U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Embed Size (px)

Citation preview

Page 1: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

U.S. DOTPipeline and Hazardous Materials

Safety Administration

Pipeline Safety Reauthorization

September 16, 2015

- 1 -

Page 2: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Overview

• Reauthorization

• Mandates & Recommendations

• Regulatory Update

– Integrity Verification Program

• Safety Management Systems and Safety Culture

– API RP 1173

- 2 -

Page 3: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Congressional Reauthorization

• Congress Reauthorizes the Federal Pipeline Safety Program Every 4 years. (Due in 2016)• State Pipeline Safety Program Certification Agreements are

reauthorized as part of larger package. (50 million grant program)

• Reauthorization is the Congressional “Performance Appraisal” of an Agency• Good job = “Clean” bill

• Poor job = New ways to improve (OUCH!)

- 3 -

Page 4: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Why should you care about reauthorization?

Flashback to January 2010…• “Window” was open, and our performance had been

good

• Everyone was generally happy with PHMSA –

• Congress

• Inspector General (Exec Branch’s internal auditor),

• General Accounting Office (Congress’ auditor),

• National Transportation Safety Board

- 4 -

Page 5: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

April 20, 2010

Page 6: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 7: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Congress and the Public did not distinguish between an

offshore drilling incident and onshore pipelines.

They saw Big Oil and Gas hurting people and the

environment.

Page 8: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Salt Lake CityJune 11, 2010

Page 9: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 10: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Marshal, MIJuly 26, 2010

Page 11: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 12: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

San Bruno, CASeptember 2010

Page 13: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 14: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 15: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Philadelphia, PAJanuary 19, 2011

- 15 -

Page 16: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 16 -

Page 17: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Allentown, PAFebruary 2011

- 17 -

Page 18: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 18 -

Page 19: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Chicago, ILNovember 13, 2011

- 19 -

Page 20: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 20 -

Page 21: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

The Fallout• A spate of tragic and highly visible accidents in 2010 -2011.

• A polarized political environment, and a rabid media

• We appeared ineffective and too close to industry

• Congress reauthorized PHMSA in late 2011, with a ton of new mandates, little time, and no new resources.

We DON’T want this to happen in 2016.

• p.s. What is a mandate?

- 21 -

Page 22: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

2011 Act Mandates

• 42 mandates and 6 actions in Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011

• Completed 26 mandates and 2 actions

• Includes 9 required studies (Leak Detection, Cover over Buried Pipelines, R&D, Diluted Bitumen, Cast Iron, Damage Prevention, Expansion of IMP, Gathering Lines, etc.

• Other topics include: MAOP Records Verification, Rpting of Any Exceedance of MAOP, Tests to Confirm Material Strength of Previously Untested GT in HCAs, 1 hr Notification of Incidents, Automatic/Remote Shut-off Valves, EFVs, Biofuels, CO2, Updated Mapping, Cost Recovery for Design Reviews, Limitation on IBR, Tribal Consultation, Increased Civil Penalties, etc.

• http://phmsa.dot.gov/pipeline/psa/phmsa-progress-tracker-chart

- 22 -

Page 23: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

NTSB Recommendations

• 39 NTSB recommendations:

• Investigations – 17 open/9 Closed

– Excess flow valves

– ASV/RSVS

– Communication

– Removal of Grandfather clause, etc.

• 22 from the Gas IM Study 21 open/ 1 closed

– State Programs

– NPMS

– Threat identification and risk assessment

– Data

- 23 -

Page 24: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

GAO Audits & Recommendations

7 Recommendations/ 1 Closed

• Completed: Whether transmission should be redefined from 20% to 30% SMYS (No recs)

• Completed: Unregulated Gathering Lines

– 2 recommendations, 1 closed: related to collecting data and information sharing.

• Completed: Diversity in the Industry Workforce (No recs)

• Completed: Operator’s Response to Emergencies

– 2 recs related to improving incident response data and assisting operators in decisions about automated valves.

• Completed: 7- year reassessment interval

– 2 recommendations related to risk based inspection intervals

• Completed: Oil and Gas Transportation

– 1 recommendation related to gathering lines

- 24 -

Page 25: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

IG Audits & Recommendations

• Completed: Hazardous Liquid IMP

– 9 recommendations, 7 closed: Recs were related to various issues including IM measures, better identification/validation of operator risk assessments, improved data analysis

• Completed: State Program Oversight

– 7 recommendations, 7 closed: Recs were related to procedures and guidelines, training, and the formula

- 25 -

Page 26: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

State Regulated Entities• Growing Recognition of the State Role in Pipeline Safety

