Upload
dothien
View
262
Download
4
Embed Size (px)
Citation preview
CONSTRUCTION ORGANISATION
About UsFIELD DIVISIONS/UNITSPLANNING SURVEYSFINANCEELECTRICALS&TContact UsRTI TENDERS
About Us
HEADQUARTERS
Construction Organisation is headed by Chief Administrative Officer (Construction). There are at present 3 Chief Engineers of Civil Engineering cadre [CE(C)North, CE(C)South & CE(C)MTP], 2 Chief Signal & Telecommunication Engineers [CSTE(C)I & CSTE(C)II], 1 Chief Electrical Engineer [CEE(C)] and 2 Financial Advisor & Chief Accounts Officer [FA&CAO(C)I & FA&CAO(C)II] working under CAO(C).
ORGANISATION CHART
FIELD DIVISIONS/UNITS:
At present there are various field Divisions/Units:
1) DADAR
2) GHATKOPAR
3) JUINAGAR
4) PANVEL
5) PUNE
6) SOALPUR
7) AMRAVATI
8) NAGPUR
Activities
The Construction Organisation carries out sanctioned works of New Lines, Gauge Conversion, Doubling, Surveys and all other major works assigned to Construction Organization.
PLANNING
Budget
BG and Expenditure - Plan-head wise
S.N.
Plan Head Modified BG 2011-12
Approx. Expn upto Sept.’11
1 11 - New Lines 163.79 63.692 14 - Gauge Conversion 40.00 9.833 15 - Doubling 95.70 19.624 16 - Traffic Facilities 18.68 15.395 30 - Road Safety 6.18 2.586 33 - S&T works 23.09 2.617 36 - Other Electrical work 5.52 2.168 42 - Workshops 35.54 14.779 51 - Staff Quarters 5.00 2.7010 52 - Staff amenities 1.70 0.3111 53 - Passenger Amenities 13.82 7.7212 64 - Other specified works 5.70 2.8712 81- MTP (RLY) 82.71 10.3213 MRVC 45.00 14.83
Total 542.43 169.40
WORKS List of works in progress
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%) P.H. 11 - New Lines
1. 1 Amravati- Narkher (138km) 548.95 (S) 56.19 95%2. 2 Ahmednagar- Beed-Parli Vaijnath
(250km) 462.67 (S)
1010 (US)Rev.
55.00 5%
3. 3 Baramati- Lonand (54 Kms) 138.48(S) 10.00 45%4. 4 Puntamba- Shirdi(16.40km) 78.43(S) 2.60 100%5. 5 Wardha-Nanded (270 km) 1604.94 (US) 40.00 2%
P.H. 14 - Gauge Conversion6. 6 Miraj- Latur (359km) 802.24(S) 40.00 100%
P.H. 15 - Doublings7. 7 Panvel-Roha (75.44 km) land
acquisition17.32 (US) 10.00 50%
8. 8 Diva-Kalyan Doubling of 5th & 6th line 69.75(S) 6.00 100%
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)9. 9 Panvel- Jasai-JNPT (28.5 km) 53.23(S) 0.01 100%
10. 10 Pakni- Solapur (16.28 km) 38.52 0.80 100%11. 11 Pakni- Mahol (17 km) 47.16 1.00 100%12. 12 Panvel - Pen (35 km) 99.38(S)
193.60 (US)39.38 49%
13. 13 Pen – Roha (40 kms) 130.35204.28 (US)
34.50 30%
14. 14 Godhani-Kalumna chord (13.7 km) 50.38 0.01 -15. 15 Bhusawal-Jalgaon – 3rd line
(24.13 km)184.06 2 -
16. 16 Kalyan-Kasara – 3rd line (67.6 km) 279.70 2 -P.H. 16 - Traffic Facility Works
17. 17 Mumbai VT-Remodelling of main line complex (Ph-I)
97.36 1.94 100%
18. 18 CSTM-Kurla -Thane-Kalyan train describer
58.78 1.43 85%
19. 22 New Mulund –Additional Goods shed facilities
7.64 0.20 100%
20. 27 Bhivandi- Kharbao- Kaman-Nilje- Taloje Pachhnad IBS
5.9 0.59 45%
21. 28 Bagmar-Loop lines in both directions 11.67 4.00 55%22. 29 Ramtekdi – Development of new
freight terminal –Ph. I11.55 0.50 -
23. 30 Solapur-HL platform & COP on new jumbo rake siding
7.7 0.45 80%
24. 31 Amravati Development of station with terminal facility (yard remodeling)
16.2 1.43 80%
25. 33 Turbhe goods shed-Augmentation of handling capacity for dealing two addl. rakes.
10.5 - -
26. 36 IGP-Extn. of PF line nos.1,2,3 & 4 for dealing 24 Coach trains along with Banker Engine.
