Upload
utpal-yadul
View
3
Download
2
Embed Size (px)
DESCRIPTION
daily KPI control sheet
Citation preview
MONTH May-14
ISSUE BY GAJENDER SINGH
DATES
ABS in %.
Target
Line Start Time
Line Stop Time
Linea
Punto
Manza
Vista
Manza 1st. Cycle
Vista 1st cycle
Punto 1st cycle
Spare part box
Part body
Dummy body bypass
Empty skid
Bypass pass due to defect
Repaint
Total Production
Efficency
Fresh Car Efficency
fresh car painted
T/C Strip out body count.
PTO
Production
as per SCM
PRODUCTION CONTROL FEED BACK/ INFORMATION
CONTROL
MANAGEMENT SHEET 14
Defect Target / 100
LINT 0.36
HAIR 0.10
PAINT DISTRUB 0.09
TOP COAT FOULING 0.08
UNCOVER PATCH 0.07
Thin Paint 0.15
Base Coat Rundown 0.15
Clear Rundown 0.15
Pipe Fouling 0.03
Uncover sanding patch 0.15
Visual
Visual
Visual
Visual
Visual
Check Point Std.
Booth Air Balance
Booth Temperature <QUALITY>
Booth Humidity
Manual Station Air Pressure 4 Bar ± 0.5 bar
Paint Pressure
Painting Gun & QRC Condition Visual
Jigs condition Visual MAINTENANCE
Booth Gratting Condition Visual
Top Coat 5S Condition Visual
Robot Bell Cup Condition Visual
Robot Cover Condition Visual
Both Oven condition Visual / weekly
Target
Washing Thinner / car 2.5ltrs / car
Mask & it's filters after 1700 car
Painter Dagri & Cap after 1200 car
Hand Gloves after 800 car
Robot Dangri after 1500 car
Robot Nozzole Covers after 100 car
Suggestion 1.2 / man
OPL as per req.
ABSENTISM < 5.00 %
PRODUCTION 247 / day
EFFICIENCY 93%
STOPAGE NIL
FTQ 92.00%
DEF/CAR < 2%
Top Coat DPV 1.05
Body GAP Time in Min. NIL
Dual Tone as per SCM
Quality
For FTQ
For DPV top five 1
st 5Car
Check Points
Positive at 30° ANGLE
22°C to 28°C
70% ± 5%
1.5 kg/cm² ± 0.5 kg/cm²
Cost
MAN
Morning
meeting
Ok √ Not ok ×
CRITICAL / IMPORTATANT THINGS OF MONTH
uSELF INITIATIVE POLICY BASE PLAN
MONTH May-14
ISSUE BY GAJENDER SINGH
DATES
ABS in %.
Target
Line Start Time
Line Stop Time
Linea
Punto
Manza
Vista
Manza 1st. Cycle
Vista 1st cycle
Punto 1st cycle
Spare part box
Part body
Dummy body bypass
Empty skid
Bypass pass due to defect
Repaint
Total Production
Efficency
Fresh Car Efficency
fresh car painted
T/C Strip out body count.
PTO
Production
as per SCM
PRODUCTION CONTROL FEED BACK/ INFORMATION
CONTROL
MANAGEMENT SHEET 14
Defect Target / 100
LINT 0.36
HAIR 0.10
PAINT DISTRUB 0.09
TOP COAT FOULING 0.08
UNCOVER PATCH 0.07
Thin Paint 0.15
Base Coat Rundown 0.15
Clear Rundown 0.15
Pipe Fouling 0.03
Uncover sanding patch 0.15
Visual
Visual
Visual
Visual
Visual
Check Point Std.
Booth Air Balance
Booth Temperature <QUALITY>
Booth Humidity
Manual Station Air Pressure 4 Bar ± 0.5 bar
Paint Pressure
Painting Gun & QRC Condition Visual
Jigs condition Visual MAINTENANCE
Booth Gratting Condition Visual
Top Coat 5S Condition Visual
Robot Bell Cup Condition Visual
Robot Cover Condition Visual
Both Oven condition Visual / weekly
Target
Washing Thinner / car 2.5ltrs / car
Mask & it's filters after 1700 car
Painter Dagri & Cap after 1200 car
Hand Gloves after 800 car
Robot Dangri after 1500 car
Robot Nozzole Covers after 100 car
Suggestion 1.2 / man
OPL as per req.
