Weekly Rake Supply Status As On Date Week Period From : 05-02-2018 To : 11-02-2018

ZONE DVSN LDNG POINT LDNG DATE INDENT INDENT DATE DSTN

CR BB  BRSG  07-02-2018 22:40  BRSG1/05022018  05-02-2018 14:56

 PBPS

 BRSG  11-02-2018 09:45  BRSG1/07022018  07-02-2018 17:35

 IIEL

 CRNM  05-02-2018 17:45  CRNM1/05022018  05-02-2018 16:15

 CCMP

 CRNM  08-02-2018 15:30  CRNM1/08022018  08-02-2018 13:30

 CCMP

 CRTK  06-02-2018 20:50  CRTK1/06022018  06-02-2018 12:00

 CTCS

 DRTA  05-02-2018 20:05  DRTA1/05022018  05-02-2018 16:00

 CGPT

 DRTA  06-02-2018 09:45  DRTA1/06022018  06-02-2018 02:00

 ICPH

 DRTA  06-02-2018 17:50  DRTA2/06022018  06-02-2018 16:00

 ACDA

 DRTA  07-02-2018 22:20  DRTA1/07022018  07-02-2018 14:00

 GFPA

 DRTA  08-02-2018 18:20  DRTA1/08022018  08-02-2018 17:00

 BNGD

 DRTA  10-02-2018 19:30  DRTA1/10022018  10-02-2018 18:00

 BRGW

 DRTA  10-02-2018 23:55  DRTA2/10022018  10-02-2018 21:00

 BNGD

 DRTA  11-02-2018 13:20  DRTA1/11022018  11-02-2018 06:00

 ICBD

 FZSG  05-02-2018 08:45  FZSG1/03022018  03-02-2018 15:19

 MMR

 FZSG  06-02-2018 11:00  FZSG1/23012018  23-01-2018 16:10

 FBD

 FZSG  07-02-2018 10:00  FZSG1/31012018  31-01-2018 11:20

 LUR

 FZSG  08-02-2018 04:25  FZSG1/06022018  06-02-2018 14:08

 YJUD

 FZSG  08-02-2018 23:30  FZSG1/07022018  07-02-2018 15:54

 J

 FZSG  10-02-2018 05:45  FZSG1/29012018  29-01-2018 10:54

 BT

 FZSG  11-02-2018 02:50  FZSG2/09022018  09-02-2018 10:55

 SLI

 FZSG  11-02-2018 21:00  FZSG1/02022018  02-02-2018 10:56

 RBG

 JNPT  05-02-2018 05:10  JNPT1/05022018  05-02-2018 00:00

 TICD

Page 2: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 JNPT  05-02-2018 05:15  JNPT2/05022018  05-02-2018 00:00

 DCCS

 JNPT  05-02-2018 05:15  JNPT3/05022018  05-02-2018 00:00

 CSTN

 JNPT  05-02-2018 11:45  JNPT4/05022018  05-02-2018 00:00

 ICDM

 JNPT  05-02-2018 12:00  JNPT5/05022018  05-02-2018 00:00

 TICD

 JNPT  05-02-2018 12:45  JNPT6/05022018  05-02-2018 00:19

 MILK

 JNPT  05-02-2018 16:30  JNPT7/05022018  05-02-2018 00:00

 CWCJ

 JNPT  05-02-2018 22:06  JNPT8/05022018  05-02-2018 00:00

 TICD

 JNPT  05-02-2018 22:08  JNPT9/05022018  05-02-2018 00:00

 ICDD

 JNPT  05-02-2018 22:10  JNPT10/05022018  05-02-2018 00:00

 ACDA

 JNPT  05-02-2018 23:00  JNPT11/05022018  05-02-2018 00:00

 CCTA

 JNPT  05-02-2018 23:10  JNPT12/05022018  05-02-2018 00:00

 DRTA

 JNPT  05-02-2018 23:50  JNPT13/05022018  05-02-2018 00:00

 CSTN

 JNPT  06-02-2018 05:20  JNPT1/06022018  06-02-2018 00:00

 MATP

 JNPT  06-02-2018 05:30  JNPT2/06022018  06-02-2018 00:00

 ACDA

 JNPT  06-02-2018 11:10  JNPT3/06022018  06-02-2018 00:10

 CCTB

 JNPT  06-02-2018 14:00  JNPT4/06022018  06-02-2018 01:00

 CRCC

 JNPT  06-02-2018 14:18  JNPT5/06022018  06-02-2018 01:45

 ICBD

 JNPT  06-02-2018 20:10  JNPT6/06022018  06-02-2018 00:57

 CCTA

 JNPT  06-02-2018 20:15  JNPT7/06022018  06-02-2018 00:02

 TICD

 JNPT  06-02-2018 23:50  JNPT8/06022018  06-02-2018 00:05

 ACDA

 JNPT  06-02-2018 23:50  JNPT9/06022018  06-02-2018 00:39

 GRFV

 JNPT  07-02-2018 05:10  JNPT1/07022018  07-02-2018 00:00

 HTPP

 JNPT  07-02-2018 06:00  JNPT2/07022018  07-02-2018 00:00

 CWCJ

 JNPT  07-02-2018 06:05  JNPT3/07022018  07-02-2018 00:00

 RICD

Page 3: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 JNPT  07-02-2018 06:40  JNPT4/07022018  07-02-2018 00:00