12.15 0.0001 -
27. 37 Jasai – Additional R&D lines on UP side & two loop lines with additional connectivity to IOTL siding.
17.31 0.0001 -
28. 38 Kasara – Extension of 3 R&D lines in UP yard & 3 R&D lines in DN Yard.
11.05 0.0001 -
29. 40 Karjat – Extn of R&D lines connecting UP yard to Karjat-PNVL line & 4th line between KJT-Palasdari
20.15 0.0001 -
30. 51 Pune extn of IOH shed 0.43 0.0001 -31. LAW
45New Mulund goods shed provision of cover over shed on 3rd rake handling facility
3.34 0.50 99%
P.H. 30 - Road Saftey Works (ROB/RUBs)32. 66 Niphad Road Over Bridge 6.5 1.00 -33. 67 Kalyan -R O B 1/A 4.94 0.005 15%34. 68 Kalyan -ROB 47/B 7.42 0.56 50%35. 69 Shegaon-Road Over Bridge 10.06 2.00 -36. 70 Katol-Road Over Bridge 5.72 0.27 18%37. 71 Narkhed-Road Over Bridge 6.02 0.18 -38. 72 Pulgaon-Road Over Bridge 6.15 0.5 -
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)39. 73 Mangalwari ROB 5.83 0.03 80%40. 74 Warora Road Over Bridge 5.08 0.13 45%41. 77 Nagargaon – ROB in lieu of LC No.32 3.87 0.50 -42. 78 Rajapath – ROB in lieu of LC gate
No.S45.55 0.50 -
43. LAW Vikhroli ROB 10.23 - -44. LAW
218Kharigaon-ROB near Rly. Crossing No.28C between Kalwa & Mumbra station.
10.88 0.50 -
Deposit works45. - Outer ring road ROB near Nagpur 3.54 3.00 10%46. - Nimblak ROB 9.63 5%47. - ROB in lieu of LC No.60 Solapur-
Wadi16.9 16.09 -
48. - Arangaon ROB 2.37 2.37 - P.H. 33 - S&T Works
49. 237 Pune-LNL-track circuiting with ABS (122.83 km) (B route)
23.66 2.75 40%
50. 239 NGP - RRI 14.54 2.50 80%51. 244 Kasara -RRI 7.81 1.00 40%52. 249 Thane - RRI 4.12 1.20 70%53. 253 Bhusawal Goods Yard -Repl. of worn
out lever frames with centralized operation of points & signals & merger of GC-2, GC-4 with GYC
15.32 4.00 -
54. 255 Akola stn. replacement of worn out lever frame
6.37 2.00 -
55. 259 Bhandup stn. replacement of signaling gears…..
2.27 1.60 -
56. LAW 438
Kasara- IGP-TGR 3 – EI 2.29 8.50 20%
57. LAW439
Pen- Electronic Interlocking 2.43 0.75 -
58. LAW440
Mumbai-TGR 2 Electronic Interlocking
2.34 1.00 20%
59. LAW441
Thakurwadi - Electronic Interlocking 2.23 0.64 25%
60. LAW443
Kalwa – Repl. of signaling gears at panel interlocking station with EI
2.17 0.50 -
61. LAW444
BSL - Replacement of old aged panel and signaling gears at BSL ‘A’ cabin
2.26 0.25 -
62. 254 BSL Div. – Replacement of old aged panel and signaling gears at BSL ‘C’ cabin ‘A’ Route
2.81 0.60 -
63. 261 Betul - Repl. of old aged worn-out signaling gears with centralized operation of point & signals by Route setting type Panel Interlocking on ‘A’ route of Nagpur Division
4.25 2.35 -
64. 262 Gundankhapa and Tadali – Repl. of old aged worn-out signaling gears with centralized operation of point & signals by Route setting type Panel
2.86 1.35 -
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)Interlocking on ‘A’ route of Nagpur Division.
65. 264 Amla-Parasia RRI at 8 stations & CLS at 14 LCs.
23.12 0.10 -
P.H. 36 - Other Electrical Works66. 271 Igatpuri-(Nasik road) additional 21.6
MVA transformer 2.57 0.13 50%
67. 273 BSL repl of transformers by 21.6 MVA with switchgear
2.36 0.13 100%
68. 277 BB divn.-off loading of 2.2 KV traction feeder by SEBS & standby DG set (22 loc.)
