Venusan Co.

EPC Contractor

E-mail: [email protected]

Site: www.venusan.co

Phone: 0098-21 44306005

Fax: 0098- 21 44306640 1

Page 2: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

History & Background

Policy

Scope of Activities

Organization Chart

Members of Boards

Current Projects (Completed or Under Execution)

MEG&MRU –Phase 19

- UNITS 108&144 15 & 16

- HVAC 17 & 18

- MC 17 & 18

- Civil & UG – Phase 17&18

- UNITS 113&114&115 – 22 , 23 & 24

- MOHR FACTORY

Previous Projects

Senior Managers of the Company

Managers’ Resumes

Company General Software

Certificates

2

Page 3: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

History & Background

Venusan Company as an EPC contractor was founded in 2012 under No. 422098 in Tehran Companies

Registration Office. The activities area of this company includes: Engineering, Procurement &

Construction services in the fields of Energy , executing the oil and gas transmission pipelines

projects and related activities. The most and foremost part of Venusan executive performances and its

managers’ and founders’ experiences traces , engineering and executing different and numerous

projects. In this regard, this company has started the construction of Venusan Factories Complex in

Mohr Industrial Area to build and prepare the required equipment and materials. This company is

ready to participate in every related project due to its experienced and skillful managers and experts,

modern machineries and required equipment.

This company believes in Corporate Governance and also observes all beneficiaries’ rights to reach growth and

development of its shareholders and staff. The governance principles of Venusan Company are as

follows:

Venusan Company prefers and focuses on transparency and integration as two key principles.

Venusan executes and performs all of its activities and policies in accordance with applicable general

and particular laws and regulations and also in parallel to its Codes and employers’ standards and ethic

norms.

Mutual observation and respecting and considering beneficiaries’ rights are two of the most important

and base of Venusan company activities.

The appointment of Members of Board and Managing Director shall be performed in a democratic and

clear atmosphere with the observation and considering all shareholders’ rights.

Venusan Co.

EPC Contractor

3

Page 4: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

The Policy of Venusan Company

Venusan Company, holding the Registration No. 422098 is offering Engineering,Procurement and Construction services in the fields of oil, gas and other relatedareas which plays a significant role in development of our country and reachinghigher goals through the employment of skillful and experienced managers andexperts.

Mission

Designing, procurement of sources and equipment & execution of different projectsin the field of oil, gas and energy, civil projects, road works, buildings and otherconstructions

Vision

To be known as one of the 10 greatest EPC companies in our country andparticipate actively in national and international projects in the fields of oil, gas andenergy regarding the mission of our company and execution of EPC projects.

Values

Quality, innovation, Smart and skillful work, observing national benefits, keepingand secrecy with respecting the beneficiaries’ interests and observing theprofessional ethics.

4

Page 5: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Strategy Policy

-speed in executing the projects

-high quality in accordance with contract and

regulations conditions

-planning to execute the projects properly with

observing permanent and safe development principles

-giving suggestions and problem solutions to the

employer to improve the quality, safety and increase the

economic lifetime of the projects

-utilizing modern technologies to execute the project

-residuum and sources management

-Supervising the sub-contractors’ activities

-safety risks and HSE control

- motivating the personnel

Obtaining the consent of Employers and projects users

permanent development, preserving the environment

and preventing the pollution

preventing work accidents and injuries

- Progressive development of every affairs in the

company

I, as the Managing Director of Venusan Company have selected ISO 9001:2008, ISO 14001: 2004,

OHSAS 18001: 2007, TS 29000: 2010 standards and HSE-MS of Oil Ministry as our guidelines and

expect all the personnel and contractors to observe accurately these guidelines and standards.