 MKPP

 JNPT  07-02-2018 10:30  JNPT5/07022018  07-02-2018 00:24

 ICDD

 JNPT  07-02-2018 10:40  JNPT6/07022018  07-02-2018 00:00

 CRNM

 JNPT  07-02-2018 14:40  JNPT7/07022018  07-02-2018 00:24

 MKPP

 JNPT  07-02-2018 20:42  JNPT9/07022018  07-02-2018 03:00

 IBBM

 JNPT  07-02-2018 23:50  JNPT10/07022018  07-02-2018 12:00

 ACDA

 JNPT  07-02-2018 23:55  JNPT11/07022018  07-02-2018 07:00

 CWCJ

 JNPT  08-02-2018 05:55  JNPT2/08022018  08-02-2018 00:00

 CWCJ

 JNPT  08-02-2018 06:10  JNPT1/08022018  08-02-2018 00:15

 DCCS

 JNPT  08-02-2018 06:45  JNPT4/08022018  08-02-2018 00:00

 ICDD

 JNPT  08-02-2018 07:00  JNPT3/08022018  08-02-2018 00:15

 BNGD

 JNPT  08-02-2018 13:40  JNPT7/08022018  08-02-2018 00:00

 GDGH

 JNPT  08-02-2018 14:00  JNPT8/08022018  08-02-2018 00:38

 MRWN

 JNPT  08-02-2018 17:30  JNPT9/08022018  08-02-2018 00:14

 DCCS

 JNPT  08-02-2018 18:00  JNPT10/08022018  08-02-2018 00:30

 CKYR

 JNPT  08-02-2018 18:20  JNPT5/08022018  08-02-2018 11:52

 DD

 JNPT  08-02-2018 20:35  JNPT11/08022018  08-02-2018 00:12

 CCTB

 JNPT  08-02-2018 22:10  JNPT12/08022018  08-02-2018 00:28

 CRNM

 JNPT  08-02-2018 22:45  JNPT13/08022018  08-02-2018 00:37

 ICMB

 JNPT  08-02-2018 23:10  JNPT14/08022018  08-02-2018 00:59

 TICD

 JNPT  09-02-2018 05:10  JNPT1/09022018  09-02-2018 00:00

 GRFV

 JNPT  09-02-2018 05:20  JNPT2/09022018  09-02-2018 00:00

 MATP

 JNPT  09-02-2018 06:15  JNPT3/09022018  09-02-2018 00:00

 BNGD

 JNPT  09-02-2018 09:30  JNPT4/09022018  09-02-2018 02:00

 CWCJ

Page 4: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 JNPT  09-02-2018 11:55  JNPT5/09022018  09-02-2018 03:00

 KIFH

 JNPT  09-02-2018 14:15  JNPT6/09022018  09-02-2018 07:00

 CRNM

 JNPT  09-02-2018 14:20  JNPT7/09022018  09-02-2018 03:00

 MKPP

 JNPT  09-02-2018 17:30  JNPT8/09022018  09-02-2018 00:22

 CSTN

 JNPT  09-02-2018 17:40  JNPT9/09022018  09-02-2018 00:34

 CWCJ

 JNPT  09-02-2018 19:10  JNPT10/09022018  09-02-2018 00:53

 MILK

 JNPT  09-02-2018 21:30  JNPT11/09022018  09-02-2018 00:18

 ACDA

 JNPT  09-02-2018 23:10  JNPT6/08022018  08-02-2018 12:02

 DD

 JNPT  09-02-2018 23:50  JNPT12/09022018  09-02-2018 00:16

 ICDM

 JNPT  10-02-2018 05:35  JNPT1/10022018  10-02-2018 00:00

 ICDD

 JNPT  10-02-2018 07:15  JNPT2/10022018  10-02-2018 00:00

 CSTN

 JNPT  10-02-2018 10:00  JNPT3/10022018  10-02-2018 00:41

 CSTN

 JNPT  10-02-2018 11:35  JNPT5/10022018  10-02-2018 00:00

 TICD

 JNPT  10-02-2018 14:10  JNPT6/10022018  10-02-2018 00:58

 CRNM

 JNPT  10-02-2018 14:50  JNPT7/10022018  10-02-2018 00:43

 TICD

 JNPT  10-02-2018 18:06  JNPT8/10022018  10-02-2018 10:00

 DCCS

 JNPT  10-02-2018 18:58  JNPT9/10022018  10-02-2018 08:00

 MLSW

 JNPT  10-02-2018 21:35  JNPT10/10022018  10-02-2018 12:00

 CCTB

 JNPT  10-02-2018 21:40  JNPT11/10022018  10-02-2018 15:00

 MATP

 JNPT  10-02-2018 23:00  JNPT12/10022018  10-02-2018 18:00

 MATP

 JNPT  11-02-2018 10:21  JNPT1/11022018  11-02-2018 00:13

 CCMP

 JNPT  11-02-2018 12:30  JNPT2/11022018  11-02-2018 00:11

 ICDG

 JNPT  11-02-2018 13:10  JNPT3/11022018  11-02-2018 00:56

 CWCJ

 JNPT  11-02-2018 14:00  JNPT4/11022018  11-02-2018 00:44

 DCCS

Page 5: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 JNPT  11-02-2018 17:40  JNPT5/11022018  11-02-2018 00:34

 TICD

 JNPT  11-02-2018 17:55  JNPT6/11022018  11-02-2018 00:49

 CWCJ

 JNPT  11-02-2018 18:27  JNPT7/11022018  11-02-2018 00:21

 CCTA

 JNPT  11-02-2018 19:05  JNPT8/11022018  11-02-2018 00:57

 CSTN

 JNPT  11-02-2018 19:40  JNPT9/11022018  11-02-2018 00:23

 MKPP

 JNPT  11-02-2018 23:05  JNPT10/11022018  11-02-2018 00:58

 TICD

 JNPT  11-02-2018 23:45  JNPT11/11022018  11-02-2018 00:02

 CRNM

 JSWD  05-02-2018 00:40  JSWD4/02022018  02-02-2018 10:24

 KSWR

 JSWD  05-02-2018 11:50  JSWD2/03022018  03-02-2018 16:15

 BOR

 JSWD  06-02-2018 08:55  JSWD1/05022018  05-02-2018 11:37

 KOKG

 JSWD  06-02-2018 21:30  JSWD1/04022018  04-02-2018 09:53

 KSWR

 JSWD  07-02-2018 11:20  JSWD2/05022018  05-02-2018 11:46

 JSWV

 JSWD  07-02-2018 23:30  JSWD1/06022018  06-02-2018 10:09

 BOR

 JSWD  08-02-2018 20:10  JSWD1/07022018  07-02-2018 10:15

 KSWR

 JSWD  09-02-2018 09:40  JSWD2/07022018  07-02-2018 10:18

 BOR

 JSWD  09-02-2018 23:10  JSWD1/08022018  08-02-2018 14:49

 JSWV

 JSWD  10-02-2018 11:00  JSWD1/09022018  09-02-2018 10:37

 BOR

 JSWD  10-02-2018 23:05  JSWD2/09022018  09-02-2018 15:46

 JSWV

 JSWD  11-02-2018 21:00  JSWD1/11022018  11-02-2018 10:20

 BOR

 JSWV  05-02-2018 15:20  JSWV1/05022018  05-02-2018 10:00

 JNPT

 KLMG  09-02-2018 22:59  KLMG1/06022018  06-02-2018 17:00

 KMN

 KTIG  09-02-2018 00:30  KTIG1/09022018  09-02-2018 00:10

 C

 MBPP  05-02-2018 22:51  MBPP1/05022018  05-02-2018 08:40

 LPBP

 MBPP  08-02-2018 17:00  MBPP2/05022018  05-02-2018 19:31

 LPBG

Page 6: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 MBPP  08-02-2018 23:10  MBPP3/05022018  05-02-2018 19:36

