31
LIST B: Cornwall Council List of Background and Submission Documents Submission documents shown in black type Other background documents which do not form part of the formal submission in blue type Document name Date of document Previous versions Y/N Ref No Hard Copy Provided Section A – Submission Documents: New/Updated Since Publication of Proposed Submission(March 2014) or Focussed Changes (September 2014) Document combining the text and policies in the Proposed Submission Local Plan (March 2014) with the changes proposed in the ‘Schedule of focussed changes’ document (Sept 2014). Combined document provided for information and to support submission to the Secretary of State. January 2015 Y A.1 Y Statement of representations Y A.2 Y Copies of representations received in accordance with regulation 20 (i.e. to proposed submission stage and focussed changes stage – both published under regulation 19) NA A.3.1 Y Representations received: Proposed Submission (March 2014) March 2014 A.3.1 Y Representations received: Focused Changes (September 2014) September 2014 A.3.2 Y 24th July 2014 Committee Documentation: Committee Report (added 25/02/2015) July 2014 A.3.3 Y 24th July 2014 Committee Documentation: Appendix 3a (Proposed Submission Response Report Main Policies) (added 25/02/2015) July 2014 A.3.4 Y 24th July 2014 Committee Documentation: Appendix 3b (Proposed Submission Response Report Place Policies ) (added 25/02/2015) July 2014 A.3.5 Y 14th November 2014 Committee Documentation: Committee November 2014 A.3.6 Y

 · Web viewSupporting Documents published alongside the preferred approach for a core strategy and options/preferred options for minerals, waste and energy (January 2012). Supporting

Embed Size (px)

Citation preview

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Section A – Submission Documents: New/Updated Since Publication of Proposed Submission(March 2014) or Focussed Changes (September 2014)Document combining the text and policies in the Proposed Submission Local Plan (March 2014) with the changes proposed in the ‘Schedule of focussed changes’ document (Sept 2014). Combined document provided for information and to support submission to the Secretary of State.

January 2015

Y A.1 Y

Statement of representations Y A.2 Y

Copies of representations received in accordance with regulation 20 (i.e. to proposed submission stage and focussed changes stage – both published under regulation 19)

NA A.3.1 Y

Representations received: Proposed Submission (March 2014)March 2014

A.3.1 Y

Representations received: Focused Changes (September 2014)September 2014 A.3.2 Y

24th July 2014 Committee Documentation: Committee Report (added 25/02/2015) July 2014 A.3.3Y

24th July 2014 Committee Documentation: Appendix 3a (Proposed Submission Response Report Main Policies) (added 25/02/2015)

July 2014 A.3.4 Y

24th July 2014 Committee Documentation: Appendix 3b (Proposed Submission Response Report Place Policies) (added 25/02/2015)

July 2014 A.3.5 Y

14th November 2014 Committee Documentation: Committee Report (added 25/02/2015)

November 2014 A.3.6 Y

14th November 2014 Committee Documentation: Appendix 4 (Focused Changes Response Report) (added 25/02/2015)

November 2014 A.3.7 Y

Additional Responses to Consultation (added 25/02/2015) February 2015 A.3.8 Y

Local Development Scheme Y A.4 YSustainability Appraisal Final Report November Y - updated A.5 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

2014Habitats Regulations Assessment Final Report Nov 2014 Y - updated A.6 Y

Duty to Co-operate Statement January 2015

N A.7 Y

Annual Monitoring Report 2014 December 2014

N A.8 Y

Housing Land Availability and Five Year Land Supply Assessment 13-14 N A.9 Y

Strategic Housing Land Availability Assessment (SHLAA) (Updated report) January 2015

Y A.10 Y

SHLAA - 2009 & 2011 Site Plans Y A.10.1 Y

SHLAA - 2012-2014 Site Plans - Volume i and Volume ii Y A.10.2 Y

SHLAA - 2009 Camborne, Pool, Illogan and Redruth site assessments Y A.10.3 Y

Report on objectively assessed need for housing January 2015

N A.11 Y

Overview report on housing distribution January 2015

N A.12 Y

Cornwall Council Housing Strategic Viability AppraisalUpdate of Market Values: July 2014

July 2014 A.13 Y

Cornwall Council Housing Strategic Viability AppraisalResponse to Stakeholder Feedback on the Update of Market Values: July 2014

July 2014 A.14 Y

Report on Sustainability Appraisal of eco-community site allocations at West Carclaze, Baal and Par Docks Part 1 and Part 2

January 2015

N A.15 Y

Strategic Flood Risk Assessment 2 for site allocations at West Carclaze, Baal and Par Docks

January 2015

N A.16 Y

Deliverability of housing sites within rural areas and provision outside the AONB

January 2015

N A.17 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Report on assessment of landscape sensitivity to on-shore wind energy and large scale photovoltaic development in Cornwall + annexes (updated report).