Managing Director

Venusan Co.EPC Contractor

5

Page 6: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

The Scope of Activities of the Company

Engineering, Procurement, and Construction of:

1.Oil, Gas & Water Transmission Pipeline & Facilities

2.Refinery, Petrochemical & Productivity Plants

3.Wellhead Facilities, Gathering & Gas Injection

4.Compressor & Pumping Stations

6

Page 7: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

7

Page 8: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

8

Vice chairman of Board- Mohammad Ali Khavari

Managing Director & Member of Board- Rasoul Yahyazade

Chairman of Board- Akbar Bagheri

Member of Board- Mohsen Khorassani

Member of Board- Ali Kianian

Page 9: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Current Project

MEG Package – Phase 19

HVAC – Phases 17&18

MC – Phases 17&18

Civil – Phases 17&18

Phases 22&23&24

Phases 15&16

9

Venusan Co.

EPC Contractor

Page 10: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Project: UNITS 108,144 Phase 15&16

Clint: Arya Naft Shahab

Location: South Pars Assalouyeh

10

Page 11: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

HVAC Project- SP 17 & 18• Project: HVAC (Heating Ventilation & Air Conditioning)- Phases 17 & 18 – South Pars

• Project Type: PC

• Contract No.: SP17&18-HVAC-18

• Client: Industrial Projects Management of Iran (IPMI)

• Project Location: Phases 17 & 18 – South Pars- Assalouyeh- Boushehr

• Project Description: Construction, material and resources procurement, installation, completion, punchremoval, pre-commissioning and assistant in commissioning the mechanical and HVAC systems, civilworks, electrical and instrument, mechanical and HVAC systems control, as well as EWSD and CO2

system of industrial buildings (S.S , GIS) of 17 & 18 phases of South Pars.

EWSD:

EWSD (Elektronisches Wählsystem Digital in German, Electronic Digital Switching System/ElectronicWorld Switch Digital in English) is one of the most widely installed telephone exchange systems in theworld. EWSD can work as a local or tandem switch or combined local/tandem, and for landline or mobilephones.

CO2 System:

CO2 or Carbon Dioxides is an odorless, colorless and neutral gas with numerous qualities which makes itsuitable as a fire-fighting substance. CO2 is useful and applicable especially in fighting the fire caused bygas and electronic devices. Additionally, it is ideal to be used in closed environments such as controlrooms, S.S, GIS because there is no need to clean the environment after its usage. CO2 gas is stored incylinders and under-pressure tanks as liquid.

11

Page 12: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

12

Page 13: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

MC Project- SP 17 & 18

• Project: Management of Construction - Phases 17 & 18 – South Pars Gas Field development

• Project Type: MC

• Contract No.: 100-9374696

• Client: Industrial Projects Management of Iran (IPMI)

• Project Location: Phases 17 & 18 – South Pars- Assalouyeh- Boushehr

• Project Description: collecting and organizing the project records and documents, creating adata base, monitoring the daily, weekly and monthly activities, presenting the project reportsand reports of progress, determining work front, determining the details of installation andexecution, determining the activities procedure according to the fixed priorities, Mark up planof maps, preparing the contractors’ invoices, preparing MC book, preparing the contractors’interface and MTO.

• Purpose of the project: Comprehensively Gathering data in the fields of engineering,procurement and construction of the project to process and present the unique report toproperly control and manage each project in different disciplines as a powerful tool besides theproject manager by the use of prepared technical software.

• Some of the activity scope of this project includes:

Work Front

Material Status

Spool Status

Test package Status, etc.

13

Page 14: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

14

South Pars Gas - Phases 22&24Project: Unit 113,114,115

Client: Petro Sina Arya

Project Location: Phase 22&24 - South Pars - Kangan

Project Description: Complete Civil- Mec.- St.St.- Piping in unit 113,114,115

Venusan Co.

EPC Contractor

Page 15: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

South Pars Gas Filed Development–Phase 19 Plot Plan

Project: MEG & MRU Packages

Client: Petro Pars Iran (PPI)

Project Location: Phase 19 - South Pars - Kangan

Project Description: Installation of MEG & MRU Packages

Description Quantity Unit

Piping 72,000 ID

Supporting 31,000 Kg

Mechanical 1000 Ton

Heavy

Structure

1,100 Ton

Light Structure 370 Ton

Cabling 17,000 m

Instrument

Device

2,950 No.