 LPBP

 MBPP  09-02-2018 15:00  MBPP1/30012018  30-01-2018 11:04

 HPLC

 MBPP  09-02-2018 23:20  MBPP1/08022018  08-02-2018 15:43

 LPBG

 MBPP  11-02-2018 22:55  MBPP1/11022018  11-02-2018 17:48

 LPBG

 MILK  09-02-2018 13:00  MILK1/09022018  09-02-2018 11:00

 DLIB

 MIOJ  05-02-2018 16:00  MIOJ2/31012018  31-01-2018 15:19

 PSIA

 MIOJ  06-02-2018 20:15  MIOJ2/01022018  01-02-2018 18:54

 IOHR

 MIOJ  10-02-2018 23:55  MIOJ1/07022018  07-02-2018 21:58

 PICN

 MIOJ  11-02-2018 20:30  MIOJ1/08022018  08-02-2018 01:16

 MRJ

 PNCS  06-02-2018 17:15  PNCS1/04022018  04-02-2018 16:51

 RBG

 PPDP  05-02-2018 18:45  PPDP2/29012018  29-01-2018 16:31

 RPLW

 PPDP  06-02-2018 07:10  PPDP3/29012018  29-01-2018 16:32

 RPLW

 PPDP  07-02-2018 00:45  PPDP4/29012018  29-01-2018 16:33

 RPLW

 PPDP  08-02-2018 08:15  PPDP5/29012018  29-01-2018 16:34

 RPLW

 PPDP  10-02-2018 23:55  PPDP6/29012018  29-01-2018 16:35

 RPLW

 PPDP  11-02-2018 23:55  PPDP7/29012018  29-01-2018 16:36

 RPLW

 TVSG  05-02-2018 11:50  TVSG1/27012018  27-01-2018 12:10

 KRD

 TVSG  05-02-2018 20:40  TVSG1/03022018  03-02-2018 11:23

 MSZ

 TVSG  06-02-2018 15:35  TVSG1/05022018  05-02-2018 11:01

 JL

 TVSG  06-02-2018 23:45  TVSG2/05022018  05-02-2018 11:08

 TDD

 TVSG  07-02-2018 09:05  TVSG3/05022018  05-02-2018 11:11

 SSV

 TVSG  07-02-2018 19:15  TVSG5/13012018  13-01-2018 11:30

 MNDH

 TVSG  08-02-2018 08:14  TVSG2/07022018  07-02-2018 14:16

 MYA

 TVSG  08-02-2018 19:40  TVSG4/07022018  07-02-2018 15:47

 AK

Page 7: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 TVSG  09-02-2018 11:25  TVSG2/27122017  27-12-2017 14:49

 MLDT

 TVSG  09-02-2018 19:00  TVSG4/05022018  05-02-2018 11:13

 JCL

 TVSG  10-02-2018 07:05  TVSG5/05022018  05-02-2018 11:23

 GRMT

 TVSG  10-02-2018 12:35  TVSG1/07022018  07-02-2018 11:21

 DNM

 TVSG  10-02-2018 21:10  TVSG3/27122017  27-12-2017 14:53

 RNI

 TVSG  11-02-2018 11:35  TVSG1/09022018  09-02-2018 11:34

 NZB

 TVSG  11-02-2018 19:20  TVSG1/25012018  25-01-2018 11:54

 LUR

 VOSG  05-02-2018 21:35  VOSG1/31012018  31-01-2018 16:48

 KRI

 VOSG  08-02-2018 20:45  VOSG1/07022018  07-02-2018 07:22

 BPOL

 VOSG  09-02-2018 19:45  VOSG1/05022018  05-02-2018 19:27

 BCPL

BSL  BD  08-02-2018 21:30  BD1/07022018  07-02-2018 12:45

 POY

 BPCP  05-02-2018 05:55  BPCP4/04022018  04-02-2018 11:31

 POLG

 BPCP  05-02-2018 12:40  BPCP1/05022018  05-02-2018 05:55

 BROL

 BPCP  05-02-2018 18:20  BPCP2/05022018  05-02-2018 11:46

 BPCL

 BPCP  05-02-2018 23:55  BPCP3/05022018  05-02-2018 18:20

 IOBT

 BPCP  06-02-2018 09:00  BPCP1/06022018  06-02-2018 02:50

 IIEL

 BPCP  06-02-2018 15:20  BPCP2/06022018  06-02-2018 02:51

 BROL

 BPCP  06-02-2018 21:20  BPCP3/06022018  06-02-2018 14:50

 POLG

 BPCP  07-02-2018 03:20  BPCP4/03022018  03-02-2018 12:53

 HPCD

 BPCP  07-02-2018 10:50  BPCP1/07022018  07-02-2018 02:29

 PIOP

 BPCP  07-02-2018 16:55  BPCP2/07022018  07-02-2018 09:29

 WL

 BPCP  07-02-2018 22:55  BPCP3/07022018  07-02-2018 09:44

 IIEL

 BPCP  08-02-2018 06:30  BPCP6/07022018  07-02-2018 10:31

 BROL

 BPCP  08-02-2018 15:00  BPCP5/07022018  07-02-2018 10:30

 IOC

Page 8: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 BPCP  08-02-2018 22:30  BPCP7/07022018  07-02-2018 10:32

