USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 – 01 DECEMBER 2017 LOCATION: CONTRACTOR FACILITY MAINTENANCE MANAGER: MARVIN WRIGHT PORT ENGINEER: FRANK SANTOS JR. ITEM JCN DESCRIPTION 1 of 1 077-01 N/A HAZARDOUS WASTE PRODUCED ON NAVAL VESSELS; CONTROL 243-01 N/A PROPELLER; REPLACE 505-01 N/A VALVE REPAIR; ACCOMPLISH 631-01 N/A UNDERWATER HULL AND FREEBOARD; PRESERVE 982-01 N/A DOCK AND SEA TRIALS; ACCOMPLISH 992-01 N/A CLEANING AND PUMPING; ACCOMPLISH 992-02 N/A TEMPORARY SERVICES; PROVIDE 997-01 N/A DRYDOCKING AND UNDOCKING; ACCOMPLISH

USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

USNV LIBERTY BAY YP-701

CRP 17-005

POP: 15 JULY 2017 – 01 DECEMBER 2017

LOCATION: CONTRACTOR FACILITY

MAINTENANCE MANAGER: MARVIN WRIGHT

PORT ENGINEER: FRANK SANTOS JR.

ITEM JCN DESCRIPTION

1 of 1

077-01 N/A HAZARDOUS WASTE PRODUCED ON NAVAL VESSELS; CONTROL

243-01 N/A PROPELLER; REPLACE

505-01 N/A VALVE REPAIR; ACCOMPLISH

631-01 N/A UNDERWATER HULL AND FREEBOARD; PRESERVE

982-01 N/A DOCK AND SEA TRIALS; ACCOMPLISH

992-01 N/A CLEANING AND PUMPING; ACCOMPLISH

992-02 N/A TEMPORARY SERVICES; PROVIDE

997-01 N/A DRYDOCKING AND UNDOCKING; ACCOMPLISH

Page 2: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 1 of 8

I N D E X

NAVSEA STANDARD ITEMS ARE AVAILABLE AT

http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

CATEGORY I ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY

TO THIS CONTRACT. ITEMS IN BOLD ITALICS ARE INVOKED FOR ALL

SOLICITATIONS.

CATEGORY I. FY-18 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER

WITHOUT FURTHER REFERENCE

ITEM NO. TITLE DATE

009-01 General Criteria; accomplish 18 NOV 16

009-02 Environmental Compliance Reports 18 NOV 16

for Material Usage at Naval

Facilities; accomplish

009-03 Toxic and Hazardous Substances; control 18 NOV 16

009-04 Quality Management System; provide 18 NOV 16

009-06 Maintaining Protection and Cleanliness 18 NOV 16

from Non-Radioactive Contaminate-Producing

Operations; accomplish

009-07 Confined Space Entry, Certification, Fire 18 NOV 16

Prevention and Housekeeping; accomplish

009-08 Shipboard Fire Protection; accomplish 18 NOV 16

009-10 Asbestos-Containing Material (ACM); 18 NOV 16

control

009-19 Provisioning Technical Documentation (PTD); 30 JUL 15

provide

009-20 Government Property; control 18 JUL 14

009-21 Logistics and Technical Data; provide 18 JUL 14

009-23 Interferences; remove and install 18 NOV 16

009-24 Authorization, Control, Isolation, Blanking, 18 NOV 16

Tagging and Cleanliness; accomplish

Page 3: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 2 of 8

009-29 Asbestos-Free Pipe Hanger Liner Material; 29 JUL 04

install

009-34 Fire Protection of Unmanned Vessels at 18 NOV 16

Contractor's Facility; accomplish

009-39 Technical Manual Contract Requirement (TMCR) 18 NOV 16

for a New Technical Manual for Commercial

Equipment/Component; accomplish

009-40 Contractor Crane, Multi-Purpose Machine 18 NOV 16

and Material Handling Equipment at a Naval

Facility; provide

009-60 Schedule and Associated Reports for 01 SEP 15

Availabilities Over 9 Weeks in Duration;

provide and manage

009-61 Shipboard Use of Fluorocarbons; control 18 JUL 14

009-65 Polychlorinated Biphenyls (PCBs); control 29 JUL 11

009-67 Integrated Total Ship Testing; manage 18 NOV 16

009-69 Heavy Weather/Mooring Plan; provide 18 NOV 16

009-70 Confined Space Entry, Certification, Fire 18 NOV 16

Protection, Fire Prevention, and

Housekeeping for Unmanned Vessel;

