U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions 4 th Quarter Fiscal Year 2016 The Consolidated Appropriations Act, 2016, directs the Secretary of the Department of Transportation to “submit consolidated reports of the information provided by the States and territories each quarter to the House and Senate Committees on Appropriations.” Background Section 125 of the Department of Transportation Consolidated Appropriations Act, 2016, title I of division L, Public Law 114- 113, (hereinafter “Repurposing Provision”) provides the authority for a State or territory (hereinafter “States”) to repurpose any earmark that was designated on or before September 30, 2005, and is less than 10 percent obligated or final vouchered and closed. The repurposed funds may be obligated on a new or existing project in the State within 50 miles of the earmark designation. The project must be an eligible project under the Surface Transportation Block Grant Program (STBG) (23 U.S.C. 133(b)), or the Territorial and Puerto Rico Highway Program (THP) (23 U.S.C. 165). The Repurposing Provision was available to be applied in Fiscal Year 2016. The repurposed funds must be obligated on the identified projects no later than September 30, 2019. Discussion In March 2016, the Federal Highway Administration (FHWA) issued guidance on the Repurposing Provision. Shortly thereafter, FHWA began receiving requests from States to repurpose earmarks. During the 3 rd quarter of Fiscal Year (FY) 2016, FHWA received requests to repurpose 171 projects totaling $149,790,783.88 from 11 States. During the 4 th quarter, FHWA received requests to repurpose 2,074 projects totaling $1,677,138,816.77 from 43 States, District of Columbia, American Samoa, and U.S. Virgin Islands. Through the FY 2016 Repurposing Provision, the States are able to put a total of $1,826,929,600.65 of previously idle earmarked funding to use on critical highway and bridge projects. A similar provision was authorized in FY 2017. Funds repurposed under that provision will be reported in the next required report to Congress. Attachments Attached is a summary of the total number and amounts of earmarked projects that were repurposed by each State and territory during FY 2016. Also attached is a detailed list of earmarked projects that were submitted during the 4 th quarter of FY 2016 for repurposing.

U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

U.S. Department of Transportation Federal Highway Administration

Report to Congress Repurposed Earmark Submissions

4th Quarter Fiscal Year 2016

The Consolidated Appropriations Act, 2016, directs the Secretary of the Department of Transportation to “submit consolidated reports of the information provided by the States and territories each quarter to the House and Senate Committees on Appropriations.” Background Section 125 of the Department of Transportation Consolidated Appropriations Act, 2016, title I of division L, Public Law 114- 113, (hereinafter “Repurposing Provision”) provides the authority for a State or territory (hereinafter “States”) to repurpose any earmark that was designated on or before September 30, 2005, and is less than 10 percent obligated or final vouchered and closed. The repurposed funds may be obligated on a new or existing project in the State within 50 miles of the earmark designation. The project must be an eligible project under the Surface Transportation Block Grant Program (STBG) (23 U.S.C. 133(b)), or the Territorial and Puerto Rico Highway Program (THP) (23 U.S.C. 165). The Repurposing Provision was available to be applied in Fiscal Year 2016. The repurposed funds must be obligated on the identified projects no later than September 30, 2019. Discussion In March 2016, the Federal Highway Administration (FHWA) issued guidance on the Repurposing Provision. Shortly thereafter, FHWA began receiving requests from States to repurpose earmarks. During the 3rd quarter of Fiscal Year (FY) 2016, FHWA received requests to repurpose 171 projects totaling $149,790,783.88 from 11 States. During the 4th quarter, FHWA received requests to repurpose 2,074 projects totaling $1,677,138,816.77 from 43 States, District of Columbia, American Samoa, and U.S. Virgin Islands. Through the FY 2016 Repurposing Provision, the States are able to put a total of $1,826,929,600.65 of previously idle earmarked funding to use on critical highway and bridge projects. A similar provision was authorized in FY 2017. Funds repurposed under that provision will be reported in the next required report to Congress. Attachments Attached is a summary of the total number and amounts of earmarked projects that were repurposed by each State and territory during FY 2016. Also attached is a detailed list of earmarked projects that were submitted during the 4th quarter of FY 2016 for repurposing.

Page 2: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

The FHWA previously submitted a report on 3rd quarter requests for repurposing that contained information on all repurposing requests submitted to FHWA through June 30, 2016. Since the transmittal of the previous report, FHWA has completed processing those 3rd quarter requests, which has resulted in amendments to the prior list of earmarked projects. As such, the amended 3rd quarter list of earmarked projects submitted for repurposing is also attached. Each State has reviewed the list and certified that the earmarks were eligible for repurposing, the projects receiving the funding are within 50 miles of the earmark location within the State, and the funding will be obligated for eligible purposes as required in the Repurposing Provision. List of Repurposed Earmarks The lists are organized by State and shows information pertaining to the original earmark on the left and new project descriptions on the right. For each earmark that was repurposed, the lists provide the description of the original earmark, amount available for repurposing, new project description(s) on which the funds will be used, and the repurposed amount for each of the identified new project descriptions. For example, New York has an earmark for “Westchester County, NY Rehabilitation of June Road Town of North Salem” and $520,767.00 is available for repurposing. New York is repurposing that total amount available for “ADA Sidewalks and Ramps - Upper Westchester.”

In some cases, a State repurposed multiple earmarks and put that funding toward the same project. For example, New York has an earmark for “Reconstruct Main Street in the Town of Lewisboro” and $72,106.00 is available for repurposing. The State also has an earmark for “Improvements to Clark Pl. and Cherry Ln. Rt. 6 and 6 N in Putnam County” and $296,437.00 is available for repurposing. New York is repurposing both of those amounts for “Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale.”

State Demo ID Project Description Amount  Project Description Amount

NY NY272 Westchester County, NY Rehabilitation of June Road Town of North Salem 520,767.00 ADA Sidewalks and Ramps ‐ Upper Westchester  520,767.00

State Demo ID Project Description Amount  Project Description Amount

NY NY301  Reconstruct Main Street in the Town of Lewisboro 72,106.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 72,106.00

NY NY302 Improvements to Clark Pl. and Cherry Ln.  Rt. 6 and 6 N in Putnam County 296,437.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 296,437.00

Page 3: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

In some scenarios, a State repurposed one earmark and put that funding toward multiple projects. For example, New York has an earmark for “Construct Northern State Parkway and LIE access at Marcus Ave. and Lakeville Rd. and associated Park and Ride” and $1,362,006.00 is available for repurposing. New York is repurposing that amount for three different projects: $500,000.00 for “Complete Plandome Rd Culvert reconstruction project, Town of North Hempstead,” $838,142.00 for “Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail, Town of North Hempstead,” and $23,864.00 for “Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, Oyster Bay towns.”

State Demo ID Project Description Amount  Project Description Amount

Complete Plandome Rd Culvert reconstruction project, Town of North 

Hempstead

500,000.00

Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail, 

Town of North Hempstead

838,142.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

23,864.00

1,362,006.00Construct Northern State Parkway and LIE access at Marcus Ave. and 

Lakeville Rd. and associated Park and Ride

NY587NY

Page 4: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd and 4th Quarter

Summary

State # of Earmarks Repurposed Total Amount Repurposed

Alabama 31                                                86,766,184                             

Alaska 44                                                49,616,886                             

Arizona 22                                                30,405,489                             

Arkansas 39                                                18,064,929                             

California 184                                              197,922,100                           

Colorado 14                                                7,254,394                               

Connecticut 29                                                53,834,554                             

Delaware 16                                                16,362,418                             

District of Columbia 2                                                3,938,058                               

Florida 59                                                41,884,968                             

Georgia 100                                              96,676,929                             

Hawaii 11                                                11,338,114                             

Idaho 1                                                2,403,540                               

Illinois 196                                              53,149,172                             

Indiana 54                                                20,323,283                             

Iowa 28                                                37,524,119                             

Kansas 1                                                2,004,683                               

Kentucky 43                                                38,428,894                             

Louisiana 37                                                43,708,844                             

Maine 3                                                2,684,820                               

Maryland 5                                                9,453,924                               

Massachusetts 20                                                24,879,282                             

Michigan 95                                                53,202,441                             

Minnesota 27                                                14,921,231                             

Mississippi 15                                                9,463,413                               

Missouri 49                                                72,593,291                             

Montana 14                                                10,070,511                             

Nebraska 34                                                29,192,530                             

New Hampshire 15                                                6,710,781                               

New Jersey 120                                              103,921,634                           

New Mexico 39                                                38,662,025                             

New York 162                                              125,364,773                           

North Carolina 40                                                30,871,896                             

Ohio 70                                                44,775,398                             

Oklahoma 10                                                4,110,062                               

Oregon 9                                                3,860,011                               

Pennsylvania 197                                              128,091,091                           

South Carolina 20                                                31,371,930                             

South Dakota 32                                                29,628,257                             

Tennessee 102                                              75,528,022                             

Texas 18                                                36,183,537                             

Utah 15                                                5,802,189                               

Vermont 18                                                13,180,413                             

Virginia 63                                                60,907,567                             

Washington 126                                              46,319,394                             

West Virginia 2                                                577,222                                   

Wyoming 8                                                588,364                                   

American Samoa 5                                                732,062                                   

U.S. Virgin Islands 1                                                1,673,972                               

Total 2,245                                          1,826,929,600.65                  

Page 5: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Summary

State # of Earmarks Repurposed Total Amount Repurposed

Alabama 31                                               86,766,184.24                        

Alaska 44                                               49,616,886.18                        

Arizona 22                                               30,405,488.67                        

Arkansas 39                                               18,064,929.00                        

California 184                                             197,922,100.33                      

Colorado 14                                               7,254,394.00                          

Connecticut 29                                               53,834,553.63                        

Delaware 16                                               16,362,417.55                        

District of Columbia 2                                                 3,938,057.62                          

Florida 59                                               41,884,967.67                        

Georgia 100                                             96,676,928.50                        

Hawaii 11                                               11,338,113.87                        

Illinois 196                                             53,149,172.22                        

Indiana 54                                               20,323,283.14                        

Iowa 28                                               37,524,118.72                        

Kentucky 43                                               38,428,894.25                        

Louisiana 37                                               43,708,844.15                        

Maine 3                                                 2,684,820.00                          

Maryland 4                                                 5,448,024.00                          

Massachusetts 20                                               24,879,282.00                        

Michigan 94                                               52,963,484.42                        

Minnesota 26                                               14,766,939.85                        

Mississippi 15                                               9,463,413.00                          

Missouri 49                                               72,593,291.12                        

Montana 14                                               10,070,510.99                        

Nebraska 34                                               29,192,530.20                        

New Hampshire 15                                               6,710,780.66                          

New Jersey 79                                               54,344,501.15                        

New Mexico 39                                               38,662,025.11                        

New York 162                                             125,364,773.00                      

North Carolina 39                                               30,357,034.60                        

Ohio 70                                               44,775,398.16                        

Oklahoma 10                                               4,110,062.26                          

Oregon 9                                                 3,860,011.01                          

Pennsylvania 197                                             128,091,090.75                      

South Carolina 20                                               31,371,930.02                        

South Dakota 24                                               22,076,545.93                        

Tennessee 3                                                 1,437,424.58                          

Texas 18                                               36,183,536.97                        

Utah 15                                               5,802,188.60                          

Vermont 3                                                 4,508,524.81                          

Virginia 63                                               60,907,566.99                        

Washington 126                                             46,319,394.16                        

Wyoming 8                                                 588,364.48                              

American Samoa 5                                                 732,062.21                              

U.S. Virgin Islands 1                                                 1,673,972.00                          

Total 2,074                                          1,677,138,816.77                  

Page 6: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Alabama

State Demo ID Project Description Amount  Project Description Amount

AL AL019 Construct the Decatur Southern Bypass (FY 1998) 4,100,399.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 4,100,399.00

AL AL021 Dothan I‐10 Connector Alabama (FY2003) 4,966,882.78 Add lanes on SR‐12 (US‐84) from east of SR‐87 to east of CR‐507 4,966,882.78

AL AL023 Construct repairs to viaducts connecting downtown and midtown areas 

Birmingham (FY 1998)

455,431.40 Sign rehab, On I‐20 from I‐59 to the St. Clair county line 455,431.40

AL AL043 Capital costs associated with track relocation, construction and rehab, 

highway‐rail separation construction activities including ROW acquisition and 

utility relocation, and signal improvements in Muscle Shoals, Tuscumbia and 

Sheffield Al (FY 2001)

4,989,000.00 Additional lanes on SR‐133 from Sr‐20 to the Norfolk Southern RR 4,989,000.00

AL AL077 US‐278 from Sulligent to Guin (FY 2004) 136,612.06 Bridge replacement on SR‐118 over Little New River 136,612.06

AL AL108 Construction of Valleydale Road flyover and widening improvements from US‐

31 to US‐65 (FY 2005)

4,726,962.00 Resurfacing of I‐20 from the Coosa  River to MP 173.294 4,726,962.00

AL AL112 Pedestrian improvements for Homewood, AL (FY 2005) 320,472.00 Sign rehabilitation on I‐20 from I‐59 to the St. Clair county line 320,472.00

AL AL114 I‐20 widening and safety improvements in St. Clair County (FY 2005) 4,005,900.00 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 4,005,900.00

AL AL116 Pedestrian improvements for Morris, Al (FY 2005) 106,823.67 Sign rehabilitation on I‐20 from I‐59 to the St. Clair county line 106,823.67

AL AL117 To construct up to 2 interchanges on US alternate Highway 72/Alabama 

Highway 20 from Interstate 65 to US Highway 31 in Decatur, Alabama with 

additional lanes as necessary (FY 2005)

4,005,900.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 4,005,900.00

AL AL120 I‐65 widening from US‐31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228) 

(FY 2005)

6,409,440.00 I‐59 pavement rehabilitation from SR‐23 to north of US‐231 at Whitney 6,409,440.00

AL AL121 Pedestrian improvements for Moody, Al (FY 2005) 106,823.67 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 106,823.67

AL AL128 Expand to 4 lanes US highway 278 from Sulligent to Guin (FY 2005) 801,180.00 Bridge replacement on SR‐18 (US‐43) over Deadwater creek 801,180.00

AL AL132 To construct up to 2 interchanges on US alternate Highway 72/Alabama 

Highway 20 from Interstate 65 to US Highway 31 in Decatur, Alabama with 

additional lanes as necessary (FY 2005)

1,602,360.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 1,602,360.00

AL AL134 Pedestrian improvements for Gardendale, AL (FY 2005) 534,120.33 Resurfacing of I‐20 from the Coosa  River to MP 173.294 534,120.33

AL AL137 Alabama Highway 36 extension and widening ‐ phase II (FY 2005) 801,180.00 Resurfacing of SR‐3 (US‐31) from Lacon Road to SR‐36 801,180.00

AL AL138 Pedestrian improvements for Northport, AL (FY 2005) 213,648.33 Additional lanes and Bridge replace, on I‐59 from south of McFarland 

Boulevard to south of Buttermilk Road

213,648.33

AL AL142 Expand to 4 lanes US 278 from I‐65 to US‐231 (FY 2005) 2,804,130.00 Resurfacing of I‐65 from Jefferson county line to the Cullman county line 2,804,130.00

AL AL143 Design and construct a 4‐lane highway from Muscle Shoals, AL to I‐10 (FY 

2005)

801,180.00 Additional lanes on SR‐133 from Sr‐20 to the Norfolk Southern RR 801,180.00

AL AL144 Construct I‐10/US‐231 connector from Dothan Al to Florida (FY 2005) 2,403,540.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84) 

from Belaire Dr. to Pinetree Dr.

2,403,540.00

AL AL151 Construct additional lanes on SR‐77 from Southside, AL to Green Valley Road 

(FY 2005)

1,362,006.00 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 1,362,006.00

AL AL152 The City of Calera, Alabama‐Northern Bypass Segment (US Highway 31 to 

Alabama State Highway 25) (FY 2005)

5,188,024.00 Resurfacing I‐59 from the Tuscaloosa county line to north of Academy drive 5,188,024.00

AL AL153 Alabama Highway 36 extension and widening ‐ phase II (FY 2005) 240,354.00 Resurface SR‐3 (US‐31) from Lacon Road to SR‐36 240,354.00

AL AL155 Preliminary engineering, design, ROW acquisition, and construction of the I‐

10 connector (FY 2005)

15,022,126.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84) 

from Belaire Dr. to Pinetree Dr.

15,022,126.00

AL AL159 To widen Highway 84 to 4 lanes west of I‐65 from Evergreen Monroeville and 

beyond to the Alabama state line (FY 2005)

4,005,900.00 Bridge replacement on I‐65 over Murder Creek and Relief 4,005,900.00

ToFrom

3

Page 7: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Alabama

State Demo ID Project Description Amount  Project Description Amount

ToFrom

AL AL160 I‐65 widening from US‐31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228) 

(FY 2005)

5,007,375.00 Pavement rehabilitation on I‐459 from I‐59 south of CR‐52 at Greenwood 5,007,375.00

AL AL161 Preliminary engineering, design, ROW acquisition, and construction of the 

Tuscaloosa Bypass, Alabama (FY 2005)

5,011,707.00 Additional lanes and Bridge replace, on I‐59 from south of McFarland 

Boulevard to south of Buttermilk Road

5,011,707.00

AL AL162 Dothan, I‐10 connector (FY 2005) 5,011,707.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84) 

from Belaire Dr. to Pinetree Dr.

5,011,707.00

AL AL184 Grade crossing improvements along Wiregrass Central RR at Boll Weevil 

Bypass in Enterprise, AL (FY 2005)

250,000.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84) 

from Belaire Dr. to Pinetree Dr.

250,000.00

AL AL185 Grade crossing improvements along Conecuh Valley RR at Henderson 

Highway (CR‐21) in Troy, AL (FY 2005)

300,000.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84) 

from Belaire Dr. to Pinetree Dr.

300,000.00

AL AL189 Engineering and right‐of‐way acquisition for the McWrights Ferry Road 

Extension between Rice Mine Road and New Watermelon Road in Tuscaloosa 

County (FY 2005)

1,075,000.00 Resurfacing SR‐13 from the I‐359 bridge to the Hugh Thomas Bridge 1,075,000.00

Total Amount Repurposed 86,766,184.24

Total # of Earmarks Repurposed 31

4

Page 8: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Alaska

State Demo ID Project Description Amount  Project Description Amount

AK AK003 Construct Spruce Creek Bridge in Soldotna 218,477.73 Kenai Spur Road Rehabilitation 218,477.73

AK AK004 Construct capital improvement to Intermodal freight and passenger facilities 

servicing the AMH and other related transportation modes in Seward 

provided that the state public authority which owns the current Intermodal 

facilities carrie

531,443.00 Seward Road Improvements 531,443.00

AK AK006 Construct Pt. Mackenzie Intermodal Facility 814,627.78 Parks Hwy MP 48.8 to 52.3 Pittman Rd to Big Lake Rd Reconstruction 814,627.78

AK AK008 Construct Coffman Cove Ferryboat 326,474.00 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended 

Parking

326,474.00

AK AK011 Extend West Douglas Road 1,332,696.13 Egan Drive Improvements ‐ Main Street to 10th Street 1,332,696.13

AK AK013 Construct Gravina Island Bridge in Ketchikan 5,376,330.08 Gravina Access 5,376,330.08

AK AK014 Construct NW Alaska Railroad/Rail access 380,377.65 Kotzebue Cape Blossom Road 380,377.65

AK AK015 Construct North Denali access route 821,446.76 Parks Highway MP 239‐263 Reconstruction (Nenana Canyon to Bear Creek) 821,446.76

AK AK016 Construct Capital improvements to marine transportation facilities for Prince 

of Wales Island

106,825.00 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended 

Parking

106,825.00

AK AK018 Construct new access route to Ship Creek Access in Anchorage 2,307,734.43 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 2,307,734.43

AK AK019 Construct Bradfield Canal Road   88,464.02 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 88,464.02

AK AK022 Gravina Bridge, Ketchikan 1,987,000.00 GRAVINA ACCESS 1,987,000.00

AK AK023 Japonski Island Road, Sitka  713.60 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 713.60

AK AK054 Sitka Road Improvements, Alaska  24,414.93 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 24,414.93

AK AK055 University of Alaska Transportation Research Center   2,685.07 Noble Street Upgrade:  Fairbanks 2,685.07

AK AK072 Construct False Pass causeway and road to the terminus of the south arm 

breakwater project

1,399,184.66 AMHS Tustumena Replacement Vessel  1,399,184.66

AK AK078 Akutan Airport Access 152,362.00 AMHS Tustumena Replacement Vessel  152,362.00

AK AK079 Bridge and road work at Little Susitna River Access road in Mat‐Su Borough 1,001,475.00 Parks HWY MP 48.8 to MP 52.3 Pittman Rd to Big Blake Rd Reconstruction 1,001,475.00

AK AK080 Emergency evacuation road at Point Hope, North Slope Borough 2,999,940.54 Point Hope Transportation Infrastructure & Transit Improvements 2,999,940.54

AK AK081 Bogard/Sheldon Extension Mat‐Su Borough Description Changed 8/28/2008 

Hatcher Pass Ski Development Road in Matanuska‐Susitna Borough

406,299.00 Parks HWY MP 45 to 52 Pittman Rd to Big Blake Rd Reconstruction 406,299.00

AK AK082 Coffman Cove IFA Ferry terminal or IFA vessel debt repayment for MN Prince 

of Wales Ferry

325,039.08 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended 

Parking

325,039.08

AK AK084 Planning, design and EIS of Bradfield Canal Road   203,150.00 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 203,150.00

AK AK085 Pt. MacKenzie in Mat‐Su Borough plan and design road access Description 

changed 8/28/2008 Hatcher Pass Ski Development Road in Matanuska‐

Susitna Borough

101,576.00 Parks HWY MP 45 to 52 Pittman Rd to Big Blake Rd Reconstruction 101,576.00

AK AK087 Necessary imp to Indian River Rd in Sitka   212,680.68 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 212,680.68

AK AK095 Construct access road and bridge crossing the Naknek River terminus points 

in South Naknek‐King Salmon Hwy  

3,004,425.00 Alaska Peninsula Highway Bridges 3,004,425.00

AK AK096 Anchorage Traffic Congestion Relief 507,875.00 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 507,875.00

AK AK097 Earthwork and roadway construction Gravina Access PJ 11,663,651.76 Gravina Access 11,663,651.76

AK AK104 Various road imp in Petersburg 4,638.17 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 4,638.17

AK AK107 Float Plane road in Aleknagik 1,001,475.00 Paving Wood River Bridge Approach Roads  1,001,475.00

ToFrom

5

Page 9: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Alaska

State Demo ID Project Description Amount  Project Description Amount

ToFrom

AK AK109 Coffman Cove Road paving in Coffman Cove 49,448.03 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended 

Parking

49,448.03

AK AK111 Construction of trail between Lake Lucille and Big Lake in Mat‐Su 2,002,950.00 Parks HWY MP 48.8 to MP 52.3 Pittman Rd to Big Blake Rd Reconstruction 2,002,950.00

AK AK114 Intermodal Ferry dock in Hoonah 132,621.16 AMHS Gustavus Ferry Terminal Modifications  132,621.16

AK AK116 Improvements to Lake Camp Road in Bristol Bay Borough   304,725.00 Alaska Peninsula Highway Bridges 304,725.00

AK AK117 Feasibility study of constructing natural gas pipeline from NSB to South 

Central Alaska along existing transportation corridors

313,824.51 Parks Highway MP 239‐263 Reconstruction (Nenana Canyon to Bear Creek) 313,824.51

AK AK121 Bristol Bay: Transportation imp to the access road and bridge crossing at the 

Naknek River 

3,004,425.00 Alaska Peninsula Highway Bridges 3,004,425.00

AK AK125 Chignik: Inter‐Village Road, for design, engineering, permitting and 

construction  

5,007,375.00 Chignik Public Dock 5,007,375.00

AK AK135 Wrangell: Road Improvements   626.49 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 626.49

AK AK136 Petersburg Road imp including design, engineering, permitting and 

construction

1,355.32 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 1,355.32

AK AK138 Southeast: Planning, Design, and EIS of Bradfield Canal Road   203,150.00 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 203,150.00

AK AK143 Sitka: Imp to Indian River Rd including design, engineering, permitting and 

construction 

596.98 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 596.98

AK AK144 Anchorage: Handicapped and ped access construction, surfacing & other imp 

for 2006 Natl Veterans Wheelchair Games

300,761.00 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 300,761.00

AK AK147 Fairbanks: O'Connor Road Bridge replacement  250,369.00 Noble Street Upgrade:  Fairbanks 250,369.00

AK AK148 Anchorage Transportation improvement to the Creekside Development 454,547.20 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 454,547.20

AK AKF01 Alaska 2004 Akutan Ferry Planning & Design 286,629.42 AMHS Tustumena Replacement Vessel  286,629.42

Total Amount Repurposed 49,616,886.18

Total # of Earmarks Repurposed 44

6

Page 10: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Arizona

State Demo ID Project Description Amount  Project Description Amount

AZ AZ006 Tucson: Veterans Memorial Interchange/Palo Verde Bridge Replacement 939,184.58 I‐10; Ina Rd TI (MP 148), Reconstruct Traffic Interchange and Mainline in 

Tucson

939,184.58

AZ AZ035 Upgrade and Widen SR 85 to I 10 (Mileposts 120 141) 183,443.00 SR‐347 @ Union Pacific RR, Grade Separation in Maricopa 183,443.00

AZ AZ036 Improving Lone Pine Dam Road in Navajo County 203,150.00 US 60; SR 77 (MP 342.0) to 40th St (MP 343.33) Roadway Widening in Show 

Low

203,150.00

AZ AZ038 Pinal Avenue/Main Street right‐of‐way acquisition Pinal county, Casa Grande, 

AZ To reconstruct Main St. to include a bypass for commercial traffic

438,337.19 I‐10; Early Rd to I‐8, Widen to 6 Lanes, near Casa Grande 438,337.19

AZ AZ039 Navajo Route 20/Navajo Nation, Coconino County, AZ/To Conduct a 2‐lane 

road design for 28 miles of dirt road between the communities of La Chee, 

Coppermine, and Gap

81,259.00 US 160; IR 6731 to SR 98, Construct four (4) bus pullouts near Tuba City 81,259.00

AZ AZ040 Kabba Wash project between I‐40 and Wikieup 295,924.12 US 93; Burro Creek Bridge (NBI#846) MP 139, Bridge Rehabilitation, South of 

Wikieup

295,924.12

AZ AZ043 Navajo Mountain Road on the Navajo Nation 101,576.00 US 160; Long House ‐ Kayenta Pavement Preservation 101,576.00

AZ AZ045 Design and construction of roadway improvements on U.S. 60 from 67th 

Avenue to McDowell

1,602,360.00 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane 

divided highway, NW of Wickenburg

1,602,360.00

AZ AZ046 Construct pedestrian and bicycle overpass at McDowell Road and 35th 

Avenue in Phoenix

243,780.00 Various Locations; Quarter Sections 27‐19, 27‐20, 27‐25, 28‐19, Pave Dirt 

Alleys in Phoenix

243,780.00

AZ AZ047 Upgrade and re‐opening of Main Street in Yuma 101,624.00 4th Ave Gateway, State Line (MP 0) ‐ 1st St (MP 0.3) in Yuma, pedestrian 

lighting and signage

101,624.00

AZ AZ048 Planning, design, and construction of Navajo Route 9010‐off of I‐40 at Houck, 

AZ (Exit 348) to Pine Springs  Day School

349,418.00 I‐40; Black Creek Bridge EB#1134 and Houck TI UP #955, near Saunders 349,418.00

AZ AZ050 Construct of Modify Railroad Grade Separations on 6th ST. and 22nd St. and 

Reconstruct Speedway Blvd. Underpass in Tucson

10,655,695.00 I‐10; Ina Rd TI (MP 248), Reconstruct Traffic Interchange and Mainline, in 

Tucson

10,655,695.00

AZ AZ051 Replacement of  Safford Bridge which crosses the Gila River directly north of 

Safford, AZ on North 8th Avenue

932,945.00 8th Avenue and Airport Road, Intersection Improvement in Safford 932,945.00

AZ AZ053 Construct bridges at Aspen St., at Birch St., at Cherry St., at Bonito St., at 

Thorpe St.

