
be c
hain
dr
iven
with
mot
or b
ased
at g
roun
d le
vel f
or e
ase
of
acce
ss
ap
prox
imat
ely
a 10
yea
r cyc
le
4. L
IGH
TIN
G
LED
in g
roun
d up
light
ing
allo
wed
, IP6
5 or
hig
her
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
An
nual
insp
ectio
n re
com
men
ded
MAT
ERIA
LS A
ND
MAI
NTE
NAN
CEK
INET
ICA
SOLA
R WE
AVE
3D V
ISUA
LISA
TIO
NPL
AN &
ELE
VATI
ON
MAT
ERIA
LS &
MAI
NTE
NAN
CE
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
7 of
36
CO
NC
EPT
DES
IGN
INTE
NT
Rem
inis
cent
of a
sun
flar
e, th
e ar
twor
k is
fuel
led
by th
e su
ns li
ght
and
resp
onsi
ve e
nviro
nmen
t tha
t we
inha
bit.
Furt
her,
it ca
ptur
es th
e su
rrou
ndin
g so
lar e
nerg
y an
d co
nver
ts it
into
wov
en s
trip
s of
ligh
t for
a
dyna
mic
nig
ht ti
me
pres
ence
. Its
del
icat
e w
oven
nat
ure
allo
ws
a m
ultip
le
of p
ersp
ectiv
e vi
ews
that
cha
nge
as o
ne tr
ansi
tions
abo
ut th
e w
ork.
CO
NC
EPT
APP
RO
ACH
An e
xpan
sive
inst
alla
tion
prop
osed
as
an o
vera
ll le
ngth
of n
ear 1
25 x
11
.5m
hig
h of
ferin
g co
mm
uter
s a
chan
ging
per
spec
tive
upon
app
roac
h an
d fro
m e
ither
dire
ctio
n.
Desi
gned
to b
e an
icon
ic e
xam
ple
of re
new
able
ene
rgy
art i
n pr
actic
e.
pres
ence
in th
e ni
ght t
ime
envi
ronm
ent.
Pow
ered
by
Tesl
a Po
wer
wal
l bat
tery
sto
rage
sys
tem
s or
sim
ilar s
elf
cont
aine
d un
its.
PR
OP
OSE
D D
EVEL
OP
MEN
T
light
ing.
Idea
lly tr
ansf
orm
ers
wou
ld b
e lo
cate
d be
low
gro
und
leve
l in
elem
ents
are
10m
leng
ths,
leng
ths
inst
alle
d to
be
cons
ider
ed fo
r eas
e of
m
aint
enan
ce.
Engi
neer
ing
prel
imin
arie
s ha
ve ra
ised
con
cern
s ab
out w
ind
indu
ced
impl
icat
ion
of c
ross
-bra
cing
and
stif
fene
rs th
at m
ay b
e ne
cess
ary
to ru
n to
gro
und.
CON
CEPT
SU
MM
ARY
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
8 of
36
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 2
9 of
36
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
0 of
36
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
1 of
36
SOLA
R W
EAV
E
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
2 of
36
ELEV
ATIO
NS,
PLA
N &
GEN
ERAL
DIM
ENSI
ON
SSO
LAR
WEA
VE
124,
160
17,1
00
11,425
PLA
N V
IEW
FRO
NT
ELEV
ATIO
NSI
DE
ELEV
ATIO
N
16,2
0044
,750
63,2
30
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
3 of
36
APPR
OXIM
ATE
SITE
LO
CATI
ON
SOLA
R W
EAV
E
ALL
DIM
ENSI
ON
S IN
MIL
LIM
ETRE
S - D
O N
OT
SCAL
E
ALL
DIM
ENSI
ON
S IN
DICA
TIVE
ON
LY, P
ENDI
NG
FU
RTH
ER D
ESIG
N D
EVEL
OPM
ENT
44,7
5024,000
21,000
PLA
N V
IEW
N
NO
TE :D
IMEN
SIO
NS
TO R
OAD
SID
E K
ERB
16,2
0063
,230
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
4 of
36
1. P
AIN
TED
MIL
D S
TEEL
Lo
w m
aint
enan
ce
Cl
eani
ng re
com
men
ded
on a
n as
nee
ds b
asis
, an
nual
ly a
s a
min
imum
inte
grity
will
be
war
rant
able
and
the
colo
ur w
ill s
till b
e hi
gh im
pact
vis
ually
2. S
OLA
R P
ANEL
S AN
D T
ESLA
PO
WER
WAL
L
prod
uct h
owev
er ty
pica
l life
span
of a
ppro
xim
atel
y 25
ye
ars
3. L
IGH
TIN
G
how
ever
opt
ion
is fe
