26
© Vattenfall AB Vattenfall Eldistribution AB, Sweden Project AMR – Automatic Meter Reading METERING EUROPE 2005, Barcelona Smart Metering Experiences Erik Nordgren Head of AMR-project Vattenfall Eldistribution AB

Vattenfall Eldistribution AB, Sweden Project AMR ... Nordgren.pdf · Vattenfall Eldistribution AB, Sweden Project AMR – Automatic Meter Reading METERING EUROPE 2005, Barcelona Smart

  • Upload
    buidat

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

© Vattenfall AB

Vattenfall Eldistribution AB, SwedenProject AMR – Automatic Meter Reading

METERING EUROPE 2005, BarcelonaSmart Metering Experiences

Erik Nordgren Head of AMR-project

Vattenfall Eldistribution AB

© Vattenfall AB

2September 2005

� Vattenfall Group in brief

� Vattenfall Eldistribution AB

� The Automatic M eter Reading Project

�Background

�Procurement, installation, roll-out

�Lessons learned – so fare

Content of presentation

© Vattenfall AB

3September 2005

� Vattenfall Group in brief

� Vattenfall Eldistribution AB

� The Automatic M eter Reading Project

�Background

�Procurement, installation, roll-out

�Lessons learned – so fare

Content of presentation

© Vattenfall AB

4September 2005

Vattenfall Group in brief

� Europe’s fifth largest generator of electricity and the largest generator of heat. Net sales12,586 MEUR and a net profit of 1,307 MEUR for year 2004

� Vision: To be a leading European energy company.

� Operations in Sweden, Finland, Denmark, Germany and Poland

� Electricity generation, transmission, distribution sales and trading. Annual generation 167.1 TWh

� Heat generation, distribution and sales. Annual generation 34.5 TWh

� About 33,000 employees.

� Vattenfall AB is wholly owned by the Swedish State.

© Vattenfall AB

5September 2005

� Vattenfall Group in brief

� Vattenfall Eldistribution AB

� The Automatic M eter Reading Project

�Background

�Procurement, installation, roll-out

�Lessons learned – so fare

Content of presentation

© Vattenfall AB

6September 2005

Local network850 000

Regional network

260

Number of customers: Transmission, GWh

Lokalnät104 000

Regional network16 000

Total cable length, km

Number of employees :

730

Replacement cost

54 000 MSEK

MSEK

Net sales 6500

Result 1600

Investments 1400

Local networks15 100 GWh

Regional networks72 500 GWh

(Year: 2004)

Vattenfall Eldistribution AB – key figures 2004

© Vattenfall AB

7September 2005

� Vattenfall Group in brief

� Vattenfall Eldistribution AB

� The Automatic M eter Reading Project

�Background

�Procurement, installation, roll-out

�Lessons learned – so fare

Content of presentation

© Vattenfall AB

8September 2005

Being no 1!

Environment

Economy

Vattenfall is number one when the customer considers us as the obvious first hand choice.

Lars G. Josefsson, President & CEO

Customer

Vattenfall being number ONE for:

Vision Goal

Highest customer reliance!

Göran Lundgren, Head of BU Distribution Sweden

Vattenfall Project AMR

© Vattenfall AB

9September 2005

…with increased demands from authorities…

Government proposition

2002/03:85

Vissa elmarknadsfrågor(“Some questions regarding the market for electricity”)

� Monthly readings for all customers at the latest 01 July 2009

� Hourly readings for all customers having a subscription of electricity with a power limit 80-200 Amperes at the latest by 1 July 2006

Ministry of Industry, Employment and Communication

Vattenfall Project AMR

© Vattenfall AB

10September 2005

…and towards the focus on the customers

”I would like to understand my electricity bill.”

”I would like to be able to pay for my real

electricity consumption only.”

”I would like to understand the

information in order to know what I am

paying for.”

Vattenfall Project AMR

© Vattenfall AB

11September 2005

� Market oriented sourcing

� Options and alternatives

� Purchase Strategy

� Public Procurement Process

The Sourcing Strategy – important issuesVattenfall Project AMR

© Vattenfall AB

12September 2005

Contract

”Shortlist”

Negotiations

Month 1

Pre-Qualification

Request for Tender

M2 M3 M4 M5 M6 M7

Evaluation

Tender

Announcement – TED

The Sourcing Strategy – other issues…..Vattenfall Project AMR

Purchase lead time

© Vattenfall AB

13September 2005

AMR Meters

Radio

PLC

WAN

GSM

GPRS

Capacity and plan for delivery

System performance

Financial strength

Service & Support

Cost & LCC

Commercial conditions

Tender compliance

QA / Environment

References

Product quality

Vattenfall Project AMRThe Sourcing Strategy – other issues…..

Supplier evaluation

© Vattenfall AB

14September 2005

The first contract…..

ProcurementThe AMR Contract I Signed in June 2003

Type of contract: Turn-Key, frame contract

Supplier: Actaris

Main area of roll-out: South west of Sweden

Scope, phase I 50 000 meter nodes

phase II 50 000 meter nodes

phase III 50 000 meter nodes

Technology

Vattenfall Project AMR

Radio Communication

Concentrator

Concentrator

AMR Meters

AMR Meters

WAN

Radio CollectorMeterCentral AMR system

GSM

© Vattenfall AB

15September 2005

The second contract…..

