Upload
marlene-callaham
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
U.S. General Services Administration
Lance Davis Kevin StallingsSustainable Design Architect Customer Service DirectorGSA GSA
Lance Davis Kevin StallingsSustainable Design Architect Customer Service DirectorGSA GSA
11 June 200911 June 2009
Sustainability for Buildings on GSA Multiple Award Schedule (MAS)
Sustainability for Buildings on GSA Multiple Award Schedule (MAS)
Office of Federal High Performance and Green Buildings
2
Value to the Customer
Participants will be able to understand the building requirements of EISA, EPACT, EO#13423 and ARRA.
Participants will be able to evaluate their upcoming project to incorporate legislative requirements.
Participants will be able to locate products that meet legislative requirements on MAS.
3
DHSOmaha, NE
NPSOmaha, NE
SSAAuburn, WA
DOTWashington, DC
• Integrated Design•Energy•Water
• Indoor Environmental Quality•Materials
What makes up a High Performance Green Building
4
USDAManhattan, KS
Denver Federal CenterLakewood, CO
St. Elizabeth’sWashington, DC
FDAWhite Oak, MD
• Install advanced metersElectricity
GasSteamWater
•LEED Silver Certification•Comply with Guiding Principles
Immediate Actions
5
Sam Nunn Atlanta Federal CenterAtlanta, GA
EPA Computer CenterRTP, NC
Land Port of EntryCalais, ME
Metzenbaum U.S. CourthouseCleveland, OH
• Put together an integrated team• Include commissioning
Integrated Design
6
Morse U.S. CourthouseEugene, OR
NOAASuitland, MD
EPA Science and TechnologyKansas City, KS
U.S. Census BureauSuitland, MD
• Reduce energy usage by 30% per 2003 baseline
• Target an ENERGYSTAR score of 80 or higher• Use ENERGYSTAR Target finder to set an
energy reduction goal of 60%.• Use ENERGYSTAR or FEMP designated energy
efficient products • Use solar thermal systems for 30% of hot
water demand• Incorporate on site renewable energy systems
Energy
7
USDAManhattan, KS
Denver Federal CenterLakewood, CO
St. Elizabeth’sWashington, DC
FDAWhite Oak, MD
• Reduce indoor potable water usage by at least 20% per 2007 baseline.
• Reduce outdoor potable water usage by at least 50% per conventional baseline
• Manage at least 20% of rainfall on site. 40% for new buildings.
• Reduce cooling tower potable water usage• Use EPA WaterSense label products
Water
8
• Lighting Controls• Occupancy Sensors• Daylight Sensors
• Low Emitting Building Materials
Indoor Environmental Quality
Sam Nunn Atlanta Federal CenterAtlanta, GA
EPA Computer CenterRTP, NC
Land Port of EntryCalais, ME
Metzenbaum U.S. CourthouseCleveland, OH
9
USDAManhattan, KS
Denver Federal CenterLakewood, CO
St. Elizabeth’sWashington, DC
FDAWhite Oak, MD
• Products with less effect on health and the environment
• Products per the Comprehensive Procurement Guidelines
• Bio-based products per USDA• Salvage 50% of construction waste
Materials
10
Morse U.S. CourthouseEugene, OR
NOAASuitland, MD
EPA Science and TechnologyKansas City, KS
U.S. Census BureauSuitland, MD
• Advanced Lighting SystemsGarage
Parking LotStairways
Interior work area• Roofing
CoolPlanted
BIPVPV Ballasted
ARRA• Meters
• Recommissioning• HVAC Upgrades• Water Efficiency
11
GSA’s Federal Acquisition Service:Helping You Met Your Sustainability Requirements
www.gsa.gov/CSD
13
GSA’s Multiple Award Schedule (MAS) Contracts
39 GSA managed schedules with 16,000+ contracts awarded providing access to millions of commercial products/services
Contract period effective 5 years from date of award plus three 5-year options
Approximately 81% of all MAS contractors are small businesses; small businesses received 37% of sales in FY ‘08
FY ’08 sales nearly $37 billion
14
Why Use MAS Contracts?
