USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 1 of 25Doc ID: BLANK URS

USER REQUIREMENTS TEMPLATEFOR A SYSTEM

(INSERT YOUR SYSTEM DESCRIPTION HERE)

Page 2: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 2 of 25Doc ID: BLANK URS

REVISION HISTORY

Rev. Date Developed By: Revision Summary0

1

2

3

The revision history section should be utilized during development to provide information that will allow the reviewer/approver to understand what part/parts of the document is/are being revised. For an initial release, provide a note that the document is being routed for initial review/approval. This will ensure reviewers/approvers evaluate the entire document. In the revision summary include the revision number of the Blank Template used to create any equipment specific templates.

(Reminder of Page Intentionally Left Blank)

Page 3: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 3 of 25Doc ID: BLANK URS

TABLE OF CONTENTS

1.0 INTRODUCTION (SCOPE)................................................................................4

2.0 OVERVIEW........................................................................................................5

3.0 OPERATIONAL REQUIREMENTS...............................................................63.1 CAPACITY.........................................................................................................63.2 PROCESS REQUIREMENTS...............................................................................63.3 PROCESS CONTROL.........................................................................................63.4 FUNCTIONS.......................................................................................................63.5 DATA AND SECURITY.......................................................................................93.6 ENVIRONMENT...............................................................................................11

4.0 CONSTRAINTS...............................................................................................134.1 MILESTONES AND TIMELINES.......................................................................134.2 EQUIPMENT CONSTRAINTS...........................................................................144.3 COMPATIBILITY AND SUPPORT.....................................................................144.4 AVAILABILITY................................................................................................164.5 PROCEDURAL CONSTRAINTS.........................................................................164.6 MAINTENANCE...............................................................................................18

5.0 LIFE-CYCLE....................................................................................................195.1 DEVELOPMENT...............................................................................................195.2 TESTING..........................................................................................................195.3 DELIVERY.......................................................................................................195.4 SUPPORT.........................................................................................................21

6.0 GLOSSARY......................................................................................................22

7.0 REFERENCES.................................................................................................23

8.0 APPROVAL......................................................................................................24

9.0 ATTACHMENTS.............................................................................................25

Page 4: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 4 of 25Doc ID: BLANK URS

Project No.:Insert the unique project number associated with this particular URS.

Document No.:Insert the Document Identification Number and Revision.

Document Description:Insert description of document, e.g. PURE STEAM GENERATOR, User Requirements Specification.

1.0INTRODUCTION (SCOPE)Note: Insert your own description and introduction. You may wish to include your own requirements and specifics to provide the inexperienced reader, contractors, and suppliers an adequate explanation to understand the scope of the equipment.

Describe who produced the document, under what authority, and for what purpose.

Describe the contractual status of the document. Include or reference as an attachment the “legal” paragraph that communicates purchasing terms and conditions in this section.

Describe the relationship of this document to other documents. This is important for equipment that is part of an integrated process or line and will help the Supplier to understand and ask questions that may otherwise be overlooked.

Refer to the Equipment Validation Plan that outlines the Supplier’s responsibilities is attached.

Remove any options that are not applicable for this project, if other uses will apply list each separately.

This is to be utilized as a guide for the user to answer the majority of questions involved in specifying the “what” for the equipment. Addendums may be used to round out the requirements.

Page 5: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 5 of 25Doc ID: BLANK URS

2.0OVERVIEWThis document encompasses the normal range of equipment operations. This section should be expanded to provide a high level description of the system explaining why it is required and what is required of it. Include the background, key objectives and benefits, main functions and interfaces, applicable GxP requirements, and other applicable regulations. Obviously, technology improvements and new applications may require deviation from this template.

The User should consider including information on the following:

2.1 Use: Describe what applications the equipment/system will be used to support. Include a brief explanation of the general functions.For example (for a Wide Range Filler):

2.1.1 The wide range filler line shall process pharmaceutical vials under sanitary conditions with the following functions: vial filling, put stoppers to vials, oxygen reduction, sample check weighing, and vial eject.

