Venusan Co.
EPC Contractor
E-mail: [email protected]
Site: www.venusan.co
Phone: 0098-21 44306005
Fax: 0098- 21 44306640 1
Venusan Co.
EPC Contractor
History & Background
Policy
Scope of Activities
Organization Chart
Members of Boards
Current Projects (Completed or Under Execution)
MEG&MRU –Phase 19
- UNITS 108&144 15 & 16
- HVAC 17 & 18
- MC 17 & 18
- Civil & UG – Phase 17&18
- UNITS 113&114&115 – 22 , 23 & 24
- MOHR FACTORY
Previous Projects
Senior Managers of the Company
Managers’ Resumes
Company General Software
Certificates
2
History & Background
Venusan Company as an EPC contractor was founded in 2012 under No. 422098 in Tehran Companies
Registration Office. The activities area of this company includes: Engineering, Procurement &
Construction services in the fields of Energy , executing the oil and gas transmission pipelines
projects and related activities. The most and foremost part of Venusan executive performances and its
managers’ and founders’ experiences traces , engineering and executing different and numerous
projects. In this regard, this company has started the construction of Venusan Factories Complex in
Mohr Industrial Area to build and prepare the required equipment and materials. This company is
ready to participate in every related project due to its experienced and skillful managers and experts,
modern machineries and required equipment.
This company believes in Corporate Governance and also observes all beneficiaries’ rights to reach growth and
development of its shareholders and staff. The governance principles of Venusan Company are as
follows:
Venusan Company prefers and focuses on transparency and integration as two key principles.
Venusan executes and performs all of its activities and policies in accordance with applicable general
and particular laws and regulations and also in parallel to its Codes and employers’ standards and ethic
norms.
Mutual observation and respecting and considering beneficiaries’ rights are two of the most important
and base of Venusan company activities.
The appointment of Members of Board and Managing Director shall be performed in a democratic and
clear atmosphere with the observation and considering all shareholders’ rights.
Venusan Co.
EPC Contractor
3
Venusan Co.
EPC Contractor
The Policy of Venusan Company
Venusan Company, holding the Registration No. 422098 is offering Engineering,Procurement and Construction services in the fields of oil, gas and other relatedareas which plays a significant role in development of our country and reachinghigher goals through the employment of skillful and experienced managers andexperts.
Mission
Designing, procurement of sources and equipment & execution of different projectsin the field of oil, gas and energy, civil projects, road works, buildings and otherconstructions
Vision
To be known as one of the 10 greatest EPC companies in our country andparticipate actively in national and international projects in the fields of oil, gas andenergy regarding the mission of our company and execution of EPC projects.
Values
Quality, innovation, Smart and skillful work, observing national benefits, keepingand secrecy with respecting the beneficiaries’ interests and observing theprofessional ethics.
4
Strategy Policy
-speed in executing the projects
-high quality in accordance with contract and
regulations conditions
-planning to execute the projects properly with
observing permanent and safe development principles
-giving suggestions and problem solutions to the
employer to improve the quality, safety and increase the
economic lifetime of the projects
-utilizing modern technologies to execute the project
-residuum and sources management
-Supervising the sub-contractors’ activities
-safety risks and HSE control
- motivating the personnel
Obtaining the consent of Employers and projects users
permanent development, preserving the environment
and preventing the pollution
preventing work accidents and injuries
- Progressive development of every affairs in the
company
I, as the Managing Director of Venusan Company have selected ISO 9001:2008, ISO 14001: 2004,
OHSAS 18001: 2007, TS 29000: 2010 standards and HSE-MS of Oil Ministry as our guidelines and
expect all the personnel and contractors to observe accurately these guidelines and standards.
Managing Director
Venusan Co.EPC Contractor
5
Venusan Co.
EPC Contractor
The Scope of Activities of the Company
Engineering, Procurement, and Construction of:
1.Oil, Gas & Water Transmission Pipeline & Facilities
2.Refinery, Petrochemical & Productivity Plants
3.Wellhead Facilities, Gathering & Gas Injection
4.Compressor & Pumping Stations
6
7
Venusan Co.
