11
www.worldmeeting.org first announcement postponed 12 th World Meeting on Pharmaceutics, Biopharmaceutics and Pharmaceutical Technology Vienna, Austria 08 - 11 February 2021 in combination with all hygiene guidelines and official requirements are obeyed

Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

www.worldmeeting.org

first announcementpostponed

12th World Meeting on Pharmaceutics, Biopharmaceutics and Pharmaceutical Technology

Vienna, Austria 08 - 11 February 2021

in combination with

all hygiene guidelines and official

requirements are obeyed

Page 2: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting,

The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020, has been postponed to 8-11 February 2021. The organizers would like to express their explicit regrets for any inconveniences this may cause.

As the warning signals were elevated for a visit of Vienna, and since various countries, universities and companies have filed travel bans or instructions for quarantine upon return, we came to the conclusion that the character of a “World Meeting” would be lost under the given, exceptional circumstances. In the sake of our participants, exhibitors, speakers as well as of their families and friends, we felt liable to enable a safe visit of our conference which became virtually impossible.

For these reasons, we decided to postpone the 12th PBP World Meeting and the ResearchPharm® exhibition to 08 - 11 February 2021. In continuation of the very successful scientific meetings in Budapest, Paris, Berlin, Florence, Geneva, Barcelona, Malta, Istanbul, Lisbon, Glasgow and Granada, we decided to keep the beautiful location Vienna as venue for our postponed conference.

This conference series has gained an ever increasing impact among the pharmaceutical scientists: With more than 1000 submitted abstracts and more than 1300 participants it has become a well-established major meeting attracting scientists from all over the world. It is usually organized every two years, in March or April of the even years. Due to the circumstances the 12th PBP World Meeting will take place in an uneven year.

The entire spectrum of topics ranging from engineering aspects during the manufacturing process, the portfolio of commercially available excipients enabling formulation of a large variety of medicinal products, the underlying physico-chemical principles, cutting-edge characterization techniques as well as potential pitfalls and hurdles to be overcome during product development, manufacturing and characterisation will be addressed.

The conference will be held on 3.5 days: from Monday (noon) until Thursday (evening). From Tuesday to Thursday, 4 parallel sessions with oral presentations will be held:

• 2 sessions on industry-related topics, presented by distinguished invited speakers, giving overviews on the current state of the art in the respective fields

• 2 sessions with short talks selected from submitted abstracts, presenting the latest research findings in the broad field of Pharmaceutics, Biopharmaceutics and Pharmaceutical Technology.

During the entire conference, the accompanying exhibition ResearchPharm® provides a cross-disciplinary platform for pharmaceutical scientists working in all fields of drug development in industry, academia and regulatory bodies. This exhibition is steadily growing and offers the possibility to present and learn about the newest trends and products in the area of pharmaceutical ingredients, developing and processing equipment, analytical technologies, medicinal products, medical devices and contract manufacturing.

In addition, young and experienced scientists from academia and industry will present their latest research achievements in form of posters, allowing for succesful exchanges with the authors.

The meeting is intended to bring together people working in fundamental and applied academic research, in the chemical and pharmaceutical industry and the regulatory field, offering the opportunity to initiate fruitful discussions and collaborations.

The organizing committee cordially invites you to join the 12th World Meeting and would be glad to welcome you in Vienna, Austria!

Anna Maria Fadda Juergen Siepmann Joerg Breitkreutz President ADRITELF President APGI President APV

12th World Meeting on Pharmaceutics, Biopharmaceutics and Pharmaceutical Technology

postponed to 08 - 11 February 2021, Vienna, Austria

Page 3: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Monday, 08 February 2021

Key note lecture

13:45 - 14:45

Engineering cancer immunotherapyDavid J. Mooney, Harvard School of Engineering and Applied Sciences, Cambridge, USA

14:45 - 15:30 Coffee break/exhibition

Hot topic session

15:30 - 16:10

Digital assistant to support drug product developmentFerdinand Brandl, BASF, Ludwigshafen, German

16:10 -16:50

Advances in PLGA drug delivery systemSteven Schwendeman, Department of Pharmaceutical Sciences and the Biointerfaces Institute, University of Michigan, Ann Arbor, MI, USA

16:50 -17:30

Delivery of cannabinoids to and across the skinElka Touitou, Hebrew University of Jerusalem, Israel

17:30 - 19:00 Welcome reception

Tuesday, 09 February 2021

Invited talks: What´s new in nanotechnology?

09:00 - 09:40

What‘s needed in nanomedicine?Twan Lammers, Department Nanomedicines and Theranostics, RWTH, Aachen University, Germany

09:40 -10:20

to be determindto be determind

10:20 -11:00

Hyperloaded polymeric micelles for chemo- and immunotherapyAlexander Kabanov, Eshelman School of Pharmacy at Chapel Hill, University of North Carolina, USA

Invited talks: Solid dosage forms

09:00 - 09:40

Adoption of the MCS concept in the pharmaceutical industryMichael Leane, Bristol-Myers Squibb, New York City, USA/Anikó Szepes, F. Hoffmann-La Roche, Basel, Switzerland

09:40 -10:20

Process design for innovative drug delivery systemsJukka Rantanen, Department of Pharmacy, University of Copenhagen, Denmark

10:20 -11:00

The importance of understanding the physical and chemical properties of APIs in the digital design of drug products Kevin Roberts, Faculty of Engineering, University of Leeds, United Kingdom

Short talks: Controlled drug delivery

09:00 - 09:20

Design and control of a floating gastroretentive drug delivery system made by hot-melt tube extrusionPaul Bebernik, University of Bonn, Germany

09:20 -09:40

A new calcium oral-controlled-release system based on zeolite for prevention of osteoporosisYlenia Zambito, University of Pisa, Italy

09:40 -10:00

Spray dried microparticulate drug delivery systems for long-term local osteoarthritis treatmentCarlota Salgado, University of Geneva, Switzerland

10:00 - 10:20

Tuning the mechanical poreperties and release profile on an antimicrobial peptide from an injectable hydrogel using glycol chitosanJames Flynn, University of Limerick, Ireland

10:20 - 10:40

Development of N-acetylcysteine-functionalized microcontainers for degredation of biofilm matrixStine Egebro Birk, Technical University of Denmark, Lyngby, Denmark

10:40 - 11:00

SymBiosys® based long acting injectable miroparticle formulations for large proteinsTanja Henzler, Merck, Darmstadt, Germany

Short talks: Pulmonary, nasal and buccal delivery

09:00 - 09:20

High potency, brittle matrix tacrolimus powders for dry powder for inhalation by thin film freezingSawittree Sahakijpijarn, University of Texas at Austin, USA (tbc)

09:20 -09:40

Delivery of beclomethasone dipropionate nanosuspensions via electronic cigaretteLuca Casula, University of Cagliari, Italy

09:40 -10:00

P. aeruginosa biofilm infectred bronchial epithelium as test-system for anti-infective aerosol formulationsClaus-Michael Lehr, Saarland University, Saarbrücken, Germany

ProgrammeMonday 08 February 2021

Key note lecture

Opening Ceremony

Coffee break

Hot topic lectures

Welcome Reception

13:00 – 13:45

13:45 – 14:45

14:45 – 15:30

15:30 – 17:30

17:30 – 19:00

Exhibition

Tuesday 09 February 2021

09:00 – 11:00

11:00 – 11:30

11:30 – 13:00

13:00 – 15:00

15:00 – 17:00

17:00 – 18:00

Hofburg

Invited talks Short talks

Invited talks Short talks

Coffee break

Lunch

Posters

Exhibition

Award session and

Plenary lecture

Students meets industry

Page 4: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

10:00 - 10:20

Evaluation of a novel probiotic nasal spray in human volunteersKatarina Jokicevic, University of Antwerp, Belgium (tbc)

10:20 - 10:40

Nanofibers with antibiotics and probiotics for the two-stage therapy of peridontal diseaseSpela Zupancic, University of Ljubljana, Slovenia (tbc)

10:40 - 11:00

Mucoadhesive films to elicit nanoparticle buccal permeationJavier Morales, University de Chile, Santiago, Chile

11:00 - 11:30 Coffee break/exhibition/posters

11:30 - APGI award session13:00 and plenary lecture

Advances in nanotechnology Patrick Couvreur, Faculty of Pharmaceutical Sciences, Paris Sud University, France

13:00 - 15:00 Lunch break/exhibition/posters

Invited talks: Advanced therapeutic products: an industrial perspective

15:00 - 15:40

Formulation approaches for cell and gene therapiesChris Van der Walle, MedImmune, Cambridge, United Kingdom

15:40 -16:20

Lentiviral vector-based medicines from concept to marketJames Miskin, Oxford Biomedica, United Kingdom

16:20 -17:00

Biodrugs and advanced therapy medicinal products: a revolution in medicineMaria Luisa Nolli, NCNbio, Milan, Italy

Invited talks: 3D-printing

15:00 - 15:40

3D-printing of medicines and implants: making the formulations workClive Roberts, School of Pharmacy, University of Nottingham, United Kingdom

15:40 -16:20

3D-printing of medicines at the point of care: fantasy or the future?Matthew Peak, Alder Hey Children’s Hospital, Liverpool, United Kingdom

16:20 -17:00

3D-printing in an industrial GMP settingJaedeok Yoo, Aprecia Pharmaceuticals, Blue Ash, OH, USA

Short talks: Preformulation and bioavailability

15:00 - 15:20

In situ drug amorphization using laser irradiationNele-Johanna Hempel, University of Copenhagen, Denmark

15:20 - 15:40

In-depth exploration of the intensified vibratory mill: a modern design of experiments approachElene De Cleyn, KU Leuven, Belgium

15:40 -16:00

Evaluation of different preprocessing methods of x-ray micro computed tomography imagesSebastian Bollmann, Univeristy of Düsseldorf, Germany

16:00 - 16:20

Preliminary experimental and numerical studies of the cohesion of pharmaceutical particles of wet granulesMaroua Rouabah, Claude Bernard University Lyon 1, France

16:20 - 16:40

Amorphous drug-polyelectrolyte nanoparticle complex as a solubility enhancement strategy of poorly-soluble drugsKunn Hadinoto, Nanyang Techonological University, Singapore (tbc)

16:40 - 17:00

Insight into amorphous solid dispersion dissolution behaviour: laser-diffraction and Raman spectroscopy holding handsMaria Paisana, Hovione FarmaCiencia, Lisbon, Portugal

Short talks: Tablets and coated tablets

15:00 - 15:20

Profiling the influence of process parameters on the interfacial properties of bilayer tabletsJan Hendrik Finke, Technical University of Braunschweig, Germany

15:20 - 15:40

Evaluation of the performance of an external lubrication system implemented in a compaction simulatorCedrine de Backere, Ghent University, Ghent, Belgium

15:40 -16:00

Influence of the unloading conditions on capping and lamination during tableting: numerical and experimental studyVincent Mazel, University of Bordeaux, France

16:00 - 16:20

to be determindto be determind

16:20 - 16:40

High solids film coating systems: continuous vs. batch processingChristian Mühlenfeld, Ashland Industries Deutschland GmbH, Düsseldorf, Germany

16:40 - 17:00

to be determindto be determind

Programme

Page 5: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Wednesday, 10 February 2021

Invited talks: Formulation issues for biotech drugs

09:00 - 09:40

Pellet freeze-drying of biopharmaceuticalsStefan Schneid, Bayer, Wuppertal, Germany

09:40 -10:20

L-arginine-based protein formulations in freeze drying: opportunities and challengesHenning Gieseler, Department of Chemistry and Pharmacy, University Erlangen-Nürnberg, Germany

10:20 -11:00

to be determindto be determind

Invited talks: Oral drug delivery

09:00 - 09:40

Hydrophobic ion pairs: A game-changing approach for delivery of BCS class 3 drugsAndreas Bernkop-Schnürch, Faculty of Chemistry and Pharmacy, University of Innsbruck, Austria

09:40 -10:20

Biological barriers to oral delivery of macromoleculesCaitriona O‘Driscoll, School of Pharmacy, University of Cork, Ireland