For equipment dealing with solid dosage pharmaceutical products directly:

2.1.1 The products being developed on the specified equipment are of:

2.1.1.1 Low active (vitamins, supplements)2.1.1.2 Medium active (e.g. Aspirin)2.1.1.3 Highly active (e.g. Morphine)2.1.1.4 Exclusive (e.g. Penicillin)

2.2 Capacity: Provide a brief description of the equipment/system capacity requirements.For example (for a Wide Range Filler):

2.2.1 The equipment shall be capable of producing XYZ product continuously, over an 8-hour shift.

Page 6: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 6 of 25Doc ID: BLANK URS

3.0OPERATIONAL REQUIREMENTSThis Section shall state the operational requirements: system functions, data and interfaces. It shall also define the environment in which the system must operate. Critical requirements shall be specifically identified as such. Include process descriptions and flowcharts as appropriate.

3.1 Capacity

3.1.1 Range of products

3.1.2 Commodities to be used (i.e. vials, bottles, tablets, etc.)

3.1.3 Processed Materials to be used or involved

3.1.4 Production rates

3.2 Process Requirements

3.2.1 Quality of products and concentrations

3.2.2 Product limitations (i.e. temperature, humidity, pH, etc.)

3.3 Process Control

3.3.1 Measurement Range

3.3.2 Setpoint Range

3.3.3 Parameter Control Tolerance

Note: At a minimum, list the critical, process parameters. Consider documenting how each of the parameter requirements was determined.

3.4 Functions

3.4.1 Operation

Enter your specific operational requirements here.

3.4.1.1 Cycles expected the system will operate at are…

3.4.1.2 Recipes the system will contain are…

3.4.1.3 Operator interaction with the system will include…

The following is an example:

3.4.1.1 The system shall operate with a minimum of operator involvement. Operation shall be safe from an operator and environmental standpoint.

3.4.1.2 The system shall be operated locally at the equipment itself.

Control system requirements:

Page 7: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 7 of 25Doc ID: BLANK URS

3.4.1.4 Manual only

3.4.1.5 Manual/automatic

3.4.2 Power failure/Recovery

3.4.2.1 Power Failure: Insert your specific power failure/recovery scheme here.

For example:

In the event of a power failure, the system shall protect in the following priority:

3.4.2.1.1 Personnel

3.4.2.1.2 Equipment

3.4.2.1.3 Product

3.4.2.2 Recovery Methods: Insert your specific recovery scheme here.

For example:

3.4.2.2.1 Manually re-start based on operator inputs (Operator initiates power recovery sequence).

3.4.2.2.2 Re-start based on last state before loss of power. (System runs through power recovery sequence when operator start signal is given)

3.4.2.2.3 If there is an automatic batch reporting system, the information shall be retained in the event of a power failure (A UPS is required for automatic batch reporting systems for data retention).

3.4.3 “Emergency Stop”

Insert your specific “Emergency Stop” (E-Stop) strategy and communication scheme here.

For example:

3.4.5.1 The system shall have an E-Stop mechanism designed to stop all physical movement of the equipment immediately. The E-Stop mechanism(s) shall be located in easily accessible areas around the equipment as required by national and local safety standards.

3.4.4 Alarms and Warnings

3.4.4.1 “Critical alarms” - Insert your specific “Critical

Page 8: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 8 of 25Doc ID: BLANK URS

Alarm” action scheme here.

For example:

3.4.4.1.1 Critical Alarms shall take action via interlock(s) and/or operator procedural response to shut the equipment down and notify the operator of the condition(s). The operator shall be required to acknowledge the alarm before the alarm can be reset and the system restarted. Once the alarm is reset, the operator may restart the system.

3.4.4.2 “Informational Messages” shall notify the operator and take no further action.