3.26 0.50 85%
69. 278 BSL/TD- repl. of transformers by 21.6 MVA with switchgear CSN & PC grid sub stn. (2 Nos)
6.74 0.36 45%
70. 279 Betul & Multai repl of transformers by 132/21.6 MVA
7.11 2.00 5%
71. 281 Mumbai-Normal supply from SEB& DG set as standby arrangement.(35 loc)
5.79 0.25 50%
72. 283 BSL/TD-Provn of shunt capacitor bank at MKU, CSM & PC (3Nos)
4.35 1.22 98%
73. 308 KYN-TD – Addl. power supply arrangement
5.37 0.05 -
74. 311 BSL-TD – Augmentation of transformer capacity
6.94 0.05 -
75. 312 NGP-TD – Replacement of Cross & Parallel feeder
3.86 0.05 -
P.H. 42 - Workshops& Sheds76. 314 Parel W/S - facilities for POH of 25
Non AC Coaches/month 19.95 2.00 80%
77. 317 Kalyan TRS-Renovation of electric loco shed for development of facilities for maintenance of AC Locos.
4.97 0.45 20%
78. 318 LTT –Coaching Depot –Extension of IOH
5.98 0.48 90%
79. 319 Parel - Mid life rehabilitation of coaches.
27.37 0.95 20%
80. 320 Matunga –Modernization of workshop
40 2.29 25%
81. 321 BSL/TRS extn of electric loco shed BSL for holding capacity of 150 locos
4.1 0.30 100%
82. 324 Ghorpuri Yard –Pit & stabling lines (3 nos each) and IOH shed for 26 coach trains (Ph II)
35.85 5.23 30%
83. 325 Solapur – Coach maintenance facilities
7.18 2.00 55%
84. 326 Ajni- Augmentation of coaching maint. facilities
8.79 2.00 75%
85. 329 Ajni TRS –augmentation of capacity of Electric loco shed
9.18 0.30 -
86. 330 Kalyan TRS – Creation of facilities for maintenance of three phase WAG-9
10 0.20 25%
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)locomotives
87. 331 Kurduwadi workshop – facility for rehabilitation of wagon.
30.25 3.81 5%
88. 332 Wadi Bunder – Four maintenance sidings and extension of IOH shed
23.31 0.19 -
89. 333 Bhusawal- Electric loco workshop – Augmentation of Wheel sets manufacturing capacity
3.50 0.19 -
90. 334 Badnera Wagon Repair Shop 247.57 10.80 -91. 336 Kurla – Diesel loco shed 4.49 0.03 -92. 337 Kalyan – Diesel Loco Shed 2.50 0.03 -93. Del Parel W/Shop- 22kv independent
power supply from Tata’s receiving station
0.88 - 80%
94. LAW563
BSL/ ELW-provision of facilities of loco body manipulator.
1.37 0.25 100%
P.H. 51 - Staff Quarters95. 339 Mumbai (Cuffe Parade)-Type-V 12
units 2.06 0.0001 100%
96. 340 Pune –Transit Type IV-24 units 3.21 0.0001 100%97. 341 Gun powder road colony (East)-Type-
1 80 units.5.47 0.0001 -
98. 342 Break down chawl-Qtrs (22 units) Type RB-I 40 units.
2.7 0.0001 -
99. 344 Lonavala-Type-I 27&Type-II 45 units 3.06 0.11 80%100. 347 Panvel-Type-I 36 & Type-II-11, Karjat
Type-I 13 & Type-II 6 units2.58 0.0001 -
101. 350 Parel – RB I (80 units) & RB-II qrs 24units
8.43 0.77 12%
102. 352 Pune Divn – Type-II – 77 units 7.33 0.90 65%103. 353 Pune –Type V-10 units & type-Spl
unit3.26 2.97 2%
104. LAW 628
Byculla- Type-I 25 units (at Kalwa) 0.91 0.25 70%
P.H.52 –Staff Amenities 105. 361 BB/GS Repl. of AC Plant of
auditorium and operation theatre, post operative & ICCU at Byculla Hospital
3.21 0.20 40%
106. 363 Byculla Hospital-construction of patients rest house
4.32 2.00 10%
107. LAW PA const. of officers club for new divn.
1.78 0.0001 -
P.H. 53 – Passenger Amenities108. 377 Kalyan-Remodelling & improvement
of station 4.65 0.0001 100%
109. 381 LTT – New station building. 16.49 0.98 70%110. 382 LTT – Integration of new station
building by sub-way.10.82 1.02 5%
111. 383 Amravati New terminal station building with circulating area & new P/F
6.63 1.46 75%
112. 387 Daund- Replacement of existing 7.87 2.30 10%
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)FOB at Solapur end by 6m wide.
