USCG Hurricane Response & HMS BOUNTY SAR Case North Carolina 2013 All-Hazards Conference 12 March...
If you can't read please download the document
USCG Hurricane Response & HMS BOUNTY SAR Case North Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins– Deputy Sector Commander LT Kevin
USCG Hurricane Response & HMS BOUNTY SAR Case North
Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins
Deputy Sector Commander LT Kevin Sullivan Sector NC Command Center
Chief
Command Structure ICS Structure Decision Point Scalability
Interoperability
Slide 4
Assets/Capabilities Sector Assets Surge Capabilities Personnel
Reservists Assets Aviation Cutters ATON Strike Teams Facility
Support
Slide 5
Missions SAR Limitations Inland/Coastal/Offshore Missions
Marine Transportation System Recovery (MTSR) Ferry System Ports
(Disaster Recovery Supplies) Aids to Navigation (ATON) Marine
Environmental Protection (MEP) Law Enforcement Ports, Waterways and
Coastal Security (PWCS)
Slide 6
Missions: Inland SAR Hoist capable helos MH-60 MH-65 High Water
Rescue Swift Water Rescue Communications (800 MHz) Tertiary Cell
Phone ARES
Slide 7
Missions: Marine Environmental Protection
Slide 8
Missions: MTSR/ATON
Slide 9
Stray Buoys
Slide 10
Slide 11
Partners Federal Army Corps of Engineers Environmental
Protection Agency State/County/Local State/Eastern Branch/County
EOCs & 911 Centers Coastal Municipalities (Fire/Police/EMS)
NCDOT Bridges/Ferry Divisions NC Wildlife/Marine Patrol Industry
State Ports Pilots
Slide 12
Partnerships: ACOE/EPA
Slide 13
Emergency Ferry Routes
Slide 14
Questions?
Slide 15
HMS BOUNTY SAR Case Challenges
Slide 16
Slide 17
Timeline (all times local) Sunday 28 OCT 2130: SCC receives
email via agent that HMS BOUNTY w/ 16POB is disabled and T.O.W.
90NM SE of Cape Hatteras. SCC is unable to establish direct comms
with vessel SCC Requests C-130 from A/S E-City to investigate.
~2330: C-130 on-scene, establishes comms. Overnight the C-130
remains on-scene, provides comms link as situation worsens. SCC
coordinated plan to abandon ship after sunrise.
SAR EFFORT STAT SHEET CASE TOTALS: Total area (SQNM): 10877.21
Total track miles: 6214.11 Searches Conducted - 22 H-60 5 C-130 7
C-144 - 2 ELM 3 GALLATIN - 5 Total Sorties 19 Investigation and
Hearing Pending