Vattenfall and
the HYBRIT project2018-09-13
Mikael Nordlander
…
1Confidentiality –None (C1)
2
Fossil free within one generation
Confidentiality –None (C1)
Sweden - a good place to start
98 31 16
…% fossil free
power
generation
…€/MWh
average spot
price in 2017
…TWh/yr
electricity
exported
2013-2017
Confidentiality –None (C1)
If you want to replace fossil fuels – it matterswhat you can squeeze out of a piece of land
Confidentiality –None (C1)
That’s why…we want to electrify everything
THE TRANSPORT SECTOR HEATING THE INDUSTRY
Confidentiality –None (C1)
To live up to the Paris Agreement, Swedish industry and transports need to be handled
32%
32%
9%
13%
14%
Total GHG emissions 2016
Domestic transports
Industry
Power and heat
Agriculture
Other
36%
19%
16%
9%
5%
4%2%
8%
Industrial GHG emissions 2016
Iron- and steel
Minerals (cement)
Refineries
Chemistry
Pulp and paper
Other metals
Food
Other
Source: Swedish Environmental Protection Agency
52.9 Mton 16.9 Mton
Confidentiality –None (C1)
Fossil free steel with SSAB/LKAB
Confidentiality –None (C1)
Close to complete elimination of CO2
Confidentiality –None (C1)
HYBRIT roadmap
9
2025-20352018-20242016-2017
Feasibility study phase Pilot phase Demonstration phase
2018
Pilot plant “green light” decision
2018-2020
Construction of pilot plant
2020-2024
Pilot plant trials
2016-2017
Feasibility study
2017
Joint venture formed
2017
Start of 4 year R&D program
Confidentiality –None (C1)
HYBRIT – prefeasibility conclusions
• No new major technical showstoppers identified• However, significant development efforts required to
overcome main challenges
• 20-30% increase in crude steel production cost• Cost structure strongly dependent on prices of coking coal,
electricity and CO2 emission rights
• Further optimisation possible
• On the same level or better than competing alternatives
• Anticipated shift in prices and market demands make fossil-free steel an attractive option
• Strengthened belief in the concept
Proceed with pilot plant (decision Feb 2018)
+20-30%
Confidentiality –None (C1)
HYBRIT pilot plant - the next step
• Pre-engineering and design since January
• Location Luleå & Malmberget
• Direct reduction: ~1 ton/h DRI
• H2: ~600-700 Nm3/h (~3-4 MWe)
• Steel (EAF): ~10 ton/batch
• H2 storage: TBD 2019
• Time schedule
• Start groundwork summer 2018
• Commissioning early 2020
• Test campaigns 2020-2024
• Total cost 2018-2024 ~150 M€
• Includes CAPEX + OPEX for whole test period
• Co-funded by Swedish Energy Agency
Direct reduction
Electrolysis
Steel (EAF)
PelletsMalmberget
Luleå
Pellets
Confidentiality –None (C1)
H2 storage – an important part of the HYBRIT concept
• Underground H2 gas storage the most cost effective storage alternative
• Salt caverns not available in Sweden
• Lined Rock Cavern (LRC) storage promising alternative
• Natural gas LRC demo in operation in Sweden (Skallen) since early 2000
• Main challenges are 1) the liner material selection, and 2) rock mechanics at dynamic operation
12Confidentiality –None (C1)
HYBRIT pilot plant – ground breaking ceremony June 20th 2018
Confidentiality –None (C1)