January 2015

Y – updated from previous version

N

China Clay evidence base report (updated report) January 2015

Y – updated from 2014

A.18 Y

Local Aggregates Assessment (updated report) December 2014

Y – updated from previous version

A.19 Y

Building stone evidence base report (updated report) January 2015

Y – updated from 2014

A.20 Y

Assessment of future waste arising in Cornwall (updated report) Jan 2015 Y – updated from previous report

A.21 Y

Existing waste management capacity in Cornwall (updated report) January 2015

Y – updated from previous report

A.22 Y

Assessment of the additional waste management provision required in Cornwall up to 2030 (updated report)

January 2015

Y – updated from previous report

A.23 Y

Report on Infrastructure needs assessment December 2014

N A.24 Y

Report on relationship between old and new policy January 2015

N A.25 Y

Whole plan viability statement January 2015

N A.26 Y

Section B - Focused Changes published for consultation in September 2014Schedule of Focused Changes to the Cornwall Local Plan: Strategic Policies Proposed Submission Draft March

September 2014

B.1 Y

Proposed Submission Local Plan policies map and Key (as published as part of focussed changes) including notations for existing adopted policies (to be retained or deleted for Caradon policies, Carrick policies, North

B.2.1 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Cornwall policies, Penwith policies, Restormel Part 1 and Restormel Part 2, Minerals Local Plan and Waste Local Plan); Town Centre, Prime Shopping Area & Prime Shopping Frontage boundaries for main towns (Cornwall Town Centre Boundaries Assessment Report, Appendix 1 and Appendix 2) and, allocations for the Eco-community programme.•Inset 1 Penzance;•Inset 2 St Ives;•Inset 3 Hayle;•Inset 4 Camborne;•Inset 5 Redruth;•Inset 6 Helston;•Inset 7 Falmouth;•Inset 8 Truro;•Inset 9 Newquay;•Inset 10 Wadebridge;•Inset 11 Bodmin;•Inset 12 West Carclaze/Baal;•Inset 13 St Austell;•Inset 14 Par Docks;•Inset 15 Liskeard;•Inset 16 Launceston;•Inset 17 Saltash;•Inset 18 Bude.

B.2.2B.2.3B.2.4B.2.5B.2.6B.2.7B.2.8B.2.9B.2.10B.2.11B.2.12B.2.13B.2.14B.2.15B.2.16B.2.17B.2.18B.2.19

YYYYYYYYYYYYYYYYYY

Supporting documents published alongside focussed changes (Sept 2014)Addendum to Sustainability Appraisal: Update to Local Plan Pre Submission Consultation Version (August 2014);

August 2014 B.3 Y

Habitat Regulations Assessment Update (May 2014); May 2014 B.4 Y

Gypsy and travelling communities strategy July 2014 Listed in Error – March 14 final copy

Gypsy and travelling communitie

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provideds strategy

Gypsy & Traveller Accommodation Needs Assessment Update Briefing Note Sept 2014 B.5 Y

The Statement of Representation Procedure September 2014

N

Section C – Proposed Submission document – published for consultation March 2014Cornwall Local Plan: Strategic Policies Proposed Submission document March 2014 C.1 Y

Key Diagram March 2014 C.2 Y

Statement of Representations March 2014 NStatement of Representation Procedure March 2014 NSustainability Appraisal: Pre Submission Document Report January

2013C.3 Y

Addendum to Sustainability Appraisal: Update to Local Plan Pre Submission Consultation Version (January 2013)

January 2013

C.4 Y

Addendum to Sustainability Appraisal: Update to Local Plan Pre Submission Consultation Version (February 2013)

February 2013

C.5 Y

Addendum to Sustainability Appraisal: Update to Local Plan Pre Submission March 2014 C.6 YCornwall Local Plan: Habitat Regulations Assessment March 2013 March 2013 C.7 Y

Strategic Flood Risk Assessment 1 November 2009

C.8 Y

Strategic Housing Market Needs Assessment July 2013; July 2013 C.9 Y

Strategic Housing Land Availability Assessment 2013 Update September 2013

C.10 Y

Gypsy & Travelling Communities Strategy 2014 Update March 2014 C.11 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Housing Requirement for Cornwall (Peter Brett Associates report) October 2012