304,725.00 Kachina Trail; Kachina Boulevard to Ancient Trail, Roadway Reconstruction, 

south of Flagstaff

304,725.00

AZ AZ055 Many Farms, Apache County ‐ For the preconstruction (including survey and 

archeological clearances0 and construction of N8086 and N8084 on the 

Navajo Nation. Preconstruction (including survey and archeological 

clearances) and construction

48,756.00 US 191; Aqua Sal 1004/1005. Lukachikal Wash 1008 (MP 476.34), deck rehab, 

south of Round Rock

48,756.00

AZ AZ058 Pilocane Cliffs reconstruction between Wikieup and the Santa Maria River 402,131.80 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane 

divided highway, NW of Wickenburg

402,131.80

AZ AZ059 Scott Ranch Road. Navajo County‐Connect White Mountain Road (SR 260) 

and Penrod Road (SR 77)

420,421.62 US 60; SR 77 (MP 342.0) to 40th St (MP 343.33) Roadway Widening in Show 

Low

420,421.62

AZ AZ060 Design and Construction of Rio Salado Pedestrian Bridge in Tempe, AZ 243,780.00 Tempe; South city limits to US 60 on Scottsdale Rd, Fiber install, in Tempe 243,780.00

AZ AZ062 U.S. 60 and U.S. 93 connection on the eastern edge of central Wickenburg 1,602,360.00 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane 

divided highway, NW of Wickenburg

1,602,360.00

AZ AZ064 Pave remaining stretch of BIA Route 4 from the junction of the BIA Route 4 

and N8031 in Pinon, AZ, to the Navajo and Hopi border

162,520.00 SR 264; Dinnabito Wash Bridge #1013, northwest of Second Mesa 162,520.00

AZ AZ065 Arizona Department of Transportation; for those projects it has identified as 

highest priorities

9,947,132.41 I‐10; Ina Rd TI (MP 248), Reconstruct Traffic Interchange and Mainline, in 

Tucson

9,947,132.41

AZ AZ066 Replacement of Safford Bridge which crosses the Gila River directly north of 

Safford, AZ on North 8th Avenue

1,144,965.95 8th Avenue and Airport Road, Intersection Improvement in Safford 1,144,965.95

ToFrom

7

Page 11: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Arizona

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Total Amount Repurposed 30,405,488.67Total # of Earmarks Repurposed 22

8

Page 12: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Arkansas

State Demo ID Project Description Amount  Project Description Amount

AR AR002 Access Control Demo, Construction of, and improvements to, US 63 in 

Jonesboro, Arkansas 

565,033.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in 

Craighead, Poinsett & Crittenden Co

565,033.00

AR AR006 North Belt Freeway project (N. Little Rock) 527,691.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

527,691.00

AR AR008 Ft. Smith: Improve Phoenix Avenue in the vicinity of the Ft. Smith Airport 695,426.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in 

Sebastian County

695,426.00

AR AR009* DeValls Bluff: Replacement Bridge Across the White River 164.00 Hwy. 13 ‐ Screeton ‐ System preservation of approximately 6 miles of Hwy. 70 

in Lonoke & Prairie Counties

164.00

Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7 

miles of Hwy. 5 in Izard County

653,265.00

Hwy. 62 West ‐ Hwy. 62 East ‐ System Preservation of approximately 5 miles 

of Hwy. 62B in Baxter County.

1,200,000.00

AR AR011* Uniform Traffic Control Devices Hwy Project (Statewide) 37,025.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

37,025.00

AR AR014 Development of Little Rock Port Authority 239,707.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

239,707.00

AR AR016 Widen Highway 65/82 from Pine Bluff to the Mississippi State line [see P.L. 

106‐69 Section 361]

455,874.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

455,874.00

AR AR017 Upgrade US Rt. 67, Newport to Missouri State line 130,392.00 Arrington St. ‐ Hwy. 157 ‐ System Preservation of approximately 2 miles of 

Hwy. 14 in Jackson County.

130,392.00

AR AR021 Construct Highway 371 from Magnolia to Prescott [see P.L. 106‐69 Section 

361]

195,089.00 Hwy. 8 ‐ Nevada Co. Line (Sel. Secs.) ‐ System preservation of approximately 

30 miles of Hwy. 53 in Clark County

195,089.00

AR AR022 Upgrade U.S. 65 in Faulkner and Van Buren Counties 260,785.00 I‐40 ‐ North (Sel. Secs.) ‐ System Preservation of approximately 2 miles of 

Hwy. 363 in Pope County

260,785.00

AR AR024 Upgrade Arkansas State Highway 59 from Rena Road to Old Uniontown Road 

in Van Buren

219,493.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in 

Sebastian County

219,493.00

AR AR025 Construct Highway 82 from Hamburg to Montrose [see P.L. 106‐69 Section 

361]

455,874.00 Hwy. 133S ‐ Co. Rd. 16 ‐ System Preservation of approximately 5 miles of 

Hwy. 133 in Ashley County

455,874.00

AR AR026 Construct bypass at Ashdown 434,141.00 Cossatot River ‐ DeQueen ‐ Major Widening of approximately 6 miles of Hwy. 

71 in Sevier County

434,141.00

AR AR027 Upgrade Highway 63, Marked Tree to Lake David 869,283.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in 

Craighead, Poinsett & Crittenden Co.

869,283.00

AR AR028 Enhance area in the vicinity of Dickson Street in Fayetteville 130,392.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the 

intersection of Hwy. 71B & I‐49 in Benton County

130,392.00

AR AR030 Construct turning lanes at US‐71/AR‐8 intersection in Mena 21,732.00 Cossatot River ‐ DeQueen ‐ Major Widening of approximately 6 miles of Hwy. 

71 in Sevier County

21,732.00

AR AR031 Enhance area around the Paris Courthouse in the vicinity of Arkansas Scenic 

Highway 22 and Arkansas Scenic Highway 309, Paris Arkansas

34,771.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in 

Sebastian County

34,771.00

AR AR032 Improve Highway 167 from Fordyce, Arkansas, to Saline County line [see P.L. 

106‐69 Section 361]

69,428.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

69,428.00

AR AR035 Little Rock River Rail Project 173,857.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

173,857.00

AR AR036 Improvements to I‐30 From Benton to Geyer Springs Exit in Little Rock 173,857.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

173,857.00

AR AR037 Development of Interchange at Intersection of I‐40 and Airport Road in West 

Memphis

521,570.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in 

Craighead, Poinsett & Crittenden Co.

521,570.00

To

US‐412, AR Between Mount Home and Viola, ArkansasAR010AR 1,853,265.00

From

9

Page 13: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Arkansas

State Demo ID Project Description Amount  Project Description Amount

ToFrom

AR AR040 Construction of and improvements to highway projects in the corridor 

designated by section 1105(c)(18)(C)(ii) of the Intermodal Surface 

Transportation Efficiency Act of 1991 [see P.L. 106‐69 Section 361]

477,374.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

477,374.00

AR AR067 Junction Bridge Rehabilitation and conversion from rail to pedestrian use 130,016.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

130,016.00

AR AR069 Bentonville, Arkansas Widen Arkansas Highway 102 between U.S. 71B and 

the west city limits

152,362.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the 

intersection of Hwy. 71B & I‐49 in Benton County

152,362.00

AR AR070 Widen to four lanes, improvement, and other development to U.S. Highway 

167 from LA State line north to I‐530.

507,875.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

507,875.00

AR AR072 Highway 165: Railroad Overpass 162,520.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

162,520.00

AR AR074 Rogers, Arkansas‐‐Construct new interchange on I‐540 near the existing Perry 

Road overpass.

507,875.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the 

intersection of Hwy. 71B & I‐49 in Benton County

507,875.00

AR AR081 Highway 67: Kiehl Avenue‐‐ Vandenberg Boulevard: rehabilitating and 

widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg 

Blvd

300,662.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

300,662.00

AR AR082 Highway 412: Baxter Co. to Ash Flat 162,520.00 Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7 

miles of Hwy. 5 in Izard County

162,520.00

AR AR087 Washington County, Arkansas‐‐Replace and rebuild Tilly Willy Bridge 81,259.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the 

intersection of Hwy. 71B & I‐49 in Benton County

81,259.00

AR AR095 Construction of I‐530 between Pine Bluff and Wilmar 6,004,152.00 Construction of Monticello Bypass & I‐69 connector on new location in Drew 

County

6,004,152.00

AR AR100 Highway 67: Kiehl Avenue‐‐ Vandenberg Boulevard: rehabilitating and 

widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg 

Blvd

406,299.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of 

Hwy. 70 in Garland & Saline Counties

406,299.00

AR AR104 Develop a railroad overpass connecting U.S. Highway 67 and U.S. Highway 

371 in Prescott

53,632.00 Hwy. 8 ‐ Nevada Co. Line (Sel. Secs.) ‐ System preservation of approximately 8 

miles of Hwy. 67 in Clark County

53,632.00

AR AR107 Rogers‐‐Construct new interchange on I‐540 near the existing Perry Road 

overpass

342,510.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the 

intersection of Hwy. 71B & I‐49 in Benton County

342,510.00

AR AR109 Highway 165: Railroad Overpass Construction. 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

203,150.00

AR AR110 Improve Highway 412: Baxter Co. to Ash Flat. 101,574.00 Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7 

miles of Hwy. 5 in Izard County

101,574.00

AR AR112 Widening of Highway 65/82: Pine Bluff‐Greenville Bridge 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

203,150.00

AR AR113 Highway 167 Widening: Fordyce to Sheridan Bypass 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in 

Jefferson County

203,150.00

*Subject to availability of funds upon additional research.

Total Amount Repurposed 18,064,929.00Total # of Earmarks Repurposed 39

10

Page 14: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

CA CA001 Construct Ontario International Airport Ground Access Program 3,983,931.23 Grove Avenue from 4th Street to State Street/Airport Drive and the 

intersection of Grove Avenue and Holt Boulevard in the City of Ontario ‐ 

street widening and intersection improvements

3,983,931.23

CA CA015 Upgrade SR 4 East in Contra Costa County 743,346.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

743,346.00

CA CA016 Improve Burbank Airport Access 2,719,124.76 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,719,124.76

CA CA050 Oxnard: Extend Rice Road, widen Hueneme Road and construct interchange. 

(Improve and modify the Port of Hueneme Intermodal corridor Phase II in 

Ventura County)

1,689,736.08 Vineyard/Patterson Resurfacing in Oxnard. 1,689,736.08

CA CA053 Long Beach: Airport Access 41,446.27 SR‐71 Gap from I‐10 to Rio Rancho Rd 41,446.27

CA CA054 For improvements on I‐15 and I‐40 in CA, NV, & AZ, including the I‐15/US‐95 

interchange in Nevada (for improvements on I‐15 and I‐40 in CA, NV, & AZ), 

including the I‐15/US‐95 interchange in Nevada ($10.5 million of which shall 

be expended on the Nevada portion of the corridor)

1,837,883.64 US 395 from SR 18 in Victorville to Chamberlaine Lane in Adelanto ‐ widen 

highway and turn channelization

1,837,883.64

CA CA059 CA 138, CA14 to 50th Street E 925,000.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 925,000.00

CA CA061 Widen I‐15 in San Bernardino County, California 2,092,582.61 North 1st Avenue over the BNSF Railroad yard in the City of Barstow ‐ bridge 

replacement

2,092,582.61

CA CA069 Improve SR 91 ‐ Green River Road interchange 580,360.00 McKinley Street grade separation at the BNSF Railroad tracks in the City of 

Corona

580,360.00

CA CA078 Enhance Fort Bragg and Willits Passenger Stations 33,905.00 City of Fort Bragg; Chestnut Street from Franklin to Dana Street, Chestnut 

Street Corridor Project

33,905.00

CA CA079 Widen and improve I‐5/State Route 126 interchange in Valencia. 2,334,145.86 Pavement Preservation on various streets in City of Santa Clarita 2,334,145.86

CA CA081 Realign and improve California Route 79 in Riverside County 475,612.75 SR 91 HOV remnant work along the Pachappa Underpass in the City of 

Riverside

475,612.75

CA CA083 Upgrade Fort Irwin Road from I‐15 to Fort Irwin 596,037.56 North 1st Avenue over the BNSF Railroad yard in the City of Barstow ‐ bridge 

replacement

596,037.56

CA CA087 Upgrade I‐680 Corridor, Alameda County 797,763.90 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

797,763.90

CA CA089 Upgrade Highway 99, Sutter County 690,029.79 Howsley Road Bridge Replacement 690,029.79

CA CA124 Implement safety and congestion mitigation improvements along Pacific 

Coast Highway, Malibu

100,972.69 SR‐71 Gap from I‐10 to Rio Rancho Rd 100,972.69

CA CA126 Construct extension of State Route 180 between Rt. 99 and the Hughes/West 

Diagonal

1,351,569.00 SR 180 East ‐ west of Kingsburg Canal to west of Alta Main Canal in Fresno 

County ‐ Road Construction

1,351,569.00

CA CA138 Conduct Highway 65 Improvement and Mitigation Project 390,648.80 Regional Connect Card Program ‐ Sacramento Region 390,648.80

CA CA139 Undertake Median Improvements Along E. 14th Street, San Leandro 72,893.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

72,893.00

CA CA145 Construct improvements to Harry Bridges Blvd., Los Angeles 2,913,935.50 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,913,935.50

CA CA148 Improve the Avenue H overpass in Lancaster, California 412,272.80 SR‐71 Gap from I‐10 to Rio Rancho Rd 412,272.80

CA CA157 Upgrade D Street Between Grand and Second Street, Hayward 83,237.66 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

83,237.66

CA CA169 Construct Imperial Highway grade separation and sound walls at Esperanza 

Road/Orangethoupe Avenue in Yorba Linda, California

1,196,276.40 Gene Autry Way / I‐5 road extension and HOV Access in Anaheim, California 1,196,276.40

CA CA171 Construct Cabot‐Camino Capistrano Bridge project in Southern Orange 

County

965,937.89 San Juan Creek Bridge Replacement, LOSSAN Corridor in the City of San Juan 

Capistrano.

965,937.89

ToFrom

11

Page 15: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA176 Extend State Route 52 in San Diego 72,789.89 Pedestrian Improvements in San Diego near San Diego Airport along Palm 

Street. 

72,789.89

CA CA186 Construct Arbor Vitae Street improvements, Inglewood 2,632,337.89 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,632,337.89

CA CA187 Install Silicon Valley Smart Corridor Project Along the I‐880 Corridor 409,756.47 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

409,756.47

CA CA190 Construct Tulare County Roads in Tulare County 8,063.16 Avenue 144 from Burnett Road to Road 96, west of the community of Tipton 8,063.16

CA CA197 Kingvale, California Satellite Operation Control Center 489,015.98 Bridge Rehabilitation from 0.6 miles to 0.4 miles south of Bell Road in Placer 

County.

489,015.98

CA CA200 Ventura County Highway Video Camera Monitoring Project, California 496,750.00 Route 101 in Ventura County Widening and/or improvement 496,750.00

CA CA205 Compton Willow Creek ITS Project (Letter from Congresswoman Richardson 

clarifying earmark description since Compton Willow Creek does not exist and 

ITS project is not a viable project for this location.  Project should be 

"Installation of Safety lights" on Compton Creek OK per April 1/26/09)

496,750.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 496,750.00

CA CA213 Ramsey Street extension, Banning, California 1,738,625.00 I‐10 Bypass south of I‐10 from the City of Banning east city limits to Apache 

Trail in the community of Cabazon

1,738,625.00

CA CA214 Safety Enhancement on Sherman Way between De Sota and Topanga 

Canyon, California

159,394.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 159,394.00

CA CA217 Construction, including  related activities, of an extension of highway 180 

from the City of Fresno to I‐5 in Fresno to I‐5 in Fresno County, California

1,061,148.70 SR 180 East ‐ west of Kingsburg Canal to west of Alta Main Canal in Fresno 

County ‐ Road Construction

1,061,148.70

CA CA229 Interstate 5‐Sorrento Valley Road and Genesee Avenue Interchange Projects 141,737.55 SR 163/Friars Road Interchange and adjacent ramps and roadway in San 

Diego ‐ Interchange and roadway improvements

141,737.55

CA CA273 I‐80 Colfax Narrows Project, California 519,020.50 Increase Capacity on I‐80 between Sacramento/Placer County Line and State 

Route 65.

519,020.50

CA CA288 SR‐152 Safety Improvements, Santa Clara County 10,408.36 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

10,408.36

CA CA298 Street Improvements, Gardena, California 36,539.97 SR‐71 Gap from I‐10 to Rio Rancho Rd. 36,539.97

CA CA303 Vasco Road Safety Improvements 431,070.39 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

431,070.39

CA CA309 Builds a Pedestrian Bridge from Hill Street to the Bay Trail, Belmont 321,605.88 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

321,605.88

CA CA316 Adams Street Rehabilitation Project, Glendale 310,858.20 Pennsylvania Avenue Rehabilitation Project  ID: LA0G1314 (LA11G1) 310,858.20

CA CA319 Will add landscaping enhancements along the Ronald Regan Freeway Route 

118 for aesthetic purposes.

2,323,422.00 Simi Valley Arterial Resurfacing 2,323,422.00

CA CA321 State Route 86S and Ave. 66 highway safety grade separation 3,605,310.00 Avenue 66 from west of Lincoln Street to Dale Kiler Road in Riverside County ‐ 

construct grade separation

3,605,310.00

CA CA327 Soundwall construction on the 210 Freeway, Pasadena 506,813.82 SR‐71 Gap from I‐10 to Rio Rancho Rd 506,813.82

CA CA333 Reconstruct 710 southern terminus off ramps, Long Beach 2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,403,540.00

CA CA337 Study of Thomas Bridge to meet future cargo and passenger traffic needs of 

the ports of Long Beach and Los Angeles

1,602,360.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,602,360.00

CA CA342 Construct a raised landscaped median on Alondra Blvd. between Clark Ave. 

and Woodruff Ave. in Bellflower

320,472.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 320,472.00

CA CA344 Santa Anita Avenue Corridor Improvement project, Arcadia, California 806,759.30 SR‐71 Gap from I‐10 to Rio Rancho Rd. 806,759.30

12

Page 16: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA349 Construction of a traffic signal at the intersection of Independence Avenue 

and Sherman Way

100,148.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 100,148.00

CA CA351 Complete the Bay Trail Along the Western Edge of the American Canyon 

Wetlands Edge Bay Trail

237,440.13 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

237,440.13

CA CA353 Implement streetscape project on Central Avenue from 103rd Street to 

Watts/103rd Street Station, Watts

2,884,720.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,884,720.00

CA CA355 Upgrade and Extend Commerce Avenue, City of Concord 1,602,360.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

1,602,360.00

CA CA359 Widen Firestone Blvd. between Ryerson Blvd. and Stewart and Gray Road in 

Downey

1,602,360.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,602,360.00

CA CA360 Construct Air Cargo Access Road to Oakland International Airport Construct I‐

580 Interchange, Livermore

721,062.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

721,062.00

CA CA361 Widen Lakewood Blvd. between Telegraph Rd. and Fifth St. in Downey 854,943.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 854,943.00

CA CA362 Pasadena Ave/Monterey Rd. Partial Grade Separation, Preliminary 

Engineering, Feasibility, South Pasadena

240,354.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 240,354.00

CA CA366 Carlsbad, CA Construction of Poinsettia Lane 1,602,360.00 El Camino Real from Cassia Road to Camino Vida Roble in the City of Carlsbad, 

San Diego County. 

1,602,360.00

CA CA367 Construct pedestrian enhancements on Broadway in Los Angeles 2,002,950.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,002,950.00

CA CA370 Rehabilitate street surface of Cedros Avenue between Burbank Blvd. and 

Magnolia Blvd.

34,451.20 SR‐71 Gap from I‐10 to Rio Rancho Rd 34,451.20

CA CA375 Tuolumne, Stanislaus and Merced Counties Upgrade Existing County 

Highway, J59

335,950.01 Stanislaus County SR 132 road widening, PM R12.4 to R16.2 335,950.01

CA CA376 Diamond Bar On‐Off Ramp at Lemon Ave. on SR 60 8,441,548.36 SR‐71 Gap from I‐10 to Rio Rancho Rd 8,441,548.36

CA CA377 Reconstruct Interchange for South‐bound traffic Entering i‐80 from Central 

Avenue, City of Richmond

3,124,602.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

3,124,602.00

CA CA381 Begin construction of road from U.S. 395 west towards SR 14 801,180.00 US 395 from SR 18 in Victorville to Chamberlaine Lane in Adelanto ‐ widen 

highway and turn channelization

801,180.00

CA CA390 Grade Separation at Vanowen and Clybourn, Burbank 517,932.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 517,932.00

CA CA392 Upgrade CA SR4 East from the Vicinity of Loveridge Road to G Street, Contra 

Costa County

1,658,885.29 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

1,658,885.29

CA CA395 Construct Inland Empire Transportation Management Center in Fontana to 

better regulate traffic and dispatch personnel to incidents

1,201,770.00 Install fiber optic cable to the Transportation Management Center in the City 

of Fontana

1,201,770.00

CA CA397 Planning, design, engineering, and construction of Naval Air Station, North 

Island access tunnel on SR 75‐282 corridor, San Diego.

444,571.05 City of Coronado, Coronado Gateway Project ‐ Operational Improvement 444,571.05

CA CA399 North Atlantic Pedestrian Bridge, Monterey Park  Pedestrian Safety 

Improvements near North Atlantic Boulevard, Monterey Park (Change per 

H.R. 1195‐6/6/08)

480,708.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 480,708.00

CA CA401 Design Traffic Flow Improvements Azusa and Amar, City of West Covina 144,424.01 SR‐71 Gap from I‐10 to Rio Rancho Rd. 144,424.01

CA CA406 Rehabilitate street surfaces in Sherman Oaks 99,346.60 SR‐71 Gap from I‐10 to Rio Rancho Rd. 99,346.60

CA CA407 Repair and realignment of Brahma Drive and Winnetka Ave. 240,354.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 240,354.00

CA CA410 Improve bridge 58‐7 on SR 115 that crosses the Alamo River in Holtville and 

also project design and environmental analysis of a new bridge over the same 

river.

99,445.20 Pavement Improvements. 6th Street between Holt Ave and Melon Avenue in 

the City of Holtville, Imperial County.

99,445.20

CA CA413 Realign First St. between Mission Rd. and Clarence St. in Los Angeles 1,001,475.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,001,475.00

CA CA414 Construct Overpass on Central Ave. at the Railroad Crossing in Newark 600,885.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

600,885.00

13

Page 17: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA417 Widen State Route 98 from Route 111 to State Route 7, Calexico. 3,590,545.17 Road Widening on SR98, from Rockwood Ave to Ollie Ave in the City of 

Calexico, Imperial County

3,590,545.17

CA CA422 Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara 

County and San Luis Obispo County

475,920.62 Operational and safety improvements on US101 ramps at Avila Beach 

Drive(SB ramp node Intersection)

475,920.62

CA CA424 Improvements to State Route 67/State Route 52 interchange. 5,900.00 Pedestrian Improvements in San Diego near San Diego Airport along Palm 

Street. 

5,900.00

CA CA425 Construct Valley Boulevard Drainage Improvements, El Monte. 600,885.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 600,885.00

CA CA426 Implement intelligent management and logistics measures to improve freight 

movement, Gateway Cities

544,873.04 SR‐71 Gap from I‐10 to Rio Rancho Rd 544,873.04

CA CA427 Los Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit, 

Gateway Cities

400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00

CA CA429 Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes. 346,654.00 American Avenue from SR 99 to Temperence Avenue in Fresno County‐ Road 

Reconstruction

346,654.00

CA CA439 Upgrade Bellflower intersections at Alondra Blvd. and at Rosecrans Ave. in 

Bellflower

175,726.95 SR‐71 Gap from I‐10 to Rio Rancho Rd 175,726.95

CA CA442 Long Beach Intelligent Transportation System: Integrate functioning traffic 

management center that includes the port, transit, airport as well as the city's 

police and fire departments, Long Beach.

2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,403,540.00

CA CA444 Construct sound barriers at the I‐805/SR 54 Interchange, National City 681,003.00 City of National City, San Diego County. Road Rehabilitation 681,003.00

CA CA446 Compton Arterial Reconstruction and Improvement Program, Compton. 2,147,907.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,147,907.00

CA CA448 Construction of new freeway between I‐15 and U.S. 395, including new 

interchange at I‐15.

4,005,900.00 Green Tree Boulevard at the BNSF Railroad crossing in the City of Victorville ‐ 

construct grade separation

4,005,900.00

CA CA454 Reconstruct Bloomfield Ave. with medians from Carson St. to north city limits 

in Hawaiian Gardens.

74,229.41 SR‐71 Gap from I‐10 to Rio Rancho Rd 74,229.41

CA CA455 Reconstruct Paramount Blvd. with medians and improve drainage from 

Artesia Blvd. to Candlewood St. in Long Beach

137,533.08 SR‐71 Gap from I‐10 to Rio Rancho Rd 137,533.08

CA CA458 Construct Traffic Flow Improvements Vincent and Lake Drive, West Covina 137,352.03 SR‐71 Gap from I‐10 to Rio Rancho Rd 137,352.03

CA CA459 Construction of a Lincoln Bypass on SR 65 in Placer County, CA 422,838.34 Regional Connect Card Program ‐ Sacramento Region 422,838.34

CA CA464 Construct truck lane on Keystone Road from State Route 111 to Austin Road, 

Imperial County.