113. 385 Amravati washable apron 2.95 0.0001 82%114. 390 Pune – Widening of existing centre
FOB by 12 m & provision of ramp in 2nd FOB at Mumbai end
5.99 0.80 -
115. 391 Dadar – Provision of 6 m wide new FOB elevator-cum-Staircase facility at CSTM end connecting all platforms
2.58 0.40 -
116. LAW 736
Badnera- additional FOB at CSTM end
2.34 0.24 100%
117. LAW 797
Amravati- Provision of cover over platform (& bays shed & 25 foundation)
0.99 100%
118. LAW 811
Amravati- Provn. of subway to connect up & down PF by RCC blocks
0.98 100%
P.H. 64 – Other Specified Works119. 396 Pune New Division 11.57 0.80 75%120. 399&
401New IRICEN bldg –Ph I&II 16.41 0.90 50%
121. 400 Nasik road –Shifting of training centre from Chinkhill Phase- II
4.23 0.80 30%
122. 402 Byculla-Centralised hostel building at S&T Workshop
5.26 0.0001 -
123. 404 Nasik-Facilities for training of elect. supervisors (PhI)
15.7 0.0001 -
124. 405 Thakurli – Const of 12th battalion Rly Protection Special Force.
31.64 1.00 -
125. 408 Pune – Setting up of balance divisional office (Phase II)
4.60 0.0001 -
126. 400 ZRTI BSL – const. of Hostel 3.50 0.0001 -127. 411 Mulund – Construction of G + 2 ½
structures for RPF Barrack3.50 0.0001 -
128. 413 Pune – Centralised training Institute for supervisors of Engineering Department
5.90 0.0001 -
129. LAW802
Extension of IRICEN Hostel by 16 rooms at Koregaon Park, Pune
0.71 0.0001 -
P.H. 81 – MTP Projects130. 418 Belapur-PNVL-Doubling of commuter
line as part of East-West corridor 10.9Km
280.31 10.00 100%
131. 419 Thane-Turbhe-Nerul-Vashi-Part of Corridor No.1 in New Mumbai
403.39 17.71 100%
132. 420 Belapur-Seawood-Uran-Electrified double line
495.44 55.00 12%
MRVC Projects133. 14 Kurla-Thane I 136.45 6.00 100%134. Kurla-Thane II 89.18 2.00 100%135. EMU maintenance facilities I 67 0 100%136. EMU maintenance facilities II 97.99 20.00 -137. Stabling lines I 37.57 0 100%
SN PB / LAW No.
Name Anticipated Cost
BG 2011-12
Physical progress
(%)138. Stabling lines II 99.97 15.00 -139. CSTM-Kurla 5th & 6th Line 537.0 4.00 -140. Elimination of speed restriction at
Thane9.50 1.00 5%
DC-AC Conversion Works141. Reconstruction of Hancock ROB &
Curry Road ROB8.85 - -
142. Reconstruction of ROB at Dehu Road 4 - 100%143. Reconstruction of FOB at Masjid 0.49 - -144. Reconstruction of FOB at Matunga 0.64 - -145. Reconstruction of FOB at Kurla –
Swadeshi mill0.35 - -
146. Reconstruction of FOB at Kurla – Kasaiwada
1.01 - -
147. Raising of Carnac, Garden, Carol, Matunga & Patripool ROB
32 - -
Other Works148. World class station at Mumbai CST
Consultancy work11.50 - -
Deposit works149. Pulgaon-Arvi diversion of N.G .line 8.82 -150. 2 Nos Canal Xing in Amravati-
Narkher 1.1 -
151. Wadala-Kurla dedicated freight corridor
107.77 15.00 -
List of works completed during last 3 years
1.0 Works Completed during 2011-12 upto Sept’ 11
SN Name of work Date of completion
1 Kurla – Thane 5th & 6th Line (34 Kms) April ’11
2 Control office of Mumbai Division and SCADA system April ’11
3 RRI at Vidyavihar April ’11
4 Road Over Bridge near Harangul April ’11
5 Road Over Bridge near Seawood-Darave May ’11
6 6 Stabling sidings at Vangani June ’11
7 Replacement of transformers at Bhusawal, Pachora, Chalisgaon, Betul & Multai
Sept ’11
8 Provision of capacitor bank at Chalisgaon Sept ’11
9 Officer’s Rest House & Subordinate Rest House at Shirdi - 12 suites each
May ‘11
10 PECT Survey work of new line between Pen-Thal July ‘11
2.0 Works Completed during 2010-11
SN Name of work Date of completion
1 Amravati – Narkher New Line (138 Kms) (Trial Engine run) Feb’ 11
2 Lonand - Phaltan New Line (27 Kms) (Trial Engine run) March ’11
3 Pandharpur–Miraj (137 km) Passenger opening Feb ’11
4 Extension of PF for running of 12 car rakes in Thane-Vashi-Panvel (12 Stations)
April ‘10
5 Platform No. 1 & 4 at Panvel along with yard remodeling April ’10
6 RRI alteration at Thane April ‘10
7 RRI work of Amravati alongwith yard remodeling March ’11
8 2.44 m FOB at Puntamba Sept ’109 Cover over Mulund goods shed Nov ’1010 EMU maintenance facility at Sanpada Car shed Nov ‘10
11 Transformers at Sangola and Dhalgaon Sept ’10
12 Transformer at Parel work shop March ’11
13 DRPC at Nashik Road Aug’1014 PECT Survey for Pune-Nashik New Line (266 Km) March’10
15 Survey work of Narkher-Badnera extension of new BG line upto Washim
June ‘10
16 RECT Survey for new line between Ballarsha and Surajgad (Etapalli) (130 Km)
Jan ‘11
17 RECT Survey for new line between Khandwa & Dhar Via. Khargone & Barwani (255 Kms)
Jan ’11
18 Updating RECT Survey for Dhule- Amalner new line (39 Km) March’11
3.0 WORKS COMPLETED DURING 2009-10
SrNo.
