Use of lignin solution in the road
structure to increase the bearing capacity
of forest truck roads
Jan Bjerketvedt
FORMEC 2016 – From Theory to Practice: Challenges for Forest Engineering
September 4 – 7, 2016, Warsaw, Poland
0
10000
20000
30000
40000
50000
60000
19
49
19
51
19
53
19
55
19
57
19
59
19
61
19
63
19
65
19
67
19
69
19
71
19
73
19
75
19
77
19
79
19
81
19
83
19
85
19
87
19
89
19
91
19
93
19
95
19
97
19
99
20
01
20
03
20
05
20
07
20
09
20
11
New roads
Rebuilt roads
Larger timber trucks
Transport through the whole year
Roads build with local materials
Building of forest truck roads, acc. km
Climatic changes
42.000 km -10.000 km 32.000 km older than 25 years
Rebuilding cost: 270 NOK/m (30 €)
8,64 bill. NOK ( 1 b. €)
4 meters
25 cm
25 cm top layer of crushed rock reduce the road width about 30 cm on each side 35 cm top layer of gravel reduce the width 2x50 cm The Norwegian Forest Road Standard increased the minimum road width from 3.5 meters to 4.0 meters in 1997
Reinforce and widen
Reinforce without widening?
Add bearing capacity reinforcing materials
or solutions?
The common use of lignin (or lignosulfonate) solution is on the road surface as a dust suppressant and road stabilizer; it binds soil particles to provide a solid, hardwearing surface. Long term experiences from the Norwegian Public Road Administration indicated that the treatment also resulted in an increased bearing capacity.
This study is aimed at measuring the effect on bearing capacity of applying lignin (Norwegian trademark Dustex) to the top/base layer (upper 20 cm) on existing forest roads and if this is an economically viable alternative to traditional methods.
Dustex is biodegradable and has no environmental restrictions.
4
18.09.2016
What have we done?
1. Measure bearing capacity 1, before treatment, - June 2013 2. Crushing and Dustex-treatment, - June 2013 3. Measure bearing capacity 2, after 1 year, - July 2014 4. Measure bearing capacity 3, autumn rain, - October 2014 5. Measure bearing capacity 4, after 2 years, - June 2015
18.09.2016
Bearing capacity was registered for every 50 meter on the right road side. On the retour the starting point was moved 25 meters, so that the measurements from the left road side was placed between the ones on the right side. The roads are mapped with measurements for every 25 meters, but on alternating road side. General impression: Large variations between neighboring points, road side (cut/fill) and road sections. Should not be a surprice for an old forest road built with local moraine materials, but….
18.09.2016 16
0
2
4
6
8
10
12
14
16
18
20
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Før_1306
Som1_1407
18.09.2016 17
0
2
4
6
8
10
12
14
16
18
20
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Før_1306
Som1_1407
Høst_1410
18.09.2016 18
0
5
10
15
20
25
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Før_1306
Som1_1407
Høst_1410
Som2_1506
18.09.2016 19
0,00
5,00
10,00
15,00
20,00
25,00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Før_1306
Som1_1407
Høst_1410
Som2_1506
0,00
5,00
10,00
15,00
20,00
1 2 3 4 5 6 7 8 9
Før_1306
Som1_1407
Høst_1410
Som2_1506
ROAD 1
18.09.2016 20
0
5
10
15
20
25
0 1 2 3 4 5 6 7 8
Før_1306
Som1_1407
Høst_1410
Som2_1506
0
5
10
15
20
25
30
10 11 12 13 14 15 16 17 18 19 20 21
Før_1306
Som1_1407
Høst_1410
Som2_1506
ROAD 2
18.09.2016 21
0
50
100
150
200
250
Før_1306 Som1_1407 Høst_1410 Som2_1506
Ubehandlet
Behandlet
% ROAD 1
Untreated Dustex treated
18.09.2016 22
0
20
40
60
80
100
120
140
160
180
Før_1306 Som1_1407 Høst_1410 Som2_1506
Ubehandlet
Behandlet
ROAD 2
Untreated Dustex treated
18.09.2016 23
Untreated Dustex-treated
Road 1 Road 2
Untreated Dustex-treated
- 3 t / - 19 % - 2.4 t / - 15 % + 2 t / + 17 %
+ 1 t / + 9 %
The Norwegian Forest Road Standard requirement is 10 tons axel load
4 meters
25 cm
25 cm top layer of crushed rock reduce the road width about 30 cm on each side 35 cm top layer of gravel reduce the width 2x50 cm
25 cm top layer, 4 m width is 1 m3 or 1,5 tonn materiale per meter road 1,5 t a 100 NOK = 150 NOK/m road + transport + widening = ca 250-300 NOK/m road (28-33 €)
Reinforce and widen
Dustex-treatment: ca 160-200 NOK/m road (18-22 €)
18.09.2016
Conclusion
• Clear positive effekt of the Dustex-treatment for the bearing capacity in wet/rainy periods, - in short term
• Whether this treatment is an economically viable alternative to
traditional methods in the long term or not, still remains an unanswered question. The lignin is compostable and the duration of the measured increase in bearing capacity under wet conditions is uncertain.
• The Norwegian Institute of Bioeconomy Research (NIBIO) aims to follow up these test roads in the future (2018? After 5 years?)