Streamlined ordering procedures Lots of choices – “Best Value” determinations Reduce procurement lead-times from months to
weeks or days “Most Favored Customer” Pricing Schedule purchases count toward socio-
economic goals Contracts awarded in compliance with all
applicable laws & regulations
www.gsa.gov/schedules
16
Special Features
17
Options for Total Solutions
GSA Schedule holders team across multiple business lines Contractor Teaming Arrangements
May establish Blanket Purchase Agreements under any GSA Schedule Simplify the filling of recurring needs
One GSA contract that includes multiple business lines to
meet a multi-dimensional requirement 00CORP Consolidated Schedule
18
Price Reductions
Allows ordering activities to take advantage of the flexible and dynamic pricing in the commercial marketplace
Quantity discounts BPA’s Competitive forces Technological change Labor conditions Industry sales goals
Vendors may offer reductions to one agency without obligation to offer it to all
19
03FAC – Facilities Maintenance & Management
• Energy Planning & Strategies• Energy Choice Analysis• Risk Management• Metering Services• Billing & Mgmt Oversight• Preparing agency SOW’s• Homeland Security Services• Energy Audit Services
• Resource Efficiency Mgmt• Use of Alternative Energy
Sources• Building Commissioning
Services• Training on • Program Support Services• Training• Water Conservation
Energy Management, Water Conservation & Support Services
20
Schedule 56 – Buildings & Building Materials/Industrial Services & Supplies
253 40 Environmental Equipment & Services related to Maintenance & Repair Shop Equipment (recycling services; refrigerant recycling; antifreeze
coolant recycling; oil recyclers)
563 15 Solar Window Film
563 29 Misc. Building Materials (includes energy efficient, eco-green & environmentally
friendly solutions)
206 3 Alternative & Renewable Energy Solutions (solar energy systems; solar lighting; fuels cells; wind
power)
206 4 Energy Saving Lighting, Energy Efficient and/or Environmentally Friendly Lamps (light bulbs), Lighting
Fixtures & Accessories, Indoor Emergency Lighting, Reading Lights & Lighting Sensor Systems
21
72 I A Floor Coverings
31 601 – Recycled and/or biobased content flooring Broadloom carpet Carpet tiles Carpet cushion Resilient (hard surface) sheets Tile & planks Mats & matting
31 602 – Flooring Recycling Programs
22
Schedule 84 – Total Solutions for Law Enforcement, Security, Facilities Management, Fire, etc.
246 42 2 Facility Management Systems (energy and facility management functions & services, building automation control systems including lighting, HVAC controls & sensors and building comfort systems including heating, ventilation & air conditioning, chillers)
246 42 3 Facility Management Systems – accessories and repair parts (includes systems capable of both security functions and energy management functions)
246 53 Facility Management and Energy Solutions – Includes but not limited to projects using appropriated funds as well as alternative financing methods through the use of Energy Savings Performance Contracts (ESPC’s) in accordance
with the National Energy Conservation Policy Act (NECPA) as amended by the Energy Policy Act of 2005 (EPACT). (includes energy audits, project management & energy upgrades of HVAC, Lighting, Controls, etc.)
23
Schedule 899 – Environmental Services
899-1 Environmental Planning Services & Documentation 899-2 Environmental Compliance Services 899-3 Environmental Occupational Training Services 899-4 Waste Management Services 899-5 Reclamation, Recycling and Disposal Services 899-6 Environmental Advisory Services 899-7 Geographic Information Services 899-8 Remediation Services 899-99 New Technologies
24
Locating Product and Service Offerings
www.gsa.gov/green: GSA Environmental Initiatives Aisle
www.gsaelibrary.gsa.gov: Schedules e-Library is the online source for the latest contract award info. for GSA & VA MAS contracts and GSA’s GWAC’s for IT products/services
www.gsaadvantage.gov: Online shopping & Ordering system that provides access to thousands of contracts and millions of
services & products
www.ebuy.gsa.gov: A component of GSA Advantage! and an online Request for Quotations (RFQ) & Request for Information (RFI) System
www.gsa.gov/green
www.gsaadvantage.gov
27
glass cleaner
www.gsaelibrary.gsa.gov
energy management
31
32
33
www.ebuy.gsa.gov
water conservation
40
Thank You for Your Interest!!!
Lance Davis(202) [email protected]
Kevin Stallings(404) 331-1110 [email protected]