Utility Conflict Plans - Project No. SS-3-030(032)128, PCN 21562 Item No. P&P Sh # Cross Section Sht # Approx. Sta. From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable NDTEL1 1 1, 2, 3, 4, 5, 6, 7 6796+90 6799+50 6802+90 6805+60 6807+70 6812+10 6798+00 6800+40 6804+00 6806+70 6808+90 6813+30 1 1' Right Approach Reconstruction Communications line near proposed grading tie line along new foreslope. No excavation planned. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable NPE1 1 3 6802+85 6802+85 1 1' Crossing Foreslope Underground power line near proposed grading tie crossing the roadway. No excavation planned. Northern Plains Electric Underground Power Line 2 Not reimbursable NDTEL2 2 7, 8 6815+00 6816+90 1 1' Right Approach Reconstruction Communications line near proposed grading tie line along new foreslope. No excavation planned. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable NDTEL3 3 14, 16, 17 6841+00 6847+20 6842+10 6853+00 1 1' 1' Right Approach Reconstruction, Ditch bottom and Backslope Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable NDTEL4 3 14 6840+80 6840+80 1 1' Crossing Foreslope Communications line near proposed grading tie crossing the roadway. No excavation planned. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable CPW1 3 14, 15 6842+10 6842+10 1 1' Crossing Foreslope Rural water line near proposed grading tie crossing the roadway. No excavation planned. Central Plains Water District Rural Water Line 2 Not reimbursable NPE2 3 14, 15 6842+60 6842+60 1 1' Crossing Foreslope Overhead power line near proposed grading tie crossing the roadway. 3" pavement overlay planned. Northern Plains Electric Overhead Power Line 2 Not reimbursable NDTEL5 4 17, 18, 21, 22 6853+00 6869+40 6854+20 6870+40 1 1' 1' Right Approach Reconstruction, Ditch bottom and Backslope Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable NDTEL6 5 23, 24 6875+20 6879+50 1 1' Right Ditch bottom and Backslope Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable NDTEL7 6 27, 28 6893+90 6895+10 1 1' Right Approach Reconstruction Communications line near proposed grading tie line along new foreslope. No excavation planned. North Dakota Telephone Cooperative Fiber Optic Line 2 Not reimbursable PRELIMINARY - THESE UTILITY CONFLICT PLANS, CROSS SECTIONS AND DOCUMENTS ARE PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENTATION PURPOSES All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. Approx. Maximum Cut Fill Page 1

Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Utility Conflict Plans - Project No. SS-3-030(032)128, PCN 21562

Item No.

P&P Sh

#

Cross

Section

Sht #

Approx.

Sta. From

Approx.

Sta. To

Approx.

Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable

NDTEL1 11, 2, 3, 4, 5, 6,

7

6796+906799+506802+906805+606807+706812+10

6798+006800+406804+006806+706808+906813+30

1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned. North Dakota Telephone

CooperativeFiber Optic Line 2 Not reimbursable

NPE1 1 3 6802+85 6802+85 1 1' Crossing ForeslopeUnderground power line near proposed grading tie crossing the roadway. No excavation planned.

Northern Plains ElectricUnderground Power Line

2 Not reimbursable

NDTEL2 2 7, 8 6815+00 6816+90 1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL3 314, 16,

176841+006847+20

6842+106853+00

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL4 3 14 6840+80 6840+80 1 1' Crossing Foreslope

Communications line near proposed grading tie crossing the roadway. No excavation planned. North Dakota Telephone

CooperativeFiber Optic Line 2 Not reimbursable

CPW1 3 14, 15 6842+10 6842+10 1 1' Crossing ForeslopeRural water line near proposed grading tie crossing the roadway. No excavation planned.

Central Plains Water District

Rural Water Line 2 Not reimbursable

NPE2 3 14, 15 6842+60 6842+60 1 1' Crossing ForeslopeOverhead power line near proposed grading tie crossing the roadway. 3" pavement overlay planned.

Northern Plains ElectricOverhead Power

Line2 Not reimbursable

NDTEL5 417, 18, 21, 22

6853+006869+40

6854+206870+40

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL6 5 23, 24 6875+20 6879+50 1 1' RightDitch bottom and

Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL7 6 27, 28 6893+90 6895+10 1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

PRELIMINARY - THESE UTILITY CONFLICT PLANS, CROSS SECTIONS AND DOCUMENTS ARE PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENTATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

Approx.

Maximum

Cut Fill

Page 1

Page 2: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Utility Conflict Plans - Project No. SS-3-030(032)128, PCN 21562

Item No.

P&P Sh

#

Cross

Section

Sht #

Approx.

Sta. From

Approx.

Sta. To

Approx.

Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable

Approx.

Maximum

Cut Fill

CPW2 6 27, 28 6894+10 6894+10 1 1' Crossing ForeslopeRural water line near proposed grading tie crossing the roadway. No excavation planned.

Central Plains Water District

Rural Water Line 2 Not reimbursable

NDTEL8 732, 33,

356916+906923+20

6918+106925+40

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL9 838, 39, 40, 41

6933+506946+80

6941+706947+60

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

CPW3 8 41 6946+90 6946+90 1 1' Crossing ForeslopeRural water line near proposed grading tie crossing the roadway. No excavation planned.

Central Plains Water District

Rural Water Line 2 Not reimbursable

NDTEL10 11 58 7011+50 7011+50 1 1' Crossing Foreslope

Communications line near proposed grading tie crossing the roadway. No excavation planned. North Dakota Telephone

CooperativeFiber Optic Line 2 Not reimbursable

NPE3 12 59 7014+80 7014+80 1 1' Crossing ForeslopeOverhead power line near proposed grading tie crossing the roadway. 3" pavement overlay planned.

Northern Plains ElectricOverhead Power

Line2 Not reimbursable

NDTEL11 12 60 7018+40 7019+40 1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL12 1364, 65, 66, 67

7034+407044+40

7039+607045+50

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL13 14 72, 73 7064+60 7065+50 1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NPE4 15 75 7073+45 7073+45 1 1' Crossing ForeslopeOverhead power line near proposed grading tie crossing the roadway. 3" pavement overlay planned.

Northern Plains ElectricOverhead Power

Line2 Not reimbursable

NDTEL14 15 75, 76 7073+50 7077+50 1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

Page 2

Page 3: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Utility Conflict Plans - Project No. SS-3-030(032)128, PCN 21562

Item No.

P&P Sh

#

Cross

Section

Sht #

Approx.

Sta. From

Approx.

Sta. To

Approx.

Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable

Approx.

Maximum

Cut Fill

CPW4 1575, 76,

777073+70 7079+70 1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

Central Plains Water District

Rural Water Line 2 Not reimbursable

NDTEL15 16 86 7111+85 7111+85 1 1' Crossing Foreslope

Communications line near proposed grading tie line crossing the roadway. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL16 1788, 89, 90, 91

7117+507124+80

7122+007125+75

1 1' 1' Right

Approach Reconstruction,

Ditch bottom and Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

CPW5 17 91 7125+40 7125+40 1 1' Crossing ForeslopeRural water line near proposed grading tie crossing the roadway. No excavation planned.

Central Plains Water District

Rural Water Line 2 Not reimbursable

NDTEL17 18 96, 97 7144+10 7145+10 1 1' RightApproach

Reconstruction

Communications line near proposed grading tie line along new foreslope. No excavation planned.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NDTEL18 19 99 7153+40 7154+60 1 1' RightDitch bottom and

Backslope

Communications line near proposed grading tie line along new backslope. May have to be lowered or relocated depending upon actual depth.

North Dakota Telephone Cooperative

Fiber Optic Line 2 Not reimbursable

NPE5 19 104 7169+90 7169+90 1 1' Crossing ForeslopeOverhead power line near proposed grading tie crossing the roadway. 3" pavement overlay planned.