Note: For a customized equipment application, include an alarm table, like the example that follows.For example:

3.4.4.2.1 The Equipment shall have the following critical alarms and warnings:

Alarm or Informational Message Critical Alarm

Stackpole Light

Illumination (color/flashin

g)

Informational Message

Response

Interlock(s) Operator Procedural

Emergency Stop X X

Control Platform Communication Watchdog X X

Control Power Fault X X

Main Air Fault X X

XXXX X

YYYY X

ZZZZ X

Motor Faults X X

CONTROL PLATFORM Battery Low Warning X X

The list of critical alarms in the table is not intended to be a comprehensive list of all alarms for the system. A complete alarm list will be developed and included in the Functional Specification document.

Page 9: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 9 of 25Doc ID: BLANK URS

For a standard equipment type application, request the supplier to submit the complete alarm list and differentiate between critical and non-critical alarms.

Note: Consider documenting how “critical and informational message” criterions were determined.

3.5 Data and Security

Controls provided with Data Collection systems intended for use in the manufacture of pharmaceutical products shall be required to meet 21 CFR Part 11 compliance.

3.5.1 User Interfaces

This section should address the following issues:

3.5.1.1 User interface access levels3.5.1.2 Frequency of data point collection3.5.1.3 Hardcopy/electronic data collection requirements3.5.1.4 Compliance with 21CFR Part 11 (for Europe - EREC

Guidelines)3.5.1.5 Data retention time on the system3.5.1.6 Data storage media

Access to all Input/Output values and system status bits shall be provided through a data-communication link. Security for data and operator access is provided by (User ID/Password, Card Reader, Biometric (Fingerprint, eye scan, voice recognition, etc.).

3.5.2 User Interface with Supervisors and Operators

Insert your interface scheme here.

For example:

3.5.2.1 The CONTROL PLATFORM system shall include interfaces with the Operator and Supervisor that ensures easy, safe, and reliable operation.

3.5.2.2 An operator-interface panel shall be provided and mounted near the equipment or on the equipment. This panel shall provide the necessary switches, indicators, and devices to operate the equipment.

3.5.3 Language requirements

Specify language that information will be displayed in (i.e. English, Spanish, German, Bilingual, etc.)

3.5.3.1 Displayed Requirements:

Page 10: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 10 of 25Doc ID: BLANK URS

State the system of measurement that will be used (English or Metric (S.I.)).

Parameter Format Unit(s) of measurement

XXXXXXX (###.#) units units

YYYYYYY (##)% %

3.5.4 Interface with Other Equipment

The control system shall include the interfaces necessary to facilitate operation and configuration. For example:

3.5.4.1 An RS-232 communications port shall be provided.3.5.4.2 A Modem communications port shall be provided.3.5.4.3 A high-speed configuration/monitoring connection shall

be provided.3.5.5 Security Levels

List the total number of different access levels that will be required. Provide a general description of the access rights for each level (screen navigation, operational control, control loop variable manipulation, alarm setpoint manipulation, etc.).

3.5.6 Data Collection

Consider any archiving and reporting requirements here.

3.5.6.1 None3.5.6.2 Recorder3.5.6.3 Process Printout3.5.6.4 Electronic process printout, Historical Trending3.5.6.5 Electronic process printout, Historical Trending and

interface to company networkThe following shall be recorded:

3.5.6.6 XXXXX3.5.6.7 YYYYY3.5.6.8 ZZZZZ

3.6 Environment

Provide details of the physical environment in which the [equipment/system] will be operated.

3.6.1 Layout

For example:

3.6.1.1 Allocated floor space for the equipment is _____ inches

Page 11: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 11 of 25Doc ID: BLANK URS

by ________ inches with at least a _______inch corridor around the periphery for the equipment.

3.6.1.2 Vertical clearance is _________ inches.3.6.1.3 Floor Loading is pounds/ft23.6.1.4 See attached drawing #________________________ (if

applicable).Layout is specific to the size equipment being used and system requirements of the equipment.

