Vertical ConcreteSlipforming
Scholer-Peterson Concrete ConferenceFebruary 12
Kansas State University
byFred J. Fairchild, P.E.
Department of Grain Science and IndustryKansas State University
Applicable Codes• ACI-318
• ACI-313
Slipform Form
jaYoke
Form Walls
Slipform Form
jaForm Walls
3’-6
”
Slipform Form
jaJack Rod
Jack
Slipform Form
jaChamfer Strips
Jacks and YokesJack Capacities:• 3 Ton• 6 Ton• 22 TonYoke Spacing:• 3-4 Ft. ApartConcrete Placed in 6-8” liftsContinuous Pour 24 hours/day
Round Bins/Structures
Individual Yoke w/ Jack
Multiple Wall Plan
Multiple Wall Plan
8 - 22 Ton Jack
Locations
Multi Wall Yoking
Delta Yoke
Cross Yoke
Standard Yoke
Overhead Beam Structure
Overhead Structure
22 Ton Jack
Slipform Deck
Slipform Processing Plant
Wall Beams Under Deck
KSU FLOUR MILL CONSTRUCTION
PREPARING THE SITE
• September 14, 2005
FORMING FOUNDATION
• Sept 22, 2005
POURING FOUNDATION• October 4, 2005
• 42” Thick
• 809 Yards of Concrete
• 66 Tons of Reinforcement
BUILDING SLIP FORMS
BUILDING SLIP FORMS
BUILDING SLIP FORMS
SLIPPING THE WALLS
• First Pour 8:00AM • Monday, October 31, 2005
SLIPPING THE WALLS
• 9 Ft. High• 7:00PM Monday, October 31, 2005
SLIPPING THE WALLS
• 19 Ft. High8:00AM Tuesday, November 1, 2005
SLIPPING THE WALLS
• 29 Ft. High7:00PM Tuesday, November 1, 2005
SLIPPING THE WALLS
• 39 Ft. High8:00AM Wednesday, November 2, 2005
SLIPPING THE WALLS
• 50 Ft. High7:00PM Wednesday, November 2, 2005
SLIPPING THE WALLS
• 61 Ft. High8:00AM Thursday, November 3, 2005
WALLS FINISHED
• 72 Ft. High7:00PM Thursday, November 3, 2005
WALLS FINISHED
• Continuous Pour
• 83 Hours
• 1406 Yards of Concrete
• 92 Tons of Reinforcement
INSIDE THE WALLS
FORMING THE FLOORS
POURING THE FLOORS
FORMING ROOF DECK
POURING THE ROOF
POURING THE FLOORS
• 5 Floors and Roof
• 100 Yards of Concrete Each Floor
• Last Pour (Roof) February 3, 2006
FINISHING ROOF POUR
Questions ?
Thank You