788,886.44 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to 

Fawcett Road, Paving, Drainage ADA

788,886.44

CA CA466 Freeway 180 Improvements Fresno 903,476.00 Intersection of Marks Avenue and Nielsen Avenue in the City of Fresno ‐ 

Traffic Signal Installation

903,476.00

CA CA467 Construction of a smart crosswalk system at the intersection of Arminta St. 

and Mason Ave.

40,059.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 40,059.00

CA CA468 Improve I‐8 off ramp at Ocotillo to the Imperial Valley College Desert 

Museum/Regional Traveler Visitor Center, Imperial County

801,180.00 Conservation easement, access improvements and parking facilities at the 

Desert museum, Imperial County

801,180.00

CA CA470 Add Turn Lane and Adaptive Traffic Control System at Intersection of San 

Tomas Expressway and Hamilton Avenue in Campbell

378,692.13 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

378,692.13

CA CA471 Interchange improvements at Rice Avenue and U.S. Highway 101 in the City 

of Oxnard.

1,015,448.29 Vineyard/Patterson Resurfacing in Oxnard. 1,015,448.29

CA CA475 Project Design, Environmental Assessment, and Roadway Construction of 

Lonestar Road from Alta Road to Enrico Fermi Drive San Diego County

246,578.14 Bradley avenue Overpass at SR67 including adjacent ramps and roadways in 

County of San Diego.

246,578.14

CA CA476 Project Study Reports for I‐ 105 and I‐405 Interchanges at Los Angeles 

International Airport.

320,472.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 320,472.00

14

Page 18: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA477 Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia 

Ave. to Five Points in Whittier

1,358,351.38 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,358,351.38

CA CA478 Conduct project report study on Old River School Rd‐Firestone Blvd. 

intersection re‐ configuration.

400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00

CA CA479 Operational and Highway Safety Improvements on HWY 94 between the 20 

mile marker post on Jamul and HWY 188 in Tacate

2,403,540.00 Roadway Improvements and realignment in the County of San Diego on 

Emery Road at and near SR94.

2,403,540.00

CA CA483 Conduct study of SR 130 Realignment Project, San Joaquin County and Santa 

Clara, CA

1,602,360.00 Track extension. Stockton Robert Cabral Station to ACE maintenance facility, 

south of Alpine Avenue

1,602,360.00

CA CA487 Construction of new roadway lighting on major transportation corridors in 

the Northeast San Fernando Valley.

78,427.03 SR‐71 Gap from I‐10 to Rio Rancho Rd. 78,427.03

CA CA488 Rehabilitation of Tulare County Farm to Market road system 506,363.28 Avenue 144 from Burnett Road to Road 96, west of the community of Tipton 506,363.28

CA CA489 Implement Northeast San Fernando Valley Road and Safety Improvements. 48,236.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 48,236.00

CA CA501 Upgrade and Reconstruct the I‐80/I‐680/SR 12 Interchange, Solano County 1,775,546.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

1,775,546.00

CA CA503 Construct an Interchange on Highway 70 at Georgia Pacific Road in Oroville 1,958,192.41 State Route 70 Passing Lanes from Cox Lane to 0.1 mile south of Palermo 

Road

1,958,192.41

CA CA505 Ramona Avenue Grade Separation, Montclair, California 1,602,360.00 Central Avenue Overhead at UPRR tracks 0.2 mi. south of Holt Boulevard in 

the City of Montclair ‐ Bridge rehabilitation and widening.  Bridge No. 54C‐

0112.

1,602,360.00

CA CA506 Construction of a smart crosswalk system at the intersection of Topanga 

Canyon Blvd. and Gault St.

40,059.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 40,059.00

CA CA508 Randolph St. improvements between Wilmington Ave. and Fishburn Ave. in 

Huntington Park.

961,416.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 961,416.00

CA CA511 Reconstruct and widen Del Amo Blvd. to four lanes between Normandie Ave. 

and New Hampshire Ave., Los Angeles County

2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,403,540.00

CA CA514 Construct Route 101 Bicycle/Pedestrian Overpass at Milbrae Ave. for the San 

Francisco Bay Trail

487,601.51 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

487,601.51

CA CA518 The Foothill South Project, construct 16 miles of a six‐lane limited access 

highway system

8,011,801.00 NB SR‐241 to EB SR‐91 and WB SR‐91 to SB SR‐241, HOT connectors 8,011,801.00

CA CA521 Design and Construction Camino Tassajara Crown Canyon to East Town 

Project, Danville

84,010.10 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

84,010.10

CA CA522 Realignment of La Brea Avenue to reduce congestion, City of Inglewood. 1,501,865.32 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,501,865.32

CA CA532 Construct Operational and Safety Improvements to I‐880 N 29th Ave in 

Oakland

215,950.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

215,950.00

CA CA535 Design and Construct new Interchange at Potrero Blvd and State Route 60 in 

Beaumont

1,602,360.00 SR 91 HOV remnant work along the Pachappa Underpass in the City of 

Riverside

1,602,360.00

CA CA538 Construct truck lane on Baughman Road from State Route 78/86 to Forrester 

Road, Westmorland.

368,649.01 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to 

Fawcett Road, Paving, Drainage ADA

368,649.01

CA CA540 I‐5 Sorrento Valley/Genesee Avenue, San Diego, CA 419,024.01 SR 163/Friars Road Interchange and adjacent ramps and roadway in San 

Diego ‐ Interchange and roadway improvements

419,024.01

CA CA541 To Construct road surface improvements, and improve road safety from 

Brawley Water plant to Hwy 86 to 9th Street to 18th Street, Brawley.

200,318.96 Rio Vista Avenue between Allen Street and Cattle Call Drive, in the City of 

Brawley, Imperial County.

200,318.96

15

Page 19: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA544 710 Freeway Study to comprehensively evaluate the technical feasibility of a 

tunnel alternative to close the 710 Freeway gap.

2,403,540.00 Design and ROW for new multimodal transportation center. On Aviation Blvd 

from Arbor Vitae St to 96th St.

2,403,540.00

CA CA551 Rancho Vista Blvd, Widening Project 2,804,130.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,804,130.00

CA CA558 Widen Haskell Avenue between Chase St. and Roscoe Blvd. 160,236.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 160,236.00

Harbor Drive Multi‐Modal Corridor along Harbor Drive and Tidelands Avenue 

between 10th Avenue Marine Terminal.

379,201.62

and National City Marine Terminal. Work to include Multi‐Modal Traffic 

Impact Assessment.

243,780.00

CA CA562 Streetscape and Transportation Enhancements on 7th Street in Calexico, 

Traffic Signalization on Highway 78, Construction of the Renewable Energy 

and Transportation Learning Center, improve and enlarge parking lot, and 

create Bus stop, Brawley  

801,180.00 Parking lot paving and ADA access improvements on CA‐78 in the City of 

Brawley, Imperial County.

801,180.00

CA CA565 Las Tunas Drive Pedestrian Enhancement, San Gabriel 120,177.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 120,177.00

CA CA566 Improve Access to I‐80 at Eureka Road Interchange 162,520.00 Regional Connect Card Program ‐ Sacramento Region 162,520.00

CA CA567 Interstate 15, California Oaks Road Interchange Project 1,602,360.00 Reconstruct the I‐215 / Keller Road interchange in the City of Murrieta 1,602,360.00

CA CA568 Acquire Lands for Mitigation Adjacent to U.S. 101 as Part of Southern Santa 

Clara County Wildlife Corridor Protection and Scenic Enhancement Project

400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

400,590.00

CA CA574 Construct landscape medians along Skyline Drive from Sears Avenue to 58th 

Street, San Diego.

140,194.09 SR 163/Friars Road Interchange and adjacent ramps and roadway in San 

Diego ‐ Interchange and roadway improvements

140,194.09

CA CA576 Upgrade essential road arterials, connectors, bridges and other road 

infrastructure improvements in the Town of Desert Hot Springs, CA

199,064.17 I‐10 Bypass south of I‐10 from the City of Banning east city limits to Apache 

Trail in the community of Cabazon

199,064.17

CA CA579 Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the 

City of Los Angeles.

3,327,620.17 SR‐71 Gap from I‐10 to Rio Rancho Rd. 3,327,620.17

CA CA582 Replace twin 2 lane bridge with single 4 lane bridge on SR 138 over Big Rock 

Wash

400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00

CA CA589 Construct Cabot‐Camino Capistrano Bridge Project and related roadway 

improvements in Cities of Mission Viejo and Laguna Niguel, California

671,942.10 Crown Valley Parkway from La Pata Drive to Moulton Parkway and from 

Greenfield Drive to Cabot Road

671,942.10

CA CA591 Construction of a traffic signal at the intersection of Hamlin St. and Corbin 

Ave.

100,148.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 100,148.00

CA CA594 Forest Highway 171 Upper Skyway Improvement 1,369,862.59 State Route 70 Passing Lanes from Cox Lane to 0.1 mile south of Palermo 

Road

1,369,862.59

CA CA595 Construct crosswalk bump‐ outs and related streetscape improvements on 

Temple St. between Hoover St. and Glendale Blvd., Los Angeles

79,311.64 SR‐71 Gap from I‐10 to Rio Rancho Rd. 79,311.64

CA CA600 Construct the Los Angeles River bicycle and pedestrian path in the San 

Fernando Valley.

460,679.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 460,679.00

CA CA601 Construct Route 101 Bicycle/Pedestrian Overpass at Milbrae Ave. for the San 

Francisco Bay Trail

1,001,475.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

1,001,475.00

CA CA602 Conduct necessary planning and engineering and implement comprehensive 

corridor management plan for Arroyo Seco Historic Parkway, Los Angeles.

403,782.63 Design and ROW for new multimodal transportation center. On Aviation Blvd 

from Arbor Vitae St to 96th St.

403,782.63

CA CA608 Design and Construct Access Improvements in North Central Business District, 

Sacramento

687,602.59 Construct Cl 1/Multi‐use Trail on the s side of the American River Pkwy, from 

28th St to H St in Sacramento

687,602.59

CA CA609 Establish I‐15 Interchange at Nisqualli and Mojave River crossing in San 

Bernardino County.

741,487.07 Green Tree Boulevard at the BNSF Railroad crossing in the City of Victorville ‐ 

construct grade separation

741,487.07

CA CA613 Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton 3,167,325.02 SR‐71 Gap from I‐10 to Rio Rancho Rd 3,167,325.02

622,981.62Construct truck ramp linking Interstate 5 to the National City Marine Cargo 

Terminal, National City

CA560CA

16

Page 20: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA614 Conduct study and construct Daggett Road, Port of Stockton, CA, access 

project

809,786.32 Navy Drive, between McCloy Avenue and W. Washington Street. Widening 

and bridge replacement.

809,786.32

CA CA616 Implement streetscape improvements along Wilbur Avenue to enhance 

traffic and pedestrian safety.

80,118.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 80,118.00

CA CA617 Provide landscape enhancement of an existing open culvert on Atherton 

Street, Long Beach

410,220.43 SR‐71 Gap from I‐10 to Rio Rancho Rd 410,220.43

CA CA618 Crenshaw Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of 

Torrance

203,676.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 203,676.00

CA CA623 Construct pedestrian sidewalk enhancements in Bellflower 44,144.27 SR‐71 Gap from I‐10 to Rio Rancho Rd 44,144.27

CA CA626 Construct 213th Street pedestrian bridge to provide safe passage for 

pedestrians and wheelchairs, Carson.

254,704.02 SR‐71 Gap from I‐10 to Rio Rancho Rd 254,704.02

CA CA633 Conduct Environmental Review of Proposed Improvements Related to the 

Connection of Dumbarton Bridge to Highway 101

400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

400,590.00

CA CA634 Construct parking facility and improve access to Imperial Valley Expo 42,231.05 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to 

Fawcett Road, Paving, Drainage ADA 

42,231.05

CA CA635 Develop bicycle paths and pedestrian access to Third Avenue, Chula Vista. 69,331.18 Interstate‐5 Light Rail Trolley Corridor from State Route‐54 to Main Street. 69,331.18

CA CA636 Widen and Reconfigure Sepulveda and Culver Boulevards, Culver City. 2,195,233.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,195,233.00

CA CA637 Olsen Road widening and roadway improvements in Simi Valley, California. 178,244.31 Simi Valley Arterial Resurfacing 178,244.31

CA CA647 Improve Access Road to Beale Air Force Base (Smartville Road) 329,966.73 Shoulder Widening on Hammonton Smartville Road from South Golden 

Parkway to 1 mile west

329,966.73

CA CA649 Citywide Traffic Signal Upgrades requiring the Installation of Hardware and 

Software at 9 Major Intersections, Palo Alto

400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South 

of Grand Ave(San Mateo County)

400,590.00

CA CA650 Rehabilitate street surface of Addison St. between Kester Ave. and Lemona 

Ave

37,655.80 SR‐71 Gap from I‐10 to Rio Rancho Rd. 37,655.80

CA CA651 Construct grade separations at Washington Ave. and UPRR crossing east and 

Washington Ave. and La Cadena Drive in Colton

400,590.00 Washington Street from Reche Canyon Road to the east city limits of City of 

Colton ‐ realign Reche Canyon Road to Hunts Lane

400,590.00

CA CA652 SR 91 I‐605 Needs Assessment Study, Whittier, CA 12,819.40 SR‐71 Gap from I‐10 to Rio Rancho Rd 12,819.40

On I‐5 in Solano Beach. From Lomas Santa Fe UC to SR‐78 overcrossing in 

Oceanside in San Diego County. 

556,200.80

Pedestrian Improvements in San Diego near San Diego Airport along Palm 

Street. 

244,979.20

CA CA657 Design and Construct new Interchange at Potrero Blvd and State Route 60 in 

Beaumont

801,180.00 SR 91 HOV remnant work along the Pachappa Underpass in the City of 

Riverside

801,180.00

CA CA666 Walnut Grove at Broadway Intersection Capacity Enhancements, San Gabriel. 200,295.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 200,295.00

CA CA668 Restoration of Victoria Avenue in the City of Riverside CA 400,590.00 Roadway widening of Magnolia Avenue from Buchanan Street to Banbury 

Drive in the City of Riverside

400,590.00

CA CA670 Pedestrian Beach Trail in San Clemente, CA 121,180.00 San Juan Creek Bridge Replacement, LOSSAN Corridor in the City of San Juan 

Capistrano.

121,180.00

CA CA673 Expand Diesel Emission Reduction Program of Gateway Cities COG 365,020.85 SR‐71 Gap from I‐10 to Rio Rancho Rd 365,020.85

CA CA675 Construct traffic circle in San Ysidro at the intersection of Via de San Ysidro 

and West San Ysidro Boulevard, San Diego

240,354.00 SR 163/Friars Road Interchange and adjacent ramps and roadway in San 

Diego ‐ Interchange and roadway improvements

240,354.00

801,180.00Construct parking facility and improve museum pedestrian access from 

trolley station, San Diego

CA653CA

17

Page 21: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

CA CA676 Construct and resurface unimproved roads in the Children's Village Ranch and 

improve access from Children's Village Ranch to Lake Morena Drive, San 

Diego County

801,180.00 On I‐5 in Solano Beach. From Lomas Santa Fe UC to SR‐78 overcrossing in 

Oceanside in San Diego County. 

801,180.00

CA CA679 Acquisition of land along CA 86 at the Desert Cahuilla Prehistoric Site, 

Imperial County for environmental mitigation related to reducing wildlife 

mortality while maintaining habitat connectivity

526,509.00 Road Widening on SR98, from Rockwood Ave to Ollie Ave in the City of 

Calexico, Imperial County

526,509.00

CA CA680 Conduct preliminary engineering and design analysis for a dedicated 

intermodal right‐of way link between San Diego and the proposed Regional 

International Airport in Imperial Valley including a feasibility study and cost 

benefit analysis evaluating the comparative options of dedicated highway or 

highway lanes

1,179.04 Pedestrian Improvements in San Diego near San Diego Airport along Palm 

Street. 

1,179.04

CA CA682 Construct new sidewalks in the City of Heber, CA. 136,799.97 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to 

Fawcett Road, Paving, Drainage ADA

136,799.97

CA CA683 To Convert a railroad bridge into a highway bridge spanning over the Feather 

River between Yuba City and Marysville

3,170,875.15 5th St Bridge over the Feather River and 2nd Street Undercrossing.  Bridge 

replacement and approach work.

3,170,875.15

CA CA688 ITS and Intersection Improvements, LAX. 1,001,475.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,001,475.00

CA CA692 Compton Arterial Reconstruction and Improvement Program, Compton. 1,902,262.44 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,902,262.44

CA CA694 Sealing unpaved roads in Calaveras County 957,865.68 HMA / chipseal surfacing of  Six Mile Road near Murphys from Vallecito Cal 

Fire Road to Vallecito Bluffs Road

957,865.68

CA CA701 Interstate 5‐Sorrento Valley Road and Genessee Avenue Interchange Projects 534,703.11 SR 163/Friars Road Interchange and adjacent ramps and roadway in San 

Diego ‐ Interchange and roadway improvements

534,703.11

CA CA708 Design and Construct Access Improvements in North Central Business District, 

Sacramento

305,039.23 Construct Cl 1/Multi‐use Trail on the s side of the American River Pkwy, from 

28th St to H St in Sacramento

305,039.23

CA CA712 Interchange Improvements: Laval and I‐5, City of Lebec. 471,269.86 In Bakersfield:  Centennial Corridor, I‐5 to SR58 at Cottonwood; SR58/SR99 to 

Westside Parkway ‐ Construct new freeway section

471,269.86

CA CA713 Planning, design, engineering, and construction of Naval Air Station, North 

Island access tunnel on SR 75‐282 corridor, San Diego.

1,441,577.01 City of Coronado, Coronado Gateway Project ‐ Operational Improvement 1,441,577.01

CA CA723 Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce 

congestion (El Segundo).

1,014,201.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,014,201.00

CA CA730 Construct eastern loop of Campus Parkway in Merced 570,533.64 Campus Parkway Segment 2 (from Childs Avenue to State Route 140) 570,533.64

CA CA734 Hilmar/Turlock California Highway 99 interchange and safety 

improvements/realignment of SR 165 project study report and environmental 

studies in Merced and Stanislaus Counties

893,220.23 Hilmar Community Pedestrian Improvements (Collector Roadways within 

Hilmar)

893,220.23

CA CA739 Feasibility study for constructing SR 130 realignment project connecting the 

Central Valley and San Joaquin County and Santa Clara County

6,014,049.00 Track extension. Stockton Robert Cabral Station to ACE maintenance facility, 

south of Alpine Avenue

6,014,049.00

CA CAM01 Interstate 215 at Barton Road overcrossing, City of Grand Terrace, San 

Bernardino County‐ interchange reconstruction, including redesign of 

northbound Barton Road on and off ramps and widening of Barton Road 

bridge structure

1,659,609.17 Barton Road interchange improvement in the City of Grand Terrace 1,659,609.17

18

Page 22: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

California

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Marin‐Sonoma Narrow: US 101

PM 04‐MRN‐101‐27.0/27.6

PM 04‐Son‐10‐0.0/4.5

15,000,000.00

SMART: San Rafael Bettini Transit Center 3,205,079.00

Total Amount Repurposed 197,922,100.33Total # of Earmarks Repurposed 184

18,205,079.00Multimodal Facility Improvements, construction, and ferry acquisition by 

North Bay Ferry Service, Inc., located at Port Sonoma in Petaluma, California

CAM02CA

19

Page 23: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Colorado

State Demo ID Project Description Amount  Project Description Amount

CO CO003 PE Demo ‐ Interstate 66 Feasibility Study 10,000.00 US50 Chipseal in Manzanola and Las Animas in Bent County (20760) 10,000.00

CO CO016 Construction of, and improvements to, 17th Avenue and 23rd Avenue 

highway ramps in Denver, Colorado

11,485.00 56th Ave widening at Pena Blvd. 11,485.00

CO CO017 Broomsfield Wadsworth Interchange, Colorado 396,751.00 Direct Connection across US 36‐120th Ave. 396,751.00

CO CO041 Construction of U.S. 24—Tennessee Pass, Colorado   458,070.00 US 24 MP143‐148, resurfacing, ADA improvements, guardrail 458,070.00

CO CO043 East 104th and U.S. 85 Intersection: Study, design, and construction of 

needed improvements to intersection

67,446.00 I‐270 at Vasquez Planning and Environmental Linkage Study 67,446.00

CO CO046 CO 56th Avenue and Quebec Street Improvements Phase I, Denver 4,034,197.00 56th Ave widening at Pena Blvd. 4,034,197.00

CO CO052 Improve and Widen State Highway 44 from Colorado Boulevard to State 

Highway 2

706,573.00 I‐270 at Vasquez Planning and Environmental Linkage Study 706,573.00

CO CO075 Transportation Improvements to U.S. 24‐‐Tennessee Pass   189,651.00 US 24 MP143‐148, resurfacing, ADA improvements, guardrail 189,651.00

CO CO076 Transportation Improvements to Bromley Lane and U.S. 85 Interchange 10,108.00 I‐270 at Vasquez Planning and Environmental Linkage Study 10,108.00

CO CO077 Transportation Improvements to 104th and U.S. 85 Intersection 94,826.00 I‐270 at Vasquez Planning and Environmental Linkage Study 94,826.00

CO CO088 Transportation Improvements to 56th Avenue and Quebec Street 405,607.00 56th Ave widening at Pena Blvd. 405,607.00

CO CO098 Improvements to 56th Avenue from Quebec St. to Havana St. and to Quebec 

St. from I‐70 to 56th Ave. in Denver

773,477.00 56th Ave widening at Pena Blvd. 773,477.00

CO CO111 Improvement to 10th and U.S. 85  Intersection 96,202.00 I‐270 at Vasquez planning and Environmental Linkage Study 96,202.00

CO CO112 Denver Union Station 1.00 56th Ave widening at Pena Blvd. 1.00

Total Amount Repurposed 7,254,394.00Total # of Earmarks Repurposed 14

ToFrom

20

Page 24: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Connecticut

State Demo ID Project Description Amount  Project Description Amount

CT CT006 Norwich Intermodal Transportation Center            

(FY 1995 ‐ Public Law 103‐331)

328,586.02 Retaining Wall Reconstruction on Route 12, Norwich 328,586.02

CT CT025 Implement Trinity College Area Road Improvements, Hartford  

(FY 1998 ‐ Public Law 105‐178)

1,341,965.40 Traffic Signal Upgrades, Hartford 1,341,965.40

CT CT035 Pedestrian/disabled Access Improvements at Mark Twain House  Historic site. 

(Y 1998 ‐ Public Law 105‐178)

6,399.68 Traffic Signal Upgrades, Hartford 6,399.68

Rehabilitate Bridge 00255 ‐ I‐395 over Rt 85, Waterford 36,254.02

Replace Bridge 00488 ‐ CT66 over P&W RR, Windham 40,000.00

CT CT049 Beacon Falls‐Seymour, Connector Roadway  (FY2004 ‐ Public Law 108‐199) 487,607.60 Naugatuck River Greenway, Waterbury 487,607.60

Rehab Br 00255 ‐ I‐395 over Rt 85, Waterford 3,000,000.00

Replace Br 00488 ‐ CT 66 over P&W RR, Windham 9,489,074.84

CT CT080 Construct roadway on East Commerce Drive, Oxford, CT (FY 2005 ‐ Public Law 

109‐59)

400,590.00 I‐84 Improvements at Exit 16, Southbury 400,590.00

Farmington Canal Greenway, New Haven 471,890.00

Traffic Signal Upgrades, New Haven 471,600.00

Rehabilitation of the Grand Avenue Bridge (Br 03810) over the Quinnipiac 

River, New Haven

258,280.00

CT CT086 Construct Pomfret Pedestrian Bridge (FY 2005 ‐ Public Law 109‐59) 80,118.00 Replace Br 02339 ‐ CT44 over Bark Meadow Brk, Pomfret 80,118.00

Realignment CT 37 @ Stacey Rd, Danbury 2,276,284.00

Widening CT 37 @ Barnum Rd, Danbury 447,728.00

Replace Br 02931 ‐ CT 2A over Dickerman's Brk, Preston 602,360.00

Replace Br 02932 ‐ CT 2A over Dickerman's Brk, Preston 1,000,000.00

CT CT092 Construct Entrance Ramp at Route 8 Exit 11, Shelton, CT (FY 2005 ‐ Public Law 

109‐59)

801,180.00 Naugatuck River Greenway, Waterbury 801,180.00

CT CT093 Make Improvements to Plainfield Moosup Pond Road (FY 2005 ‐ Public Law 

109‐59)

200,295.00 Rehab Br 00668 ‐ CT 12 over Mill Brook, Plainfield 200,295.00

CT CT095 Construct bike and pedestrian paths along Salem Greenway‐Salem, CT (FY 

2005 ‐ Public Law 109‐59)

80,118.00 Route 85 Spot Improvements, Salem 80,118.00

CT CT098 Make Improvements to Plainfield Cemetery Road (FY 2005 ‐ Public Law 109‐

59)

160,236.00 Rehab Br 00668 over Mill Brook, Plainfield 160,236.00

CT CT099 Conduct multimodal study of Route 8 corridor between Beacon Falls‐Seymour 

town line and Exit 40 (FY 2005 ‐ Public Law 109‐59)

357,370.87 Naugatuck River Greenway, Waterbury 357,370.87

CT CT104 Make Improvements to North Stonington, CT Westerly, R.I. Pawcatuck River 

Bridge (FY 2005 ‐ Public Law 109‐59)

240,354.00 Replace Br 02968 ‐ CT 49 over Pendleton Brk, North Stonington 240,354.00

CT CT106  I‐84 Expressway Reconstruction from Waterbury to Southbury                            

(FY 2005 ‐ Public Law 109‐59)

1,201,770.00 Naugatuck River Greenway, Waterbury 1,201,770.00

Undertake road improvements associated with Coltsville Area 

Redevelopment, Hartford

3,831,024.84

Traffic Signal Upgrades, Hartford 3,179,300.16

CT CT109 Realign, widen, and reconstruct Arch Street and connect pedestrian walkways 

to Constitution Plaza in Hartford (FY 2005 ‐ Public Law 109‐59)

239,751.07 Traffic Signal Upgrades, Hartford 239,751.07

Installation of a Wayfinding Sign System, New Haven 1,141,175.00

Rehabilitation of the Grand Avenue Bridge (Br 03810) over the Quinnipiac 

River, New Haven

3,866,200.00

 Reconstruct Waterfront Street Corridor, City of New Haven  (FY 2005 ‐ Public 

Law 109‐59)

CT083 1,201,770.00CT

To

Route 11‐‐Connecticut Greenway Commission (FY 2003 ‐ Public Law 108‐7)CT046CT 76,254.02

12,489,074.84Construct Route 11 Extension and bicycle and pedestrian path from Salem to 