N

BN1 - Objectively Assessed Need November 2013

N

BN2 - The Housing Market and the Strategic Housing Market Assessment November 2013

N

BN3 - Population and Population Projections November 2013

N

BN4 - Households and Household Projections November 2013

N

BN5 - Jobs, Housing and Economic Growth Projections November 2013

N

BN6 - Why do we Need to Build More Houses? The Consequences of Building Too Few or Too Many New Homes

November 2013

N

BN7 - Empty Homes November 2013

N

BN8 - Deliverability and the Strategic Housing Land Availability Assessment November 2013

N

BN9 - Five Year Land Supply and the Flexibility Allowance November 2013

N

BN10 - Affordable Housing November 2013

N

BN11 - Second and Holiday Homes November 2013

N

BN12 - Converting Objectively Assessed Need into a Single Housing Target November 2013

N

BN13 - Housing Mix, Types and Tenures November 2013

N

BN14 - House Prices and Affordability November 2013

N

BN15 - Housing Backlog November N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

2013BN16 - Private Rented Sector November

2013N

BN17 - Incomes and Earnings November 2013

N

BN18 - Housing Distribution November 2013

N

BN20 - Local Plan Examination Findings on Objectively Assessed Housing Need

November 2013

N

BN22 - Welfare Reform and its Impact on Housing November 2013

N

Community Facilities and Services Survey 2012 Update January 2013

C.12 Y

Settlements: Hierarchy and Settlement Categories 2012 Update January 2013

C.13 Y

Cornwall Employment Land Review November 2010

C.14 Y

Cornwall Retail Study November 2010

C.15 Y

Cornwall Town Centre Boundaries Assessment Report,Appendix 1Appendix 2

November 2012

C.16.1C.16.2C.16.3

YYY

An assessment of the landscape sensitivity to on-shore wind energy and large scale photovoltaic development in Cornwall plus annex,Appendix 1Appendix 2Appendix 3Appendix 4Appendix 5

April 2011 C.17.1

C.17.2C.17.3C.17.4C.17.5C.17.6

Y

YYYYY

Energy Projections for Cornwall March 2013 NRenewable Energy Resource Potential March 2013 N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Comparing Cornwall’s Renewable and low carbon energy Resource Potential with its Energy Consumption

March 2013 N

M1 China Clay (updated March 2014) March 2014 C.18 Y

M2 Local Aggregate Assessment March 2013 C.19 Y

M3 Building Stone (updated March 2014), March 2014 C.20 Y

M4 Metals March 2013 C.21 Y

M5 Fowey/Par Bulk Transport Study March 2013 C.22 Y

M7 Mineral Safeguarding Areas March 2013 C.23 Y

W1 Assessment of Future Waste Arisings in Cornwall (updated November 2013),

November 2013

C.24 Y

W2 Existing Waste Management Capacity in Cornwall (updated November 2013)

November 2013

C.25 Y

W3 Assessment of the Additional Waste Management Provision Required in Cornwall up to 2030 (updated November 2013)

November 2013

C.26 Y

W4 Report of cross boundary waste movements(new paper November 2013) November 2013

C.27 Y

Growth Factors Profiles for the community network areas of:Bodmin,Bude,Camborne Pool and Redruth,Camelford,Caradon,China Clay,Cornwall Gateway,Falmouth and Penryn,Hayle and St Ives,

February 2013

N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Helston and the Lizard,Launceston,Liskeard and Looe,Newquay and St Columb,St Agnes and Perranporth,St Austell,St Blazey Fowey and Lostwithiel,Truro and the Roseland,Wadebridge and PadstowWest Penwith;Infrastructure Needs Assessment SchedulesStrategic Schedule and Accompanying mapBodmin ScheduleBude ScheduleCamborne, Pool and Redruth ScheduleCamelford ScheduleCaradon ScheduleChina Clay ScheduleCornwall Gateway ScheduleFalmouth and Penryn ScheduleHayle and St Ives ScheduleHelston and the Lizard ScheduleLaunceston ScheduleLiskeard and Looe ScheduleNewquay and St Columb ScheduleSt Agnes and Perranporth ScheduleSt Austell ScheduleSt Blazey, Fowey & Lostwithiel ScheduleTruro and the Roseland ScheduleWadebridge and Padstow ScheduleWest Penwith ScheduleCornwall Wide Schedule

March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014March 2014

C.28.1C.28.2C.28.3C.28.4C.28.5C.28.6C.28.7C.28.8C.28.9C.28.10C.28.11C.28.12C.28.13C.28.14C.28.15C.28.16C.28.17C.28.18C.28.19C.28.20C.28.21C.28.22