Name of work Date of Completion
P.H. 11 - New Lines 1. Chord line at Badnera (MM) Mar-10
P.H. 14 - Gauge Conversion 2. Pandharpur -Miraj (137km) Mar-10
(pending CRS inspection)P.H. 16 - Traffic Facility Works
3. Mumbai VT-Remodelling of main line complex (Ph-I) Mar.104. Ambernath, Kasara & Thakurli ext. of 1 & provn. of 7 EMU
stabling sidingsFeb.10
5. New Mulund –Additional Goods shed facilities Completed P.H. 30 - Road Saftey Works (ROB/RUB)
6. Jeur-Road Over Bridge (Rly. portion) Completed7. Nagar Devla-ROB Mar-09
P.H. 36 - Other Electrical Works8. BSL repl of transformers by 21.6 MVA with switchgear Mar-09
P.H. 42 - Workshops& Sheds
SrNo.
Name of work Date of Completion
9. BSL/ ELW-provision of facilities of loco body manipulator. Aug-0910. Ghorpuri Yard- Pit lines for maintenance of 24 Coach trains
with stabling lines (2nos.)Aug-09
P.H. 51 - Staff Quarters 11. Mumbai (Cuffe Parade)-Type-V 12 units Dec-0912. Pune –Transit Type IV-24 units Dec-0913. PA- Porter chawl - 64 units Sep-0914. PA-Portar chawl-RB II 35 units Nov-09
P.H. 53 - Passenger Amenities15. Kalyan-Remodelling & improvement of station Feb-09
P.H. 81 - MTP Projects16. Belapur-PNVL-Doubling of commuterline as part of East-
West corridor 10.9KmApr-00
17. Thane-Turbhe-Nerul-Vashi-Part of Corridor No.1 in New Mumbai
Jan-09
MRVC Projects18. EMU maintenance facilities - I Sep-0819. Stabling lines - I Completed
DC-AC Conversion Works 20. Reconstruction of ROB at Dehu Road Dec-09
SURVEYSList of On Going Surveys
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
1 Updating of Traffic Survey for Wardha-Yavatmal-Pusad-Nanded (260 kms)
2006-07
208 149 59 submitted
Report submitted to Rly Bd on 01.08.06 at the project cost of Rs.581 crore with ROR of (-) 2.684%.Project sanctioned by Railway Board.
2 Updating Survey for a new line from Kalyan-Ahmednagar (240 kms)
2006-07
3501 1440 1789 272 30.3.12 Traffic chapter Vetted, S&T Estimate, mechanical Vetted, Civil estimate, Electrical estimate under preparation.
3 Reconnaissance Engg-cum Traffic Survey for new line between Veer-Harihareshwar (45 kms)
2008-09
656 303 253 100 submitted
Report submitted to Rly Bd on 17.12.09 at the project cost of Rs. 447.77 crore with ROR (-) 5.19%. Rly Board's quarries replied, Revised Report submitted with a cost of Rs 531.10 Cr. ROR(-) 7.75on 08.05.11
4 Reconnaissance Engineering cum Traffic
2009-10
1313 4819 3 submitted
Report submitted to Rly Bd on 29.01.10 at the project cost of Rs.928.11 crore with ROR of (-)4.37%
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
Survey for New BG line between Karad and Chiplun
5 Reconnaissance Engg-cum Traffic Survey for Fly Over at Jalgaon
200 100 100 Field survey completed. Estimate recd from field unit. Accounts quarry to be replied.
6 Reconnaissance Engineering cum Traffic Survey for extension of Narkher-Badnera new line upto Washim via Dhanaj, Karanja and Mangrulpur.