Waterford                                 

CT068CT

From

I‐84 Danbury Exits I‐11 Upgrade Interchanges (FY 2005 ‐ Public Law 109‐59) 2,724,012.00CT089CT

Make Improvements to Montville‐Preston Mohegan Bridge (FY 2005 ‐ Public 

Law 109‐59)

CT091CT 1,602,360.00

Undertake road improvements associated with Coltsville Area 

Redevelopment, Hartford (FY2005 ‐ Public Law 109‐59)

7,010,325.00CT107CT

Land acquisition, remediation, improvements and construction for ferry‐ 

highway‐rail terminal at junction of Interstates 91 and 95 adjacent to East 

Street and Forbes Avenue in New Haven                                                                     

5,007,375.00CT111CT

21

Page 25: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Connecticut

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Replace Bridge 00315 ‐ US 1 over Noroton River, Stamford 602,950.00

Mill River Greenway, Stamford 1,400,000.00

CT CT133 Construct pedestrian and vehicular access road to Riverfront Park in 

Glastonbury (FY 2005 ‐ Public Law 109‐59)

25,409.00 Traffic Signal Upgrades, Hartford 25,409.00

Rehab Br 06787 & 06788 ‐ CT207  over Beaver Brk, Franklin 960,000.00

Rehab Br 01291 ‐ CT97 over Beaver Brk, Sprague 1,040,000.00

Realignment, Brookwood to Williams Roads ‐ SR 740, Branford 4,461,812.39

Replace Br 00196 ‐ I95 over US 1, Branford 1,049,250.61

CT CT138 Widen Interstate 84 between Danbury and Waterbury (FY 2005 ‐ Public Law 

109‐59)

6,472,801.13 Upgrade Expressway ‐ I 84 ‐ Phase 3, Waterbury 6,472,801.13

CT CT146 Make improvements to Plainfield Moosup Pond Road (FY 2005 ‐ Public Law 

109‐59)

500,738.00 Rehab Br 00668 ‐ CT12 over Mill Brook, Plainfield 500,738.00

CT CTF01 Stamford High Speed Ferry (FY 2003 ‐ Public Law 108‐7) 496,750.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 496,750.00

CT CTF03 Stamford High Speed Ferry, Stamford (FY 2004 ‐ Public Law 108‐199) 440,386.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 440,386.00

CT CTF04 Stamford High Speed Ferry, Connecticut (FY 2005 ‐ Public Law 108‐447) 346,944.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 346,944.00

Total Amount Repurposed 53,834,553.63Total # of Earmarks Repurposed 29

Construct high‐speed ferry terminal in Stamford, Connecticut to facilitate 

transportation between Connecticut and New York                                         

2,002,950.00CT118CT

7,511,063.00Widen Interstate 95 between Branford and North Stonington                               

(FY 2005 ‐ Public Law 109‐59)

CT137CT

22

Page 26: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Delaware

State Demo ID Project Description Amount  Project Description Amount

DE DE009 Replacement of the Indian River Inlet Bridge, Sussex County, Delaware 487,560.00 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 487,560.00

DE DE013 City of Dover Transportation and Community and Systems Preservation 1,001,475.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,001,475.00

DE DE014 Wilmington Train Station Restoration 9,588.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 9,588.00

DE DE015 Replacement of the Lake Gerar Bridge in Rehoboth 23,039.35 SR 1, Little Heaven Grade Separated Intersection SPN 200412202 23,039.35

DE DE016 Wyoming Mill Road Realignment, Dover 529,208.59 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 529,208.59

DE DE017 Replacement of the Woodland Ferry on the Naticoke River between Seaford 

and Laurel

2,503,688.00 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 2,503,688.00

DE DE018 Hydrogen Storage Research at Delaware State University in Dover 186,122.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 186,122.00

DE DE020 Replacement of Railroad Crossings in Wilmington and Marshallton 378,761.38 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 378,761.38

DE DE022 Improve pedestrian and bicycle access at the University of Delaware in 

Newark

1,475.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,475.00

DE DE023 Replacement of Fixed Route Transit Buses 279,840.94 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 279,840.94

DE DE024 Enhance and expand the DelTrac Integrated Transportation Management 843,668.96 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 843,668.96

DE DE025 Planning, Design, and Construction of the Energy Exploration Center at the 

Destination Station in Rehoboth Beach

384,728.89 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 384,728.89

DE DE027 Develop and construct an alternative route for truck traffic in the core 

downtown area of Harrington

2,723,596.83 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 2,723,596.83

DE DE028 Build the Pomeroy Line Pedestrian/Bicycle Trail and Facility in Newark 1,467,530.11 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,467,530.11

DE DE029 Infrastructure and Streetscape Improvements on Rehoboth Avenue in 

Rehoboth

5,063,616.50 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 5,063,616.50

DE DE030 University of Delaware's Automotive Based Fuel Cell Hybrid Bus Program in 

Newark

478,518.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 478,518.00

Total Amount Repurposed 16,362,417.55Total # of Earmarks Repurposed 16

ToFrom

23

Page 27: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

District of Columbia

State Demo ID Project Description Amount  Project Description Amount

DC DC018 Planning, environmental work, and preliminary engineering of highway, 

pedestrian, vehicular and bicycle access to the John F. Kennedy Center for the 

Performing Arts in the District of Columbia FY2000

15,340.00 Metropolitan Branch Trail Fort Totten Design/Build 15,340.00

DC DC031 Highway Improvements to improve access to the Kennedy Center FY2005 3,922,717.62 Metropolitan Branch Trail Fort Totten Design/Build 3,922,717.62

Total Amount Repurposed 3,938,057.62Total # of Earmarks Repurposed 2

ToFrom

24

Page 28: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Florida

State Demo ID Project Description Amount  Project Description Amount

FL FL034 Construct Wonderwood Connector from Mayport to Arlington, Duval County, 

Florida.

20,000.00 I‐95 (SR9) improvements 20,000.00

FL FL042 Construct interchange at 21st Street to provide access to Talleyrand Marine 

Terminal

1,023,337.00 I‐295 (SR9A) improvements 1,023,337.00

FL FL052 Widen U.S 192 between CR 532 an I‐95 in Brevard and Osceola Counties 565,785.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

565,785.00

FL FL060 Construct Alden Road Improvement Project in Orange County, Florida 126,783.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

126,783.00

FL FL122 East Orange County Trailway System, Florida 24,192.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

24,192.00

FL FL150 Construct Saxon Blvd Extension, Volusia County,

Florida

1,682,478.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

1,682,478.00

FL FL151 Homestead, FL Widening of SW 328fromSW137 Ave. to 152 Ave. 5,598,102.00 City of Homestead ‐ Multimodal Transit Center 5,598,102.00

FL FL154 Construction of paved road over existing unpaved roadway on SE 144th Ave. 

from SR 100 to U.S. 301, distance of 1.2 miles

245,250.00 SR 223 (ALT US 301) 245,250.00

FL FL155 Construct I‐4 Frontage Rd., Volusia County, Florida 1,602,360.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

1,602,360.00

FL FL156 Bicycle and Pedestrian Improvements in the Town of Windermere, Florida 44,687.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

44,687.00

FL FL163 Construct Flagler Avenue Improvements, City of Key West, Florida 155,690.00 City of Key West, Bahama Village Cultural Resource Assessment 155,690.00

FL FL167 U.S. 441 Traffic Improvements ‐ Road surface, road access, curb, gutter, and 

right‐of‐way, Miami Gardens

145,062.00 City of Miami Gardens, Assessment and Road Improvements 145,062.00

FL FL169 Reconstruction of Hanford Boulevard, North Miami Beach 602,160.00 City of North Miami Beach ‐ Bus/Trolley Purchase FM #439907‐1 602,160.00

FL FL170 Construction of 4 lane highway around Jacksonville connecting U.S. 1 to 

Route 9A

270,439.00 I‐95 (SR9) improvements 270,439.00

FL FL171 West Relief Bridge Rehabilitation, Bay Harbor Islands 1,201,770.00 Town of Bay Harbor Islands, Broad Causeway 1,201,770.00

FL FL174 Construct U.S. 1 Improvements, Cities of Holly Hill and Ormond Beach, Florida 56,055.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

56,055.00

FL FL176 Design and construction of double‐deck roadway system exiting FLL airport 

connecting Y.S. 1 and I‐ 595

3,204,720.00 City of Hollywood Mobility Improvements 3,204,720.00

FL FL190 Homestead, FL Widening of SW 320 St. (Mowry Dr.) from Flagler Ave. to SW 

187 Ave.

2,002,950.00 City of Homestead ‐ Multimodal Transit Center 2,002,950.00

FL FL191 U.S. 17‐92 and French Ave. Roundabout, Sanford 369,390.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

369,390.00

FL FL193 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange 

County, Florida

721,171.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

721,171.00

FL FL199 Construction and Design of Miami River Greenway Road Improvements and 

5th Street Improvements.

1,073,744.00 SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199 

STREET

1,073,744.00

FL FL201 Construct Atlantic Boulevard Improvements, Key West, Florida 121,257.00 City of Key West, Bahama Village Cultural Resource Assessment 121,257.00

FL FL202 Construct Route 9B from U.S. 1 to Route 9A (I‐295) to the Duval County line 450,732.00 I‐95 (SR9) improvements 450,732.00

SR 820 / Hollywood Blvd. 336,306.00

Pine Island Rd. 233,900.00

FL FL210 Normandy Blvd. and Cassat Ave. Transportation Enhancements, Jacksonville 111,545.00 I‐95 (SR9) improvements 111,545.00

To

570,206.00Town of Southwest Ranches Urban Interchange.FL207FL

From

25

Page 29: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Florida

State Demo ID Project Description Amount  Project Description Amount

ToFrom

FL FL212 Implement Kennedy Boulevard corridor improvements to improve safety in 

Tampa.

310,461.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 310,461.00

FL FL214 Englewood Interstate connector in Sarasota County, Florida 725,575.00 Trail Bridge over Laurel Rd Legacy Trail, Pedestrian/wildlife crossing Sarasota 

County

725,575.00

FL FL216 Plan and construct 17th Street in the City of Sarasota County, FL 1,536,865.00 Myrtle Street, sidewalks in Sarasota County 1,536,865.00

FL FL219 Conduct study for Port of Miami Tunnel, Miami, FL. 1,602,360.00 Port Miami Tunnel Freight Mobility Evaluation Study 1,602,360.00

FL FL223 Construct North Ormond Beach Business Park Interchange at I‐95 between 

U.S. 1 and SR 40, Volusia County

297,886.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

297,886.00

FL FL229 Acquire right‐of‐way and construct East‐West Connector from SR 37 to SR 

563 in Lakeland, FL

449,376.00 Ft. Fraser Trail Extension from SR540/Winter Lk Rd. to Combee Rd., Lakeland 449,376.00

FL FL230 City of Wilton Manors Powerline Road Streetscape Enhancement Project. 51,167.00 City of Hollywood Mobility Improvements 51,167.00

FL FL233 Traffic Reconfiguration of SR 934 and U.S. 1 Route, Miami. 160,321.00 SR 847/NW 47 Ave from SR 860/NW 183 St to N. of NW 199 St 160,321.00

FL FL235 Access Rd. Streetscaping, Sanford Airport 57,819.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

57,819.00

FL FL236 Destiny Rd. Reconstruction, Eatonville 801,180.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

801,180.00

FL FL241 Construction of Little Venice Road, Marathon, FL. 101,845.00 City of Marathon, Aviation Blvd., Bike Path/Trail 101,845.00

FL FL242 Construct St. Augustine to Palatka Rail Trail, Florida. 398,323.00 SR 313 398,323.00

FL FL248 Construct access road to entrances to Opa‐Locka Airport at Opa‐Locka Airport 

at N.W. 135th Street and N.W. 47th Avenue, including improvements to N.W. 

47th Avenue with median strip, City of Opa‐Locka.

1,602,360.00 SR 847/NW 47 Ave from SR 860/NW 183 St to N. of NW 199 St 1,602,360.00

FL FL253 Plant City Traffic Management System. 264,636.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 264,636.00

FL FL258 Grand Lagoon Bridge Replacement Project. The replacement of a two lane 

bridge with a four lane bridge

540,757.00 SR 30 (US98) 540,757.00

FL FL262 New Kings Rd. Pedestrian Overpass and Enhancements, Jacksonville 193,893.00 I‐295 (SR9A) improvements 193,893.00

FL FL265 Construction of an interchange at Florida's Turnpike and Stirling Rd. in 

Broward County.

4,437,703.67 Snake Road, FL 4,437,703.67

FL FL267 Implement Busch Boulevard corridor improvements to improve safety in 

Tampa.

469,703.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 469,703.00

FL FL274 Alleviate congestion at Atlantic Corridor Greenway Network, City of Miami 

Beach, FL.

51,590.00 City of Miami Beach ‐ recreational Corridor 51,590.00

FL FL279 Powerline Rearvision motor carrier backover motor carrier safety research. 85,427.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 85,427.00

FL FL284 Coral Way, SR 972 Highway Beautification, Phase One, Miami, Florida 166,814.00 SR 847/NW 47 Ave from SR 860/NW 183 St TO N. OF NW 199 St 166,814.00

FL FL289 Construct improvements to NE 19th Street/NE 19th Terrace from NE 3rd 

Avenue to NE 8th Avenue, Gainesville

120,051.00 SW 62nd Blvd. 120,051.00

FL FL295 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange 

Count, Florida

949,610.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

949,610.00

FL FL300 Construct Flagler Avenue improvements, City of Key West, Florida. 106,834.00 City of Key West, Bahama Village Cultural Resource Assessment 106,834.00

FL FL303 Widen Sr 80, Hendry County 346,719.00 US 27 (SR 80) from Industrial Canal to Central Street 346,719.00

FL FL305 Construction of four lane highway around Jacksonville connecting U.S. 1 to 

Route 9A

225,366.00 I‐95 (SR9) improvements 225,366.00

FL FL309 City of Hollywood for US1/Federal Highway, North of Young Circle 134,464.00 City of Hollywood Mobility Improvements 134,464.00

26

Page 30: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Florida

State Demo ID Project Description Amount  Project Description Amount

ToFrom

FL FL310 City of Miami Greenway Roadway, construction and design of Miami 

Greenway Road improvements and 5th St. improvements

671,091.00 SR 847 ‐ FM 430637‐1 671,091.00

FL FL315 West Palm Beach, Construction of U.S. 1, Flagler Drive Waterfront 

Redevelopment and Traffic Calming Project.

214,024.00 City of Hollywood Mobility Improvements 214,024.00

FL FL320 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange 

Count, Florida

1,067,636.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

1,067,636.00

SR A1A @ Northeast 21st Avenue 333,590.00

Pine Island Rd., Broward County, FL 276,410.00

FL FL361 West Ave Bridge, City of Miami Beach 620,000.00 City of Miami Beach ‐ Recreational corridor 620,000.00

FL FLB01 A. Max Brewer Causeway Bridge, Florida (FY 2002 Supplemental 

Appropriations Act P.L. 107‐206)

53,037.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes 

and Rehabilitate Pavement

53,037.00

FL FLM01 Central Sarasota Parkway Interchange at I‐75,

Sarasota, Florida

470,209.00 Trail Bridge over Laurel Rd Legacy Trail, Pedestrian/wildlife crossing Sarasota 

County

470,209.00

Total Amount Repurposed 41,884,967.67Total # of Earmarks Repurposed 59

610,000.00Pine Island Road pedestrian overpass, City of TamaracFL360FL

27

Page 31: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Georgia

State Demo ID Project Description Amount  Project Description Amount

GA GA008 Atlanta: Study of 5‐Points Intermodal Terminal   223,626.34 I‐285 @ I‐20 West Side Interchange Reconstruction & Widening (PI#0013918) 223,626.34

GA GA010 Lake Lanier access project 279,479.79 SR 347/Friendship Rd from Mcever Rd to Lake Lanier ‐ Phase II (PI#007319) 279,479.79

GA GA012 State Road 611 connector with I‐20  1,678,811.38 SR 16 from SR 100 to CS 1110/Columbia Drive (PI#M005454) 1,678,811.38

GA GA013 I‐75 advanced transportation management system in Cobb County 436,828.81 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 436,828.81

GA GA015 GA SR 316 Improvements‐‐Gwinnett, Barrow, Oconee Counties, Georgia 1,962,548.14 SR 316/US 29 @ SR 11 (PI#0008430) 1,962,548.14

GA GA016 Construct Athens to Atlanta Transportation Corridor 935,391.00 SR 316/US 29 @ SR 11 (PI#0008430) 935,391.00

GA GA018 Resurface Davis Drive, Green Street, and North Houston Road in Warner 

Robins  

220,093.34 I‐75 FM .30 MI S of SR 26/Houston to .43 MI N OF SR 96/Peach (PI#M005542) 220,093.34

GA GA023 Conduct a study of transportation alternatives in Northwest Georgia between 

Atlanta and Chattanooga.

437,641.00 ROME‐Cartersville Development Corridor ‐ Scoping (PI#0013238) 437,641.00

GA GA026 Conduct a study of a multimodal transportation corridor from Lawrenceville 

to Marietta  

1,617,432.00 I‐285 FM I‐75/Cobb thru Fulton to I‐85/Dekalb‐Express Lanes (PI#0001758) 1,617,432.00

GA GA029 Construct North River Causeway and Bridge, St. Mary's County 746,395.78 CR 90/Colerain Road from W OF I‐95 to E OF Kings Bay Road (PI#0007414) 746,395.78

GA GA031 Construct surface transportation facilities along Atlanta‐Griffin‐Macon 

corridor

734,161.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I  (PI#311000‐) 734,161.00

GA GA034 Construct noise barriers on the west side of I‐185 between Macon Road and 

Airport Thruway and on I‐75 between Mt. Zion Road and Old Dixie Highway in 

the Atlanta area

496,327.74 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 496,327.74

GA GA037 Upgrade US RT. 27 2,212,623.41 CS 1081/Greenville Street @ CSX Railroad in Lagrange (PI#343455‐) 2,212,623.41

GA GA040 National Infantry Museum Transportation Network 978,535.00 I‐16 at I‐95 Interchange Reconstruction(PI#0012758) 978,535.00

GA GA046 Forsyth Downtown Streetscape Project, Georgia 265,728.00 SR 74 from SR 7/US 341 to Bibb County Line (PI#M005205) 265,728.00

GA GA060 Bouldercrest Road Improvements, Georgia 387,344.99 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 387,344.99

GA GA073 Construct Waycross East Bypass from U.S. 84 in Pierce County, Georgia to 

U.S. 1 in Ware County, Georgia

2,563,775.00 CR 392/Hatcher Point Mall Road from SR 4/US 1 to SR 520/US 82 

(PI#0007664)

2,563,775.00

GA GA075 Extend the south Toccoa Bypass east of Toccoa to CR 311, four lanes for 

approximately 5.7 miles on new location

2,323,422.00 SR 106 from SR 59/Franklin to SR 63/Stephens (PI#M005200) 2,323,422.00

GA GA076 U.S. 19/SR 92 median work from Ellis Rd. to West Taylor ST, Griffin 1,201,770.00 SR 74 @ NS #718831X in Senoia (PI#333176‐) 1,201,770.00

GA GA078 Upgrade sidewalks and lighting, Wrightsville 320,472.00 SR 16 @ SHORT CREEK (PI#0007057) 320,472.00

GA GA079 Construction on U.S. 82 from Dawson to Alabama Line 801,180.00 SR 55 from Calhoun County Line to SR 520/US 82 (PI#M004800) 801,180.00

GA GA080 SR 4 widen from Milledgeville Road to Government Street, Richmond County 4,005,900.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 4,005,900.00

GA GA082 Intersection improvement at Harris Drive at SR 42 161,108.10 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 161,108.10

GA GA083 Streetscape project to replace sidewalks in downtown Forsyth 149,553.51 SR 74 from SR 7/US 341 to Bibb County Line (PI#M005205) 149,553.51

GA GA084 Resurface and widen Jac‐Art Road as part of the Bleckley County 

Development Authority project

200,295.00 I‐16 @ 12 LOCS Between Bleckley County & Emanuel Country (PI#M004189) 200,295.00

GA GA085 Bike and pedestrian paths and other transportation enhancements at Georgia 

Veterans Memorial Park

640,944.00 I‐285 @ I‐20 ‐ East side Interchange Reconstruction (PI#0013915) 640,944.00

GA GA088 Broad Avenue Bridge: Albany 43,030.54 SR 91 from Baker County Line to SR 62 (PI#M005565) 43,030.54

GA GA092 U.S. 341 U.S. 41 SR 7 from Barnesville to SR 3, Georgia 3,204,720.00 SR 7 from CS 600/Redbud Drive to CR 322/Meadovista Road (PI#M005045) 3,204,720.00

GA GA093 Streetscape‐Cordele 200,295.00 SR 300 from CR 29/Old Coney Road to SR 300 Conn (PI#M005498) 200,295.00

GA GA097 Rebuild sidewalks, install sidewalks, and add speed monitoring system, Alamo 250,369.00 SR 135 @ Altamaha River ‐ TIA (PI#0007037) 250,369.00

Tofrom

28

Page 32: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Georgia

State Demo ID Project Description Amount  Project Description Amount

Tofrom

GA GA098 Extend East Greene Street, install street lights, utilities, and landscaping, 

Milledgeville

150,607.84 SR 243 from SR 29 to SR 22 (PI#M005465) 150,607.84

GA GA109 Construction of bypass around town of Hiram, from SR 92 to U.S. 278, 

Paulding County, Georgia

178,360.00 SR 92 from CS 611/Malone Rd to CS 519/Nebo Rd‐Segment 1‐PH IV 

(PI#0007691)

178,360.00

GA GA113 Widen SR 104 from SR 383/ Belaire Road to CR 515/ Cumberland Drive 

(including bridges) in Columbia County.

3,204,720.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 3,204,720.00

GA GA116 Extension of Sugarloaf Parkway, Gwinnett County 2,403,540.00 I‐85 @ SR 324 (PI#0012698) 2,403,540.00

GA GA122 Streetscape‐Quitman 160,236.00 SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC‐Signal Upgrades 

(PI#0010855)

160,236.00

GA GA125 Historic preservation of a city bus station in downtown Eastman 160,236.00 SR 87/US 23 from Log Cabin/Dodge to S of SR 257/Bleckley‐Tia (PI#222410‐) 160,236.00

GA GA126 Replace sidewalks, upgrade lighting, and install landscaping, Helena. 320,472.00 SR 87/US 23 from Log Cabin/Dodge to S of SR 257/Bleckley‐Tia (PI#222410‐) 320,472.00

GA GA132 Construct and improve Cobb County Trails. 554,855.88 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 554,855.88

GA GA135 I‐75 lanes from Aviation Boulevard to SR 54, Clayton County 1,201,770.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 1,201,770.00

GA GA137 Rebuild SR 10 Memorial Drive for bicycle and pedestrian safety, from 

Mountain Drive to Goldsmith Road, Dekalb County  

892,082.58 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 892,082.58

GA GA138 Construct sidewalks between Marion Middle School, City Park, and 

Community Center, Buena Vista.

300,442.00 SR 355 from SR 137 to Talbot County Line (PI#M005290) 300,442.00

GA GA142 Streetscape project for lighting and landscaping on Main Street along Georgia 

Highway 231, Davisboro.

226,857.14 SR 15 from CS 524/3rd Ave to SR 24/SR 88 (PI#M005067) 226,857.14

GA GA143 Revitalization project will extend and resurface the Roberta Walking Trail, 

Roberta. 

100,655.67 SR 22 from SR 7/Crawford to 0.58 MI W of Columbus Rd. Bibb (PI#M005137) 100,655.67

GA GA145 Riverside Drive Streetscape Project, Macon 400,590.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700 400,590.00

GA GA148 Upgrade sidewalks and lighting, Lyons. 115,551.00 SR 144 from SR 27 to SR 121 (PI#M004830) 115,551.00

GA GA151 Pave portions of CR 345, CR 44, and CR 45, Hancock County 400,590.00 SR 16 from SR 15 to Warren County Line (PI#M005513) 400,590.00

GA GA157 Greene County, Georgia conversion of I‐20 and Carey Station Road overpass 

to full interchange.

882,856.00 I‐20 from NS #733146T/Morgan to SR 44/Greene (PI#M005197) 882,856.00

GA GA158 I‐20 HOV lanes from Evans Mill Road to Salem Road, Dekalb and Rockdale 

Counties

1,201,770.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 1,201,770.00

GA GA160 Rockdale County Veteran's Park‐‐Create park trails 263,210.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 263,210.00

GA GA161 Streetscape‐Albany. 400,590.00 SR 300 from SR 520 to N of CR 243/Branch Road (PI#M005122) 400,590.00

GA GA165 SR 85 widening from Adams DR to I‐75 and reconstruct the Forest Parkway 

interchange, Clayton County

1,201,770.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 1,201,770.00

GA GA167 Streetscape‐Thomasville 240,354.00 SR 111 @ Little Creek Tributary 5 MI SW of Moultrie (PI#0013744) 240,354.00

GA GA172 Extend sidewalks, upgrade landscaping in downtown Hawkinsville 400,590.00 CR 198/Tippettville Road @ Ten Mile Creek Trib NW of Finleyson (PI#331890‐

)

400,590.00

GA GA176 SR 26 from CR 17/Julian Simpson road to SR 87 (PI#M004852) 300,442.00 SR 26 from CR 17/Julian Simpson road to SR 87 (PI#M004852) 300,442.00

GA GA177 SR 36 passing lanes north of Jackson to Newton County line, Butts County, 

Georgia.

2,443,599.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 2,443,599.00

GA GA181 Upgrade sidewalks, replace street lights, and landscaping, Metter. 78,530.39 SR 46 from SR 4 to Candler County Line (PI#M005329) 78,530.39

GA GA182 Intersection improvement at Lake Dow Road and SR 81 Harris Drive at SR 42. 51,723.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes 9PI#0014203) 51,723.00

GA GA185 SR 32 @ Otter Creek Approx 5 MI E of Douglas (PI#0011679) 160,236.00 SR 32 @ Otter Creek Approx 5 MI E of Douglas (PI#0011679) 160,236.00

GA GA186 I‐20 West from SR 5 Bill Arp to SR 6‐‐HOV Lanes 5,808,555.00 I‐285 @ I‐20 West Side Interchange Reconstruction & Widening (PI#0013918) 5,808,555.00

29

Page 33: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Georgia

State Demo ID Project Description Amount  Project Description Amount

Tofrom

GA GA189 Commission a study and report regarding the construction and designation of 

a new Interstate linking Savannah, Augusta, and Knoxville.