accomplish

009-72 Physical Security at a Private Contractor 18 NOV 16

Facility; accomplish

009-73 Shipboard Electrical/Electronic Cable 18 NOV 16

Procedure; accomplish

009-74 Occupational, Safety and Health Plan; 18 NOV 16

accomplish

009-79 Government Owned Material (GOM) Status; 18 NOV 16

report

009-80 Ship's Facilities; maintain 18 NOV 16

009-81 Compartment Closeout; accomplish 18 NOV 16

Page 4: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 3 of 8

009-82 Installation of Equal Component Vice 18 NOV 16

Specified Component; report

009-89 Contractor Furnished Anode (Purchase and 18 NOV 16

Inspection); accomplish

009-93 Emergency Planning and Community 18 NOV 16

Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

009-94 General Environmental Work at Contractor 18 NOV 16

Facility; accomplish

009-97 Shipbuilding and Ship Repair Operations 17 JAN 13

National Emission Standard for Hazardous

Air Pollutants (NESHAPS) for Surface

Coating Information; provide

009-99 Ship Departure Report; provide 18 JUL 14

009-100 Ship's Stability; maintain 18 NOV 16

009-101 Ship Transit and Berthing; accomplish 18 NOV 16

009-102 Alteration Verification; provide 29 JUL 11

009-103 Weight and Moment Change Data; provide 18 JUL 14

009-106 Work Authorization Form Coordinator 18 NOV 16

(WAFCOR); provide

009-108 Aircraft Carrier Transit and Berthing; 18 NOV 16

accomplish

009-109 Non-SUBSAFE Work ON SUBSAFE-Certified 18 NOV 16

Vessel; accomplish

009-110 Non-Nuclear Work on a Nuclear Vessel; 18 NOV 16

accomplish

009-111 Schedule and Associated Reports for 18 NOV 16

Availabilities 9 Weeks or Less in

Duration; provide and manage

009-117 Combat System Light-Off; support 18 NOV 16

Page 5: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 4 of 8

009-118 CG Deck Loading; accomplish 18 JUL 14

009-120 Fact Finding and Critique of Unplanned 18 NOV 16

Event; manage

009-122 Temporary Padeye; install and remove 18 NOV 16

Page 6: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 5 of 8

I N D E X

CATEGORY II. FY−18 STANDARD ITEMS WHICH MAY BE INVOKED IN THE

WORK ITEMS OF THIS JOB ORDER

ITEM NO. TITLE DATE

009-05 Temporary Accesses; accomplish 18 NOV 16

009-09 Process Control Procedure (PCP); provide 18 NOV 16

and accomplish

009-11 Insulation and Lagging; accomplish 18 NOV 16

009-12 Weld, Fabricate, and Inspect; accomplish 18 NOV 16

009-13 Meters; repair 18 NOV 16

009-14 Gage, Switch, and Thermometer; repair 18 NOV 16

009-15 Rotating Machinery; balance 18 NOV 16

009-16 Electronic Equipment; repair 18 NOV 16

009-17 Rotating Electrical Equipment; repair 18 NOV 16

009-18 Magnetic Material; control 18 NOV 16

009-25 Structural Boundary Test; accomplish 18 NOV 16

009-26 Deck Covering; accomplish 18 NOV 16

009-27 Material Identification and Control (MIC) 18 NOV 16

for Level I System; accomplish

009-30 Boiler Sample Tube; inspect 18 NOV 16

009-31 Boiler Waterjet Cleaning; accomplish 18 JUL 14

009-32 Cleaning and Painting Requirements; 12 MAY 16

accomplish

009-33 Rotating Electrical Equipment; rewind 18 NOV 16

009-36 Controller; repair 18 NOV 16

009-37 General Procedure for Woodwork; accomplish 18 NOV 16

Page 7: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 6 of 8

009-38 Boiler, Catapult Accumulator, and Reboiler 18 NOV 16

Dry Lay-up; accomplish

009-41 Technical Manual Contract Requirement 18 NOV 16

(TMCR) for a Topically Structured

Technical Manual; accomplish

009-42 Technical Manual Contract Requirement 18 NOV 16

(TMCR) for Updating Technical Manuals;

accomplish

009-43 Engineering Plant Production Completion 30 JUL 15

Date (PCD), Light-Off Assessment (LOA)

Support; provide

009-45 Tapered Plug Valve; repair 18 NOV 16

009-46 Butterfly Valve, Synthetic and Metal 18 JUL 14

Seated; repair

009-47 Gate Valve; repair 18 NOV 16

009-48 Pressure Seal Bonnet Valve Shop Repair; 18 NOV 16

accomplish

009-49 Pressure Seal Bonnet Valve In-line Repair; 18 NOV 16

accomplish

009-50 Horizontal Swing Check Valve; repair 18 NOV 16

009-51 Globe, Globe Angle, and Globe Stop Check 18 NOV 16

Valve; repair

009-52 Relief Valve; repair 18 NOV 16

009-53 Bolted Bonnet Steam Valve Shop Repair; 18 NOV 16

accomplish

009-54 Bolted Bonnet Steam Valve In-line Repair; 18 NOV 16

accomplish

009-55 Regulating/Reducing Valve; repair 18 NOV 16

009-56 Main Propulsion Boiler Wet Lay-up; 18 NOV 16

accomplish

Page 8: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 7 of 8

009-57 Reduction Gear Security; accomplish 18 NOV 16

009-58 Pump and Driver Shaft Alignment; accomplish 01 SEP 15

009-59 Organotin Antifouling Material; control 18 NOV 16

009-62 Boiler Handhole, Manhole Seat and Plate; 18 NOV 16

inspect

009-63 Lubricating Oil and Hydraulic Fluid; 18 NOV 16

analyze

009-64 Synthetic Fire Resistant Hydraulic Fluid; 18 NOV 16

control

009-68 Bolted Bonnet Valve; repair 29 JUL 11

009-71 Piping System; test 18 NOV 16

009-75 Circuit Breaker; repair 18 NOV 16

009-76 Waveguide and Rigid Coaxial Lay-up; 18 NOV 16

accomplish

009-77 Cofferdam Installation; accomplish 18 NOV 16

009-78 Passive Countermeasures System (PCMS) 18 NOV 16

Material; repair

009-83 Wire Rope Assembly; fabricate 18 NOV 16

009-84 Threaded Fastener Requirements; accomplish 18 NOV 16

009-85 Government Sponsored Planning Yard/ 19 JUL 07

Configuration Data Manager (CDM) On-Site

Representative Facility; provide

009-86 Recovery and Turn-In of Ozone Depleting 18 NOV 16

Substance (ODS); accomplish

009-87 Chemical Disinfection Procedures; 18 NOV 16

Accomplish

009-88 Collection, Holding and Transfer (CHT) 18 NOV 16

and Motor Gasoline (MOGAS) Tanks, Spaces,

and Piping, including Sewage or MOGAS-

Contaminated Tanks, Spaces, and Piping;

Page 9: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701 CRP NO: 17-005

Page 8 of 8

certify

009-90 Technical Representative; provide 18 JUL 14

009-91 Propeller In-Place Inspection; accomplish 18 NOV 16

009-92 Resilient Mount; install 18 NOV 16

009-95 Mechanically Attached Fitting (MAFs); 18 NOV 16

install

009-96 Ball Valve; repair 18 NOV 16

009-104 Vibration Testing and Analysis; accomplish 18 JUL 14

009-105 Thermal Sprayed Coating for Machinery 18 NOV 16

Component Repair; accomplish

009-107 Piping System Cleanliness Restoration 18 NOV 16

(Non-Nuclear); accomplish

009-112 Prevention of Radiographic-Inspection 18 NOV 16

Ionizing-Radiation Hazards; accomplish

009-113 Rotating Electrical Equipment with a 18 NOV 16

Sealed Insulation System (SIS); rewind

009-114 Mold Remediation; accomplish 07 NOV 13

009-115 Bearing Rebabbitting; accomplish 30 JUL 15

009-116 Auxiliary and Waste Heat Boiler Sodium 30 JUL 15

Nitrite Wet Lay-up; accomplish

009-121 Ship Assessment/Inspection: accomplish 18 NOV 16

009-123 Fiber Optic Component; remove, relocate, 18 NOV 16

Repair, and install

Page 10: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 077-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 7 ITEM NO: 077-01

