13
USER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning And Maintenance Of YSNet Together With Related Hardware And Software For The Department Of Youth And Sports, Ministry Of Culture, Youth And Sports Contract Ref: KKBS/EG01/2012 Date: October 1, 2015 Version: 1.0 Prepared by: Danawan Technologies Sdn Bhd Unit 5, 2nd Floor, Bangunan Majid Mohamad, Kampong Kiarong, BE1318, Bandar Seri Begawan, Negara Brunei Darussalam.

USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

  • Upload
    others

  • View
    44

  • Download
    0

Embed Size (px)

Citation preview

Page 1: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

USER MANUAL Module Name: Pusat Pembangunan Belia

Project Name: The Supply, Delivery, Installation, Testing, Commissioning And Maintenance Of YSNet Together With Related Hardware And Software For The Department Of Youth And Sports, Ministry Of Culture, Youth And Sports

Contract Ref: KKBS/EG01/2012

Date: October 1, 2015

Version: 1.0

Prepared by:

Danawan Technologies Sdn Bhd

Unit 5, 2nd Floor, Bangunan Majid Mohamad, Kampong Kiarong, BE1318,

Bandar Seri Begawan, Negara Brunei Darussalam.

Page 2: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat Pembangunan Belia Version: 1.0 User Manual Date: 1 October 2015

ii

Revision History Change Record

Version Date Name Revision Description

1.0 Sept 19, 2015 Mohd Shahrul Faiz Mohd Nor

Final Document

Reviewers

Name Version Approved

Role Date

Mohd Shahrul Faiz Mohd Nor

1.0 Project Manager Sept 19, 2015

Distribution

Name Date

Document Properties

Item Details

Document Title User Manual

Author Khairul Amri Yaacob

Creation Date Sept 17, 2015

Last Updated Sept 20, 2015

Page 3: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  1  

Table  of  Contents  

Document  Navigation  ...................................................................................................  2  

Urus  Program.  ...............................................................................................................  3  

Tambah  Unit.  ................................................................................................................  4  

Tambah  Rekod  Tugasan.  ...............................................................................................  5  

Urus  Sessi.  .....................................................................................................................  5  

Registration  Form.  ........................................................................................................  6  

Penilaian  Pelatih  ...........................................................................................................  6  Permohonan  Baru.  ....................................................................................................  6  Senarai  Temuduga  ....................................................................................................  7  Senarai  Pendek  .........................................................................................................  8  Berjaya  ......................................................................................................................  8  Tidak  Berjaya  ............................................................................................................  9  Status  Pelatih  ............................................................................................................  9  Carian  Pelatih  ............................................................................................................  9  Program  Pembangunan  Belia  .................................................................................  10  

Program  Penempatan  Kerja  .......................................................................................  10  

Kehadiran  ...................................................................................................................  10  

Disiplin  ........................................................................................................................  11  

Kebenaran  Keluar  Masuk  ............................................................................................  11    

Page 4: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  2  

Document  Navigation  

This  document   is  meant   to  explain   the  user  process  based  on   the  given  document  

specifically.  

This  User  manual  is  separated  into  3  major  breakdowns  which  described  as  below:-­‐  

 The  user  manual  will  be  based  on  the  following  diagram  to  ensure  the  test  is  in  

accordance  of  the  flow  process.  

Page 5: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  3  

Urus  Program.  

1. In  this  page,  PPB  admin  can  manage  the  ‘Kurus’  that  will  be  offered  in  the  Pusat  

Pembangunan  Belia.    

 

2. To  add  the  program  click  on  ‘Tambah  Program’  and  you  will  be  redirected  to  the  

control  panel  page.  

 3. Fill  the  name  of  the  ‘Kursus’  that  will  be  listed.  

4. The  program  that  is  not  active  can  be  moved  to  the  ‘Arkib’  page.  By  selecting  the  

Kemaskini  button  and  select  Arkib/Aktif  

 

Page 6: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  4  

Tambah  Unit.  

1. This  page  is  meant  to  add  and  remove  the  ‘syllabus’  and  ‘tugasan’  for  each  

kurus  created.  

2. To  create  the  syllabus,  admin  need  to  select  the  Program  and  kursus  first.

   

3. Hit  the  button  ‘simpan’  to  add  new  subject  to  the  syllabus.  

 

 

Page 7: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  5  

Tambah  Rekod  Tugasan.  

1. Each  of  the  syllabus  will  contain  ‘Tugasan’  

 2. Admin  can  manage  each  tugasan  in  this  page  and  each  tugasan  will  be  under  

each  matapelajaran  title.  

 

3. To  add  tugasan  hit  the  ‘Tambah  Tugasan’  button  and  admin  will  be  redirected  

to  the  manage  tugasan  page.  

4. Add  the  detais  of  the  tugasan  and  hit  the  ‘Simpan’  Button  

 

Urus  Sessi.  

1. This  page  is  meant  to  add  and  remove  the  syllabus  and  ‘Sessi’  for  each  Program  

intake  created.  

2. To  create  a  new  session,  admin  need  to  select  the  Program  and  kursus  first.  

Page 8: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  6  

3. Hit  the  button  ‘Tambah  Session’  admin  will  be  redirected  to  the  Session  control  

panel  page.  

4. Fill  up  the  details  and  then  hit  the  ‘Simpan’  button  

5. The  new  added  session  will  be  listed  in  the  session  list.  

 

Registration  Form.  

