  • POINT PLEASANT WATER TREATMENT PLANT EXPANSION

    ENVIRONMENTAL STUDY REPORT

    May 2009

    Prepared by:

    In Association with:

    1101 Prince of Wales Drive, Suite 330

    Ottawa, Ontario K2C 3W7

    JLR 22575

  • Utilities Kingston Point Pleasant Water Treatment Plant Expansion Environmental Study Report

    J. L. Richards & Associates Limited JLR 22575 CH2MHILL Canada Limited i May 2009

    TABLE OF CONTENTS Page

    NOTICE OF COMPLETION OF ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY........................................................................................... ES-1 1.0 INTRODUCTION AND BACKGROUND............................................................... 1

    1.1 The Class Environmental Assessment Planning Process.......................... 2 1.2 Existing Plant ............................................................................................. 4

    2.0 PROBLEM STATEMENT ..................................................................................... 7 3.0 ALTERNATIVE SOLUTIONS ............................................................................... 7 4.0 KEY ISSUES AND ALTERNATIVE DESIGN CONCEPTS................................... 8

    4.1 Source Water Quality and Drinking Water Treatment Objectives .............. 8 4.2 Existing Facility Condition Assessment.................................................... 10 4.3 Low-Life Pumping Station ........................................................................ 10 4.4 Treatment Process Options ..................................................................... 12 4.5 Treated Water Pumping and Storage ...................................................... 14 4.6 Planning Context ..................................................................................... 14 4.7 Archaeological Assessment..................................................................... 15 4.8 Ecological Assessment ............................................................................ 16

    5.0 PROJECT DESCRIPTION AND POTENTIAL EFFECTS................................... 16 5.1 Overview.................................................................................................. 16 5.2 Preliminary Conceptual Layouts .............................................................. 17 5.3 Potential Effects on the Environment, Mitigation Measures, and Net

    Effects...................................................................................................... 18 5.4 Opinion of Probable Capital Cost............................................................. 26 5.5 Opinion of Probable Operating Cost ........................................................ 27 5.6 Implementation Schedule ........................................................................ 27

    6.0 MONITORING .................................................................................................... 28 6.1 Pre-Construction...................................................................................... 28 6.2 During Construction ................................................................................. 28 6.3 After Construction .................................................................................... 28

    7.0 PRE-CONSTRUCTION APPROVALS ............................................................... 29 8.0 CONSULTATION ACTIVITIES........................................................................... 29 9.0 OUTSTANDING ISSUES/CONCERNS AND POSSIBLE COURSE OF

    ACTION REQUEST FOR PART II ORDER................................................... 31

  • Utilities Kingston Point Pleasant Water Treatment Plant Expansion Environmental Study Report

    J. L. Richards & Associates Limited JLR 22575 CH2MHILL Canada Limited ii May 2009

    LIST OF TABLES

    Table 1 Class EA Process ........................................................................................... 3 Table 2 Description of Existing Plant............................................................................ 6 Table 3 Recommended Treated Water Quality Objectives .......................................... 9 Table 4 Potential Effects Caused by Proposed Works............................................... 23 Table 5 Opinion of Probable Capital Costs ................................................................ 26 Table 6 Opinion of Probable Operating Costs Per Year @ 80 MLD .......................... 27

    LIST OF FIGURES

    Figure 1 Location of Point Pleasant Water Treatment Plant ..................................................... 1 Figure 2 Process Block Flow Diagram ...................................................................................... 5 Figure 3 Site Layout Option 1..................................................................................................19 Figure 4 Site Layout Option 2..................................................................................................20 Figure 5 Site Layout Option 3..................................................................................................21 Figure 6 Site Layout Option 4..................................................................................................22

    APPENDICES

    Appendix A 2007 Master Plan for Water Supply for the City of Kingston Urban Area Appendix B-1 Certificate of Approval No. 9808-6C4N5V Appendix B-2 Permit to Take Water No. 72-P-0397 Appendix C-1 Source Water and Drinking Water Treatment Objectives Appendix C-2 Existing Facility Condition Assessment Appendix C-3 Low-Lift Pumping Station Appendix C-4 Treatment Process Options Appendix C-5 Treated Water Storage and Pumping Appendix C-6 Planning Context Review Appendix C-7 Archaeological Assessment Appendix C-8 Ecological Assessment