ABSENTISM < 5.00 %
PRODUCTION 247 / day
EFFICIENCY 93%
STOPAGE NIL
FTQ 92.00%
DEF/CAR < 2%
Top Coat DPV 1.05
Body GAP Time in Min. NIL
Dual Tone as per SCM
Quality
For FTQ
For DPV top five 1
st 5Car
Check Points
Positive at 30° ANGLE
22°C to 28°C
70% ± 5%
1.5 kg/cm² ± 0.5 kg/cm²
Cost
MAN
Morning
meeting
Ok √ Not ok ×
CRITICAL / IMPORTATANT THINGS OF MONTH
uSELF INITIATIVE POLICY BASE PLAN
UTE-2 CONTROL POINTS Month - S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1
Man
pow
erP.Booth
P.Sanding
Absentism ( % )
2 Production
3 Effieciency
4 Stoppage
5 Defect/Car
6Grey
White
7
S.Powder
S.Mark
Sealer Traces
8 Orbital sander at Roof Ditch
9
10 Royal Cars
11ICP SCORE :
Kaizen / OPL
N.B. ::
Control PointsDate
Dust Count (in primer)
Defects in Finishing
Line
DAMAGE ( SealerDelibera /PrimerDelibra )
Electricty /PropaneTarget =
UTE-2 CONTROL POINTS Month - S.No.
Major Action Points
1 Absentism
2 Production
3 Efficiency
4 Stoppages
5 Defect/Car
6Grey
White
7
S.Powder
S.Mark
S.No.
1 Absentism
2 Production
3 Efficiency
4 Stoppages
5 Defect/Car
6Grey
White
7
S.Powder
S.Mark
Control PointsDate
Dust Count (in primer)
Defects in Finishing Line
Sealer Traces
Control PointsDate
Dust Count (in primer)
Defects in Finishing Line
Sealer Traces
S.No. Activities / Kaizen / Improvements List Status
UTE-1 WATER LEAK CONTROL POINTS Month -
DATE PS WL FTQ WATER LEAK DETAILS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
UTE-1 CONTROL POINTS Month - S.No.
1
MA
NP
OW
ER
Present / Total
2 Present /Total
3 %Absentism
4 HPV
5
PR
OD
UCT
ON
PRODUCTION
6 CAGES
7 Running Time
8 % Efficiency
9 Loss time
10 Reason
11
QU
ALI
TY
CED DROP
12 CED DEFECT
13 LINE MARK / Flow mark
14 Total
15 SHOWER FTQ
16 WBSN.B. ::
Control PointsDate
Stdd / Target
UTE-1 CONTROL SHEET Month drafted by UTPAL Kr. Singh
S.NO TO DO ACTIVITIES DESCRITPTION Start Date Tar Date DOC Responsibilty Status SUGGESTIONS1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
3 TO DO LIST & SUGGESTIONS
UTE-1 CONTROL SHEET Month drafted by UTPAL Kr. Singh
S.NO TO DO ACTIVITIES DESCRITPTION Start Date Tar Date DOC Responsibilty Status SUGGESTIONS1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
2 TO DO LIST & SUGGESTIONS
UTE-1 CONTROL SHEET Month - drafted by UTPAL Kr. Singh
S.No.
1 S unsafe cond / Act
MA
NP
OW
ERTr. Absent / Total
2 App. Absent / Total
3 %Absentism
5
PR
OD
UCT
ON
PRODUCTION
6 CAGES
7 Running Time
8 % Efficiency
9 Loss time
Reason10
11
QU
ALI
TY
12 CED DEFECT
13
14 TOTAL DPV - FINISHING
Reason15
16 SHOWER FTQ / WBS
17
COST
TOTAL COST PER CAR
18 MASKING TAPE
Reason21
QUALITY ::
MAINTENANCE ::
Spec. Propject. CED DROP REDUCTION
Control PointsDate
Stdd / Target (Non - Routine) Major Activites/ Kaizens / Feedback
CED DROP = PRIMER / FINISHING
LINE MARK / FLOW MARK
(Months major) Critical Events / Points DAILY ISSUES ::: Actions / Change Point / Observation
1 DAILY MANAGEMENT