EPC Contractor
8
Vice chairman of Board- Mohammad Ali Khavari
Managing Director & Member of Board- Rasoul Yahyazade
Chairman of Board- Akbar Bagheri
Member of Board- Mohsen Khorassani
Member of Board- Ali Kianian
Current Project
MEG Package – Phase 19
HVAC – Phases 17&18
MC – Phases 17&18
Civil – Phases 17&18
Phases 22&23&24
Phases 15&16
9
Venusan Co.
EPC Contractor
Venusan Co.
EPC Contractor
Project: UNITS 108,144 Phase 15&16
Clint: Arya Naft Shahab
Location: South Pars Assalouyeh
10
Venusan Co.
EPC Contractor
HVAC Project- SP 17 & 18• Project: HVAC (Heating Ventilation & Air Conditioning)- Phases 17 & 18 – South Pars
• Project Type: PC
• Contract No.: SP17&18-HVAC-18
• Client: Industrial Projects Management of Iran (IPMI)
• Project Location: Phases 17 & 18 – South Pars- Assalouyeh- Boushehr
• Project Description: Construction, material and resources procurement, installation, completion, punchremoval, pre-commissioning and assistant in commissioning the mechanical and HVAC systems, civilworks, electrical and instrument, mechanical and HVAC systems control, as well as EWSD and CO2
system of industrial buildings (S.S , GIS) of 17 & 18 phases of South Pars.
EWSD:
EWSD (Elektronisches Wählsystem Digital in German, Electronic Digital Switching System/ElectronicWorld Switch Digital in English) is one of the most widely installed telephone exchange systems in theworld. EWSD can work as a local or tandem switch or combined local/tandem, and for landline or mobilephones.
CO2 System:
CO2 or Carbon Dioxides is an odorless, colorless and neutral gas with numerous qualities which makes itsuitable as a fire-fighting substance. CO2 is useful and applicable especially in fighting the fire caused bygas and electronic devices. Additionally, it is ideal to be used in closed environments such as controlrooms, S.S, GIS because there is no need to clean the environment after its usage. CO2 gas is stored incylinders and under-pressure tanks as liquid.
11
Venusan Co.
EPC Contractor
12
Venusan Co.
EPC Contractor
MC Project- SP 17 & 18
• Project: Management of Construction - Phases 17 & 18 – South Pars Gas Field development
• Project Type: MC
• Contract No.: 100-9374696
• Client: Industrial Projects Management of Iran (IPMI)
• Project Location: Phases 17 & 18 – South Pars- Assalouyeh- Boushehr
• Project Description: collecting and organizing the project records and documents, creating adata base, monitoring the daily, weekly and monthly activities, presenting the project reportsand reports of progress, determining work front, determining the details of installation andexecution, determining the activities procedure according to the fixed priorities, Mark up planof maps, preparing the contractors’ invoices, preparing MC book, preparing the contractors’interface and MTO.
• Purpose of the project: Comprehensively Gathering data in the fields of engineering,procurement and construction of the project to process and present the unique report toproperly control and manage each project in different disciplines as a powerful tool besides theproject manager by the use of prepared technical software.
• Some of the activity scope of this project includes:
Work Front
Material Status
Spool Status
Test package Status, etc.
13
14
South Pars Gas - Phases 22&24Project: Unit 113,114,115
Client: Petro Sina Arya
Project Location: Phase 22&24 - South Pars - Kangan
Project Description: Complete Civil- Mec.- St.St.- Piping in unit 113,114,115
Venusan Co.
EPC Contractor
Venusan Co.
EPC Contractor
South Pars Gas Filed Development–Phase 19 Plot Plan
Project: MEG & MRU Packages
Client: Petro Pars Iran (PPI)
Project Location: Phase 19 - South Pars - Kangan
Project Description: Installation of MEG & MRU Packages
Description Quantity Unit
Piping 72,000 ID
Supporting 31,000 Kg
Mechanical 1000 Ton
Heavy
Structure
1,100 Ton
Light Structure 370 Ton
Cabling 17,000 m
Instrument
Device
2,950 No.
15
Venusan Co.