YYYYYYYYYYYYYYYYYYYYYY

Topic Based Papers: N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Agriculture and FoodBiodiversity and GeodiversityClimate ChangeCoast and MaritimeCrime and Anti-Social BehaviourDesign and Efficient Use of ResourcesEconomyEducation and SkillsEnergyFlooding Drought and Water ConsumptionGreen Infrastructure Summary and AppendicesHealthHistoric EnvironmentHousingLandscape and SeascapeMineralsRetail and Town CentresSocial InclusionSoil Air and WaterSport Recreation and Open SpaceTourismTransport and AccessibilityWaste

January 12

Topic Based Papers (below) These papers were published to accompany the Proposed Submission Plan, March 2014. Their purpose was to provide background information to assist readers in understanding some of the place based issues at earlier stages. Documents are included in library.Place Based Topic Papers:Bodmin CNA,Bude CNA,Camborne Pool and Redruth CNA,Camelford CNA,Caradon CNA,

February 11March 2013

N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

China Clay CNA,Cornwall Gateway CNA,Falmouth and Penryn CNA,Hayle and St Ives CNA,Helston and the Lizard CNA,Launceston CNA,Liskeard and Looe CNA,Newquay and St Columb CNA,St Agnes and Perranporth CNA,St Austell CNA,St Blazey Fowey and Lostwithiel CNA,Truro and the Roseland CNA,Wadebridge and Padstow CNA,West Penwith CNA.Section D – Pre-Submission document. Published for consultation in March 2013Cornwall Local Plan: Strategic Policies Pre Submission Version March 2013 D1 Y

Sustainability Appraisal: Pre Submission Document Report January 2013

D2 Y

Addendum to Sustainability Appraisal: January 2013 Update, January 2013

D3 Y

Addendum to Sustainability Appraisal: March 2013 Update to Local Plan Pre Submission Consultation Version

March 2013 D4 Y

Statement of Procedure for Making Representations March 2013 NRepresentations Statement March 2013 NSupporting documents published alongside the pre-submission Local Plan (March 2013). Supporting documents are listed below but, with the exception of the Sustainability Appraisal, are not included in documents submitted to the SoS. Hard/electronic copies may however be provided on requestCornwall Local Plan: Habitat Regulations Assessment March 2013 D5 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Housing Strategic Viability Appraisal plus Technical Annex, Final Report, 3 Dragons Opinion Research Services

September 2012

N D6 Y

Housing Growth and Distribution Executive Summary March 2013 NHousing Growth and Distribution: Housing Growth Pre Submission Version March 2013 NHousing Growth and Distribution: Distribution Preferred Approach Version ? NAlternative Proposal for Cornwall Local Plan Housing Target 2010-2030 January

2013N

Housing Requirement for Cornwall October 2012

N

Strategic Housing Land Availability Assessment 2012 NCommunity Facilities and Services Survey 2012 Update January

2013N

Settlements: Hierarchy and Settlement Categories 2012 Update January 2013

N

Strategic Housing Market Needs Assessment June 2013 NStrategic Flood Risk Assessment 1 November

2009N

Cornwall Employment Land Review November 2010

N

Cornwall Retail Study November 2010

N

Cornwall Town Centre Boundaries Assessment Report, Appendix 1 and Appendix 2

February 2013

N

Population and Household Change 2013 Update March 2013 NAn assessment of the landscape sensitivity to on-shore wind energy and large scale photovoltaic development in Cornwall plus annex

March 2013 N

E1 Energy Projections for Cornwall March 2013 NE2 Renewable Energy Resource Potential March 2013 NE3 Comparing Cornwall’s Renewable and low carbon energy Resource Potential with its Energy Consumption

March 2013 N

M1 China Clay March 2013 NM2 Local Aggregate Assessment March 2013 N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

M3 Building Stone March 2013 NM4 Metals March 2013 NM5 Fowey/Par Bulk Transport Study March 2013 NM7 Mineral Safeguarding Areas March 2013 NW2 Existing Waste Management Capacity in Cornwall March 2013 NW3 Assessment of the Additional Waste Management Provision Required in Cornwall up to 2030

March 2013 N

Growth Factors Profiles (updated) for the community network areas of Bodmin, Bude, Camborne Pool and Redruth, Camelford, Caradon, China Clay, Cornwall Gateway, Falmouth and Penryn, Hayle and St Ives, Helston and the Lizard, Launceston, Liskeard and Looe, Newquay and St Columb, St Agnes and Perranporth, St Austell, St Blazey Fowey and Lostwithiel, Truro and the Roseland, Wadebridge and Padstow and West Penwith