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels;

control

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 49 U.S.C. §5103, Federal Hazardous Materials

Transportation Act

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. §7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in

3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this

Work Item, submit the original of 2.3 to the SUPERVISOR for

assignment of Environmental Protection Agency (EPA) or delegated

state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-

generated hazardous waste listed in 3.5 in accordance with 2.1

and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy, in hard copy or

approved transferrable media, of 2.3 signed by the owner or

Page 11: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 7 ITEM NO: 077-01

operator of the disposal facility to the SUPERVISOR within 48

hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using

EPA or delegated state environmental agency identification

number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste

generated solely by the physical actions of Ship's Force or Navy

employees (termed Navy-Generated Hazardous Waste) on board the

vessel shall only bear a generator identification number issued

to the Navy pursuant to applicable law. The contractor shall

obtain SUPERVISOR'S concurrence with the categorization of the

waste as Navy-generated before completion of the manifest. The

manifest prepared shall be presented to the SUPERVISOR for

completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste

generated solely by the physical actions of contractor personnel

(termed Contractor-Generated Hazardous Waste) shall bear a

generator identification number issued to the contractor

pursuant to applicable law. Regardless of the presence of other

material in or on the shipboard systems or structure which may

have qualified a waste stream as hazardous, where the contractor

performs work on a system or structure using materials (whether

or not the use of such materials was specified by the Navy)

which by themselves would cause the waste from such work to be a

hazardous waste, documentation related to such waste shall only

bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste

generated by the combined physical actions of Navy and

contractor personnel (termed Co-Generated Hazardous Waste) shall

bear a generator identification number issued to the contractor

pursuant to applicable law and shall also cite in the remarks

block a generator identification number issued to the Navy

pursuant to applicable law. When the contractor merely drains a

system and such drainage creates hazardous waste or the

contractor performs work on system or structure using materials

which by themselves would not cause the waste from such work to

be hazardous waste but such work nonetheless creates a hazardous

waste, documentation related to such waste shall bear a

generator identification number issued to the contractor and

shall also cite in the remarks block a generator identification

number issued to the Navy. The contractor shall sign the

Page 12: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

3 of 7 ITEM NO: 077-01

generator certification on the Uniform Hazardous Waste Manifest

whenever use of the manifest is required for disposal. The

contractor shall obtain SUPERVISOR's concurrence with the

categorization of the wastes as co-generated before completion

of the manifest. Manifests prepared shall be presented to the

SUPERVISOR for completion after the hazardous waste has been

identified.

3.3 If the contractor, while performing work at a

Government facility, cannot obtain a separate generator

identification number from the state in which the availability

will be performed, the contractor shall notify the SUPERVISOR

within 3 business days of receipt of written notification by the

state. After obtaining approval of the SUPERVISOR, the

contractor shall use the Navy site generator identification

number and insert in the remarks block the contractor generator

identification number issued for the site where his main

facilities are located.

3.4 If, for availabilities at a contractor-owned or

controlled facility, the Navy cannot obtain a separate generator

identification number for use at a contractor facility, the Navy

shall notify the contractor within 3 business days of receipt of

notification by the state. The contractor shall dispose of

hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be

produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include

spent sulfamic, citric,

chromic, nitric, sulfuric,

hydrochloric, etc.) _____ _____ _____

Ethylene Glycol (Antifreeze) _____ _____ _____

Sodium Hydroxide _____ _____ _____

Cleaning Solvents _____ _____ _____

Sodium Phosphates

(Tri, Bi, or Mono) _____ _____ _____

Page 13: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

4 of 7 ITEM NO: 077-01

Fluorocarbons _____ _____ _____

Morpholine _____ _____ _____

Sodium Chromates _____ _____ _____

Hydrazine _____ _____ _____

Carbohydrazide _____ _____ _____

Methyl Ethyl Ketone _____ _____ _____

Spent Abrasive Blast Material

(contaminated with a known

hazardous waste) _____ _____ _____

Trichloroethane _____ _____ _____

Miscellaneous Chemicals

(Ignitable) _____ _____ _____

Miscellaneous Chemicals

(Corrosive) _____ _____ _____

Miscellaneous Chemicals

(TCLP Toxic) _____ _____ _____

Miscellaneous Chemicals

(Reactive) _____ _____ _____

Oil (Synthetic) _____ _____ _____

Paints (enamel, latex,

epoxy, thinners, oil based,

rubber paint, nonskid,

lacquer, remover, varnishes) _____ _____ _____

Paints (may include lead,

cadmium, or chrome) _____ _____ _____

Paint Strippers (phenols,

lead, chromium) _____ _____ _____

Sludge (contaminated with a

known hazardous waste) _____ _____ _____

Page 14: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

5 of 7 ITEM NO: 077-01

Wool Felt (contaminated

with chromium and PCB's) _____ _____ _____

Ventilation Debris/Residue

(heavy metals, e.g., cadmium,

chromium) _____ _____ _____

(*1) _____ _____ _____

3.6 Notify the SUPERVISOR at least one working day prior

to shipment of hazardous waste for disposal.

3.7 Submit one legible copy, in hard copy or approved

transferrable media, of a report identifying type, amount, and

disposal cost of waste listed in 3.5 that was removed during the

performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other

method used to identify the waste and state whether each listed

waste was hazardous (with generator assignment), non-hazardous,

or did not exist.

3.7.1.1 Chemical analysis shall be accomplished

by laboratories with state or EPA approved quality assurance

programs.

3.7.2 The contractor shall make an effort to minimize

hazardous waste generation by reducing the volume or toxicity by

neutralizing, recycling, or otherwise removing it from the

requirements of Subtitle C of 2.1 and include a description of

such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the

contractor from complying with applicable federal, state, and

local laws, codes, ordinances, and regulations, including the

obtaining of licenses and permits in connection with hazardous

waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best

information available at the time of preparation of the

solicitation. Hazardous waste generated during the actual

performance of the work may vary in type or amount from waste

Page 15: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

6 of 7 ITEM NO: 077-01

listed in 3.5 which may result in renegotiation for credit or

increase pursuant to Paragraph (b) of 2.4. The contractor is

expected to use best management practice to identify and dispose

of all hazardous waste. Some of the substances listed in 3.5 may

be neutralized, recycled, or otherwise removed from the

requirements of Subtitle C of 2.1. Inclusion of these substances

in the waste listed in 3.5 does not preclude the contractor from

taking action consistent with 2.1 to reduce or eliminate the

hazardous constituents of any waste required to be disposed of

under the contract in accordance with 2.2. Processes that add

hazardous constituents to the bilges may require that bilge

water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5

are estimates of waste to be disposed of under this contract as

required by 2.4. They are not estimates of the amount of the

work involved in generating that waste. The work requirements of

each individual Work Item specify the actual work to be

accomplished.