asib
le. I
P Ra
ting
of 6
5 or
abo
ve is
Re
com
men
ded
that
tran
sfor
mer
s ar
e ho
used
in
belo
w g
roun
d ca
bine
t, fo
r eas
e of
acc
ess
Co
nsid
erat
ion
of L
ED s
trip
leng
ths
to a
llow
over
life
of w
ork
An
nual
insp
ectio
n re
com
men
ded
MAT
ERIA
LS A
ND
MAI
NTE
NAN
CESO
LAR
WEA
VE
UAP F
ACTO
RY
11 M
arch
201
6 / T
rans
urba
n - M
2 Fe
asib
ility
Stu
dy/ 3
6 of
36
UAPC
OMPA
NY.C
OM
CO
NTA
CTS
TRAN
SUR
BAN
JASO
N H
ENN
ING
DIR
ECT
MO
BILE
+61
405
324
292
EMAI
L jh
enni
ng@
tran
surb
an.c
om
MAT
THEW
BR
ENN
ANH
ead
of S
usta
inab
ility
DIR
ECT
MO
BILE
+61
437
677
472
EMAI
L m
bren
nan@
tran
surb
an.c
om
DAN
IEL
NO
AEEN
MO
BILE
+61
405
231
143
EMAI
L dn
oaee
n@tr
ansu
rban
.com
UAP
SAM
UEL
MAY
ZE
DIR
ECT
+61
7 36
30 6
329
MO
BILE
EM
AIL
sam
uel.m
ayze
@ua
pcom
pany
.com
CR
AIG
HIR
THLe
ad D
esig
ner
DIR
ECT
EMAI
L cr
aig
hirt
h@ua
pcom
pany
.com
M2 Macquarie Park Art Installation – Visual Impact Assessment Report
APPENDIX B
Design entries selected for further development and assessment
1. ‘Kinetica’
2. ‘Interleaves’
3. ‘Solar Weave’
M2 Macquarie Park Art Installation – Visual Impact Assessment Report
1. ‘Kinetica’
Re
ge
ne
rati
on
. R
eb
irth
. U
niq
ue
. R
esi
lie
nt.
C
olo
urf
ul. F
un
.
Co
nte
mp
ora
ry. D
eco
nst
ructe
d. R
eco
nst
ructe
d. K
ine
tic.
Th
e d
isp
lay
of
pu
blic
art
in
any
env
iro
nm
ent
is a
val
uab
le
met
ho
d o
f cr
eati
ng
a d
eep
er a
pp
reci
atio
n a
nd
un
der
stan
din
g
of
its
con
text
ual
mea
nin
g.
Kin
etic
a is
an
ar
two
rk
des
ign
ed
to
com
plim
ent
Lan
dca
re A
ust
ralia
’s r
egen
erat
ion
co
nce
pt
pla
n a
nd
th
e M
2 M
oto
rway
wh
ilst
pay
ing
tri
bu
te t
o A
ust
ralia
’s
love
of
con
tem
po
rary
art
an
d n
atu
re.
Th
is b
od
y o
f w
ork
is
an o
utr
ageo
us
fusi
on
of
colo
ur
and
fo
rm,
dep
icti
ng
th
e re
silie
nce
an
d c
om
ple
xiti
es
invo
lved
in
th
e re
pro
du
ctio
n
and
lif
e cy
cle
of
Au
stra
lia’s
n
ativ
e fl
ora
. P
arti
ally
co
nst
ruct
ed
of
alu
min
ium
, th
ese
flo
ral
form
s u
nif
y in
du
stry
an
d
nat
ure
, en
com
pas
sin
g t
he
gro
wth
of
the
Mac
qu
arie
P
ark
area
wh
ilst
pro
mo
tin
g s
ust
ain
able
infr
astr
uct
ure
. T
he
juxt
apo
siti
on
o
f o
rgan
ic
and
sh
arp
lin
es
also
as
sist
s in
th
is a
mal
gam
atio
n.
No
t o
nly
is
Au
stra
lia’s
fl
ora
un
den
iab
ly u
niq
ue
in it
s ap
pea
ran
ce b
ut
also
in
its
abili
ty t
o w
ith
stan
d e
xtre
me
clim
atic
co
nd
itio
ns.
In
fact
, man
y o
f A
ust
ralia
’s n
ativ
e fl
ora
can
no
t ex
ist
in
the
abse
nce
of
fire
. Kin
etic
a ex
plo
res
this
cyc
le in
a
con
tem
po
rary
, ab
stra
ct a
nd
qu
irky
man
ner
- t
he
colo
urf
ul a
rms
rota
te in
slo
w, c
ircu
lar
mo
tio
ns
on
ce
agai
n r
ein
forc
ing
th
is n
oti
on
of
cycl
es, b
rin
gin
g t
his
ev
er s
o p
layf
ul
wo
rk t
o l
ife.
E
yes
blin
k at
slo
w
inte
rval
s, w
atch
ing
ove
r m
oto
rist
s as
th
ey p
ass
and
it
is t
hro
ug
h p
erso
nif
icat
ion
th
at t
hes
e q
uir
ky f
orm
s su
dd
enly
b
eco
me
a re
pre
sen
tati
on
o
f an
ev
er
chan
gin
g,
ever
g
row
ing
, so
ciet
y o
n
the
mo
ve.