2009-10
2025 1500 525 submitted
Survey report submitted to Railway Board on 18.6.10 at the project cost of Rs.559.63 crore with ROR of (-)5%
7 Updating Survey of new line between Rotegaon-Puntamba (47 kms)
2008-09
470 460 10 submitted
Report submitted to Rly Bd on 21.7.09 at the project cost of Rs.97 crore with ROR of (-)5% for proposal-I and Rs.106.72 crore with ROR of (-)5% for proposal-II. Project shelved by Rly Bd on 26.10.09
8 Reconnaissance Engineering cum Traffic Survey for new line between Solapur-Jalgaon (450 kms)
2008-09
6705 779 3505 2421 28.2.12 Field survey completed, Estimates under preparation
9 Reconnaissance Engineering cum Traffic Survey for new line between Khandwa & Dhar via Khargone and Barwani
2009-10
2805 1228 1577 submitted
Survey report submitted to Railway Board on 07.01.11 at the project cost of Rs. 2025.25 crore with ROR of (-)3.43%.As per Rly board observation Civil Estimate under Revision
10 Reconnaissance Engineering
2008-09
1950 1956 950 submitted
Survey report submitted to Railway Board on 31.01.11 at the project
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
cum Traffic Survey for new line between Ballarsha and Surajgad(Etapalli)
cost of Rs. 565.79 crore with ROR of (-)5.19% for One Train System and at the project cost of Rs. 586.23 crore with ROR Less than (-) 5%crores for ABS.As per Rly board observation Civil Estimate under Revision
11 Reconnaissance Engg cum Traffic Survey for 3rd line between Itarsi-Nagpur-Wardha-Ballarshah
2004-05
5483 4437 1046 submitted
Survey report submitted to Railway Board on 24.10.08. at the project cost of Rs. 1571.76 crore with ROR of Cost 959.76 Cr. & ROR -12.13% for Itarsi – NagpurCost 211.30 Cr. & ROR 17.63%. for Nagpur - Wardha.Cost 400.69 Cr.& ROR 15.11% for Wardha - Ballarshah. As per Railway Board’s querry, further cost has been updated and submitted for finance vetting civil and S&T estimates for all three vetted. Electrical Estimate to be submitted
12 Reconnaissance Engg cum Traffic Survey for new line from Pandharpur-Lonand
2005-06
2055 1931 96 28 submitted
Survey report submitted to Railway Board on 24.12.2008 at the project cost of Rs.251.28 crore with ROR less than 5%. Board has not communicated their Decision.
Para 101 item no
176
13 Preliminary Engineering cum traffic survey for Pune-Nasik (266 kms)
2009-10
7950 5961 1989 submitted
Survey report submitted to Railway Board on 12.3.2010 at the project cost of Rs. 1899.64 crore with Rate of return of (-) 2.84%. Project shelved by Railway Board on 29.6.2010.
Para 101 item no
143
14 Preliminary Engineering cum Traffic Survey for a new line between Nasik-Dhanu Road (168 kms)
2010-11
5040 10 5030 30.12.11 Traffic chapter Vetted, S&T Estimate Vetted, Civil estimate return, reply to be submitted, Electrical estimate to be submitted to account
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
15 Preliminary Engineering cum Traffic Survey for a new line for Grade Separator at Kurla Yard
1000 10 990 This survey is being carried out alongwith Detailed engineering survey of Kurla CSTM.5th & 6th line. M/S RITES has been awarded consultancy by MRVC
(ii) NEW SURVEYS AS PER BUDGET SPEECH 2011-12, APPEARING IN DEMAND NO.2
Para 128 item no 35
16 New line between Pandra Road-Gotegaon
2011-12
1 - Not Pertains to Central Railway. Board referred to transfer the work
Para 128 item no 36
17 New line for Connecting Fatehebad-Chandravatiganj (20 km) with Ratlam-Indore project
2011-12
1 - Not Pertains to Central Railway. Board referred to transfer the work
Para 128 item no 39
18 New line for Additional Suburban line on Virar-Diva-Panvel section PECT survey As per Railway Bd’s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12. (approx 65 km)
2011-12
2535 800 1 Board has been referred to transfer this work to MRVC vide this office letter dated 7.10.11.
Para 128 item no 41
19 Bye-pass line from Chudawa-Basmat station
2011-12
1 - Vide Boards letter dated 5.6.11 work has been transferred to SCR Railway
Para 128 item no 38
20 New line for connecting Kolhapur to Konkan Railway RECT survey As per Railway Bd.s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12.(approx 120
2011-12
172500
1 30.8.12 Similar survey is sanctioned as SN no. 21. Reference for the above sent to Rly. Board for clarification
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
km) Para 128 item no 86
21 New line between Kolhapur-Rajapur RECT survey As per Railway Bd.s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12. (approx 120 km)
2011-12
1800 1 31.08.12 Similar survey is sanctioned as SN no. 20. Reference for the above sent to Rly. Board for clarification
Para 128 item no 88
22 New line between Karad-Belgaum via Nipani RECT survey As per Railway Bd.s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12. (approx 596 km)
2011-12
89400 1 30.06.12 Field Work is in progress
Para 128 item no 93
23 Sausar- Pandhurana RECT survey As per Railway Bd.s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12. (approx 30 km)
2011-12
4500 1 30.3.12 Field Work is in progress
Para 130item no 1
24 Pune-Lonavala-3rd line PECT survey As per Railway Bd’s letter No. 2010/W-1/Genl./Survey/10-11 & 11-12. (approx 64 km)
2011-12
249600
1 30.06.12 Field Work is in progress
Para 128 item no 97
25 New line between Nagar-Kalyan
2011-12
1 30.3.12 Similar survey is sanctioned as updating of survey as item no 2 in 11-12 also which is in progress . Reference made to board for clarification.