Northern Plains ElectricOverhead Power

Line2 Not reimbursable

Contact Name Phone

Richard Anderson (701) 547-3751

Seth Syverson (701) 652-3156

Terry Thompson (701) 662-6482 North Dakota Telephone Cooperative, PO Box 180 Devils Lake, ND 58301-0180 [email protected]

Email Address

[email protected]

[email protected] Plains Electric Cooperative, PO Box 180 Carrington, ND 58421

Central Plains Water District, PO Box 157 Fessenden, ND 58438-0157

Contact information for Utility Facilities with or without Conflicts

Utility Company Name and Address

Page 3

Page 4: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

OFFICE OF PROJECT DEVELOPMENT

R 69 W R 69 W

25 24 13 12 1

30 19 18 7 6

29 20 17 8 5

49162128

29 17

162128

2032

33

34 27 22 15

14232635

129 130 131 132 133 134 135 136

Maddock

RR

VW

ND 30

T 1

53 N

T 1

52 N

ND 1

9

Sta. 7169+98

RP 135.795

SS-3-030(032)128

End Project

Sta. 6794+39

RP 128.682

SS-3-030(032)128

Begin Project

DESIGNERS

ND DEPARTMENT OF TRANSPORTATION

__________________________________________

APPROVED DATE _________________________

GRAND

FORKS

GO

LD

EN

VA

LLE

Y

CASS

RIC

HLAN

D

RANSOM

SAR

GEN

T

DICKEY

LA MOURE

BARNES

KID

DER

LOGAN

MC IN

TOSH

BU

RLEIG

H

MORTON

GRANT

SIOUXADAMS

HETTIN

GER

SLOPE

BOWMAN EM

MO

NS

OLIVER

MERCER

STARKBIL

LIN

GS

DUNN

MC KENZIE

MC LEAN

SHERID

AN

WELLS

EDDY

FOSTER

GRIG

GS

STEELE

TRAILL

DIVIDE

WILLIAMS

BURKE

MO

UNTR

AIL

RE

NVIL

LE

WARD

MC H

EN

RY

BOTTINEAU

ROLLETTE

TO

WNER

CAVALIER

RA

MSEY

WALSH

PE

MBIN

A

NELSO

NBENSONPIE

RC

E

STUTSMAN

STATE COUNTY MAP

11

21562

RP 128.682 to RP 135.795

Benson County

Sliver Widening, Hot Bituminous Paving, Signing, Striping, and Incidentals

SS-3-030(032)128

DESIGN DATA

Traffic Average Daily

Current 2015

Forecast 2035

Pass: 520

Pass: 705

Trucks: 215

Trucks: 320

Total: 735

Total: 1025

Design Speed: Posted Speed

Bridges: N/A

Pavement Design Life: N/A

Minimum Sight Dist. for Stopping: N/A

Clear Zone Distance: Existing

Sight Dist. for No Passing Zone: N/A

Design Accumulated One-way Flexible ESALs: N/A

SS-3-030(032)128

North Edge Maddock North to Jct. ND 19

STATE PROJECT NO.

ND

PCNNO.

SHEET

NO.

SECTION

DEPARTMENT OF TRANSPORTATION

NORTH DAKOTA

__________________________________________

APPROVED DATE _________________________

engineer under the laws of the state of ND.

and that I am a duly registered professional

prepared by me or under my direct supervision

I hereby certify that the attached plans were

12/27/2017 bschaff N:\NDD20609\3030128.032\Design\001_Upfront\001TS_001_TitleSheet.dgn2:03:06 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMIN

ARY

JOB #

7.113 7.113SS-3-030(032)128 \ ND Hwy 30

GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION

effective on the date the project is advertised.

Department of Transportation and the Supplemental Specifications

2014 Standard Specifications adopted by the North Dakota

GOVERNING SPECIFICATIONS:

Sambatek, Inc.

Page 5: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

129 130 131 132 133 134 135 136

MaddockND 30

RR

VW

6810+08

6862+92

6915+65

6968+34

7022+18

7075+05

7127+23

7179+33

Legend

Sliver Widening, Hot Bituminous Paving

Subcut Area, Hot Bituminous Paving

Sta. 6794+39

Begin Project

39th St

NE

40th St

NE

41st St

NE

42nd St

NE

49th Ave NE

43rd St

NE

44th St

NE

ND 1

9

ND 30

Airport

Municipal

Maddock

Sta. 7169+98

End Project

PT 2

PT 3PT 4

PT 5

PT 6

PT 7

See Section 10 Sheet 2 for Point Information

Detail - Airport Airspace Surface

6865+00

6870+00

PT 1

Borrow Pit

Optioned

Department

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Design\001_Upfront\004SW_001_SCOPE.dgn1:22:26 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMIN

ARY

4 1

Scope of Work

SS-3-030(032)128

Page 6: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

12' 12'

12'12'

4:1

4:1

4:1

2' 2'

2' 2'

3" HBP Overlay

Embankment

Topsoil

Embankment

Topsoil

Match Existing Match Existing

Match ExistingMatch Existing

4:1

Embankment

3" HBP Overlay

Topsoil

Embankment

Topsoil

CL 5 Aggregate Base

CL 5 Aggregate Base

CL 5 Aggregate Base

CL 5 Aggregate Base

38.2'

37.8'

Sta 6795+14 to Sta 6841+31

ND 30

Sta 7126+44 to Sta 7169+10

Sta 6841+31 to Sta 7116+08

ND 30

4:1

Match ExistingMatch Existing

4:1

Embankment

3" HBP Overlay

Topsoil

Embankment

Topsoil

CL 5 Aggregate Base

CL 5 Aggregate Base

VariesVaries

Varies

Sta 7169+10 to Sta 7169+98

ND 30 at Jct 19

30

2

Proposed Typical Sections

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/29/2017 bschaff N:\NDD20609\3030128.032\Design\030_TypSec\030TP_002_Ppsd.dgn8:46:03 AM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMIN

ARY

SS-3-030(032)128

Page 7: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

underground power line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict withEmbankment grading tie

Excavation grading tie

transitionMilling

transitionPaving

3" Proposed Overlay

24" X 166' CSP (fair)

6793+85 - 55 RT to W end

27" X 109' CSP (poor)

6794+42 - 46' RT

24" X 30' CSP (fair)

6793+79 - 32' LT

18" X 50' CSP (fair)

6797+51 - 45' RT

24" X 60' CSP (fair)

6800+01 - 45' RT

18" X 60' CSP (poor)

6802+12 - `

18" X 30' CSP (poor)

6803+42 - 49 RT

21" X 40' RCP (poor)

6806+13 - 44 RT

18" X 40' CSP (poor)

6808+27 - 50 RT

2 CSFES (poor)

18" X 78' CSP (good)

6812+81 - 45 RT

Out: 1578.44 @ 45' Rt

In: 1578.60 @ 46' Rt

Install 18" x 15' CSP

North: Remove 2'

Install 18" x 18' CSP

South: Remove 2'

Sta 6797+51 - 45' Rt

Out: 1578.58 @ 37' Rt

In: 1578.60 @ 37' Lt

Install 18" x 9' CSP

Rt: Remove 4'

Install 18" x 13' CSP

Lt: Remove 4'

Sta 6802+12 - `

Out: 1579.12 @ 46' Rt

In: 1579.27 @ 43' Rt

Install 24" x 12' CSP

North: Remove 2'

Install 24" x 13' CSP

South: Remove 2'

Sta 6800+01 - 45' Rt

Out: 1578.48 @ 49' Rt

In: 1579.82 @ 48' Rt

Install 18" x 25' CSP

North: Remove 2'

Install 18" x 29' CSP

South: Remove 2'

Sta 6803+42 - 49' Rt

Out: 1582.08 @ 50' Rt

In: 1582.37 @ 50' Rt

Install 18" x 18' CSP

North: Remove 2'

Install 18" x 14' CSP

South: Remove 2'

Sta 6808+27 - 50' Rt

Out: 1580.22 @ 42' Rt

In: 1580.73 @ 45' Rt

North: Install 21" x 14' RCP

Install 21" x 22' RCP

South: Remove 4'

Sta 6806+13 - 44' Rt

Out: 1584.16 @ 45' Rt

In: 1585.72 @ 44' Rt

Install 18" x 3' CSP

North: Remove 2'

Install 18" x 21' CSP

South: Remove 2'

Sta 6812+81 - 45' Rt

R Mkr 129

BENSON COUNTY

6795

+00

6800

+00

6805

+00

6810

+00

6793+17.7

4

RR

VW

S 0^ 56' 36" E (Align & Sec line)

CITY OF MADDOCK

Sec line

1550

1560

1570

1580

1590

1600

1610

1620

1550

1560

1570

1580

1590

1600

1610

1620

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_001.dgn1:57:36 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 1