Mo
vem
ent
also
as
sist
s in
p
rom
oti
ng
th
e id
ea
of
ren
ewab
le e
ner
gy.
Kin
etic
a is
a w
ond
erla
nd o
f ab
stra
cted
, dec
ons
truc
ted
an
d r
eco
nst
ruct
ed n
atio
nal
fav
ou
rite
s in
teg
rate
d i
n
an e
xplo
sio
n o
f co
lou
r. B
old
sh
ades
of
red
, g
reen
,
yello
w a
nd
blu
e ar
e a
resp
on
se t
o A
ust
ralia
’s c
olo
urf
ul
lan
dsc
ape,
g
ener
atin
g
a se
nse
o
f fa
mili
arit
y w
hils
t h
arm
on
izin
g w
ith
th
e n
atu
ral
surr
ou
nd
s.
In c
reat
ing
a
sen
se o
f h
arm
ony
an
d f
amili
arit
y th
rou
gh
an
oth
erw
ise
exci
tin
g a
nd
co
nte
mp
ora
ry b
od
y o
f w
ork
, K
inet
ica
is
des
ign
ed
to
up
lift
and
in
spir
e m
oto
rist
s ra
ther
th
an
dis
trac
t th
em.
Th
is w
ide
vari
ety
of
colo
ur,
shap
e an
d
form
als
o c
reat
es a
n u
plif
tin
g s
ense
of
div
ersi
ty t
hu
s ap
pea
ling
to
all
wal
ks o
f lif
e, y
ou
ng
, o
ld,
pas
t, p
rese
nt
and
fu
ture
gen
erat
ion
s.
Kin
etic
a is
a n
on
dis
crim
inat
ory
b
od
y o
f w
ork
des
ign
ed t
o a
pp
eal t
o o
ne
and
all
in s
pit
e o
f g
end
er, r
ace,
rel
igio
n o
r p
olit
ical
ag
end
a.
Re
gis
trati
on
No
.: M
210
4
M2
| M
acq
uar
ie P
ark
| L
and
care
Au
stra
lia
1
M2
| M
acq
uar
ie P
ark
| L
and
care
Au
stra
lia
Fig
ure
4. W
AR
ATA
H
Fig
ure
1. K
inet
ica
gro
up
sho
t in
situ
wit
h s
cale
.
Fig
ure
3. G
OL
DE
N W
AT
TL
E
Fig
ure
2. B
AN
KS
IA
Fig
ure
5. G
UM
LE
AV
ES
Se
lf-S
ust
ain
able
& E
co-F
rie
nd
lyS
ola
r en
erg
y w
ill
po
wer
b
oth
th
e sl
ow
-tu
rnin
g
arm
s, b
linki
ng
eye
s an
d L
ED
lig
hts
. S
ola
r p
ow
er
dra
ws
pu
re,
clea
n e
ner
gy
fro
m t
he
sun
, re
du
cin
g
gre
enh
ou
se
gas
em
issi
on
s an
d
ou
r re
lian
ce
on
fo
ssil
fuel
s. T
imer
s w
ill c
on
tro
l th
e re
spo
nsi
ven
ess
of
the
LE
D li
gh
ts a
s th
e su
n r
ises
an
d s
ets
mak
ing
th
is w
ork
sel
f-su
stai
nab
le.
Lo
cati
on
Pla
nT
he
inst
alla
tio
n w
ill b
e vi
sib
le t
o p
assi
ng
tra
ffic
an
d
nei
gh
bo
uri
ng
pro
per
ties
, an
d w
ill c
om
ple
men
t th
e en
viro
nm
enta
l ass
ets
of
the
loca
tio
n. T
he
M2
site
is
sep
arat
ed
fro
m
the
Mac
qu
arie
P
ark
com
mer
cial
an
d r
esid
enti
al c
entr
e b
y th
e H
ills
M2
Mo
torw
ay,
wh
ich
fo
rms
the
sou
ther
n s
ite
bo
un
dar
y. T
he
site
is
bo
un
ded
in
th
e ea
st
by
Kh
arto
um
R
oad
. Im
po
rtan
tly,
Lan
e C
ove
Nat
ion
al P
ark
adjo
ins
the
maj
ori
ty o
f th
e n
ort
her
n b
ou
nd
ary
and
a n
atu
re
rese
rve
is
on
th
e w
este
rn
bo
un
dar
y.
A
smal
l n
um
ber
of
med
ium
den
sity
res
iden
tial
pro
per
ties
al
so a
djo
in t
he
no
rth
ern
bo
un
dar
y.
Art
wo
rkA
pp
roxi
mat
ely
8-1
0 x
Fre
e-st
and
ing
Scu
lptu
res
Mat
eri
als,
Tre
atm
en
ts &
Co
lou
rs1.