Budget
Speech
Referenc
e
Blue Boo
k Referenc
e
Name of Survey
W.P. Year
Anticipated Cost
Expenditure to the end of 09-10
outlay 10-
11
Outlay 11-12
Balance to complete
survey
Target date for submission to Rly Bd.
status
B. SURVEY SANCTIONED IN 11-12 VIDE RLY BOARDS Letter No.26 New line
between PEN-THAL
2011-12
1029
1000.00
30.07.11 Survey Report submitted on 27.07.11 to board with a cost of Rs170.54 Cr with ROR (-)3.75
C. SURVEY AS PER BUDGET SPEECH, NOT APPEARING IN BLUE BOOK 2011-12AGAIST CENTRAL RAILWAY
1 Fast corridor on Harbour line
2011-12
1 - Board has been referred to transfer this work to MRVC
D. SURVEY SANCTIONED IN 10-11 ,APPEARING IN BUDGET SPEECH BUT NOT APPEARING IN BLUE BOOK 11-12
Updating SurveysPara 101 item no 120
Updating Survey for new line between Dhule-Amalner
2010-11
585 submitted
Survey report submitted to Railway Board on 31.3.2011 at the project cost of Rs. 215.85 crore with Rate of return of (-) 7.16%
Para 101 item no 121
Updating Survey for New line Jalna- Khamgaon- (155 kms)
2325 30.05.11 Traffic chapter submitted, Field Survey completed and CIVIL estimate, S&T estimate, mech estimate vetted. Electrical estimate under vetting. Survey report under preparation.
Para 101 item no 122
Updating Survey for new line between Wardha-Katol.(80 kms)
2010-11
1200 30.06.11 Traffic chapter submitted ,Field Survey completed and S&T estimate, vetted. CIVIL estimate, Electrical estimate under vetting. survey report under preparation.
Para 101 item no 123
Updating Survey for new line between Warora-Umrer.(106 kms)
2010-11
1590 31.07.11 Field Survey completed and estimate under finance vetting.
SURVEY REPORTS COMPLETED IN RECENT PAST
Sr.No
Name of the Survey Year of complition
Project cost
(in cr.)
ROR(%) Remark
1 PECT survey for construction of New line between Pen –Thal (26.40 kms)
July2011
170.54 (-)3.75 % Survey report submitted to Railway Board on 29.07.11
2 Updated Reconnaissance Engineering cum Traffic Survey for New BG line between Veer and Harihareshwar(45 Kms)
May11 531.10 (-)7.70 %
Survey report submitted to Rly Bd. on.08.5.2011
3 Updating Survey for new line between Dhule-Amalner (39.421 Kmsa)
March2011
215.85 (-)7.16% Survey report submitted to Rly Bd on 31.03.11
4 Reconnaissance Engineering cum Traffic Survey for new line between Ballarsha and Surajgad (Etapalli) (130 Kms)
Jan-11 One Train System565.79
Absolute Block system586.23
(-) 5.19%
Less than (-)5%
Survey report submitted to Rly Bd. on 31.01.2011.
5 Reconnaissance Engineering cum Traffic Survey for new line between Khandwa & Dhar via Khargone and Barwani (255 Kms)
Jan-11 2025.25
(-) 3.43%
Survey report submitted to Rly Bd.on 07.01.2011.
6 Reconnaissance Engineering cum Traffic Survey for extension of Narkher-Badnera new line upto Washim via Dhanaj, Karanja and Mangrulpur (135 Kms)
June -10 559.63 (-) 5% Survey report submitted to Rly Bd. on .06.2010.