  • Point Pleasant Water Treatment Plant Expansion Schedule C Class Environmental Assessment

    Utilities Kingston has nearly completed a Municipal Class Environmental Assessment (Class EA) for the

    expansion of the Point Pleasant (formerly known as the Kingston West) Water Treatment Plant located on Sunny Acres Road in the Citys west end. The proposed expansion is to increase the plant capacity from

    45.96 to 80 million litres per day, based on the recommendation from the 2007 Master Plan for Water Supply for the City of Kingston Urban Area. The purpose of this Class EA is to confirm the preferred alternative and

    ensure that the proposed project can be implemented with minimal impact to the environment.

    This project is being planned under Schedule C of the Municipal Class EA. Subject to comments received as a result of this Notice, and the receipt of necessary approvals, Utilities Kingston intends to proceed with the design and construction of this project. The capital budget for this project, excluding

    land acquisition costs, is estimated at $60.5 million plus GST.

    The Environmental Study Report, which contains a summary of pertinent information compiled during the Master Plan and the Class EA is available online at:

    http://www.utilitieskingston.com/water/west/treatment-plant.html or in person at:

    Utilities Kingston 1211 John Counter Boulevard

    Kingston, ON K7L 4X7

    Mon-Fri: 8:30 a.m. 4:30 p.m.

    (613) 546-1181 ext 2250

    Kingston Frontenac Public Library

    Central Branch 130 Johnson Street

    Kingston, ON K7L 1X8

    Mon-Thurs: 09:00-21:00 Fri-Sat: 09:00-17:00

    Sun: 13:00-17:00

    (613) 549-8888

    Clerks Office at City Hall City of Kingston

    216 Ontario Street Kingston, ON K7L 2Z3

    Mon-Fri: 08:30-16:30

    (613) 546-0000 ext. 1407

    Interested people should provide comment to Utilities Kingston on the proposal within 30 calendar days from the date of this Notice. Comment should be directed in writing to:

    Jim Keech, P. Eng., President & CEO Utilities Kingston

    1211 John Counter Boulevard Kingston, ON K7L 4X7

    If concerns arise regarding this project, which cannot be resolved through discussion with Utilities Kingston, a person or party may request that the Minister of the Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order), which addresses individual

    environmental assessments. Requests must be received by the Minister at the address below within 30 calendar days of this Notice. A copy of the request must also be sent to Utilities Kingston. If no request is received within 30 calendar days of this Notice, the Point Pleasant Water Treatment Plant Expansion will

    proceed to design and construction as outlined in the Environmental Study Report.

    Minister of the Environment 135 St. Clair Avenue 10th Floor Toronto, ON M4V 1P5

    Dan Lalande, P.Eng., Project Manager J.L. Richards & Associates Limited 863 Princess Street, Suite 203 Kingston ON K7L 5N4 Phone: (613)-544-1424 Ext. 224 Fax: (613) 544-5679

    Allen K. Lucas, P.Eng., Utilities EngineerUtilities Kingston

    1211 John Counter BoulevardKingston, ON K7L 4X7

    Phone: (613)-546-1181, Ext.2250Fax: (613) 542-1463

    This Notice issued June 9, 2009

    Notice of Completion of Environmental Study Report

  • Utilities Kingston Point Pleasant Water Treatment Plant Expansion Environmental Study Report

    J. L. Richards & Associates Limited JLR 22575 CH2MHILL Canada Limited ES-1 May 2009

    EXECUTIVE SUMMARY

    In June 2007, Utilities Kingston completed a Water Supply Master Plan for the City of Kingstons Urban Area. The Master Plan identified works to meet existing and future water demand increases resulting from forecasted growth up to year 2026. One of the priority projects identified as part