Plan & Profile

Sta 6794+00 to Sta 6813+00

Lg Trees

1577.19 1577.45

1578.46

1578.50

1578.521578.55

1578.561578.58

1578.59

1578.931579.13

1579.241579.43

2 FO Tel Peds

Ped

Tel

FO

Wood

1580.24

1580.34 1580.64

Gr

FO Tel Ped

Wood

Gr

Sign

Inlet

Gr

Gr

EL

Riprap

ND TEL

1582.131582.30

E Mtr

Gr

Conc

Gr

Asph

Gr

Sign

Asph

Asphalt Xin

g

RR

VW

Asph

1584.46

Conc

Lg Trees

Gr

CITY OF MADDOCK

1585.70

Asph

GrLg Trees

Tank

Ammonia

Anhydrous

BldgLg Trees

Bldg

Lg Trees

Bldg

3 Silos

6794+00 6795+00 6796+00 6797+00 6798+00 6799+00 6800+00 6801+00 6802+00 6803+00 6804+00 6805+00 6806+00 6807+00 6808+00 6809+00 6810+00 6811+00 6812+00 6813+00

1,583.96

1,584.30

1,584.59

1,584.59

1,584.70

1,585.05

1,585.13

1,585.33

1,585.53

1,585.89

1,585.92

1,586.17

1,586.62

1,587.19

1,587.65

1,588.14

1,588.87

1,589.89

1,590.92

1,591.97

1,584.21

1,584.55

1,584.84

1,584.84

1,584.95

1,585.30

1,585.38

1,585.58

1,585.78

1,586.14

1,586.17

1,586.42

1,586.87

1,587.44

1,587.90

1,588.39

1,589.12

1,590.14

1,591.17

1,592.22

Page 8: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with Embankment grading tie

Excavation grading tieContractor to avoid

fiber optic line

Near conflict with

3" Proposed Overlay

Out: 1591.57 @ 39' Lt

In: 1591.83 @ 37' Rt

Install 18" x 12' CSP

Rt: Remove 4'

Install 18" x 8' CSP

Lt: Remove 4'

Install 76' CIPP Liner - 18"

Sta 6828+10 - `

2 CSFES (poor)

18" X 78' CSP (good)

6812+81 - 45 RT

18" X 106' CSP & RCP (poor)

6815+88 - 41 RT

18" X 29' CSP (good)

6815+22 - 49 LT18" X 63' CSP (poor)

6828+10 - `

Out: 1585.85 @ 48' Lt

In: 1587.11 @ 49' Lt

Install 18" x 29' CSP

North: Remove 2'

Install 18" x 33' CSP

South: Remove 2'

Sta 6815+22 - 46' Lt

Out: 1586.74 @ 45' Rt

In: 1588.04 @ 42' Rt

Install 15^ Bend 18" RCP

North: Install 18" x 16' RCP

Install 18" x 23' CSP

South: Remove 2'

Sta 6815+88 - 41' Rt

BLOCK 10

8th St

NE

6815

+00

6820

+00

6825

+00

6830

+00Sec 19

Sec 20

E 2205489.03

N 355304.76

Sec line

1560

1570

1580

1590

1600

1610

1620

1630

1560

1570

1580

1590

1600

1610

1620

1630

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_002.dgn1:57:38 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 2

Plan & Profile

Sta 6813+00 to Sta 6833+00

2 FO Tel Peds

Gr

EL

FO Tel Ped

Lg Trees

Gr

Asph

2 ND TEL

Gr

Pvt Mailbox

Asph

Asph

6813+00 6814+00 6815+00 6816+00 6817+00 6818+00 6819+00 6820+00 6821+00 6822+00 6823+00 6824+00 6825+00 6826+00 6827+00 6828+00 6829+00 6830+00 6831+00 6832+00 6833+00

1,591.97

1,592.85

1,593.74

1,594.64

1,594.93

1,595.50

1,595.89

1,596.27

1,596.78

1,597.56

1,598.52

1,598.81

1,598.59

1,598.36

1,598.53

1,598.73

1,598.89

1,599.01

1,599.34

1,599.11

1,598.80

1,592.22

1,593.10

1,593.99

1,594.89

1,595.18

1,595.75

1,596.14

1,596.52

1,597.03

1,597.81

1,598.77

1,599.06

1,598.84

1,598.61

1,598.78

1,598.98

1,599.14

1,599.26

1,599.59

1,599.36

1,599.05

Page 9: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

overhead power line

Near conflict with

Contractor to avoid

rural water line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1591.95 @ 36' Rt

In: 1592.21 @ 36' Lt

Install 18" x 11' CSP

Rt: Remove 2'

Install 18" x 3' CSP

Lt: Remove 2'

Install 74' CIPP Liner - 18"

Station 6844+13 - `

18" X 43' CSP (poor)

6841+55 - 45 RT

18" X 42' CSP (poor)

6841+52 - 46 LT

18" X 63' CSP (fair)

6844+13 - `

Out: 1592.14 @ 47' Lt

In: 1592.74 @ 46' Lt

Install 18" x 24' CSP

North: Remove 2'

Install 18" x 25' CSP

South: Remove 2'

Station 6841+52 - 46' Lt

Out: 1592.23 @ 46' Rt

In: 1592.47 @ 45' Rt

Install 18" x 27' CSP

North: Remove 2'

Install 18" x 22' CSP

South: Remove 2'

Station 6841+55 - 43' Rt

39th St

NE

6835

+00

6840

+00

6845

+00

6850

+00

R-69-W

T-152-N

Sec 18

R-69-W

T-152-N

Sec 17

R-69-W

T-152-N

Sec 20

R-69-W

T-152-N

Sec 19

Sec line

Sec line

E 2205446.07

N 357941.81

WC

ND 30

1560

1570

1580

1590

1600

1610

1620

1630

1560

1570

1580

1590

1600

1610

1620

1630

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_003.dgn1:57:39 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 3

Plan & Profile

Sta 6833+00 to Sta 6853+00

ND TEL

Gr2 ND TEL

WGV

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

FO Tel Ped

FO Tel Ped

Wire

FO Tel Ped

FO Tel Ped

Gr

WGV

CENT PL WATER DIST Approx Loc

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

provided by Interstate Engineering

Water line graphics drawn by location map

Pvt Mailbox

Gr

Gr

Asph

ND TEL

Lg Tre

es

ELFO Tel Ped

EL

Gr

Asph

NTHN PLNS ELEC

Clearance = 25.17'

6833+00 6834+00 6835+00 6836+00 6837+00 6838+00 6839+00 6840+00 6841+00 6842+00 6843+00 6844+00 6845+00 6846+00 6847+00 6848+00 6849+00 6850+00 6851+00 6852+00 6853+00

1,598.80

1,598.39

1,598.34

1,598.48

1,598.47

1,598.64

1,598.83

1,598.51

1,598.29

1,598.43

1,598.57

1,598.73

1,599.54

1,600.57

1,602.21

1,604.21

1,605.74

1,606.15

1,605.29

1,604.57

1,604.24

1,599.05

1,598.64

1,598.59

1,598.73

1,598.72

1,598.89

1,599.08

1,598.76

1,598.54

1,598.68

1,598.82

1,598.98

1,599.79

1,600.82

1,602.46

1,604.46

1,605.99

1,606.40

1,605.54

1,604.82

1,604.49

Page 10: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict withEmbankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1590.84 @ 34' Rt

In: 1591.65 @ 32' Lt

Install 24" x 7' CSP

Rt: Remove 5'

Install 24" x 5' CSP

Lt: Remove 5'

Install 66' CIPP Liner - 24"

Station 6863+21 - `

Out: 1590.97 @ 35' Rt

In: 1591.67 @ 31' Lt

Install 24" x 7' CSP

Rt: Remove 5'

Install 24" x 6' CSP

Lt: Remove 4'

Install 66' CIPP Liner - 24"

Station 6863+23 - `

24" X 63' CSP (poor)

6863+21 - `

24" X 61' CSP (poor)

6863+23 - `

18" X 39' CSP (poor)

6869+88 - 42 RT

18" X 30' CSP (poor)

6869+92 - 42 LT

Out: 1594.50 @ 43' Rt

In: 1595.11 @ 44' Rt

Install 18" x 26' CSP

North: Remove 2'

Install 7.5^ Bend 18" CSP

Install 18" x 27' CSP

South: Remove 2'

Station 6869+88 - 42' Rt

Out: 1594.90 @ 42' Lt

In: 1594.90 @ 42' Lt

Install 18" x 33' CSP

North: Remove 2'

Install 18" x 33' CSP

South: Remove 2'

Station 6869+92 - 42' Lt

R Mkr 130

6855

+00

6860

+00

6865

+00

6870

+00Sec 18

Sec 17

É= 0̂ 0

0' 39"

Rt

6867+98.1

2

#5 R

ebar

Rec S

ec C

or

line

41

line

41

E 2205402.56

N 360585.21

2 WCs

Sec line

1560

1570

1580

1590

1600

1610

1620

1630

1560

1570

1580

1590

1600

1610

1620

1630

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_004.dgn1:57:40 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 4