 POLG

 BPCP  09-02-2018 06:30  BPCP1/08022018  08-02-2018 08:49

 RPOS

 BPCP  09-02-2018 16:50  BPCP4/07022018  07-02-2018 09:52

 PSIA

 BPCP  09-02-2018 23:50  BPCP1/09022018  09-02-2018 16:40

 POLG

 BPCP  10-02-2018 07:15  BPCP5/09022018  09-02-2018 20:00

 BROL

 BPCP  10-02-2018 13:45  BPCP4/09022018  09-02-2018 18:31

 WL

 BPCP  10-02-2018 21:05  BPCP3/09022018  09-02-2018 17:53

 IIEL

 BPCP  11-02-2018 04:25  BPCP6/09022018  09-02-2018 20:01

 POLG

 BPCP  11-02-2018 11:35  BPCP1/11022018  11-02-2018 04:25

 HPSG

 BPCP  11-02-2018 17:25  BPCP2/11022018  11-02-2018 11:20

 BROL

 BPCP  11-02-2018 23:55  BPCP3/11022018  11-02-2018 18:05

 MRJ

 ICBD  07-02-2018 14:10  ICBD1/07022018  07-02-2018 12:50

 CCMP

 ICBD  09-02-2018 06:10  ICBD1/09022018  09-02-2018 05:15

 CCMP

 KNW  06-02-2018 21:10  KNW1/05022018  05-02-2018 11:20

 NMKL

 KW  05-02-2018 23:00  KW1/02022018  02-02-2018 11:30

 FUT

 KW  05-02-2018 23:00  LS1/02022018  02-02-2018 12:30

 FUT

 KW  10-02-2018 22:10  KW1/08022018  08-02-2018 11:50

 CP

 KW  10-02-2018 22:10  MMR1/08022018  08-02-2018 12:00

 CP

 LS  06-02-2018 20:00  LS1/04022018  04-02-2018 16:00

 FUT

 LS  06-02-2018 20:00  YL1/04022018  04-02-2018 16:00

 FUT

 LS  10-02-2018 18:40  LS2/07022018  07-02-2018 11:45

 FUT

 LS  10-02-2018 18:40  NR1/07022018  07-02-2018 11:45

 FUT

 MMR  07-02-2018 22:55  MMR1/06022018  06-02-2018 14:15

 FUT

 MMR  11-02-2018 19:30  MMR1/09022018  09-02-2018 12:00

 FUT

Page 9: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 MMR  11-02-2018 19:30  YL1/09022018  09-02-2018 11:30

 FUT

 NGN  09-02-2018 17:00  NGN1/08022018  08-02-2018 12:45

 BAP

 OCSB  06-02-2018 15:40  OCSB1/05022018  05-02-2018 20:30

 ST

 OCSB  07-02-2018 16:20  OCSB1/06022018  06-02-2018 20:00

 KNW

 OCSB  09-02-2018 21:45  OCSB1/08022018  08-02-2018 19:00

 ST

 PS  07-02-2018 18:45  PS1/06022018  06-02-2018 11:05

 TUP

NGP  ACDA  05-02-2018 12:30  ACDA1/05022018  05-02-2018 11:00

 JNPT

 ACDA  06-02-2018 23:55  ACDA1/06022018  06-02-2018 22:15

 JNPT

 ACDA  07-02-2018 08:15  ACDA1/07022018  07-02-2018 06:35

 JNPT

 ACDA  07-02-2018 18:00  ACDA2/07022018  07-02-2018 16:00

 ICDT

 ACDA  08-02-2018 14:30  ACDA1/08022018  08-02-2018 07:45

 JNPT

 ACDA  09-02-2018 06:45  ACDA1/09022018  09-02-2018 05:05

 JNPT

 ACDA  09-02-2018 17:15  ACDA2/09022018  09-02-2018 15:00

 JNPT

 ACDA  09-02-2018 23:30  ACDA3/09022018  09-02-2018 21:30

 JNPT

 ACDA  10-02-2018 06:45  ACDA1/10022018  10-02-2018 05:00

 JNPT

 BPQ  05-02-2018 16:50  MBCB1/05022018  05-02-2018 11:48

 KPCC

 BPQ  05-02-2018 23:45  MBCB2/05022018  05-02-2018 16:54

 KPCC

 BPQ  06-02-2018 23:20  MBCB2/03022018  03-02-2018 14:04

 TPHS

 BPQ  07-02-2018 16:00  MBCB1/06022018  06-02-2018 15:51

 KPCC

 BPQ  07-02-2018 23:30  MBCB1/07022018  07-02-2018 12:06

 TPHS

 BPQ  08-02-2018 14:45  MBCB2/07022018  07-02-2018 15:45

 KPCC

 BPQ  08-02-2018 23:50  MBCB1/08022018  08-02-2018 10:51

 KPCC

 BPQ  09-02-2018 20:40  MBCB2/08022018  08-02-2018 17:19

 KPCC

 BPQ  10-02-2018 13:30  MBCB1/09022018  09-02-2018 15:38

 KPCC

Page 10: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 BPQ  10-02-2018 23:50  MBCB1/10022018  10-02-2018 13:08