10:20 -11:00

The virtual patient and the in-silico design of solid dosage formsHans Leuenberger, College of Pharmacy, University of Florida, Lake Nona Medical Campus, Orlando, FL, USA

Short talks: Nanotechnology

09:00 - 09:20

Heterotelechelic polymer prodrug nanoparticles for imaging and combination theraphyJulien Nicolas, University Paris-Sud, France

09:20 -09:40

Enhanced performance of lipid nanocapsule formulations of NIR-emitting conjugated polymers for optical and photoacoustic imagingPaola Modicano, University of Halle-Wittenberg, Germany

09:40 -10:00

Antiangiogenic folate-targeted nanoparticles for docetaxel delivery in ovarian cancerClaudia Conte, University of Naples Federico II, Italy

10:00 - 10:20

Cellular and subcellular targeting of TRAP1 as a new therapeutic approach for cancer treatmentClelia Mathieu, Institute Galien - Paris Sud, France

10:20 - 10:40

Effects of cytokines release in tissue regeneration and cancer treatmentsSlivia Pisani, University of Pavia, Italy

10:40 - 11:00

Bacterial membrane vesicles as novel treatment avenue for intracellular infectionsGregor Fuhrmann, HIPS, Saarbrücken, Germany

Short talks: Continuous manufacturing / Modeling and simulation

09:00 - 09:20

In-line measurement of granual size distribution in a continuous manufacturing lineRaphael Wiedey, University of Duesseldorf, Germany

09:20 -09:40

Coninuous production of cyclodextrin-based reconstitution powder from aqueous solution using scaled-up electrospinningPanna Vass, Budapest University of Technology and Economics, Hungary

09:40 -10:00

An in-silico workflow for designing a continuous mixing process with DEM simulationsPeter Toson, RCPE, Graz, Austria

10:00 - 10:20

Visualization of solvent effects on crystal surfaces by chemical force mapping - a combined experimental and simulation approachMikkel Herzberg, University of Copenhagen, Denmark

10:20 - 10:40

Predicting crystal breakage in pharmaceutical agitated dryersFrancois Hallac, University of Leeds, UK

10:40 - 11:00

CFD modeling on the hydrodynamics in the flow-through dissolution apparatus (UPS 4)Pracha Bunyawanichakul, Srinakharinwirot University, Nakhonnayok, Thailand (tbc)

11:00 - 11:30 Coffee break/exhibition/posters

11:30 - 12:00 APV award session

Plenary lecture

12:00 - 13:00

Pharmacomicrobiomics: drugs meet the human microbiomeChristine Moissl-Eichinger, Medical University of Graz, Austria

13:00 - 15:00 Lunch break/exhibition/posters

Invited talks: Localised drug delivery15:00 - 15:40

Jumping to the brain: tailored nanomedicinesGiovanni Tosi, University of Modena and Reggio Emilia, Italy

15:40 -16:20

to be determindto be determind

16:20 -17:00

Inhaled chemotherapy: a new modality for lung cancer treatment?Nathalie Wauthoz, Université Libre de Bruxelles, Belgium

09:00 – 11:00

11:00 – 11:30

11:30 – 12:00

12:00 – 13:00

13:00 – 15:00

15:00 – 17:00

17:00 – 17:45

20:00 – 02:00

Wednesday 10 February 2021

Elsevier workshop: meet the editors

Hofburg

Invited talks Short talks

Invited talks Short talks

Coffee break

Plenary lecture

Lunch

Posters

Exhibition

Award session

Gala dinner at the Hofburg

Programme

Page 6: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Invited talks: Amorphous drug delivery systems

15:00 - 15:40

Rapidly advancement of poorly bioavailable compounds to the clinicDavid Lyon, Lonza, USA

15:40 -16:20

Hybrid mixtures: A perspective on amorphous solid dispersions in food applicationsLennart Fries, Nestlé Research Center, Vevey, Switzerland

16:20 -17:00

The variability of the amorphous state in relation to processingMarc Descamps, University of Lille, France

Short talks: 2D- and 3D-printing

15:00 - 15:20

Direct powder extrusion 3D-printing: novel technology for manufacturing amorphous solid dispersionsAlvaro Goyanes, FabRx, London, UK

15:20 - 15:40

Semi-solid extrusion and 3D-printing: successful duo for the production of personalized gastro-retentive formulationsPaola Russo, University of Salerno, Fisciano, Italy

15:40 -16:00

Suitability of copovidone for selective laser sintering of pharmaceutical oral dosage formsYanis Abdelhamid Gueche, University of Montpellier, France

16:00 - 16:20

Direct-ink writing of implantable hybrid PCL/PEO drug delivery systemsSe Hun Chung, University College London, UK

16:20 - 16:40

Investigations on inkjet printed metoprolol tartrate orodispersible films for paediatric applicationOlga Kiefer, University of Düsseldorf, Germany

16:40 - 17:00

Traceable personalized oral dosage forms containing cannabinoidsHeidi Öblom, Abo Akademi University, Finland

Short talks: Transdermal delivery / Protein formulations

15:00 - 15:20

A new approach to predict in vitro-in vivo correlation for transdermal therapeutic systemsDorothea Gutekunst, LTS Lohmann Therapie-Systeme, Andernach, Germany

15:20 - 15:40

mRNA based skin vaccination by intradermal applications of lipid coated polymeric nanoparticlesLena Kliesch, HIPS, Saarbrücken, Germany

15:40 -16:00

Targeted iontophoretic delivery of an anti-EGFR monoclonal antibody to skinMaria Lapteva, University of Geneva, Switzerland

16:00 - 16:20

to be determindto be determind

16:20 - 16:40

Continuous alternative to freeze-drying: solid formulation of a monoclonal antibody using high-speed electrospinningJúlia Domján, Budapest University of Technology and Economics, Hungary

16:40 - 17:00

A holistic approach to develop a spray-drying method for CXCL8Sonja Hartl, RCPE, Graz, Austria

20:00 - 02:00 Gala dinner at the Hofburg

Thursday, 26 March 2020

Invited talks: In silico simulation for manufacturing processes

09:00 - 09:40

Digitalization in pharmaceutical product and process design: from advanced simulations to virtual drug product developmentJohannes Khinast, Graz University of Technology, Austria

09:40 -10:20

Digital Process DesignSean Bermingham, Process System Enterprise (PSE), London, United Kingdom

10:20 -11:00

Modelling and simulation of fluid-bed processesStefan Heinrich, Hamburg University of Technology, Germany

Invited talks: Nanofabrication technologies

09:00 - 09:40

Novel manufacturing for healthcare: microbubbles, particles, capsules and fibresMohan Edirisinghe, Biomaterials Processing Laboratory, Department Mechanical Engineering, University College London, United Kingdom

09:40 -10:20

Advances in electrospinningNalin de Silva, Department of Chemistry, University of Colombo, Sri Lanka

10:20 -11:00

Advanced in vitro lung-on-chip platforms for inhalation assaysJosue Sznitman, Department of Biomedical Engineering, Israel Institute of Technology, Haifa, Israel

Short talks: Processing and PAT

09:00 - 09:20

to be determindto be determind

09:20 -09:40

Production and downstream-processing of API-nanosuspensionsArno Kwade, Technical University of Braunschweig, Germany (tbc)

Thursday 11 February 2021

09:00 – 11:00

11:00 – 11:30

11:30 – 12:00

12:00 – 13:00

13:00 – 15:00

15:00 – 17:00

Hofburg

Invited talks Short talks

Invited talks Short talks

Coffee break

Plenary lecture

Lunch

Posters

Exhibition

Award session

Programme

Page 7: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

09:40 -10:00

Improving particle size distributions in a conical mill through new impeller air flow optimization comparisons utilizing computational fluid dynamics (CFD) analysis and empirical DoEWilf Sanguesa, Quadro Engineering, Ontario, Canada

10:00 - 10:20

Process control of high shear melt granulation processes by inline particle size analysisGerd Kutz, OWL University of Applied Sciences and Arts, Detmold, Germany

10:20 - 10:40

Designing an at-line PAT tool - a fluid bed coating case studyJaspreet Arora, Lonza Pharma and Biotech, Bend, USA (tbc)

10:40 - 11:00

NIR as an in-line PAT tool to study desorption kinetics in spin freeze-dried formulationsLaurens Leys, Ghent University, Belgium

Short talks: Gene delivery and ATMP

09:00 - 09:20

Formulation development to stabilize viral vectorsSabine Hauck, Leukocare, Munich, Germany

09:20 -09:40

to be determindto be determind

09:40 -10:00

Anti-EGFR nanovector of siRNA - a theranostic tool for triple negative breast cancer active targetingPhuoc Vinh Nguyen, Tours University, France

10:00 - 10:20

siRNA in lung slices: knocking down fibrosis?Mitchel Ruigrok, University of Groningen, The Netherlands

10:20 - 10:40

Lyophilization of human cells in presence of DMSOUte Rockinger, LMU Munich, Germany (tbc)

10:40 - 11:00

MSC extracellular vesicles for treatment of alpha-1-antitrypsin deficiency pulmonary diseasesElia Bari, University of Pavia, Italy

11:00 - 11:30 Coffee break/exhibition/posters

11:30 - 12:00 ADRITELF award session

Plenary lecture

12:00 - 13:00

Oral drug delivery systems: from irrelevance to top-selling products and ongoing challengesAndrea Gazzaniga, Biopharmaceuticals and Pharmaceutical Technology Laboratory, University of Milan, Italy

13:00 - 15:00 Lunch break/exhibition/posters

Invited talks: Dermal and transdermal delivery

15:00 - 15:40

Skin permeation from Pickering emulsionsMarie-Alexandrine Bolzinger, Claude Bernard University Lyon, France

15:40 -16:20

Microarray patches for high-dose drug delivery: targeting global healthcare challengesRyan F. Donnelly, School of Pharmacy, Queen‘s University Belfast, United Kingdom

16:20 -17:00

Improved vaccine immunogenicity through microneedle deliveryMichael Schrader, Vaxess, Boston, MA, USA

Invited talks: Continuous manufacturing

15:00 - 15:40

Process development of the future: fully automated DoE process analysis in an integrated continuous manufacturing plant for solid oral dosage formsVictoria Pauli, Novartis, Basel, Switzerland

15:40 -16:20

Pfizer´s „continuous“ journey - Implementing continuous manufacturing into a factory for solid dosage formsClemens Stief, Pfizer, Freiburg, Germany

16:20 -17:00

Continuous manufacturing of solid dosage forms; opportunities and controversiesKendal Pitt, GlaxoSmithKline, Ware, United Kingdom

Short talks: Advanced drug delivery

15:00 - 15:20

Repurposing of cationic amphiphiles to promote cytosolic RNA deliveryKoen Raemdonck, Ghent University, Belgium

15:20 - 15:40

Antibody-functionalised electrosprayed microparticles for in-vivo T-cell activationKarolina Dziemidowicz, University College London, UK (tbc)

15:40 -16:00

Intravitreal administration of bevacizumab: optimization of freeze-dried solid matricesEleonora Terreni, University of Pisa, Italy (tbc)

16:00 - 16:20

FRET as a tool for monitoring polyplex assembly and for tracking its cellular fateLorenz Isert, LMU Munich, Germany

16:20 - 16:40

A novel polyethlyene glycol-based linker platform for the development of hydrophilic antibody-drug conjugatesGianfranco Pasut, University of Padova, Italy

16:40 - 17:00

to be determindto be determind

Short talks: Oral drug delivery / Pediatric formulations

15:00 - 15:20

Poly(ethylene oxide)-block-Poly(ε-Caprolactone) micelles for oral delivery of Cyclosporine A: a tissue distribution studyZiyad Binkhathlan, King Saud University, Riyadh, Saudi Arabia (tbc)

15:20 - 15:40

X-ray imaging of micorcontainers used for oral drug deliveryRolf B. Kjeldsen, Technical Univeristy of Denmark, Lyngby, Denmark

Programme

Page 8: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

15:40 -16:00

Controlled permeability enhancement with short peptide inhibitors of protein kinase C zetaJoel Brunner, University of Geneva, Switzerland

16:00 - 16:20

A toolbox for mimicking gastrointestinal conditions in children: S(imulated) P(aediatric) B(reakfast) M(edia) for addressing the variability of gastric contents after typical paediatric breakfastsLisa Freerks, University of Greifswald, Germany (tbc)

16:20 - 16:40

Design and evaluation of self-emulsifying drug delivery system for pediatric useXiaona Liu, University of Copenhagen, Denmark

16:40 - 17:00

Acceptability of antibiotics in pediatrics: findings from an international observational studyThibault Vallet, ClinSearch, Malakoff, France

17:00 End of conferenceProgramme subject to be changed!