15

Page 16: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Mohr Factory

Project Description

This project is supposed to be completed in 3 phases, each lasting for 2 years. It is a steel pre-fabricatedparts factory. The main activities of this factory includes: production of drilling raft parts, maintenance andfabrication of related equipment, establishment of a technical institute to teach the required skills in thefabrication and installment of upstream and downstream equipment in the oil and gas industries.

Application and employment of the local resources like talented manpower, satisfying the civil andnational needs, etc. in the petrochemical, refineries and other industries and general urban and non-urbanprojects are of the main goals of the present project.

To accomplish this project, either the trained or later will be trained local manpower will be employed andit is expected to supply about 70% of the required manpower from the local people.

Phase 1:

The executive team in the steel pre-fabricated parts and other related equipment unit will be about 150people in technical, support, management and executive departments who will be chosen among trained,talented and skillful local applicants.

phase 2:

Activities like maintenance, repairing the equipment, fabrication of different parts as well as drilling raftwill be added to the activities of phase 1 and 50 other people will be also added to the previous employedmanpower. a standard training institute will be established to serve as a technical college in order toprovide services in different technical fields such as: wielding, turning, topography, computer and otherrelated fields to increase the technical and professional knowledge of people.

16

Page 17: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractorphase 3:

This phase will be initiated after 4 years when every other unit has set out and the basic capacities have

increased significantly. It is estimated to add another 100 people to our manpower. It should be noticed

that we will be trying to satisfy a part of our country’s civil demands and create an industrial pole

consisting of our factory as its focus and center point. This factory will play a great role not only as a

training center but also will help to create job opportunities for local people.

Required Manpower in 3 Phases

Manpower in technical, executive & support units according to separate phases

150Phase 1

50Phase 2

100Phase 3

300Total

17

Page 18: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Project Client Contractor Venusan Company

South Pars Gas Filed

Development–Phases 22, 23 &

24Petro Sina Arya (P.S.A) PAYANDAN CO. Management Team

South Pars Gas Filed

Development–Phase 13 Petro Paydar Iranian (P.P.I) PAYANDAN CO. Management Team

South Pars Gas Filed

Development–Phase 19 Petro Pars Iran (P.P.I) Boland Tabagheh Co. Management Team

South Pars Gas Filed

Development–Phases 15 & 16 Arya Naft Shahab PAYANDAN CO. Management Team

Parsian Gas Refinery IPMI PAYANDAN CO. Management Team

12" Khonj-Lar Gas pipeline NIGC PAYANDAN CO. Management Team

10" & 8" Arak Gas PipelineNIGC PAYANDAN CO. Management Team

Imam Khomeini International

Air Port, Piping System Road Ministry PAYANDAN CO. Management Team

Tabnak Gas Field

Development Project (Piping,

Civil, foundational equipment,

etc.)

NIGC PAYANDAN CO. Management Team

Lamard International Airport

(Mechanical & Foundational

equipment)Road Ministry PAYANDAN CO. Management Team

nternational City Project –

Phases I & II, Dubai General Mechanic Co. Management Team

Al-Ethehad Railway Project -

EUA BTIC Co. Management Team

Third Tunnel – Kouhrang Tabliyeh Co. Management Team18

Page 19: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Parsian Gas Refinery

The project is in form of EPC (in cooperation with IPMI) for 43 MMCM/D gas

treating plant in Lamerd (South of Iran) which includes slug catcher,

separation, dehydration, Hg removal, LPG extraction and fractionation units,

receiving facilities, chilling units, butane and propane storages, metering and

VRU compressor units in order to produce following products :

450,000 ton/year propane, 310,000 ton/year butane, 11 MM BBL/year

condensate(C5+), 850,000 ton/year ethane and 1520 MMSCFD lean gas.

