Tender Call No. 149-2017 Addendum No. 3 Landfill Gas Remediation for Four (4) Priority Sites, for requalified contractors through Request to Prequalify (RTP) No. 3907-16-3092 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Elena Caruso Manager Goods & Services May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017 Re: Landfill Gas Remediation for Four (4) Priority Sites, for prequalified contractors through Request to Prequalify (RTP) No. 3907-16-3092 Contract No. 17ECSMl-02SW Closing Date: May 31, 2017, 12:00 O'clock (Noon) Local Time Please refer to the above Tender document in your possession and be advised of the following: 1. REVISIONS: (continued from Addendum No. 2) R10: Pricing Form with revised items A.12, A.22, A.23, A.24, A.25, A.31, A.34, B.11, B.19, B.25, C.12, C.21, C.22, C.23, C.29, C.30, D.11, D.25, D.26, D.27, E.12, E.21, E.27, and E.29, including the additions of A.31a, A.31b, B.25a, B.25b, C.29a, C.29b, C.30a, C.30b, E.27a, and E.27b. Use the attached REVISED Tender Submission Package Pricing Form in your submission. R11: Section 4 Scope of Work Construction Staging and Phasing. Phases 2 (Closed Disco Landfill - Area C) and 3 (Closed Disco Landfill - Areas A & B) revised from Provisional to Base Scope, resulting from MOECC issue of Environmental Compliance Approval (Air) No. 5326-AKWL4E for the Disco A & B and Disco C systems on May 18, 2017. Replace page 4-3 with the attached. R12: Section 4A Special Provision 2 Construction Constraints GN102SP last page. Replace page 4A-36 with the attached. R13: Section 4A Special Provision 7: Pre- and Post-Construction Condition Surveys GN116SP. Replace pages 4A-40 to 4A-42 with the attached. R14: Remove and replace drawings (provided on CD with original tender) as follows:

VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Tender Call No. 149-2017 – Addendum No. 3

Landfill Gas Remediation for Four (4) Priority Sites, for requalified contractors through Request to Prequalify

(RTP) No. 3907-16-3092

Michael Pacholok, Chief Purchasing Official and Director

Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2

Elena Caruso Manager Goods & Services

May 24, 2017

VIA INTERNET POSTING

(4 pages + 3 attachments)

ADDENDUM NO. 3

Tender Call No. 149-2017

Re: Landfill Gas Remediation for Four (4) Priority Sites, for prequalified contractors through Request to Prequalify (RTP) No. 3907-16-3092

Contract No. 17ECS–Ml-02SW

Closing Date: May 31, 2017, 12:00 O'clock (Noon) Local Time

Please refer to the above Tender document in your possession and be advised of the following: 1. REVISIONS: (continued from Addendum No. 2) R10: Pricing Form with revised items A.12, A.22, A.23, A.24, A.25, A.31, A.34, B.11,

B.19, B.25, C.12, C.21, C.22, C.23, C.29, C.30, D.11, D.25, D.26, D.27, E.12,

E.21, E.27, and E.29, including the additions of A.31a, A.31b, B.25a, B.25b,

C.29a, C.29b, C.30a, C.30b, E.27a, and E.27b. Use the attached REVISED

Tender Submission Package Pricing Form in your submission.

R11: Section 4 Scope of Work – Construction Staging and Phasing. Phases 2 (Closed

Disco Landfill - Area C) and 3 (Closed Disco Landfill - Areas A & B) revised from

Provisional to Base Scope, resulting from MOECC issue of Environmental

Compliance Approval (Air) No. 5326-AKWL4E for the Disco A & B and Disco C

systems on May 18, 2017. Replace page 4-3 with the attached.

R12: Section 4A Special Provision 2 Construction Constraints – GN102SP last page.

Replace page 4A-36 with the attached.

R13: Section 4A Special Provision 7: Pre- and Post-Construction Condition Surveys –

GN116SP. Replace pages 4A-40 to 4A-42 with the attached.

R14: Remove and replace drawings (provided on CD with original tender) as follows:

Page 2: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Tender Call No. 149-2017 – Addendum No. 3

Landfill Gas Remediation for Four (4) Priority Sites, for requalified contractors through Request to Prequalify

(RTP) No. 3907-16-3092

Drawing No. 1152-2016-01-050 (C403) is available on CD from Senior Buyer

Ted Justin from City Hall, 100 Queen St. West, Toronto 17th floor west tower.

2. QUESTIONS & ANSWERS Q18. With regards to Specification Section 15060-2.10 Pipe Insulation, are all pipes to be

insulated? A18. Per Drawing No. 1152-2016-01-002 (G002), General Notes, LFG Header and Lateral

Pipes note no. 9, LFG header and lateral pipes shall be insulated with a frost box where cover is less than 1.2 m.

Q19. With regards to Tender Item A.34, please provide diameter of wells to be abandoned? A19. Monitoring well construction associated with Item A.34 is unknown. For Tender

purposes, assume that the diameter of the monitoring well pipe is 50 mm and its depth is 10 metres.

Q20. For all sites A, B, C, D, E. With regards to Site A Tender Item A.22 through A.25, are

100 mm long lateral piping from well to LFG header including connections? A20. No, these are not including connections. Q21. Please explain Tender Item A.31? States quantity 26 wellhead assembly including

connection to LFG header valve. A21. The valve referenced in Item A.31 is the 100 mm diameter HDPE ball valve. LFG

Header Pipe Isolation Valves are covered under Item D.40. Q22. There are only 25 wells and 25 connections to LFG header. With regards to Tender

Items A.22 through A.25 do they include connection and valve as does A.31? A22. No, they do not include connection and valve. The Pricing Form descriptions have been

revised accordingly. Q23. With regards to Drawing G004, detail 6: What material would you like the 12.5mm valve

made of? A23. The valve will be made of PVC. Q24. With regards to Drawing G004, detail 6: What material would you like the quick-connect

made of?