3.6.2 Physical Conditions

3.6.2.1 Room Explosion ClassificationList the critical explosion requirements for the room.

3.6.2.1.1 Room will be non-hazardous

3.6.2.1.2 Room will be Class I Div II (Zone 2) (explosive atmosphere present at known times)

3.6.2.1.3 Room will be Class I Div I (Zone 1) (explosive atmosphere present at all times)

3.6.2.2 Environmental ClassificationList the critical air quality requirements for the environment.

3.6.2.2.1 ISO Class 5, 7, or 8 (ISO 14644-1 and ISO 14644-2)

3.6.2.2.2 Class A, B, C, or D (The Rules Governing Medicinal Products in the European Union – Annex 1)

3.6.2.2.3 Directional airflow

3.6.2.2.4 Airflow velocity

3.6.2.2.5 Number of air changes

3.6.2.2.6 Particle Ingress3.6.2.3 Biohazard Level

List the critical biohazard level requirements for the environment.

3.6.2.3.1 BL-1

3.6.2.3.2 BL-2

Page 12: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 12 of 25Doc ID: BLANK URS

3.6.2.4 Rating of enclosuresList the rating requirements for enclosures in the environment.

3.6.2.4.1 NEMA 1 (Open)

3.6.2.4.2 NEMA 12 (Oil tight)

3.6.2.4.3 NEMA 4 (Wash down)

3.6.2.4.4 NEMA 4X (Wash down and non-Corrosive)

3.6.3 Cleaning Requirements

3.6.3.1 Hand-Wash

3.6.3.2 Auto-Wash

3.6.3.3 Steam Clean

3.6.4 Sterilization Requirements

Describe the type of sterilization that will be performed on or within the [equipment/system] and the duration the [equipment/system] will be exposed.

3.6.5 Intended Operating Environment:

Describe the type of operating environment that the [equipment/system] will be exposed to following installation.

For example:

3.6.5.1 The [equipment/system] shall be mounted in a GMP environment with a temperature range of 15 to 25 °C, non-condensing humidity.

3.6.5.2 Vibration levels in operating environment are <Negligible, Slight, or Severe>

3.6.5.3 The Seismic Zone in the operating environment is <Zone 1, Zone 2, Zone 3, Zone 4, or Zone 4A>.

Page 13: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 13 of 25Doc ID: BLANK URS

4.0CONSTRAINTS

4.1 Milestones and Timelines

Based on the model outlined below, establish the project milestones with a timeline:

Integrate with ValidationDocumentation as appropriate

SUPPLIER

Functional Specification

(traceable to URS)

USER/(CONSULTANT if applicable)

Master Validation Plan

RFQ

User Audit

Proposal Project Plan Quality & Validation Plan

Equipment Validation Plan/ Risk Assessment

Explanation to Supplier

User RequirementsSpecification

(Living Document)

Proposal Analysis

Proposal

P.O.

Detailed DesignDocumentation

(traceable to Functional Specification)Review Functional Specification

Review Detailed Design System Acceptance TestSpecifications (IQ/OQ)

Hardware Software

Review SystemAcceptance Test Specifications

System AcceptanceTesting and Results

User Witness Optional

Maintenance & SupportDocumentation

Approval

Approval

Approval

Engineering Feasibility Studyand Results

P.O.

Page 14: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 14 of 25Doc ID: BLANK URS

4.2 Equipment Constraints

Describe the operating constraints that the [equipment/system] will be required to meet.

For example:

4.2.1 Environmental Conditions

The [equipment/system] is to be used at the following environmental conditions:4.2.1.1 Altitude ________ ft above sea level

4.2.2 HVAC Equipment Constraints

4.2.2.1 Process air enters in from…Indoor Temperature: C

4.2.2.2 Outdoor Temperature: Minimum: C

Maximum: C

4.2.2.3 Climatic conditions: Winter dry bulb C

Winter wet bulb C

Summer dry bulb C

Summer wet bulb C

4.2.3 Equipment Generated Vibration

The maximum allowable equipment vibration generated during operation is <value>.

4.3 Compatibility and Support

Include any requirements for compatibility with other User systems. In the examples provided below, fill in blanks with the appropriate information. Delete areas that are not applicable to this application.