52,642.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 52,642.00

GA GA190 Streetscape‐Bainbridge. 200,295.00 SR 310 from Decatur County Line to SR 1/US 27 (PI#M005325) 200,295.00

GA GA192 SR 133 south bound lane bridge replacement over the Georgia Florida Railnet 

line, Dougherty County

801,180.00 SR 3 from Thomas County Line to Dougherty County Line (PI#M004963) 801,180.00

GA GA200 Construct Welcome Center, and pedestrian trail, Abbeville. 300,442.00 SR 233 from SR 90/Ben Hill to SR 112/Wilcox (PI#M005346) 300,442.00

GA GA201 SR 70/Fulton Industrial Boulevard widening from Camp Creek Parkway to the 

SCL RR, Fulton County.

1,201,770.00 SR 70 from SR 154 to SR 139 (PI#M004931) 1,201,770.00

GA GA204 Commission a study and report regarding construction and designation of a 

new Interstate linking Augusta, Macon, Columbus, Montgomery, and 

Natchez.

52,642.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I  (PI#311000‐) 52,642.00

GA GA206 Upgrade sidewalks, lighting, landscaping from Cherry Street to Hampton 

Street, Industrial Park to Dooly Street, Montezuma.

201,390.01 SR 49 from SR 90 to SR 127 (PI#M005087) 201,390.01

GA GA208 Construction of I‐575 HOV Lanes from Sixes Road to SR 20, Cherokee County, 

Georgia.

801,180.00 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 801,180.00

GA GA214 Commission a study and report regarding the construction and designation of 

a new Interstate linking Savannah, Augusta, and Knoxville.

157,926.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 157,926.00

GA GA221 Commission a study and report regarding construction and designation of a 

new Interstate linking Augusta, Macon, Columbus, Montgomery, and 

Natchez.

157,926.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I  (PI#311000‐) 157,926.00

GA GA226 Improve sidewalks, upgrade lighting, and add landscaping, Newton County 

Yellow River Trail, Newton County [ref P.L. 110‐244, Sec 105(a)(155)]

685,114.63 SR 20 from Rockdale County Line to Henry County Line (PI#M005041) 685,114.63

GA GA231 Improve sidewalks, upgrade lighting, and add landscaping, Jackson Road 

improvements and utility relocations within the city of Jackson [ref P.L. 110‐

244, Sec 105(a)(326)]

500,737.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 500,737.00

GA GA235 Design and Construct Railroad Grade Crossing Gates in Acworth, GA 300,442.00 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 300,442.00

GA GA245 Upgrade SR 316 from I‐85 to SR 10 Loop, Gwinnett, Barrow, Oconee Counties 

new interchanges and HOV lanes.

1,001,475.00 SR 316/US 29 @ SR 11 (PI#0008430) 1,001,475.00

GA GA253 SR 105 from Cannon Bridge Road to Walnut Street widening 2,002,950.00 I‐85 from N OF CR 134/Hamilton Mill Road to N of SR 211 (110610‐) 2,002,950.00

GA GA254 SR 369 from Cherokee Circle to CR 267/Hightower Circle Truck Lanes, Forsyth 

County passing lanes

1,118,741.82 SR 369 @ Chattahoochee River/Lake Lanier (PI#122012‐) 1,118,741.82

GA GA255 SR 369 widening from SR 9 to SR 306 and interchange at SR 400, Forsyth 

County.

1,886,897.42 SR 369 @ Chattahoochee River/Lake Lanier (PI#122012‐) 1,886,897.42

GA GA265 Greene County, Conversion of I‐20 and Carey Station Road to a full 

interchange

801,180.00 I‐20 from NS #733146T/Morgan to SR 44/GREENE (PI#M005197) 801,180.00

GA GA266 Southeastern Economic Alliance, Next Generation High Speed Rail 

Development.

2,002,950.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I  (PI#311000‐) 2,002,950.00

GA GA267 Commission a study and report regarding the construction and designation of 

a new route linking Savannah, Augusta, and Knoxville.

658,026.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 658,026.00

GA GA268 Commission a study and report regarding construction and designation of a 

new Interstate linking Augusta, Macon, Columbus, Montgomery, and 

Natchez.

658,026.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I  (PI#311000‐) 658,026.00

30

Page 34: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Georgia

State Demo ID Project Description Amount  Project Description Amount

Tofrom

GA GA274 Transportation improvements to Dekalb County, Southeast DeKalb Arterial 

Analysis

55,738.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 55,738.00

GA GA275 City of Macon, Second Street Bridge Replacement, Reconstruction of ROW. 3,004,425.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 3,004,425.00

GA GA280 Fulton County, Atlanta, Georgia, right‐of‐way acquisition to complete a 

multimodal corridor on SR 1019 by closing property ownership gap.

2,002,950.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 2,002,950.00

GA GA281 Tift County Bypass U.S. 82/ SR 520 W to U.S. 319/SR 35 E Truck Route U.S. 

Highway 82

4,506,638.00 I‐75 from Lowndes County Line to 0.32 MI S OF Southwell Blvd (PI#M005543) 4,506,638.00

GA GA284 Columbia County, SR 104, improvements from SR 383 to CR 515. 2,002,950.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 2,002,950.00

GA GA290 SR 206 from N OF Broxton to N HWY/Ben Hill to N OF SR 32/Coffee 

(PI#M004860)

2,203,245.00 SR 206 from N of Broxton Hwy/Ben Hill to N of SR 32/Coffee (PI#M004860) 2,203,245.00

GA GA291 City of Smyrna, Railroad Quiet Zone 424,022.85 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 424,022.85

GA GA292 City of Smyrna, Brawner Park development and construction 581,275.13 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 581,275.13

GA GA293 City of Smyrna, Railroad Pedestrian Bridge. 334,299.69 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 334,299.69

GA GA294 City of Duluth, intersection realignment and road extension of Davenport Rd. 

at Buford Hwy.

801,180.00 SR 120 from SR 141/Fulton to Peachtree Ind Blvd/Gwinnett (PI#721000‐) 801,180.00

GA GA299 City of Macon, Wimbish Road, widening and striping for bike lanes. 500,738.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 500,738.00

GA GA300 Pierce Avenue, widening/ striping to create bike lanes from Ingelside Ave. to 

Riverside Drive

500,738.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 500,738.00

GA GA301 City of Macon, Rivoli Drive, widening, striping to create bike lanes 901,328.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 901,328.00

GA GA302 Rockdale County, Georgia Veterans Memorial Park pedestrian walkway 301,738.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 301,738.00

GA GA315 I‐75/CR 65/Union Grove Road‐‐New interchange, Gordon County 3,508,004.18 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 3,508,004.18

GA GA316 SR 85 widening from Adams Drive to I‐75 and reconstruct the Forest Parkway 

interchange

3,508,195.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 3,508,195.00

GA GAM01 Noise Walls on I‐20 from Fulton Industrial Blvd to HE Holmes, Fulton County, 

Georgia

435,992.40 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 435,992.40

GA GAM02 I‐285 Noise Walls from I‐20 to Bouldercrest Road, Georgia 451,401.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 451,401.00

GA GAM03 I‐285 Noise Walls , Henderson Mill to Chamblee Tucker Road, Georgia 470,209.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 470,209.00

GA GAM04 I‐75 /Aviation Blvd Atlanta, GA 752,335.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 752,335.00

Total Amount Repurposed 96,676,928.50Total # of Earmarks Repurposed 100

31

Page 35: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Hawaii

State Demo ID Project Description Amount  Project Description Amount

HI HI007 Construct Kapaa Bypass 5,137,557.13 Kuhio Highway, Kapaa Stream Bridge Replacement 5,137,557.13

HI HI008 Replace Sand Island Bridge 2,527.73 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream 

Bridge Replacement

2,527.73

HI HI014 Construct of, and improvements to, Kekaha Kauai access roads 60,548.30 Poipu Road Multimodal Improvements 60,548.30

HI HI024 Construct Waimea Bypass 801,180.00 Queen Kaahumanu Highway Resurfacing, Vicinity of Kekaha Kai State Park 801,180.00

HI HI025 Construct Puainako Street 801,180.00 Mamalahoa Highway, Hilea Bridge Replacement & Ninole Bridge 

Replacement

801,180.00

HI HI030 Study of East Hawaii Alternative Road, Island of Hawaii 160,236.00 Kawailani Street Improvements, Iwalani Street to Pohakulani Street 160,236.00

HI HI031 Leeward Coast Access Study 400,590.00 Study of Waianae Coast Emergency Access Road 400,590.00

HI HI033 Replace and Rehabilitate Kamehameha Highway Bridges, Island of Oahu 801,180.00 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream 

Bridge Replacement

801,180.00

HI HI034 Construct Bike Lanes on Kalanianaole Highway, Vicinity of Makapuu to Keolu 

Drive

240,354.00 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream 

Bridge Replacement

240,354.00

HI HI035 Construct Kapaa Bypass 2,403,540.00 Kuhio Highway, Kapaa Stream Bridge Replacement 2,403,540.00

HI HIF01 Honolulu Harbor Pier 19 Ferry Terminal Improvements 529,220.71 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream 

Bridge Replacement

529,220.71

Total Amount Repurposed 11,338,113.87Total # of Earmarks Repurposed 11

ToFrom

32

Page 36: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

IL IL024 Upgrade Illinois 336 between IL 61 to south of Loraine 59,226.52 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams 

County Line

59,226.52

IL IL084 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

19,242.48 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

19,242.48

IL IL086 Improve Campus Transportation System, Chicago 106,673.00 Arterial St. Resurfacing Project #69 ‐ South Area 106,673.00

IL IL088 Resurface S. Chicago Ave. From 71st to 95th Streets 48,000.00 130th and Torrence Intersection Improvement, Chicago 48,000.00

IL IL089 Improve access to 93rd Street Station 56,374.00 130th and Torrence Intersection Improvement, Chicago 56,374.00

IL IL093 Rehabilitate 95th St. between 54th Place and 50th Ave. 15,059.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge

15,059.00

IL IL096 Rehabilitate Timber Bridge over Little Muddy River 18,629.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking 

on IL15 from E Sunswept Rd to Main St in Bluford

18,629.00

IL IL098 Resurface 95th St. between Western Ave. and Stony Island 1,373,261.98 130th and Torrence Intersection Improvement, Chicago 1,373,261.98

IL IL099 Construct improvements to Pleasant Hill Road 70,375.21 299' of replacement of superstructure on bridge carrying Makanda Rd over 

Drury Creek

70,375.21

IL IL101 Improve access to the Rantoul Aviation Center 53,879.51 0.108 mile of the removal and replacement with a box culvert the structure 

carrying Leverett Rd over a ditch west of Leverett

53,879.51

IL IL103 Reconstruct Mt. Erie Blacktop 78,294.80 4.16 miles of milling, resurfacing, pavement marking and signal upgrades on 

US 50 from the Marion County line to CH 6 at Xenia

78,294.80

IL IL105 Intersection Improvements at 79th and Stoney Island 261,097.68 130th and Torrence Intersection Improvement, Chicago 261,097.68

IL IL107 Consolidate rail tracks and eliminate grade crossings as part of Gateway 

Intermodal Terminal access project

28,237.00 Project consists of pavement widening, traffic signal modernization and 

pedestrian access improvements. Work will include hot‐mix asphalt 

pavement and PCC sidewalk construction, curb and gutter removal & 

replacement, drainage improvements and all other work necessary to 

complete the project on Halsted Street from 183rd Street to 187th Street in 

the Village of Glenwood.

28,237.00

IL IL108 Resurface Cicero Ave. between 127th St. and 143rd St. 165,354.92 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

165,354.92

IL IL110 Construct Marion Street multi‐modal project 39,501.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

39,501.00

IL IL111 Improve Sugar Grove US 30 80,896.34 Remove the superstructure, repairs to the superstructure, and replacement 

with PPC deck beams with a 5" wearing surface

80,896.34

IL IL113 Extend South 74th St. 198,977.44 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

198,977.44

IL IL115 Construct Towanda‐Barnes Road 146,078.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek, 

located west of 3600E Road

146,078.00

IL IL118 Improve Constitution Avenue 1.21 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

1.21

IL Il122 Improve Constitution Avenue 77,831.76 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

77,831.76

ToFrom

33

Page 37: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL123 Widen 143rd Street 100,398.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

100,398.00

IL IL125 Conduct Midwest Regional Intermodal facility feasibility study 44,473.18 Cold‐in‐place recycling on FAS 194 (Prophet Rd) from Star Rd to Tampico Rd ‐ 

4.98 mi in length

44,473.18

IL IL127 Construct access road to Melvin Price Visitors Center 28,237.00 Resurfacing, patching, curb & gutter replacement & sidewalk replacement on 

College Avenue from Central Avenue to Washington Avenue in the city of 

Alton.  FAU9119

28,237.00

IL IL131 Replace Lebanon Ave. Bridge and approaches 18,825.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

18,825.00

IL IL133 Reconstruct Midlothian Turnpike 12,560.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

12,560.00

IL IL137 Improve local streets in the Village of Crestwood  66,457.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

66,457.00

IL IL139 Technology Avenue between US 45 and Willenborg St. 946.71 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

946.71

IL IL143 Reconstruct Broad Street between Maple St. to Sixth St. 3,029.77 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

3,029.77

IL IL147 Widen US 20 737,042.50 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 737,042.50

IL IL148 Improve IL 159 6,761.00 Resurface FAU 8891 (Springer Ave/Sheridan Ave) from IL 143 to Jefferson Rd 

in Edwardsville

6,761.00

IL IL151 Upgrade US 40 2,360.00 0.01 mi of the complete removal of a structure on US40 and replacing it with 

embankment adding a pipe culvert just No of Marshall

2,360.00

IL IL152 Construct Raney Street Overpass 22,420.98 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

22,420.98

IL IL153 Construct new entrance to Midway Airport Terminal 596,261.29 Arterial St. Resurfacing Project #69 ‐ South Area 596,261.29

IL IL156 Construct I‐88 interchange at Peace Road 37,649.00 0.83 mile of the removal and replacement of the structure carrying IL89 over 

the Illinois River located 1 mile south of US 6

37,649.00

IL IL159 Reconstruct Claire Blvd. 62,012.09 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

62,012.09

IL IL162 Undertake streetscaping between Damen and Halsted 61,586.69 Arterial St. Resurfacing Project #69 ‐ South Area 61,586.69

IL Il164 Upgrade industrial park road 0.02 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

0.02

IL IL165 Construct Confluence Bikeway 15,484.00 Resurfacing, patching, curb & gutter replacement & sidewalk replacement on 

College Avenue from Central Avenue to Washington Avenue in the city of 

Alton.  FAU9119

15,484.00

IL IL166 Extend Veteran's Memorial Drive over I‐57 0.20 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking 

on IL15 from E Sunswept Rd to Main St in Bluford

0.20

34

Page 38: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL169 Construction and improvements ‐ US DOT structure numbered 289‐961‐H at 

FAS Rt 37 in IL

523,874.46 Replace the bridge carrying FAU 5148 (Perryville Road) over the Union Pacific 

Railroad, located 0.50 miles south of Harrison Avenue

523,874.46

IL IL171 Extension of Sallee Street from Washington to Historic Rt 66, Litchfield, IL 570,023.28 Cold‐in‐place recycling, patching, HMA binder & surface courses, HMA 

shoulders, aggregate shoulders & pavement markings on FAU 7998

570,023.28

IL IL173 Hotze Road‐Salem, Illinois 98,629.94 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

98,629.94

IL IL189 ITS 174 in Peoria, IL 100.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

100.00

IL IL226 Preconstruction and Construction of IL 83 at IL 132 81,259.00 Replace the traffic signals on FAU 1257 (Deerfield Road) at Jewel‐Osco Plaza 

and the installing fiver optic cable interconnect from Richfield Ave to Jewel‐

Osco Plaza along Deerfield Road.  Project is located in the Village of Deerfield.

81,259.00

IL IL227 Construct Bike, Pedestrian Paths, Orland Hills 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

32,504.00

IL IL228 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

81,259.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

81,259.00

IL IL230 Reconstruction of Mockingbird Lane and Stratford St, Granite City 162,520.00 Project consists of road reconstruction including PCC pavement, curb & 

gutter, sidewalk, driveways, storm sewer, pavement marking and all other 

work necessary to complete the project in accordance with the plans and 

specifications on East main Street from 0.29 miles east of Lange Avenue to 

0.62

162,520.00

IL IL231 City of Havana, Illinois Upgrades to Broadway Street 77,405.89 8.55 mi of milling, resurfacing, patching, shoulders, guardrail, etc. on IL97 

east of McKinley St. in Havana to 0.3 mi N of CR 800

77,405.89

IL IL233 Upgrade streets in the City of Rushville, IL 81,436.50 0.13 mi of the replacement of the box culvert on IL100 from the BNSF RR 

viaduct to northerly for 0.21 mi in Frederick

81,436.50

IL IL236 Improve Great River Road, Warsaw 80,719.52 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams 

County Line

80,719.52

IL IL240 Construct Bissel Street Roadway Connector, Tri‐City Regional Port District 81,259.00 Project consists of road reconstruction including PCC pavement, curb & 

gutter, sidewalk, driveways, storm sewer, pavement marking and all other 

work necessary to complete the project in accordance with the plans and 

specifications on East main Street from 0.29 miles east of Lange Avenue to 

0.62

81,259.00

IL IL242 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

22,753.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

22,753.00

IL IL243 Upgrade roads, The Village of Berkeley 101,159.38 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

101,159.38

IL IL244 Construct new bridge on Illinois Prairie Path over East Branch River in Milton 

Township, IL

24,377.00 Project consists of interconnecting 3 existing closed loop traffic signal systems 

and establish an ethernet based communications system at various locations 

in the City of Naperville on Washington Street from Warrenville Road to 

Royce Road; along Aurora Avenue from Washington Street to West Street; 

along West Street from Aurora Avenue to Martin Avenue and along Chicago 

Avenue from Washington Street to Ellsworth Street.

24,377.00

35

Page 39: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL248 Construct Citywide bicycle path network, City of Evanston 20,335.97 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and 

pedestrian underpass in the vicinity of Montrose

20,335.97

IL IL249 Improve Roads and Bridges, Cook County 325,042.00 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 325,042.00

IL Il250 Construct Reed Station Parkway Extension to IL Rt. 3, Carbondale 362,408.00 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located 

1.0 mi east of Elkville

362,408.00

IL IL252 Construct a new 2‐lane road extending north from University Park Drive and 

improvements to University Park Drive

40,663.75 Resurface FAU 8891 (Springer Ave/Sheridan Ave) from IL 143 to Jefferson Rd 

in Edwardsville

40,663.75

IL IL253 Development and construction of an interchange at Brisbin Rd and Interstate 

80

487,560.00 The removal of two structures carrying Il 115 over Reddick run Creek and 

replacing with box culverts just north of Cabery

487,560.00

IL IL254 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

18,283.00 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

18,283.00

IL IL255 South Shore Drive and 67th Underpass 1,041,534.00 Arterial St. Resurfacing Project #69 ‐ South Area 1,041,534.00

IL IL256 Resurface Clifton Park Ave. and S. Louis Ave., Village of Evergreen 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

32,504.00

IL IL257 State Street Road Improvements from 43rd Street to IL Rt. 157, East St. Louis 1,480,441.35 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

1,480,441.35

IL IL258 Study, design, and construction of roadway and sidewalk improvements in 

the City of Monticello

91,986.92 Project consists of widening existing pavement and place paved shoulders 

along roadway on Ridge road (CH4) from East Corporate Limits of Monticello 

to Champaign county line in Piatt County.  FAS 531/FAU 7536

91,986.92

IL IL259 Improve roads, The Village of Westchester 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

81,259.00

IL IL261 Upgrade Ridge Avenue, Evanston 243,780.00 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and 

pedestrian underpass in the vicinity of Montrose

243,780.00

IL IL262 Repair of CH 29 and reconstruction of CH 8 at interchanges with Interstate 55 

at Towanda and Lexington, Illinois

81,259.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek, 

located west of 3600E Road

81,259.00

IL IL263 Construct Bike, Pedestrian Paths, Orland Hills 113,320.26 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

113,320.26

IL IL265 East Peoria, Illinois Technology Blvd. upgrades 392,015.04 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

392,015.04

IL IL266 Upgrade streets, Stickney Township 193,919.06 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

193,919.06

IL IL272 Reconstruction and realignment of Baseline Rd., Montgomery, IL. 251,834.83 Remove the superstructure, repairs to the superstructure, and replacement 

with PPC deck beams with a 5" wearing surface

251,834.83

IL IL275 Improve safety of a horizontal curve on Clarksville St. 0.25 miles north of 

275th Rd. in Grandview Township, Edgar County

26,340.49 Rehabilitation of the structure carrying IL 49 over Brushy Fork Creek 1 mile 

north of US 36

26,340.49

IL IL276 Upgrade traffic signal system on 87th Street, Chicago. 400,590.00 130th and Torrence Intersection Improvement, Chicago 400,590.00

36

Page 40: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL Il277 Engineering of the Willow Creek Trail Extension from Rock Cut State Park to 

the Long Prairie Trail

30,889.45 2.0 mi of reconstruction of IL2 from Riverside Blvd to Auburn St in Rockford 30,889.45

IL IL279 Resurfacing Congress Parkway The Illinois Department of Transportation 40,630.00 Arterial Street Resurfacing Project #63 ‐ North Area 40,630.00

IL IL280 City of Bartonville, Street widening and improvements and sidewalk 

improvements.

144,605.90 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

144,605.90

IL IL282 Widen U.S. Route 67 from Macomb to Illinois 101 1,602,360.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116 

from east of media to 0.9 miles west of US 67

1,602,360.00

IL IL289 Improve Highway‐Railroad Crossings, Galesburg 60,945.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116 

from east of media to 0.9 miles west of US 67

60,945.00

IL IL291 Expand and improve Illinois Route 47 Roadway from Reed Road to Kreutzer 

Road in Huntley, Illinois.

581,008.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd 

including the addition of one new lane in each direction

581,008.00

IL IL294 Construct multi‐use pedestrian path between Oakton St. and Dempster St., 

Skokie.

20,315.34 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and 

pedestrian underpass in the vicinity of Montrose

20,315.34

IL IL295 Development of a coordinated trail system, parking and trail systems in 

Dixon, IL

260,032.00 Cold‐in‐place recycling on FAS 194 (Prophet Rd) from Star Rd to Tampico Rd ‐ 

4.98 mi in length

260,032.00

IL IL296 For Village of Lemont to construct a bridge over Chicago Ship and Sanitary 

Canal linking Centennial Trail to I&M Canal Trail

80,118.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

80,118.00

IL IL297 For IDOT to expedite pre‐ construction and construction to widen I‐55 from 

Naperville Road south to I‐80.

284,409.00 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281 

(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy

284,409.00

IL Il298 Complete Heavy Truck Loop for DuQuoin Industrial Park 239,479.06 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located 

1.0 mi east of Elkville

239,479.06

IL IL303 Improve Great River Road, Mercer County. 40,630.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116 

from east of media to 0.9 miles west of US 67

40,630.00

IL IL307 For Will County for engineering and right‐of‐ way acquisition to extend 95th 

Street from Plainfield‐Naperville Road east to Boughton Road.

40,630.00 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281 

(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy

40,630.00

IL IL312 Road Construction and reconstruction in the Village of Hampshire: Keyes 

Ave., Industrial Drive Overlay, and Mill Avenue

170,609.00 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road) 

over Mill Creek in the City of Batavia.  Project will also include approach 

roadway construction.

170,609.00

IL IL313 Conduct study and design of Chicago North lakefront path expansion project 801,180.00 Arterial Street Resurfacing Project #63 ‐ North Area 801,180.00

IL IL315 Construct and expand Northwest Illinois U.S. Rt 20 from Freeport to Galena, 

IL

2,470,626.00 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 2,470,626.00

IL IL316 Improve U.S. Route 34 from Kewanee to Kentville Road. 400,590.00 Resurfacing and patching on IL 17 from W of 19th Ave to 220th St E of Aledo 400,590.00

IL IL319 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to 

Netty Green Road in Saline Co., Illinois.

162,520.00 656' of the removal and replacement of the structure carrying US 45 over 

south fork of Saline River approx. 1 mile NE of Stonefort

162,520.00

IL IL320 Relocate Pocket Road/ Lakewood Place for Access to the Racehorse Business 

Park, Alorton.

420,268.96 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

420,268.96

IL IL321 Construct commuter parking structure in the central business district in the 

vicinity of La Grange Road, and for projects identified by the Village of La 

Grange as its highest priorities

328,290.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the 

replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly 

avenue to Maple Avenue in the Village of Brookfield. 

328,290.00

IL IL325 Preconstruction and Construction at IL 120 at Bacon Road and Cedar Lake 

Road

110,921.00 Phase I preliminary engineering to determine the rehabilitation or 

replacement of the existing structure on Park Avenue West

110,921.00

37

Page 41: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL327 To construct a new intersection of a public road and U.S. Route 50 and a new 

street

44,692.00 4.16 miles of milling, resurfacing, pavement marking and signal upgrades on 

US 50 from the Marion County line to CH 6 at Xenia

44,692.00

IL IL328 Upgrade roads, The Village of Maywood 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

81,259.00

IL IL330 Upgrade Veterans Drive in Pekin, Illinois. 81,260.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

81,260.00

IL IL331 For DuPage County to construct certain segments of Southern DuPage County 

Regional Trail

8,126.00 Project consists of interconnecting 3 existing closed loop traffic signal systems 

and establish an ethernet based communications system at various locations 

in the City of Naperville on Washington Street from Warrenville Road to 

Royce Road; along Aurora Avenue from Washington Street to West Street; 

along West Street from Aurora Avenue to Martin Avenue and along Chicago 

Avenue from Washington Street to Ellsworth Street.

8,126.00

IL IL334 Upgrade Curtis Road in conjunction with State plan for I‐57 interchange; from 

Duncan Rd. to 1st Street in Champaign.

568,820.00 6.029 miles of milling and resurfacing on US 45 from NCL of Tolona 568,820.00

IL IL336 Complete 80,000 lb. truck route between CH 2 (Burma Rd) and IL Rt. 130 in 

Cumberland County.

243,780.12 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

243,780.12

IL IL337 Francis Cabrini/W. Green Homes CHA Street Construction, City of Chicago. 480,708.00 Arterial Street Resurfacing Project #63 ‐ North Area 480,708.00

IL IL338 Henry Horner Homes CHA Street Construction, City of Chicago 801,180.00 Arterial Street Resurfacing Project #63 ‐ North Area 801,180.00

IL IL339 Completion of the Grand Illinois Trail, Cook County 1,035,525.00 Arterial Street Resurfacing Project #63 ‐ North Area 1,035,525.00

IL IL344 Robert Taylor Homes CHA Street Construction, City of Chicago 440,649.00 130th and Torrence Intersection Improvement, Chicago 440,649.00

IL IL346 Construct Cedar Creek Linear Park Trail, Quincy. 40,630.00 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams 

County Line

40,630.00

IL IL348 Resurface Trumbull Ave. and Homan Ave., Evergreen Park 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

32,504.00

IL IL350 For U.S. Rt. 30 intersection signals, turn and deceleration lanes between 

Williams St. and IL Rt. 43 incl. 80th Ave, Wolf Rd., Lincoln Way HS and Locust 

St.

