Version Mars 12 , 2002 Zensol Automation Inc. TIMING TESTS - TIMING TESTS - ALABAMA ALABAMA NEXT PREVIOUS BACK PAGE 1 Perform timing tests on a 3 contact Perform timing tests on a 3 contact breaker breaker Breaker preparation for the test Breaker preparation for the test Cable installation by the operators Cable installation by the operators Travel transducer kit installation Travel transducer kit installation The CBA-32P The CBA-32P perform the test with CBA WIN test plan perform the test with CBA WIN test plan Conclusion Conclusion

Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Embed Size (px)

Citation preview

Page 1: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

NEXT PREVIOUS

BACK PAGE 1

Perform timing tests on a 3 contact Perform timing tests on a 3 contact breakerbreaker

• Breaker preparation for the testBreaker preparation for the test

• Cable installation by the operatorsCable installation by the operators

• Travel transducer kit installationTravel transducer kit installation

• The CBA-32PThe CBA-32P

• perform the test with CBA WIN test planperform the test with CBA WIN test plan

• ConclusionConclusion

Page 2: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Isolate the breaker thanks to the sectionnors Isolate the breaker thanks to the sectionnors

NEXT PREVIOUS

BACK PAGE 1

The sectionnors are openThe sectionnors are open

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 3: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Ground the breakerGround the breaker

NEXT PREVIOUS

BACK PAGE 1

Grounding of Grounding of the breakerthe breaker

Ground cableGround cable

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 4: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Cable of the CBA-32PCable of the CBA-32P

NEXT PREVIOUS

BACK PAGE 1

Contact cablesContact cables

Ground cableGround cable

Command cableCommand cable

Extension Extension cablescables

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 5: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

The CBA-32PThe CBA-32P

Grounding Grounding of CBA-of CBA-

32P32P

24 contact 24 contact CBA-32PCBA-32P

CommandCommand

6 analog 6 analog inputsinputs

Fiber optic Fiber optic linklink

Standard Standard labtop labtop computercomputer

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 6: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Installation of CBA-Installation of CBA-32P32P

NEXT PREVIOUS

BACK PAGE 1

Breaker with 3 Breaker with 3 separate tanksseparate tanks

CBA-32PCBA-32P

Control Control cabinetcabinet

computercomputer

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 7: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Contact connectionsContact connections

NEXT PREVIOUS

BACK PAGE 1

Simple Simple contactcontact

ResistiveResistivecontactcontact

Double Double resistive resistive contactcontact

Typical configuration of a 3 contact breakerTypical configuration of a 3 contact breaker

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 8: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Command connectionsCommand connections

NEXT PREVIOUS

BACK PAGE 1

Ouverture des Ouverture des contactscontacts

Fermeture Fermeture des contactsdes contacts

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 9: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Travel transducer kit installationTravel transducer kit installation

NEXT PREVIOUS

BACK PAGE 1

Mechanical basis allowing Mechanical basis allowing the positionning of the the positionning of the

transducer on the breakertransducer on the breaker

Linear travel Linear travel transducertransducer

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 10: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Load a test plan with the CBA Win Load a test plan with the CBA Win ©© software software

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 11: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Performing the testPerforming the test

NEXT PREVIOUS

BACK PAGE 1

Fiber optic Test Fiber optic Test linklink

Cable test linkCable test link

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 12: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Fiber optic test link Fiber optic test link

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 13: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Cable test linkCable test link

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 14: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

We can now start the testWe can now start the test

NEXT PREVIOUS

BACK PAGE 1

Start Start acquisitionacquisition

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 15: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Test : CloseTest : Close

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 16: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Test : OpenTest : Open

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 17: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Test : Close OpenTest : Close Open

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 18: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Tabular reportTabular report

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA

Page 19: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation

Version Mars 12, 2002 Zensol Automation Inc.

Tabular report (continued)Tabular report (continued)

NEXT PREVIOUS

BACK PAGE 1

TIMING TESTS - TIMING TESTS - ALABAMAALABAMA