4.2 Hazardous wastes are determined by one or more of the

following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or

toxicity (Toxicity Characteristic Leachate Procedure - TCLP)

exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet

(MSDS).

4.2.3 Applying knowledge of the hazardous

characteristics of the waste in light of the materials or the

process used.

4.3 Asbestos, bilge water, oil/water including sludge,

debris and other contaminants, sludge which includes solids and

sludge from ballast tanks, CHT tanks, voids, oily waste tanks,

fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's

(Maryland), etc., apply only in those states listing them as

hazardous waste. When an availability is to be performed in a

state where these items are hazardous waste, an estimate of the

amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

Page 16: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

7 of 7 ITEM NO: 077-01

5.1 None.

PLANNER'S NOTE: (*1) To be used for hazardous waste not listed

in 3.5.

Page 17: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 243-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 2 ITEM NO: 243-01

1. SCOPE:

1.1 Title: Propeller; replace

1.2 Location of Work:

1.2.1 Stern Area, Dry Dock

1.3 Identification:

1.3.1 Quantity (One EA), Main Propulsion Propeller,

3 Blade, R.H., 52 inch diameter, 58 inch pitch,

CF3 Stainless, 4 inch STD; 12 inch Hub, Piece

No. 01-245/2 of 2.2.

1.3.2 Quantity (One EA), Main Propulsion Propeller,

3 Blade, L.H., 52 inch diameter, 58 inch pitch,

CF3 Stainless, 4 inch STD; 12 inch Hub, Piece

No. 01-245/1 of 2.2.

2. REFERENCES:

2.1 Standard Items

2.2 243-6170099, Shafting Arrangement & Details

2.3 S9086-HP-STM-010, NSTM Chapter 245 Propellers and

Propulsors

2.4 S9245-AR-TSM-010, Marine Propeller Inspection, Repair

and Certification

3. REQUIREMENTS:

3.1 Remove existing and install new propellers listed in

1.3.1 using 2.2 through 2.4 for guidance.

3.1.1 Restore each mating surface exposed by propeller

removal. Repair by removing high spots, burrs, abrasions, and

foreign matter, where removal can be accomplished by hand tools.

Page 18: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 2 ITEM NO: 243-01

3.1.2 Chase and tap each exposed thread area.

(I)(G) “INSPECT CONTACT”

3.1.3 Inspect contact using blueing transfer method.

Contact shall be a minimum of 60 percent evenly distributed over

full length of the hub taper.

3.1.4 Fill propeller hub and cap void, including non-

vented spaces with grease conforming to MIL-G-23549 or 24139.

3.1.5 Fit and install new screws, studs, nuts,

packing, monel lockwire, pins, O-rings, plugs, and fittings.

3.1.6 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing results of the

requirements of 3.1.3 to the SUPERVISOR.

3.2 Remove blade and blade edge protection prior to

undocking and coat propeller with corrosion preventative

compound conforming to MIL-C-11796, Class 3.

(V)(G) “OPERATIONAL TEST”

3.3 Accomplish an operational test of the propeller listed

in 1.3.1 in conjunction with Sea Trials. Allowable vibration:

None.

3.3.1 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing results of the

requirements of 3.3 to the SUPERVISOR.

4. NOTES:

4.1 Known source for new propellers:

Sound Propeller Service, Inc.

7916 8th Ave S

Seattle, WA 98108

Phone 206-788-4202

Fax 206-762-2152

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 19: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 505-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 3 ITEM NO: 505-01

1. SCOPE:

1.1 Title: Valve Repair; accomplish

1.2 Location of Work:

1.2.1 Engine Room (2-36-0-E)

1.2.2 Marine Sanitation Device Space (3-16-0-V)

1.3 Identification:

1.3.1 Quantity (One EA), 3 inch, Ball Valve, V-2

MSD & SW Flushing Ovbd Discharge, Item 13 of

2.2, Wilcox-Crittenden #1565, (Port Frame 18)

1.3.2 Quantity (One EA), 1 inch, Ball Valve, V-12,

MSD SW Flushing Sea Suction, Item 12 of 2.2,

Watts B6802, (Stbd Frame 16)

1.3.3 Quantity (One EA), 3 inch, Ball Valve, V-4,

Firemain Suction, Item 9 of 2.2, Wilcox-

Crittenden #1565, (Stbd Frame 38)

1.3.4 Quantity (One EA), 1 ½ inch, Ball Valve, V1,

AC Cooling Water Suction, Item 5 of 2.2, 150#

WOG, Watts B6800-SSW, (Stbd Frame 37)

1.3.5 Quantity (Two EA), 4 inch, Ball Valve, V20,

Diesel Engine Suction, Item 3 of 2.2, 150# Watts

SF-250-150, (Port & Stbd Frame 44)

1.3.6 Quantity (Two EA), 4 inch, Duplex Filter,

Bronze, Flanged 8 bolt hole, 150#, Item S2A of

2.3, (2-36-0-E)

2. REFERENCES:

2.1 Standard Items

2.2 801-6170203, Docking Drawing

Page 20: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 3 ITEM NO: 505-01

2.3 256-6170102. Sea Water Machinery Cooling A&D W/Diagram

3. REQUIREMENTS:

3.1 Remove existing and install new duplex strainers

located in 1.2.1 and identified in 1.3.6.

3.1.1 Restore each mating surface exposed by removal.

Repair by removing high spots, burrs, abrasions, and foreign

matter, where removal can be accomplished by hand tools.

3.1.2 Remove each existing and install new salt water

piping joint gasket and fastener. Gaskets shall conform to HH-P-

151, Class I, cloth inserted rubber, or MIL-PRF-1149, Type II,

Class I, synthetic rubber. Fasteners and nuts shall conform to

MIL-DTL-1222, Type I, Grade 400 or 405, Class A or B, QQ-N-281,

nickel-copper alloy.

3.2 Accomplish the requirements of 009-96 of 2.1 for each

ball valve listed in 1.3.1 through 1.3.5.