A24. The quick-connect will be 1/4 NPT male thread non-valved metal coupling body.

Q25. With regards to Drawing G004, detail 6: Do you need both a male and female quick-

connect ends as part of the assembly? A25. Only a female quick-connect ends will be part of the assembly.

Q26. With regards to Drawing G004, detail 6: Is this quick-connect also 12.5mm? A26. No, this quick connect will be 1/4 NPT.

Page 3: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Tender Call No. 149-2017 – Addendum No. 3

Landfill Gas Remediation for Four (4) Priority Sites, for requalified contractors through Request to Prequalify

(RTP) No. 3907-16-3092

Q27. Do you have any information on the gas vent abandonments? Approximate depths and

pipe diameter? A27. Passive gas vent construction associated with Item E.29 is unknown. For the Tender

purposes, assume that the passive gas vent is 1 metre wide and its depth is 1.5 metres. This item includes removal of any horizontal and vertical vent piping.

Q28. SP1 in Addendum #1 has revised the number of boreholes per site to 15 from originally

8. The tender item for the Geotechnical Reports is still 8 units each. Please confirm the numbers to use.

A28. The REVISED Tender Submission Package Pricing Form will be revised to reflect 15

boreholes per site under Items A.12, B.11, C.12, D.11, E.12. Q29. Regarding the Pre-construction surveys in Section 7, the list of buildings to include is

complete for Disco and Sunrise and includes all buildings within the 30 metre radius. However, Stan Wadlow and Coe Hill are incomplete. The 30 metre radius could include many more buildings. Please clarify which buildings are to be included. Alternatively, please clarify if the 30 metre radius is based upon centreline of the trench, the furtherest extend of work, e.g. asphalt replacement, or some other measure. Further, does the 30 metre radius have to touch the building or just the property and is there a minimum amount included in the 30 metre radius to consider the property to be included.

A29. The intent of Section 4A – Special Specifications, Special Provision (SP) 7: Pre- and

Post-construction Condition Surveys - GN116SP, is that any structure that falls within a 30 metre radius of the work area is included in the Pre-construction Condition Survey. The work area can be defined as the outer most limit that the Contractor will be working, including areas 30 metre beyond any trench, asphalt/sidewalk restoration activities, or equipment that may be working beyond these areas. Refer to Revision 12.

Q30. Drawing 1152-2016-01-050, C403 Addendum #1 detail shows the same elevation for the

header as the existing ground. Please clarify. A30. Drawing No. 1152-2016-01-050 (C403) has been revised and is attached. A CD with the

full sized drawings is available from the Senior Corporate Buyer. Q31. Could we have full size drawings of the Addendum #1 drawings, similar to the rest of the

tender drawings? A31. A CD with the full sized drawings from Addendum 1 and Addendum 3 is available from

the Senior Corporate Buyer. Q32. Regarding the post construction survey, we understand that only the properties claiming

an impact from the work need to be resurveyed, and we allow for the first 10. However, the size of properties ranges from small single family residential to large commercial buildings. The range of effort required is substantial and with no indication of which we should allow for in the required 10 surveys. Further, in the case of multi-unit residential buildings, if there is a compliant in one unit, would we be required to survey the entire building? Please clarify the post construction survey requirements.

A32. For the post-construction survey, if a survey is required that involves a multiple unit

building assume that up to 3 units will be included. In the event that a complaint is received from one unit, only that unit requires the post-construction survey.

Page 4: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Tender Call No. 149-2017 – Addendum No. 3

Landfill Gas Remediation for Four (4) Priority Sites, for requalified contractors through Request to Prequalify

(RTP) No. 3907-16-3092

Q33. The standard City of Toronto requirement for question cut off of 3 days prior to tender closing was changed in Addendum #1 to May 16, or 7 days prior to closing. Was this intentional and if so can it be amended back to the standard 3 days?

A33. The cut off for questions was already extended. Refer to Addendum No. 2. Q34. Regarding the auto-dialer, it was noted that the vendor could not be located as displayed

(i.e., CL-DIS-LFG-ADL101), nor could the reference be located within the Specifications. Additional information was requested.

A34. Note that the designation CL-DIS-LFG-ADL101, provided in the Drawings (Site specific)

represents the information that is required to be included on the lamacoid nameplate. The auto-dialer is specified in Section 13430, Article 2.10B “The selected Autodialer shall be AlarmAgent by Raco, Model Number 920AA-102DCRT.” Note that the model number should actually be “900AA-102-DCRTG”. Also note that the Antenna, identified in 2.10J should read “Supplier code: 820AA-PAEC1830”.

Q35. Regarding the uninterruptible power supply (UPS), it was noted that the Eaton/Ferrups

1.4 kVA model listed was not recognized or listed via the manufacturer. Clarification was requested.

A35. Note that the model number should be “Eaton Ferrups 1.4 kVA Model No.

FE000BB3A0A0A0A or approved equivalent”.

Please attach this addendum to your Tender document and be governed accordingly.

Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 9 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same. Should you have any questions regarding this addendum, contact Ted Justin, Senior Corporate Buyer at (416) 338-5578 email [email protected]

Yours truly, Leanne Dacosta Supervisor, Goods & Services Purchasing and Materials Management

Page 5: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-1

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

Part A: Closed Disco Landfill – Areas A & B

A.1 SP47 Payment for Bonds 1.00 lump sum

A.2 SP47 Payment for Insurances

1.00 lump sum

A.3 SP47 Mobilization and Demobilization

1.00 lump sum

A.4 SS1 SS2 SS11 SS37 SP2 SP8 SP24 SP47 Section 5A-12 Section 5A-33

TS 1.00

Provide traffic control for maintenance of traffic as per Ontario Traffic Manual (OTM) Book 7 Temporary Conditions

1.00 lump sum

A.5 SS13 SP4 SP7 SP47

Completion of pre- and post-construction condition survey of each business and residence located within or adjacent to the Work, including submission of associated reports

1.00 lump sum

A.6 SP1 SP47 Section 5A-13

Supply, install, and manage “Capital improvement Project Construction Sign” as per contract document

1.00 each

A.7 SP26 SP37 SP47

T-219.130-1 Supply, install, maintain, and remove sediment control fence

250.00 metre

A.8 SP26 SP37 SP47

Supply, install, maintain, and remove temporary Class 1 non-woven geotextile fabric silt control for catchbasins

20.00 each

A.9 SP43 SP47 02821 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Fence removal and restoration

1.00 lump sum

A.10 SP4 SP28 SP47 Section 4A-Attachment 2

Provide as-constructed survey & as-built

1.00 each

Page 6: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-2

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

Section 5A-10

A.11 SP25 SP47 TS 1.10

Supply and install field offices for City staff

6.00 month

A.12 SS5 SS6 SS8 SS13 SP4 SP17 SP18 SP28 SP30 SP37 SP41 SP46 SP47 Section 4-10 Section 4A-5 Section 4A-Attachment 3

Complete geotechnical investigation, including asphalt asbestos testing

15.00 each

A.13 SP29 SP47 Toronto Urban Forestry Spec. OPSS 565

Barrier for tree protection

350.00 metre

A.14 SP4 SP28 SP29 SP47 Section 4A-Arborist Reports

Tree removal 9.00 each

A.15 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Top asphalt restoration – HL3 (40 mm)

2,600.00 square metre

A.16 SP4 SP28 SP37 SP41 SP47 TS 4.60

Cold Mill and Disposal of Asphalt Pavement (40 mm)

2,600.00 square metre

A.17 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – Collector (open cut)

60.00 metre

Page 7: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-3

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

A.18 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – Major Arterial (open cut)

170.00 metre

A.19 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – boulevard/green space/outside roadway (open cut)

120.00 metre

A.20 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-310.010-1 T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – sidewalk (open cut)

30.00 metre

A.21 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-4 LFG header pipe insulation

10.00

metre

A.22 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – Collector (open cut)

10.00 metre

A.23 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – Major Arterial (open cut)

35.00 metre

A.24 SP4 SP28 SP34 SP43 SP47

T-310.010-1 T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – sidewalks (open cut)

10.00 metre

Page 8: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-4

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

01000 02300 02507

A.25 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – boulevard/green space/outside roadway (open cut)

10.00 metre

A.26 SP4 SP28 SP30 SP43 SP47 02300

Rock, shale, and large waste material excavation (Provisional)

200.00 cubic metre

A.27 SS10 SP4 SP28 SP43 SP47 02300

Excavation Work (Provisional)

200.00 cubic metre

A.28 SP4 SP28 SP43 SP46 SP47 02300

Excavation of soft spots (Provisional)

200.00 cubic metre

A.29 SS8 SS35 SP4 SP28 SP17 SP37 SP41 SP42 SP43 SP47 Section 4-12 OPSS.MUNI 1101

Cold Mill and Disposal of Asphalt Pavement Containing Asbestos (Provisional)

2,600.00 square metre

A.30 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction wells, including borehole

130.00 metre

Page 9: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-5

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

A.31a SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration

13.00 each

A.31b SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtenances, including but not limited to wellhead assembly, valve and quick connect assembly, flush mount lockable monitoring well manhole, concrete collar, tee, valve, fittings, all connections including connections to long lateral pipe, excavation, backfill, and restoration

13.00 each

A.32 SS8 SS37 SP2 SP4 SP24 SP28 SP47 OPSS 710

Supply and apply pavement marking, white or yellow, solid or skip lines, 100 mm wide

250.00 metre

A.33 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02521

Drilling Refusal 50.00 metre

Page 10: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-6

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

A.34 SP4 SP28 SP33 SP43 SP47 02522

Monitoring Well Abandonment (Provisional)

20.00 metre

A.35 SP4 SP28 SP36 SP43 SP44 SP47 02300 02507 11550 13122 13420 13430 13622 13623 15010 15060 15075 15700 16000 16010 16060 16075 16123 16131 16140 16150 16411 16470 16505 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Blower Enclosure for Closed Disco Landfill – Areas A&B, including foundation, passive vent system, above grade landfill gas piping, insulation, enclosure structure, doors, locks, lights, gas detection system, autodialler system, heaters, louver, fan, LFG blower, control panel, fencing, all associated electrical wiring, conduits, seals and connection to power supply via underground feeder.

1.00 lump sum

A.36 SP37 SP42 SP43 SP47 Section 4-12

Waste Disposal 5,400 tonne

A.37 SS36 SP47 TS 3.70

Supply and install tactile walking surface indicator – 610 mm width (Provisional)

2.00 each

A.38 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Temporary Top asphalt restoration – HL8 (40 mm)

500.00 square metre

A.39 SP8 SP47

Construct test pits to determine location and depth

31.00 each

Page 11: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-7

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

of utilities – backfill with Granular B (Provisional)

A.40 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill with unshrinkable fill (Provisional)

16.00 each

A.41 SP12 SP47

Construct test pits to determine location and depth of water service – backfill with Granular B (Provisional)

1.00 each

A.42 SS8 SP4 SP28 SP40 SP41 SP42 SP47 TS 4.60

Restoration of existing utility cut repairs (Provisional)

450.00 square metre

Total for Part A: Closed Disco Landfill – Areas A & B

Part B: Closed Disco Landfill – Area C

B.1 SP47 Payment for Bonds 1.00 lump sum

B.2 SP47 Payment for Insurances

1.00 lump sum

B.3 SP47 Mobilization and Demobilization

1.00 lump sum

B.4 SS1 SS2 SS11 SS37 SP2 SP8 SP24 SP47 Section 5A-12 Section 5A-33

TS 1.00

Provide traffic control for maintenance of traffic as per Ontario Traffic Manual (OTM) Book 7 Temporary Conditions