Chair of the conference Eva Roblegg, University of Vienna/University of Graz, Austria

Co-chairs of the conferenceJörg Breitkreutz, University of Düsseldorf, Germany Anna Maria Fadda, University of Cagliari, Italy Jürgen Siepmann, University of Lille, France

Chair of the programme committeeDuncan Craig, University College London, UK

Programme committee membersDorothee Ambrosius, Boehringer Ingelheim, Germany Maria Carafa, Sapienza University Rome, Italy Simon Geissler, Merck, Darmstadt, Germany Catherine Herry, Capsugel, Ploermel, France Alessandro Regola, Italy

International Advisory BoardMichael Altorfer, Swiss Biotech Association, Switzerland Lilian M. Azzopardi, Malta Pharmaceutical Association, Malta Rok Dreu, SFD (Slovenian Pharmaceutical Society), Slovenia Anna-Maria Fadda, SCI (Italian Chemical Society), ItalyLinda Hakes, APS (Academy of Pharmaceutical Sciences), United KingdomChristoph Herwig, Arbeitskreis Prozessanalytik der GDCh und DECHEMA, AustriaRenata Jachowitcz, PTF (Polish Pharmaceutical Society), PolandMaja Jakševac Mikša, HFD (Croatian Pharmaceutical Society), Croatia Karin Kogermann, EASP (Estonian Academical Society of Pharmacy), Estonia Vesna Matovic, SFUS (Pharmaceutical Association of Serbia)Francisco J. Otero-Espinar, SEFIG (Sociedad Espanola de Farmacia Industrial y Galenica), Spain Leena Peltonen, The Finnish Pharmaceutical Society, FinlandSven Stegemann, Geriatric Medicine Society e.V., Germany Piroska Szabó-Révész, HSPS (Hungarian Society for Pharmaceutical Sciences), HungaryHelmut Viernstein, Austrian Pharmaceutical Society, Austria Yukiyoshi Yamada, APPIE (Association of Powder Process Industry and Engineering), JapanFrédéric Zwahlen, GSIA, Switzerland

Chairs and committees

Programme

Page 9: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Social programme

Welcome reception *The welcome reception will be held on

Monday, 08 February 2021 from 18:00 - 19:30 h. Enjoy a glass of wine while networking with old and new friends or strolling around the industrial exhibition ResearchPharm® at the congress centre.

Gala dinner * Join us for our unmissable social networking gala dinner at the charming event location „Hofburg“. The doors will be open for you

from 19:45 h on Wednesday, 10 February 2021!The Hofburg is reachable within walking distance in the city centre of Vienna. Experience Vienna on a traditional exclusive level and establish contacts in a relaxed atmosphere. Taste the variety of traditional Austrian food with a seated three-course dinner menu.

Already submitted and accepted abstractsAlready submitted and accepted abstracts remain valid. Authors have the possibility to update their abstract online.

Online submissionShort papers can only be submitted online. Please use the following URL: worldmeeting.org/abstract-submission/Deadline for short paper submission: 15 October 2020

AbstractsSubmitted short papers will be presented from 08 -11 February 2021, either orally or in poster form.

Acceptance of abstractsAuthors will be notified of acceptance of their short paper and the type of presentation (oral or poster) by end of November 2020.

Authors also have the possibility to view the status of their abstract by using the function “status of your abstract“.

There they can view the status as well as they can edit their data and upload the latest version of their abstract. For log in use your registration ticket and your e-mail address.

- 1 -

Fill in the header for your short-paper here 1st Author Name1; 2nd Author Name2; 3rd Author Name3

1 Affiliation, Address ,e-mail address, Optional phone number 2 Affiliation, Address ,e-mail address, Optional phone number 3 Affiliation, Address ,e-mail address, Optional phone number

INTRODUCTION The following text should only help you to understand what to do and how to use the template. After you read the text, please delete it and start filling in the columns with your own text. This format is to be used for submissions of your short-papers. As your short-paper will be distributed to all delegates of the PBP World Meeting, we want to make sure that all papers look the same, are consistent and have a high-quality appearance. We therefore ask you to follow some simple guidelines. In essence, you should format your paper exactly like this document. The easiest way to do this is simply to download a template from the conference web site, and replace the content with your own material. For more information please go to: www.worldmeeting.org/abstract.

PAGES AND COLUMNS You need to have two (2) pages filled. If your short-paper is only one page, we cannot accept it and we will ask you to edit it, but we also have to ask you to shorten your short-paper if it is longer than two pages. Please make sure you use both columns, on the left and on the right, starting with the left column on the first page and going to the right column on the first page, before typing your text on the second page (left first, after that right column).

SUBMISSION FORMAT Please submit your short-paper in a PDF format.

Second Page On the second page, start at the top of the page and continue in double-column format. The two columns on this last page should be approximately of equal length.

References and Citations Use a numbered list of references at the end of the article, ordered as they appear in the text or ordered alphabetically by first author. See the examples of citations at the end of this document. Your references should be published materials accessible to the public. Proprietary information may not be cited. Private communication should be

acknowledged in the main text, not referenced (e.g., “[Robertson, personal communi-cation]”).

Figure 1. For images, be sure to have a good resolution image

SECTIONS The heading of a section should be in Times New Roman 10-point or Arial 9-point bold, all in capitals (Heading 1 Style in this template file). Sections should not be numbered.

Subsections Headings of subsections should be in Times New Roman 10-point or Arial 9-point bold with only the initial letters capitalized (Heading 2). (Note: For sub-sections and sub-subsections, a word like the or of is not capitalized unless it is the first word of the heading.)

Sub-subsections Headings for sub-subsections should be in Times New Roman 10-point or Arial 9-point italic with initial letters capitalized (Heading 3).

Text Text text

Figure 1 2

Figure 1 2

Table 1. Table captions should be placed below the table.

* subject to applicable corona regulations

Abstract submission

Page 10: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

ResearchPharm®

We invite you to join this state-of-the-art industrial exhibition

Coffee breaks, welcome reception as well as the event dinner are included in the registration fee. Coffee breaks and welcome reception will be integrated in the exhibition/poster area to create as much traffic around your booth as possible.

It’s easy to book a stand at the ResearchPharm®. Just fill in the booking form, which you find on our homepage www.researchpharm.org and send it to us.

Your contact for further information is:Heide Zweyer + 49 6131 97 69 90 [email protected]

SponsoringGain direct access to the delegates of the PBP World Meeting through enhanced visibility and exposure to attract new business. Are you interested in knowing more about our sponsoring opportunities for the PBP World Meeting? Let’s get in touch and find out what might be most suitable for your business development goals.

For more information on sponsoring options visit our homepage www.worldmeeting.org or contact Heide to learn more about our sponsoring and tailor-made packages.

Take advantage of this great event to showcase your company and your products

to an international and very versatile audience!Many thanks to our sponsors:

Current floor plan with available booths can be downloaded from our homepage:

www.researchpharm.org

O

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

N

M

N

BC

DA

FE

GH

MI

JL

KO

N

B

C

D

A

F

E

G

H

M

I

J

L

K

O

N

P

Q

S

R

T

U

P

Q

R

S

T

U

V

W

X

Y

Z

D1

E1

F1

A1

B1

C1

O

P

Q

R

S

T

U

V

W

X

5 ST 18/30

5 ST

18/

30

5 ST 18/30

5 ST

18/

30

HAU

ST. A

NL.

OE Q

112 0

HS

GIT

TER

RO

ST

0 112

SCH

LEU

SE

OE Q

110 0

ST3.

48m

2KU

NST

ST.P

L.

0 110

OE Q 521 0 ST0 521

WASCHR. H.

OE Q 119 0 WC5.07m2STEINZEUGPL.RH=273.6

0 119WASCHR. D.

OE Q 118 0 WC5.07m2STEINZEUGPL.RH=273.6

0 118

FOYER CAFE - VERKAUFSFLÄCHE

OE F 242 0 FC

46.81 m2

LINOLEUM

RH=277.7

0 242

FEUERWEHRAUFZ.

OE Q 225 0 PA182.5/152.5cm

0 225

PERSONENAUFZ.

Q2.1

Q2.2

FEU

ERW

EHR

AUFZ

.

OE Q

625 0

PA20

7.5/

127.

5cm

0 625

PER

SON

ENAF

UZ.

SCH

LEU

SE

OE Q

620 0

ST3.

48m

2KU

NST

ST.P

L.

0 620

WASCHR. D.

OE Q 628 0 WC5.07m2STEINZEUGPL.RH=273.6

0 628 WASCHR. H.

OE Q 629 0 WC5.07m2STEINZEUGPL.RH=273.6

0 629

HAU

ST. A

NL.

OE Q

612 0

HS

GIT

TER

RO

ST

0 612

SCH

LEU

SE

OE Q

610 0

ST3.

48m

2KU

NST

ST.P

L.

0 610

FOYE

R E

OE E

551 0

FO89

2.46

m2

EIC

HEN

BRET

TBEL

AGR

H=2

70

0 551

REQU

ISIT

ENRA

UMOE

E 07

7 0 LR

30.9

7m2

KUNS

TSTE

INPL

.

RH=2

700 077

EICHENBRETTBEL.

FOYER E

OE E 551 0 FO

892.46m2

EICHENBRETTBEL.

RH=270

0 551

OE Q 511 0 ST0 511Q5.1

SCHLEUSE

OE Q 510 0 ST

3.48m2

KUNSTSTPL.0 510

FEUERWEHRAUFZ.

OE Q 515 0 PA

182.5/152.5cm0 515 PERSONENAUFZ.

OE V 382 0 GRGRASDACH

0 382

OE V 381 0 TRGRANITPLATTEN

0 381

KONFERENZRAUM128.78m2HOLZBODEN

0.11-0.12

ALLG. VERKEHRSFL.

OE J 035 0 WF75.06m2GRANITPLATTEN

0 035

OE Q 537 0 ST

GRANITPALTTEN0 537

SCHLEUSE

OE F 114 2 OO5.01m2EICHENBRETTBEL

0 114 C

HAU

ST. A

NL.

OE Q

113 0

HS

GIT

TER

RO

ST

0 113

WC

1.07m2

PISSR.

1.41m2

WC

1.07m2

WC

1.07m2

ABSTELLRAUM

OE Q 114 1 HS

GITTERROST

0 114 B

DOKUMENTENFÄCHER

SCHLEUSE

OE F 007 0 OO9.07m2EICHENBRETTBEL.RH=271.5

0 007HAUSTECHNISCHE ANLAGE

OE Q 124 0 HS

LUFTFÜHRENDER SCHACHT

0 124

SCH

LEU

SE

OE F

008

3.89

m2

EIC

HEN

BRET

TBEL

.R

H=2

71.5

0 008

OE Q 211 0 ST

0 211

PUTZ

RAU

M

OE S

147 0

PU9.

82m

2KU

NST

STEI

NPL

.