3.2.1 Ensure the seat tightness is 150 PSIG.

3.2.2 Ensure the test medium is clean, fresh water.

3.2.3 Remove each existing and install new salt water

piping joint gasket and fastener. Gaskets shall conform to HH-P-

151, Class I, cloth inserted rubber, or MIL-PRF-1149, Type II,

Class I, synthetic rubber. Fasteners and nuts shall conform to

MIL-DTL-1222, Type I, Grade 400 or 405, Class A or B, QQ-N-281,

nickel-copper alloy.

(V)(G) “OPERATIONAL TEST”

3.3 Accomplish an operational test of each valve and

duplex strainer installed at system pressure.

3.3.1 Cycle each valve from full closed to full open

to full closed 4 times. Allowable external leakage: None.

3.3.2 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing results of the

requirements of 3.3 to the SUPERVISOR.

Page 21: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

3 of 3 ITEM NO: 505-01

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 22: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 631-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 2 ITEM NO: 631-01

1. SCOPE:

1.1 Title: Underwater Hull and Freeboard; preserve

1.2 Location of Work:

1.2.1 Underwater Hull, Keel to Six Inches Above Upper

Boot Top Limit, including Port and Starboard Bow

Thruster Pockets, Sea Chests, and Port and

Starboard Torpedo Launchways and Voids

1.2.2 Freeboard, From Six Inches Above Upper Boot Top

Limit to Upper Limit of Side Shell and Transom

Plating

1.3 Identification: USNV LIBERTY BAY YP-701

1.3.1 Length Overall: 108 feet

1.3.2 Extreme Beam: 25 feet

1.3.3 Full Load Displacement: 175 long tons

1.3.4 Draft (approx.): 6 feet

2. REFERENCES:

2.1 Standard Items

2.2 631-5900319, Painting Schedule

2.3 100-5900230, Bulwark Details, Chain Lockers, Ice

Sheathing, Misc. Details

2.4 603-5900312, Draft Marks & Hull Designation

2.5 801-5900328, Outboard Profile

3. REQUIREMENTS:

Page 23: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 2 ITEM NO: 631-01

3.1 Accomplish a low pressure fresh water washdown of the

surfaces listed in 1.2, using a minimum nozzle pressure of 3000

psi for 100 percent removal of marine growth and non-adhering

paint from hull surfaces.

(V)(G) “VISUAL INSPECTION”

3.2 Accomplish a joint visual inspection with the PORT

ENGINEER of the surfaces listed in 1.2 for structural integrity,

deterioration, pitting, cracks, and areas of damage or

distortion, and to determine required repairs.

3.2.1 Record distinguishing marks and figures.

3.2.1.1 Distinguishing marks and figures shall

include, but are not limited to: boottop limits, painted

waterline, draft marks, raised and painted marks and figures.

3.2.2 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing results of the

requirements of 3.2 to the SUPERVISOR.

3.3 Remove existing and install new 16 zinc anodes in

accordance with 2.3.

3.3.1 Remove existing and install new 32 studs and

fasteners identified in 3.2 in accordance with 2.3

3.4 Accomplish the requirements of 009-32 of 2.1,

including Table One, Line 20, for locations listed in 1.2.

3.4.1 Restore all hull markings in accordance with

2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 24: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 982-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 2 ITEM NO: 982-01

1. SCOPE:

1.1 Title: Dock and Sea Trials; accomplish

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

(I)(G) "DOCK TRIAL"

3.1 Accomplish a dock trial a minimum of 24 hours prior to

sea trials. Dock trial shall be scheduled for a six hour

duration. Ship’s Force will operate all equipment to insure that

the boat is ready for sea trials. The contractor shall insure

that temporary service and boat securing lines are prepared to

support the dock trial. Dock trials shall be conducted during

normal working hours, on a weekday.

(I)(G) "SEA TRIAL"

3.2 Sea trials shall be conducted in local waters, during

normal working hours, on a weekday. Trials will not exceed 6

hours. Contractor shall provide a minimum of one machinist, one

pipefitter, and one electrician to participate in the sea

trials.

3.2.1 Submit two legible copies of a list of

contractor and subcontractor personnel assigned to sea trials,

to the SUPERVISOR, 48 hours prior to trials.

Page 25: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 2 ITEM NO: 982-01

3.3 Equipment repaired or modified during this

availability will be operated in accordance with applicable

technical manuals.

3.3.1 Submit a list of deficiencies noted to the

SUPERVISOR.

3.3.2 Upon completion of trials, correct contractor

responsible deficiencies and prove proper operation to the

SUPERVISOR prior to delivery of ship.

4. NOTES:

4.1 Ship’s Force shall pilot the vessel and operate all

equipment.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 26: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 992-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 7 ITEM NO: 992-01

1. SCOPE:

1.1 Title: Cleaning and Pumping; accomplish

1.2 Location of Work:

1.2.1 Fuel Oil Tank (2-30-1-F), (Approximately 2500

gallons)

1.2.2 Fuel Oil Tank (2-30-2-F), (Approximately 2500

gallons)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 S9086-T8-STM-010/CH-593, Pollution Control

2.3 S9086-SP-STM-010/CH-542, Gasoline and JP-5 Fuel

Systems

2.4 MIL-HDBK-291, Military Handbook Cargo Tank Cleaning

2.5 S9086-CJ-STM-010/CH-075, Fasteners

2.6 S9086-CM-STM-020/CH-078, Gaskets and Packing

2.7 MIL-DTL-1222, Studs, Screws and Nuts for Applications

Where a High Degree of Reliability is Required;

General Specification for

3. REQUIREMENTS:

3.1 Open, ventilate, empty, clean, render dry, and

maintain any tank or space including adjacent tanks, spaces, or

piping systems where the scope of repairs will result in a need

for certification during the performance of this Job Order.

Page 27: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 7 ITEM NO: 992-01

3.1.1 Spaces listed in 1.2.1 through 1.2.2 shall be

certified and maintained throughout the availability.

3.1.2 Tanks listed in 1.2.1 through 1.2.2 are to

support inspections by Government inspectors.

3.1.3 Ensure that harmful vapors, fumes, and mists are

ventilated to the exterior of the vessel.

3.1.4 Submit one legible copy, in approved

transferrable media, of a report listing the location, origin,

and quantity of each manhole cover removed in 3.1 with respect

to its tank, ship's frame, and distance off centerline to the

SUPERVISOR.