7 Preliminary Engineering cum traffic survey for Pune - Nasik (266 Kms)
Mar-10 1899.64
(-) 2.84%
Survey report submitted to Rly Bd. on .12.03.10 & project shelved by Railway Board on 29.6.2010
8 Reconnaissance Engineering cum Traffic Survey for New BG line between Karad and Chiplun (112 Kms)
Jan-10 928.11 (-) 4.37%
Survey report submitted to Rly Bd. on .29.01.10
9 Reconnaissance Engineering cum Traffic Survey for New BG line between Veer and Harihareshwar(45 Kms)
Dec-09 447.77 (-) 5.19%
Survey report submitted to Rly Bd. on.17.12.09
10 Updating survey of new line between Rotegaon and Puntamba a) Proposal-I (27.10 kms)b) Proposal- II (30.25 kms)
July-09
97.00106.72
(-) 5% Survey report submitted to Rly Bd. on . 21.7.09 &
Sr.No
Name of the Survey Year of complition
Project cost
(in cr.)
ROR(%) Remark
shelved by Railway Board on 26.10.09
11 Updating of RECT Survey for new line between Manmad- Indore (Mhow) section.(339 kms)
July-09 1750.93
8.92% Survey report submitted to Rly Bd. on . 06.7.09
12 Reconnaissance Engg. cum Traffic survey for new line from Pandharpur – Lonand. (109 kms)
Dec.08 251.28 Less than than (-)5%
Survey report submitted to Rly Bd.on. 24.12.2008
13 Preliminary Engineering cum Traffic Survey for the Conversion of Achalpur-Mutjapur-Yavatmal & Pulgaon-Arvi.(225 kms)
Nov.08 464.78 Less than (-)5%
shelved by Railway Board on 20.02.09.
14 Reconnaissance Engg. Cum Traffic survey for 3rd line between Itarsi –NGP-WR- Ballarshah i.e. (505 kms)i) Itarsi - Nagpurii)Nagpur - Wardha (Sewagram)iii) Wardha - Ballarshah
July 08 1571.76
959.76211.30
400.69
12.1317.63
15.11
EW/689/S/247dt.24.10.2008
15 Preliminary Engineering cum traffic survey for New BG line between Chinchwad-Roha (95 kms)
Feb 08 Alt-I 600.68
Alt-II620.56
(-) 4.94%
(-) 4.67%
Pproject shelved by Railway Board on 23.01.09
16 Reconnaissance Engg. cum Traffic survey for New line between Shirpur-Mhow (185 kms)
Feb 08 552.37 (-) 2.73%
Survey report submitted to Rly Bd.on.20.02.2008
17 Updating of Survey for Pune-Miraj-Kolhapur Doubling. (326 kms)
Dec.05 787.21 -1.06 Shelved by Railway Board on 15.07.2008
18 PECT Survey for Nasik-Kopargaron via Shirdi New BG line. (92.60 kms)
June 1996
118.24 2.98 Shelved on 30.7.96.
19 RECT survey for New BG line between Khandwa-Nardana via Khargone and Sendhwa (220.4 kms)
Oct 03 519.64 -2.46 Shelved by Railway Board on.14.6.04
20 RECT Survey for construction of New BG line from Solapur to Osmanabad. (80 kms)
Aug 05 189.47 -4.452% Railway Board has shelved this project on .9.11.05.
21 RECT survey for GC from NG to BG from April 2000 126.19 -3.666 Shelved on
Sr.No
Name of the Survey Year of complition
Project cost
(in cr.)
ROR(%) Remark
Pachora to Jamner & Extension from Pahur to Ajanta & Jamner to Bodwad. (104.05 kms)
06/07/2000
Contact Us
Chief Administrative Officer (Construction)Central Railway New Administrative Office Building 6th floorDadabhai Naoroji Road, CST Mumbai - 400001
Phone: 91 22 22621546 Fax: 91 22 22621608E-mail: [email protected] , [email protected]
Name Designation OfficeRailwa
yMTNL
Shri M.K. Gupta Chief Administrative Officer (Construction)
54300 22621546
Shri A.K. Sachan Chief Engineer (Construction) MTP 54743 22697303
Shri Vineet Gupta Chief Engineer (Construction) North 54306 22620963
Shri R.C. Thakur Chief Engineer (Construction) South 54315 22612416
Shri Surendra Barania Chief Electrical Engineer (Construction) 54350 22620694
Shri Aditya Kumar Chief Signal & Telecommunication Engineer (Construction) - I
54700 22620423
Shri Mewalal Patel Chief Signal & Telecommunication Engineer (Construction) - II
54701 22612391
Shri A. Gopinath Financial Advisor & Chief Accounts Officer (Construction) - I
54450 22620187
Smt. Apala Singh Financial Advisor & Chief Accounts Officer (Construction) - II
54831 22697129
RTI
PIOShri R.C. Thakur
Chief Engineer (construction) SouthNew Administrative Office Building, 6th FloorCentral Railway D.N. Road, CST Mumbai - 400001Tel: 91 22 22612416
APIOShri Navin PatilDeputy Chief Engineer (construction) PlanningNew Administrative Office Building, 6th FloorCentral Railway D.N. Road, CST Mumbai - 400001Tel: 91 22 22702805