4.3.1 CONTROL PLATFORM Controllers

4.3.1.1 The Supplier shall utilize Control Platform Controllers that shall include a communications port.

4.3.1.2 The Supplier shall provide documentation that the program (embedded software) was developed and coded utilizing program development and documentation software.

4.3.1.3 The supplier shall indicate the use of custom or “bespoke” code within the equipment, and shall supply licensing of the custom code for the life of the

Page 15: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 15 of 25Doc ID: BLANK URS

equipment.4.3.1.4 An escrow agreement shall be required in the event the

supplier cannot support the supplied custom software any longer. In such instances, the source code and all information regarding the source code shall be given to the user in a timely fashion to prevent downtime of the equipment.

4.3.2 Preferred Vendor List

4.3.2.1 If necessary attach any critical preferred vendors. Refrain from driving the supplier into customizing his equipment package.

4.3.2.2 If the vendor wishes to deviate from the Preferred Instrumentation List, a listing of the proposed components and instrumentation sub-vendors indicating type and model numbers shall be submitted with the quotation, along with an explanation of why the deviation is recommended.

4.3.3 Utilities

4.3.3.1 The utilities and space involved needs to be discussed prior to purchasing the equipment. Obviously, the actual equipment size is but a small part of the entire scope of work necessary to implement a larger system. The unit and its support equipment must be able to be installed in current building facilities.

4.3.3.2 The User shall ensure that the following utilities are available and that the utility supply lines and piping are terminated with fittings or connections, which are compatible with those described on the Customer Connection Drawings.

4.3.3.3 The Supplier shall specify utility data, which is marked with a triangle. Utility data, which are not specified or marked with a triangle, shall be brought to the attention of the User. These data shall be specified (by the User or the Supplier) and shall be approved by both the User and the Supplier before system design begins.

Base Utilities Worksheet

4.3.3.4 Related Discharges

4.3.3.4.1 Volume

4.3.3.4.2 pH

4.3.3.4.3 Temperature

Page 16: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 16 of 25Doc ID: BLANK URS

4.3.3.4.4 Materials4.3.3.5 Electricity

4.3.3.5.1 ______ VAC ____ Hertz

4.3.3.5.2 Phases

4.3.3.5.3 Amperage

4.3.3.5.4 Uninterruptible Power Supply (Define Use)

4.3.3.6 Control Air

4.3.3.6.1 PressureFor example:

_______ PSIG (must be clean, dry ISA instrument quality air, capacity to be determined by size of equipment). Recommend at least 90 PSIG constant air pressure for all equipments, unless specified.

4.3.3.7 Other Utility RequirementsProvide details regarding any other utility systems that are required to support operation of the equipment/system.

4.4 Availability

4.4.1 The [equipment/system] is intended to be operated [Continuously, Regularly, __ hours per day, __ hours per week].

4.4.2 Operation of the [equipment/system] shall be suspended, and the system shall be available for preventative maintenance or routine service [__ hours per week, __ continuous hours per week, __ days per month, __ weeks per year].

4.5 Procedural Constraints

4.5.1 Product Contact Materials

Describe any local procedural requirements such as local standards, which must be adhered to if applicable.

4.5.1.1 All piping welds and product contact welds shall meet ASME and 3A specification requirements.

4.5.1.2 Product contact metal to be (316L Stainless Steel, 316 Stainless Steel, 304 Stainless Steel, etc.)

Page 17: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 17 of 25Doc ID: BLANK URS

4.5.1.3 List critical requirements for surface finish, roughness, etc.

4.5.1.4 Other standards are attached.The Supplier shall adhere to the indicated sections only.

4.5.2 Product in Contact with Materials

All product contact parts should be considered.

4.5.2.1 The [equipment/system] will be used for (aqueous solutions, low LEL (lower explosion limit) solvents, high LEL solvents, etc.).

4.5.3 Noise Level Constraints

Insert your own noise level constraint requirements here.

For example:

The noise level generated during operation of the [equipment/system] will not exceed 85 dB from 3 feet away.

4.5.4 EMI / RFI levels are:

Insert your own electrical and radio noise immunity requirements here.