3.1.5 Clean and disinfect each CHT/sewage tank and

associated piping in accordance with 2.2.

3.1.6 Clean each tank and associated piping in

accordance with 2.3 and 2.4.

3.1.7 Clean and inspect each removed fastener for wear

and defects, using Paragraph 075-8.3 of 2.5 for accept or reject

criteria. Visually inspect to ensure material type is the same

as required in 3.10 (CRES, Brass, Nickel-copper, galvanized or

zinc coated steel). Retain fasteners found acceptable for reuse.

3.1.7.1 Accomplish a visual inspection to verify

correct material for application.

3.1.7.2 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing results of the

requirements of 3.1.7 and 3.1.7.1 to the SUPERVISOR.

3.2 Steam clean each area where the removal of

preservative is required.

3.2.1 Install new rust preventative compound

conforming to MIL-PRF-16173, Grade One or 3.

3.2.2 Install new Monel fill and drain plugs

conforming to QQ-N-281, Class B, to replace those removed to

accomplish steam cleaning.

Page 28: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

3 of 7 ITEM NO: 992-01

3.3 Pump tanks containing petroleum products to the low

suction level of each tank.

3.3.1 Off-loading or transferring of petroleum

products shall be accomplished during daylight hours only.

3.3.2 Hoses, pumps, and containers shall be clean and

dry prior to start of off-loading.

3.3.3 Submit one legible copy, in approved

transferrable media, of completed Attachment A (inventory

schedule-petroleum products) to the SUPERVISOR.

(V)(G) "VERIFY OFF LOAD/TRANSFERRING COORDINATION"

3.4 Coordinate the off-loading or transferring of fluids

through the ship's Chief Engineer, via the SUPERVISOR, to

maintain ship's stability and to prevent flooding.

3.4.1 Obtain a list from the SUPERVISOR of petroleum

soundings for tanks prior to start of pumping operations.

3.5 Clean each bilge of spaces listed in 1.2 free of

trash, debris, grease, oily liquids, and other liquid

contaminants prior to the initial certification.

3.5.1 Maintain each bilge to a clean, dry condition

for the duration of the availability on a 7-day-a-week, 24-hour-

a-day basis.

3.5.2 Remove and dispose of an additional 25 gallons

of non-hazardous liquids from bilges listed in 1.2, generated by

the Navy, after initial cleaning and certification is obtained.

Removals shall be measured. Total amount of liquids removed

greater or less than the above amount will be the subject of an

equitable adjustment.

(V)(G) "SOURCE DETERMINATION"

3.5.2.1 Submit one legible copy, in approved

transferrable media, of a report listing the amount of gallons

removed in 3.5.2, responsible source of liquids, and date

liquids were removed after each pumping operation.

Page 29: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

4 of 7 ITEM NO: 992-01

3.5.3 Remove and install pumping equipment 3

evolutions after space turnover to support the requirements of

3.5.1 and 3.5.2.

(V)(G) "CLEAN AND DRY BILGES"

3.5.4 Prior to space turnover, when directed by the

SUPERVISOR, accomplish a final detergent cleaning of each bilge

of spaces listed in 1.2, removing all trash, debris, grease,

oily liquids, and other liquid contaminants from the bilges.

3.6 Clean each chain locker free of silt, mud, and foreign

matter.

3.7 Remove and dispose of liquids, including compensating

sea water from compensating fuel tanks, sludge, and debris, in

accordance with federal, state, and local laws, codes,

ordinances, and regulations.

3.7.1 Accomplish a chemical analysis of liquid waste,

sludge, and debris in accordance with applicable federal, state,

and local laws, codes, ordinances, regulations, and Naval

Facility requirements.

3.7.1.1 One chemical analysis is required for

each containment (Engine Room, Space, etc.) or for each type of

liquid (fuel oil, JP-5, etc.).

3.7.1.2 Submit one legible copy in approved

transferrable media, of each analysis to the SUPERVISOR. Also

identify the volume of the liquid from which each sample was

taken.

3.8 Tank Closure Repairs:

3.8.1 Clean, chase, or tap threaded areas prior to

installing covers.

3.8.2 Weld up, drill, and tap a total of 20 stripped

manhole cover bolting ring holes for tanks opened in 3.1.

3.8.3 Remove existing and install new a total of 40

missing, broken or defective manhole cover studs for tanks

opened in 3.1 conforming to 2.7, Type IV, Grade 304.

Page 30: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

5 of 7 ITEM NO: 992-01

3.8.4 Accomplish the requirements of 009-12 of 2.1,

including Table 4, Column A Lines One through 7.

3.8.5 Remove all paint from seal mating surfaces (both

cover and tank ring) prior to 3.8.6.

3.8.6 Accomplish the requirements of 009-32 of 2.1 for

surfaces in the vicinity of tank closure, to include manhole

ring, sealing area, coaming and flanged areas.

(V)(G) "INSPECT TANK CLEANLINESS AND COMPLETION OF REPAIRS"

3.9 Inspect each tank for cleanliness and completion of

repairs prior to final closing with the Chief Engineer and Port

Engineer. Document the personnel who were present during the

inspection and confirm that they have exited the space prior to

closure of tanks, voids, and cofferdams. Designate one person to

account for all personnel who may have entered the space.

(V)(G) “VERIFY TORQUE WRENCH WITHIN PROPER RANGE OF TORQUE

VALUES” (See 4.7)

3.10 Install manhole covers.

3.10.1 Reinstall existing fasteners found acceptable

in 3.1.7.

3.10.2 Install manhole cover for each tank, using new

gaskets in accordance with Table 078-8-2 of 2.6, new 120 CRES

washers conforming to FF-W-92, Type A, Grade One, Class B, and

new brass 120 nuts conforming to MIL-DTL-1222, Type I, Grade

464, and/or new 60 CRES hex head cap screws conforming to ASTM F

593, Group 1, Alloy 304, or Group 2, Alloy 316.

3.10.2.1 Install new 60 CRES bolts conforming

to MIL-DTL-1222, Grade 5, Class 316, for flush deck bolted

manhole covers.

3.10.3 Install access cover for each potable water,

feedwater, and sewage tank, using new gaskets conforming to

Table 078-8-2 of 2.6, new 20 zinc coated steel nuts conforming

to MIL-DTL-1222, Type I, Grade 5, and new 20 CRES washers

conforming to FF-W-92, Type A, Grade One, Class B.