 KPCC

 BPQ  11-02-2018 22:40  MBCB1/11022018  11-02-2018 17:22

 KPCC

 BZU  06-02-2018 23:50  BZU1/29012018  29-01-2018 14:00

 HTE

 CESG  05-02-2018 02:25  CESG1/03022018  03-02-2018 18:15

 TAPG

 CESG  05-02-2018 15:35  CESG3/01022018  01-02-2018 00:56

 ST

 CESG  06-02-2018 10:45  CESG2/05022018  05-02-2018 11:48

 JL

 CESG  06-02-2018 18:45  CESG1/05022018  05-02-2018 11:23

 DWX

 CESG  07-02-2018 08:25  CESG1/01022018  01-02-2018 00:43

 VAPI

 CESG  08-02-2018 01:30  CESG4/01022018  01-02-2018 01:00

 JOS

 CESG  08-02-2018 14:30  CESG2/01022018  01-02-2018 00:49

 DDE

 CESG  09-02-2018 22:05  CESG2/07022018  07-02-2018 09:43

 NK

 CESG  10-02-2018 15:25  CESG4/07022018  07-02-2018 09:51

 CWA

 CESG  11-02-2018 09:10  CESG1/07022018  07-02-2018 09:37

 AK

 CKNI  06-02-2018 20:25  CKNI1/03022018  03-02-2018 15:00

 SISB

 CKNI  10-02-2018 16:20  CKNI1/06022018  06-02-2018 16:30

 SISB

 CSID  06-02-2018 10:55  CSID1/05022018  05-02-2018 16:24

 MPBG

 CSID  06-02-2018 22:00  CSID1/06022018  06-02-2018 08:00

 MSPC

 CSID  06-02-2018 22:00  HRG1/06022018  06-02-2018 04:10

 MSPC

 CSID  08-02-2018 21:50  CSID1/07022018  07-02-2018 16:09

 MPBG

 CSID  09-02-2018 23:45  CSID2/19012018  19-01-2018 17:12

 MSPC

 CSID  10-02-2018 22:50  CSID1/10022018  10-02-2018 01:00

 MPBG

 CSID  10-02-2018 22:50  HRG1/10022018  10-02-2018 13:30

 MPBG

 CSID  11-02-2018 19:15  CSID1/11022018  11-02-2018 08:00

 MPBG

 CSID  11-02-2018 19:15  HRG1/11022018  11-02-2018 08:20

 MPBG

Page 11: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 DLIB  10-02-2018 20:40  DLIB1/10022018  10-02-2018 19:30

 JNPT

 GGS  05-02-2018 03:15  GSG6/02022018  02-02-2018 17:22

 MQSG

 GGS  05-02-2018 06:30  GGS5/04022018  04-02-2018 16:34

 NTPG

 GGS  05-02-2018 09:10  GSG6/03022018  03-02-2018 13:10

 MQSG

 GGS  05-02-2018 15:30  GGS2/17082017  17-08-2017 15:13

 GISN

 GGS  05-02-2018 17:00  GSG2/03022018  03-02-2018 11:44

 NTPG

 GGS  05-02-2018 20:15  GSG3/04022018  04-02-2018 12:00

 NMVP

 GGS  05-02-2018 22:30  GGS3/04022018  04-02-2018 11:39

 NTPG

 GGS  05-02-2018 23:45  GSG5/03022018  03-02-2018 11:54

 MFSG

 GGS  06-02-2018 04:30  GGS6/04022018  04-02-2018 16:37

 NTPG

 GGS  06-02-2018 08:00  GSG1/05022018  05-02-2018 11:31

 GETS

 GGS  06-02-2018 10:45  GGS2/05022018  05-02-2018 11:52

 NTPG

 GGS  06-02-2018 15:55  GGS5/05022018  05-02-2018 17:09

 NTPG

 GGS  06-02-2018 18:15  GSG1/03022018  03-02-2018 10:35

 PSSS

 GGS  06-02-2018 20:45  GGS6/05022018  05-02-2018 17:14

 NTPG

 GGS  06-02-2018 22:45  GSG2/06022018  06-02-2018 17:06

 NMVP

 GGS  06-02-2018 23:55  GGS7/05022018  05-02-2018 17:17

 NTPG

 GGS  07-02-2018 04:10  GSG6/04022018  04-02-2018 16:44

 MFSG

 GGS  07-02-2018 07:35  GGS2/06022018  06-02-2018 17:07

 NTPG

 GGS  07-02-2018 11:10  GSG2/07022018  07-02-2018 09:09

 NMVP

 GGS  07-02-2018 13:00  GGS1/05022018  05-02-2018 11:50

 NTPG

 GGS  07-02-2018 16:00  GSG2/05022018  05-02-2018 16:57

 GETS

 GGS  07-02-2018 18:45  GGS1/07022018  07-02-2018 11:56

 NTPG

 GGS  07-02-2018 23:15  GSG11/31082017  31-08-2017 17:12

 MCNP

Page 12: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 GGS  07-02-2018 23:50  GGS3/07022018  07-02-2018 13:07

 NTPG

 GGS  08-02-2018 06:15  GGS4/07022018  07-02-2018 15:43

 NTPG

 GGS  08-02-2018 08:30  GSG3/07022018  07-02-2018 12:03

 MQSG

 GGS  08-02-2018 12:30  GGS6/07022018  07-02-2018 16:42

 NTPG

 GGS  08-02-2018 13:45  GSG4/07022018  07-02-2018 12:08

 KRDS

 GGS  08-02-2018 17:45  GGS3/17082017  17-08-2017 15:14

 GISN

 GGS  08-02-2018 20:00  GSG3/03022018  03-02-2018 11:47

 NTPG

 GGS  08-02-2018 23:55  GGS1/08022018  08-02-2018 10:54

 NTPG

 GGS  09-02-2018 07:00  GGS4/08022018  08-02-2018 15:59

 NTPG

 GGS  09-02-2018 08:45  GSG1/08022018  08-02-2018 16:50

 KRDS

 GGS  09-02-2018 13:45  GGS2/08022018  08-02-2018 11:15

 NTPG

 GGS  09-02-2018 16:45  GSG6/07022018  07-02-2018 16:04

 PSSS

 GGS  09-02-2018 19:15  GGS3/08022018  08-02-2018 11:19

 NTPG

 GGS  09-02-2018 21:00  GSG4/09022018  09-02-2018 13:03

 MTPK

 GGS  09-02-2018 22:30  GSG1/06022018  06-02-2018 17:05

 GETS

 GGS  09-02-2018 23:55  GGS1/09022018  09-02-2018 11:16

 NTPG

 GGS  10-02-2018 06:50  GSG3/05022018  05-02-2018 16:59

 MFSG

 GGS  10-02-2018 09:30  GGS5/08022018  08-02-2018 16:01

 NTPG

 GGS  10-02-2018 11:45  GSG1/10022018  10-02-2018 10:59

 TSWS

 GGS  10-02-2018 15:45  GSG4/03022018  03-02-2018 11:51

 NTPG

 GGS  10-02-2018 18:00  GGS8/04022018  04-02-2018 17:02

 NMVP

 GGS  10-02-2018 20:45  GSG3/01022018  01-02-2018 17:25

 NTPG

 GGS  10-02-2018 23:55  GSG1/07022018  07-02-2018 09:08

 MFSG

 GGS  11-02-2018 04:30  GGS2/09022018  09-02-2018 13:14

 NTPG

Page 13: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 GGS  11-02-2018 07:30  GSG3/10022018  10-02-2018 13:38