– DOT/IG Top 10 Management Challenge

– NTSB Integrity Management Audit

– Data: 75% of all human consequences at State level

– States Lead on Issue of Damage Prevention

– Drive for More Prescriptive Rulemaking

• Methane Emission Reduction – From All Sources– Keeping it in the Pipe

• Pressure on Infrastructure Modernization– High risk pipe replacement:

http://opsweb.phmsa.dot.gov/pipeline_replacement/

– Innovative rate recovery: https://www.aga.org/sites/default/files/agastatereplacementactivity.docx

- 26 -

Page 27: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Rulemaking • Miscellaneous Rulemaking (Final Rule)

• Standards Update (Final Rule)

• Excavation Damage Prevention (Final Rule)

• Plastic Pipe (NPRM)

• Operator Qualification, Cost Recovery and Other Pipeline Safety Proposed Changes (NPRM)

• EFV Expansion beyond Single Family Residences (NPRM)

• Safety of Gas Transmission and Gathering Lines (NPRM)

• Safety of On-Shore Hazardous Liquid Pipelines (NPRM)

• Rupture Detection and Valve Rule (NPRM)

- 27 -

Page 28: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 28 -

Current Rulemakings in Process

Safety of On-Shore Hazardous Liquid Pipelines

(NPRM stage – not yet issued) NPRM moved past DOT ANPRM published 10/18/2010 Major topics under consideration:

• Assessments beyond High Consequence Areas (HCAs)• Leak detection beyond HCAs• Repair criteria in HCA and non-HCA areas• Piggability of lines • Reporting requirements for Gathering lines• Gravity Line exception

Page 29: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Safety of Gas Transmission and Gathering Lines

(NPRM stage – not yet issued) NPRM moved past DOT

ANPRM Published 8/25/2011

Major Topics under consideration:

• Expansion of IM requirements beyond HCA’s

• Repair criteria for both HCA and non-HCA areas

• Assessment methods

• Corrosion control

• Gas gathering

• Assessment methods for GT Lines (NACE petition)

• IVP – Grandfathered pipe/pipe records/legacy pipe/pipe tested below 1.1 MAOP - 29 -

Page 30: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Excavation Damage Prevention

(Final Rule stage)

Final Rule published 7/23/2015 Effective date 1/1/2016 Adv. Committee approval vote December 2012 NPRM published 4/2/2012 Major Topic

• Enforce damage protection laws in States that have inadequate enforcement to protect safety. Complies with PIPE’s Act 60114(f).

- 30 -

Page 31: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Miscellaneous Rulemaking

(Final Rule stage) Final Rule published 3/11/2015

Effective date 10/1/2015 Immediate compliance authorizedReceived three petitions for reconsideration

NPRM published 11/29/2011 Major Topics

• performance of post-construction inspections• leak surveys of Type B onshore gas gathering lines• requirements for qualifying plastic pipe joiners• regulation of ethanol• transportation of pipe

- 31 -

Page 32: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

EFV Expansion beyond Single Family Residences

(NPRM stage)

NPRM published 7/15/2015; Comment period ended 9/14/2015 ANPRM published 11/25/2011

Major Topics

• Rule will propose to require EFVs for:

– branched service lines serving more than one single family residence

– multi-family residential dwellings

– commercial buildings

- 32 -

Page 33: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Operator Qualification, Cost Recovery and Other Pipeline Safety Proposed Changes

(NPRM stage) NPRM published 7/10/15; comment period ended 9/8/2015

This rule will address reauthorization issues related to:

• Operator Qualification for new construction

• Incident Reporting

• Cost Recovery

• Assessment methods for HL lines (NACE petition)

• Renewal process for special permits

• API 1104 and in-service welding

- 33 -

Page 34: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in ProcessPlastic Pipe

(NPRM stage) NPRM published May 21, 2015; Comment period ended 7/31/2015

Address the following plastic pipe topics:

• Authorized use of PA12

• AGA petition to raise D.F. from 0.32 to 0.40 for PE pipe

• Enhanced Tracking and traceability

• Miscellaneous revisions for PE and PA11 pipelines

• Additional provisions for fittings used on plastic pipe

- 34 -

Page 35: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Rupture Detection and Valve Rule

(NPRM stage – not yet issued)

This rule would establish and define rupture detection and response time metrics including the integration of Automatic Shutoff Valves (ASV) and Remote Control Valve (RCV) placement as necessary, with the objective of improving overall incident response

Page 36: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Rupture Detection and Valve Rule

(NPRM stage – not yet issued)

This rule responds to:

Requirements of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 (The Act):

• Section 4: ASV/RCV or equivalent technology be installed on newly constructed or entirely replaced natural gas and hazardous liquid transmission pipelines 2 years after the act was issued

• Section 8: Require operators of hazardous liquid pipeline facilities to use leak detection systems and establish standards for their use.