1.00 lump sum

B.5 SS13 SP4 SP7 SP47

Completion of pre- and post-construction condition survey of each business and residence located within or adjacent to the Work, including submission of associated reports

1.00 lump sum

Page 12: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-8

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

B.6 SP1 SP47 Section 5A-13

Supply, install, and manage “Capital improvement Project Construction Sign” as per contract document

1.00 each

B.7 SP26 SP37 SP47

T-219.130-1 Supply, install, maintain, and remove sediment control fence

125.00 metre

B.8 SP26 SP37 SP47

Supply, install, maintain, and remove temporary Class 1 non-woven geotextile fabric silt control for catchbasins

5.00 each

B.9 SP26 SP37 SP47

Terrafix (sediment) Siltsacks in TRCA regulated areas

10.00 each

B.10 SP4 SP28 SP47 Section 4A-Attachment 2 Section 5A-10

Provide as-constructed survey & as-built

1.00 each

B.11 SS5 SS6 SS8 SS13 SP4 SP17 SP18 SP28 SP30 SP37 SP41 SP46 SP47 Section 4-10 Section 4A-5 Section 4A-Attachment 3

Complete geotechnical investigation, including asphalt asbestos testing

15.00 each

B.12 SP29 SP47 Toronto Urban Forestry Spec. OPSS 565

Barrier for tree protection

200.00 metre

B.13 SS8 SP4 SP28 SP41 SP42 SP47

Top asphalt restoration – HL3 (40 mm)

1,900.00 square metre

Page 13: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-9

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

TS 4.60

B.14 SP4 SP28 SP37 SP41 SP47 TS 4.60

Cold Mill and Disposal of Asphalt Pavement (40 mm)

1,900.00 square metre

B.15 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – Local Road (open cut)

160.00 metre

B.16 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – boulevard/green space/outside roadway (open cut)

110.00 metre

B.17 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – parking lot (open cut)

30.00 metre

B.18 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-4

LFG header pipe insulation

15.00

metre

B.19 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – parking lots (open cut)

10.00 metre

B.20 SP4 SP28 SP30 SP43 SP47 02300

Rock, shale, and large waste material excavation (Provisional)

200.00 cubic metre

Page 14: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-10

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

B.21 SS10 SP4 SP28 SP43 SP47 02300

Excavation Work (Provisional)

200.00 cubic metre

B.22 SP4 SP28 SP43 SP46 SP47 02300

Excavation of soft spots (Provisional)

200.00 cubic metre

B.23 SS8 SS35 SP4 SP28 SP17 SP37 SP41 SP42 SP43 SP47 Section 4-12 OPSS.MUNI 1101

Cold Mill and Disposal of Asphalt Pavement Containing Asbestos (Provisional)

1,900.00 square metre

B.24 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction wells, including borehole

75.00 metre

B.25a SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration

13.00 each

B.25b SP4 SP28 SP30

Installation of LFG extraction well appurtenances,

3.00 each

Page 15: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-11

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

including but not limited to wellhead assembly, valve and quick connect assembly, flush mount lockable monitoring well manhole, concrete collar, tee, valve, fittings, all connections including connections to long lateral pipe, excavation, backfill, and restoration

B.26 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02521

Drilling Refusal 50.00 metre

B.27 SP4 SP28 SP36 SP43 SP44 SP47 02300 02507 11550 13122 13420 13430 13622 13623 15010 15060 15075 15700 16000 16010 16060 16075 16123 16131 16140 16150 16411 16470 16505 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Blower Enclosure for Closed Disco Road Landfill – Area C, including foundation, passive vent system, above grade landfill gas piping, insulation, enclosure structure, doors, locks, lights, gas detection system, autodialler system, heaters, louver, fan, LFG blower, control panel, fencing, all associated electrical wiring, conduits, seals and connection to power supply, and associated restoration including coordination with Toronto Hydro for installation of aerial service and utility meter.

1.00 lump sum

Page 16: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-12

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

B.28 SP37 SP42 SP43 SP47 Section 4-12

Waste Disposal 4,000.00 tonnes

B.29 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Temporary Top asphalt restoration – HL8 (40 mm)

500.00 square metre

B.30 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill with Granular B (Provisional)

11.00 each

B.31 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill with unshrinkable fill (Provisional)

16.00 each

B.32 SP12 SP47

Construct test pits to determine location and depth of water service – backfill with Granular B (Provisional)

42.00 each

B.33 SS8 SP4 SP28 SP40 SP41 SP42 SP47 TS 4.60

Restoration of existing utility cut repairs (Provisional)

200.00 square metre

Total for Part B: Closed Disco Landfill – Area C

Page 17: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-13

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

Part C: Closed Coe Hill Landfill – Areas A & B

C.1 SP47 Payment for Bonds 1.00 lump sum

C.2 SP47 Payment for Insurances

1.00 lump sum

C.3 SP47 Mobilization and Demobilization

1.00 lump sum

C.4 SS1 SS2 SS11 SS37 SP2 SP8 SP24 SP47 Section 5A-12 Section 5A-33

TS 1.00

Provide traffic control for maintenance of traffic as per Ontario Traffic Manual (OTM) Book 7 Temporary Conditions

1.00 lump sum

C.5 SS13 SP4 SP7 SP47

Completion of pre- and post-construction condition survey of each business and residence located within or adjacent to the Work, including submission of associated reports

1.00 lump sum

C.6 SP1 SP47 Section 5A-13

Supply, install, and manage “Capital improvement Project Construction Sign” as per contract document

1.00 each

C.7 SP26 SP37 SP47

T-219.130-1 Supply, install, maintain, and remove sediment control fence

80.00 metre

C.8 SP26 SP37 SP47

Supply, install, maintain, and remove temporary Class 1 non-woven geotextile fabric silt control for catchbasins

