8
VIRTUAL GAS PIPELINE NEW ENERGY TECHNOLOGY

VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

VIRTUAL GAS PIPELINE

NEW ENERGY TECHNOLOGY

Page 2: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

INTRODUCTION

I D E A L

Build gas pipeline facility from gas source and transfer to consumers

T R E A T

There are consumers who are located in remote areas or other areas

that are geography challenging to build gas pipeline

O P P O R T U N I T Y

Virtual gas pipeline as gas distribution method by CNG/LNG to

consumers

Page 3: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

SEMARANG

GROBOGAN

DEMAK

KUDUS

JEPARA

PATI

REMBANG

BLORA

CEPUUNGARAN

T A M B A K

L O R O K ,

C E N T R A L J A V A

PLTGU TAMBAK LOROK

20” - 130 KM GAS PIPELINE

GAS SOURCE

GAS

LOCATION

GAS PIPELINE

EAST JAVACENTRAL JAVA

GAS TRANSFER STATION

GAS RECEIVING STATION

Gas Pipeline 20” – 130 KM

Capacity 200 MMSCFD

Page 4: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

4© TITIS SAMPURNA 2018

CNG PLANT DESIGN CAPACITY:

1.5 MMSCFD

COMPRESSION SYSTEM:Compressor (3 Units):

3 X 0.5 MMSCFD

CEPU

Page 5: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

LNG PLANT

BONTANG

LNG TERMINAL

KOLAKA

600 NMROUNDTRIP ± 6 Days

87JTINVESTMEN

T

PEMBANGUNAN TERMINAL LNG &

REGASIFIKASI KOLAKA

LNGFACILITIES

Storage 15,000 M3

Regasification Unit 54 MMSCFD

Page 6: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

VIRTUAL GAS PIPELINE

SCHEME

ENERGY

ELECTRICITY

FUEL

CITY GAS

CNG PLANT

BIOGAS PLANT

BENEFIT

• Supplying small scale market

• Providing energy to areas that are geographically

challenging to install conventional pipeline

• Scalable and modular

• Reliable and flexible

PROCESSING FACILITIES VIRTUAL PIPELINE

LNG PLANT

CNG PLANT

Page 7: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

Medium Size Power Station with LNG

Hub

FSU/FSRUFPP (Medium)

LNG Liquefaction Terminal

Global LNG Distribution to LNG Hub

LNG Sources : Bontang Tangguh Masela Donggi Senoro Sengkang Madura

Remote Power Station A

Small LNG Distribution(Virtual Pipeline)

Remote Power Station B

Remote Power Station C

Remote Power Station D

Remote Power Station E

BONTANG

ARUN

LNG DISTRIBUTION IN EASTERN INDONESIA

Page 8: VIRTUAL GAS PIPELINE · demak kudus jepara pati rembang blora ungaran cepu tambak lorok, central java pltgu tambak lorok 20” - 130 km gas pipeline gas source gas location gas pipeline

ADDRESSSovereign Plaza 10th FloorJl. TB. Simatupang Kav. 36 Cilandak Jakarta 12430www.titissampurna.com

CONTACTEmail: [email protected]

Phone: +6221 2940 0212Fax: +6221 2940 0220