0 147

HAUSTECHNISCHE ANLAGE

OE T 001 0 HS0 001 A

REQUISITENRAUM

OE F 142 0 WC

30.97m2

KUNSTSTEINPL.0 142 B

SCHIEBEWANDLAGER

OE T 000 3 BT

13.17m2

0 F 000 D

HAUSTECHNISCHE ANLAGE

OE T 001 0 HS

GITTERROST0 001 B

ABSTELLRAUM

OE F 243 0 FC

33.31m2

PVC-ALTRO

RH=277.7

0 243

HAUS

TECH

NISC

HE A

NLAG

E

OE Q

214 0

HSLU

FTFÜ

HREN

DER

SCHA

CHT

0 214

SCHLEUSEOE F 002 0 OO12.53m2EICHENBRETTBELAG

RH=271.5

0 002 A

PERSONENAUFZ.OE Q 216 0 PA

182.5/152.5cm

0 216

PERSONENAUFZ.OE Q 215 0 PA

182.5/152.5cm

0 215

SCHLEUSEOE Q 210 0 ST3.48m2KUNSTST.PL.

0 210

FOYE

R F

OE F

241 0

FO99

8.64

m2

EICH

ENBR

ETTB

ELAG

RH=2

700 241

DOKU

MEN

TENF

ÄCHE

R

SCHL

EUSE

OE F

003 0

OO9.

07m

2EI

CHEN

BRET

TBEL

AG

RH=2

71.50 003

LA

STEN

AUFZ

UGOE

Q 22

7 0 LA

639/

320c

m

0 227

SCHLEUSEOE Q 220 0 ST3.48m2KUNSTST.PL.

0 220

OE Q 221 0 ST

0 221

FEUERWEHRAUFZ.

OE Q 226 0 PA182.5/152.5cm

0 226

PERSONENAUFZ.

HAUS

TECH

NISC

HE A

NLAG

E

OE Q

224 0

HSNI

CHT

LUFT

FÜHR

ENDE

R SC

HACH

T

0 224

AGI

TTER

ROST

RH=274

RAUM F. SCHIEBEWAND

OE T 004 0 BT16.22m2KUNSTSTEINPL.

0 004

HAUSTECHNISCHE ANLAGE

OE T 005 0 HT0 005

RAU

M F

. SC

HIE

BEW

AND

OE T

006 0

BT16

.22m

2KU

NST

STEI

NPL

ATTE

N

0 006

(OE F 000 2 OO)(0 F 000 C)

(OE F 000 1 OO)(0 F 000 B)

FEU

ERW

EHR

AUFZ

.

OE Q

626 0

PA20

7.5/

127.

5cm

0 626

PER

SON

ENAF

UZ.

HAUSTECHNISCHE ANLAGE

OE Q 624 0 HS

LUFTFÜHRENDER SCHACHT

0 624 A

OE Q

621 0

ST0 6

21

ABSTELLRAUM

OE Q 624 1 HS

GITTERROST

0 624 B

WC

1.07m2

PISSR.

1.41m2

WC

1.07m2

WC

1.07m2

SCHLEUSE

OE E 074 0 OO9.07m2EICHENBRETTBEL.RH=271.5

0 074

DOKUMENTENFÄCHER

HAU

ST. A

NL.

OE Q

613 0

HS

GIT

TER

RO

ST

0 613

OE Q

611 0

ST0 6

11

HAUSTECHNISCHE ANLAGE

OE Q 614 0 HS

LUFTFÜHRENDER SCHACHT

0 614

PUTZ

RAU

M

OE S

643 0

PU9.

82m

2KU

NST

STEI

NPL

.

0 643

REGIERAUM

OE E 076 0 RR3.89m2VELOURRH=234

0 076

OE T

068 0

HS

0 068

B

SCHI

EBEW

ANDL

AGER

OE T

067 3

BT13

.17m

2

0 E 06

7 D

HAUS

TECH

NISC

HE A

NLAG

E

OE T

068 0

HSGI

TTER

ROST

0 068

A

PERSONENAUFZ.

182.5/152.5cm

HAUSTECHNISCHE ANLAGE

OE Q 524 0 HS

LUFTFÜHRENDER SCHACHT

0 524 A

OE Q

111 0

ST0 1

11

SCHLEUSE

OE E 070 0 OO

9.07m2

EICHENBRETTBELAG

RH=271.5

0 070

LASTENAUFZUG

OE Q 517 0 LA

639/320cm0 517

HAUSTECHNISCHE ANLAGE

OE Q 514 0 HS

LUFTFÜHRENDER SCHACHT

0 514GITTERROST

FEUERWEHRAUFZ.

OE Q 516 0 PA

182.5/152.5cm0 516 PERSONENAUFZ.

RAUM F. SCHIEBEWAND

OE T 071 0 BT

16.22m2

KUNSTSTEINPL.0 071

HAUS

TECH

NISC

HE A

NLAG

E

OE T

072 0

HTGI

TTER

ROST

0 072

RAU

M F

. SC

HIE

BEW

AND

OE T

073 0

BT16

.22m

2KU

NST

STEI

NPL

ATTE

N

0 073

(OE E

067 2

OO)

(0 E 0

67 C)

SAAL

EOE

E 06

7 0 OO

1057

.02m

2EI

CHEN

BRET

TBEL

.

0 E 06

7 A

HAUST. ANLAGE

OE Q 422 0 HS

GITTERROST0 422

HAUST. ANLAGE

OE Q 423 0 HS

GITTERROST0 423

HAUSTECHNISCHE ANLAGE

OE Q 424 0 HS

NICHT LUFTFÜHRENDER SCHACHT

0 424 A

GITTERROST

SCHLEUSE

OE Q 420 0 ST

3.48m2

KUNSTSTPL.0 420

OE Q 421 0 ST0 421

Q4.2

LASTENAUFZUG

OE Q 427 0 LA

639/320cm0 427

HAUSTECHNISCHE ANLAGE

OE Q 414 0 HS

LUFTFÜHRENDER SCHACHT

0 414

OE Q 411 0 ST0 411

SCHLEUSE

HAUS

TECH

NISC

HE A

NLAG

E

OE Q

314 0

HSNI

CHT

LUFT

FÜHR

ENDE

R SC

HACH

T

0 314

GITT

ERRO

ST

HAUST.ANLAGEOE Q 312 0 HSGITTERROST

0 312

HAUST.ANLAGEOE Q 313 0 HSGITTERROST

0 313

LAST

ENAU

FZUG

OE Q

317 0

LA63

9/32

0cm

0 317

OE Q 311 0 ST

0 311

SCHLEUSEOE Q 310 0 ST3.48m2KUNSTST.PL.

0 310

Q3.1

HAUS

TECH

NISC

HE A

NLAG

E

OE Q

324 0

HSLU

FTFÜ

HREN

DER

SCHA

CHT

0 324

A

SCHLEUSE0 320

OE Q 321 0 ST

0 321

Q3.2

OE Q 431 0 ST0 431

TECHNIKRAUM

OE Q 434 0 PU

11.94m2

KUNSTSTEINPL.0 434

OE Q 433 0 RT

GRANITPLATTEN0 433

HAUST. ANL.

OE Q 432 0 HS0 432

WR.H.

11.67m2

RH=273.6

WC

1.07m2

WASCHR. HERREN

OE Q 435 0 WC

7.21m2

STEINZEUGPL.

RH=273.6

0 435

VERSEHRTEN WC

WASCHR. DAMEN

OE Q 437 0 WC

8.78m2

STEINZEUGPL.

RH=273.6

0 437

WC

1.04m2

WC

1.07m2

WC

1.04m2

WASCHR. D.

17.30m2

Q3.3

OE Q

331 0

ST

0 331

GRANITPLATTEN

OE Q 339 0 RT

0 339

HT-ANLAGEOE Q 333 0 ST

0 333

PERS

. AUF

Z.OE

Q 33

2 0 PA

100/

135m

2

0 332

WR.H.

7.83m2

WC

1.07m2

WC

1.04m2

VERS. WCOE Q 337 0 WC7.12m2STEINZEUGPL

0 337

WASCHR. D.17.94m2RH=273.6

WC

1.07m2WC

1.04m2

WC

1.07m2

WC

1.04m2WC

1.04m2WC

1.04m2

Q2.3

KONFERENZRAUM95.84m2HOLZBODEN

0.96-0.97

LOUNGE

20.27m2KUNSTSTOFFBELAG

OE Q

230 0

STGR

ANIT

PLAT

TEN

0 230

OE Q 232 0 STGRANITPLATTEN

0 232

WASCHR. HERRENOE Q 234 0 WC

8.78m2STEINZEUGPL.

RH=273.6

0 234

WASCHR. DAMENOE Q 235 0 WC

9.17m2STEINZEUGPL.

RH=273.6

0 235

WASCHR. D.15.38m2

PISSOIR

11.18m2

WC

1.07m2

WC

1.04m2

WC

1.04m2

WC

1.07m2

WC

1.04m2

WC

1.04m2

WC

1.07m2

WC

1.07m2

WC

1.04m2

WC

1.07m2WC

1.04m2

PARKRAUM FALTWAND2.84m2HOLZBODEN

0 236

HAU

ST. A

NL.

OE Q

122 0

HS

GIT

TER

RO

ST

0 122

SCH

LEU

SE

OE Q

120 0

ST3.

48m

2KU

NST

ST.P

L..

0 120

OE Q

121 0

ST0 1

21

HAU

ST. A

NL.

OE Q

123 0

HS

GIT

TER

RO

ST

0 123

SCHLEUSE

OE E 624 2 OO5.01m2EICHENBRETTBELAG

0 624 C

GANG

OE E

075 0

GG23

.97m

2EI

CHEN

BRET

TBEL

AG

RH=2

71.50 075

WAS

CHR.

D.

OE E

079 0

WC

2.61

m2

STEI

NZ.P

L.RH

=277

.70 079

1.11

m2

PISS

.R.

1.14

m2

WAS

CHR.

H.

OE E

078 0

WC

3.13

m2

STEI

NZEU

GPL.

RH=2

77.70 078

DOKUMENTENFÄCHER

SCHLEUSE

OE E 524 1 OO

5.01m2

EICHENBRETTBEL.0 524 B

(OE E

067 1

OO)

(0 E 0

67 B)

PUTZ

RAUM

OE J 0

45 0

PU11

.48m

2KU

NSTS

TEIN

PL.

0 045

HAUPTEINGANGSHALLE

OE J 034 0 EH3768.12m2GRANITPLATTENRH=316

0 034 A

HAUSTECHNISCHE ANLAGE

OE Q 114 0 HS

LUFTFÜHRENDER SCHACHT

0 114 A

GANGOE F 008 0 GG

19.32m2

EICHENBRETTBEL.

RH=271.5

0 008 A

HT-ANL.

OE F 008 1 HS0 008 B

WASCHR. H.

OE F 010 0 WC

3.13m2

STEINZEUGPL.

RH=277.7

0 010

WC

1.32m2

WC

1.11m2

PISS.R.

1.14m2

WASCHR. D.

OE F 011 0 WC

2.61m2

STEINZEUGPL.

RH=277.7

0 011

PAGULADECKE

REGI

ERAU

MOE

F 00

2 1 RR

3.89

m2

VELO

URRH

=2340 0

02 B

SCHL

EUSE

OE F

224 1

OO5.

01m

2EI

CHEN

BRET

TBEL

.

0 224

B

PUTZRAUM

OE J 046 0 PU

11.48m2

KUNSTSTEINPL.0 046

SAAL F

OE F 000 0 OO

1057.02m2

EICHENBRETTBEL.0 F 000 A

ABSTELLRAUM

OE Q 424 1 AR

GITTERROST0 424 B

OE J 040 0 RT0 040

OE J 041 0 ST0 041

ABSTELLRAUM

OE J 039 0 AR

21.28m2

KUNSTSTEINPLATTEN

0 039

ZEITUNGSKIOSK

OE J 034 4 ZK0 034 E

HAUPTEINGANGSHALLE

OE J 034 0 EH3768.12m2GRANITPLATTENRH=316

0 034 A

OE J 043 0 RT

0 043

OE J 044 0 ST

0 044

ABSTELLRAUMOE J 042 0 AR21.28m2KUNSTSTEINPLATTEN

0 042

BANKSCHALTEROE J 034 3 BK

0 034 D

WASCHR.

OE F 142 0 WC

2.08m2

STEINZ.PL.