Main parts of the work consist of installation of 8,500 ton steel structures,

4,000 tons mechanical equipment, 200,000 in-dia. piping, 330 km cabling for

instrument and electrical system,40,000 m³ concrete and 32,000 m² building,

preparing As built drawings, equipment reservation

Parsian Gas Refinery

Description

Civil St.St. Piping Equipment Electrical Instrument Non

Building

Industrial

m3 Ton ID Kg Eq. (no.) Cab. (m) Dev. (no.) Cab. (m) m²

Quantity 70,000 10,000 250,000 4,500 120 150,000 2,100 180,00

0

23,000

19

Page 20: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Parsian Gas Refinery

20

Page 21: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

• Resumes of Managers and Shareholders of the Company

21

Page 22: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Managing Director- Member of Board

22

Personal Information Education

Family Name: Yahyazadeh Degree Field

Name: Rasoul B.S. Economy

Date of Birth: 1969

Marital Status: Married

E-mail: [email protected]

Phone number: 09121213212

Experiences

Company Position From ToVenusan Engineering and Construction Co. M.D. 2012 present

Payandan Engineering Co. 1997 2012

Project Manager- Refinery Projects of phases 13, 22&24, 15&16, etc.

Project Manager- LGST project- Phases 15&16, Gas Refinery Construction

Project Manager- Erection & Construction of Parsian Gas Refinery

Project Manager- Conveying Water Pipelines to Amiriye of Parsian Refinery

Project Manager- Gas Transmission Project to Aouz, Khonj, Lar, Farmahin, Arak,

etc.

Project Manager- Urban Gas Network of related districts (6 projects)

Project Manager- Foundational Installation of Imam Khomeini Airport

Koosha Paydar Co. Expert & Designer of Foundational Installation 1996 2004

Peydar Co. (Engineering Dep.) Expert & Designer of Foundational Installation 1994 1996

Pars Sina Gostar Co. Chairman of Board 1992 1994

Page 23: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

chairman of board

23

Personal Information Education

Family Name: Bagheri Degree Field University

Name: Akbar B.S. Economy Allameh Tabatabaee

Date of Birth: 1963

Marital Status: Married

E-mail: [email protected]

Phone number: 09121148102

Experiences

Company Position From To

Venusan Engineering and Construction Co. Chairman of board 2012 present

Iranian Urban Development International Co. M.D.Deputy 2011 2012

Industrial Management Co. Instructor 2006 2008

Haffari Shomal Co. Economy Advisor

Payandan Co. Member of board 1996 2011

Hessam Accounting Co. Senior Accountant 1995 1996

Payandan Co. Financial Deputy 1994 1995

C.D.H.O. Financial Manager 1992 1994

Sobat Co. Chief of Accounting 1987 1992

Page 24: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Vice-chairman & Member of Board

24

Family Name: Khavari Degree Field

Name: Mohammad ali D.B.A. (candidate) Doctorate of Business Administration- 2013 up to

now

Date of Birth: 1961 M.S. MBA (Strategic Management) 2010

Marital Status: Married B.S. Economy 2001

E-mail: [email protected]

Phone number: 09122189075

Personal Information Education

Experiences

Company Position From ToVenusan Engineering and Construction Co.- Vice Chairman of Board 2013 present

United Golf Const. & Gen. Transport P.M.O. & Commercial Manager 2012 2013

B. T. C. Co. (Afghanistan) President 2012 present

Project SC 3+1 & 2 Phase 19 Member of Steering committee 2012 2013

B.T.I.C (in UAE, Dubai) P.M.O. & Commercial Manager 2010 present

Soyasun Co. M.D. 2009 2010

Boland Tabagheh Co. (Iran) Chairman 2004 2013

Naft Gostar Qeshm (Assaluye) 2002 2004

- Jam Petrochemical-PE unit Financial and Logistic Manager

Culverts & Roads- Phase 1 Assaluye Financial and Logistic Manager

Tablieh- Kouhrang, 3rd Tunnel Financial and Logistic Manager 1995 2001

Simava Co. (Bandar Anzali) Shareholder & Founder 1986 1994

Page 25: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Member of Board

25

Personal Information Education

Family Name: Khorassani Degree Field University Date

Name: Mohsen M.S. Hydrolic Structures Amir Kabir 1990

Date of Birth: 1964 B.S. Civil Engineering

Marital Status: Married

E-mail: [email protected]

Phone number: 09121211833

Experiences

. Company Position From To

• Venusan Engineering and Construction Co.- Member of Board, Senior Projects Manager 2012 Present