February 2013

N

Infrastructure Needs Assessment (INA) Schedules comprising a Strategic Schedule, a Cornwall Wide Schedule and one for each of the community network areas: Bodmin INA, Bude INA, Camborne Pool and Redruth INA, Camelford INA, Caradon INA, China Clay INA, Cornwall Gateway INA, Falmouth and Penryn INA, Hayle and St Ives INA, Helston and the Lizard INA, Launceston INA, Liskeard and Looe INA, Newquay and St Columb INA, St Agnes and Perranporth INA, St Austell INA, St Blazey Fowey and Lostwithiel INA, Truro and the Roseland INA, Wadebridge and Padstow INA and West Penwith INA

? N

Place Based Topic Papers: updated papers for Bodmin CNA, Bude CNA, Camborne Pool and Redruth CNA, Camelford CNA, Caradon CNA, China Clay CNA, Cornwall Gateway CNA, Falmouth and Penryn CNA , Hayle and St Ives CNA, Helston and the Lizard CNA, Launceston CNA, Liskeard and Looe CNA, Newquay and St Columb CNA, St Agnes and Perranporth CNA, St Austell CNA, St Blazey Fowey and Lostwithiel CNA, Truro and the Roseland CNA, Wadebridge and Padstow CNA, West Penwith CNA

March 2013 N

Section E – Preferred Approach and Options/Preferred Options for Minerals, Energy and Waste published for consultation in January 2012

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Our Preferred Approach for a Core Strategy January 2012

E1 Y

Community Network Area Discussion Papersover 3 documents – East(E), Mid(M) & West(W)

BodminBudeCamborne Pool and RedruthCamelfordCaradonChina Clay, St Austell and St Blazey Fowey and LostwithielCornwall GatewayFalmouth and PenrynHayle and St IvesHelston and the LizardLauncestonLiskeard and LooeNewquay and St ColumbSt Agnes and PerranporthTruro and the RoselandWadebridge and PadstowWest Penwith.

January 2012

E.2.1E.2.2E.2.3E.2.4E.2.5E.2.6E.2.7E.2.8E.2.9E.2.10E.2.11E.2.12E.2.13E.2.14E.2.15E.2.16E.2.17

Yes – split

(E)(E)(W)(E)(E)(M)(E)(W)(W)(W)(E)(E)(M)(M)(M)(E)(W)

Preferred Approach Sustainability Appraisal December 2011 E.3

Y

Alternative Options document December 2011

E4 Y

Preferred Approach Habitats Regulation Assessment January 2012

E5 Y

Options and Preferred Options for Energy, Minerals and Waste January 2012

E6 Y

Options and Preferred Options for Energy, Minerals and Waste Sustainability Appraisal

December 2011

E7 Y

Options and Preferred Options for Energy, Minerals and Waste Habitats January E8 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Regulation Assessment 2012Supporting Documents published alongside the preferred approach for a core strategy and options/preferred options for minerals, waste and energy (January 2012). Supporting documents are listed below but, with the exception of the Sustainability Appraisal, are not included in documents submitted to the Secretary of State.

Housing Growth and Distribution of Housing February 2012

N

Strategic Housing Land Availability Assessment 2011 NStrategic Housing Market Assessment 2008Strategic Flood Risk Assessment 1 November

2009N

Cornwall Employment Land Review November 2010

N

Cornwall Retail Study November 2010

N

Town Framework Evidence Base for Bude TF, Camborne Pool Illogan and Redruth TF, Falmouth and Penryn TF, Hayle TF, Launceston TF, Liskeard TF, Newquay TF, Penzance and Newlyn TF, Saltash TF and St Ives and Carbis Bay TF

November 2011

N

Truro and Threemilestone ? NBodmin Masterplan ? NEco Communities January

2012N

St Austell, St Blazey and China ClayArea Regeneration Plan: Sustainability Appraisal of Land Use Alternatives

May 2012 New Document Added - Background

N

Cornwall LDF Core Strategy Eco Developments Study, Appendix 5 Site Assessment Tables Part 1, Part 2 and Part 3;

September 2011

N

Infrastructure Delivery Plan Schedules comprising a Strategic Schedule, a Cornwall Wide Schedule and one for each of the community network areas

? N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

of Bodmin IDP, Bude IDP, Camborne Pool and Redruth IDP, Camelford IDP, Caradon IDP, China Clay, St Austell and St Blazey Fowey and Lostwithiel IDP, Cornwall Gateway IDP, Falmouth & Penryn IDP, Hayle and St Ives IDP, Helston and the Lizard IDP, Launceston IDP, Liskeard and Looe IDP, Newquay and St Columb IDP, St Agnes and Perranporth IDP, Truro and the Roseland IDP, Wadebridge and Padstow IDP and West Penwith IDPM1 – China Clay January