RH=273.6

0 142 A

WC

2.08m2

OE Q

231 0

STGR

ANIT

PLAT

TEN

0 231

WC

1.04m2

WC

1.04m2

WR. H.

11.67m2

OE Q

330 0

STGR

ANIT

PL.

0 330

PISS.R.

7.12m2

WASCHR. HERRENOE Q 338 0 WC

7.26m2STEINZEUGPL

RH=273.6

0 338

WC

1.04m2

WC

1.07m2

WC

1.07m2

WC

1.07m2

WC

1.09m2

HT-ANLAGE

OE Q 430 0 ST

GRANITPLATTEN0 430

PISSRAUM

11.18m2

WC

1.07m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.07m2

ZUL

ABL

EV

RH=325.5

ZUL

ABL

EV

RH=6

34RH

=325

.5

EV

RH=316RH=297

RH=2

97RH

=316

RH=297

RH=316

RH=297

RH=316

ZUL

ABL

EV

RH=325.5

ZUL

ABL

EV

ZUL

ABL

EV

RH=325.5

RH=316

RH=297

RH=316RH=297

RH=634

RH=325.5

ZUL

ABL

EV

ZUL

ABL

EV

RH=3

25.5

RH=2

97RH

=316

RH=316

RH=297

ZUL

ABL

EV

ZUL

ABL

EV

RH=756RH=316

ZUL

ABL

EV

ZUL

ABL

EV

ABST

ELLR

AUM

OE Q

324 1

ARGI

TTER

ROST

0 324

B

RH=324

RH=270

RH=324

RH=270

RH=2

65RH

=316

GRAN

ITPL

ATTE

N

RH=265RH=316

KUNS

TWER

K

KUNSTWERK

RH=270

RH=234

SCHIEBEWAND SCHIEBEWAND

SCH

IEBE

WAN

D

SCHIEBEWAND

SCH

IEBE

WAN

D

SCHIEBEWAND

BESPRECHUNGSRAUM

???OE S 265 0 BU

18.95m2HOLZBODEN

0 265

PRESSERAUM

OE U 451 0 PR

(130.78m2)

GUSSBODEN

RH=324

0.31

KONFERENZRAUM104.40M2HOLZBODEN

0.94-0.95

UUK +18.28

UUK +18.16

UUK +18.59

UUK

+18.

28

UUK +16.97

UUK +18.59

UUK

+18.

28

UUK +18.59

UUK +18.16

UUK +16.97

UUK +18.16

+14.80

+13.90

+15.

668

+14.80

+14.

80

+14.80+14.80

+13.90

+15.

668

+14.

80

+15.70

+14.80

+15.

70

+14.80

+15.668

+13.90

+14.80

+14.80

+14.80

+14.80

+15.668

+13.90

+14.80

+14.

80

+14.

80

+14.80

+14.80

+13.90

+15.

668

+14.80

+14.

80

+14.80

+13.90

+15.

668

+14.80

+14.

80

+14.80

+15.70

+14.80

+15.

70

+15.668

+13.

90

+14.80

+14.

80

+14.80

+14.

80

+14.

80

+14.

80

+15.668

+13.

90

+14.80

+14.

80

+14.80

+14.

80

+13.90

+14.80

+14.80

+15.668

+14.80

+15.668

+13.90

+14.80

+14.80

+14.80

+14.80

+14.80

+14.

80

+15.668

+13.

90

+14.80

+14.80

+14.80

+14.

80

+15.668

+13.

80

+14.76

+14.

76

+14.

76

+14.

71

+14.76

+14.

76

+14.

76+14.

80

+14.

80

+14.

80

+13.

10

+14.80

+14.80

+14.

76

+14.

76+14.

80

+14.

80

+12.

41

+14.

80

+14.80

+14.76

+14.80

+12.41

+14.80

+14.80

+14.80

+14.80

+13.10

63189

93189

63189

93189

63189

93189

63189

93189

63189

93189

63189

93189

63189

93189

63189

93189

63189

93189

183243

63189

63189

93189

93189

63189

63189

93189

93189

63189

63189

63189

+14.65

+14.65

+14.65

+14.65

+14.65

+14.65

+14.65

+14.65

+14.65

+14.

65

+14.

65

+14.65

+14.65

+14.

65

+14.65

+14.65

+14.

65

+14.

65+14.

55

+14.65

+14.

46

+14.

65

+14.

46

+14.

65

+14.65

+14.

46

+14.

65

+14.

46

+14.

65+1

4.63

+14.

65

+14.65

+14.65

+14.65

28 STH17.35/26

18 STH18/26

28 STH17.35/26

18 STH18/26

28 STH

24 STH

18/26

28 STH

17.35/26

24 STH

18/26

28 S

TH17

.35/

26

18 STH18/26

28 S

TH17

.35/

26

28 STH17.35/26

18 S

TH18

/26

28 STH17.35/26

18 S

TH18

/26

18 STH

18/26

28 STh

17.35/26

18 STH

18/26

28 STH

17.35/26

14 STH 17.35/30

28 S

TH17

.35/

2618 S

TH18

/26

28 S

TH17

.35/

26

18 S

TH18

/26

28 STH17.35/26

19 STH17.05/26

19 S

TH17

.05/

30

28 STH17.35/26

19 STH17.05/26

28 STH

17.35/26

19 STH

17.05/26

19 STH

17.05/30

14.75

14.73

14.76

90210

T30110234

90210

T30110234

110

210

T30

120

217.

5

55.8

210.

3

55.8

210.

3

55.8

210.

3

55.8

210.

3

277

76139

91124

110210

110

210

T30

721.5325.5

T30

80216

T30

193.

521

0T3

0

193.

521

0T3

0

193.

521

0

193.

521

0

110

210

T30

120

217.

5

277

76139

91124

100210

T30

162

210

162

210

T30

85210

T30 100217.5

85210

T30 100217.5

120210

135217.5

60 156

T30

140210T30

155217.5

80207.2

95214.7

80207.2

95214.7

55.8210.3

85 210

85210

T30100217.5

100

217.

5

82 210

T30

120210

162210

T30

110210

T30

120217.5

91

193.5210

193.5210

193.5210

T30

193.5210

T30

69 202.

5T3

0

82210

T30

721.5

325.5

T30

320

T30

110210

T30

120217.5

90210

T30110234

320306

T30

110210

T30

120217.5

90210

T30110234

31277

76139

91124

480324

T30

80210

T30

110210

T30

110210

85210

T30 100217.5

85210

T30 100217.5

85210

T30 100217.5

110

210

T30

120

217.

5

55.8

210.

3

55.8

210.

3

55.8

210.

3

55.8

210.

3

85210

T30 100217.5

110

210

T30

120

217.

5

277

76139

91124

277

76139

91124

110210

110

210

T30

80216

T30

193.

521

0T3

0

193.

521

0T3

0

193.

521

0

193.

521

0

162

210

T30

162

210

120210

120210

135217.5

155217.5

140210

T30

60156

85210

T30

100217.5

100217.5

85210

80207.2

95214.7

55.8210.3

80207.2

95214.7

55.8210.3

115217.5

100210

721.5325.5

T30

82 210

T30

120210

69207.5

T30

100

210

115

217.

5

135

217.

5

120

210

60 216

T30162210

T30

100

210

T30

162210

110210

T30

120217.5

110210

T30

120217.5

110210

T30

120217.5

320350T30

110210

T30

120217.5

9021

0

110

234

T30

9021

0

110

234

T30

90 210

T30

110

234

90 210

T30

110

234

3127

7

7613

9

9112

4

31 277

76 139

91 124

192.5210T30

192.5210T30

192.5210

192.5210

480378T30

110

210

110210T30

725.

532

5.5

T30

82210

T30

85210T30

100217.5

85210T30

100217.5

110210

T30

120217.5

110210

T30

120217.5

320216

T30

110210

T30

120217.5

76139

91124

31277

76139

91124

90209.5

T30

90209.5

T30

85210

90210

80210

85 210

T30

100

217.

5

85 210

T30

100

217.

5

320216

T30

110210

T30

120217.5

110210

T30

120217.5

110210

T30

120217.5

3127

7

7613

9

9112

4

76 139

91 124

90 209.

5

T30

90 209.

5

T30

140210

55.8210.3

80 207.

295 214.

7

80 207.

295 214.

7

80207.5

210

205183210 18388.5

183210 18388.5

150

210

EI2

30-C

176

210

T30

165210T30

183210

213210

165

210

T30

193.

521

0T3

0

193.

521

0T3

0

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

176

210

T30

213210

183210

135

210

T30

150

217.

5

165

210

T30

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

80207.2

95214.7

120210

135217.5

140210

T30155247.5

176210

T30

135210

T30

165210

T30

183210

220210

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

220210

183210

165210

T30

193.5210

T30

223.5210

T30

HAUSTECHN. ANL.

OE Q 233 0 HS

0 233

RH=756RH=316

90

VERBINDUNGSGANG

FOYER F

OE F 241 0 FO896.55m2EICHENBRETTBEL.RH=270

0 241

E2

E1

E

FOYER F

F1

F2

F

PRESSERAUM

OE U 451 0 PR

(130.78m2)

GUSSBODEN

RH=324

0.32

Suite F

I

II III

IV

EINGANGSHALLEENTRANCE HALL

150

220

EI2

30-C

PARK

RAUM

FAL

TWAN

D2.

41m

2HO

LZBO

DEN

0 334

GANG

13.11m2HOLZBODEN

0 264

GLAS

WAN

D

170

220

EI2

30-C

FALTWAND

VSG

VERG

LASU

NG E

I30

FALTWAND

120

210

EI2

30-C

80 220

EI2-

30C

170

220

EI2-

30-C

WIRTSCHAFTSRAUM8.18m2KERAM.PLATTEN

0 237

FALTWAND

100210

120220EI2 30-C

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

GK

SCHÜ

RZE

UK +

3.16

ü. F

OK

120220

RESTFLÄCHE

5.67 m2

LINOLEUM

RH=277.7

40875130

33253325

3164

5424

5424

9161

1194

8

3049 24852485 2485

3506

2885

3370

CATERING CATERING

55025502

2978

24852500 2435

3715

CATERINGCATERING

62 Posterboards124 Posterflächen(H 250cm x W 100cm)

56 Stände à 9m² (3 x 3m)

H/B = 420 / 594 (0.25m²) Allplan 2015

-------

Halle: Messe:

Standnr.:

M: Blatt:

Benennung:

Projektleiter:

Bearbeiter:

Alle Angebotsunterlagen bleiben Eigentum der Expoxx Messebau GmbH und können jederzeit zurückverlangt werden. Sie dürfen nicht vervielfältigt oder Dritten zugänglich gemacht werden.

Datum:

1:Kunde:

Auftragsnr.: Zng-Nr Plan-Nr

Projekt:

000000

EXPOXX MESSEBAU GmbHMesseplatz 1, Postfach 277, A-1021 WienT: +43 (0) 1 / 727 20-6101F: +43 (0) 1 / 720 [email protected] - UID-Nr.: ATU 37633003

2018Lvl 0

Ges. -

BVA2200

PBP World M. Ebner04093.2020.002

001 030

05.03.