Mat
eri
als
Th
e sp
ecif
ied
mat
eria
ls f
or
this
pro
ject
are
bas
ic
met
als.
A
b
len
d
of
recy
cled
m
etal
&
tr
eate
d
alu
min
ium
is
the
sele
cted
mat
eria
l fo
r th
is p
roje
ct
as
it
is
rob
ust
an
d
allo
ws
flex
ibili
ty
for
colo
ur
trea
tmen
t. T
he
mai
n s
culp
ture
s w
ill c
om
pri
se o
f la
ser
cut
shee
t m
etal
(1
0-2
0m
m
thic
knes
s).
Co
ncr
ete
will
b
e u
sed
to
se
t th
e ar
t p
iece
s p
erm
anen
tly
into
pla
ce.
LE
D li
gh
tin
g w
ill a
lso
be
stra
teg
ical
ly p
lace
d in
an
d
aro
un
d
the
scu
lptu
res/
seat
ing
to
b
e ill
um
inat
ed
afte
r h
ou
rs,
for
the
full
effe
ct o
f th
e la
ser
cutt
ing
.
Th
e L
ED
lig
hti
ng
will
be
inst
alle
d/f
ixed
in
to t
he
gro
un
d a
nd
wit
hin
th
e st
ruct
ure
to
cre
ate
a so
ft,
sub
tle
amb
ien
ce i
n c
oh
esio
n w
ith
th
e co
nce
ptu
al
them
e o
f re
juve
nat
ion
an
d g
row
th.
2. T
reat
me
nts
As
this
bo
dy
of
wo
rk w
ill b
e p
lace
d o
utd
oo
rs, t
hey
w
ill
nee
d
to
wit
hst
and
al
l th
e el
emen
ts
of
the
nat
ura
l en
viro
nm
ent.
Th
e ex
teri
or
of
the
scu
lptu
re
and
sea
ts w
ill h
ave
a p
olis
hed
sp
ray
pai
nt-
like
glo
ss
fin
ish
to
avo
id a
ny o
r m
uch
oxi
dat
ion
/co
rro
sio
n. A
n
ano
dis
ing
tre
atm
ent
may
be
nee
ded
to
hel
p f
urt
her
p
rote
ct
the
surf
ace.
A
fu
rth
er
varn
ish
w
ill
be
app
lied
to
h
elp
p
rote
ct
the
artw
ork
fr
om
va
nd
alis
m, s
uch
as
gra
ffit
i.
3. C
olo
urs
/Pat
tern
sA
wid
e ra
ng
e o
f b
rig
ht
and
eva
nes
cen
t co
lou
rs w
ill
be
use
d t
o d
epic
t th
e ab
un
dan
ce o
f th
e cu
ltu
rally
d
iver
se p
eop
le w
ith
in t
he
com
mu
nit
y.
Ult
imat
ely,
th
e co
lou
r p
alet
te f
or
this
bo
dy
of
wo
rk w
ill a
im t
o
insp
ire,
at
trac
t an
d
emb
ark
the
view
er
on
an
im
agin
ativ
e an
d c
reat
ive
wh
imsi
cal j
ou
rney
.
Fab
rica
tio
n /
In
stal
lati
on
/ M
ain
ten
ance
1. F
abri
cati
on
En
gin
eeri
ng
& P
lan
nin
gA
map
pin
g o
ut
and
fin
al m
od
el o
f th
e w
ork
s m
ust
be
calc
ula
ted
to
en
sure
all
the
pie
ces
of
the
wo
rk t
og
eth
er a
s a
wh
ole
. T
his
will
th
en
allo
w
corr
ect
step
s fo
r th
e la
ser
cutt
ing
an
d
inst
alla
tio
n o
f th
e m
etal
pie
ces.
Est
imat
ed
tim
e o
f co
mp
leti
on
: 5 w
eeks
Las
er C
utt
ing
of
Alu
min
ium
Sh
eet
Met
alT
his
pro
cess
is q
uic
k an
d e
asy
step
. Est
imat
ed
tim
e
of
com
ple
tio
n: 3
wee
ks
Ro
llin
g a
nd
Co
lou
r P
rep
arat
ion
Th
e m
etal
sh
eets
will
th
en b
e p
roce
ssed
th
rou
gh
a
rolle
r to
ach
ieve
th
e w
avy
pet
al-l
ike
effe
ct o
f th
e en
d r
esu
lt. A
ll m
etal
pie
ces
will
nee
d t
o b
e tr
eate
d
ind
ivid
ual
ly.
Th
e en
gin
eeri
ng
ste
ps
to t
his
pro
ject
w
ill e
nsu
re w
hat
ste
ps
nee
d t
o b
e ta
ken
. Est
imat
ed
ti
me
of
com
ple
tio
n: 8
wee
ks
Co
lou
r w
ill
be
app
lied
vi
a a
spra
y p
ain
tin
g-l
ike
pro
cess
an
d g
loss
var
nis
hin
g.