Plan & Profile

Sta 6853+00 to Sta 6873+00

49°58'13.23"

FO Tel Ped

FO Tel Ped

Asph Asph

ND TEL

Gr

Gr

EL

6853+00 6854+00 6855+00 6856+00 6857+00 6858+00 6859+00 6860+00 6861+00 6862+00 6863+00 6864+00 6865+00 6866+00 6867+00 6868+00 6869+00 6870+00 6871+00 6872+00 6873+00

1,604.24

1,603.69

1,602.82

1,601.88

1,600.62

1,599.37

1,598.60

1,598.22

1,597.76

1,597.57

1,597.53

1,597.69

1,597.85

1,598.25

1,599.11

1,600.10

1,601.05

1,601.86

1,602.07

1,602.38

1,602.85

1,604.49

1,603.94

1,603.07

1,602.13

1,600.87

1,599.62

1,598.85

1,598.47

1,598.01

1,597.82

1,597.78

1,597.94

1,598.10

1,598.50

1,599.36

1,600.35

1,601.30

1,602.11

1,602.32

1,602.63

1,603.10

Page 11: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with Embankment grading tie

Excavation grading tie

3" Proposed Overlay

6875

+00

6880

+00

6885

+00

6890

+00

N 0^ 55' 55" W (Align & Sec line) S 0^ 55' 55" E (Align & Sec line)

R-69-W

T-152-N

Sec 17

R-69-W

T-152-N

Sec 18

Sec line

1570

1580

1590

1600

1610

1620

1630

1640

1570

1580

1590

1600

1610

1620

1630

1640

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_005.dgn1:57:41 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 5

Plan & Profile

Sta 6873+00 to Sta 6893+00

ND TEL

Asph

CENT PL WATER DIST Approx Loc

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

provided by Interstate Engineering

Water line graphics drawn by location map

Asph Asph

6873+00 6874+00 6875+00 6876+00 6877+00 6878+00 6879+00 6880+00 6881+00 6882+00 6883+00 6884+00 6885+00 6886+00 6887+00 6888+00 6889+00 6890+00 6891+00 6892+00 6893+00

1,602.85

1,603.54

1,604.31

1,604.94

1,605.71

1,606.31

1,606.72

1,607.19

1,607.80

1,608.46

1,609.22

1,609.70

1,610.21

1,610.60

1,611.03

1,611.39

1,611.74

1,612.19

1,612.53

1,612.69

1,613.16

1,603.10

1,603.79

1,604.56

1,605.19

1,605.96

1,606.56

1,606.97

1,607.44

1,608.05

1,608.71

1,609.47

1,609.95

1,610.46

1,610.85

1,611.28

1,611.64

1,611.99

1,612.44

1,612.78

1,612.94

1,613.41

Page 12: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

rural water line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1605.87 @ 37' Lt

In: 1606.36 @ 36' Rt

Install 18" x 9' CSP

Rt: Remove 2'

Install 18" x 11' CSP

Lt: Remove 2'

Station 6904+13 - `

Out: 1606.32 @ 47' Rt

In: 1607.88 @ 46' Rt

Install 18" x 23' CSP

Remove 2'North:

Install 18" x 37' CSP

Remove 2' South:

Sta 6894+53 - 47' Rt

S end plugged

18" X 41' CSP (fair)

6894+53 - 47 RT

W end plugged

18" X 57' CSP (fair)

6904+13 - `

40th St

NE

6895

+00

6900

+00

6905

+00

6910

+00

R-69-W

T-152-N

Sec 8

R-69-W

T-152-N

Sec 7

R-69-W

T-152-N

Sec 17

R-69-W

T-152-N

Sec 18

É = 0̂ 0

7' 02"

Lt

6894+41.7

8

Sec line

Sec line

WC

ND 30Sec line

#5 R

ebar

Rec S

ec C

or

E 2205359.57

N 363228.53

1570

1580

1590

1600

1610

1620

1630

1640

1570

1580

1590

1600

1610

1620

1630

1640

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_006.dgn1:57:42 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 6

Plan & Profile

Sta 6893+00 to Sta 6913+00

CENT PL WATER DIST Approx Loc

CENT PL WATER DIST Approx Loc

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

provided by Interstate Engineering

Water line graphics drawn by location map

ND TEL

Gr

Asph

2 FO Tel Peds

Asph

Gr

6893+00 6894+00 6895+00 6896+00 6897+00 6898+00 6899+00 6900+00 6901+00 6902+00 6903+00 6904+00 6905+00 6906+00 6907+00 6908+00 6909+00 6910+00 6911+00 6912+00 6913+00

1,613.16

1,613.82

1,613.99

1,614.19

1,614.30

1,614.13

1,613.58

1,613.34

1,613.19

1,613.15

1,613.00

1,612.73

1,612.64

1,612.47

1,611.68

1,610.73

1,610.13

1,609.37

1,608.40

1,607.48

1,606.92

1,613.41

1,614.07

1,614.24

1,614.44

1,614.55

1,614.38

1,613.83

1,613.59

1,613.44

1,613.40

1,613.25

1,612.98

1,612.89

1,612.72

1,611.93

1,610.98

1,610.38

1,609.62

1,608.65

1,607.73

1,607.17

Page 13: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict withEmbankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1598.00 @ 39' Rt

In: 1598.21 @ 37' Lt

Install 18" x 7' CSP

Rt: Remove 2'

Install 18" x 19' CSP

Lt: Remove 12'

Station 6919+15 - `

Out: 1595.54 @ 36' Rt

In: 1595.75 @ 33' Lt

Install 27" x 4' CSP

Rt: Remove 4'

Install 27" x 9' CSP

Lt: Remove 4'

Install 70' CIPP Liner - 27"

Station 6932+36 - `

Out: 1597.82 @ 49' Rt

In: 1598.44 @ 48' Rt

Install 18" x 32' CSP

Remove 2'North:

Install 18" x 29' CSP

South: Remove 2'

Sta 6917+51 - 49' Rt

18" X 30' CSP (fair)

6917+52 - 46 LT

18" X 29' CSP (fair)

6917+51 - 49 RT

18" X 64' CSP (fair)

6919+15 - `

18" X 29' CSP (poor)

6928+57 - 45 LT

27" X 64' CSP (poor)

6932+36 - `

Out: 1596.32 @ 49' Lt

In: 1598.01 @ 46' Lt

Install 7.5^ Bend 18" CSP

Install 18" x 36' CSP

Remove 2'North:

Install 18" x 30' CSP

South: Remove 2'

Sta 6917+52 - 46' Lt

Out: 1595.00 @ 47' Lt

In: 1596.61 @ 44' Lt

Install 18" x 31' CSP

Remove 2'North:

Install 18" x 30' CSP

South: Remove 2'

Sta 6928+57 - 45' Lt

R Mkr 131

6915

+00

6920

+00

6925

+00

6930

+00Sec 7

Sec 8

É = 0̂ 0

1' 40"

Rt

6920+85.4

8

#5 R

ebar

Cor

41

Rec

line

41

line

41

E 2205311.17

N 365871.79

2 WCs

GPS 302

1560

1570

1580

1590

1600

1610

1620

1630

1560

1570

1580

1590

1600

1610

1620

1630

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_007.dgn1:57:43 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 7

Plan & Profile

Sta 6913+00 to Sta 6933+00

Gr

FO Tel Ped

Gr

Asph

ND TEL

CENT PL WATER DIST Approx Loc

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

Gr

Asph

6913+00 6914+00 6915+00 6916+00 6917+00 6918+00 6919+00 6920+00 6921+00 6922+00 6923+00 6924+00 6925+00 6926+00 6927+00 6928+00 6929+00 6930+00 6931+00 6932+00 6933+00

1,606.92

1,606.45

1,605.70

1,605.25

1,605.29

1,605.27

1,605.13

1,605.32

1,605.53

1,605.20

1,604.72

1,604.63

1,604.13

1,603.44

1,603.03

1,603.10

1,603.00

1,602.71

1,602.53

1,602.58

1,602.55

1,607.17

1,606.70

1,605.95

1,605.50

1,605.54

1,605.52

1,605.38

1,605.57

1,605.78

1,605.45

1,604.97

1,604.88

1,604.38

1,603.69

1,603.28

1,603.35

1,603.25

1,602.96

1,602.78

1,602.83

1,602.80

Page 14: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Embankment grading tie

Excavation grading tie

Contractor to avoid

rural water line

Near conflict with

3" Proposed Overlay

18" X 39' CSP (poor)