2012N

M2 – Aggregates January 2012

N

M3 – Building Stone January 2012

N

M4 – Metals January 2012

N

M5 – Par/Fowey bulk transport study January 2012

N

E1 (a) - Energy consumption in Cornwall, E1 (b) - Energy forecasts for Cornwall

January 2012

N

E2 - Renewable energy resource potential January 2012

N

E3 - Comparing Cornwall’s renewable/low carbon resource potential with energy consumption

January 2012

N

E4 (a) - An Assessment of the Landscape Sensitivity to Onshore Wind and Large Scale Solar Photovoltaic Development in Cornwall, E4 (b) - Annex 1 Landscape Sensitivity;

January 2012

N

W1 – Assessment of future waste arisings in Cornwall up to 2031 January 2012

N

W2 – Existing waste management capacity in Cornwall January 2012

N

W3 – Assessment of additional waste management provision required in Cornwall up to 2031

January 2012

N

Growth Factors Profiles for Bodmin Profile, Bude Profile, Camborne Pool and Redruth Profile, Camelford Profile, Caradon Profile, China Clay, St Austell and

January 2012

N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

St Blazey Fowey and Lostwithiel Profile, Cornwall Gateway Profile, Falmouth and Penryn Profile, Hayle and St Ives Profile, Helston and the Lizard Profile, Launceston Profile, Liskeard and Looe Profile, Newquay and St Columb Profile, St Agnes and Perranporth Profile, Truro and the Roseland Profile, Wadebridge and Padstow Profile and West Penwith ProfileTopic based papers on Agriculture and Food, Biodiversity and Geodiversity, Climate Change, Coast and Maritime, Crime and Anti-Social Behaviour, Design and Efficient Use of Resources, Economy, Education and Skills, Energy, Flooding Drought and Water Consumption, Green Infrastructure Summary and Appendices, Health, Historic Environment, Housing, Landscape and Seascape, Minerals, Retail and Town Centres, Social Inclusion, Soil Air and Water, Sport Recreation and Open Space, Tourism, Transport and Accessibility and Waste

January 2012

N

Place based papers on Bodmin CNA, Bude CNA, Camborne Pool and Redruth CNA, Camelford CNA, Caradon CNA, China Clay CNA, Cornwall Gateway CNA, Falmouth and Penryn CNA, Hayle and St Ives CNA, Helston and the Lizard CNA, Launceston CNA, Liskeard and Looe CNA, Newquay and St Columb CNA, St Agnes and Perranporth CNA, St Austell CNA, St Blazey Fowey and Lostwithiel CNA, Truro and the Roseland CNA, Wadebridge and Padstow CNA and West Penwith CNA.

January 2012

N

Section F – Core Strategy Options – published for consultation in February 2011

Core Strategy Options Paper February 2011

F.1 Y

Area Based Discussion Paper February 2011

F.2 Y

Sustainability Appraisal:summary,detailed growth optionsanalysis of trends,housing distribution Sustainability Appraisal

2011F.3F.3.1F.3.2F.3.3

YYYY

Habitats Regulation Assessment January F.4 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

including maps for the:Cornwall Towns,DispersedEconomy Led distribution options

2011F.4.1F.4.2F.4.3

YYY

Supporting documents published alongside the Core Strategy Options Report (February 2011). Supporting documents are listed below but, with the exception of the Sustainability Appraisal, are not included in documents submitted to the Secretary of State.Future Cornwall (Cornwall’s Sustainable Community Strategy); N

Topic based papers on Agriculture & Food, Biodiversity & Geodiversity, Climate Change, Coast & Maritime, Crime & Anti-Social Behaviour, Design & Efficient Use of Resources, Economy, Education & Skills, Energy, Flooding Drought & Water Consumption, Green Infrastructure Summary and Appendices, Health, Historic Environment, Housing, Landscape & Seascape, Minerals, Retail & Town Centres, Social Inclusion, Soil Air & Water, Sport Recreation & Open Space, Tourism, Transport & Accessibility and Waste.

February 2011

N

Place based papers on Bodmin, Bude, Camborne Pool & Redruth, Camelford, Caradon, China Clay, Cornwall Gateway, Falmouth & Penryn, Hayle & St Ives, Helston & the Lizard, Launceston, Liskeard & Looe, Newquay & St Columb, St Agnes & Perranporth, St Austell, St Blazey Fowey & Lostwithiel, Truro & the Roseland, Wadebridge & Padstow and West Penwith.