Page 31: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

6 of 7 ITEM NO: 992-01

3.10.4 Determine the proper tightening sequence from

Figure 075-4-1 of 2.5 and 078-8.2.3 of 2.6 (078-8.2.3 refers to

Figure 078-8-4 to illustrate several bolt tightening patterns).

3.10.5 Tighten fasteners uniformly. Apply 10 percent

of the specified torque first to make sure that the parts are

solidly together. Then, apply torque in 25 percent increments

(i.e., 25, 50, 75, and 100 percent). Reverse previous sequence

(i.e., 6, 5, 4, 3, 2, 1), tightening to 100 percent of required

torque.

(V)(G) “VERIFY THREAD ENGAGEMENT”

3.11 Verify proper thread protrusion in accordance with

Paragraph 7.5.1 and 8.2.3 of 2.5.

3.12 Accomplish the requirements of 009-32 of 2.1 for new

and disturbed surfaces.

3.13 Accomplish the requirements of 009-87 of 2.1 for

locations listed in 1.2.16 and 1.2.17.

4. NOTES:

4.1 For the purpose of this Work Item, the term "tank or

space" includes voids, cofferdams, and inaccessible or confined

areas.

4.2 Consider each bilge to contain contaminated oily salt

water.

4.3 Booklet of General Plans and Tank Sounding Tables are

available for review at the office of the SUPERVISOR.

4.4 The SUPERVISOR will provide sequence of tanks and

dates of inspections referenced in 3.1.2.

4.5 Associated piping is defined as, "An assembly of pipe,

tubing, valves, fittings and related components forming a whole

or a part of a system which starts or terminates in subject

area, thus being common to and associated with same."

4.6 PTFE string gasket material of 100 percent virgin 3500

VALVERLON 3/32 inch diameter (manufactured by A.W. Chesterton

Page 32: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

7 of 7 ITEM NO: 992-01

Co) may be used as a means of ensuring a watertight seal of

manhole and access covers.

4.7 Torque wrenches shall be selected in such a manner

that the required final torque falls within 20 to 90 percent of

the torque wrench range.

4.7.1 A torque wrench with a scale range of 0-100 ft-

lbs can be used for a maximum torque of 90 ft-lbs and minimum

torque of 20 ft-lbs.

4.7.2 A torque wrench with a scale range of 0-250 ft-

lbs can be used for a maximum torque of 225 ft-lbs and a minimum

torque of 50 ft-lbs.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 33: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701

ATTACHMENT A

START FINISH

NFD DIRECTOR

CONTRACTOR/SUBCONTRACTOR AUTHORIZED REPRESENTATIVE

SHIP'S COMMANDING OFFICER'S AUTHORIZED REPRESENTATIVE

TAPE READINGNUMBER

GALLONS

REMOVED

REMARKS

SIGNATURES

TYPE OF

PETROLEUM

PRODUCT

TANK

NO

PUMPED TO

TANK/TRUCK/

BARGE NO.

DATE REMOVED

FROM SHIP

INVENTORY SCHEDULE - PETROLEUM PRODUCTS

CONTRACTOR: ______________ SUB: ______________ CONT NO.: _________ LOT NO.: __________SHIP: YTT10

ITEM NO: 992-01

Page 34: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 992-02

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 2 ITEM NO: 992-02

1. SCOPE:

1.1 Title: Temporary Services; provide

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 320-6170110 Electrical One-Line Diagram

3. Requirements:

3.1 Movement of vessel within the Contractor’s yard shall

be the responsibility of the Contractor.

(V)(G) “GANGWAY INSPECTION”

3.2 Provide quantity (1 each), well-lighted gangway and

landing platform, aft, while the craft is alongside the pier or

in drydock. Gangway and landing platform shall be a minimum of 3

feet in width and designed and constructed to support 75 pounds

per square foot.

3.2.1 Install safety nets under gangways and

platforms.

3.2.1.1 Safety nets shall extend six feet on

each side of gangway or platform.

3.2.2 Maintain gangways free of dirt, debris, ice,

snow, and foreign matter.

Page 35: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 2 ITEM NO: 992-02

3.2.3 Inclination of gangway shall not exceed 45

degrees.

3.2.4 The entire length of the gangway and adjacent

areas shall be illuminated with weather-tight lights, shielded

to prevent temporary blinding of personnel.

3.3 Provide shore power at 450 VAC, 60 Hertz, 3-Phase, 100

Amps for connection to shore power receptacle in accordance with

2.2.

3.4 Provide quantity two each parking spaces adjacent to

the docking location of vessel for the entire time in dock.

3.4.1 Mark each parking space with a sign designating

the spaces for NUWC KEYPORT PARKING only.

3.5 Disconnect and remove temporary services when directed

by the SUPERVISOR.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

Page 36: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

SHIP: USNV LIBERTY BAY YP-701 ITEM NO: 997-01

CRP NO: 17-005 JSN: N/A

POC: STEINSVIK PORT ENGINEER: SANTOS

1 of 5 ITEM NO: 997-01

1. SCOPE:

1.1 Title: Drydocking and Undocking; accomplish

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification: USNV LIBERTY BAY YP-701

1.3.1 Length Overall: 108 feet

1.3.2 Extreme Beam: 25 feet

1.3.3 Full Load Displacement: 175 long tons

1.3.4 Draft (approx.): 6 feet

1.3.5 Hull Construction: Wood with aluminum

superstructure

2. REFERENCES:

2.1 Standard Items

2.2 S9086-7G-STM-010/CH-997, Docking Instructions and

Routine Work in Dry Dock

2.3 801-6170203, Docking Drawing

2.4 801-6170199, Curves of Form & Other Curves

3. REQUIREMENTS:

3.1 Furnish a sound dock, qualified personnel, divers, and

necessary equipment to dock the craft identified in 1.3 in

accordance with 2.2, using 2.3 and 2.4 for guidance.

3.1.1 Docking facility shall be in accordance MIL-STD-

1625.

Page 37: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

2 of 5 ITEM NO: 997-01

3.1.1.1 Submit one legible copy, in hard copy or

approved transferrable media, of a report certifying the dock

facility and qualifications of all personnel to the SUPERVISOR

within 14 days of contract award.

3.1.2 Provide tugs, pilots, and personnel for the

transfer, docking, and undocking of the craft identified in 1.3.

3.1.3 Provide following information to the SUPERVISOR

five business days prior to scheduled drydocking.