EPC Contractor
Mohr Factory
Project Description
This project is supposed to be completed in 3 phases, each lasting for 2 years. It is a steel pre-fabricatedparts factory. The main activities of this factory includes: production of drilling raft parts, maintenance andfabrication of related equipment, establishment of a technical institute to teach the required skills in thefabrication and installment of upstream and downstream equipment in the oil and gas industries.
Application and employment of the local resources like talented manpower, satisfying the civil andnational needs, etc. in the petrochemical, refineries and other industries and general urban and non-urbanprojects are of the main goals of the present project.
To accomplish this project, either the trained or later will be trained local manpower will be employed andit is expected to supply about 70% of the required manpower from the local people.
Phase 1:
The executive team in the steel pre-fabricated parts and other related equipment unit will be about 150people in technical, support, management and executive departments who will be chosen among trained,talented and skillful local applicants.
phase 2:
Activities like maintenance, repairing the equipment, fabrication of different parts as well as drilling raftwill be added to the activities of phase 1 and 50 other people will be also added to the previous employedmanpower. a standard training institute will be established to serve as a technical college in order toprovide services in different technical fields such as: wielding, turning, topography, computer and otherrelated fields to increase the technical and professional knowledge of people.
16
Venusan Co.
EPC Contractorphase 3:
This phase will be initiated after 4 years when every other unit has set out and the basic capacities have
increased significantly. It is estimated to add another 100 people to our manpower. It should be noticed
that we will be trying to satisfy a part of our country’s civil demands and create an industrial pole
consisting of our factory as its focus and center point. This factory will play a great role not only as a
training center but also will help to create job opportunities for local people.
Required Manpower in 3 Phases
Manpower in technical, executive & support units according to separate phases
150Phase 1
50Phase 2
100Phase 3
300Total
17
Venusan Co.
EPC Contractor
Project Client Contractor Venusan Company
South Pars Gas Filed
Development–Phases 22, 23 &
24Petro Sina Arya (P.S.A) PAYANDAN CO. Management Team
South Pars Gas Filed
Development–Phase 13 Petro Paydar Iranian (P.P.I) PAYANDAN CO. Management Team
South Pars Gas Filed
Development–Phase 19 Petro Pars Iran (P.P.I) Boland Tabagheh Co. Management Team
South Pars Gas Filed
Development–Phases 15 & 16 Arya Naft Shahab PAYANDAN CO. Management Team
Parsian Gas Refinery IPMI PAYANDAN CO. Management Team
12" Khonj-Lar Gas pipeline NIGC PAYANDAN CO. Management Team
10" & 8" Arak Gas PipelineNIGC PAYANDAN CO. Management Team
Imam Khomeini International
Air Port, Piping System Road Ministry PAYANDAN CO. Management Team
Tabnak Gas Field
Development Project (Piping,
Civil, foundational equipment,
etc.)
NIGC PAYANDAN CO. Management Team
Lamard International Airport
(Mechanical & Foundational
equipment)Road Ministry PAYANDAN CO. Management Team
nternational City Project –
Phases I & II, Dubai General Mechanic Co. Management Team
Al-Ethehad Railway Project -
EUA BTIC Co. Management Team
Third Tunnel – Kouhrang Tabliyeh Co. Management Team18
Venusan Co.
EPC Contractor
Parsian Gas Refinery
The project is in form of EPC (in cooperation with IPMI) for 43 MMCM/D gas
treating plant in Lamerd (South of Iran) which includes slug catcher,
separation, dehydration, Hg removal, LPG extraction and fractionation units,
receiving facilities, chilling units, butane and propane storages, metering and
VRU compressor units in order to produce following products :
450,000 ton/year propane, 310,000 ton/year butane, 11 MM BBL/year
condensate(C5+), 850,000 ton/year ethane and 1520 MMSCFD lean gas.
