Department of Veterans Aairs/DeMaria Building Company NaƟonal Energy Progress Report Progress Report DeMaria Building Company, Inc. reserves the right to alter content of this publication at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. 2012 DeMaria Building Company, Inc. All rights reserved.

VA National Energy Progress Report

Embed Size (px)

DESCRIPTION

This is an update on projects DeMaria Building Company is working on for the Department of Veterans Affairs in the Energy Market

Citation preview

Page 1: VA National Energy Progress Report

Department of Veterans Affairs/DeMaria Building Company Na onal Energy Progress Report  

Progress Report  

DeMaria Building Company, Inc. reserves the right to alter content of this publication at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document.

2012 DeMaria Building Company, Inc. All rights reserved.

Page 2: VA National Energy Progress Report

DeMaria Building Company, Inc. it’s about the PEOPLE, the PROCESS and the RESULTS    

Page 3: VA National Energy Progress Report

Table of Contents Togus VA Medical Center Co-Generation Plant Augusta ME pgs 4-5 VA Battle Creek Boiler Plant Replacement Battle Creek, MI pgs 6-7 VA Battle Creek Co-Generation Plant Battle Creek, MI pgs 8-9 VA Ann Arbor Co-Generation Plant Ann Arbor, MI pgs 10-11           

Page 4: VA National Energy Progress Report

Togus VA Medical Center Co-Generation System Augusta ME VA 701-RA-0044 Delivery Method: Design/Build Project Team Contractor: DeMaria Building Company Architect: HGA Project Executive: Mark Brimmeier Project Manager: Ryan Molitor Project Superintendent: Tom LaMay Project Engineer: Zach Vizena Project Estimator: Brian Kelly BIM Coordinator: Aaron Tassell Progress Report Safety: 0 Incidents 0 Lost Time 360 days without lost time incident Schedule: Notice to Proceed: 9/01/02010 Contract Duration: 674 Calendar Days Contract Completion: 7/05/2012 Current percent complete: 80% Current Status: Exterior: Metal Panels Complete except 18’ section left open for access Brick and glazing complete Interior: ESP installation is 90% complete Gasifier installed, including duct and trim items. Refractory installation is complete Economizer installed Grinder installed Dust collector installed Interior conveyors-Receiving conveyors installed Upcoming Milestones: Boiler hydro test 2nd week of April Phase 1 Electrical switch over in last week of March Catwalk steel starting last week of March

4

Page 5: VA National Energy Progress Report

5

BIM Coordination Model

Exterior Elevation

Exterior Elevation

BIM Clash Detection Session

Boiler, dust collection system and economizer

Gasifier and Boiler

Page 6: VA National Energy Progress Report

6

VA Battle Creek Boiler Plant Replacement Battle Creek, MI W911XK-09-C-0036-FY09 Delivery Method: Design/Bid/Build Project Team Contractor: DeMaria Building Company Architect: HGA Project Executive: Mark Brimmeier Project Manager: Eric Winquist Project Superintendent: Ken Kersanty Project Engineer: Rob Rowe Project Estimator: Brian Kelly Progress Report Safety: 0 Incidents 0 Lost Time 844 days without lost time incident Schedule: Notice to Proceed: 11/23/2009 Contract Duration: 1,100 Calendar Days Contract Completion: 11/16/2012 On-Schedule Current Status: Steam tunnel to Vault 7 complete All Boiler set in place Excavation to Vault 10 complete Boiler observation platform construction underway Steam piping above catwalk on-going

Page 7: VA National Energy Progress Report

7

Looking West at the New Boiler Plant

Placing backfill over the steam tunnel east of Vault #3.

East elevation of new Boiler Plant with CoGen foundations

Looking West at the New Boiler Plant

Placing concrete for steam tunnel walls from Vault to building

New Boiler and heating hot water piping High and medium pressure steam piping along East catwalk

Page 8: VA National Energy Progress Report

8

VA Battle Creek Co-Generation Plant Battle Creek, MI VA 701-C-0107 Delivery Method: Design/Build Project Team Contractor: DeMaria Building Company Architect: HGA Project Executive: Mark Brimmeier Project Manager: Eric Winquist Project Superintendent: Ken Kersanty Project Engineer: Don Haueter Project Estimator: Brian Kelly

Progress Report Safety: 0 Incidents 0 Lost Time 60 days without lost time incident Schedule: Notice to Proceed: 3/21/2011 Contract Duration: 630 Calendar Days Contract Completion: 12/20/2012 Current Status: Foundation Walls started Construction Documents at 90% BIM coordination started

Page 9: VA National Energy Progress Report

Column line L south of fuel pit

Fuel elevating pit

Column line L

9

BIM Coordination Model

Foundation

Start of Foundation Walls

Page 10: VA National Energy Progress Report

10

VA Ann Arbor Co-Generation Plant Ann Arbor, MI VA 701-C-0177 Delivery Method: Design/Build Project Team Contractor: DeMaria Building Company Architect: SSOE Project Executive: Mark Brimmeier Project Manager: Ryan Molitor Project Superintendent: TBD Project Engineer: Don Haueter Project Estimator: Tom Allen Progress Report Safety: NA Schedule: Notice to Proceed: 9/06/2011 Contract Duration: 630 Calendar Days Contract Completion: 7/26/2013 Current Status: Documents at 30% completion and being reviewed Authorization to move equipment inside existing plant Upcoming Milestones: Approval of 30% design from SSOE 60% design submission by DeMaria Building Company

 

Page 11: VA National Energy Progress Report

11

Main Level Overall Floor Plan at 30% Design