For example:

The [equipment/system] [will/will not] be used in an area where two-way radio communication devices are in operation. The [equipment/system] shall meet CE requirements for electrical noise immunity and emissions.

4.5.5 Containment

4.5.5.1 Explosion Protection

This section is only valid if the product being used is highly reactive. Insert containment guidelines here (i.e. Bar Construction with isolation and suppression, 10 Bar construction with isolation only, Closed-Loop Nitrogen System, etc.).

4.5.6 Labeling

All equipment and control wiring shall be labeled and identified.

4.6 Maintenance

Describe the expected hardware and software maintenance support including: ease of maintenance, expansion capability (software only), likely enhancements (software only), expected lifetime and long-term support.

4.6.1.1 System shall be maintained on a schedule as indicated by

Page 18: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 18 of 25Doc ID: BLANK URS

the supplier.

4.6.1.2 Supplier is to provide (at minimum) the following maintenance instructions:

4.6.1.3 All sub-systems provided (Maintenance and operation manuals of vendor equipment)

4.6.1.4 A comprehensive lubrication list and recommended lubrication schedule

4.6.1.5 A comprehensive recommended maintenance (regular recommended inspection intervals, wear points, recommended spare parts list)

4.6.1.6 Supplier shall supply ______ Copies of Operation, Installation, Maintenance and de-commissioning manuals

4.6.1.7 Accessibility for operation and maintenance personnel.

Page 19: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 19 of 25Doc ID: BLANK URS

5.0LIFE-CYCLE

5.1 Development

If S88 is to be applied to the equipment being acquired, it should be referenced in this section of the document.

5.1.1 The Supplier shall provide a Quality and Project Plan as part of their proposal. The Supplier shall have a quality system in place. Internal quality procedures shall be available for the User’s review.

5.1.2 The Supplier shall provide a Project Manager for the project to provide a single communication point with the User.

5.1.3 The project shall utilize the GAMP methodology when developing the system and documentation.

5.2 Testing

Describe the Supplier testing requirements. Reference the Validation Test Plan, Factory Acceptance Test, special tests, etc. This section should also include required amount of demonstrated run time, any special materials necessary to complete testing, integration testing, etc.

5.2.1 In order to verify system performance, the User shall witness the execution of the Factory Acceptance Test procedures. The Supplier shall notify the User _______ weeks in advance of the start of this test.

5.2.2 The Factory Acceptance Test Specification shall be submitted to the User for review and approval prior to execution. A minimum of _______ weeks shall be allowed for the User to review and to comment and/or approve the Factory Acceptance Test Specification.

5.2.3 The User shall notify the Supplier of the length of runs required, special materials required, and any other unique test requirements _______ weeks in advance of the start of testing.

Refer to the Equipment Validation Plan for applicable procedures.

5.3 Delivery

The [equipment/system], with all options, equipment, and the documentation listed below, shall be delivered to the User’s receiving dock.

5.3.1 Documentation

5.3.1.1 Installation, operation, and maintenance instruction documentation for the system shall be developed to a

Page 20: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 20 of 25Doc ID: BLANK URS

level that is comprehensible to a high school graduate.5.3.1.2 The Supplier shall use the formats described in the

GAMP Supplier Guide, Current Version, to produce the documentation. The Supplier shall provide the documentation for preliminary review. The Supplier shall provide documentation reflecting “as-built” condition with final delivery.

5.3.1.3 All final documents shall be shipped with transmittals that identify them as contractually required documents. All final documents and drawings shall reflect “as-built” condition.