Est
imat
ed
tim
e o
f co
mp
leti
on
: 6 w
eeks
2. I
nst
alla
tio
nT
his
bo
dy
of
wo
rk c
om
pri
ses
of
app
roxi
mat
ely
8 t
o
10 l
arg
er-t
han
-lif
e sc
ulp
tura
l p
iece
s. T
he
bo
dy
of
sc
ulp
ture
s w
ill
no
t b
e fu
nct
ion
al.
Th
e m
ain
sc
ulp
tura
l p
iece
(W
arat
ah)
will
co
nta
in 3
lay
ered
m
oti
f p
iece
s an
d w
ill n
eed
inte
nsi
ve a
nd
cal
cula
ted
la
bo
ur.
Th
e fi
nis
hed
p
iece
s w
ill
nee
d
to
be
tran
spo
rted
an
d p
erm
anen
tly
inst
alle
d w
ith
bo
lts
and
co
ncr
ete
bas
es
to
ho
ld
each
p
iece
. L
oca
l fa
bri
cato
rs
can
b
e so
urc
ed.
Est
imat
ed
ti
me
o
f co
mp
leti
on
: 2 w
eeks
.
LE
D L
igh
tin
gTo
co
mp
lete
th
e sc
ulp
tura
l in
stal
lati
on
will
be
the
inse
rtio
n
of
spec
ial
LE
D
ligh
tin
g,
wh
ich
w
ill
stra
teg
ical
ly
be
pla
ced
ar
ou
nd
an
d
in
the
mai
n
scu
lptu
re p
iece
to
illu
min
ate.
Th
is s
ecti
on
of
the
pro
ject
req
uir
es e
lect
rica
l in
stal
lati
on
& p
roce
sses
. E
stim
ate
d t
ime
of
com
ple
tio
n: 2
wee
ks
3. M
ain
ten
ance
Th
ese
fin
al
wo
rks
will
b
e o
f lo
w-m
ain
ten
ance
. D
ura
ble
an
d
sust
ain
able
m
ater
ials
w
ill
be
use
d
wh
ich
are
ro
bu
st a
nd
eas
ily m
ain
tain
ed.
Min
imal
g
raff
iti r
emo
val a
nd
gen
eral
cle
anin
g d
uti
es a
re t
he
on
ly e
xcep
tio
ns.
Est
imat
ed
Tim
e f
or
Pro
ject
: 8-1
0 m
on
ths
Re
gis
trati
on
No
.: M
210
422
M2
| M
acq
uar
ie P
ark
| L
and
care
Au
stra
lia
Lay
er
1
Lay
er
2
Lay
er
3
Las
er-
cut
de
taili
ng
Slo
wtu
rnin
g
mo
tio
n
Flip
pin
gm
oti
on
to
re
veal
Las
er-
cut
de
taili
ng
Eye
s o
pen
an
d c
lose
fo
ur
tim
es d
aily
giv
ing
th
e w
ork
a h
um
oro
us
per
ple
xity
. E
yelid
s ar
e a
ran
ge
of
colo
urs
wh
en
clo
sed
on
ce a
gai
n
sup
po
rtin
g t
he
idea
o
f d
iver
sity
an
d f
un
. T
he
reve
rse
sid
e o
f th
is
pie
ce w
ill b
e id
enti
cal
in b
oth
ap
pea
ran
ce
and
fu
nct
ion
.
Arm
s tu
rn in
a s
low
, co
ntr
olle
d c
ou
nte
r cl
ock
wis
e m
oti
on
g
ener
atin
g t
he
no
tio
n
of
cycl
es a
nd
an
eve
r ch
ang
ing
, eve
r g
row
ing
, so
ciet
y o
n
the
mo
ve.
Th
e re
vers
e si
de
of
this
p
iece
will
be
iden
tica
l in
bo
th a
pp
eara
nce
an
d f
un
ctio
n.
Th
ree
laye
rs o
f p
etal
s w
ill t
urn
in
slo
w, c
on
tro
lled
mo
tio
ns
on
ce
agai
n g
ener
atin
g t
he
no
tio
n o
f cy
cles
an
d a
n e
ver
chan
gin
g,
ever
gro
win
g s
oci
ety
on
th
e m
ove
. T
he
two
ou
ter
laye
rs w
ill s
pin
co
un
ter
clo
ckw
ise
wh
ilst
the
mid
dle
la
yer
will
sp
in c
lock
wis
e to
cr
eate
a v
isu
ally
stu
nn
ing
ce
nte
rpie
ce. T
he
reve
rse
sid
e o
f th
is p
iece
will
be
iden
tica
l in
b
oth
ap
pea
ran
ce a
nd
fu
nct
ion
.