 GETS

 GGS  11-02-2018 12:30  GSG5/07022018  07-02-2018 13:02

 MFSG

 GGS  11-02-2018 14:15  GGS6/08022018  08-02-2018 16:03

 NTPG

 GGS  11-02-2018 16:30  GSG4/04022018  04-02-2018 16:28

 NTPG

 GGS  11-02-2018 20:15  GGS8/08022018  08-02-2018 16:40

 VIPS

 GGS  11-02-2018 23:30  GSG2/08022018  08-02-2018 17:01

 MFSG

 GNQ  07-02-2018 23:50  GNQ1/03022018  03-02-2018 12:30

 TUP

 HGT  11-02-2018 14:55  HGT2/08022018  08-02-2018 12:00

 SGWF

 HLSG  05-02-2018 17:30  HLSG1/05022018  05-02-2018 12:00

 KRDS

 HLSG  05-02-2018 17:30  RCXG1/05022018  05-02-2018 16:00

 KRDS

 HLSG  06-02-2018 23:20  HLSG1/06022018  06-02-2018 17:00

 TPHS

 HLSG  06-02-2018 23:20  RCXG1/06022018  06-02-2018 19:00

 TPHS

 HLSG  07-02-2018 18:45  HLSG1/07022018  07-02-2018 13:00

 MFSG

 HLSG  07-02-2018 18:45  RCXG1/07022018  07-02-2018 10:00

 MFSG

 HLSG  08-02-2018 21:00  HLSG2/08022018  08-02-2018 15:00

 NTPG

 HLSG  08-02-2018 21:00  RCXG1/08022018  08-02-2018 16:00

 NTPG

 HLSG  09-02-2018 23:30  HLSG1/09022018  09-02-2018 17:15

 TPHS

 HLSG  09-02-2018 23:30  RCXG1/09022018  09-02-2018 14:30

 TPHS

 HLSG  10-02-2018 22:40  HLSG1/10022018  10-02-2018 15:00

 NTPG

 HLSG  10-02-2018 22:40  RCXG1/10022018  10-02-2018 10:00

 NTPG

 HLSG  11-02-2018 23:45  HLSG2/11022018  11-02-2018 16:00

 TPHS

 HLSG  11-02-2018 23:45  RCXG1/11022018  11-02-2018 17:00

 TPHS

 HRG  09-02-2018 20:15  HRG1/08022018  08-02-2018 13:25

 MSPC

 KSWR  06-02-2018 20:25  KSWR3/27012018  27-01-2018 16:00

 NRPA

Page 14: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 KSWR  08-02-2018 21:00  KSWR1/02022018  02-02-2018 13:30

 SURI

 MELG  11-02-2018 16:05  MELG3/30012018  30-01-2018 16:00

 BSPC

 MJKN  05-02-2018 05:20  CGM1/28012018  28-01-2018 11:01

 MFSG

 MJKN  05-02-2018 15:45  CGM1/05022018  05-02-2018 10:55

 VIPS

 MJKN  05-02-2018 21:30  CGM2/05022018  05-02-2018 16:01

 NMVP

 MJKN  06-02-2018 04:30  CGM3/04022018  04-02-2018 16:51

 MFSG

 MJKN  06-02-2018 17:30  CGM5/05022018  05-02-2018 16:43

 VIPS

 MJKN  06-02-2018 21:40  CGM2/06022018  06-02-2018 16:03

 NMVP

 MJKN  07-02-2018 05:20  CGM4/05022018  05-02-2018 16:40

 MQSG

 MJKN  07-02-2018 12:10  CGM1/07022018  07-02-2018 09:05

 NMVP

 MJKN  07-02-2018 21:55  CGM3/07022018  07-02-2018 15:39

 NMVP

 MJKN  08-02-2018 07:30  CGM1/06022018  06-02-2018 16:01

 MFSG

 MJKN  08-02-2018 16:30  CGM5/07022018  07-02-2018 16:38

 NMVP

 MJKN  08-02-2018 23:45  CGM5/08022018  08-02-2018 21:22

 NTPG

 MJKN  09-02-2018 11:50  CGM1/03022018  03-02-2018 13:17

 KRDS

 MJKN  09-02-2018 19:10  CGM2/08022018  08-02-2018 16:14

 NMVP

 MJKN  10-02-2018 01:45  CGM2/07022018  07-02-2018 12:12

 MQSG

 MJKN  10-02-2018 10:00  CGM2/09022018  09-02-2018 16:22

 NMVP

 MJKN  10-02-2018 18:30  CGM2/10022018  10-02-2018 12:34

 NMVP

 MJKN  11-02-2018 04:30  CGM3/05022018  05-02-2018 16:35

 MFSG

 MJKN  11-02-2018 12:10  CGM3/10022018  10-02-2018 12:36

 NMVP

 MJKN  11-02-2018 23:40  CGM1/11022018  11-02-2018 16:37

 NMVP

 MLSW  05-02-2018 14:50  MLSW1/05022018  05-02-2018 13:00

 JNPT

 MLSW  08-02-2018 02:45  MLSW1/06022018  06-02-2018 09:26

 JCWS

Page 15: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 MTY  07-02-2018 22:30  MTY1/07022018  07-02-2018 20:00