• The Act also mandated two studies of leak detection and response, one by the GAO, and one by PHMSA.

• Two NTSB Recommendations related to valves and leak detection

Page 37: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Current Rulemakings in Process

Future Actions

State Decertification rulemaking

Standards Update rulemaking

Page 38: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Integrity Verification Program

• Drivers: Incidents (San Bruno and Marshall, MI) directly led to NTSB recommendations and Congressional mandates.

• Basic premise – companies don’t know their pipe as well as they should and assumptions are not conservative enough.

• IVP is designed to:

– Verify records and MAOP;

– Confirm material strength of untested lines;

– Help with deletion of the grandfather clause;

– Verify seam stability via 1.25 x MAOP; and

– Move towards making all lines piggable.

- 38 -

Page 39: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Pipeline Infrastructure (% by Decade in USA)

- 39 -

< 1940 1940s 1950s 1960s 1970s 1980s 1990s 2000s0%

5%

10%

15%

20%

25%

Gas Transmission Pipeline Vintage59% installed prior to 1970

39

Page 40: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Basic Principles of IVP Approach

• IVP is based on 4 principles1. Apply to higher risk locations

– High Consequence Areas (HCAs) and Moderate Consequence Areas (MCAs)

2. Screen segments for categories of concern (e.g., “Grandfathered” segments)

3. Assure adequate material and documentation

4. Perform assessments to establish MAOP

40

40

Page 41: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Why Implement a Safety Management System (API

1173)

- 41 -

Page 42: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

(It’s not about Compliance)

It’s About Getting to Zero and Improving Performance

- 42 -

Page 43: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

We believe SMS concepts will improve safety through organizational and cultural

change.

We are implementing SMS concepts within PHMSA.

- 43 -

Page 44: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

We embrace SMS and all of the other safety

improvements not because they are easy or save

money.

We do it because it is the right thing to do.

- 44 -

Page 45: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 45 -

Page 46: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Thank you!

- 46 -

Page 47: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Bonus Slides

- 47 -

Page 48: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Description of Regulated Industry

Pipeline Facilities by System Type – data as-of 2/2/2015

System Type Miles % Miles # Operators

Hazardous Liquid 192,3886,970 Tanks

7% 442

Gas Transmission 302,811 11% 993

Gas Gathering 17,437 1% 357

Gas Distribution (Mains & Services ) 2,149,291 81% 1,371

Total 2,661,927 100% Some Operators have multiple System Types

Liquefied Natural Gas 133 Plants 203 Tanks 83

Page 49: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Safety Trends and Leading Causes

49

All Reported – everything operators report

Serious – fatality or injury requiring in-patient hospitalization, but Fire First excluded. Fire First are gas distribution incidents with a cause of “Other Outside Force Damage” and sub-cause of “Nearby Industrial, Man-made, or Other Fire/Explosion”

Significant include any of the following, but Fire First excluded: 1. Fatality or injury requiring in-patient hospitalization 2. $50,000 or more in total costs, measured in 1984 dollars 3. Highly volatile liquid (HVL) releases of 5 barrels or more 4. Non-HVL liquid releases of 50 barrels or more 5. Liquid releases resulting in an unintentional fire or explosion

Page 50: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -
Page 51: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 51 -

Page 52: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 52 -

Serious Incidents

All System Type rises slightly in 2014

29 each in CY 201490% Gas Distribution

7% Gas Transmission

3% LNGdata as-of 2/2/2015

Page 53: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

- 53 -

Significant Incidents

All System Types rises slightly in 2014

310 in CY 2014 21% Gas Dist 3% Gas Gather

25% Gas Trans 50% Haz Liq

1% LNGdata as-of 5/18/2015

Page 54: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Gas Distribution Significant Incidents

- 54 -

CY 2014 Leading Causes:Excavation DamageOther Outside Force DamageOther

data as-of 2/2/2015

Page 55: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Gas Gathering Significant Incidents

- 55 -

CY 2014 Leading Causes:CorrosionMaterial/Weld/Equipment FailureOther

data as-of 2/2/2015

Page 56: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Interstate Gas TransmissionSignificant Incidents

- 56 -

Top 3 Causes: Equipment, Corrosion, Pipe/Weld Failure

data as-of 2/27/2015

Page 57: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Intrastate Gas TransmissionSignificant Incidents

- 57 -

Top 3 Causes: Equipment, Corrosion, Excavation Damage

data as-of 2/27/2015

Page 58: U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16, 2015 - 1 -

Hazardous Liquid and Carbon Dioxide Significant Incidents

- 58 -

Top 2 Causes: Equipment Failure and Corrosion

data as-of 2/27/2015