5.00 each

C.9 SP26 SP37 SP47

Terrafix (sediment) Siltsacks in TRCA regulated areas

15.00 each

C.10 SP4 SP28 SP47 Section 4A-Attachment 2 Section 5A-10

Provide as-constructed survey & as-built

1.00 each

Page 18: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-14

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.11 SP25 SP47 TS 1.10

Supply and install field offices for City staff

6.00 month

C.12 SS5 SS6 SS8 SS13 SP4 SP17 SP18 SP28 SP30 SP37 SP41 SP46 SP47 Section 4-10 Section 4A-5 Section 4A-Attachment 3

Complete geotechnical investigation, including asphalt asbestos testing

15.00 each

C.13 SP29 SP47 Toronto Urban Forestry Spec. OPSS 565

Barrier for tree protection

350.00 metre

C.14 SP4 SP28 SP29 SP47 Section 4A-Arborist Reports

Tree removal 1.00 each

C.15 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Top asphalt restoration – HL3 (50 mm)

1,500.00 square metre

C.16 SP4 SP28 SP37 SP41 SP47 TS 4.60

Cold Mill and Disposal of Asphalt Pavement

1,500.00 square metre

C.17 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-509.010.1 T-509.010.1 T-708.01-3

Supply and install 150 mm SDR21 LFG header pipe – Local (Composite Pavement) (open cut)

20.00 metre

Page 19: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-15

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.18 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4 T-509.010.1

Supply and install 150 mm SDR21 LFG header pipe – Local (Composite Pavement) and Sidewalk (open cut)

110.00 metre

C.19 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – boulevard/green space/off roadway (open cut)

20.00 metre

C.20 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-310.010-1 T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – sidewalk (open cut)

160.00 metre

C.21 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-509.010.1 T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – Local (Composite Pavement) (open cut)

10.00 metre

C.22 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – boulevard/green space/off roadway (open cut)

10.00 metre

C.23 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-310.010-1 T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 long lateral pipe – sidewalk (open cut)

10.00 metre

C.24 SP4 SP28 SP30 SP43 SP47 02300

Rock, shale, and large waste material excavation (Provisional)

200.00 cubic metre

Page 20: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-16

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.25 SS10 SP4 SP28 SP43 SP47 02300

Excavation Work (Provisional)

200.00 cubic metre

C.26 SP4 SP28 SP43 SP46 SP47 02300

Excavation of soft spots (Provisional)

200.00 cubic metre

C.27 SS8 SS35 SP4 SP28 SP17 SP37 SP41 SP42 SP43 SP47 Section 4-12 OPSS.MUNI 1101

Cold Mill and Disposal of Asphalt Pavement Containing Asbestos (Provisional)

1,500.00 square metre

C.28 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction wells, including borehole

220.00 metre

C.29a SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration – Local (Composite Pavement) and Sidewalk

8.00 each

Page 21: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-17

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.29b SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtenances, including but not limited to wellhead assembly, valve and quick connect assembly, flush mount lockable monitoring well manhole, concrete collar, tee, valve, fittings, all connections including connections to long lateral pipe, excavation, backfill, and restoration – Local (Composite Pavement) and Sidewalk

2.00 each

C.30a SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration – sidewalk/boulevard/green space/off roadway

11.00 each

C.30b SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtenances, including but not limited to wellhead assembly, valve and quick connect assembly, flush mount lockable monitoring well manhole, concrete collar, tee, valve, fittings, all connections including

1.00 each

Page 22: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-18

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

connections to long lateral pipe, excavation, backfill, and restoration – sidewalk/boulevard/green space/off roadway

C.31 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02521

Drilling Refusal 50.00 metre

C.32 SP4 SP28 SP36 SP43 SP44 SP47 02300 02507 11550 13122 13420 13430 13622 13623 15010 15060 15075 15700 16000 16010 16060 16075 16123 16131 16140 16150 16411 16470 16505 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Blower Enclosure for Closed Coe Hill Landfill, including foundation, passive vent system, above grade landfill gas piping, insulation, enclosure structure, doors, locks, lights, gas detection system, autodialler system, heaters, louver, fan, LFG blower, control panel, fencing, all associated electrical wiring, conduits, seals and connection to power supply, underground duct bank from road crossing pole to facility per Toronto Hydro standards, coordination with Toronto Hydro for installation of service cable(s) and utility meter, and restoration of Toronto Hydro work areas.

1.00 lump sum

C.33 SP4 SP28 SP43 SP47

Bollards 18.00 each

Page 23: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-19

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.34 SP37 SP42 SP43 SP47 Section 4-12

Waste Disposal 4,200.00 tonnes

C.35 SP43 SP47

Coe Hill Parkette 1.00 lump sum

C.36 SS28 SP47

Removal, replacement and restoration of bus shelter, concrete slab, and all appurtenances, to original or better conditions and to the satisifaction of the Contract Administrator (Provisional)

2.00 lump sum

C.37 SS28 SP47

Removal, replacement and restoration of street furniture, including but not limited to newspaper stands, garbage recepticles, benches, concrete slabs, and all appurtenances, to original or better conditions and to the satisifaction of the Contract Administrator (Provisional)

3.00 lump sum

C.38 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Temporary Top asphalt restoration – HL8 (40 mm)

100.00 square metre

C.39 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill with Granular B (Provisional)

69.00 each

Page 24: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-20

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

C.40 SP12 SP47

Construct test pits to determine location and depth of water service – backfill with Granular B (Provisional)

2.00 each

C.41 SS8 SP4 SP28 SP40 SP41 SP42 SP47 TS 4.60

Restoration of existing utility cut repairs (Provisional)