6947+20 - 42 LT

18" X 35' CSP (fair)

6947+23 - 43 RT

Out: 1599.01 @ 45' Lt

In: 1599.65 @ 44' Lt

Install 7.5^ Bend 18" CSP

Install 18" x 30' CSP

Remove 2'North:

Install 7.5^ Bend 18" CSP

Install 18" x 18' CSP

South: Remove 2'

Sta 6947+20 - 42' Lt

Out: 1600.12 @ 43' Rt

In: 1600.47 @ 43' Rt

Install 18" x 24' CSP

Remove 2'North:

Install 18" x 26' CSP

South: Remove 2'

Sta 6947+23 - 43' Rt

41th St

NE

6935

+00

6940

+00

6945

+00

6950

+00

R-69-W

T-152-N

Sec 6

R-69-W

T-152-N

Sec 5

R-69-W

T-152-N

Sec 8

R-69-W

T-152-N

Sec 7

É = 0̂ 1

9' 20"

Rt

6947+29.2

2

Sec line

Sec line

#5 R

ebar

Rec S

ec C

or

E 2205264.05

N 368515.10

WC

ND 30Sec line

1570

1580

1590

1600

1610

1620

1630

1640

1570

1580

1590

1600

1610

1620

1630

1640

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_008.dgn1:57:44 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 8

Plan & Profile

Sta 6933+00 to Sta 6953+00

ND TEL

3 FO Tel Peds

Gr

Asph

WGV

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST App

rox Loc

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

Gr

Asph

6933+00 6934+00 6935+00 6936+00 6937+00 6938+00 6939+00 6940+00 6941+00 6942+00 6943+00 6944+00 6945+00 6946+00 6947+00 6948+00 6949+00 6950+00 6951+00 6952+00 6953+00

1,602.55

1,602.76

1,602.79

1,603.11

1,603.21

1,603.16

1,603.24

1,603.35

1,603.25

1,603.56

1,604.31

1,604.75

1,604.91

1,605.31

1,606.07

1,606.73

1,606.94

1,606.95

1,607.14

1,607.63

1,608.18

1,602.80

1,603.01

1,603.04

1,603.36

1,603.46

1,603.41

1,603.49

1,603.60

1,603.50

1,603.81

1,604.56

1,605.00

1,605.16

1,605.56

1,606.32

1,606.98

1,607.19

1,607.20

1,607.39

1,607.88

1,608.43

Page 15: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

S 0^ 41' 57" E (Align & Sec Line)

Out: 1598.60 @ 48' Rt

In: 1598.67 @ 49' Lt

Install 18" x 17' CSP

Rt: Remove 5'

Install 18" x 9' CSP

Lt: Remove 5'

Install 98' CIPP Liner - 18"

Station 6960+90 - `

18" X 81' CSP (poor)

6960+90 - `

TS 6971

+17.39

SC 6973

+17.39

R Mkr 132

6955

+00

6960

+00

6965

+00

6970

+00Sec 6

Sec 5

E 2205228.46

N 371158.60

2 WCs

R/W Mon

Sec line

w/ cap LS 5582

#5 Rebar

Rec Qtr Cor

1570

1580

1590

1600

1610

1620

1630

1640

1570

1580

1590

1600

1610

1620

1630

1640

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_009.dgn1:57:45 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 9

Plan & Profile

Sta 6953+00 to Sta 6973+00

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

ND TEL FO Tel Ped

AsphAsph

Asph

6953+00 6954+00 6955+00 6956+00 6957+00 6958+00 6959+00 6960+00 6961+00 6962+00 6963+00 6964+00 6965+00 6966+00 6967+00 6968+00 6969+00 6970+00 6971+00 6972+00 6973+00

1,608.18

1,608.88

1,609.73

1,610.41

1,610.29

1,609.40

1,608.39

1,608.06

1,608.35

1,608.93

1,609.38

1,610.01

1,610.62

1,611.18

1,611.30

1,611.16

1,611.10

1,611.33

1,611.36

1,611.65

1,612.06

1,608.43

1,609.13

1,609.98

1,610.66

1,610.54

1,609.65

1,608.64

1,608.31

1,608.60

1,609.18

1,609.63

1,610.26

1,610.87

1,611.43

1,611.55

1,611.41

1,611.35

1,611.58

1,611.61

1,611.90

1,612.31

Page 16: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

2 RCFES (fair)

24" X 64' RCP (good)

38' LT to NW end

6978+18 - `

18" X 78' CSP (poor, skew)

6979+59 - 82' LT to N end

6978+85 - 66' LT to S end

Out: 1604.61 @ 41' Lt

In: 1604.78 @ 37' Rt

Install 24" Flared End Section

Rt: Install 24" x 8' RCP

Lt: Install 24" Flared End Section

Station 6978+18 - `

Out: 1604.47 @ 60' Lt

In: 1604.71 @ 83' Lt

Install 18" x 7' CSP

North: Remove 2'

Install 18" x 34' CSP

South: Remove 2'

Station 6979+26 - 74' Lt

6992+34 - 69' RT

18" X 38' CSP (poor)

Out: 1609.91 @ 69' Rt

In: 1610.04 @ 69' Rt

Install 18" x 3' CSP

North: Remove 2'

Install 18" x 3' CSP

South: Remove 2'

Station 6992+34 - 69' Rt

100'

100'

33'33'

TS 6971+17.39

SC 6973+17.39

CS 6991

+16.87

PI 6983

+20.1

7

ST 6993+16.87

49th Ave N

E

6975

+00

6980

+00

6985

+00

6990

+00

= 6983+20.17PI

Delta

Da

= 1,910.08R= 1,799.48L= 200.00Ls

Sc

= 1,202.78Ts

Curve C2038

N 59̂16' 42" E

N 0̂ 39' 54" W (S

ec lin

e)

N 0̂ 41' 57" W (T

ange

nt)

E 22

0522

8.46

N 37

1158.60

T p

ost

2 W

Cs

R/W M

on

ND 30

Sec line

S 0̂ 46' 17" E (S

ec lin

e)

w/ cap LS 55

82

#5 Rebar

Rec

Qtr

Cor

1570

1580

1590

1600

1610

1620

1630

1640

1570

1580

1590

1600

1610

1620

1630

1640

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_010.dgn1:57:46 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 10

Plan & Profile

Sta 6973+00 to Sta 6993+00

provided b

y Interstate

Engineer

ing

Water line g

raphics dr

awn by lo

cation map

CENT PL WATER DIST Approx Loc

ND TEL

Wire FO Tel Ped

Asph

Sign

AsphGr

Gr

Gr

Asph

6973+00 6974+00 6975+00 6976+00 6977+00 6978+00 6979+00 6980+00 6981+00 6982+00 6983+00 6984+00 6985+00 6986+00 6987+00 6988+00 6989+00 6990+00 6991+00 6992+00 6993+00

1,612.06

1,612.08

1,612.22

1,612.37

1,612.80

1,613.03

1,613.34

1,613.36

1,613.62

1,614.00

1,614.29

1,614.48

1,614.85

1,615.07

1,615.44

1,615.86

1,616.10

1,616.32

1,616.41

1,616.63

1,616.69

1,612.31

1,612.33

1,612.47

1,612.62

1,613.05

1,613.28

1,613.59

1,613.61

1,613.87

1,614.25

1,614.54

1,614.73

1,615.10

1,615.32

1,615.69

1,616.11

1,616.35

1,616.57

1,616.66

1,616.88

1,616.94

Page 17: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

N 89̂ 21' 33" E

Out: 1609.66 @ 35' Rt

In: 1610.80 @ 30' Lt

Remove & Relay FES

Rt: Install 24" x 8' RCP

Remove & Relay FES

Lt: Install 24" x 6' RCP

Station 6994+20 - `

2 RCFES (good)

24" X 46' RCP (good)

6994+20 - ̀

ST 6993

+16.87

TS 6997

+36.05

SC 6999

+36.05

PI 7009

+10.04

42nd St N

E

6995

+00

7000

+00

7005

+00

7010

+00

7015+00

R-69-WT-

153-

NSec 3

3

R-69-W

T-152-

NSec 5

R/W MonE 2

207643.12

N 3740

44.24

(Ahd Tan)

Twp line

ND 30

Sec line

1580

1590

1600

1610

1620

1630

1640

1650

1580

1590

1600

1610

1620

1630

1640

1650

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_011.dgn1:57:48 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 11