Main parts of the work consist of installation of 8,500 ton steel structures,
4,000 tons mechanical equipment, 200,000 in-dia. piping, 330 km cabling for
instrument and electrical system,40,000 m³ concrete and 32,000 m² building,
preparing As built drawings, equipment reservation
Parsian Gas Refinery
Description
Civil St.St. Piping Equipment Electrical Instrument Non
Building
Industrial
m3 Ton ID Kg Eq. (no.) Cab. (m) Dev. (no.) Cab. (m) m²
Quantity 70,000 10,000 250,000 4,500 120 150,000 2,100 180,00
0
23,000
19
Venusan Co.
EPC Contractor
Parsian Gas Refinery
20
Venusan Co.
EPC Contractor
• Resumes of Managers and Shareholders of the Company
21
Venusan Co.
EPC Contractor
Managing Director- Member of Board
22
Personal Information Education
Family Name: Yahyazadeh Degree Field
Name: Rasoul B.S. Economy
Date of Birth: 1969
Marital Status: Married
E-mail: [email protected]
Phone number: 09121213212
Experiences
Company Position From ToVenusan Engineering and Construction Co. M.D. 2012 present
Payandan Engineering Co. 1997 2012
Project Manager- Refinery Projects of phases 13, 22&24, 15&16, etc.
Project Manager- LGST project- Phases 15&16, Gas Refinery Construction
Project Manager- Erection & Construction of Parsian Gas Refinery
Project Manager- Conveying Water Pipelines to Amiriye of Parsian Refinery
Project Manager- Gas Transmission Project to Aouz, Khonj, Lar, Farmahin, Arak,
etc.
Project Manager- Urban Gas Network of related districts (6 projects)
Project Manager- Foundational Installation of Imam Khomeini Airport
Koosha Paydar Co. Expert & Designer of Foundational Installation 1996 2004
Peydar Co. (Engineering Dep.) Expert & Designer of Foundational Installation 1994 1996
Pars Sina Gostar Co. Chairman of Board 1992 1994
Venusan Co.
EPC Contractor
chairman of board
23
Personal Information Education
Family Name: Bagheri Degree Field University
Name: Akbar B.S. Economy Allameh Tabatabaee
Date of Birth: 1963
Marital Status: Married
E-mail: [email protected]
Phone number: 09121148102
Experiences
Company Position From To
Venusan Engineering and Construction Co. Chairman of board 2012 present
Iranian Urban Development International Co. M.D.Deputy 2011 2012
Industrial Management Co. Instructor 2006 2008
Haffari Shomal Co. Economy Advisor
Payandan Co. Member of board 1996 2011
Hessam Accounting Co. Senior Accountant 1995 1996
Payandan Co. Financial Deputy 1994 1995
C.D.H.O. Financial Manager 1992 1994
Sobat Co. Chief of Accounting 1987 1992
Venusan Co.
EPC Contractor
Vice-chairman & Member of Board
24
Family Name: Khavari Degree Field
Name: Mohammad ali D.B.A. (candidate) Doctorate of Business Administration- 2013 up to
now
Date of Birth: 1961 M.S. MBA (Strategic Management) 2010
Marital Status: Married B.S. Economy 2001
E-mail: [email protected]
Phone number: 09122189075
Personal Information Education
Experiences
Company Position From ToVenusan Engineering and Construction Co.- Vice Chairman of Board 2013 present
United Golf Const. & Gen. Transport P.M.O. & Commercial Manager 2012 2013
B. T. C. Co. (Afghanistan) President 2012 present
Project SC 3+1 & 2 Phase 19 Member of Steering committee 2012 2013
B.T.I.C (in UAE, Dubai) P.M.O. & Commercial Manager 2010 present
Soyasun Co. M.D. 2009 2010
Boland Tabagheh Co. (Iran) Chairman 2004 2013
Naft Gostar Qeshm (Assaluye) 2002 2004
- Jam Petrochemical-PE unit Financial and Logistic Manager
Culverts & Roads- Phase 1 Assaluye Financial and Logistic Manager
Tablieh- Kouhrang, 3rd Tunnel Financial and Logistic Manager 1995 2001
Simava Co. (Bandar Anzali) Shareholder & Founder 1986 1994
Venusan Co.