1,351,036.73 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's 

Highway to East of Crawford Avenue, pavement removal, aggregate subbase 

and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic 

signals and pavement markings.  Crawford Avenue will be reconstructed at 

the intersection with University Parkway, all located in the Village of 

University Park.

1,351,036.73

IL IL351 Preconstruction activities for Sangamon Valley Bicycle Trail (IL) 40,630.00 Cold‐in‐place recycling, patching, HMA binder & surface courses, HMA 

shoulders, aggregate shoulders & pavement markings on FAU 7998

40,630.00

IL IL352 St. Charles Road, The Village of Bellwood. 356,097.95 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

356,097.95

Retaining Wall and rip‐rap along 19th Street from IL 84/92 to 0.1 mi S in Silvis 422,173.72

Bridge replacement at IL 97 over Haw Creek Tributary 6.5 mi N of Maquon 1,830,000.00

2,252,173.72Railroad crossing improvements on Illinois Route 82 in GeneseoIL354IL

38

Page 42: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL355 Construction of a new bicycle‐pedestrian bridge in Wayne, IL 272,796.49 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road) 

over Mill Creek in the City of Batavia.  Project will also include approach 

roadway construction.

272,796.49

IL IL357 Village of South Jacksonville‐‐West Vandalia Road upgrades 77,579.87 Replace the bridge carrying El Dara Road (CH4) over Bull Run Creek, located 

3.5 miles south of Barry.  FAS 597

77,579.87

IL IL360 Pre‐construction and construction IL 15 over Wabash River at Mount Carmel 565,568.00 The removal and replacement with culverts of two structures carrying IL 130 

over unnamed creeks 

565,568.00

130th and Torrence Intersection Improvement, Chicago 719,921.00

130th and Torrence Intersection Improvement, Chicago 81,259.00

IL IL368 Reconstruct Winter Ave, existing 1 lane RR subway, and 1 lane bridge to 

provide access to Winter Park in Danville

439,588.99 Replace existing three span precast box beam bridge with a single span steel 

wide flange beam bridge, including roadway approaches on Maplewood Drive 

(CH55) 0.1 mile North of Rantoul over Upper Salt Creek in Champaign County. 

FAS 1523

439,588.99

IL IL369 Construct pedestrian tunnel at railroad crossing in Winfield, IL 81,259.00 Project consists of interconnecting 3 existing closed loop traffic signal systems 

and establish an ethernet based communications system at various locations 

in the City of Naperville on Washington Street from Warrenville Road to 

Royce Road; along Aurora Avenue from Washington Street to West Street; 

along West Street from Aurora Avenue to Martin Avenue and along Chicago 

Avenue from Washington Street to Ellsworth Street.

81,259.00

IL IL370 Upgrade streets, undertake streetscaping, and implement traffic and 

pedestrian safety signalization improvements and highway‐rail crossing safety 

improvements, Oak Lawn

398,175.39 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

398,175.39

IL IL371 Improve Sheridan Road, Evanston 162,520.00 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and 

pedestrian underpass in the vicinity of Montrose

162,520.00

IL IL373 Install traffic control devices on traffic signals in Village of Oak Lawn 19,503.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

19,503.00

IL IL375 Upgrade roads, The Village of Hillside. 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

81,259.00

IL IL377 Construct Parking Facility and pedestrian walkways at 94th and S. Oak Park 

Ave, Oak Lawn

19,503.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

19,503.00

IL IL378 Improve Mill Street, Rock Island 81,469.40 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

81,469.40

IL IL381 Road extension for Highway 22 in Macon County, IL 54,280.20 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

54,280.20

IL IL382 IL 8 from East Peoria to Washington, IL 82,798.89 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

82,798.89

IL IL383 Restoration and reconstruction of the central business district street. 

Cambridge, IL.

97,512.19 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

97,512.19

801,180.00Improve Cottage Grove intersection, South Chicago Avenue and 71st StreetIL363IL

39

Page 43: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL384 Improve 63rd Street, Chicago. 1,602,360.00 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 1,602,360.00

IL IL385 Establish transportation museum, Chicago 432,637.00 Arterial Street Resurfacing Project #63 ‐ North Area 432,637.00

IL IL386 For the construction of the Grand Avenue Underpass, Village of Franklin Park 94,260.52 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

94,260.52

IL IL387 Resurface Yellow Banks Road, Franklin County. 32,504.00 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located 

1.0 mi east of Elkville

32,504.00

IL IL388 Intersection Reconstruction at U.S. 12‐IL 31 Tryon Grove Road 73,134.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd 

including the addition of one new lane in each direction

73,134.00

IL IL389 Construct Bridge Overpass, DuSable Museum‐Chicago 801,180.00 Various Pin and Link Expansion Joint Retrofits 801,180.00

IL IL390 Entry Road to Southern Illinois University Research Park, Carbondale. 165,068.00 299' of replace of superstructure on bridge carrying Makanda Rd over Drury 

Creek

165,068.00

IL IL391 Improve safety of culvert replacement on 250th Rd. between 460th St. and 

City Hwy 20 in Grandview Township, Edgar County

7,151.20 Rehabilitation of the structure carrying IL 49 over Brushy Fork Creek 1 mile 

north of US 36

7,151.20

IL IL392 Traffic Signalization, Matteson 73,743.00 Traffic Signalization, Matteson 73,743.00

IL IL393 Preconstruction and construction McCarthy Road, Bell Road to U.S. 45 and 

123rd Street U.S. 45 to 86th Avenue in Palos Park

72,483.80 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

72,483.80

IL IL394 Establish transportation museum, Chicago 400,590.00 Arterial Street Resurfacing Project #63 ‐ North Area 400,590.00

IL IL395 Road extension for Redco Drive to Skyline Drive, Williamson County. 221,259.00 299' of replace of superstructure on bridge carrying Makanda Rd over Drury 

Creek

221,259.00

IL IL399 Extension North from Rt. 30 to Wheeler Road and Galena Boulevard 

extension west of Rt. 47 in Sugar Grove, IL

386,797.00 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road) 

over Mill Creek in the City of Batavia.  Project will also include approach 

roadway construction.

386,797.00

IL IL400 Improve roads, The Village of Westchester 22,753.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

22,753.00

IL IL403 Reconstruct and Widen Route 60 Bridge over I‐94 in Lake Forest. 914,174.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd 

including the addition of one new lane in each direction

914,174.00

IL IL404 For Village of Bolingbrook to construct Remington Blvd. extension. 75,180.16 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281 

(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy

75,180.16

IL IL408 Improve Streets, Merrionette Park 48,756.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

48,756.00

IL IL409 Offramp and overpass from I‐ 57 outside of Marion and necessary connector 

roads.

406,299.00 656' of the removal and replacement of the structure carrying US 45 over 

south fork of Saline River approx. 1 mile NE of Stonefort

406,299.00

IL IL411 Washington Street Widening, Gurnee 273,032.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd 

including the addition of one new lane in each direction

273,032.00

IL Il412 Improve Roads and Bridges, Cicero 223,398.81 Resurface, base repair, patching & curb & gutter replace on FAU 2790 (Austin 

Blvd) from Roosevelt Rd to Cermak Rd in Town of Cicero

223,398.81

IL IL413 Project is a stand‐alone roadway improvement consisting of the complete 

reconstruction of the roadway, The Village of Forest Park.

81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

81,259.00

40

Page 44: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL414 Upgrade County Highways 18 and 22 in conjunction with State I‐57 

interchange plan north of Mattoon.

162,520.00 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

162,520.00

IL IL415 Construct I‐57 Bridge Overpass, City of Markham. 480,708.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

480,708.00

IL IL417 Construct access roads to National Great Rivers Research Center. 101,576.28 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

101,576.28

IL IL421 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on 

the east side of I‐57 with incorporated area lying west

81,259.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking 

on IL15 from E Sunswept Rd to Main St in Bluford

81,259.00

IL IL427 Resurface Shawnee College Road, Pulaski County 128,085.00 4.21 mi of patching and resurfacing on IL37 from the Wye W of Mounds City 

to Mounds Rd

128,085.00

IL IL428 For Cook County to reconstruct and widen 127th Street between Smith Road 

and State Street in Lemont

36,567.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

36,567.00

IL IL430 Construct Leon Pass overpass, and for projects identified by the Village of 

Hodgkins as its highest priorities

78,009.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the 

replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly 

avenue to Maple Avenue in the Village of Brookfield. 

78,009.00

IL IL431 Undertake Streetscaping project on Harlem Avenue initiating from 71st 

Street to I‐80, Cook County

638,382.52 Rehabilitate the bridge that carried Chatham Street from Canal Street to 

Fulton Street over the Cal‐Sag Channel in the City of Blue Island.  MS 1030 

bridge is being currently closed to traffic and will be converted from a 

vehicular bridge to a pedestrian bridge.

638,382.52

IL IL433 Upgrade Roads, Summit 78,009.05 Resurfacing, curb & gutter replacement, sidewalk replacement and the 

replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly 

avenue to Maple Avenue in the Village of Brookfield. 

78,009.05

IL IL435 Construct bike/pedestrian paths, facilities and infrastructure improvements in 

Spring Rock Park, Western Springs Park District.

58,506.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the 

replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly 

avenue to Maple Avenue in the Village of Brookfield. 

58,506.00

IL IL436 Upgrade roads, Plainfield 24,377.00 Resurfacing, patching, sidewalk replacement and curb & gutter replacement 

on FAU 281 (Crossroads Pkwy) from north Center Blvd to Veterans Pkwy

24,377.00

IL IL439 Reconstruction and Improvement of North Lincoln Ave, O'Fallon. 136,110.01 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

136,110.01

IL IL440 Reconstruction of 20th Street, Granite City 121,891.00 Project consists of road reconstruction including PCC pavement, curb & 

gutter, sidewalk, driveways, storm sewer, pavement marking and all other 

work necessary to complete the project in accordance with the plans and 

specifications on East main Street from 0.29 miles east of Lange Avenue to 

0.62

121,891.00

IL IL441 Road Alignment from IL Route 159 to Sullivan Drive, Swansea 91,417.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

91,417.00

IL IL442 State Rt. 78 to Lathrop Street to 2900 E (Township Road)‐‐A 1.5 mile village 

street extension, bridges, and upgrading of existing street

27,971.49 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

27,971.49

IL IL443 Bloomington‐Normal East Side Highway Corridor. 81,259.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek, 

located west of 3600E Road

81,259.00

41

Page 45: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL445 Construct and expand Northwest Illinois U.S. Rt 20 from Freeport to Galena, 

IL

5,007,375.00 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 5,007,375.00

IL IL451 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on 

the east side of I‐57 with incorporated area lying west

2,950.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking 

on IL15 from E Sunswept Rd to Main St in Bluford

2,950.00

IL IL453 Improvements to Harrison Street, Quincy 44,073.09 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams 

County Line

44,073.09

IL IL454 Construction of Joliet Arsenal Road improvements, Will County. 20,504.58 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's 

Highway to East of Crawford Avenue, pavement removal, aggregate subbase 

and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic 

signals and pavement markings.  Crawford Avenue will be reconstructed at 

the intersection with University Parkway, all located in the Village of 

University Park.

20,504.58

IL IL457 Improve U.S. Route 34 from Kewanee to Kentville Road. 500,738.00 Improve U.S. Route 34 from Kewanee to Kentville Road. 500,738.00

IL IL459 Road improvements in Elmwood Park, Franklin Park, Northlake, Oak Park, 

River Forest, River Grove, and Stone Park

93,418.54 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

93,418.54

IL IL462 Improvements to Maple/ Manteno Lake Road, Manteno 103,436.71 The removal and replacement of the structure carrying IL 102 over Rock 

Creek, 6.5 miles NW of Bourbonnais

103,436.71

IL IL464 Constitution Trail Extension‐‐Grove Street south to Lafayette Street, 

Bloomington.

1,106.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek, 

located west of 3600E Road

1,106.00

IL IL469 Upgrade Roads, Summit 39,358.72 Resurfacing, curb & gutter replacement, sidewalk replacement and the 

replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly 

avenue to Maple Avenue in the Village of Brookfield. 

39,358.72

IL IL471 For the construction of the Grand Avenue Underpass, Village of Franklin Park 1,475.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm 

sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive) 

from Taft Avenue to Wolf Road in the Village of Berkeley

1,475.00

IL IL472 Construction of IL Route 31‐‐Algonquin Bypass to Rakow Road 10,325.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd 

including the addition of one new lane in each direction

10,325.00

IL IL473 Road improvements associated with Diversatech Campus, Manteno. 1,033.00 The removal and replacement of the structure carrying IL 102 over Rock 

Creek, 6.5 miles NW of Bourbonnais

1,033.00

IL IL474 Upgrade Veterans Drive in Pekin, Illinois. 123,018.61 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

123,018.61

IL IL475 Street Resurfacing, City of Centreville. 110,262.51 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

110,262.51

IL IL479 Mitchell Road to Farnsworth Avenue improvements, Aurora 3,688.00 Remove the superstructure, repairs to the superstructure, and replacement 

with PPC deck beams with a 5" wearing surface

3,688.00

IL IL481 Improve Great River Road, Mercer County. 738.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116 

from east of media to 0.9 miles west of US 67

738.00

IL IL482 Improve Great River Road, Warsaw 369.01 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams 

County Line

369.01

IL IL489 Improve Lightfoot Road, City of Farmington 738.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek, 

located south of Richmond Ave in the City of Peoria

738.00

IL IL492 City of Havana, Illinois Upgrades to Broadway Street 14,452.79 8.55 mi of milling, resurfacing, patching, shoulders, guardrail, etc. on IL97 

east of McKinley St. in Havana to 0.3 mi N of CR 800

14,452.79

IL IL495 Bike trail extension for the Kankakee River Trail Project, Kankakee. 1,075.46 The removal and replacement of the structure carrying IL 102 over Rock 

Creek, 6.5 miles NW of Bourbonnais

1,075.46

42

Page 46: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Illinois

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IL IL496 Improve Highway‐Railroad Crossings, Galesburg 16,875.77 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116 

from east of media to 0.9 miles west of US 67

16,875.77

IL Il497 Improvements to township roads in and adjacent to the Shawnee National 

Forest, Pope County. [ref P.L. 110‐244, Sec 105(a)(264)]

13,167.75 299' of replacement of superstructure on bridge carrying Makanda Rd over 

Drury Creek

13,167.75

IL IL503 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to 

Netty Green Road in Saline Co., Illinois.

2,950.00 656' of the removal and replacement of the structure carrying US 45 over 

south fork of Saline River approx. 1 mile NE of Stonefort

2,950.00

IL IL506 Constitution Trail Extension‐‐Grove Street south to Lafayette Street, 

Bloomington.

369.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek, 

located west of 3600E Road

369.00

IL IL507 Improvements to 11th Avenue streetscape, campus trails and bridges at 

Augustana College in Rock Island

2,213.00 0.01 miles of the removal and replacement of the structure carrying IL 81 

over the BNSF RR at Lynn Center.

2,213.00

IL IL508 Improvements to Oakland, Main Street, Eldorado and Fairview, streetscape in 

the vicinity of Millikin University, Decatur.

2,213.30 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

2,213.30

IL IL510 Restoration of the historic railroad depot and intermodal in Mattoon. 1,770.00 0.01 mile of the removal and replacement of the structure carrying IL 121 

over Long Point Creek 9 miles north of Montrose

1,770.00

IL IL511 Construct overpass, U.S. 40 to Southwest Andrews Drive in Greenville. 1,475.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of 

Lebanon.  Soil Mod, HMA binder & surf courses, storm sewer

1,475.00

IL IL516 Construct new Mississippi River Bridge and related roads in the vicinity of 

East St. Louis

2,355,635.77 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB 

to I‐55/64 WB

2,355,635.77

IL IL520 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on 

the east side of I‐57 with incorporated area lying west

4,683.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking 

on IL15 from E Sunswept Rd to Main St in Bluford

4,683.00

IL IL521 Construction of Joliet Arsenal Road improvements, Will County. 2,341.00 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's 

Highway to East of Crawford Avenue, pavement removal, aggregate subbase 

and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic 

signals and pavement markings.  Crawford Avenue will be reconstructed at 

the intersection with University Parkway, all located in the Village of 

University Park.

2,341.00

IL IL523 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to 

Netty Green Road in Saline Co., Illinois.

51,629.00 656' of the removal and replacement of the structure carrying US 45 over 

south fork of Saline River approx. 1 mile NE of Stonefort

51,629.00

Resurfacing, patching, curb & gutter, sidewalks and pavement markings on 

FAU 1392 (First Street) from West Avenue to Willow Road in the City of 

Elmhurst.

397,000.00

Reconstruct FAU 1551 (Plainfield Road) from manning Road to Cass Avenue in 

DuPage county.  Base course widening, resurfacing, sidewalks, traffic signals, 

and pavement markings.

800,000.00

IL ILM02 Improvements on the Kennedy Expressway in Chicago 2,879,073.20 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 2,879,073.20

Total Amount Repurposed 53,149,172.22Total # of Earmarks Repurposed 196

1,197,000.00I‐55 at various locations from Lemont Road to Illinois 83 in Darien, DuPage 

County ‐ construction of sound barriers

ILM01IL

43

Page 47: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Indiana

State Demo ID Project Description Amount  Project Description Amount

IN IN051 Improvements to McClung Rd, Boston St, Larson St, and Whirlpool Drive in 

the city of LaPorte, IN  (2001)

34,352.50 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian 

Facilities 

34,352.50

IN IN055 I‐65/70 Market Square Redesign/Replace ramp, Indiana (2003) 68,663.69 Indianapolis, Install school zone flashers at various schools in Marion County, 

Pedestrian Flashing Beacons

68,663.69

IN IN058 Indiana Dunes National Lakeshore (IDNL) hike/bike trail and pedestrian 

bridge/overpass, Indiana  (2003)

24,837.00 Porter County, 1.6 miles south of CR 1000 S over Kankakee River Bridge #62, 

Bridge Replacement

24,837.00

IN IN059 INDOT US‐31 Environmental and Design study, Indiana  (2003) 9,028.87 Warsaw, Kosciusko Co., Husky Trail Rd: From Mariner Dr to Warsaw City 

limits (0.2 mi S of CR 200N) Road Rehabilitation (3R/4R Standards) 

9,028.87

Sign project, Delaware County, VA 1033, Sign inventory and replacement for 

Town of Eaton

53,550.00

Bridge 226 on County Road 419 East over Bike/Ped. Trail , Bridge Removal , 

Delaware Co.

713,800.00

Bridge #161 over White River on CR 170S, 1.8 miles S of SR 32 , Bridge 

Rehabilitation, Delaware Co.

226,150.00

IN IN076 Gary Green Link Trail, Indiana, Lake County  (2005) 26,423.83 Gary, Industrial Highway EJ&E overpass to E of Main Airport Entrance Phase 1 

, Road Reconstruction

26,423.83

IN IN079 Hoosier Heartland Highway, Miami and Huntington Counties, Indiana  (2005) 66,650.70 Huntington, Huntington Co. CN Resurface of State road completed in 2014,  66,650.70

IN IN089 Oak Savannah Trail, Indiana  (2005) 4,613.65 Sign Replacement, Safety Improvement, Sign Modernization (Series Of Units),  4,613.65

IN IN095 Construction of Dixon Road from Markland Avenue to Judson Road in 

Kokomo, Indiana  (2005)

115,551.00 Howard Co. Judson Road , Judson Road; Dixon Road to Phillips Street in 

Kokomo, Road Reconstruction (3R/4R)

115,551.00

IN IN098 Construct interchange at I‐ 65 and 109th Avenue, Crown Point, Indiana (2005) 621,398.22 I‐65  from US 231 to US 30, Added Travel Lanes, Crown Point, Lake County 621,398.22

IN IN100 Upgrade Traffic Signals Phase III in the City of Muncie, Indiana (2005) 126,535.17 City of Muncie, Delaware Co., Bike/Pedestrian Facilities near Bunch Blvd & 

near St.Rd. 32 over White River

126,535.17

IN IN103 Construct Grade Separation Underpass on Main Street in Mishawaka, Indiana  

(2005)

1,602,360.00 St. Joseph Co., Bridge Rehab on Cleveland over St. Joseph River, Bridge 

Rehabilitation Or Repair 

1,602,360.00

IN IN107 Reconstruct and widen Shelby County Indiana 500 East from 1200 N to U.S. 

52  (2005)

801,180.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line , 801,180.00

IN IN108 Extend Everbrook Drive from SR 332 to Bethel Avenue in the City of Muncie, 

Indiana  (2005)

512,755.00 Trail in Muncie, Delaware Co., MS BIKE, new trail‐ phase 2; Near SR 32 over 

White River, near Bunch Blvd, Bike/Pedestrian Facilities 

512,755.00

IN IN111 Upgrade rail crossing at 93rd Avenue, St. John  (2005) 160,236.00 Lake Co., Bridge #36 State Line Road over Kankakee River,  Bridge 

Replacement

160,236.00

IN IN112 Study Traffic on Muncie By‐ Pass from Centennial Avenue to McGalliard Road 

in the City of Muncie and Delaware County, Indiana  (2005)

96,142.00 Delaware County, ST 1024, Bridge # 516 over White River on Tillotson 

Avenue, 0.15 miles north of SR32 Bridge Replacement

96,142.00

IN IN114 Reconstruct Boston Street, from State Road 2 to Bach St., Larson‐Whirlpool 

St. in LaPorte, Indiana  (2005)

199,228.61 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian 

Facilities 

199,228.61

IN IN117 Improve Intersection at Jackson Street and Morrison Road in the City of 

Muncie, Delaware County, Indiana (2005)

105,186.00 White River Greenway from Nature Preserve to Kitselman trail head (Phase 3) 

in Muncie, Delaware Co.; Bike/Pedestrian Facilities.

105,186.00

IN IN120 Construct Shelby County Indiana Shelbyville Parkway  (2005) 400,590.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, 400,590.00

IN IN125 Acquire right‐of‐way for and construct University Parkway from Upper Mount 

Vernon Road to SR 66  (2005)

603,417.71 Newburgh, Warrick Co., B. Gene Aurand Trailhead to Pollack Ave/SR662 

intersection (Phase 3A),  Bike/Pedestrian Facilities 

603,417.71

IN IN126 Conduct study for U.S. 50 Corridor Improvements, Dearborn County, Indiana  

(2005)

240,354.00 Jennings Co. , Bridge 52 over Otter Creek on Co RD 560 E, Br Repl, 

Comp.Cont.Precast Conc. Beam 

240,354.00

To

993,500.00SR‐332 Reconstruction at I‐69, Delaware County, Indiana  (2003)IN061IN

From

44

Page 48: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Indiana

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IN IN128 Improve Bailie Street, Kentland Biking and pedestrian trail construction, 

Kentland [ref P.L. 110‐244, Sec 105(a)(100)]  (2005)

27,108.44 Curb sidewalk reconstruction SR 2 (Commercial Ave) Freemont to Burr St, 

Local Road Project, Lowell, Lake Co.

27,108.44

IN IN132 Preliminary engineering, right‐of‐way, and construction for Perimeter 

Parkway‐West Lafayette/ Purdue University, Indiana  (2005)

614,627.80 Cherry Lane, intersection of McCormick in West Lafayette; Intersect. Improv. 

W/ Added Turn Lanes.

614,627.80

Porter Co., 1.6 miles south of CR 1000 S over Kankakee River Bridge #62 , 

Bridge Replacement

128,756.00

Porter Co., Marquette Greenway, Calumet Trail Phase V, Bike/Pedestrian 

Facilities 

56,313.25

IN IN139 Complete construction of paths at Hamilton County Riverwalk, Noblesville, 

Indiana  (2005)

45,446.75 Hamilton Co. new road reconstruction  CN, 136th Street at Prairie Baptist 

Road, approx 1.3 miles SE of I‐69 and SR 238 ,

45,446.75

George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 Harrison Co; New Road 

Construction

2,698,578.91

0.7 miles North of Beechwood Way (Bridge 43) Crawford Co Bridge  1,555,687.09

IN IN142 Study alternatives along 2 miles of railroad to eliminate in‐town highway‐ rail 

crossings to improve safety and reduce congestion in Delaware County  

(2005)

120,177.00 Yorktown, Delaware Co. bridge, Tiger Drive, Bridge 141, over White River, 0.6 

mi N of SR 32, Bridge Rehabilitation

120,177.00

IN IN146 Reconstruct Standard Avenue, Whiting  (2005)   105,738.00 Lake Co., Bridge #36 State Line Road over Kankakee River, Bridge 

Replacement

105,738.00

Plymouth, Marshall Co., Improve SRTS path & ADA along Baker St from 

Columbus thru Randolph intersection Bike/Pedestrian Facilities

314,460.20

Culver, Marshall Co., Academy Rd. and College Ave., Bike/Pedestrian Facilities  86,129.80

IN IN155 Construction of Dixon Road from Markland Avenue to Judson Road in 

Kokomo, Indiana.  (2005)

27,006.40 Howard Co. Judson Road , Judson Road; Dixon Road to Phillips Street in 

Kokomo, Road Reconstruction

27,006.40

IN IN158 Construct interchange at I‐ 65 and 109th Avenue, Crown Point, Indiana (2005) 891,814.03 I‐65  from US 231 to US 30, Added Travel Lanes, Crown Point, Lake County 891,814.03

IN IN159 Transportation improvements to 126th Street Project, Town of Fishers, 

Indiana (2005)

171,674.81 Hamilton Co. new road reconstruction CN, 136th Street at Prairie Baptist 

Road, approx 1.3 miles SE of I‐69 and SR 238 ,

171,674.81

IN IN161 Construct grade separation underpass on Main Street in Mishawaka, Indiana  

(2005)

400,590.00 St. Joseph Co. , Bridge Rehab on Cleveland over St. Joseph River, Bridge 

Rehabilitation

400,590.00

IN IN167 Reconstruct and widen Shelby County, Indiana 500 East from 1200 North to 

U.S. 52  (2005)

200,295.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, Road 

Reconstruction (3R/4R Standards) 

200,295.00

IN IN168 Extend Everbrooke Drive from SR 332 to Bethel Avenue in the City of Muncie, 

Indiana  (2005)

128,189.00 Muncie, Delaware Co. new trail‐ phase 2; Near SR 32 over White River, near 

Bunch Blvd; Bike/Pedestrian Facilities. 