1. In  this  page,  applicant  will  fill  out  the  form  to  register  into  courses  in  PPB.    

2. The  form  will  be  pre-­‐filled  based  on  the  information  in  the  YSnet  user  profile.  

3. If  the  profile  is  not  complete,  applicant  need  to  update  their  Personal  Profile  first  

before  proceeding  to  the  PPB  registration  form.  

4. The  section  which  will  be  pre-­‐filled  by  the  system  are:  

• Maklumat  Peribadi  

• Maklumat  Perhubungan  

• Maklumat  org  yg  dihubungi  ketika  kecemasan  

5. Applicant  will  need  to  update  the  form  with  information  needed  which  are:  

• Kelayakan  akademik  

• Muat  naik  salinan  sijil  kelayakan    

 

Penilaian  Pelatih  

Permohonan  Baru.  1. Each  of  the  new  application  for  Pusat  Pembangunan  Belia  will  be  listed  in  this  

page.    

 

2. Admin  can  review  the  application  form  for  each  applicant  from  the  list.  

3. Select  ‘kemaskini’  for  updating  the  application.  

4. Admin  will  need  to  update  the  application  status  based  on  the  status  listed.  

Page 9: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  7  

 5. Status  Permohonan  

a. Lengkap/Tidak  Lengkap  

b. Panggil  untuk  temuduga  

c. Tarikh  

d. Masa  

e. Tempat  

6. Succesfull  application  in  this  stage  will  move  the  name  to  the  next  stage  of  

evaluation  which  is  senarai  temuduga  

Senarai  Temuduga  1. After  the  applicant  has  passed  the  first  stage  of  evaluation,  the  nama  will  be  

displayed  under  the  senarai  temuduga  list.  

 2. Admin  will  need  to  update  the  applicant  status  be  hitting  the  ‘Kemaskini’  botton  

at  the  end  of  the  name    

3. In  the  kemaskini  page,  admin  will  see  the  list  of  kursus  that  has  been  selected  by  

the  applicant.    

4. In  this  page  admin  can  update  the  kursus  that  will  be  offered  to  the  applicant    

5. Admin  will  need  to  update    

a. Status  sokongan  

b. Catatan  

c. Nama  penemuduga  

Page 10: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  8  

6. After  the  process  has  been  finalized,  hit  the  ‘Simpan’  button  and  the  applicant  

name  will  be  moved  from  Senarai  Temuduga  to  Senarai  Pendek

 

Senarai  Pendek  1. This  page  is  to  list  out  the  application  that  has  passed  the  ‘Temuduga’  session.  

 2. Admin  can  view  the  “Senarai  Pendek’  list  according  to  the  Program  and  Kursus.  

3. Admin  will  need  to  assign  the  applicant  to  the  Kursus  Session  and  Tarikh  

kemasukan  in  this  page.  

Berjaya  1. The  page  is  to  list  out  the  final  list  of  successful  application.  

Page 11: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  9  

2. Application  that  has  passed  the  senarai  pendek  evaluation  will  be  listed  in  this  

page  

Tidak  Berjaya  3. The  page  is  to  list  out  the  final  list  of  unsuccessful  application.  

Status  Pelatih  1. This  page  is  meant  to  update  the  status  for  each  student  in  Pusat  Pembangunan  

Belia.  

2. Admin  will  need  to  search  the  pelatih  based  on  the  Program,  Kursus  and  sessi  

3. Click  on  ‘Kemaskini’  to  update  the  status  

Admin  can  update  the  status  as  below  

 a. Aktif  

b. Tamat  Pengajian    

c. Diberhentikan  

Carian  Pelatih  1. Admin  need  to  select  the  Program,  Kursus  and  Sessi  to  narrow  down  the  list  of  

pelatih.  

2. Click  on  kemaskini  to  add  details  for  the  particular  pelatih

   

Page 12: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  10  

Program  Pembangunan  Belia  1. In  this  page,  admin  can  manage:  

a. List  of  Rekod  Matapelajaran  for  each  student  in  Pusat  Pembangunan  Belia  

b. Marks  and  grade  for  the  particular  student  based  on  the  silibus  that  has  

been  created  earlier  in  the  training  session  

Program  Penempatan  Kerja  

1. In  this  page,  admin  can  update  the  daily  log  for  each  student  that  has  been  sent  

for  ‘Program  Penempatan  Kerja’  

   

Kehadiran  

1. Each  of  every  student  attendance  record  will  be  stored  in  this  page.  

 2. Attendance  will  be  recorded  based  on  Monthly  basis.  

3. Admin  need  to  update  the  supporting  document  for  monthly  records  

 

Page 13: USER MANUAL - belia-sukan.gov.bn Documents/YSNet User Manual - PPB.pdfUSER MANUAL Module Name: Pusat Pembangunan Belia Project Name: The Supply, Delivery, Installation, Testing, Commissioning

Pusat  Pembangunan  Belia  Module  User  Manual  v1.0  

 

  11  

Disiplin  

1. This  page  is  to  keep  records  of  disciplinary  for  each  student  in  Pusat  

Pembangunan  Belia  

 2. Admin  can  record  disciplinary  cases  by  incident  

 

Kebenaran  Keluar  Masuk  

1. Admin  can  record  the  ‘Kebenaran  keluar  masuk’  in  this  page.  

 The  record  will  be  kept  for  each  time  the  student  applies  for  ‘Kebenaran  keluar  

masuk’