Vienna, Austria08 - 11 Feb. 2021Austria Center ViennaBruno-Kreisky-Platz 1, 1220 Vienna, Austria, www.acv.at

FLOOR 0

Floor 0 Auditoria F2Floor 1 Auditoria N

Floor 1 Auditoria M Floor 2 Plenary A

Auditoria F2

Design height 2,60 m

3

1

24

475

62

8

910

1112 13 14

17 16 15

19 18

2221

20

23

2526

292827

3231

30

33

36 35 34

38 37

39 40 41

4443

42 464850

454749

525456

515355

Lefan-

caps

DFEGrace Pharma-

Test

Gamlen

/Giro-nex

JRS

Phar

ma

Opt

ima

Qua

dro

/ Fitz

-pa

trick

Thermo Fisher

Scientific

Beckman

Freund-Vector Lonza

Granu-

tools Teledy-ne

Hanson KerryXedev

LTSParsum

Armor Pharma

Bayer

Glatt

BASFMeggle

Lubrizol

AshlandHARKE

Pharma

Maag Autom

atik

Maag Pum

p

Gala

Stable Micro Sys-tems

Munit SA

Next-Pharma

Beneo

Shin-Etsu

MG2

SOTAX

Evonik

Agilent Asahi

Kasei

Merck

NISSO

BIO-

GRUND

Inter-reg SiteDrug

NOF

RCPE

Gatte-fosse

WITec GmbH

open

closed

reserved

Balda

Medel-pharm

O

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

N

M

N

BC

DA

FE

GH

MI

JL

KO

N

B

C

D

A

F

E

G

H

M

I

J

L

K

O

N

P

Q

P

Q

V

W

X

S

R

T

U

P

Q

R

S

T

U

V

W

X

Y

Z

D1

E1

A1

B1

C1

O

P

Q

R

S

T

U

V

W

HAU

ST. A

NL.

O1 Q

112 0

HS

GIT

TER

RO

ST

1 112

SCH

LEU

SE

O1 Q

110 0

ST3.

48m

2KU

NST

ST.P

L.

1 110

O1 Q 521 0 ST1 521

WASCHR. H.

O1 Q 119 0 WC5.07m2STEINZEUGPL.RH=273.6

1 119 WASCHR. D.

O1 Q 118 0 WC5.07m2STEINZEUGPL.RH=273.6

1 118

Q5.2

FEUERWEHRAUFZ.

O1 Q 225 0 PA182.5/152.5cm

1 225

PERSONENAUFZ.

Q2.1

Q2.2

FEU

ERW

EHR

AUFZ

.

O1 Q

625 0

PA20

7.5/

127.

5cm

1 625

PER

SON

ENAF

UZ.

SCH

LEU

SE

O1 Q

620 0

ST3.

48m

2KU

NST

ST.P

L.

1 620

WASCHR. D.

O1 Q 628 0 WC5.07m2STEINZEUGPL.RH=273.6

1 628WASCHR. H.

O1 Q 629 0 WC5.07m2STEINZEUGPL.RH=273.6

1 629

HAU

ST. A

NL.

O1 Q

612 0

HS

GIT

TER

RO

ST

1 612

SCH

LEU

SE

O1 Q

610 0

ST3.

48m

2KU

NST

ST.P

L.

1 610

FOYE

R M

O1 J 5

65 0

AU66

5m2

EICH

ENBR

ETTB

ELAG

RH=3

241 565

A

PERSONENAUFZ.

O1 Q 525 0 PA

182.5/152.5cm1 525

SCHLEUSE

O1 Q 520 0 ST

3.48m2

KUNSTSTPL.1 520

FOYER

O1 L 549 0 FO

160.99m2

EICHENBRETTBEL.

RH=270

1 549

O1 Q 511 0 ST1 511 Q5.1

SCHLEUSE

O1 Q 510 0 ST

3.48m2

KUNSTSTPL.1 510

FEUERWEHRAUFZ.

O1 Q 515 0 PA

182.5/152.5cm1 515

PERSONENAUFZ.

ALLGEM. VERKEHRSFLÄCHE

O1 J 034 0 EH

2291.89m2

GRANITPLATTEN

RH=270

1 034 A

ALLG. VERKEHRSFL.

O1 J 036 0 WF

64.26m2

GRANITPLATTEN1 036

ALLG. VERKEHRSFL.

O1 J 035 0 WF64.26m2GRANITPLATTEN

1 035

O1 Q 537 0 RT1 537

O1 Q 530 0 ST

GRANITPLATTEN1 530

HAUSTECHN. ANL.

O1 Q 532 0 HS1 532

WASCHR. HERREN

O1 Q 536 0 WC

8.78m2

STEINZ.PL.

RH=273.6

1 536

WC

1.09m2

WC

1.07m2

WC

1.07m2

PISS.

1.07m2

WR.D.

O1 Q 534 0 WC

1.92 m2

STEINZ.PL.1 534

WASCHR. H.

O1 Q 533 0 WC

3.88m2

STEINZ.PL.1 533

PISSOIR

7.12m2

RH=273.6

WC

1.07m2

WASCHR. H.

5.91m2

HAU

ST. A

NL.

O1 Q

113 0

HS

GIT

TER

RO

ST

1 113

WC

1.07m2

PISSR.

1.41m2

WC

1.07m2

WC

1.07m2

ABSTELLRAUM

O1 Q 114 1 AR

GITTERROST

1 114 B

SCHLEUSE

O1 F 027 0 OO5.99m2VELOURRH=271.5

1 027 HAUSTECHNISCHE ANLAGE

O1 Q 124 0 HS

LUFTFÜHRENDER SCHACHT

1 124

O1 Q 211 0 ST

1 211

HAUSTECHNISCHE ANLAGE

O1 T 001 0 HS1 001 A

SCHIEBEWANDLAGER

O1 T 000 3 BT1 F 000 D

HAUSTECHNISCHE ANLAGE

O1 T 001 0 HS

GITTERROST1 001 B

ABSTELLRAUM

O1 J 243 0 FC

29.36m2

PVC-ALTRO

RH=277.7

1 243

HAUS

TECH

NISC

HE A

NLAG

E

O1 Q

214 0

HSLU

FTFÜ

HREN

DER

SCHA

CHT

1 214

VORR

AUM

O1 J 2

44 0

FC7.

45m

2KU

NSTS

TEIN

PL.

RH=3

241 244

PERSONENAUFZ.O1 Q 216 0 PA

182.5/152.5cm

1 216

PERSONENAUFZ.O1 Q 215 0 PA

182.5/152.5cm

1 215

SCHLEUSEO1 Q 210 0 ST3.48m2KUNSTST.PL.

1 210

SCHL

EUSE

O1 F

002 0

OO5.

67m

2VE

LOUR

RH=2

71.51 002

LAST

ENAU

FZUG

O1 Q

227 0

LA63

9/32

0cm

1 227

SCHLEUSEO1 Q 220 0 ST3.48m2KUNSTST.PL.

1 220

O1 Q 221 0 ST

1 221

FEUERWEHRAUFZ.

O1 Q 226 0 PA182.5/152.5cm

1 226

PERSONENAUFZ.

HAUS

TECH

NISC

HE A

NLAG

E

O1 Q

224 0

HSNI

CHT

LUFT

FÜHR

ENDE

R SC

HACH

T

1 224

GITT

ERRO

ST

RH=324

HT ANLAGE SCHWACHSTROMVERSTÄRKER, MCR-ANLAGE

O1 T 004 0 HT20.90m2PVC 100 kOhm

1 004

HAUSTECHNISCHE ANLAGE

O1 T 005 0 HT1 005

FEU

ERW

EHR

AUFZ

.

O1 Q

626 0

PA20

7.5/

127.

5cm

1 626

PER

SON

ENAF

UZ.

HAUSTECHNISCHE ANLAGE

O1 Q 624 0 HS

LUFTFÜHRENDER SCHACHT

1 624 A

O1 Q

621 0

ST1 6

21

ABSTELLRAUM

O1 Q 624 1 HS

GITTERROST

1 624 B

WC

1.07m2

PISSR.

1.41m2

WC

1.07m2

WC

1.07m2

SCHLEUSE

O1 E 094 0 OO5.99m2VELOURRH=343.5

1 094

HAU

ST. A

NL.

O1 Q

613 0

HS

GIT

TER

RO

ST

1 613

O1 Q

611 0

ST1 6

11

HAUSTECHNISCHE ANLAGE

O1 Q 614 0 HS

LUFTFÜHRENDER SCHACHT

1 614

HAUS

TECH

N. A

NLAG

E

O1 T

068 0

HS

1 068

B

SCHI

EBEW

ANDL

AGER

O1 T

067 3

BT

1 E 06

7 D

HAUS

TECH

NISC

HE A

NLAG

E

O1 T

068 0

HS

1 068

A

PERSONENAUFZ.

O1 Q 526 0 PA

182.5/152.5cm1 526

HAUSTECHNISCHE ANLAGE

O1 Q 524 0 HS

LUFTFÜHRENDER SCHACHT

1 524

O1 Q

111 0

ST1 1

11

SCHLEUSE

O1 E 069 0 OO

5.67m2

VELOUR

RH=271.5

1 069

LASTENAUFZUG

O1 Q 517 0 LA

639/320cm1 517

HAUSTECHNISCHE ANLAGE

O1 Q 514 0 HS

LUFTFÜHRENDER SCHACHT

1 514GITTERROST

FEUERWEHRAUFZ.

O1 Q 516 0 PA

182.5/152.5cm1 516

PERSONENAUFZ.

SCHWACHSTROMVERSTÄRKER

O1 T 071 0 HT

20.90m2

PVC 100 kOhm1 071

HAUS

TECH

NISC

HE A

NLAG

E

O1 T

072 0

HS

1 072

(O1 E

067 2

OO)

(1 E 0

67 C)

LUFT

RAUM

SAA

L E

O1 E

067 0

OO

1 E 06

7 A

HAUST. ANLAGE

O1 Q 422 0 HS

GITTERROST1 422

HAUST. ANLAGE

O1 Q 423 0 HS

GITTERROST1 423

HAUSTECHNISCHE ANLAGE

O1 Q 424 0 HS

NICHT LUFTFÜHRENDER SCHACHT

1 424 GITTERROST

SCHLEUSE

O1 Q 420 0 ST

3.48m2

KUNSTSTPL.1 420

O1 Q 421 0 ST1 421

Q4.2

LASTENAUFZUG

O1 Q 427 0 LA

639/320cm1 427

HAUSTECHNISCHE ANLAGE

O1 Q 414 0 HS

LUFTFÜHRENDER SCHACHT

1 414 A

O1 Q 411 0 ST1 411

Q4.1

SCHLEUSE

O1 Q 410 0 ST

3.48m2

KUNSTSTPL.1 410

PERSONENAUFZ.

HAUS

TECH

NISC

HE A

NLAG

E

O1 Q

314 0

HSNI

CHT

LUFT

FÜHR

ENDE

R SC

HACH

T

1 314

GI

TTER

ROST

HAUST.ANLAGEO1 Q 312 0 HSGITTERROST

1 312

HAUST.ANLAGEO1 Q 313 0 HSGITTERROST

1 313

LAST

ENAU

FZUG

O1 Q

317 0

LA63

9/32

0cm

1 317

O1 Q 311 0 ST

1 311

SCHLEUSEO1 Q 310 0 ST3.48m2KUNSTST.PL.

1 310

Q3.1

HAUS

TECH

NISC

HE A

NLAG

E

O1 Q

324 0

HSLU

FTFÜ

HREN

DER

SCHA

CHT

1 324

A

SCHLEUSEO1 Q 320 0 ST3.48m2KUNSTST.PL.

1 320

O1 Q 321 0 ST

1 321

Q3.2

PERSONENAUFZ.

1 326

Q4.3O1 Q 431 0 ST

GRANITPLATTEN1 431

PUTZRAUM

O1 Q 434 0 PU

8.95m2

KUNSTSTEINPL.1 434

O1 Q 433 0 RT1 433

HAUST. ANL.

O1 Q 432 0 HS1 432

WR.H.

11.67m2

RH=273.6

WC

1.07m2

WASCHR. HERREN

O1 Q 436 0 WC

8.78m2

STEINZEUGPL.

RH=273.6

1 436

WASCHR. DAMEN

O1 Q 437 0 WC

9.17m2

STEINZEUGPL.1 437

WC

1.04m2

WC

1.04m2

WASCHR. D.

17.30m2

RH=273.6 Q3.3

O1 Q

331 0

STGR

ANIT

PLAT

TEN

1 331

O1 Q 338 0 RT

1 338

HT-ANLAGEO1 Q 333 0 ST

1 333

PERS

. AUF

Z.O1

Q 33

2 0 PA

100/

135c

m

1 332

WR.H.