EPC Contractor
Member of Board
25
Personal Information Education
Family Name: Khorassani Degree Field University Date
Name: Mohsen M.S. Hydrolic Structures Amir Kabir 1990
Date of Birth: 1964 B.S. Civil Engineering
Marital Status: Married
E-mail: [email protected]
Phone number: 09121211833
Experiences
. Company Position From To
• Venusan Engineering and Construction Co.- Member of Board, Senior Projects Manager 2012 Present
• BTIC Co. (UAE- Dubai) Member of Board, Senior Projects Manager 2007 Present
BTIC Co. (Afghanistan- Kabul) Member of Board, Senior Projects Manager 2007 Present
• Boland Tabagheh Construction Co. Member of Board, Vice M.D, Senior Projects Manager. 2007 Present
General Mechanic Co. Member of Board, Regional Director, Senior Projects Manager 1998 Present
• Kavand-sazeh, Consulting & Designing Eng. Co. M.D. 1992 1998
• Nika- sazan Construction Co. Project Manager 1992 1998
Venusan Co.
EPC Contractor
Member of Board
26
Personal Information Education
Family Name: Kianian Degree Field
Name: Ali M.S. Executive Manager
Date of Birth: 1970 B.S. Indutrial Management
Marital Status: Married
E-mail: [email protected]
Phone number: 09121984904
Experiences
Company Position From To* Venusan Engineering and Construction Co. Member of Borad 2012 present
* Payandan Engineering Co. Site Manager- Erection & Construction of Parsian Gas Refinery 2008 2012
Deputy Manager- LGST project- Phases 15&16, Gas Refinery Construction
Plant Manager- Conveying Water Pipelines to Amiriye of Parsian Refinery
Site Manager- Gas Transmission Project to Farmahin, Komijan, Khondab & Milajerd.
Technical Office Manager- Urban Gas Network of related districts (4 projects)
Site Manager- Foundational Installation of Imam Khomeini Airport
Technical Office Manager- Conveying Gas to Shour Abad- Tehran
Anhar CO. Contractor of National Gas Co., Gas Conveying Project of Mehrshahr 1998 2000
Executive Contractor of Gas Conveying to KHatoon Abad
Technical Office Manager- Gas Transmission Project to Saleh Abad
Executive Contractor- performance of Empty cavities lines
Technical Office Manager- Gas Transmission to empty cavities of Nazar Abad
Deputy Manager- LGST project- Phases 15&16, Gas Refinery Construction
Baradaran Engineering CO. Deputy Manager & Technical Office Manager of Gas Conveying Project 1997 1998
Payandan Engineering Co. Technical Office Manager 1996 1997
National Gas Co. Execution Supervisor of 24ʺ Gas pipeline- Northeast of Tehran 1995 1996
Execution Supervisor of 36ʺ Gas pipeline- Ghom to Tehran 1994 1995
Senior Execution Superisor at Tehran Urgent plan 1992 1994
Venusan Co.
EPC Contractor
Project Manager
27
Personal Information Education
Family Name: Yahyazadeh Degree Field
Name: Reza B.S. Mechanical Engineering
Date of Birth: 1978
Marital Status: Married
E-mail: [email protected]
Phone number: 09123343473
Education
Company Position From ToVenusan Engineering and Construction Co. Project Manager 2013 present
Payandan Co. Project Manager- Phase 13 2012 present
QC/QA Deputy 2011 2012
Procurement Engineering Manager 2010 2011
Mechanical Estimation Manager 2008 2010
Technical Deputy & Mechanical and Piping Supervisor 2005 2008
Ava Sanat Co. Zone Manager- South Pars Gas Field development 2003 2005
Payandan Co. Technical Office Manager- Gas transmission Project to Arak 2001 2003
Koosha Payedar Co. Mechanical Dep. Designer & advisor 2001 2003
General Mechanic Co. Technical Officer 2000 2001
Payandan Co. Technical Officer- Imam Airport 1999 2000
Ase Sanat Co. Technical Officer 1998 1999
Venusan Co.
EPC Contractor
Project Manager
28
Personal Information ` Education
Family Name: Malmir Degree Field
Name: Omid M.S. Civil Engineering
Date of Birth: 1976 B.S. Civil & Construction Eng.