 KRTH

 MTY  07-02-2018 22:30  MTY2/07022018  07-02-2018 20:30

 CWA

 PUX  05-02-2018 15:05  PUX1/02022018  02-02-2018 18:31

 RUPC

 PUX  11-02-2018 04:00  PUX1/06022018  06-02-2018 09:37

 RUPC

 PVIT  10-02-2018 22:35  PVIT1/09022018  09-02-2018 21:10

 HEGM

 RKSG  05-02-2018 18:00  DCSG1/05022018  05-02-2018 01:00

 MPBG

 RKSG  05-02-2018 18:00  RKSG1/05022018  05-02-2018 01:00

 MPBG

 RKSG  06-02-2018 13:23  DCSG1/06022018  06-02-2018 01:00

 KRDS

 RKSG  06-02-2018 13:23  RKSG1/06022018  06-02-2018 01:00

 KRDS

 RKSG  07-02-2018 11:57  DCSG1/07022018  07-02-2018 01:00

 MPBG

 RKSG  07-02-2018 11:57  RKSG1/07022018  07-02-2018 01:00

 MPBG

 RKSG  08-02-2018 12:08  DCSG1/08022018  08-02-2018 01:00

 PSSS

 RKSG  08-02-2018 12:08  RKSG1/08022018  08-02-2018 01:00

 PSSS

 RKSG  09-02-2018 11:45  DCSG1/09022018  09-02-2018 01:00

 PSSS

 RKSG  09-02-2018 11:45  RKSG1/09022018  09-02-2018 01:00

 PSSS

 RKSG  10-02-2018 14:35  DCSG1/10022018  10-02-2018 02:00

 PSSS

 RKSG  10-02-2018 14:35  RKSG1/10022018  10-02-2018 02:00

 PSSS

 RKSG  11-02-2018 16:25  DCSG1/11022018  11-02-2018 06:00

 PSSS

 RKSG  11-02-2018 16:25  RKSG1/11022018  11-02-2018 06:00

 PSSS

 TAE  06-02-2018 19:40  TAE1/01022018  01-02-2018 08:45

 ANG

 TAE  08-02-2018 11:00  TAE1/03022018  03-02-2018 19:00

 NGN

 TAE  11-02-2018 16:10  TAE1/09022018  09-02-2018 10:30

 LONI

 UMSG  05-02-2018 03:30  UMSG7/03022018  03-02-2018 13:58

 TSWS

 UMSG  05-02-2018 08:55  UMSG3/03022018  03-02-2018 11:19

 BESG

Page 16: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 UMSG  05-02-2018 14:05  UMSG2/04022018  04-02-2018 16:54

 MFSG

 UMSG  05-02-2018 15:35  UMSG6/05022018  05-02-2018 11:37

 MTPK

 UMSG  05-02-2018 19:00  UMSG17/31012018  31-01-2018 16:28

 MPBG

 UMSG  05-02-2018 23:00  UMSG1/05022018  05-02-2018 10:44

 PSSS

 UMSG  05-02-2018 23:50  UMSG12/05022018  05-02-2018 16:22

 PSSS

 UMSG  06-02-2018 06:20  UMSG3/04022018  04-02-2018 16:58

 MFSG

 UMSG  06-02-2018 09:15  UMSG3/05022018  05-02-2018 11:21

 MQSG

 UMSG  06-02-2018 16:35  UMSG8/05022018  05-02-2018 16:07

 MQSG

 UMSG  06-02-2018 18:00  UMSG4/05022018  05-02-2018 11:23

 BESG

 UMSG  06-02-2018 20:40  UMSG3/06022018  06-02-2018 16:16

 MTPK

 UMSG  06-02-2018 23:35  UMSG5/05022018  05-02-2018 11:36

 TSWS

 UMSG  07-02-2018 00:35  UMSG7/05022018  05-02-2018 16:04

 MFSG

 UMSG  07-02-2018 06:00  UMSG9/05022018  05-02-2018 16:09

 BESG

 UMSG  07-02-2018 11:30  UMSG1/07022018  07-02-2018 09:02

 MTPK

 UMSG  07-02-2018 13:35  UMSG13/05022018  05-02-2018 17:02

 TSWS

 UMSG  07-02-2018 18:40  UMSG12/31102017  31-10-2017 15:26

 KGW

 UMSG  07-02-2018 18:55  UMSG6/06022018  06-02-2018 16:26

 PSSS

 UMSG  07-02-2018 23:30  UMSG9/06022018  06-02-2018 16:53

 TPAP

 UMSG  07-02-2018 23:50  UMSG10/05022018  05-02-2018 16:16

 MQSG

 UMSG  08-02-2018 05:00  UMSG11/05022018  05-02-2018 16:19

 MFSG

 UMSG  08-02-2018 08:00  UMSG2/06022018  06-02-2018 16:15

 MQSG

 UMSG  08-02-2018 11:50  UMSG1/08022018  08-02-2018 07:00

 MPBG

 UMSG  08-02-2018 14:50  UMSG3/08022018  08-02-2018 11:00

 TSWS

 UMSG  08-02-2018 18:15  UMSG36/27072017  27-07-2017 13:42

 LPGU

Page 17: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 UMSG  08-02-2018 20:30  UMSG2/07022018  07-02-2018 14:25

 MTPK

 UMSG  08-02-2018 23:50  UMSG2/08022018  08-02-2018 10:57

 MTPK

 UMSG  09-02-2018 09:50  UMSG1/09022018  09-02-2018 09:31

 TSWS

 UMSG  09-02-2018 10:00  UMSG37/27072017  27-07-2017 13:43

 LPGU

 UMSG  09-02-2018 13:35  UMSG3/07022018  07-02-2018 15:53

 PSSS

 UMSG  09-02-2018 19:00  UMSG38/27072017  27-07-2017 13:45

 LPGU

 UMSG  09-02-2018 23:50  UMSG5/07022018  07-02-2018 15:57

 BESG

 UMSG  09-02-2018 23:50  UMSG6/07022018  07-02-2018 16:06

 MQSG

 UMSG  10-02-2018 04:50  UMSG4/08022018  08-02-2018 16:05

 MFSG

 UMSG  10-02-2018 08:45  UMSG8/08022018  08-02-2018 16:47

 MTPK

 UMSG  10-02-2018 11:20  UMSG5/08022018  08-02-2018 16:29

 GETS

 UMSG  10-02-2018 13:40  UMSG13/31102017  31-10-2017 15:28

 GISN

 UMSG  10-02-2018 18:25  UMSG4/06022018  06-02-2018 16:22

 MQSG

 UMSG  10-02-2018 23:50  UMSG9/10022018  10-02-2018 13:37

 PSSS

 UMSG  11-02-2018 03:10  UMSG1/06022018  06-02-2018 16:12

 MFSG

 UMSG  11-02-2018 08:40  UMSG9/08022018  08-02-2018 17:14

 MTPK

 UMSG  11-02-2018 12:17  UMSG7/06022018  06-02-2018 16:28

 MQSG

 UMSG  11-02-2018 18:15  UMSG4/07022018  07-02-2018 15:55

 MQSG

 UMSG  11-02-2018 18:25  UMSG39/27072017  27-07-2017 13:46

 LPGU

 UMSG  11-02-2018 18:25  UMSG4/07022018  07-02-2018 15:55

 LPGU

 UMSG  11-02-2018 23:30  UMSG5/06022018  06-02-2018 16:24

 MFSG

 UMSG  11-02-2018 23:50  UMSG3/10022018  10-02-2018 12:24

 MQSG

 WANI  05-02-2018 14:15  WANI7/19012018  19-01-2018 17:30

 MSPC

 WANI  05-02-2018 23:30  WANI2/04022018  04-02-2018 17:05

 NMVP

Page 18: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 WANI  06-02-2018 14:30  WANI1/05022018  05-02-2018 15:51