11.67m2

WC

1.07m2

WC

1.04m2

WASCHR. DAMENO1 Q 334 0 WC

9.17m2STEINZEUGPL

RH=273.6

1 334

WASCHR. D.17.30m2

WC

1.04m2

WC

1.07m2

WC

1.04m2WC

1.04m2WC

1.04m2

Q2.3

O1 U

261 0

GG28

.64m

2VE

LOUR

RH=3

241 261

BÜROO1 U 26520.91m2VELOUR

1.97

BÜRO O1 U 26421.90m2VELOUR

1.96

O1 Q

230 0

STGR

ANIT

PLAT

TEN

1 230

PUTZ

RAUM

O1 Q

238 0

PU12

.32m

2KU

NSTS

TEIN

PL.

1 238

HAUSTECHN. ANL.

O1 Q 233 0 HS

1 233

FOYERO1 O 245 0 FO

160.99m2EICHENBRETTBELAG

RH=270

1 245

WASCHR. DAMENO1 Q 235 0 WC

9.17m2STEINZEUGPL.

RH=273.6

1 235

WASCHR. D.9.61m2

PISSOIR

7.12m2

WC

1.07m2

WC

1.07m2

WC

1.07m2

WC

1.04m2WC

1.07m2WC

1.09m2WC

1.09m2 WASCHR. HERRENO1 Q 237 0 WC

1.92m2STEINZEUGPL.

1 237

O1 V 281 0 TR1 281

HAU

ST. A

NL.

O1 Q

122 0

HS

GIT

TER

RO

ST

1 122

SCH

LEU

SE

O1 Q

120 0

ST3.

48m

2KU

NST

ST.P

L..

1 120

O1 Q

121 0

ST1 1

21

HAU

ST. A

NL.

O1 Q

123 0

HS

GIT

TER

RO

ST

1 123

VER

KEH

RSF

LÄC

HE

O1 E

073 0

GG

7.88

m2

VELO

UR

RH

=270

1 073

(O1 E

067 1

OO)

(1 E 0

67 B)

ALLGEMEINE VERKEHRSFL. GELERIEFLÄCHE

O1 J 034 0 EH2291.89m2GRANITPLATTENRH=270

1 034 A

HAUSTECHNISCHE ANLAGE

O1 Q 114 0 HS

LUFTFÜHRENDER SCHACHT

1 114 A

PAGULADECKE

(O1 F 000 2 OO)(1 F 000 C)

ABSTELLRAUM

O1 Q 414 1 AR

GITTERROST1 414 B

O1 J 040 0 RT1 040

O1 J 041 0 ST1 041

O1 J 043 0 RT

1 043 O1 J 044 0 ST

1 044

ALLG. VERKEHRSFL.

O1 J 034 0 EH2291.89m2

GRANITPLATTEN

RH=270

1 034 A

O1 Q

231 0

STGR

ANIT

PLAT

TEN

1 231

WC

1.04m2

WR. H.

5.91m2

O1 Q

330 0

STGR

ANIT

PL.

1 330

PISS.R.

11.18m2

WASCHR. HERRENO1 Q 335 0 WC

8.78m2STEINZEUGPL

RH=273.6

1 335

WC

1.04m2

WC

1.07m2

WC

1.07m2

HT-ANLAGE

O1 Q 430 0 ST

GRANITPLATTEN1 430

PISSRAUM

11.18m2

WC

1.07m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.07m2

O1 Q 531 0 ST

GRANITPLATTEN1 531

WC

1.04m2WC

1.04m2

WC

1.04m2

ABST

ELLR

AUM

O1 Q

324 1

ARGI

TTER

ROST

1 324

B

GRAN

ITPL

ATTE

N

SCHIEBEWAND SCHIEBEWAND

BESPRECHUNGSRAUM

O1 J 241 1 BR

RH=324

1.86

PARKETT

BÜROO1 U 26620.91m2VELOUR

1.98

FUSS

ABST

REIF

GITT

ER

O1 Q 232 0 RT

1 232

WASCHR. HERRENO1 Q 234 0 WC

8.78m2STEINZEUGPL.

RH=273.6

1 234

WASCHR. DAMENO1 Q 236 0 WC

1.92m2STEINZEUGPL.

1 236

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

WC

1.04m2

VERS. WCO1 Q 336 0 WC5.54m2STEINZEUGPL

RH=273.6

1 336

PUTZRAUMO1 Q 337 0 PU8.85m2KUNSTSTEINPL.

1 337

TELEFONZ.

TELEFONZ.

FUSSABSTREIFGITTER

VERS. WC.

O1 Q 435 0 WC

5.54m2

STEINZEUGPL.

RH=273.6

1 435

TELEFONZ.

TELEFONZ.

WC

1.04m2

WC

1.07m2

WC

1.04m2

WC

1.04m2

ABSTELLRAUM

8.06m2

STEINZEUGPL.

RH=277.7

GRANITPLATTEN

WC

1.07m2

WC

1.07m2

FOYER

O1 L 549 0 FO

160.99m2

EICHENBRETTBELAG1 549

PAGULADECKE

(O1 F 000 1 OO)(1 F 000 B)

LUFTRAUM SAAL F

O1 F 000 0 OO1 F 000 A

BESUCHERGALERIE (PRESSEGALERIE)

O1 Q 028 0 OO31.59m2VELOUR

1 028DOLMETSCH REGIE

O1 F 019 0 DR21.63m2VELOUR

1 019

VER

KEH

RSF

LÄC

HE

O1 F

020

0 GG

7.88

m2

VELO

UR

RH

=270

1 020

AB

STEL

LRAU

M

O1 F

021 0

AR4.

32m

2PV

C

1 021

DOLMETSCH KAB.

O1 F 018 0 DO6.81m2VELOUR

1 018

WASCHR. H.

O1 F 022 0 WC2.27m2STEINZ.PL.RH=273.6

1 022

WC

1.51m2

WC

1.07m2

WR. D.

O1 F 023 0 WC3.84m2STEINZ.PL.RH=273.6

1 023

WC

1.07m2

DOLMETSCH KAB.

O1 F 017 0 DO6.84m2VELOUR

1 017 PUTZRAUM

O1 J 038 0 PU4.86m2KUNSTST.PL.

1 038

DOLMETSCH KAB.

O1 F 016 0 DO8.07m2VELOUR

1 016

DOLMETSCH KAB.

O1 F 015 0 DO

6.64m2

VELOUR1 015

LICHTREGELGERÄTERAUM

O1 F 007 1 EZ

10.99m2

PVC 100 kOhm1 007 B

ABSTELLR. F. ORF GERÄTE

O1 F 024 0 AR

6.89m2

KUNSTSTEINPL.1 024

ABSTELLR. F. SCHEINWERFER M

ONITORE

O1 F 025 0 AR

9.66m2

KUNSTSTEINPL.1 025

PROJEKT. KAB.

O1 F 014 0 PK

21.87m2

PVC 100 kOhm

RH=270

1 014

DOLMETSCH KAB.

O1 F 013 0 DO

6.64m2

VELOUR1 013

DOLMETSCH KAB.

O1 F 012 0 DO

8.07m2

VELOUR1 012

PRES

SEGA

LERI

E (B

ESUC

HERG

ALER

IE)

O1 F

003 0

OO31

.59m

2VE

LOUR1 0

03

VERKEHRSFLÄCHE

O1 F 006 0 GG7.88m2VELOURRH=270

1 006

ABSTELLRAUMO1 F 026 0 AR2.23m2VELOUR

1 026

VERKEHRSFLÄCHE

O1 F 007 0 GG67.64m2VELOUR

1 007 A

KOM

MEN

TATO

RKAB

.

O1 F

011 0

RF6.

84m

2VE

LOUR1 0

11

KOM

MEN

TATO

RKAB

.

O1 F

010 0

RF6.

81m

2VE

LOUR1 0

10

KOM

MEN

TATO

RKAB

.

O1 F

009 0

RF6.

81m

2VE

LOUR1 0

09

ORF-

REGI

EO1

F 00

8 0 RF

14.3

4m2

VELO

UR1 008

RH

=271

.5

BESUCHERGALERIE (PRESSEGALERIE)

O1 E 095 0 OO31.59m2VELOUR

1 095

ORF REGIKAB.

O1 E 075 0 RF14.34m2VELOUR

1 075

ABST

ELLR

AUM

O1 E

093 0

AR4.

32m

2PV

C

1 093

KOMMENTATORKAB.

O1 E 076 0 RF6.81m2VELOUR

1 076

WASCHR. HERREN

O1 E 092 0 WC2.29m2STEINZ.PL.RH=273.6

1 092

WC

1.52m2

RH=273.6

WASCHR. DAMEN

O1 E 091 0 WC3.84m2STEINZ.PL.RH=273.6

1 091

KOMMENTATORKAB.

O1 E 077 0 RF6.81m2VELOUR

1 077 WC

1.07m2

WC

1.07m2

KOMMENTATORKAB.

O1 E 078 0 RF6.84m2VELOUR

1 078

PUTZRAUM

O1 J 037 0 PU4.86m2KUNSTSTEINPL.

1 037

DOLMETSCHKABINE

O1 E 079 0 DO8.07m2VELOUR

1 079

DOLMETSCHKABINE

O1 E 080 0 DO6.64m2VELOUR

1 080

LICHTREGELGERÄTER.

O1 E 074 1 EZ10.99m2PVC 100 kOhm

1 074 B

PROJEKTIONSKABINE

O1 E 081 0 PK21.87m2PVC 100 kOhm

1 081

ABST

ELLR

. F. S

CHEI

NW.,

MON

ITOR

E

O1 E

089 0

AR9.

66m

2KU

NSTS

TEIN

PLAT

TEN

1 089

ABST

ELLR

. F. O

RF-G

ERÄT

E

O1 E

090 0

AR6.

89m

2KU

NSTS

TEIN

PLAT

TEN

1 090

DOLMETSCHKABINE

O1 E 082 0 DO6.64m2VELOUR

1 082

DOLMETSCHKABINE

O1 E 083 0 DO8.07m2VELOUR

1 083

RH=343.5

PRESSEGALERIE (BESUCHERGALERIE)

O1 E 070 0 OO

31.59m2

VELOUR1 070

VERKEHRSFLÄCHE

O1 E 074 0 GG

67.64m2

VELOUR

RH=270

1 074 A

ABSTELLRAUM

O1 E 088 0 AR

2.23m2

PVC

1 088

TELEFONZELLEN1.23m2

1.23m2

VERKEHRSFLÄCHE

O1 E 087 0 GG

7.88m2

VELOUR

RH=270

1 087

RH=324

DOLMETSCH REGIE

O1 E 086 0 DR

21.68m2

VELOUR1 086

DOLMETSCHKABINE

O1 E 085 0 DO

6.81m2

VELOUR1 085

DOLMETSCHKABINE

O1 E 084 0 DO

6.84m2

VELOUR1 084

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

RH

=324

RH=2

70

RH=2

52RH

=270

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

RH

=343

.5

2 BILDELEMENTE 60/269CM

2 BILDELEMENTE 50/269CM

RH

=324

RH=270

RH=252

RH=270

RH=3

43.5

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

ZUL

ABL

EV

1 BI

LDEL

EMEN

T 10

3.5/

269C

M,

3 BI

LDEL

EMEN

TE 1

17/2

69C

M

FALTWAND

FALTWAND

RH=324

RH=270

RH=2

70RH

=324

RH=2

70RH

=324

RH=3

24RH

=324

1.1

BILD

TEPP

ICH

GRÖS

SE 6

75x2

43 C

M

SOCK

ELHÖ

HE 2

7 CM

RH=270

RH=324RH=270

1.2 BILDTEPPICH

GRÖSSE 675x243 CM

SOCKELHÖHE 27 CM

RH=270

RH=324

RH=270

RH=324

RH=270

FOYER N

O1 J 241 0 DF

597,60m2

PARKETT

RH=324

1 241 A

200210 200

210LOUNGE 8

95,02m2

LOUNGE 197,68 m2

UUK +23.02

UUK +22.91

UUK +23.14

UUK +23.02

UUK +23.14

UUK +23.14

99126

54126

99126

54126

183189

183189

183189

183189

183189

54126

99126

99126

54126

183243

183243

183243

183243

183243

183189

63189

63189

93189

93189

63189

63189

93189

93189

63189

63189

93189

93189

183189

183189

183189

183189

183189

90210

T30110234

110

210

T30

120

217.