Plan & Profile

Sta 6993+00 to Sta 7013+00

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL W

ATER D

IST Appr

ox Loc

ND TEL

1609.80

1609.91

1610.03

1610.70Gr

Asph

ND T

EL

Asph

2 FO Tel Peds

CE

NT P

L W

ATER DIS

T A

pprox

Loc

Gr

Lg Trees

6993+00 6994+00 6995+00 6996+00 6997+00 6998+00 6999+00 7000+00 7001+00 7002+00 7003+00 7004+00 7005+00 7006+00 7007+00 7008+00 7009+00 7010+00 7011+00 7012+00 7013+00

1,616.69

1,616.88

1,617.02

1,617.20

1,617.27

1,617.80

1,618.33

1,618.45

1,618.99

1,619.21

1,619.61

1,619.91

1,620.33

1,620.81

1,621.62

1,622.31

1,623.42

1,624.86

1,626.45

1,627.63

1,628.76

1,616.94

1,617.13

1,617.27

1,617.45

1,617.52

1,618.05

1,618.58

1,618.70

1,619.24

1,619.46

1,619.86

1,620.16

1,620.58

1,621.06

1,621.87

1,622.56

1,623.67

1,625.11

1,626.70

1,627.88

1,629.01

Page 18: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

overhead power line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Both ends plugged

18" X 29' CSP (fair)

7018+91 - 45' LT

18" X 30' CSP (fair)

7018+88 - 40' RT

2 RCFES (fair)

30" X 62' RCP (good)

7028+73 - `

Out: 1620.79 @ 46' Lt

In: 1620.85 @ 44' Lt

Install 18" x 29' CSP

North: Remove 2'

Install 18" x 33' CSP

South: Remove 2'

Sta 7018+91 - 45' Lt

Out: 1621.64 @ 44' Rt

In: 1622.47 @ 44' Rt

Install 7.5^ Bend 18" CSP

Install 18" x 33' CSP

North: Remove 2'

Install 7.5^ Bend 18" CSP

Install 18" x 30' CSP

South: Remove 2'

Sta 7018+88 - 40' Rt

Out: 1617.42 @ 38' Lt

In: 1617.64 @ 36' Rt

Install 30" Flared End Section

Rt: Install 30" x 4' RCP

Install 30" Flared End Section

Lt: Install 30" x 4' RCP

Station 7028+73 - `

CS 7017

+37.46

ST 7019

+37.46

R Mkr 133

42nd St

NE

7015

+00

7020

+00

7025

+00

7030

+00

N 8

9̂ 2

1' 33"

E

R-69-W

T-153-N

Sec 34

R-69-W

T-153-N

Sec 33

N 0̂ 45' 25" W (Sec line & Tangent)

#5 R

ebar

Rec 1/4 C

or 2644.7

9' E to

Sec 33

Sec 34

(Ahd T

an)

Twp line

Twp line

R/W Mon

ND 30

Sec line

Twp line Xin

g

#5 R

ebar

1590

1600

1610

1620

1630

1640

1650

1660

1590

1600

1610

1620

1630

1640

1650

1660

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_012.dgn1:57:49 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 12

Plan & Profile

Sta 7013+00 to Sta 7033+00

Lg Trees

Lg Trees

Lg Trees

Asph

Asph

Gr

Lg Trees

Gr

Asph

Asph

2 WGVs

provided by Interstate Engineering

Water line graphics drawn by location map

CE

NT P

L W

AT

ER DIS

T A

ppro

x L

oc

CENT PL WATER DIST Approx Loc

Gr

Lg Trees

Gr

ND TEL

Gr

Gr

Sta 7014+68 - 11' RT

NTHN PLNS ELEC

Clearance = 24.43'

7013+00 7014+00 7015+00 7016+00 7017+00 7018+00 7019+00 7020+00 7021+00 7022+00 7023+00 7024+00 7025+00 7026+00 7027+00 7028+00 7029+00 7030+00 7031+00 7032+00 7033+00

1,628.76

1,629.30

1,629.78

1,629.90

1,629.68

1,629.11

1,628.25

1,627.32

1,626.86

1,626.29

1,625.91

1,625.55

1,625.40

1,625.36

1,625.36

1,625.23

1,625.12

1,624.98

1,625.20

1,625.61

1,625.78

1,629.01

1,629.55

1,630.03

1,630.15

1,629.93

1,629.36

1,628.50

1,627.57

1,627.11

1,626.54

1,626.16

1,625.80

1,625.65

1,625.61

1,625.61

1,625.48

1,625.37

1,625.23

1,625.45

1,625.86

1,626.03

Page 19: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict withEmbankment grading tie

Excavation grading tie

Contractor to avoid

fiber optic line

Near conflict with

3" Proposed Overlay

Out: 1621.55 @ 38' Lt

In: 1622.22 @ 36' Rt

Install 18" x 11' CSP

Rt: Remove 2'

Install 18" x 9' CSP

Lt: Remove 2'

Station 7049+46 - `

18" X 58' CSP (poor)

7049+46 - `

7035

+00

7040

+00

7045

+00

7050

+00Sec 33

Sec 34

Sec line

1590

1600

1610

1620

1630

1640

1650

1660

1590

1600

1610

1620

1630

1640

1650

1660

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_013.dgn1:57:50 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 13

Plan & Profile

Sta 7033+00 to Sta 7053+00

FO Tel Ped

Lg Trees

Asph

ND TEL

Asph

Lg Trees

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

Lg Trees Lg Trees

Gr

Gr

Asph

7033+00 7034+00 7035+00 7036+00 7037+00 7038+00 7039+00 7040+00 7041+00 7042+00 7043+00 7044+00 7045+00 7046+00 7047+00 7048+00 7049+00 7050+00 7051+00 7052+00 7053+00

1,625.78

1,625.95

1,626.03

1,626.32

1,626.41

1,626.62

1,626.80

1,627.01

1,627.31

1,627.51

1,627.90

1,628.47

1,629.29

1,629.33

1,629.01

1,628.94

1,628.93

1,628.84

1,628.53

1,628.57

1,628.64

1,626.03

1,626.20

1,626.28

1,626.57

1,626.66

1,626.87

1,627.05

1,627.26

1,627.56

1,627.76

1,628.15

1,628.72

1,629.54

1,629.58

1,629.26

1,629.19

1,629.18

1,629.09

1,628.78

1,628.82

1,628.89

Page 20: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1621.09 @ 44' Rt

In: 1622.11 @ 40' Lt

Install 18" x 11' CSP

Rt: Remove 5'

Install 18" x 9' CSP

Lt: Remove 5'

Station 7059+04 - `

Out: 1616.04 @ 42' Lt

In: 1616.29 @ 42' Rt

Install 18" x 14' CSP

Rt: Remove 7'

Install 18" x 11' CSP

Lt: Remove 3'

Install 84' CIPP Liner - 18"

Station 7070+20 - `

18" X 74' CSP (poor)

7059+04 - `

18" X 38' CSP (poor)

7065+16 - 43' LT18" X 68' CSP (poor)

7070+20 - `

Out: 1620.87 @ 43' Lt

In: 1622.15 @ 44' Lt

Install 18" x 25' CSP

North: Remove 2'

Install 18" x 17' CSP

South: Remove 2'

Sta 7065+16 - 43' Lt

43rd St

NE

7055

+00

7060

+00

7065

+00

7070

+00

GPS 303

R-69-W

T-153-N

Sec 27

R-69-W

T-153-N

Sec 28

R-69-W

T-153-N

Sec 34

R-69-W

T-153-N

Sec 33

É = 0̂ 0

1' 27"

Rt

7065+15.3

2

Sec line

Sec line

E 2207573.28

N 379330.93

ND 30

Rec S

ec C

or

#5 R

ebar

1590

1600

1610

1620

1630

1640

1650

1660

1590

1600

1610

1620

1630

1640

1650

1660

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_014.dgn1:57:51 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 14

Plan & Profile

Sta 7053+00 to Sta 7073+00

Pvt Mailbox

Wire

Wire

ND TEL

Wire

2 FO Tel PedsWireND TEL

ND TEL

Gr

Asph

Lg TreesGr

Gr

Lg Trees

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

CENT PL WATER DIST Approx Loc

Asph

Lg Trees Lg TreesLg Trees

Asph Asph

Sta 7073+45

NTHN PLNS ELEC

Clearance = 25.81'

7053+00 7054+00 7055+00 7056+00 7057+00 7058+00 7059+00 7060+00 7061+00 7062+00 7063+00 7064+00 7065+00 7066+00 7067+00 7068+00 7069+00 7070+00 7071+00 7072+00 7073+00