5.3.1.4 All documents shall in the language of the destination country and supplied with hard copies and electronic versions supplied in the format identified for each document:

Project Plan Microsoft Word XX (*.doc)

User Requirements Specification Microsoft Word XX (*.doc)

Functional Specification/Requirement Microsoft Word XX (*.doc)

Design Specifications Microsoft Word XX (*.doc)

Controls Test Microsoft Word XX (*.doc)

Hardware Installation Test Microsoft Word XX (*.doc)

Operational Test Microsoft Word XX (*.doc)

Factory Acceptance Test Microsoft Word XX (*.doc)

Operator, Maintenance and Service Manuals Microsoft Word XX (*.doc)

Process and Instrumentation Diagram (P&ID) AutoCAD version XX.X (*.dxf)

Instrument Listing Microsoft Word XX (*.doc) or Excel XX (*.xls)

Control Schematics AutoCAD version XX.X (*.dxf)

Control Panel Assembly Drawings AutoCAD version XX.X (*.dxf)

Equipment Assembly Drawings AutoCAD version XX.X (*.dxf)

Bill of Materials Microsoft Word XX (*.doc) or Excel XX (*.xls)

Spare Parts List Microsoft Word XX (*.doc) or Excel XX (*.xls)

Component Cut Sheets Microsoft Word XX (*.doc) or Excel XX (*.xls)

CONTROL PLATFORM Program Printout and Disk File XXX Program Development format

OIP Configuration Printout and Disk File XXX Program Development format

Page 21: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 21 of 25Doc ID: BLANK URS

5.4 Support

Describe what support activities are required after acceptance. The paragraphs outlined below provide some areas for consideration.

5.4.1 Start-up Support (list available options)

5.4.1.1 Training (list training options available)5.4.2 Post Start-up Support (list post-startup support available)

5.4.2.1 Technical Support

5.4.2.1.1 Telephone (Voice or Modem)

5.4.2.1.2 Replacement Parts Availability List (Normal lead times shall be listed)

5.4.2.2 User Site Support

5.4.2.2.1 Preventative Maintenance (list maintenance contracts available)

5.4.2.2.2 System Improvements (supplier shall notify user of any improvements available on a regular basis)

Page 22: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 22 of 25Doc ID: BLANK URS

6.0GLOSSARYIf necessary, attach a glossary, which includes definitions of terms that may be unfamiliar to the Supplier or terminology that may have meanings specific to entries on this User Requirements Check sheet.

For example (example list is not intended to be complete):

Acronym Definition

C Degrees Celsius

BL Biohazard Level

CFR Code of Federal Regulations

dB Decibels

EMI Electro-Magnetic Interference

ft Feet

GUI Graphic User Interface

HMI Human – Machine Interface

HVAC Heating, Ventilation, and Air Conditioning

ISO International Organization for Standardization

LEL Lower Explosion Limit

OIP Operator Interface Panel

RFI Radio Frequency Interference

URS User Requirement Specification

Page 23: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 23 of 25Doc ID: BLANK URS

7.0REFERENCES List references that were used in preparing this document or that provide additional details, such as:

7.1 Equipment Validation Plan7.2 Current revision of GAMP Guidelines7.3 Vendor Piping Certification (if applicable)7.4 Customer Connection Diagram7.5 Approved Instrumentation List7.6 Process Flow Diagram7.7 21 CFR Part 117.8 National Electric Code7.9 S88

Page 24: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 24 of 25Doc ID: BLANK URS

8.0APPROVALInsert your company’s standard approval page at the appropriate position in the document or utilize the sample approvals listed below. The approval process/requirements should be outlined in the Equipment Validation Plan.

This document has been reviewed by the User Project Manager and approved for use by the Supplier.

Printed/Typed Name Signature Date

This document has been reviewed by the User Quality Assurance Group and approved for use by the Supplier.

Printed/Typed Name Signature Date

This document has been reviewed by the Supplier Project Manager and approved for use by the Supplier Project Team.

Printed/Typed Name Signature Date

Other approvals as necessary may be included, such as the Technical Services Groups, User Groups, Engineering, etc. as required.

Page 25: USER REQUIREMENTS TEMPLATEcommunity.learnaboutgmp.com/uploads/db7093/original…  · Web viewDescribe the relationship of this document to other documents. This is important for

USER REQUIREMENTS SPECIFICATION

BLANK TEMPLATE

Page 25 of 25Doc ID: BLANK URS

9.0ATTACHMENTS