ProcurementThe AMR Contract II Signed in July 2004

Type of contract: Turn-Key, frame contract

Supplier: Iskraemeco

Main area of roll-out: Middle part of Sweden

Scope, phase I: 50 000 meter nodes

phase II: 50 000 meter nodes

phase III: 50 000 meter nodes

options: 300 000 meter nodes

Technology

Vattenfall Project AMR

PLC Communication

PLC Collector

PLC Collector

AMR Meters

AMR Meters

PLC

WAN

Meter PLC Concentrator Central AMR system

GPRS

© Vattenfall AB

16September 2005

The third contract…..

ProcurementThe AMR Contract III Plan to be signed in November 2005

Type of contract: Functional service contract

Main area of roll-out: All over Sweden

Scope, phase I-VI 300 000 meter nodes

options 400 000 meter nodes

Technology

Vattenfall Project AMR

© Vattenfall AB

17September 2005

Contract Implementation Process

Installation of the central

system

Preparation at the start of the

contract

Education –systems and installations

Planning & installation of

MSA

Contract completion

• Project plans

• Systems interface

• Instructions

• Directions

• Material

• Installation of infrastructure and communication

• Development of systems

• Integration of systems

• Testing of systems

• Collection

• Installation & planning

• Start of Mile Stone Areas, ~ 5000 nodes

• Planning of infrastructure

• Installation of infrastructure

• Installation of meters

• Control of communication and Clean-up

• Site Acceptance Test and handling over

Vattenfall Project AMR

• Final Acceptance

• Guarantee period

© Vattenfall AB

18September 2005

Installation Roll Out PlanVattenfall Project AMR

Meter Installation

0

100000

200000

300000

400000

500000

600000

700000

800000

900000

2003 2004 2005 2006 2007 2008

Numbers of meters

© Vattenfall AB

19September 2005

Integration with existing systems

Daily collectionDaily collection

MDMS

&

Meter Asset

System

EAI*

Exact

Invoice

A-Collect

KoncentratorPLC

PLC Communication

CustCom

Radio Communication

Collector 250

Radio EAI*

Database for meter readings

(WO)

(Work Order info)

Vst

ore Meter

Reads

Billing system

Network Information system

Existing system environment

* EAI – Enterprise Application Integration

Point to Point Communication

Meter Reads

AMR Supplier External system

WO

Monthly exportingMonthly exporting

Vattenfall Project AMR

© Vattenfall AB

20September 2005

The AMR Project organisation

AMR Project Management

AMRSystem

AMRRoll outActaris AMR Processes

AMR Steering Board

AMRRoll out

Iskraemeco

Mile Stone Area

Eldistribution AB

Mile Stone Area

Mile Stone Areas

”North”

”Middle”

”East”

”West”

Vattenfall Project AMR

AMRIskraemecoHourly Read

MSA

© Vattenfall AB

21September 2005

� Vattenfall Group in brief

� Vattenfall Eldistribution AB

� The Automatic M eter Reading Project

�Background

�Procurement, installation, roll-out

�Lessons learned – so fare

Content of presentation

© Vattenfall AB

22September 2005

Comparison - Radio or PLC technology

PLC Communication

Radio Communication

Installation and O & M Communication

• Placement of equipment up high to secure radio connection

• May require installation of a external antenna

• Requires 2 people to undertake service

• Placement of equipment low

• No need for an installation of an extra antenna

• Requires only 1 person to undertake service actions

• PLC based communication on the dedicated A-band for power line communication

• After installation, the set-up between the Concentr ator database and the Central AMR system, is initiated by the AMR system. The delivery point must have been created in the Ce ntral AMR system

• The Central AMR system initiate the meter read coll ection by using the network IP-addresses

• GPRS communication between collector and the centra l system

• The system only collects meter reads stored in the meter for theprevious day. Missing data needs separate handling.

• System influence from power line interference, eg. engines and pumps

• Radio based communication on the free band, frequen cy 433MHz

• After installation, the meters are logging on to th e Collector by themselves and reports to the Central AMR system

• The Central AMR system initiate the meter read coll ection by dialling up the Collector

• GSM communication between collector and the central system

• The system collects all meter reads stored in the m eter

• Weather sensitive – better radio communication when cloudy

Concentrator

Concentrator

AMR Meters

AMR Meters

WAN

Radio CollectorMeter Central AMR system

GSM

PLC Collector

PLC Collector

AMR Meters

AMR Meters

PLCWAN

Meter PLC Concentrator Central AMR system

GPRS

Vattenfall Project AMR

© Vattenfall AB

23September 2005

Experiences and lessons learned – Procurement

� Sourcing

� Options

� Evaluation

� Standardisation

� Interfaces

Vattenfall Project AMR

© Vattenfall AB

24September 2005

Experiences and lessons learned – Planning

� Project organisation and methodology

� Project and operational organisation

� Time scheduling

� Change management

Vattenfall Project AMR

© Vattenfall AB

25September 2005

Experiences and lessons learned – Roll- out

� Project planning and control

� Customer contacts, communication

� Training of installation teams

� Delivery and logistics of surplus materials

� Quality control

� Inspections and follow-ups

� Routines for handing over to operational organisati on

� Operation & maintenance v s installation

Vattenfall Project AMR

© Vattenfall AB

Vattenfall Eldistribution AB, SwedenProject AMR – Automatic Meter Reading

Thank you for your attention!

METERING EUROPE 2005, BarcelonaSmart Metering Experiences