1,628.64

1,628.61

1,628.61

1,628.71

1,628.96

1,629.47

1,629.68

1,630.17

1,630.21

1,630.38

1,630.04

1,628.78

1,627.47

1,626.08

1,625.61

1,625.03

1,624.46

1,624.33

1,624.26

1,624.31

1,624.54

1,628.89

1,628.86

1,628.86

1,628.96

1,629.21

1,629.72

1,629.93

1,630.42

1,630.46

1,630.63

1,630.29

1,629.03

1,627.72

1,626.33

1,625.86

1,625.28

1,624.71

1,624.58

1,624.51

1,624.56

1,624.79

Page 21: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

overhead power line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict withContractor to avoid

rural water line

Near conflict with Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1611.55 @ 37' Lt

In: 1611.82 @ 37' Rt

Install 30" x 7' CSP

Rt: Remove 3'

Install 30" x 9' CSP

Lt: Remove 3'

Station 7088+19 - `

Out: 1611.39 @ 37' Lt

In: 1611.88 @ 37' Rt

Install 30" x 7' CSP

Rt: Remove 3'

Install 30" x 9' CSP

Lt: Remove 3'

Station 7088+22 - `

Out: 1613.13 @ 47' Rt

In: 1613.58 @ 45' Rt

Install 7.5^ Bend 18" CSP

Install 18" x 28' CSP

Remove 2'North:

Install 18" x 31' CSP

South: Remove 2'

Sta 7085+64 - 44' Rt

18" X 33' CSP (fair)

7085+70 - 39' LT

18" X 30' CSP (fair)

7085+64 - 44' RT

30" X 64' CSP (fair)

7088+22 - `

30" X 63' CSP (poor)

7088+19 - `

Out: 1613.39 @ 40' Lt

In: 1613.69 @ 42' Lt

Install 18" x 31' CSP

Remove 2'North:

Install 7.5^ Bend 18" CSP

Install 18" x 30' CSP

South: Remove 2'

Sta 7085+70 - 39' Lt

R Mkr 134

7075

+00

7080

+00

7085

+00

7090

+00

S 0^ 43' 58" E (Align & Sec line) N 0^ 43' 19" W (Align & Sec line)

Sec 28

Sec 27

É = 0̂ 0

0' 39"

Rt

7091+58.8

4

line

41

line

41

#5 R

ebar

Cor

41

Rec

#5 Rebar

Rec Qtr Cor

E 2207539.47

N 381974.23

Sec line

1580

1590

1600

1610

1620

1630

1640

1650

1580

1590

1600

1610

1620

1630

1640

1650

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_015.dgn1:57:52 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 15

Plan & Profile

Sta 7073+00 to Sta 7093+00

Pvt Mailbox

FO Tel Ped

Wire Wire

Wire

Gr

Lg TreesWire

Lg Trees

Asph

WireWire

Wire

Asph

Lg Tre

es

FO Tel Ped

Asph

Wire

2 ND TEL

Lg Trees

Lg Trees

Gr

Asph

Lg Trees

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

Lg Trees

Sta 7073+45

NTHN PLNS ELEC

Clearance = 25.81'

7073+00 7074+00 7075+00 7076+00 7077+00 7078+00 7079+00 7080+00 7081+00 7082+00 7083+00 7084+00 7085+00 7086+00 7087+00 7088+00 7089+00 7090+00 7091+00 7092+00 7093+00

1,624.54

1,624.71

1,624.13

1,623.84

1,623.17

1,622.57

1,622.20

1,621.89

1,621.51

1,621.23

1,620.80

1,620.67

1,620.25

1,619.91

1,619.57

1,619.54

1,619.47

1,619.54

1,619.97

1,620.34

1,620.32

1,624.79

1,624.96

1,624.38

1,624.09

1,623.42

1,622.82

1,622.45

1,622.14

1,621.76

1,621.48

1,621.05

1,620.92

1,620.50

1,620.16

1,619.82

1,619.79

1,619.72

1,619.79

1,620.22

1,620.59

1,620.57

Page 22: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict withEmbankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1613.89 @ 37' Rt

In: 1613.91 @ 34' Lt

Install 30" x 16' CSP

Rt: Remove 14'

Install 30" x 15' CSP

Lt: Remove 14'

Station 7097+11 - `

Out: 1613.74 @ 37' Rt

In: 1614.04 @ 34' Lt

Install 30" x 18' CSP

Rt: Remove 15.5'

Install 30" x 17' CSP

Lt: Remove 15.5'

Station 7097+14 - `

30" X 67' CSP (good)

7097+11 - `

30" X 66' CSP (good)

7097+14 - `

18" X 30' CSP (fair)

7101+35 - 44' LT

Both ends plugged

18" X 30' CSP (fair)

7101+34 - 46' RT

Out: 1617.51 @ 46' Rt

In: 1617.89 @ 46' Rt

Install 18" x 27' CSP

North: Remove 2'

Install 18" x 32' CSP

South: Remove 2'

Sta 7101+34 - 46' Rt

Out: 1617.10 @ 44' Lt

In: 1618.53 @ 44' Lt

Install 18" x 30' CSP

North: Remove 2'

Install 18" x 28' CSP

South: Remove 2'

Sta 7101+35 - 44' Lt

7095

+00

7100

+00

7105

+00

7110

+00

N 0^ 43' 19" W (Align & Sec line)

S 0^ 43' 19" E (Align & Sec line)

ND 30

Sec line

1580

1590

1600

1610

1620

1630

1640

1650

1580

1590

1600

1610

1620

1630

1640

1650

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_016.dgn1:57:53 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 16

Plan & Profile

Sta 7093+00 to Sta 7113+00

Wire

Wire

Wire

3 WGVs

Asph

FO Tel Ped Ð ND TEL

ND TEL

Wire

WireGr

Sto

ckpile

ND TEL

FO Tel Ped

Asph

Wire

GrLg Tre

es

FO Tel Ped

Asph

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

Conc

Lg Tre

es

Deck

Lg Trees

Res

NTH

N P

LNS E

LEC

7093+00 7094+00 7095+00 7096+00 7097+00 7098+00 7099+00 7100+00 7101+00 7102+00 7103+00 7104+00 7105+00 7106+00 7107+00 7108+00 7109+00 7110+00 7111+00 7112+00 7113+00

1,620.32

1,620.38

1,620.53

1,620.72

1,620.35

1,621.74

1,622.24

1,623.02

1,624.08

1,624.88

1,625.06

1,625.31

1,625.62

1,625.84

1,626.03

1,626.26

1,626.46

1,627.00

1,627.18

1,627.28

1,627.57

1,620.57

1,620.63

1,620.78

1,620.97

1,620.60

1,621.99

1,622.49

1,623.27

1,624.33

1,625.13

1,625.31

1,625.56

1,625.87

1,626.09

1,626.28

1,626.51

1,626.71

1,627.25

1,627.43

1,627.53

1,627.82

Page 23: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

rural water line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1624.21 @ 34' Rt

In: 1624.89 @ 41' Lt

Install 18" x 14' CSP

Rt: Remove 6'

Install 18" x 11' CSP

Lt: Remove 2'

Station 7129+19 - `

18" X 61' CSP (poor)

7117+65 - `

24" X 59' CSP (poor)

7118+38 - `

Out: 1619.13 @ 48' Lt

In: 1619.69 @ 36' Rt

Install 22.5^ Bend 18" CSP

Install 18" x 22' CSP

Rt: Remove 12'

Install 22.5^ Bend 18" CSP

Install 18" x 20' CSP

Lt: Remove 4'

Install 88' CIPP Liner - 18"

Station 7117+65 - `

Out: 1618.68 @ 44' Rt

In: 1619.05 @ 48' Lt

Install 22.5^ Bend 24" CSP

Install 24" x 23' CSP

Rt: Remove 6'

Install 22.5^ Bend 24" CSP

Install 24" x 25' CSP

Lt: Remove 5'

Install 96' CIPP Liner - 24"

Station 7118+38 - `

18" X 30' CSP (fair)

7125+24 - 35' LT

18" X 30' CSP (fair)

7125+25 - 45' RT

18" X 58' CSP (poor)

7129+19 - `

Out: 1621.15 @ 41' Lt

In: 1621.79 @ 37' Lt

Install 7.5^ Bend 18" CSP

Install 18" x 32' CSP

North: Remove 2'

Install 7.5^ Bend 18" CSP

Install 18" x 34' CSP

South: Remove 2'