128,189.00

Styline Drive from SR 64 to Chestnut Street in Dubois County; New Bridge 235,680.51

From 4.56 mi S of N Jct of SR‐56 to 0.86 mi N of N Jct of SR‐56 resurface US‐

231 Dubois County; HMA Overlay, Preventive Maintenance. 

332,855.57

IN IN171 Upgrade rail crossing at 93rd Avenue, St. John, Indiana  (2005) 40,059.00 Lake Co., Bridge #36 State Line Road over Kankakee River,  Bridge 

Replacement, Other Construction 

40,059.00

IN IN172 Study traffic on Muncie bypass from Centennial Avenue to McGailliard Road 

in the City of Muncie and Delaware County, Indiana  (2005)

24,035.00 Bridge # 516 over White River on Tillotson Avenue, 0.15 miles north of SR32 

Delaware Co. bridge; Bridge Replacement

24,035.00

IN IN174 Reconstruct Boston Street, from State Road 2 to Bach Street, Larson‐

Whirlpool Street in LaPorte, Indiana  (2005)

150,221.00 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian 

Facilities 

150,221.00

IN IN180 Construct Shelby County, Indiana Shelbyville Parkway, Indiana  (2005) 100,148.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, Road 

Reconstruction (3R/4R Standards) 

100,148.00

400,590.00Construct Hoham Drive Extension in Plymouth, Indiana  (2005)IN147IN

568,536.08Construct U.S. 231 in Spencer and Dubois Counties  (2005)IN169IN

185,069.25North Calumet Avenue Improvements, Valparaiso  (2005)IN138IN

4,254,266.00Construction of I‐64 Interchange, Harrison County, Indiana  (2005)IN141IN

45

Page 49: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Indiana

State Demo ID Project Description Amount  Project Description Amount

ToFrom

IN IN184 Construction of multi‐use paths, Town of Fishers, Indiana (2005) 28,983.44 Hamilton Co new road reconstruction, CN, 136th Street at Prairie Baptist 

Road, approx 1.3 miles SE of I‐69 and SR 238, Sight Distance Improvement 

Sight Distance Improvement 

28,983.44

IN IN186 Conduct study for U.S. 50 Corridor improvements, Dearborn County, Indiana  

(2005)

60,089.00 Jennings Co., Bridge 52 over Otter Creek on Co RD 560 E, Br Repl, 

Comp.Cont.Precast Conc. Beam

60,089.00

IN IN188 Improve Bailie Street, Kentland, Indiana (2005) 7,249.63 Bridge #81 on Hickory Rd over Yellow River in Marshall Co; Bridge 

Replacement

7,249.63

IN IN192 Preliminary engineering, right‐of‐way and construction for Perimeter 

Parkway‐‐West Lafayette/ Purdue University, Indiana  (2005)

529,854.69 Cherry Lane, intersection of McCormick in West Lafayette; Intersect. Improv. 

W/ Added Turn Lanes.  

529,854.69

IN IN198 North Calumet Avenue improvements, Valparaiso, Indiana (2005) 165,276.84 Porter County, 1.6 miles south of CR 1000 S over Kankakee River Bridge #62 , 

Bridge Replacement

165,276.84

IN IN199 Complete construction of paths at Hamilton County Riverwalk, Noblesville, 

Indiana  (2005)  

10,111.00 Hamilton Co  new road reconstruction CN, 136th Street at Prairie Baptist 

Road, approx 1.3 miles SE of I‐69 and SR 238, Sight Distance Improvement 

Sight Distance Improvement

10,111.00

IN IN201 Construction of I‐64 interchange, Harrison County, Indiana  (2005) 1,063,567.00 George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 in Harrison Co; New Road 

Construction.

1,063,567.00

IN IN202 Study alternatives along 2 miles of railroad to eliminate in‐town highway‐ rail 

crossings to improve safety and reduce congestion in Delaware County, 

Indiana  (2005)

30,044.00 Tiger Drive, Bridge 141, over White River, 0.6 mi N of SR 32 in Delaware 

County; Bridge Rehabilitation Or Repair.  

30,044.00

IN IN203 Improve SR 9 Greenfield Corridor (2005) 14,707.21 White River Greenway from Nature Preserve to Kitselman trail head (Phase 3) 

in Muncie, Delaware Co.; Bike/Pedestrian Facilities.

14,707.21

IN IN205 SR 56 Reconstruction, Aurora, Indiana (2005) 1,025,510.00 Jennings Co. ,  Bridge 52 over Otter Creek on Co RD 560 E, Br Repl, 

Comp.Cont.Precast Conc. Beam 

1,025,510.00

Plymouth, Marshall Co., Greenways Trail between Jefferson & Garro St. near 

the Yellow River, Bike/Pedestrian Facilities  

20,000.00

Academy Rd. and College Ave., Bike/Pedestrian Facilities, Culver, Marshall Co. 80,148.00

IN IN215 Removal of I‐65/I‐70 Market Street Ramp and Streetscaping, Indianapolis  

(2005)

628,198.61 Hendricks County Bridge Extension of the National Road Heritage Trail: West 

County Line to Amo in Hendricks County; Bike/Pedestrian Facilities 

628,198.61

IN IN220 Widen unsafe U.S. 24 between Fort Wayne and Defiance, OH  (2005) 535,948.21 Fort Wayne Allen Co., Pufferbelly Trail: State St, to Fernhill Ave, 

Bike/Pedestrian Facilities

535,948.21

IN INM01 I‐64, 2.3 miles west of SR 135, Harrison County ‐ interchange justification 

study, environmental documentation, and design of new interchange  (2005)

855,000.00 George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 Harrison Co, New Road 

Construction, Harrison County

855,000.00

Total Amount Repurposed 20,323,283.14Total # of Earmarks Repurposed 54

100,148.00Construct Hoham Drive Extension in Plymouth, Indiana (2005)IN207IN

46

Page 50: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Iowa

State Demo ID Project Description Amount  Project Description Amount

IA IA009 US 20 Realignment Early to Fort Dodge   6,698.80 Detour for US20 from L21 to IA31 6,698.80

IA IA013 Highway 2 ‐ Sidney to I‐29  26,673.68 Relocated US34 bridge over I‐29 26,673.68

IA IA023 Julien Dubuque Bridge 9,722,683.43 Southwest Arterial: US61‐US151 to US20/Seippel Rd and east on US 20 to NW 

Arterial incl. Menards Frontage Rd

9,722,683.43

IA IA036 Clinton Co ‐ US 30 Mississippi River Bridge Study 277,285.68 US30 improvements in Clinton County 277,285.68

IA IA058 Hoeven Corridor/Outer Drive Project, Sioux City, Iowa 216,655.20 I‐29 Reconstruction Project, Sioux City 216,655.20

IA IA067 Study of direct link to I‐80, Pella 117,160.44 In the City of Pella, Oskaloosa St from Prairie St to SE 16th St 117,160.44

IA IA070 Study for NE Beltway, Polk Co 100,058.11 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 100,058.11

IA IA096 Construction of approaches and viaduct on Edgewood Rd SW over the UP RR, 

Prairie Creek, and the CRANDIC RR

130,773.20 C Ave NE: from Collins Rd to Blairs Ferry Rd 130,773.20

Southwest Arterial: US61‐US151 to US20/Seippel Rd and east on US 20 to NW 

Arterial incl. Menards Frontage Rd

7,275,058.00

US20: Swiss Valley Rd Intersection including work on Seippel Rd and 

Barrington Dr

9,895,196.00

Military Road Improvements 2,859,247.00

IA IA099 Construction of NW 26th St interchange on I‐35, Polk Co 248,637.40 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 248,637.40

IA IA107 TI to Hoeven Corridor/Outer Drive Project, Sioux City 993,129.53 I‐29 Reconstruction Project, Sioux City 993,129.53

IA IA110 TI to Edgewood Road Viaduct, Cedar Rapids 512,460.16 C Ave NE: from Collins Rd to Blairs Ferry Rd 512,460.16

IA IA140 Construction of Sioux City, Iowa Hoeven Corridor, Outer Driver Project 746,635.19 I‐29 Reconstruction Project, Sioux City 746,635.19

IA IA143 UNI, Native Roadside Vegetation Enhancement Center, construction and 

equipment

246,597.64 US218 at Co Rd C‐57 Interchange 246,597.64

IA IA145 Drake 28th and Carpenter Streets Improvements, Des Moines 310,301.38 E. Indianola Ave – Phase 4 – From E. Porter Ave to Army Post Rd in Des 

Moines, IA

310,301.38

IA IA147 Great River Road National Scenic Byway, Rivers to the Sea, Dubuque Co 483,016.81 Southwest Arterial: US61‐US151 to US20‐Seippel Rd and east on US 20 to NW 

Arterial incl. Menards Frontage Rd

483,016.81

IA IA153 Lewis and Clark Trail Study 47,582.60 I‐29: Reconstruction in Sioux City 47,582.60

IA IA157 Mississippi River Trail, Leach Park in Bettendorf to Riverdale 558,174.81 US67 from 10th to 17th in Bettendorf 558,174.81

IA IA159  American Discovery Trail, connection to Clear Creek Trail, Coralville 108,547.51 Clear Creek Trail Phases 6 & 7, Coralville 108,547.51

IA IA160 Downtown Improvement Project, Dewitt 208,990.34 S. 6th Avenue from Lake St. to S. 5th St., Dewitt 208,990.34

IA IA162 McCollister Boulevard, Iowa City 406,466.74 Dubuque Street Greenway Project 406,466.74

IA IA163 Country Home Road, Linn county 115,713.00 IA 100: In Cedar Rapids, from US 30 to Covington Rd (Co Rd W36) 115,713.00

E‐57 Paving from X Ave to Y Ave, Boone County 171,783.00

R‐27 Paving from E‐52 to US‐30, Boone County 630,090.00

IA IA175 Study of direct link to I‐80, Pella 110,258.00 In the City of Pella, Oskaloosa St from Prairie St to SE 16th St 110,258.00

IA IA178 Study for NE Beltway, Polk County 76,679.77 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 76,679.77

IA IA188 Hoeven Corridor/Outer Drive Project, Sioux City 209,545.94 I‐29 Reconstruction Project, Sioux City 209,545.94

IA IA194 Construction of NW 26th Street Interchange I‐35, Polk County 68,281.16 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 68,281.16

IA IA206 Kimberly Road improvements and construction in Davenport 643,738.20 I‐74: In Bettendorf and Davenport (Central Section) 643,738.20

Total Amount Repurposed 37,524,118.72Total # of Earmarks Repurposed 28

801,873.00Rehabilitation and Retrofit of Historic Boone County Wagon BridgeIA170IA

To

20,029,501.00US 20 Mississippi River Bridge and approaches, Dubuque County  IA097IA

From

47

Page 51: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Kentucky

State Demo ID Project Description Amount  Project Description Amount

KY KY013 Louisville: Waterfront Development Roadway Improvements  389,144.20 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

389,144.20

KY KY020 Construct highway rail grade separations along the City Lead in Paducah 231,232.00 1‐122.01 | Paducah Waterfront 231,232.00

KY KY021 Extend Hurstbourne Parkway from Bardstown Road to Fern Valley Road 744,107.00 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

744,107.00

KY KY022 Correct Rock Hazard on US 127 N Russell County  2,001.81 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass, 

Russell County

2,001.81

KY KY025 Reconstruct KY‐210 from Hodgenville to Morning Star Road, Larue County 1,524,659.43 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 1,524,659.43

KY KY026 Construct Kentucky 31E from Bardstowns to Salt River 66,661.97 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 66,661.97

KY KY030 Construct Savage‐Sedar Knob Bridge at Koger Creek 231,508.45 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass, 

Russell County

231,508.45

KY KY034 Construct US 127 Jamestown Bypass 684,403.09 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass, 

Russell County

684,403.09

KY KY035 Reconstruct Liberty and Todd Roads, Lexington 1,206,667.62 7‐8902 | Extend existing 4‐ln on Liberty Rd from Graftons Mill Ln to New 

Circle Rd & improve intersection 

1,206,667.62

KY KY037 Construct KY‐70 from Cave City to Mammoth Cave 183,277.80 5‐538.00: Bullitt County; CONSTRUCT NEW I‐65 INTERCHANGE BETWEEN KY 

480 AND KY 245

183,277.80

KY KY038 Reconstruct US‐231: $5,625,000 for the segment between Dry Ridge Road 

and US‐231 and US‐31; $3,000,000 for the segment between Allen‐Warren 

County line and Dry Ridge Road

1,213,715.99 3‐16.04 | Construction of new I‐65 interchange in Warren County. 1,213,715.99

KY KY041 Reconstruction of the Louisville Trolley Barn 130,393.00 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

130,393.00

KY KY043 Ohio River Major Investment Study Project, Kentucky and Indiana, and 

preliminary engineering and ROW acquisitions associated with the project 

[Multi‐State project with Indiana, see IN049]

3,569,612.50 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

3,569,612.50

KY KY079 Trevillian Way, Kentucky 9,994.99 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

9,994.99

KY KY092 Louisville Medical Center Development Corporation Project, Kentucky 12,953.50 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

12,953.50

KY KY106 Replace Bridge over Stoner Creek, 2 Miles East of U.S. 27 Junction, Bourbon 

County

265,915.36 7‐1124 | Replace bridge on CR‐1308 (MP 3.588) over Townsend Creek; .9 MI 

E of JCT KY 353

265,915.36

KY KY107 Right‐of‐way for and construction of Pennyrile Parkway Extension from 41A S. 

to I 24

739,529.00 2‐180 | Widen KY‐911 from US‐41A to Oak Grove. 739,529.00

KY KY108 Reconstruct I 64 KY 180 Interchange, Boyd County, Kentucky 162,520.54 9‐1081 | Replace bridge on KY 474 over Smith Creek at intersection of KY 474 

& Nunn Road(CR 1507) 022B00123N

162,520.54

KY KY109 Reconstruct KY 393, Oldham County, Kentucky 162,521.00 5‐483 | Six lane priority section of I‐71 between I‐265 to Lagrange, KY in 

Oldham County

162,521.00

KY KY111 Construction of bypass between KY 55 and U.S. 68 at Lebanon in Marion 

County

346,654.00 4‐8916 | Heartland Parkway: Lebanon Bypass to Marion/Washington Line 346,654.00

KY KY113 Reconstruct U.S. 127 at Bellows Road, Mercer County 400,054.76 7‐1116 | Replace bridge and approaches on KY‐152 over Herrington Lake at 

the Mercer/Garrard Co line (084B00005N)

400,054.76

KY KY118 Reconstruction of KY 259 in Edmonson County from Green River Bridge at 

Brownsville to Kyrock Elementary School.

596,920.16 3‐16.04 | Construction of new I‐65 interchange in Warren County 596,920.16

ToFrom

48

Page 52: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Kentucky

State Demo ID Project Description Amount  Project Description Amount

ToFrom

KY KY121 Construct Westbound Access to Mountain Parkway from Exit 18 (KY 1057), 

Powell County

319,025.74 10‐126 | Widen the Mountain Parkway to  4‐lanes from Campton to 

Salyersville

319,025.74

KY KY123 Construct Pedestrian Mall and Streetscape Improvements on Lexington, 

College, Walnut and Gilespie Streets, Wilmore.

318,398.54 7‐915 | Reconstruct intersection of KY 29 north of Wilmore 318,398.54

KY KY128 Improve Prospect Street Pedestrian Access, Berea 438,927.85 7‐251.40 | Priority section II & III: Widen US‐25 from US 421 to Pumpkin Run. 438,927.85

KY KY131 Reconstruct U.S. 127 at U.S. 127 South, Mercer County 63,056.93 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at 

the Mercer/Garrard Co line

63,056.93

KY KY132 Reconstruct U.S. 127 from Hustonville Road to the Mercer County Line, Boyle 

County

121,890.00 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at 

the Mercer/Garrard Co line

121,890.00

KY KY133 Construct Northern Bypass of Somerset, KY and I‐66 from the Cumberland 

Parkway west of Somerset, Kentucky to I‐75 south of London, Kentucky

2,844,099.46 8‐196 | Widen US‐27 from KY‐590 to Bell Street in Stanford (Includes new 

Goshen Cut‐off Rd)

2,844,099.46

KY KY134 Replace U.S. 68 and U.S. 150 Bridge over Chaplin River, Perryville. 425,885.00 7‐1116 | Replace bridge & approaches on KY‐152 over Herrington Lake at the 

Mercer/Garrard Co line

425,885.00

KY KY136 Widen KY 11 from U.S. 460 to the Mount Sterling Bypass, Montgomery 

County.

1,028,672.93 7‐250.10 |Reconstruct US 460 at Lucky Stop Hill  1,028,672.93

KY KY138 Reconstruct U.S. 127 at the U.S. 127 and U.S. 127 North Bypass, Mercer 

County

425,279.75 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at 

the Mercer/Garrard Co line

425,279.75

KY KY140 Construct South Airfield Road, Boone County, Kentucky 271,526.48 6‐17.04 | Transportation improvements to Brent Spence Bridge  271,526.48

KY KY141 Construct two bridges across the Ohio River from Louisville to southern 

Indiana.

6,424,719.53 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

6,424,719.53

KY KY142 WIDEN AND RECONSTRUCT KY 698 AT MASON GAP ROAD, LINCOLN COUNTY 617,914.83 8‐196 | Widen US 27 from KY 590 to Bell St in Standord (MP 18.2 TO MP 

18.9), Lincoln Co

617,914.83

KY KY145 Construct Kidville Road (KY 974) Interchange at the Mountain Parkway, Clark 

County

149,896.09 10‐126 | Widen the Mountain Parkway to 4‐lanes from Campton to 

Salyersville

149,896.09

KY KY149 Owensboro Riverfront Development Project in Owensboro. 3,047,254.63 2‐8300 | Widening KY‐54 from the US‐60 bypass toward Whitesville from 

milepost 2.45 to milepost 8.0.

3,047,254.63

KY KY151 Oregon Road Bridge Replacement Project in Mercer County. 282,550.73 7‐1116 | Replace bridge & approaches on KY‐152 over Herrington Lake at 

Mercer/Garrard Co line (084B00005N)

282,550.73

KY KY152 Ashland Riverfront Development Project in Ashland. 1,123,098.00 9‐1081 | Replace bridge on KY 474 over Smith Creek in Carter at intersection 

of KY 474 & Nunn Rd(CR 1507) 022B00123N

1,123,098.00

KY KY156 Abraham Lincoln Project, LaRue County 495,163.00 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 495,163.00

KY KY157 Breathitt‐Pennyrile Extension, Christian County 253,935.00 2‐180 | Widen KY‐911 from US‐41A to Oak Grove. 253,935.00

KY KY159 Transportation Improvements to Hwy 163 from Hwy 90 to Tompkinsville, 

Monroe County

2,122,504.95 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass, 

Russell County

2,122,504.95

KY KY163 21st Century Parks Project in Louisville, Kentucky 3,818,622.64 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017 

pledged to support financing of LSIORB

3,818,622.64

KY KY165 Owensboro Riverfront Development Project in Owensboro, Kentucky 962,024.00 2‐8300 | Widening KY‐54 from the US‐60 bypass toward Whitesville from 

milepost 2.45 to milepost 8.0.

962,024.00

Total Amount Repurposed 38,428,894.25Total # of Earmarks Repurposed 43

49

Page 53: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Louisiana

State Demo ID Project Description Amount  Project Description Amount

LA LA021 Replace ferry in Plaquemines Parish 189,497.17 H.011276 New Orleans Airport Connector Road  Sega 189,497.17

LA LA023 Increase Capacity of Lake Pntchartrain Causeway 248,120.91 H.011276 New Orleans Airport Connector Road  Sega 248,120.91

LA LA027 Reconstruct Jefferson Lakefront Bike path in Jefferson Parish, LA 153,188.06 153,188.06

LA LA029 Construct a feasibility study, design and construction of connector between 

LA 16 to I 12 Livingston

204,669.19 H.008250 I‐10 Highland to LA 73 204,669.19

LA LA044 Construct N/S Road / I 10 US 61 connection in Kenner, LA 2,270,168.36 H.011276 New Orleans Airport Connector Road  Sega 2,270,168.36

LA LA047 Widen Lalpalco Blvd from Barataria Blvd to Destrehan Ave in Jefferson parish, 

LA

638,701.41 H.011276 New Orleans Airport Connector Road  Sega 638,701.41

LA LA048 LA Segment, Gulk Coast High Speed Rail 119,246.63 H.011276 New Orleans Airport Connector Road  Sega 119,246.63

LA LA050 LA 3132 to Caddo_Bossier Port, Shreveport 354,801.15 H.011484 US 80 Red River BR Texas St Rehab (HB) 354,801.15

LA LA056 I 20 Garrett Road 496,750.00 H.011621 I‐20: LA 133 ‐ US 425 496,750.00

LA LA057 LA 18 Widening Jefferson Parish, LA 215,589.00 H.011276 New Orleans Airport Connector Road  Sega 215,589.00

LA LA080 Develop Master Plan for NO RMC 40,630.00 H.011276 New Orleans Airport Connector Road  Sega 40,630.00

LA LA082 Interstate Lighting System (I10 at LA 93) 24,378.00 H.003003 I‐10; E JCT I‐49 TO LA 328 24,378.00

LA LA085 Construct Miss River Trail and Bike path, NO 40,630.00 H.011276 New Orleans Airport Connector Road  Sega 40,630.00

LA LA087 Installation of proper lighting standards to illuminate inbound and outbound 

ramps of I 10 and LA 95

16,252.00 H.003003 I‐10; E JCT I‐49 TO LA 328 16,252.00

LA LA089 Upgrade highway railway x‐ings at Madison St. Gretna 16,252.00 H.011276 New Orleans Airport Connector Road  Sega 16,252.00

LA LA092 Plan, design and construct Pointe Clair Expressway in Iberville Parish 2,403,540.00 H.009250 I‐10 Highland to LA 73 2,403,540.00

LA LA093 Water Well Road Gateway Corridor (LA 478) 1,841,133.16 H.001146 LA120: Bridges Near Provencal 1,841,133.16

LA LA094 Construction of Turn Lane Expansion w/signals at N/B off ramp on I 49 at US 

90

40,630.00 H.003003 I‐10; E JCT I‐49 TO LA 328 40,630.00

LA LA096 Improve by widening, realigning and resurfacing 3.2 miles of LA 850 between 

LA 145 and LA 821

256,009.93 H.011621 I‐20: LA 133 ‐ US 425 256,009.93

LA LA099 Construction of a direct intermodal truck access road from I 210 to the City 

Docks of the Port of LC

9,658,251.15 H.000428 LA 12 Bridges 9,658,251.15

LA LA100 Improvements to Essen lane at I 12, Perkins Rd, Central thruway, O'Neal Ln, 

Burbank Dr & Essan Pk and LA408 study

2,658,521.03 H.008250 I‐10 Highland to LA 73 2,658,521.03

LA LA101 Study for LA 25 Washington Parish 211,356.95 H.012191 LA 445  S End I‐12 Overpass ‐ US 190 211,356.95

LA LA106 Construct I 12 and LA 1088 Interchange 243,780.00 H.012191 LA 445  S End I‐12 Overpass ‐ US 190 243,780.00

LA LA108 Upgrade LA 28 to four lanes from LA 121 to LA 465 162,520.00 H012106 LA 465: US 171 to Fort Polk Gate 162,520.00

LA LA110 Construct LA 16 Inch at I 12 and improvements; Cook Rd improvements 9,662,312.62 H.009250 I‐10 Highland to LA 73 9,662,312.62

LA LA111 Improvements to Zachary Taylor Parkway 162,520.00 H.009250 I‐10 Highland to LA 73 162,520.00

LA LA116 New Iberia Rail Grade  Separation 340,773.20 H.003003 I‐10; E JCT I‐49 TO LA 328 340,773.20

LA LA122 Widen LA 18 from Northrup Grumman/Avondale Shipyards to US 90, 

Jefferson Parish

203,265.20 H.011276 New Orleans Airport Connector Road  Sega 203,265.20

LA LA123 Improvements to LA 46, St Bernard Parish 32,504.00 H.011276 New Orleans Airport Connector Road  Sega 32,504.00

LA LA131 Red River National Wildlife Refuge Visitor Center 243,780.00 H.011484 US 80 Red River BR Texas St Rehab (HB) 243,780.00

LA LA145 Connection between LA 51 bypass and old Baton Rouge LA 1040_Hammond 100,148.00 H.012191 LA 445  S End I‐12 Overpass ‐ US 190 100,148.00

LA LA148 Design and acquire ROW, LA I 69 2,503,688.00 H.011484 US 80 Red River BR Texas St Rehab (HB) 2,503,688.00

LA LA156 LA 1 Drainage and Sidewalk improvements in Grand Isle 285,365.63 H.004540 Leeville to Golden Meadow (Phase 2) 285,365.63

LA LA162 Improve Natchitoches Johnson Chute and Posey Road Connection from I 49 

to LA1

237,503.82 H.001146 LA120: Bridges Near Provencal 237,503.82

LA LA178 George Ridge Road Bridge 21,313.18 H.011621 I‐20: LA 133 ‐ US 425 21,313.18

ToFrom

50

Page 54: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Louisiana

State Demo ID Project Description Amount  Project Description Amount

ToFrom

LA LA193 Planning, Design, and Construction of I 69 in TX, LA, AR, MS, TN, KY and IN 6,470,635.40 H.011484 US 80 Red River BR Texas St Rehab (HB) 6,470,635.40

LA LAM01 I‐20 Downing Pines Interchange, Louisiana (Funding in FMIS) 940,419.00 H.011621 I‐20: LA 133 ‐ US 425 940,419.00

Total Amount Repurposed 43,708,844.15Total # of Earmarks Repurposed 37

51

Page 55: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Maine

State Demo ID Project Description Amount  Project Description Amount

ME ME028 Relocation of southbound on‐ramp to I‐95 at Exit 184, Bangor ‐ Public Law 

1090059 1702 157. Original allocation HY10 FY2005, LY10 FY 2006

1,502,213.00 Bridge replacement: Ohio Street / I‐95 bridge #5790 in Bangor, carrying Ohio 

Street over I‐95

1,502,213.00

ME ME037 Modifications to Exit 7 / I‐295 and to Franklin Arterial, Portland ‐ Public Law 

1090059 Section 1702 1231, original allocation FY 2007.

180,266.00 Portland ‐ I‐295 updating of wayfinding signage along I‐295 between exits 5 

and 9. Signing; Highway Safety and Spot Improvements

180,266.00

ME ME074 Replacement of Waldo‐Hancock and construction of related pedestrian 

walkways ‐ Public Law 1090059 1934 194. Original Allocation FY 2005

1,002,341.00 Bridge wearing surface replacement: Penobscot Narrows Bridge #6421 on the 

