22
Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments Wednesday 18 th July 2018 [email protected] [email protected]

Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Using Constructed Wetlands to Mitigate the

Impact of Diffuse Urban Pollution in the Salmons

Brook and Moore Brook Catchments

Wednesday 18th July 2018

[email protected]

[email protected]

Page 2: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments
Page 4: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Moore Brook catchment

•Area ~ 350 hectares

•8,000 residential properties

•300 misconnected properties

rectified since 2012

Page 5: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Pymmes Park Lake – major pollution events in November 2012 and March 2013

Page 6: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments
Page 7: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Pymmes Park Wetlands

•Total area ~ 5,000m2

•Wetland area ~ 2,000m2

•Volunteer planting in May 2015 organised by

Thames21

•600m2 of pre-planted coir mats installed in 2

days

May 2015

August 2015

Page 8: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Pymmes Park Wetlands

•Spoil used to create one new 11-aside football pitch and significantly improve a second existing pitch

•Area of 10,0000m2 raised by 0.7m

Pre-scheme During works

Page 9: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments
Page 10: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Firs Farm Playing Fields 21 hectares, 12 football pitches and 1 rugby pitch

Page 11: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Firs Farm Wetlands 30,000m3 flood storage, 2.4ha habitat enhancements including 4,000m2 wetlands, 600m long cycleway

Page 12: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Firs Farm Wetlands

•Wetland area ~ 4,000m2

•Volunteer planting in September 2015 organised by Thames21

•720m2 of pre-planted coir mats installed in 2 days

•Trees and shrubs planted in Autumn 2015

During construction (July 2015)

Following completion (June 2016)

Page 13: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments
Page 14: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Constructed Wetlands Slow the Flow

1. Glenbrook SuDS – 2014

2. Grovelands Park SuDS – 2014

3. Pymmes Park Wetlands – 2015

4. Firs Farm Wetlands – 2015

5. Bury Lodge Wetlands – 2016

6. Prince of Wales Wetlands – 2017

7. Broomfield Park Wetlands – 2018

8. Enfield Town Wetlands – 2018

1

6

7

52

3

4

Glenbrook SuDS

Bury Lodge Wetlands

Grovelands Park SuDS

8

Page 15: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Community Modelling

‘A way for local people to access the tools used by

scientists and authorities to manage environmental

problems’ Oxford University

Page 16: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Catchment

Page 17: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

INCA – model

• Land use (Spatial)

• Weather – rainfall, temperature

• River Map/Network

Calibration

• Water quality readings – EA, Thames21

• Implementing constructed wetlands using observed field data

• Misconnections are assumed as effluent discharge

Page 18: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Constructed wetlands

Page 19: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Firs Farm – Ammonium DO%

Page 20: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Community Engagement

Page 21: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

Potential Sites

Page 22: Using Constructed Wetlands to Mitigate the Impact of ... · Using Constructed Wetlands to Mitigate the Impact of Diffuse Urban Pollution in the Salmons Brook and Moore Brook Catchments

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

Period Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

mg/l

Ammonium

Simulated Scenario Good

28% reduction of ammonium if 16 wetlands across the catchment were created.

Water Quality Improvements – Catchment