Sta 7125+24 - 35' Lt

Out: 1620.17 @ 45' Rt

In: 1620.71 @ 45' Rt

Install 18" x 30' CSP

North: Remove 2'

Install 18" x 34' CSP

South: Remove 2'

Sta 7125+25 - 45' Rt

R Mkr 135

44th St

NE

7115

+00

7120

+00

7125

+00

7130

+00

R-69-W

T-153-N

Sec 22

R-69-W

T-153-N

Sec 21

R-69-W

T-153-N

Sec 28

R-69-W

T-153-N

Sec 27

Sec line

Sec line

#5 Rebar

Rec Sec Cor

E 2207506.16

N 384617.68

ND 30

Sec line

1590

1600

1610

1620

1630

1640

1650

1660

1590

1600

1610

1620

1630

1640

1650

1660

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_017.dgn1:57:54 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 17

Plan & Profile

Sta 7113+00 to Sta 7133+00

Wire

ND TELFO Tel Ped

Gr

ND TEL

Gr

FO Tel Ped

FO Tel Ped

Gate

Gr

FO Tel PedND TEL

Asph

ND TEL

Gr

provided by Interstate Engineering

Water line graphics drawn by location map

CEN

T PL WATER

DIST Approx Loc

Appro

x L

oc

CE

NT P

L W

AT

ER DIS

T

Lg Trees

Lg Trees

Asph

Wire

Asph

Lg Trees

7113+00 7114+00 7115+00 7116+00 7117+00 7118+00 7119+00 7120+00 7121+00 7122+00 7123+00 7124+00 7125+00 7126+00 7127+00 7128+00 7129+00 7130+00 7131+00 7132+00 7133+00

1,627.57

1,627.09

1,626.59

1,625.92

1,625.65

1,625.91

1,626.07

1,626.09

1,626.07

1,626.45

1,626.68

1,627.03

1,627.63

1,627.99

1,628.75

1,629.65

1,630.26

1,630.74

1,631.20

1,631.22

1,631.28

1,627.82

1,627.34

1,626.84

1,626.17

1,625.90

1,626.16

1,626.32

1,626.34

1,626.32

1,626.70

1,626.93

1,627.28

1,627.88

1,628.24

1,629.00

1,629.90

1,630.51

1,630.99

1,631.45

1,631.47

1,631.53

Page 24: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Embankment grading tie

Excavation grading tie

3" Proposed Overlay

Out: 1644.39 @ 50' Rt

In: 1646.83 @ 41' Lt

Install 18" x 20' CSP

Rt: Remove 11'

Lt: Install 18" x 6' CSP

Station 7150+26 - `

18" X 30' CSP (poor)

7133+70 - 42' RT

S end plugged

18" X 33' CSP (poor)

7144+60 - 44' LT

18" X 60' CSP (good)

7144+65 - 40' RT

18" X 76' CSP (good)

7150+26 - `

Out: 1624.75 @ 42' Rt

In: 1625.51 @ 42' Rt

Install 18" x 25' CSP

North: Remove 2'

Install 18" x 34' CSP

South: Remove 2'

Sta 7133+70 - 42' Rt

Out: 1637.95 @ 44' Lt

In: 1640.34 @ 44' Lt

Install 18" x 21' CSP

North: Remove 2'

Install 18" x 28' CSP

South: Remove 2'

Sta 7144+60 - 44' Lt

Out: 1637.67 @ 44' Rt

In: 1640.88 @ 40' Rt

Install 18" x 16' CSP

North: Remove 2'

Install 15^ Bend 18" CSP

Install 18" x 16' CSP

South: Remove 2'

Sta 7144+65 - 40' Rt

7135

+00

7140

+00

7145

+00

7150

+00

É = 0̂ 0

9' 00"

7144+51.1

8

line

41

#5 R

ebar

Cor

41

Rec

line

41

Sec 21

Sec 22

E 2207477.36

N 387266.21

Sec line

1600

1610

1620

1630

1640

1650

1660

1670

1600

1610

1620

1630

1640

1650

1660

1670

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_018.dgn1:57:56 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 18

Plan & Profile

Sta 7133+00 to Sta 7153+00

provided by Interstate Engineering

Water line graphics drawn by location map

CENT PL WATER DIST Approx Loc

Asph

Gr

Gr

Asph

ND TEL

ND TEL

Wire

FO Tel Ped Ð

Asph

7133+00 7134+00 7135+00 7136+00 7137+00 7138+00 7139+00 7140+00 7141+00 7142+00 7143+00 7144+00 7145+00 7146+00 7147+00 7148+00 7149+00 7150+00 7151+00 7152+00 7153+00

1,631.28

1,631.66

1,631.82

1,632.05

1,632.74

1,633.65

1,634.98

1,636.43

1,638.25

1,640.22

1,642.55

1,644.57

1,646.39

1,648.29

1,650.32

1,651.98

1,653.15

1,654.39

1,655.46

1,656.12

1,657.14

1,631.53

1,631.91

1,632.07

1,632.30

1,632.99

1,633.90

1,635.23

1,636.68

1,638.50

1,640.47

1,642.80

1,644.82

1,646.64

1,648.54

1,650.57

1,652.23

1,653.40

1,654.64

1,655.71

1,656.37

1,657.39

Page 25: Utility Conflict Plans - Project No. SS-3-030(032)128, PCN

Contractor to avoid

fiber optic line

Near conflict with

Contractor to avoid

overhead power line

Near conflict with

Embankment grading tie

Excavation grading tie

transitionPaving

transitionMilling

3" Proposed Overlay

N 0^ 44' 11" W (Align & Sec line)

Out: 1645.29 @ 38' Lt

In: 1645.56 @ 39' Rt

Install 18" x 24' CSP

Rt: Remove 18'

Install 18" x 18' CSP

Lt: Remove 15'

Station 7168+37 - `

Out: 1649.28 @ 46' Rt

In: 1650.50 @ 43' Rt

Install 7.5^ Bend 18" CSP

Install 18" x 29' CSP

North: Remove 2'

Install 7.5^ Bend 18" CSP

Install 18" x 28' CSP

South: Remove 2'

Sta 7165+44 - 39' Rt

18" X 29' CSP (poor)

7165+44 - 39' RT

S end plugged

18" X 30' CSP (poor)

7165+45 - 43' LT

18" X 68' CSP (good)

7168+37 - `

Out: 1648.76 @ 47' Lt

In: 1650.81 @ 47' Lt

Install 15^ Bend 18" CSP

Install 18" x 29' CSP

North: Remove 2'

Install 7.5^ Bend 18" CSP

Install 18" x 32' CSP

South: Remove 2'

Sta 7165+45 - 43' Lt

ND 1

9

BENSON COUNTY

7155

+00

7160

+00

7165

+00

7170

+00

R-69-W

T-153-N

Sec 21

R-69-W

T-153-N

Sec 16

R-69-W

T-153-N

Sec 15

R-69-W

T-153-N

Sec 22

E 2207441.68

N 389909.96WC

WC

WC

ND 30Sec line

Sec line

Sec line

R/W Mon

1610

1620

1630

1640

1650

1660

1670

1680

1610

1620

1630

1640

1650

1660

1670

1680

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/27/2017 bschaff N:\NDD20609\3030128.032\Utilities\060PP_UCP_019.dgn1:57:57 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SS-3-030(032)128 19

Plan & Profile

Sta 7153+00 to Sta 7173+00

3 FO Tel Peds

CENT PL WATER DIST Approx Loc

provided by Interstate Engineering

Water line graphics drawn by location map

ND TEL

ND TELWire Gr

Sign

Gr

FO Tel Ped Ð

Ped Ð

FO Tel

Gr

Asph

FO Tel Ped

Gr

Sign

Gr

Gr

Asph

Lg Trees

Gr

Asph

Sta 7169+90

NTHN PLNS ELEC

Clearance = 26.16'

7153+00 7154+00 7155+00 7156+00 7157+00 7158+00 7159+00 7160+00 7161+00 7162+00 7163+00 7164+00 7165+00 7166+00 7167+00 7168+00 7169+00 7170+00

1,657.14

1,658.02

1,658.92

1,659.94

1,661.02

1,661.63

1,662.01

1,662.07

1,661.65

1,660.76

1,660.00

1,658.71

1,657.30

1,655.59

1,654.16

1,652.78

1,651.76

1,651.55

1,657.39

1,658.27

1,659.17

1,660.19

1,661.27

1,661.88

1,662.26

1,662.32

1,661.90

1,661.01

1,660.25

1,658.96

1,657.55

1,655.84

1,654.41

1,653.03

1,652.01

1,651.80