Upload
bambang-hadinugroho
View
230
Download
1
Embed Size (px)
Citation preview
8/12/2019 Using Recycle on Hysys
1/11
RECYCLEExterran Office
Jakarta, Dec 1 ST 2012
UNDERSTANDING
HYSYS
8/12/2019 Using Recycle on Hysys
2/11
Understanding process with recycle streamUnderstanding process design
Objectives
Case : Refrigeration System
8/12/2019 Using Recycle on Hysys
3/11
Typical refrigeration system
Typical single stage VaporCompression Refrigeration
8/12/2019 Using Recycle on Hysys
4/11
Refrigeration System using Economizer
Do you know economizer function? I believe you know the functionby its name. To get clearer information, lets start the simulation.
The green box on picture above represents Economizer.
8/12/2019 Using Recycle on Hysys
5/11
8/12/2019 Using Recycle on Hysys
6/11
Problem Solving1. Make equipment arrangement as per Refrigeration System usingEconomizer process. Do not connect recycle to main streambefore main stream can be simulate.
2. Set compressor compression ratio to 3. Ensure pressure unit inpsia.
3. Input pressure drop on each equipment (Cooler, Scrubbers).4. Put P, Molar Flow and gas composition to suction compressor as
initial trial value. Find Tsuction which is limited by condenserperformance.Note : outlet temperature of condenser is limited to 120 F due to
approach temperature of air process gas.
Command : adjust inlet temperature of condenser to 120 F withsuction temperature as variable. .Please note that the result is the minimum temperature, raise fewdegrees above the result. Fluid condition shall be superheated(gas only).
8/12/2019 Using Recycle on Hysys
7/11
Result of step 1 - 4:
2-phase, so the governing is fluid phase
Fluid at suctioncompressor shallbe in gas phase(vapour fraction =1).
For this case, takeout ADJ-1 and setTsuction at 5 F.
8/12/2019 Using Recycle on Hysys
8/11
5. To get maximum refrigeration capacity, set pressure drop VLV-100 to 0(zero) psi. Set vapour fraction at Stream 6 = 1.
8/12/2019 Using Recycle on Hysys
9/11
6. Set pressure at recycle with main stream as referenceP6 = P11; P12 = P11; P13 = P14.
5 MMSCFD at 40 psia/ 5 F Refrigeration -2.28 MMBtu/hr.
8/12/2019 Using Recycle on Hysys
10/11
6. Connect recycle stream to main stream.
7. To get refrigeration duty 4 MMBtu/hr, Adjust Molar Flow at Stream 11with target Q-ref at -4 MMBtu/hr.
The result is 8.743 MMSCFD for refrigeration capacity 4 MMBtu/hr.Compressor duty is 2.554 MMBtu/hr.
8/12/2019 Using Recycle on Hysys
11/11