• BTIC Co. (UAE- Dubai) Member of Board, Senior Projects Manager 2007 Present

BTIC Co. (Afghanistan- Kabul) Member of Board, Senior Projects Manager 2007 Present

• Boland Tabagheh Construction Co. Member of Board, Vice M.D, Senior Projects Manager. 2007 Present

General Mechanic Co. Member of Board, Regional Director, Senior Projects Manager 1998 Present

• Kavand-sazeh, Consulting & Designing Eng. Co. M.D. 1992 1998

• Nika- sazan Construction Co. Project Manager 1992 1998

Page 26: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Member of Board

26

Personal Information Education

Family Name: Kianian Degree Field

Name: Ali M.S. Executive Manager

Date of Birth: 1970 B.S. Indutrial Management

Marital Status: Married

E-mail: [email protected]

Phone number: 09121984904

Experiences

Company Position From To* Venusan Engineering and Construction Co. Member of Borad 2012 present

* Payandan Engineering Co. Site Manager- Erection & Construction of Parsian Gas Refinery 2008 2012

Deputy Manager- LGST project- Phases 15&16, Gas Refinery Construction

Plant Manager- Conveying Water Pipelines to Amiriye of Parsian Refinery

Site Manager- Gas Transmission Project to Farmahin, Komijan, Khondab & Milajerd.

Technical Office Manager- Urban Gas Network of related districts (4 projects)

Site Manager- Foundational Installation of Imam Khomeini Airport

Technical Office Manager- Conveying Gas to Shour Abad- Tehran

Anhar CO. Contractor of National Gas Co., Gas Conveying Project of Mehrshahr 1998 2000

Executive Contractor of Gas Conveying to KHatoon Abad

Technical Office Manager- Gas Transmission Project to Saleh Abad

Executive Contractor- performance of Empty cavities lines

Technical Office Manager- Gas Transmission to empty cavities of Nazar Abad

Deputy Manager- LGST project- Phases 15&16, Gas Refinery Construction

Baradaran Engineering CO. Deputy Manager & Technical Office Manager of Gas Conveying Project 1997 1998

Payandan Engineering Co. Technical Office Manager 1996 1997

National Gas Co. Execution Supervisor of 24ʺ Gas pipeline- Northeast of Tehran 1995 1996

Execution Supervisor of 36ʺ Gas pipeline- Ghom to Tehran 1994 1995

Senior Execution Superisor at Tehran Urgent plan 1992 1994

Page 27: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Project Manager

27

Personal Information Education

Family Name: Yahyazadeh Degree Field

Name: Reza B.S. Mechanical Engineering

Date of Birth: 1978

Marital Status: Married

E-mail: [email protected]

Phone number: 09123343473

Education

Company Position From ToVenusan Engineering and Construction Co. Project Manager 2013 present

Payandan Co. Project Manager- Phase 13 2012 present

QC/QA Deputy 2011 2012

Procurement Engineering Manager 2010 2011

Mechanical Estimation Manager 2008 2010

Technical Deputy & Mechanical and Piping Supervisor 2005 2008

Ava Sanat Co. Zone Manager- South Pars Gas Field development 2003 2005

Payandan Co. Technical Office Manager- Gas transmission Project to Arak 2001 2003

Koosha Payedar Co. Mechanical Dep. Designer & advisor 2001 2003

General Mechanic Co. Technical Officer 2000 2001

Payandan Co. Technical Officer- Imam Airport 1999 2000

Ase Sanat Co. Technical Officer 1998 1999

Page 28: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

Project Manager

28

Personal Information ` Education

Family Name: Malmir Degree Field

Name: Omid M.S. Civil Engineering

Date of Birth: 1976 B.S. Civil & Construction Eng.