525.00 square metre

Total for Part C: Closed Coe Hill Landfill – Areas A & B

Page 25: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-21

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

Part D: Closed Stan Wadlow Landfill – Area A

D.1 SP47 Payment for Bonds 1.00 lump sum

D.2 SP47 Payment for Insurances

1.00 lump sum

D.3 SP47 Mobilization and Demobilization

1.00 lump sum

D.4 SS1 SS2 SS11 SS37 SP2 SP8 SP24 SP47 Section 5A-12 Section 5A-33

TS 1.00

Provide traffic control for maintenance of traffic as per Ontario Traffic Manual (OTM) Book 7 Temporary Conditions

1.00 lump sum

D.5 SS13 SP4 SP7 SP47

Completion of pre- and post-construction condition survey of each business and residence located within or adjacent to the Work, including submission of associated reports

1.00 lump sum

D.6 SP1 SP47 Section 5A-13

Supply, install, and manage “Capital improvement Project Construction Sign” as per contract document

1.00 each

D.7 SP26 SP37 SP47

T-219.130-1 Supply, install, maintain, and remove sediment control fence

250.00 metre

D.8 SP26 SP37 SP47

Supply, install, maintain, and remove temporary Class 1 non-woven geotextile fabric silt control for catchbasins

20.00 each

D.9 SP4 SP28 SP47 Section 4A-Attachment 2 Section 5A-10

Provide as-constructed survey & as-built

1.00 each

D.10 SP25 SP47 TS 1.10

Supply and install field offices for City staff

6.00 month

Page 26: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-22

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

D.11 SS5 SS6 SS8 SS13 SP4 SP17 SP18 SP28 SP30 SP37 SP41 SP46 SP47 Section 4-10 Section 4A-5 Section 4A-Attachment 3

Complete geotechnical investigation, including asphalt asbestos testing

15.00 each

D.12 SP29 SP47 Toronto Urban Forestry Spec. OPSS 565

Barrier for tree protection

250.00 metre

D.13 SP4 SP28 SP29 SP47 Section 4A-Arborist Reports

Tree removal 3.00 each

D.14 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Top asphalt restoration – HL3 (40 mm)

1,900.00 square metre

D.15 SP4 SP28 SP37 SP41 SP47 TS 4.60

Cold Mill and Disposal of Asphalt Pavement

1,900.00 square metre

D.16 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – Parking Lot (open cut)

90.00 metre

D.17 SP4 SP28 SP34 SP43 SP47

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – boulevard/green

130.00 metre

Page 27: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-23

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

01000 02300 02507

space/off roadway (open cut)

D.18 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-310.010-1 T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – sidewalk (open cut)

60.00 metre

D.19 SP31 SP34 01000 02300 02507

T-708.01-4 LFG header pipe insulation

15.00

metre

D.20 SP4 SP28 SP30 SP43 SP47 02300

Rock, shale, and large waste material excavation (Provisional)

200.00 cubic metre

D.21 SS10 SP4 SP28 SP43 SP47 02300

Excavation Work (Provisional)

200.00 cubic metre

D.22 SP4 SP28 SP43 SP46 SP47 02300

Excavation of soft spots (Provisional)

200.00 cubic metre

D.23 SS8 SS35 SP4 SP28 SP17 SP37 SP41 SP42 SP43 SP47 Section 4-12 OPSS.MUNI 1101

Cold Mill and Disposal of Asphalt Pavement Containing Asbestos (Provisional)

1,900.00 square metre

D.24 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43

Installation of LFG extraction wells, including borehole

150.00 metre

Page 28: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-24

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

SP47 02300 02507 02521

D.25 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of Inline LFG extraction well (header termination) appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, piping, fittings, all connections, excavation, backfill, and restoration

2.00 each

D.26 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of Inline LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, cross, valve, piping, fittings, all connections, excavation, backfill, and restoration

4.00 each

D.27 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration

12.00 each

Page 29: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-25

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

D.28 SS8 SS37 SP2 SP4 SP24 SP28 SP47 OPSS 710

Supply and apply pavement marking, white or yellow, solid or skip lines, 100 mm wide – Closed Stan Wadlow Landfill

250.00 metre

D.29 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02521

Drilling Refusal 50.00 metre

D.30 SP4 SP28 SP36 SP43 SP44 SP47 02300 02507 11550 13122 13420 13430 13622 13623 15010 15060 15075 15700 16000 16010 16060 16075 16123 16131 16140 16150 16411 16470 16505 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Blower Enclosure for Closed Stan Wadlow Landfill, including foundation, passive vent system, above grade landfill gas piping, insulation, enclosure structure, doors, locks, lights, gas detection system, autodialler system, heaters, louver, fan, LFG blower, control panel, fencing, all associated electrical wiring, conduits, seals and connection to power supply, underground duct bank connection from Toronto Hydro’s duct bank at property line to facility per Toronto Hydro standards, coordination with Toronto Hydro for installation of service cable(s) and utility meter, and restoration Toronto Hydro work areas.

1.00 lump sum

Page 30: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-26

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

D.31 SP37 SP42 SP43 SP47 Section 4-12

Waste Disposal 4,000.00 tonnes

D.32 SS28 SP47

Removal, replacement and restoration of bus shelter, concrete slab, and all appurtenances, to original or better conditions and to the satisifaction of the Contract Administrator (Provisional)

1.00 lump sum

D.33 SS28 SP47

Removal, replacement and restoration of street furniture, including but not limited to newspaper stands, garbage recepticles, benches, concrete slabs, and all appurtenances, to original or better conditions and to the satisifaction of the Contract Administrator (Provisional)

1.00 lump sum

D.34 SS36 SP47 TS 3.70

Supply and install tactile walking surface indicator – 610 mm width (Provisional)

2.00 each

D.35 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Temporary Top asphalt restoration – HL8 (40 mm)

250.00 square metre

D.36 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill with Granular B (Provisional)

27.00 each

D.37 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill

8.00 each

Page 31: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-27

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

with unshrinkable fill (Provisional)