Th
e ic
on
ic g
um
leav
es
are
stat
ion
ary
pie
ces
wh
ich
are
em
bel
lish
ed
by
pat
tern
ed h
ole
s p
un
ched
th
rou
gh
th
eir
surf
aces
. Th
ey a
re t
he
sim
plic
ity
in a
mo
ng
st
this
bo
dy
of
wo
rk. T
he
reve
rse
sid
e o
f th
is p
iece
w
ill b
e id
enti
cal i
n
app
eara
nce
.
M2 Macquarie Park Art Installation – Visual Impact Assessment Report
2. ‘Interleaves’
1G
um
nu
ts a
nd
gu
m le
ave
s are
ico
nic
sym
bo
ls o
f th
e A
ust
ralia b
ush
. In
man
y w
ays
the
ir
shap
e a
nd
fo
rm h
ave
be
co
me
co
mm
erc
ialize
d a
nd
sti
gm
ati
ze
d a
s lo
w c
ult
ure
, re
leg
ate
d
to t
ou
rism
, m
ark
eti
ng
, co
ttag
e c
raft
s an
d c
hild
ren
sto
rie
s. T
his
art
wo
rk s
ee
ks
to r
e-
ele
vate
th
eir
sta
tus,
no
t o
nly
as
po
ten
t sy
mb
ols
of
ou
r n
ati
on
s ch
ara
cte
r an
d u
niq
ue
e
co
log
y a
nd
ge
olo
gy,
bu
t im
po
rtan
tly a
s a p
ote
nt
sym
bo
l fo
r re
ge
ne
rati
on
, re
info
rcin
g
ou
r co
nn
ecti
on
to
lan
d a
nd
pla
ce
; se
rvin
g a
s ag
en
t fo
r e
co
log
ical ch
an
ge
; h
allm
ark
of
share
d c
ust
od
ian
ship
, in
ve
nti
ve
th
inkin
g a
nd
su
stain
ab
le a
cti
on
.
We
are
pro
po
sin
g a
pu
blic a
rt in
stallati
on
, w
hic
h is
mo
nu
me
nta
l, c
reate
a s
eri
es
of
form
ally c
oh
ere
nt
wo
rks,
evo
cati
ve
of
natu
ral an
d o
rgan
ic f
orm
s, w
hic
h a
re u
tilize
d a
s p
art
of
the
pla
nn
ed
flo
ra r
eg
en
era
tio
n a
nd
bio
-filt
rati
on
syst
em
.
Ae
sth
eti
cally t
he
flo
win
g s
inu
ou
s cu
rve
s o
f th
e g
um
le
af
are
syn
on
ym
ou
s w
ith
th
e
rollin
g c
on
tou
rs o
f S
yd
ney’s
hills
an
d r
ive
r valleys.
Th
e a
rtw
ork
be
co
me
s a m
eta
ph
or
for
the
re
ge
ne
rati
ve
qu
aliti
es
of
the
Au
stra
lian
bu
sh. T
he
in
clu
sio
n o
f th
e g
um
nu
t m
ay
sym
bo
lize
th
e r
eg
en
era
tive
qu
ality
of
hu
man
sp
irit
; to
ris
e f
rom
th
e a
she
s o
f h
ard
ship
s an
d e
lem
en
ts o
r ad
ve
rsit
y. F
rom
th
e s
ee
d o
f o
ur
ide
as
we
ge
rmin
ate
th
e f
ruit
s o
f o
ur
lab
ou
r; f
rom
th
e in
ne
r vit
ality
of
the
qu
iesc
en
t se
ed
hid
de
n p
ote
nti
al aw
ait
s fa
vo
rab
le
co
nd
itio
ns
for
alc
he
my a
nd
gro
wth
.
Ou
r m
ain
fo
cus
is t
o m
ag
nif
y t
he b
eau
ty o
f n
atu
re r
ath
er
than
try
ing
to
co
py it,
to
en
cou
rag
e p
eo
ple
to
rem
em
ber
wh
at
we o
we t
o n
atu
re, th
at
we c
an
’t liv
e w
ith
ou
t it
,.
Pu
rpo
sefu
lne
ss:
Th
ese
wo
rks
are
no
t m
ere
ob
jects
in
th
e lan
dsc
ap
es
bu
t sh
elt
er, b
ow
er
or
have
n f
orm
s w
hic
h o
ffe
r w
ind
bre
aks
an
d p
rote
cti
on
fo
r th
e r
eg
en
era
tio
n o
f n
ati
ve
flo
ra.
Th
e a
rtw
ork
s st
ren
gth
en
th
e c
on
ne
cti
on
wit
h t
he
re
ge
ne
rati
ng
envir
on
me
nt,
a
fun
cti
on
ing
scre
en
be
twe
en
th
e e
ncro
ach
me
nts
of
the
urb
an
up
on
th
e n
atu
ral.