Marital Status: Married Junior College Surveying

E-mail: [email protected]

Phone number: 09122151957

Experiences

Company Position From To

Venusan Engineering and Construction Co.- Project Manager 2013 present

Payandan Co. (Oil& Gas Engineering) Site Manager- Phase 13 2002 2013

Site Manager- LGST project of Gas refinery construction

Site Manager- Lamerd International Airport

Execution & Civil Manager- Tabnak Gas Zone Development Civil Surveying Head

of Technical Dep. (Gas transmission Pipeline, khong to Lar

Site Manager (Construction of engineering management warehouse & execution of

NGC Ghom-Neyzar)

Civil & Surveying Head of Technical Dep. (Gas transmission pipeline Arak

Farmihan, Khandab-Milajerd-Komeijan)Raman Co. Surveying Head Manger 2002 2003

Payandan Co. Civil & Surveying Head of Technical Dep.(Imam Khomeini International Airport)

2000 2001

Komiteye Emdad Imam Khomeini Surveying Head Manager (Economical & Constructional Complex) 1998 1999

Raman Co. Surveying Head Manager (Imam Khomeini International Airport) 2002

Kheir alhafezin Engineering Co. Surveying Head Manager (Tehran_Saveh Freeway, Bridge Construction)1997

Sajad Pars Engineering Co. Survey Expert (Tehran-Zanjan Highway) 1994 1996

Hydrogas Electric Engineering Co Draftsman & Execution Expert 1993 1994

Page 29: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

`

Venusan Co.

EPC Contractor

Project Manager

29

Personal information Education

Family Name: Rezaei Degree Field

Name: Hamid B.S. Civil & Construction Engineering

Date of Birth: 1977 Diploma Surveying Engineering

Marital Status: Married Grade 2 Supervisor&Executer Of Nezam Mohandesi Tehran

E-mail: [email protected]

Phone number: 09122062638

Experiences

Company Position From ToVenusan Engineering and Construction Co. Project Manager 2013 present

Payandan Co. (Oil& Gas Engineering) 2005 2013

Site Manager, Site Deputy Manager, Executive & Civil Manager, - LGST project of

Gas refinery construction

Site Deputy Manager, Civil Manager- Lamerd International Airport, Fuel Equipment

Development Project

Execution & Civil Deputy Manager- Tabnak Gas Zone Development

Tarahan saze Tarsim Co. 2004 2005

Site Project Manager& Executive and Technical

advisor Industrial Constructs and office buildings,

site preparation of Industrial Zone of Mamoniye City)

Bonyade Taavoone Artesh . Civil & Surveying Head of Technical Dep. 2002 2003

Borje Arman Co. Site Head & Executive Supervisor 1996 2002

Page 30: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

30

Family Name: Amirhamzeh Tafreshi Degree Field

Name: Hamid B.S. Chemical Engineering

Date of Birth:

Marital Status: Married

E-mail: [email protected]

Phone number: 09126974271

Company Position From To

Venusan Co. M.D. Advisor 2013 Present

Payandan Co. M.D. Advisor- Assaloye, Gas Refineries 2009 Present

Head of Technical Office& Process Team 2006 2009

Chagalesh Co. Plant Process Engineering 2004 2005

PIDEC Plant Process Engineering 2002 2003

SANA Co. Maintenance Supervisor 1999 2002

EIED Co Head of Mechanical Maintenance 1998 1999

OIEC Shift Superintendent 1994 1998

Enerchimi Co. Head of Control Room 1994 1998

NIOC 1969 1983

- Tabriz Refineries (VDU & CRU & LPG) – Shift Supervisor

- Shiraz Refineries (H2S & ISO max & CRU) – Shift Supervisor

- Tehran Refineries (H2S removal& Sulfur & CRU & LPG) – Head Opeartor

Venusan Co.

EPC Contractor

Personal information Education

Experiences

Page 31: Venusan Co. EPC Contractorvenusanco.ir/Venusan_01CD_LK_H/UP/UPLOAD/VNS_LK... · Phases 15&16 9 Venusan Co. EPC Contractor. Venusan Co. EPC Contractor ... as well as EWSD and CO 2

Venusan Co.

EPC Contractor

General Software's

Steel Structure

Software'sX-Steel

Auto Cad

Boo Cad

Engineering

Software's

PDMS

Spoolgen

PV-Elite

CAESAR

HYSYS

Auto Cad P&ID

Management

Software's

PCS