2011 N

Housing Growth Targets NDeveloping a Housing Target Model NHousing Distribution NPopulation and Household Change in Cornwall NCornwall Employment Land Review November

2010N

Cornwall Retail Study November 2010

N

Strategic Housing Land Availability Assessment 1 2011 NStrategic Flood Risk Assessment 1 November

2009N

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Strategic Housing Market Assessment 2008 NPlanning for the Role and Future of Smaller Settlements in Cornwall December

2009N

Community Facilities & Services and Settlements: Hierarchy & Settlement Categories;

2011 N

Section G – Other DocumentsStatement of Community Involvement G1 Y

Section H - Post Submission Documents

Inspectors and Councils Communication

Inspector's Note 1 - Preliminary Questions Clarification and Comments

20th February 15

ID.01

Cornwall Councils Response to the Inspectors Note One 26th February 15

ID.01.CC.1Y

Cornwall Councils Response to the Inspectors Note One - Comprehensive Impact Assessment (CIA)

March 14 ID.01.CC.1.1 Y

Cornwall Councils Response to the Inspectors Note One – Table 1 and Table 2

February 15 ID.01.CC.1.2 Y

Cornwall Councils Response to the Inspectors Note One - The River Tamar Crossing Study

September 13 ID.01.CC.1.3 Y

Cornwall Councils Response to the Inspectors Note One - Economy and Culture Strategy 2013-20

September 13 ID.01.CC.1.4 Y

Cornwall Councils Response to the Inspectors Note One - Local Enterprise Partnership’s Strategic Economic Plan

May 14ID.01.CC.1.5 Y

Cornwall Councils Response to the Inspectors Note One - EU Structural and Investment Fund Strategy (the prospectus for the 2014-20 EU Growth June 14 ID.01.CC.1.6 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Programme)Cornwall Councils Response to the Inspectors Note One - EU Investment Strategy Headline evidence base October 13 ID.01.CC.1.7 YCornwall Councils Response to the Inspectors Note One - Policies Map September

14 ID.01.CC.1.8 YEco- Communities Briefing Note 16th March

15 ID.01.CC.2.1 YHousing Projections Implications Briefing Note 16th March

15 ID.01.CC.2.2 YEconomic Strategy Briefing note 16th March

15 ID.01.CC.2.3 YSchedule of Proposed Further Significant Change 16th March

15 ID.01.CC.2.4 YUpdated Schedule of Proposed Further Significant Change - V2 30th April 15

ID.01.CC.2.4.1 YUpdated Schedule of Proposed Further Significant Change – V3 13th May 15

ID.01.CC.2.4.2 YDevelopment Managements Policies Change for the Protection of the Natural and Historic Environment

16th March 15 ID.01.CC.2.5 Y

SHMA Email Response Update 17th March 15 ID.01.CC.2.6 Y

Retail Study Report Update March 15 ID.01.CC.3.1 YRetail capacity - GVA update CC cover note April 15 ID.01.CC.3.1.1 YThree Dragons Viability Report Update March 15 ID.01.CC.3.2 YTechnical Annex March 15 ID.01.CC.3.2.1 YCornwall Population and Household Forecasts - Edge Analytics Report March 15 ID.01.CC.3.3 YAnnual Household Change Report March 15 ID.01.CC.3.3.1 YImplications of the 2012 Population and Household Forecasts - CC Edge Report Cover Note

March 15 ID.01.CC.3.3.2 Y

Gypsy & Traveller Accommodation Needs AssessmentFor Cornwall, Plymouth, South Hams and West Devon Local Authorities May 2014 ID.01.CC.4 Y

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Gypsy & Traveller Minorca Lane Project Report Nov 14 ID.01.CC.4.1 Y

Inspectors Note 2 – Affordable Housing 27th February 15

ID.02 Y

Councils Response to Inspectors Note 2 on Affordable Housing 16th March 15 ID.02.CC.1 Y