3.1.3.1 Dry dock operating procedures

3.1.3.2 Manning procedures

(I)(G) “BLOCK ALIGNMENT”

3.2 Provide, set, and align the blocks in Position Number

THREE (3) in accordance with 2.3. Blocking shall be positioned

to ensure equipment on the surface of, or protruding from the

hull will not be damaged and shall be accessible for removal and

repairs. Provide at least the minimum clearances between the

craft’s hull and drydock necessary to accomplish drydock work

within this work package. The minimum clearance shall comply

with the requirements of 2.3. Hull openings shall not be

obstructed.

3.2.1 Block material/construction requirements shall

be in accordance with 2.2 and 2.3.

3.2.2 Submit one legible copy, in hard copy or

approved transferrable media, of any proposed deviations from

2.3 to the SUPERVISOR a minimum of 10 business days prior to

scheduled drydocking.

3.2.3 Proposed deviations shall include supporting

data substantiation.

3.2.4 Obtain tank soundings from the Craft Engineer

and determine ballast requirements to drydock the craft with

list, trim, and stability conditions in accordance with 2.4.

3.2.4.1 Submit one legible copy, in hard copy

or approved transferrable media, of a report listing the

Page 38: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

3 of 5 ITEM NO: 997-01

requirements of 3.2.4 to the SUPERVISOR a minimum of two days

prior to scheduled drydocking.

3.2.5 Provide ballasting and necessary services to

ballast tanks, as approved by the SUPERVISOR, with clean, fresh

water.

3.3 Conduct a docking conference, three business days

prior to drydocking, attended by the Craft Master, Craft

Engineer, Port Engineer, and Contractor’s Dock Master, who will

be present at the time of drydocking.

3.3.1 Submit a plan to the SUPERVISOR for docking

which shall contain, as a minimum, the following information:

Drydock Safety precautions, Date of drydocking and time across

the sill, Docking Position, Tugs and Pilot arrangements, Tide

schedule, Stability for moving into and out of drydock, Liquid

Load, Electrical Power, Fire Pumps, Contractor Dock Master

responsibilities, Line Handling, sounding tanks after ship has

landed on the blocks, Monitoring weight changes while in

drydock, Drydock Services, Date and Time for block inspection

and other services and procedures.

(I)(G) “BLOCK INSPECTION”

3.4 Prepare drydock for inspection at least 24 hours prior

to scheduled docking.

3.4.1 Submit one legible copy, in hard copy of a

report listing the inspection showing blocking locations

relative to sighting marks on dock coping, spacing, offsets,

heights, and shaping to the SUPERVISOR a minimum of four hours

prior to flooding the drydock.

3.4.2 Accomplish a final block inspection with the

SUPERVISOR immediately prior to flooding of the drydock.

(I)(G) “DRYDOCKING”

3.5 Drydock craft identified in 1.3 in Position Number

THREE, within the first 24 hours of receiving craft.

3.5.1 Fit of all blocks shall be in accordance with

2.2.

Page 39: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

4 of 5 ITEM NO: 997-01

3.5.1.1 Provide diving services to inspect the

fit up of blocking to hull immediately prior to setting craft on

blocks.

3.5.1.2 Inspect fit of all blocks immediately

after craft is drydocked. Shim blocking to achieve contact in

accordance with 2.2.

3.6 Provide electrical ground connection cable between the

craft and dock to protect the craft from effects of electric

storms and welding.

3.7 Inspect underwater hull and underwater appendages for

conformance to 2.3. Correct 2.3 to conform to craft’s hull form,

appendages, and shell openings.

3.7.1 Submit one legible copy, in hard copy or

approved transferrable media, of a red-line drawing of 2.3 to

the SUPERVISOR 14 business days after docking.

3.8 Remove ballast to accomplish work required by this

work package.

3.8.1 Remove and dispose of fluids necessary to

accomplish the requirements of this work package.

3.9 Accomplish stability and loading calculations based on

weight changes made on craft while in drydock. Obtain tank

loading condition upon entering drydock, and a list of weight

changes during the drydock period. Determine ballast

requirements to maintain list, trim, and stability conditions as

specified in 3.2.4.

3.9.1 Submit one legible copy, in hard copy or

approved transferrable media, of a report listing the

requirements of 3.9 to the SUPERVISOR a minimum of two days

prior to scheduled undocking.

3.9.2 Provide ballasting and necessary services to

ballast tanks, as approved by the SUPERVISOR, with clean, fresh

water.

3.10 Conduct an undocking conference, three business days

prior to undocking, attended by the Craft Master, Craft

Page 40: USNV LIBERTY BAY YP-701 CRP 17-005 POP: 15 JULY 2017 01 ... Government... · craft: usnv liberty bay yp-701 crp no: 17-005 page 5 of 8 i n d e x category ii. fy−18 standard items

CRAFT: USNV LIBERTY BAY YP-701

5 of 5 ITEM NO: 997-01

Engineer, Port Engineer, and Contractor’s Dock Master, who will

be present at the time of undocking.

3.10.1 Submit a plan to the SUPERVISOR for undocking

which shall contain, as a minimum, the following information:

Drydock Safety precautions, Date of undocking and time across

the sill, Tugs and Pilot arrangements, Tide schedule, Stability

for moving out of drydock, Liquid Load, Electrical Power, Fire

Pumps, Contractor Dock Master responsibilities, Line Handling,

sounding tanks while flooding dock, and other services and

procedures.

3.11 Submit one legible copy, in hard copy or approved

transferrable media, of a report certifying all contractor work

in the specifications requiring the craft to be in drydock are

complete to the SUPERVISOR a minimum of two days prior to

scheduled undocking.

(I)(G) “UNDOCKING”

3.12 Undock the craft identified in 1.3. Prior to

undocking, validate sea valves, shaft seals, and other hull

penetrations below full load draft are watertight.

3.12.1 Stop flooding the drydock immediately after

hull penetrations are submerged but before the craft lists off

blocks. Accomplish a watertight integrity inspection of

contractor work affecting water-tightness of hull and hull

penetrations below the water level. Continue flooding of drydock

when directed by the SUPERVISOR.

3.13 Submit one legible copy, in hard copy or approved

transferrable media, of a Docking Report (NAVSEA 9997/1 and as

appropriate NAVSEA 9997/2-9997/5) in accordance with 2.2 to the

SUPERVISOR within two business days after undocking.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.