Marital Status: Married Junior College Surveying
E-mail: [email protected]
Phone number: 09122151957
Experiences
Company Position From To
Venusan Engineering and Construction Co.- Project Manager 2013 present
Payandan Co. (Oil& Gas Engineering) Site Manager- Phase 13 2002 2013
Site Manager- LGST project of Gas refinery construction
Site Manager- Lamerd International Airport
Execution & Civil Manager- Tabnak Gas Zone Development Civil Surveying Head
of Technical Dep. (Gas transmission Pipeline, khong to Lar
Site Manager (Construction of engineering management warehouse & execution of
NGC Ghom-Neyzar)
Civil & Surveying Head of Technical Dep. (Gas transmission pipeline Arak
Farmihan, Khandab-Milajerd-Komeijan)Raman Co. Surveying Head Manger 2002 2003
Payandan Co. Civil & Surveying Head of Technical Dep.(Imam Khomeini International Airport)
2000 2001
Komiteye Emdad Imam Khomeini Surveying Head Manager (Economical & Constructional Complex) 1998 1999
Raman Co. Surveying Head Manager (Imam Khomeini International Airport) 2002
Kheir alhafezin Engineering Co. Surveying Head Manager (Tehran_Saveh Freeway, Bridge Construction)1997
Sajad Pars Engineering Co. Survey Expert (Tehran-Zanjan Highway) 1994 1996
Hydrogas Electric Engineering Co Draftsman & Execution Expert 1993 1994
`
Venusan Co.
EPC Contractor
Project Manager
29
Personal information Education
Family Name: Rezaei Degree Field
Name: Hamid B.S. Civil & Construction Engineering
Date of Birth: 1977 Diploma Surveying Engineering
Marital Status: Married Grade 2 Supervisor&Executer Of Nezam Mohandesi Tehran
E-mail: [email protected]
Phone number: 09122062638
Experiences
Company Position From ToVenusan Engineering and Construction Co. Project Manager 2013 present
Payandan Co. (Oil& Gas Engineering) 2005 2013
Site Manager, Site Deputy Manager, Executive & Civil Manager, - LGST project of
Gas refinery construction
Site Deputy Manager, Civil Manager- Lamerd International Airport, Fuel Equipment
Development Project
Execution & Civil Deputy Manager- Tabnak Gas Zone Development
Tarahan saze Tarsim Co. 2004 2005
Site Project Manager& Executive and Technical
advisor Industrial Constructs and office buildings,
site preparation of Industrial Zone of Mamoniye City)
Bonyade Taavoone Artesh . Civil & Surveying Head of Technical Dep. 2002 2003
Borje Arman Co. Site Head & Executive Supervisor 1996 2002
30
Family Name: Amirhamzeh Tafreshi Degree Field
Name: Hamid B.S. Chemical Engineering
Date of Birth:
Marital Status: Married
E-mail: [email protected]
Phone number: 09126974271
Company Position From To
Venusan Co. M.D. Advisor 2013 Present
Payandan Co. M.D. Advisor- Assaloye, Gas Refineries 2009 Present
Head of Technical Office& Process Team 2006 2009
Chagalesh Co. Plant Process Engineering 2004 2005
PIDEC Plant Process Engineering 2002 2003
SANA Co. Maintenance Supervisor 1999 2002
EIED Co Head of Mechanical Maintenance 1998 1999
OIEC Shift Superintendent 1994 1998
Enerchimi Co. Head of Control Room 1994 1998
NIOC 1969 1983
- Tabriz Refineries (VDU & CRU & LPG) – Shift Supervisor
- Shiraz Refineries (H2S & ISO max & CRU) – Shift Supervisor
- Tehran Refineries (H2S removal& Sulfur & CRU & LPG) – Head Opeartor
Venusan Co.
EPC Contractor
Personal information Education
Experiences
Venusan Co.
EPC Contractor
General Software's
Steel Structure
Software'sX-Steel
Auto Cad
Boo Cad
Engineering
Software's
PDMS
Spoolgen
PV-Elite
CAESAR
HYSYS
Auto Cad P&ID
Management
Software's
PCS
31