 MSPC

 WANI  06-02-2018 23:56  WANI1/31012018  31-01-2018 10:06

 CESG

 WANI  07-02-2018 10:10  WANI1/06022018  06-02-2018 15:57

 MSPC

 WANI  07-02-2018 18:40  WANI2/05022018  05-02-2018 15:54

 NMVP

 WANI  08-02-2018 02:30  WANI18/02112017  02-11-2017 18:59

 VIPS

 WANI  08-02-2018 14:00  WANI1/08022018  08-02-2018 13:50

 MSPC

 WANI  08-02-2018 22:30  WANI2/06022018  06-02-2018 16:05

 NMVP

 WANI  09-02-2018 16:00  WANI2/07022018  07-02-2018 12:28

 MFSG

 WANI  09-02-2018 23:50  WANI6/07112017  07-11-2017 23:43

 MDIT

 WANI  10-02-2018 13:00  WANI2/09022018  09-02-2018 15:51

 VIPS

 WANI  10-02-2018 21:25  WANI2/10022018  10-02-2018 13:24

 MSPC

 WANI  11-02-2018 11:15  WANI1/11022018  11-02-2018 09:27

 MSPC

 WANI  11-02-2018 18:30  WANI1/09022018  09-02-2018 11:14

 NMVP

PUNE

 BRMT  06-02-2018 18:00  BRMT1/02012018  02-01-2018 15:30

 JTTN

 BRMT  11-02-2018 16:00  BRMT2/08022018  08-02-2018 19:15

 DKAE

 CRCC  08-02-2018 22:30  CRCC1/08022018  08-02-2018 22:00

 CSTN

 HPLG  05-02-2018 17:15  HPLG1/05022018  05-02-2018 05:53

 HPSG

 HPLG  07-02-2018 19:45  HPLG1/07022018  07-02-2018 05:46

 HPSG

 HPLG  08-02-2018 07:15  HPLG2/07022018  07-02-2018 06:29

 MRJ

 HPLG  10-02-2018 20:15  HPLG1/10022018  10-02-2018 05:50

 MRJ

SUR  ARAG  08-02-2018 23:10  ARAG1/06022018  06-02-2018 19:00

 DKAE

 BAP  07-02-2018 05:30  BAP1/01022018  01-02-2018 18:00

 FUT

 BGVN  09-02-2018 10:45  BGVN2/25012018  25-01-2018 12:30

 KWV

 DD  07-02-2018 12:15  DD3/15012018  15-01-2018 12:30

 ANG

Page 19: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 LUR  06-02-2018 20:00  LUR1/30012018  30-01-2018 18:00

 NMKL

 MBSH  05-02-2018 21:45  MBSH1/04022018  04-02-2018 19:00

 TAPG

 MBSH  07-02-2018 14:40  MBSH1/07022018  07-02-2018 06:00

 SLI

 MBSH  08-02-2018 21:55  MBSH1/08022018  08-02-2018 06:00

 DHI

 MBSH  09-02-2018 20:25  MBSH1/09022018  09-02-2018 06:00

 NK

 MBSH  10-02-2018 18:55  MBSH1/10022018  10-02-2018 06:00

 LONI

 MBSH  11-02-2018 22:45  MBSH1/11022018  11-02-2018 06:00

 BGVN

 WDSG  05-02-2018 11:50  WDSG1/05022018  05-02-2018 08:40

 PMAK

 WDSG  05-02-2018 15:30  WDSG1/01022018  01-02-2018 11:30

 BCCK

 WDSG  05-02-2018 23:05  WDSG2/04022018  04-02-2018 19:20

 LONI

 WDSG  06-02-2018 05:00  WDSG3/05022018  05-02-2018 18:50

 ZCT

 WDSG  06-02-2018 14:00  WDSG2/05022018  05-02-2018 10:30

 VAPM

 WDSG  06-02-2018 18:30  WDSG1/06022018  06-02-2018 06:10

 BCCK

 WDSG  06-02-2018 20:30  WDSG2/06022018  06-02-2018 16:00

 PMAK

 WDSG  07-02-2018 11:25  AD1/06022018  06-02-2018 18:45

 PMAK

 WDSG  07-02-2018 11:25  WDSG2/07022018  07-02-2018 08:15

 PMAK

 WDSG  07-02-2018 14:35  WDSG4/07022018  07-02-2018 14:00

 TPND

 WDSG  08-02-2018 16:45  WDSG3/08022018  08-02-2018 13:00

 PMAK

 WDSG  08-02-2018 19:05  WDSG3/07022018  07-02-2018 13:50

 GRMT

 WDSG  08-02-2018 22:30  WDSG1/07022018  07-02-2018 07:00

 BCCK

 WDSG  09-02-2018 19:45  WDSG4/08022018  08-02-2018 18:30

 MAQ

 WDSG  09-02-2018 22:45  WDSG1/09022018  09-02-2018 16:20

 MAPT

 WDSG  10-02-2018 05:40  WDSG2/08022018  08-02-2018 10:28

 BCCK

 WDSG  10-02-2018 11:20  WDSG1/10022018  10-02-2018 07:40

 MDKS

Page 20: · Web viewWeekly Rake Supply Status As On Date . Week Period From : 05-02-2018 To : 11-02-2018. ZONE. DVSN. LDNG POINT. LDNG DATE. INDENT. INDENT DATE. DSTN. CR. BB. BRSG. 07-02-2018

 WDSG  10-02-2018 12:10  WDSG2/09022018  09-02-2018 22:20

 TAPG

 WDSG  11-02-2018 15:30  WDSG1/08022018  08-02-2018 09:30

 BCCK

 WDSG  11-02-2018 21:15  WDSG3/10022018  10-02-2018 22:00

 MRJ

 YL  08-02-2018 19:00  MMR1/07022018  07-02-2018 13:00

 FUT

 YL  08-02-2018 19:00  YL1/07022018  07-02-2018 12:30

 FUT