Mate
riality
: T
he
scu
lptu
ral fo
rms
will b
e f
ab
ricate
d f
rom
sta
inle
ss s
tee
l tu
be
in
a s
ke
leta
l st
ructu
re,
the
re
fle
cti
ve
qu
aliti
es
of
this
mate
rial allo
w it
to m
orp
h a
nd
ab
stra
ct
its
envir
on
me
nt,
cre
ati
ng
in
tere
st a
nd
pla
yfu
lne
ss.
Lig
ht:
Th
e s
ke
leta
l st
ructu
res
off
er
the
pla
y o
f lig
ht,
mo
iré
patt
ern
s an
d a
tre
llis
of
shad
ow
s.
Day a
nd
nig
ht
lig
ht
will h
ave
an
ele
me
nta
l in
tera
cti
on
wit
h t
he
wo
rk, cre
ati
ng
vis
ual
en
gag
em
en
t w
ith
in t
he
sim
ple
be
au
ty o
f th
e f
orm
s.
Th
e in
ten
tio
n w
ou
ld b
e t
o u
se h
idd
en
so
lar
pan
els
th
at
co
uld
be
ho
use
be
hin
d t
he
art
wo
rk o
n t
he
eart
h m
ou
nd
s to
dri
ve
su
stain
ab
le L
ED
lig
hti
ng
mo
un
ted
wit
hin
th
e
scu
lptu
ral fo
rms
Scale
:T
he
scale
is
de
sig
ne
d t
o b
e a
s la
rge
as
feasi
ble
, th
is w
ork
wo
uld
be
a b
old
, st
ron
g
state
me
nt
ab
ou
t th
e r
ela
tio
nsh
ip o
f th
e o
rgan
ic a
nd
th
e in
org
an
ic-
pla
ye
d o
ut
in t
he
ju
xta
po
siti
on
of
the
hard
man
-mad
e m
ate
rial la
ng
uag
e a
nd
th
e fl
uid
, o
rgan
ically
infl
ue
nce
d f
orm
s.
M2
106
Tra
nsu
rba
n S
yd
ne
y H
ills
M2
Mo
torw
ay
Cu
ltu
ral
Bio
lin
k R
ese
rve
In
terl
ea
ve
s
2M
210
6In
terl
ea
ve
s -
Tra
nsu
rba
n S
yd
ne
y H
ills
M2
Mo
torw
ay
Cu
ltu
ral
Bio
lin
k R
ese
rve
“Ou
r m
ain
fo
cus
is t
o m
ag
nif
y t
he b
eau
ty o
f n
atu
re r
ath
er
than
try
ing
to
co
py it,
to
en
cou
rag
e p
eo
ple
to
rem
em
ber
wh
at
we o
we t
o n
atu
re, th
at
we c
an
’t liv
e w
ith
ou
t it
.”
Lig
ht:
Usi
ng
su
stain
ab
le s
ola
r L
ED
lig
hti
ng
, th
e s
ke
leta
l st
ructu
res
off
er
the
pla
y o
f lig
ht,
m
oir
é p
att
ern
s an
d a
tre
llis
of
shad
ow
s.
M2 Macquarie Park Art Installation – Visual Impact Assessment Report
3. ‘Solar Weave’
Sola
r W
eave
M2
Mac
quar
ie P
ark
Icon
ic A
rt In
stalla
tion
Idea
s Com
petit
ion
Sola
r Wea
ve is
a 1
25m
long
scul
ptur
e co
nsist
ing
of 8
50 L
ED
lum
inai
res fi
xed
to a
ligh
twei
ght s
truc
tura
l fra
me.
The
LED
lum
i-na
ries a
re p
ower
ed b
y so
lar c
ells
whi
ch c
onve
rt th
e su
n's e
nerg
y in
to e
lect
ricity
.
Sol
ar W
eave
is a
larg
e sc
ale
rene
wab
le e
nerg
y in
stalla
tion.
The
resu
ltant
bla
nket
of l
ight
at n
ight
bot
h ac
ts as
a lo
cal s
igni
fier a
s w
ell a
s an
icon
ic e
xam
ple
of re
new
able
ene
rgy
art i
n pr
actic
e.
Sol
ar W
eave
hop
es to
eng
age
with
the
loca
l com
mun
ity a
nd
thro
ugh
enga
gem
ent r
aise
aw
aren
ess o
f cur
rent
app
licat
ions
and
fu
ture
pos
sibili
ties o
f ren
ewab
le e
nerg
y in
frastr
uctu
re.
Whe
ther
it b
e th
roug
h fu
rthe
r res
earc
h w
ith M
acqu
arie
Uni
ver-
sity
or lo
cal c
orpo
rate
par
tner
ship
s, th
e M
acqu
arie
Par
k co
mm
u-ni
ty is
the
idea
l tes
ting
grou
nd fo
r thi
s ins
talla
tion
due
to it
s bu
sines
s and
edu
catio
nal m
akeu
p.