D.38 SP12 SP47

Construct test pits to determine location and depth of water service – backfill with Granular B (Provisional)

3.00 each

D.39 SS8 SP4 SP28 SP40 SP41 SP42 SP47 TS 4.60

Restoration of existing utility cut repairs (Provisional)

600.00 square metre

D.40 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

Supply and installation of LFG Header Pipe Isolation Valve

2.00 each

Total for Part D: Closed Stan Wadlow Landfill – Area A

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

Part E: Closed Sunrise Landfill – Area A

E.1 SP47 Payment for Bonds 1.00 lump sum

E.2 SP47 Payment for Insurances

1.00 lump sum

E.3 SP47 Mobilization and Demobilization

1.00 lump sum

E.4 SS1 SS2 SS11 SS37 SP2 SP8 SP24 SP47 Section 5A-12 Section 5A-33

TS 1.00

Provide traffic control for maintenance of traffic as per Ontario Traffic Manual (OTM) Book 7 Temporary Conditions

1.00 lump sum

Page 32: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-28

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

E.5 SS13 SP4 SP7 SP47

Completion of pre- and post-construction condition survey of each business and residence located within or adjacent to the Work, including submission of associated reports

1.00 lump sum

E.6 SP1 SP47 Section 5A-13

Supply, install, and manage “Capital improvement Project Construction Sign” as per contract document

1.00 each

E.7 SP26 SP37 SP47

T-219.130-1 Supply, install, maintain, and remove sediment control fence

220.00 metre

E.8 SP26 SP37 SP47

Supply, install, maintain, and remove temporary Class 1 non-woven geotextile fabric silt control for catchbasins

10.00 each

E.9 SP43 SP47 02821 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Fence removal and restoration

1.00 lump sum

E.10 SP4 SP28 SP47 Section 4A-Attachment 2 Section 5A-10

Provide as-constructed survey & as-built

1.00 each

E.11 SP25 SP47 TS 1.10

Supply and install field offices for City staff (6 months)

6.00 month

E.12 SS5 SS6 SS8 SS13 SP4 SP17 SP18 SP28 SP30 SP37 SP41

Complete geotechnical investigation, including asphalt asbestos testing

15.00 each

Page 33: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-29

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

SP46 SP47 Section 4-10 Section 4A-5 Section 4A-Attachment 3

E.13 SP29 SP47 Toronto Urban Forestry Spec. OPSS 565

Barrier for tree protection

150.00 metre

E.14 SP4 SP28 SP29 SP47 Section 4A-Arborist Reports

Tree removal 9.00 each

E.15 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Top asphalt restoration – HL3 (40 mm)

175.00 square metre

E.16 SS8 SP4 SP18 SP28 SP39 SP41 SP42 SP47 TS 4.60

Parking Lot Asphalt HL3 (40 mm) HL8 (85) Granular A (50 mm) Granular B (250 mm)

125.00 square metre

E.17 SP4 SP28 SP37 SP41 SP47 TS 4.60

Cold Mill and Disposal of Asphalt Pavement

175.00 square metre

E.18 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – Parking Lot (open cut)

60.00 metre

E.19 SP4 SP28 SP34 SP43 SP47 01000

T-708.01-3 T-1007.01-4

Supply and install 150 mm SDR21 LFG header pipe – boulevard/green space/off roadway (open cut)

70.00 metre

Page 34: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-30

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

02300 02507

E.20 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-4 LFG header pipe insulation

15.00

metre

E.21 SP4 SP28 SP34 SP43 SP47 01000 02300 02507

T-708.01-3 T-1007.01-4

Supply and install 100 mm SDR 21 – boulevard/green space/off roadway (open cut)

10.00 metre

E.22 SP4 SP28 SP30 SP43 SP47 02300

Rock, shale, and large waste material excavation (Provisional)

200.00 cubic metre

E.23 SS10 SP4 SP28 SP43 SP47 02300

Excavation Work (Provisional)

200.00 cubic metre

E.24 SP4 SP28 SP43 SP46 SP47 02300

Excavation of soft spots (Provisional)

200.00 cubic metre

E.25 SS8 SS35 SP4 SP28 SP17 SP37 SP41 SP42 SP43 SP47 Section 4-12 OPSS.MUNI 1101

Cold Mill and Disposal of Asphalt Pavement Containing Asbestos (Provisional)

175.00 square metre

E.26 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43

Installation of LFG extraction wells, including borehole

60.00 metre

Page 35: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-31

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

SP47 02300 02507 02521

E.27a SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtances, including but not limited to wellhead assembly, valve and quick connect assembly, flushmount lockable monitoring well manhole, concrete collar, tee, valve, short lateral piping, fittings, all connections, excavation, backfill, and restoration

7.00 each

E.27b SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02300 02507 02521

Installation of LFG extraction well appurtenances, including but not limited to wellhead assembly, valve and quick connect assembly, flush mount lockable monitoring well manhole, concrete collar, tee, valve, fittings, all connections including connections to long lateral pipe, excavation, backfill, and restoration

1.00 each

E.28 SP4 SP28 SP30 SP31 SP32 SP33 SP34 SP43 SP47 02521

Drilling Refusal 50.00 metre

E.29 SP4 SP28 SP33 SP43 SP47 02522

Passive Gas Vent Abandonment (Provisional)

20.00 metre

Page 36: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-32

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

E.30 SP4 SP28 SP36 SP43 SP44 SP47 02300 02507 11550 13122 13420 13430 13622 13623 15010 15060 15075 15700 16000 16010 16060 16075 16123 16131 16140 16150 16411 16470 16505 TS 772 OPSS 772

OPSD 972.101 972.102 972.103 972.132

Blower Enclosure for Closed Sunrise Landfill, including foundation, passive vent system, above grade landfill gas piping, insulation, enclosure structure, doors, locks, lights, gas detection system, autodialler system, heaters, louver, fan, LFG blower, control panel, fencing, all associated electrical wiring, conduits, seals, underground service and associated restoration.