5

55.8

210.

3

55.8

210.

3

55.8

210.

3

55.8

210.

3

139

91124

110

210

T30

120

217.

5

139

91124

210 217.5

85210

T30 100217.5

90210

T30

110234

110210

T30

120217.5

90210

T30

110210

T30

120217.5

31277

76139

91124

110234

110210

T30

120217.5

90210

T30110234

110210

T30

120217.5

90210

T30110234

31277

76139

91124

80216

T30

120

210

T30

120

210

T30

120

210

120210

T30

120210 80

210

80210

80207.2

55.8

210.

3

80210

80207.2

55.8

210.

3

55.8

210.

3

80210

120210

80210

80210

T30

80210

120210T30

80210

80210

80210

80210

120210

T30

120210

320252

T30

80210

T30

120210

T30

120210

120210

80210

80210

80210T30

80210T30

80210

80212

80212

210 217.5 210 217.5

85210

T30 100217.5

110

210

T30

120

217.

5

55.8

210.

3

55.8

210.

3

55.8

210.

3

55.8

210.

3

85210

T30 100217.5

110

210

T30

120

217.

5

139

91124

139

91124

110210

T30

120217.5

110210

T30

120217.5

110210

T30

120217.5

110210

T30

120217.5

9021

0

110

234

T30

9021

0

110

234

T30

90 210

T30

110

234

90 210

T30

110

234

3127

7

7613

9

9112

4

31 277

76 139

91 124

80216

T30

120

210

T30

120

210

120

210

120210

T30

80210

80207.2

55.8

210.

3

55.8

210.

3

55.8

210.

3

80207.2

120210

80210

80210

120210

80210

80210

T30

80210

80210

80210

80210

120210

T30

80210

115217.5

100210

100210

115217.5

115

217.

5

100

210

162210

138

217.

5

120

210

120210

120210T30

320252T30

80 210

T30

120210

120

210

T30

80 212

80 212

80 210

80 210

T30 12

021

0

80 210

80 210

80 210

80 210

T30

85210T30

100217.5

85210T30

100217.5

110210

T30

120217.5

110210

T30

120217.5

320252

T30

110210

T30

120217.5

110210

T30

120217.5

31277

76139

91124

31277

76139

91124

90209.5

T30

90209.5

T30

85 210

T30

100

217.

5

85 210

T30

100

217.

5

320252

T30

110210

T30

120217.5

110210

T30

120217.5

110210

T30

120

110210

T30

120217.5

3127

7

7613

9

9112

4

31 277

76 139

91 124

90 209.

5

T30

140210

213

213

213

213

183210

18386.5

183210

208.

521

0T3

0

223.

521

0T3

0

100

217.

5

85 210

T30

80 207.

294 214.

7

80 207.

294 214.

7

55.8210.3

55.8210.3

55.8210.3

193.

521

0T3

0

223.

521

0T3

0

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

80207.2 80

207.2

80207.2 80

207.213

521

0T3

0

165

210

T30

183210

21321015

521

7.5

T30

140

210

85210

8596

183210 18388.5

213210 21388.5

85 210

85210

8596

85210

8596

85 210

85 210

85 96

213210 21388.5

183210 18388.5165

210

T30

180

217.

5

213210

183210

150

217.

5

135

210

T30

165

210

T30

80210

T30

95234

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

80 207.

295 214.

7

95 214.

7

95 207.

211

021

4.7

80212

80212

135217.5

120210

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

95207.2

110214.5

80212

80212

120210

135217.5

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

115

217.5100210

135210

T30

165210

T30

183210

213210

21388.5

210

21388.5

213210

18388.5

183210

165210

T30180217.5

183210

213210

165210

T30

150

217.5135210

T30

214.7

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

55.8210.3

193.5210

T30

223.5210

T30

140210

T30155217.5

8596

210

223.5210

T30

85210

100217.5

T30

+19.50+19.50

+19.66

+18.792

+19.

66

+19.

66

+18.

94

+18.79

+18.62

+18.94

+19.12 +18.67

+18.80

+18.

79

+19.51

+19.51+19.66+19.66

+18.792

+19.

66

+18.80+1

8.98

+19.

12

+19.

66

+19.

51

+19.

12+1

8.98

+19.66+19.51

+18.80

+18.80

+19.66

+19.66

+20.528

+18.792

+18.79

+18.94

+19.20+18.62

+19.51+18.94

+18.79

+19.66

+19.66

+19.66

+19.66

+20.528

+18.792

+19.50

+19.50

+19.66+19.51

+19.66

+18.98

+19.12

+18.98

+19.50 +19.50

+19.

66

+20.

528

+18.792

+18.94

+19.12 +18.62

+18.80

+18.

94

+18.79

+19.

66

+18.79

+19.51

+18.80

+19.

12+1

8.98

+19.

66+1

8.98

+19.12

+18.98

+18.

80

+19.66

+19.66

+18.

792

+20.528

+19.

66

+18.

80

+19.

66+1

9.51

+18.

79

+19.66

+18.

94

+18.

79

+18.

962

+19.

12

+18.

94

+19.

50

+20.528

+18.

792

+19.66

+19.

66

+19.66

+19.66+19.51

+19.

50

+19.12+18.98

+19.66

+19.50

+19.66

+19.66

+18.792

+20.528

+19.66

+19.66

+17.23

+19.66

+17.23

+18.

792

+20.528

+19.

66

+19.66

+19.66

+19.

50

+20.528

+19.

66

+19.66

+18.

792

+19.66

+18.792

+20.528

+19.66

+19.66

+19.66

+19.30

+19.62

+18.00

+18.

00

+19.

62

+19.62+19.66

+19.84

+19.84

+19.66

+19.66

+19.84

19.84

+19.66

+19.

66

+19.

66

+19.

66+1

9.62

+19.

66+1

9.62

+19.

66

+19.

66

+19.66

+19.66

+19.66

+19.51+19.66

+19.51

+19.66

+19.51

+19.66

+19.62

+19.51

+19.66

+19.66

+19.66

+19.

84+19.

66

28 STH17.35/26

28 STH17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

4 STH18/26

3 STH18/26

4 STH

18/26

3STH

18/26

28 S

TH17

.35/

26

28 STH17.35/26

28 S

TH17

.35/

26

28 STH17.35/26

28 S

TH17

.35/

26

28 STH17.35/26

28 S

TH17

.35/

26

4 STH18/26

3 STH18/26

4 ST

H18

/26

3 ST

H18

/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 S

TH17

.35/

2628 S

TH17

.35/

26

28 S

TH17

.35/

26

28 S

TH17

.35/

26

14 STH 17.35/30

14 STH 17.35/30

14 S

TH 1

7.35

/30

14 S

TH 1

7.35

/30

10 STH16.20/30

28 STH17.35/26

28 STH17.35/26

28 STH17.35/26

28 STH17.35/26

28 STH17.35/2628 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

28 STH

17.35/26

19.57

19.60

240

210

FALTWAND

FALTWAND

240210

174210

RH=264

174 210

LOUNGE 8

95.02m2

LOUNGE 1

97.68m2

Galerie

Kombi

FOYER N

N2

L1L8

FOYE

R M

Q3.3Q4.3

Q5.3 Q2.3

FALTWAND

PH=1

00 ü

. FBO

K

PH=1

00 ü

. FBO

K

VSG

VERG

LASU

NG E

I30

PH=F

BOK

170220

EI�30-C

8022

0EI�30-C

100220

170220

EI�30-C

130324

8022

0EI�30-C

100220

KONFERENZRAUM N

XXXXXXXXXXX357.07m2

EICHENBRETTBELAG

XXXX

REGI

E/ T

ECHN

IK 1

XXXX

XXXX

XXX

10.4

8m2

EICH

ENBR

ETTB

ELAG

XXXX

FALT

WAN

DPAR

KRAU

M

XXXX

XXXX

XXX

5.59

m2

EICH

ENBR

ETTB

ELAG

XXXX

REGI

E/ T

ECHN

IK 2

XXXX

XXXX

XXX

10.3

8m2

EICH

ENBR

ETTB

ELAG

XXXX

LOUNGEXXXXXXXXXXX

38.32m2TEPPICH

XXXX

90210

3287

5646

5644

2764

2691

2498

25122512

2485

2485

2945 2595

2548

24812485

88 Posterboards176 Posterflächen (H 250cm x W 100cm)

24 Stände à 9m² (3 x 3m)

CATERING CATERING

H/B = 420 / 594 (0.25m²) Allplan 2015

-------

Halle: Messe:

Standnr.:

M: Blatt:

Benennung:

Projektleiter:

Bearbeiter:

Alle Angebotsunterlagen bleiben Eigentum der Expoxx Messebau GmbH und können jederzeit zurückverlangt werden. Sie dürfen nicht vervielfältigt oder Dritten zugänglich gemacht werden.

Datum:

1:Kunde:

Auftragsnr.: Zng-Nr Plan-Nr

Projekt:

000000

EXPOXX MESSEBAU GmbHMesseplatz 1, Postfach 277, A-1021 WienT: +43 (0) 1 / 727 20-6101F: +43 (0) 1 / 720 [email protected] - UID-Nr.: ATU 37633003

2018

Ges. -

BVA2200

PBP World M. Ebner04093.2020.002

001Lvl 1

031

05.03.

Vienna, Austria08 - 11 Feb. 2021Austria Center ViennaBruno-Kreisky-Platz 1, 1220 Vienna, Austria, www.acv.atFLOOR 1

Floor 0 Auditoria F2Floor 1 Auditoria N

Floor 1 Auditoria M Floor 2 Plenary A

Auditoria M Auditoria N

Design height 2,30 m

6364

65

62

59 60 61

57 58

6667

68 7071

72

69

7374

75

78 79 80

76 77

Melt-Prep/KM-

LVision/

Colvi-

stec

Ieon

nano-

drugs

Baker

HicksSensum Spray-

ing Sys-tem Nano-form

MDPI

Bioneer

ElsevierAPV

Harro

flige

r / D

S Te

ch-

nolo

gyRo

tten-

dorf

Synt

e-go

nAD

M-

SIO

Frew

itt

open

closed

reserved

as of June 2020

Page 11: Vienna...Dear participant, abstract presenter and exhibitor of the 12th PBP World Meeting, The 12th PBP World Meeting in Vienna, which was initially to be held on 23-26 March 2020,

Registration Fees

Full participation includes admission to scientific congress/exhibition, dinner event, welcome reception, coffee breaks and congress documentation consisting of a detailed printed programme and a menu-guided USB-Stick containing all abstracts.

Full participation Student1 member2 360.00 € * non-member 520.00 € *Academia member2 640.00 € * non-member 840.00 € *Industry member2 1690.00 € * non-member 2090.00 € *

* price excl. Austrian VAT

Day ticket (not available for student registration):Day ticket: 50 % of the corresponding full-participation fee. Day tickets include admission to the scientific congress/exhibition for the corresponding day. It does not include admission to social events.

Accompanying personsTickets for the welcome reception and the dinner event for accompanying persons are available for 96.00 € excl. Austrian VAT for both events and can be ordered online. 1 Students are requested to send a copy of their valid student card/pass or a written confirmation of their supervisor. Student rate is only available for full time students. 2 Members of all participating societies are requested to upload a membership proof (copy of membership card or membership invoice) to qualify for membership fee.

Venue

ACV Austria Center Vienna

Bruno-Kreisky-Platz 11220 ViennaAustria

www.acv.at

Headquarter Hotel

Lindner Hotel am Belvedere **** Rennweg 12 1030 Vienna www.lindner.de/en/vienna-hotel-am-belvedere +43 1 794 77 932 [email protected]

Media Partner