Sol
ar W
eave
aim
s to
alig
n w
ith T
rans
urba
n’s su
stain
abili
ty p
illar
s an
d str
ateg
y fo
cusin
g on
redu
cing
thei
r ene
rgy
cons
umpt
ion
by
10%
by
2023
.
Bui
ldin
g up
on T
rans
urba
n’s re
cent
initi
ativ
es a
nd L
ED so
lutio
ns
for t
he B
olte
Brid
ge in
Mel
bour
ne a
nd th
e La
ne C
ove T
unne
l, So
lar W
eave
seek
s to
cont
inue
this
body
of w
ork
and
fuse
toge
ther
cr
eativ
ity a
nd te
chni
cal i
nnov
atio
n. West
boun
d Tr
affic N
ight
View
Sola
r W
eave
M21
291
Site
Sec
tion
M2
West
boun
dM
2 Ea
stbou
ndSh
rub
&
Gro
undc
over
Re
vege
tate
d Ra
ised
Land
form
Vege
tate
d Bi
ofiltr
atio
n Ba
sin
Recy
cled
plas
tic fl
ex tu
bes
Flex
ible
sola
r cell
arr
ay
LED
lum
inai
re
Ren
ewab
le e
nerg
y ar
t, as
des
crib
ed b
y La
nd A
rt G
ener
ator
Initi
a-tiv
e, is
a fa
irly
new
gen
re th
at in
corp
orat
es re
new
able
ene
rgy
into
th
e de
sign
of th
e ar
twor
k.
Sol
ar W
eave
con
sists
of a
num
ber o
f rec
ycle
d pl
astic
tubu
lar
elem
ents,
eac
h affi
xed
with
a se
ries o
f flex
ible
sola
r cel
l arr
ays
inte
rspe
rsed
with
LED
lum
inai
res a
t reg
ular
inte
rval
s. Al
l col
lect
ed
pow
er fr
om th
e so
lar a
rray
s are
stor
ed in
a c
entr
al b
atte
ry h
ousin
g fo
r use
at n
ight
.
The
spec
ified
LED
lum
inai
re w
ill h
ave
a lu
x le
vel s
uita
ble
to it
s m
otor
way
adj
acen
cy a
nd th
e po
sitio
ning
of t
he lu
min
aire
s will
m
inim
ise th
e ris
k of
gla
re to
mot
orist
s and
redu
ce ‘l
ight
spill
’.
The
over
all h
eigh
t and
setb
ack
of th
e in
stalla
tion
allo
ws f
or a
cle
ar
disti
nctio
n be
twee
n ro
adw
ay li
ghtin
g an
d th
e sc
ulpt
ural
LED
lig
htin
g. Th
e in
stalla
tion
has n
o fla
shin
g lig
hts.
Sol
ar W
eave
is a
n ab
strac
ted
linea
r for
m su
gges
tive
of m
ovem
ent
and
fluid
ity. C
once
ptua
lly, i
t dra
ws o
n th
e La
ne C
ove
Riv
er a
nd
com
es fr
om a
n ab
strac
tion
of b
oth
wat
er ri
pplin
g &
land
topo
gra-
phy.
The
Lane
Cov
e N
atio
nal P
ark,
adj
oini
ng th
e m
ajor
ity o
f the
no
rthe
rn b
ound
ary,
is a
372
hect
are
natio
nal p
ark
whi
ch tr
acks
the
Lane
Cov
e R
iver
. The
river
win
ds th
roug
h a
peac
eful
bus
hlan
d va
lley
and
is hi
dden
aw
ay fr
om th
e su
rrou
ndin
g ne
ighb
ourh
oods
. So
lar W
eave
seek
s to
give
the
wat
erw
ay a
noth
er p
rese
nce,
an
abstr
acte
d an
d sy
mbo
lic g
estu
re, c
eleb
ratin
g th
e sig
nific
ance
of t
his
loca
l fea
ture
. W
hilst
the
insta
llatio
n sit
s out
side
the
spec
ified
foot
prin
t it
cons
ciou
sly re
mai
ns w
ithin
the
zone
allo
cate
d fo
r sm
all s
hrub
and
gr
ound
cove
r spe
cies
. The
over
all p
erm
eabi
lity
of th
e in
stalla
tion
will
allo
w fo
r the
scul
ptur
e an
d pl
ant l
ife to
eng
age
with
one
an
othe
r ove
r tim
e. A
s the
veg
etat
ion
mat
ures
it w
ill b
egin
to
conc
eal a
nd g
row
ove
r the
bas
e of
the
insta
llatio
n al
low
ing
it to
be
read
as e
mbe
dded
into
the
natu
ral l
ands
cape
, as i
f the
se c
urvi
linea
r ‘ri
pple
s’ w
ere
flow
ing
in a
nd o
ut o
f the
gro
und.
Eastb
ound
Tra
ffic D
ayVi
ew
Site
Pla
nD
etai
l
Sola
r W
eave
M21
292
050
100m