1.00 lump sum

E.31 SP4 SP28 SP43 SP47

Bollards 18.00 each

E.32 SP37 SP42 SP43 SP47 Section 4-12

Waste Disposal 1,900.00 tonnes

E.33 SP43 SP47

Installation of stainless steel wind turbines at 30 Northline Road

1.00 lump sum

E.34 SS8 SP4 SP28 SP41 SP42 SP47 TS 4.60

Temporary Top asphalt restoration – HL8 (40 mm)

100.00 square metre

E.35 SP8 SP47

Construct test pits to determine location and depth of utilities – backfill

1.00 each

Page 37: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-33

Addendum No. Item

Standard / Special Specification

Standard / Special Drawing Description

Estimated Quantity Unit Unit Price Total Per Item

with Granular B (Provisional)

E.36 SS8 SP4 SP28 SP40 SP41 SP42 SP47 TS 4.60

Restoration of existing utility cut repairs (Provisional)

725.00 square metre

Total for Part E: Closed Sunrise Landfill – Area A

Page 38: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-34

Part F Contingency

F.1 Contingency Allowance

$1,200,000.00 $1,200,000.00

Total for Part F Contingency

$1,200,000.00

Page 39: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 3 – REVISED Tender Submission Package Pricing Form

Tender Call No. #149-2017 Contract No. 17ECS-MI-02SW

Tender 149-2017 - Addendum 3 Page 3-35

Summary of Tender Total

Part A: Closed Disco Landfill – Areas A & B

Part B: Closed Disco Landfill – Area C

Part C: Closed Coe Hill Landfill – Areas A & B

Part D: Closed Stan Wadlow Landfill – Area A

Part E: Closed Sunrise Landfill – Area A

Part F: Contingency $1,200,000.00

Total Bid Price = $X

HST Amount (13%) = $Y

Total Amount of Tender Call = $X + $Y Please indicate this amount on the Tender Call Cover Page next to “Amount of Tender Call Herein”

Company GST/HST Registration Number:

Page 40: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 4 – Scope of WorkTender Call No. T#149-2017 Contract No. 17ECA-MI-02SW

Tender 149-2017 - Addendum No. 3 Page 4-3

Closed Stan Wadlow Landfill – Area A: June 1, 2018

Closed Disco Landfill – Area C: December 14, 2017

Closed Disco Landfill – Areas A & B: December 14, 2017

Closed Sunrise Landfill – Areas A: March 29, 2018

Closed Coe Hill Landfill – Areas A & B: August 31, 2018

The Work shall be fully completed and ready for final payment within 60 days ofSubstantial Performance.

6. Construction Survey and Layout

All survey and layout required under this Contract shall be performed by the Contractor.Section 4A and Section 5A of this document provide further information on therequirements.

7. Construction Staging and Phasing

The project shall be divided into the following 5 phases:

Phase 1 (2017) Geotechnical Investiation – All Sites

Phase 2 Closed Disco Landfill – Area C

Phase 3 Closed Disco Landfill – Areas A & B

Phase 4 Closed Sunrise Landfill – Areas A

Phase 5 Closed Stan Wadlow Landfill – Area A

Phase 6 Closed Coe Hill Landfill – Areas A & B

Each of Phase 2 through Phase 6 construction shall be divided into the following 2stages at a minimum:

Stage 1 Installation of LFG extraction wells

Stage 2 Installation of LFG header pipe and lateral pipes

Page 41: VIA INTERNET POSTING ADDENDUM NO. 3 Tender Call No. 149 … · 2020. 8. 17. · May 24, 2017 VIA INTERNET POSTING (4 pages + 3 attachments) ADDENDUM NO. 3 Tender Call No. 149-2017

Section 4A – REVISED Special SpecificationsTender Call No. T#149-2017 Contract No. 17ECA-MI-02SW

Tender 149-2017 - Addendum No. 3 Page 4A-36

Contractor shall provide temporary fencing and security at sites where existing fencingexists (e.g., 120 Disco Road, 30 Northline Road).

Provide 10 Day notice of work and coordinate with City work zone traffic coordinator andothers as required by Road Cut Permits. Comply with working times specificed in RoadCut Permits.

Access to Stan Wadlow Park is permitted from October 15, 2017 to April 30, 2018. Accessto Staging Area and along the header alighnment from Cosburn Avenue to the BlowerEnclosure is permitted from October 15, 2017 to June 15, 2018.

Should any unforeseen conditions arise the Contract Administrator will have the right to directthe Contractor to re-schedule construction in a manner that minimizes the effects thereof.

All costs associated with this Work shall be incidental to all related items of Work. No separatepayment shall be made.

3. Notices to Public - GN113SP

Special Provision October 2016

Two notices shall be distributed to property owners or occupants that will be affected by theWork. Notice No. 1 shall be delivered by the City and/or Contract Administrator. Notices No. 2shall be delivered by the Contractor. The Contractor shall maintain a log record of noticesdelivered by the Contractor and follow-up activities by the Contractor at each propertythroughout the Contract Time.

Notice No. 1 (Public Notice)

A Public Notice, delivered by the City and/or Contract Administrator that includes a briefintroduction to the upcoming construction contract and indicates the name and contact phonenumber of the Contract Administrator. Notice No. 1 shall be delivered by the City and/orContract Administrator to all properties within the contract area in advance of the start of on-siteactivities by the Contractor.

Notice No. 2 (Construction Notice)

A Construction Notice, delivered by the Contractor that includes a detailed description of theupcoming construction work and indicates the name of the Contract Administrator and companyname and contact phone number of the Contractor, including any details of periodicinterruptions of water service, details of temporary water service connections and so on. NoticeNo. 2 may include information sheets from the City for the property resident. Notice No. 2 shall