Final Housing Investment Plan ID.02.CC.1.1 YHousing Strategy – Financial Appendix A ID.02.CC.1.2 YHousing Investment Plan – Financial Appendix B ID.02.CC.1.3 YCorporate Business Plan and Budget ID.02.CC.1.4 YCouncils Explanatory Note on the Viability Study Refresh 2015 April 2015 ID.02.CC.2 YAffordable Housing Delivery within the Last Five Years April 2015 ID.02.CC.2.1 YInspectors RequestInspectors Request to the Council – 2 nd April 2015 April 15 N ID.03 YCouncils Response to Inspectors Request April 15 N ID.03.CC.1 YSchedule of Planning Permissions including Affordable Housing, within the last 5 years. April 15 N ID.03.CC.1.1 YUpdated Version available of ID.03.CC.1.1 – Hearing Document – See HD.CC.05 21st May 15 HD.CC.05Inspectors Note 4 - Preliminary Council Work For July Hearings 15th April 15 N ID.04 YInspectors Note 4 - Preliminary Council Work For July Hearings (V2 minor correction to paragraph 6)

16th April 15 Y ID.04.1

Hearing Statements

Statutory and Regulatory MattersCornwall Council Response 30th April 15 HS0.CCBoyer Planning Response 30th April 15 HS0.01Natural England 30th April 15 HS0.02Issue 1Cornwall Council Response HS1.CCOrigin 3 Response 30th April 15 HS1.01

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

Emery Planning Response Plus Appendices Part 1 and Part 2 30th April 15 HS1.02Persimmon Response 30th April 15 HS1.03CPRE Cornwall Response 30th April 15 HS1.04Hallam Land Management Response 30th April 15 HS1.05Mining Villages Regeneration Group Response 30th April 15 HS1.06Savills Response 30th April 15 HS1.07Barton Wilmore Response 30th April 15 HS1.08Tetlow King Planning Response 30th April 15 HS1.09Boyer Planning Response 30th April 15 HS1.10Terrence O’Rourke Response 30th April 15 HS1.11Home Builders Federation Response 30th April 15 HS1.12PCL Planning Response 30th April 15 HS1.13Issue 2Cornwall Council Response 30th April 15 HS2.CCOrigin 3 Response 30th April 15 HS2.01Mining Villages Regeneration Group Response 30th April 15 HS2.02NLP Planning Response 30th April 15 HS2.03Barton Wilmore Response 30th April 15 HS2.04Savills Response 30th April 15 HS2.05Terrence O’Rourke Response 30th April 15 HS2.06Issue 3Cornwall Council Response 30th April 15 HS3.CCOrigin 3 Response 30th April 15 HS3.01Emery Planning Response 30th April 15 HS3.02Persimmon Response 30th April 15 HS3.03Hallam Land Management Response 30th April 15 HS3.04Mining Villages Regeneration Group Response 30th April 15 HS3.05National Trust Response 30th April 15 HS3.06Tetlow King Planning Response 30th April 15 HS3.07Boyer Planning Response 30th April 15 HS3.08Terrence O’Rourke Response 30th April 15 HS3.09WYG Planning Response 30th April 15 HS3.10

LIST B: Cornwall Council List of Background and Submission Documents

Submission documents shown in black typeOther background documents which do not form part of the formal submission in blue typeDocument name Date of

documentPrevious versions Y/N

Ref No Hard Copy Provided

WYG Planning – Blue Cedar Homes Response 30th April 15 HS3.11Home Builders Federation Response 30th April 15 HS3.12Issue 4Cornwall Council Response 30th April 15 HS4.CCRuston Planning Response 30th April 15 HS4.01Issue 5Cornwall Council Response 30th April 15 HS5.CCImerys Response HS5.01Colas UK Response 30th April 15 HS5.02Anthony Langdon & Associates Response 30th April 15 HS5.03Issue 6Cornwall Council Response 30thApril 15 HS6.CCAnthony Langdon & Associates 30th April 15 HS6.01Cory Environmental Municipal Services Ltd – In Response to Issue 6 30th April 15 HS6.02Cornwall Waste Forum – St Dennis Branch 30th April 15 HS6.03Documents Arising at the Hearing

Amendments to Policy 23 – HRA Document – CC Evidence 18th May 15 HD.CC.01Cornish Language Policy – CC Evidence 18th May 15 HD.CC.02Council of Europe – The Framework Convention for theProtection of National Minorities – CC Evidence 18th May 15 HD.CC.03Cornish Minority Report – CC Evidence 18th May 15 HD.CC.04Recalibrated Schedule of Planning Permissions including Affordable Housing, within the last 5 years – CC Evidence

21st May 15 ID.03.CC.1.1 HD.CC.05

Affordable Housing 20 Year Supply Table V4 – CC Evidence 26th May 15 HD.CC.06CC Note to Cory on Commercial and Industrial Waste with Cory Comments 21st May 15 HD.CC.07Cory Supplementary Note on Commercial and Industrial Waste 21st May 15 HD.RE.08CC Proposed Minerals Policy Changes 21st May 15 HD.CC.09