Prospect‐Verona town line, carrying Rts 1 & 3 over the Penobscot River

1,002,341.00

Total Amount Repurposed 2,684,820.00Total # of Earmarks Repurposed 3

ToFrom

52

Page 56: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Maryland

State Demo ID Project Description Amount  Project Description Amount

Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to 

existing Earmark MD082

2,454,720.00

Inner Water Taxi Terminal Project 750,000.00

MD MD061 Per Review Study of Conflicts between Road System and Light Rail Operations 

in Linthicum, MD

80,118.00 Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to 

existing Earmark MD082

80,118.00

MD MD062 Study Greater Towson Area Traffic Flow and Future Needs 160,236.00 Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to 

existing Earmark MD082

160,236.00

MD 355 Tunnel Underpass (BRAC) project: south of Jones Bridge Road/ 

Center Drive to North of South Wood 

844,001.28

Drive/South Drive.  This project is to tie WMATA station to the Bethesda 

faculties

1,158,948.72

Total Amount Repurposed 5,448,024.00

Total # of Earmarks Repurposed 4

2,002,950.00Roadway Improvements from Intersection of US 29 in Montgomery County 

along Industrial Parkway thru to FDA access/Cherry Hill Road

MD134MD

To

3,204,720.00Construction of Fringe and Corridor Parking Facility at intersection of Clinton 

Street and Keith Avenue in Baltimore City

MD057MD

From

53

Page 57: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Massachusetts

State Demo ID Project Description Amount  Project Description Amount

MA MA015 Undertake improvements to South Station Intermodal Station 908,221.00 MBTA bus stop accessibility and operational improvements 908,221.00

MA MA117 Realignments and reconstruction of a section of Route 32 in Palmer to the 

Ware town line

2,563,776.00 Design and construction of improvements to Route 32 in the Town of Palmer 2,563,776.00

MA MA119 Assabet River National Wildlife Refuge, MA, Design and Construction of 

parking areas

42,662.00 Great Meadows National Wildlife Refuge Transportation Project 42,662.00

MA MA123 Construct new interchange on I‐95 between existing Route 1A ramp to the 

north and Route 123 ramp to the south, Attleboro

500,738.00 Interchange Improvements at Routes 24 & 140  500,738.00

MA MA124 Commonwealth Ave/Kenmore Sq. roadway and pedestrian improvements 406,299.00 Improvements on Boylston Street, from Intersection of Brookline Avenue and 

Park Drive to Ipswich Street in Boston

406,299.00

MA MA125 Improve traffic signal operations, pavement markings and regulatory signage, 

Milton‐Boston City Line

1,201,770.00 Deck reconstruction over SE Expressway (East Milton Square), includes 

parking and new landscaped area

1,201,770.00

MA MA127 Pedestrian Walkway for the Town of Norwood Design and construction of the 

walking path at Ellis Pond, Norwood [ref P.L. 110‐244, Sec 105(a)(154)]

781,151.00 Intersection and signal improvements at US 1 (Providence Highway) and 

Morse Street in Norwood

781,151.00

MA MA128 Study and design I 93/Mystic Ave. Interchange at Assembly Sq 400,590.00 Design of signal and intersection improvement on I‐93 at Mystic Avenue and 

McGrath Highway 

400,590.00

MA MA133 Longwood Ave/Urban Ring Tunnel Study 129,995.00 MBTA bus stop accessibility and operational improvements within the 

Longwood Medical Area

129,995.00

MA MA149 Design and construct signal crossing and other safety improvements to 

Emerald Necklace Greenway Bicycle Trail, Town of Brookline

600,885.00 Pedestrian bridge rehabilitation over MBTA off Carlton Street 600,885.00

MA MA154 East Boston Haul Road Construction 5,007,375.00 Construct Melnea Cass Corridor Improvement in Boston #5789 5,007,375.00

MA MA156 Design and construct the Quinebaug River Rail Trail Bikeway 801,180.00 Rail Trail & Quinebaug River bank stabilization in the Town of Southbridge 801,180.00

MA MA170 Massachusetts Bay Transportation Authority Secure Station, Boston 1,001,475.00 MBTA bus stop accessibility and operational improvements 1,001,475.00

MA MA174 Oxbow National Wildlife Refuge, Design and construction of a Visitor Contact 

Station

152,362.00 Great Meadows National Wildlife Refuge Transportation Project 152,362.00

MA MA175 Rehabilitation and paving of Parker River Road 20,315.00 Intersection and signal improvements at Route 125 and Massachusetts 

Avenue in North Andover

20,315.00

MA MA181 Chelsea Roadway Improvements 2,002,950.00 Chelsea Silver Line Gateway Phase Two 2,002,950.00

MA MA188 Construct access improvements to the Lawrence Gateway Project, Lawrence  65,000.00 608407 Lawrence‐ Traffic Signal Improvements on Common Street and Lowell 

Street

65,000.00

MA MA189 Construct pedestrian and vehicular access improvements on the existing 

Brightman Street Bridge in Fall River

500,738.00 Corridor improvements on Route 79/Davol Street  500,738.00

MA MA194 Road improvements between Museum Road and Forsyth Way in Boston. 2,784,425.00 Construct Melnea Cass Corridor Improvement in Boston #605789 2,784,425.00

MA MA199 Construct Lechmere Station area roadway and access improvements in 

Cambridge.

5,007,375.00 Green Line Extension 5,007,375.00

Total Amount Repurposed 24,879,282.00Total # of Earmarks Repurposed 20

ToFrom

54

Page 58: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

MI MI005 Traffic Improvement Demo‐ Petoskey MI, US 31 Bypass or upgrade existing 

local roads.  (See PL 104‐205 Sect 406) Petoskey area transportation needs

53,781.86 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

53,781.86

MI MI006 M‐59: Urban Highway Corridor Demo (MI) 1,352,329.22 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

1,352,329.22

MI MI007 Urban Airport Access Safety Demo (MI) Detroit Airport 1,953,951.34 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore 

and Rehabilitate

1,953,951.34

MI MI008* Bristol Rd Relocation ‐ PE Demo ‐ Flint (MI) 79,765.86 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

79,765.86

MI MI009 M‐84: Expansion Saginaw‐PE Demo‐ Bay Counties, MI 15,466.45 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

15,466.45

MI MI010 US‐31 in cities of Niles & Benton Harbor‐ PE Demo 2,840.36 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the 

intersection with Howard Street in the City of Kalamazoo 

2,840.36

Monroe County ‐ Dennison Rd ‐ over Middle Br Macon Drain ‐ Bridge 

replacement

879,335.04

Monroe County ‐ Macomb N ‐ Elm E to Grove E ‐ Restore and Rehabilitate 39,098.60

MI MI017 Flint: Design & construct 1.02 miles of 5‐lane roadway 2,399.77 City of Flint ‐ Resurface ‐ Kearsley Street ‐ Chevrolet Avenue to Beach Street 2,399.77

MI MI018 Traverse City: Traverse City Bypass 65,877.61 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

65,877.61

MI MI019 Cadillac: Improvements to US 131 from Cadillac to Manton to Traverse City 10,756.88 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

10,756.88

MI MI023 Jackson County: US 127 Upgrading 327.80 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph 

County line for 8.0 miles easterly 

327.80

MI MI024 Vienna Township: I‐75/M57 interchange 41,969.92 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

41,969.92

MI MI029 20M dollars appropriated in PL 103‐122 shall be made available to MI. for M‐

59 RR‐Xing project at Pontiac; Bristal Road projects near Flint and $500,000 

available to Maple Rd at Bishop Airport.

162,066.26 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

162,066.26

MI MI038 Construct route improvements along Washington Ave. between Janes Ave. to 

Johnson St. and East Genesee Ave. Sagin

131.82 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

131.82

MI MI039 Construct Tawas Beach Road/US 23 interchange improvements, East Tawas 138,533.64 Iosco County ‐ Hot Mix Asphalt Reconstruction ‐ US‐23 ‐ North of Tawas 

Beach Road to 110' south of Kirkland Drive, City of Tawas and Baldwin 

Township

138,533.64

MI MI042 Operational improvements on M‐24 from I‐75 to the northern Oakland Co. 

border

12,550.00 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

12,550.00

MI MI046 Construct Bridge Street bridge project in Southfield 125.12 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

125.12

MI MI071 Replace Barton Rd./M‐14 interchange, Ann Arbor 266,581.19 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

266,581.19

MI MI073 Construct M‐24 Corridor from I‐69 to southern Lapeer County 1,039,022.38 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

1,039,022.38

MI MI080 Construct US‐27 between St. Johns and Ithaca 8.21 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

8.21

To

918,433.64Rail Consolidation/Highway Safety ‐ Monroe (MI)MI011MI

From

55

Page 59: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MI MI088 Conduct engineering and design and improve I‐94 in Calhoun and Jackson 

Counties

192,071.85 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the 

intersection with Howard Street in the City of Kalamazoo 

192,071.85

MI MI090 Construction of, and improvements to, the Detroit, Michigan Ambassador 

Bridge Ga

684,250.35 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road, 

City of Sterling Heights, City of Utica and Shelby Township

684,250.35

MI MI095 I‐96/ Cedar/Pennsylvania Interchange, Michigan 212,373.06 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

212,373.06

MI MI097 Oakland County Smart Corridor and Emergency Routing System, Michigan 30,357.38 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft. of 

South Blvd from Fredmoore Dr to Livernois ‐ Road ‐ Local road ‐ add right turn 

lanes, upgrade signal and resurface intersection

30,357.38

MI MI109 Clinton Township Hike/Bike Pathway, Michigan 499.99 Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica 

Park ‐ Bike/Pedestrian ‐ construct hike/bike path

499.99

MI MI114 Grand River Avenue, City of Novi, Michigan 42,894.28 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft. of 

South Blvd from Fredmoore Dr to Livernois ‐ Road ‐ Local road ‐ add right turn 

lanes, upgrade signal and resurface intersection

42,894.28

MI MI125 Traverse City Study 127.01 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

127.01

MI MI128 South Lyon, 2nd St. between Warren and Haggadorn  Pontiac Trail between 

E. Liberty and McHattie Street [ref P.L. 110‐244, Sec 105(a)(92)]

100,148.00 City of South Lyon ‐ McMunn St ‐ Dorothy St to McHattie St ‐ Restore and 

Rehabilitate

100,148.00

MI MI137 Construction and improvements to Western Avenue and associated streets 

between Third Street and Terrace Street in Muskegon

635,563.80 City of Muskegon, Reconstruction of Laketon Ave from Getty to Creston 635,563.80

MI MI139 Alger County, Repaving a portion of H‐58 from Buck Hill towards Little Beaver 

Road Alger County, to reconstruct, pave, and realign a portion of H‐58 from 

2,600 feet south of Little Beaver Lake Road to 4,600 feet east of Hurricane 

River [ref P.L. 110‐244, Sec 105(a)(114)]

177,933.75 H‐58, Alger County, Beginning at Newberg road, extending 1.8 miles Easterly ‐ 

Reconstruct ‐ hot mix asphalt paving, aggregate base, hot mix asphalt crush 

and shape, shoulders, guardrail, pavement marking, traffic control

177,933.75

MI MI140 Allen Road under the CN Railroad Grade Separation, Woodhaven 3,263,009.37 Wayne County ‐ Allen Rd, Van Horn Rd, in the cities of Trenton and 

Woodhaven ‐ restore and rehabilitate

3,263,009.37

MI MI143 Construct access road at intersection of Doerr Road and Schell Street to 

Develop 65‐Acre of Municipal Tract of Industrial Land. Village of Cass City, 

Tuscola County

20,830.40 Village of Cass City ‐ Crack Sealing, pavement markings ‐ Seeger street from 

the south village limit to the north village limit. 

20,830.40

MI MI144 Design, Right‐of‐Way and Construction of the I 196 Chicago Drive (Baldwin 

Street) Interchange Modification, Michigan

5,082,806.75 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the 

intersection with Howard Street in the City of Kalamazoo 

5,082,806.75

MI MI145 Arenac County, Upgrade Maple Ridge Road from Briggs Road east to M65 169,723.68 Arenac County ‐ Reconstruct ‐ Sterling Rd ‐ Hull Rd to US23 169,723.68

MI MI147 Iosco County, Reconstruct Bissonette Road from Lorenz Road to Chambers 

Road

33,921.00 Iosco County, Resurface, Putnam Road from Esmond Road to Webb Road 33,921.00

MI MI150 Cogshall Road Crossing Improvement and Life Safety Access Project in Holly, 

MI

961,416.00 Oakland County ‐ Grange Hall Rd ‐ Intersection with N. Saginaw/North Holly 

Rd ‐ Traffic Ops/Safety

961,416.00

MI MI151 Ontonagon County, Improve Fed. Forest Hwy 16 from M 38 to Houghton 

County Line

58,791.89 Ontonagon County ‐ Reconstruct ‐ Mud Creek Road from Roussea Road to Fox 

Road

58,791.89

MI MI154 Widen M72 from U.S. 31 easterly 7.2 miles to Old M72 268,360.58 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

268,360.58

MI MI157 Resurfacing of Masonic Boulevard in Fraser. 266,031.51 City of Fraser ‐ Masonic Blvd ‐ Kelly Rd to Gratiot Ave ‐ Restore and 

Rehabilitate

266,031.51

MI MI158 Reconstruction of Nine Mile Road in Eastpointe 117,196.39 City of Eastpointe ‐ Toepfer Rd ‐ Gratiot to Boulder ‐ Restore and Rehabilitate 117,196.39

56

Page 60: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MI MI159 M‐168 Reconstruction in the village of Elberta 199,513.93 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

199,513.93

MI MI166 M‐13 Washington Avenue Streetscape Project. Phase II of High Priority 

Project 192 in Public Law 105‐550, City of Saginaw

338,506.18 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

338,506.18

MI MI167 Construct railroad grade separation on M‐85 (Fort Street) North of Van Horn 

Road, Trenton.

1,143,073.06 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road, 

City of Sterling Heights, City of Utica and Shelby Township

1,143,073.06

MI MI168 Construct pedestrian trail and bridge in Kearsley Park in Flint. 80,118.00 City of Flint ‐ Resurface ‐ Kearsley Street ‐ Chevrolet Avenue to Beach Street 80,118.00

MI MI170 Construction of Greenways in Pittsfield Charter Township‐‐2.5 miles to 

existing Ann Arbor Greenways, Pittsfield Charter Township

61,298.84 Washtenaw County ‐ Pittsfield Township ‐ Non‐motorized improvements ‐ 

Bike/Pedestrian

61,298.84

MI MI171 I‐96 Beck, Wixom Road Interchange, design, ROW, and construction 478,422.14 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

478,422.14

MI MI172 Construction of a hike and bike path from Riverbends Park, 22 Mile Road, to 

Stony Creek Park, 25 Mile Road in Shelby Township. South to the city of Utica 

[ref P.L. 110‐244, Sec 105(a)(200)]

110,974.83 Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica 

Park ‐ Bike/Pedestrian ‐ construct hike/bike path

110,974.83

Oscoda County ‐ Reconstruction‐Crush, shape, pave, shoulder, pavement 

marking and permanent sign replacement, North Mount Tom Rd from M‐33 

north to Miller road & W. Miller Rd from Gerber Rd east to M‐33

132,033.00

Oscoda County ‐ Crush, shape, pave 2” HMA, shoulders and permanent 

pavement markings, Townline Rd.  from Lyle Road north to County line.

165,644.00

MI MI180 Purchase and implementation of various Intelligent Transportation System 

technologies in the Grand Rapids metro region.

1,413,438.93 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the 

intersection with Howard Street in the City of Kalamazoo 

1,413,438.93

MI MI181 Menominee, Ogden Street Bridge rehabilitation project‐replacement of deck, 

expansion joints, sidewalks, railing and all other joints

160,236.00 City of Menominee, paint structural steel, repair mechanical and seals of 

Ogden Street Bridge

160,236.00

MI MI184 Construction of the I‐696 and Northwestern Highway Interchange Freeway 

Ramps at Franklin Road in Southfield

473,889.76 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

473,889.76

MI MI186 Construction of Nonmotorized Pathway, City of Rockwood. 28,419.75 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore 

and Rehabilitate

28,419.75

MI MI188 Sault Ste. Marie, Reconstruct East Spruce Street with drainage, curb, gutter, 

pavement, traffic control devices.

297,575.72 City of Sault Ste Marie ‐ Reconstruction ‐ E. Spruce Street, bridge over Power 

Canal to Ord Street

297,575.72

MI MI189 Study and construct I‐96/ U.S. 31/Sternberg Road area improvements. 2,002,950.00 Muskegon County ‐ US‐31 ‐ C&O Railroad north to north of Fruitvale Road, in 

village of Lakewood Club, townships of Dalton, Fruitland, Whitehall and 

Montague

2,002,950.00

MI MI191 Construct North Central Muskegon County Corridor Improvements at U.S. 31 

and Russell Road

392,191.67 River Road, from Horton to Buys Road, Resurface 392,191.67

MI MI192 St. Clair County Parks is working with 13 local units to develop the 54‐ mile 

Bridge‐to‐Bay trail

118,159.55 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of 

South Blvd from Fredmoore Dr. to Livernois

118,159.55

MI MI194 Integrated highway realignment and grade separations at Port Huron, MI to 

eliminate road blockages from NAFTA rail traffic.

45,431.81 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of 

South Blvd from Fredmoore Dr. to Livernois

45,431.81

MI MI196 Houghton County, Rehabilitate 2 piers and remove old bridge caissons for 

Sturgeon River Bridge.

42,444.31 Houghton County, Rice Lake Road crush and shape 42,444.31

MI MI197 Westland, Ann Arbor Trail between Farmington and Merriman between 

Hines Drive and Inkster, Flamingo Street between Ann Arbor Trail and Joy 

Road, and the intersection of Warren Road and Newburgh Road [ref P.L. 110‐

244, Sec 105(a)(91)]

676,346.07 City of Westland ‐ Cowan Rd ‐ Wayne Rd to Farmington Rd ‐ Restore and 

Rehabilitate

676,346.07

297,677.00Oscoda County, Reconstruction and surfacing of Valley Road from M‐33 west 

to Mapes Road

MI177MI

57

Page 61: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MI MI198 White Lake and Commerce, pave Cooley Lake Road Between Ripple Way and 

Havenwood.

300,990.01 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and 

Rehabilitate

300,990.01

MI MI202 Widen and reconstruct Walton Boulevard Bridge in Auburn Hills between 

Opdyke and Squirrel Road

1,050,230.65 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and 

Rehabilitate

1,050,230.65

Macomb County ‐ Macomb Orchard Trail ‐ 2230' East of M‐53 on the East 

side of East Coon Creek to 3624' to the West side of Powell Rd ‐ 

Bike/Pedestrian ‐ construct trail segment

143,634.40

Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica 

Park ‐ Bike/Pedestrian ‐ construct hike/bike path

343,257.00

MI MI207 Construct pedestrian and bicycle pathway at Chippewa Landing River Park in 

the Village of Caro

64,094.00 City of Caro ‐ mill and overlay ‐ Gilford Road between Hooper Street and 

Western city limit boundary

64,094.00

MI MI211 Planning and Engineering for The American Road, The Henry Ford Museum, 

Dearborn

241,765.20 City of Dearborn ‐ Prospect Rd ‐ Schlaff to Schaefer ‐ Restore and 

Rehabilitation

241,765.20

MI MI214 City of Menominee, Resurface Hattie Street Bridge deck 250 feet from 9th 

avenue in Menominee to Riverside Avenue in Marinette, WI.

180,266.00 City of Menominee, Bridge Deck replacement and approaches 180,266.00

MI MI215 Emmet County, Ultra thin demonstration project resurfacing of Mitchell Road 

from the City of Petoskey limits east to Division

6,241.59 2018 North Conway Road reconstruction project from Hathaway Road to 

Edward Road., Emmet County

6,241.59

MI MI217 Ogemaw County, Overlay of Fairview Road to improve network of all‐season 

truck routes

34,754.67 Ogemaw County, Reconstruct, State Road, Henderson Lake Road to Schagel 

Rd.

34,754.67

MI MI221 Study and implement transportation system alternatives in the vicinity of U.S. 

31/M 46

439,429.38 River Road, from Horton to Buys Road, Resurface 439,429.38

MI MI222 Study to determine replacement options for obsolete and structurally 

deteriorating bridge (Trenton‐Grosse Isle Bridge) including approach 

roadways, Charter County of Wayne

3,204,720.00 Wayne County ‐ Grosse Ile Bridge ‐ over Trenton Channel ‐ Bridge repair 3,204,720.00

MI MI223 Design, right‐of‐way and construction of passing relief lanes and 

improvements necessary on M‐55, between M‐37 and M‐ 115

178,772.28 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand 

Traverse County line easterly to Kalkaska Rd

178,772.28

MI MI227 Walled Lake, Widen Maple Road, west of Decker to Welch. 100,148.00 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and 

Rehabilitate

100,148.00

MI MI228 Construction of Pittsfield Greenways Bridge‐‐Non‐ motorized bridge 

enhancement onto existing Bemis Road Bridge, Pittsfield Charter Township 

Pittsfield greenways construction to connect Pittsfield to the Ann Arbor 

greenway system, Pittsfield Township [ref P.L. 110‐244, Sec 105(a)(352)]

39,516.00 Washtenaw County ‐ Pittsfield Township ‐ Non‐motorized improvements ‐ 

Bike/Pedestrian

39,516.00

MI MI233 Study road runoff in Little Black Creek between U.S. 31 and Seaway Drive. 73,841.03 West Michigan Shoreline Regional Development Commission ‐ study 

strategies for port expansion and multi‐modal opportunities that can tie 

water, air, rail and highway modes of transportation together to add 

efficiency to the regional transportation network and enhance economic 

opportunities in the port. The Port of Muskegon was the #1 project selected 

for the Regional Prosperity Initiative (RPI) which was driven by Governor 

Synder. 

73,841.03

MI MI234 Eliminate major roadway on Cleary University campus and establish a new 

roadway.

101,607.68 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of 

South Blvd from Fredmoore Dr. to Livernois

101,607.68

MI 486,891.40Re‐surfacing Sebewaing Road in Huron County. Construct hike and bike path 

as part of Bridgeview Bridge replacement in Macomb County [ref P.L. 110‐

244, Sec 105(a)(209)]

MI206

58

Page 62: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MI MI237 Construct Industrial Park Service Road and Caine Road Bridge Replacement. 

Village of Millington, Tuscola County

62,426.39 Main Street in the Village of Millington, Tuscola County between M‐15 and 

Railroad Tracks just east of Depot St. Rotomill curb edges to 2" below finish 

grade and mill 2" butt joints, clean and apply SS‐1H Bondcoat for adhesion of 

2" overlay install 2" compacted thickness of 36A wearing course HMA

62,426.39

MI MI238 Canton, Pave Cherry Hill Rd. between Canton Ctr., and Haggerty 1,602,360.00 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore 

and Rehabilitate

1,602,360.00

MI MI239 Design, Right‐of‐Way and Construction of the I‐196 Chicago Drive (Baldwin 

Street) Interchange Modification, Michigan

710,857.15 Newaygo County ‐ Single course chip with fog seal utilizing a scrub seal in 

place of overband pretreatment. M‐20 ‐2,012' E of 144th Avenue east to 32' 

W of Winter Street, in village of Hesperia, Ferry and New Field Townships, 

Newaygo County. 44' E of Greenback east to 15' W of M‐37, in village of 

Hesperia, Ferry, New Field, Denver, Lincoln and Wilcox townships, Oceana 

and Newaygo counties. 

710,857.15

MI MI246 Reconstruct and widen I‐94 in Kalamazoo 812,599.85 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph 

County line for 8.0 miles easterly 

812,599.85

MI MI247 Construct an interchange at I‐675 and Warren Avenue near downtown 

Saginaw

812,599.85 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

812,599.85

MI MI249 Reconstruct I‐75 from North of U.S.‐2 to Sault Ste. Marie and reconstruct the 

existing roadway, Sault Ste. Marie

609,449.90 Emmet County ‐ HMA Crush and shape and HMA resurface US‐31 from 

Douglas Lake Rd north to E. Levering Rd, McKinley Township, Emmett County

609,449.90

MI MI252 Allen Road under the CN Railroad Grade Separation, Woodhaven 6,008,850.00 Wayne County ‐ Allen Rd, Van Horn Rd, in the cities of Trenton and 

Woodhaven ‐ restore and rehabilitate

6,008,850.00

City of Sault Ste Marie ‐ Reconstruction ‐ West 4th Avenue ‐ Hyde Street to 

Oak Street

253,169.65

City of Sault Ste Marie ‐ Reconstruction ‐ E. Spruce Street, bridge over Power 

Canal to Ord Street

174,968.71

MI MI256 Construction of the I‐696 and Northwestern Highway Interchange Freeway 

ramps at Franklin Road in Southfield

304,724.98 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

304,724.98

MI MI259 Alger County, to reconstruct, pave, and realign a portion of H‐58 from 2,600 

feet south of Little Beaver Lake Road to 4,600 feet east of Hurricane River

144,688.35 H‐58, Alger County, Beginning at Newberg road, extending 1.8 miles Easterly ‐ 

Reconstruct ‐ hot mix asphalt paving, aggregate base, hot mix asphalt crush 

and shape, shoulders, guardrail, pavement marking, traffic control

144,688.35

MI MI262 Reconstruct and widen I‐94 in Kalamazoo 2,858,372.17 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph 

County line for 8.0 miles easterly 

2,858,372.17

MI MI267 Jackson Road Boulevard Project, Scio Township 481,012.16 Washtenaw County ‐ Various Roads, Jackson, Baker, Liberty, Wagner and 

Zeeb ‐ Restore and Rehabilitate

481,012.16

MI MI268 Blue Water Bridge Plaza Expansion, Improve Highway connections along I‐94 

and I‐69 Port Huron

1,696,683.72 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road, 

City of Sterling Heights, City of Utica and Shelby Township

1,696,683.72

MI MI271 Washington Ave. Streetscape and rail relocation in Saginaw 341,134.59 Saginaw County ‐ Mill & Two Course Overlay ‐ M‐46 ‐ West limits of Merrill to 

Brennan Road 

341,134.59

MI MI272 U.S. 131 widening from the Manistee River to north of M‐113 in Grand 

Traverse County

847,757.61 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

847,757.61

MI MI273 11 Mile Road Reconstruction‐‐Berkley, Huntington Woods, Oak Park 192,404.88 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and 

Rehabilitate

192,404.88

MI MI274 Planning design, and construction of a new American border plaza at the Blue 

Water Bridge in or near Port Huron, MI

1,552,784.78 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger 

Highway to west of Fenton road

1,552,784.78

428,138.36West Portage Avenue realignment, Sault Ste. Marie.MI254MI

59

Page 63: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MI MI308 Greeway trail construction from City of Monroe to Sterling State Park, City of 

Monroe

8,342.83 Monroe County ‐ Macomb N ‐ Elm E to Grove E ‐ Restore and Rehabilitate 8,342.83

MI MIM01 Berrien County ‐ I‐94 from I‐196 to Friday Road (Exits 34‐39) ‐ resurfacing 

maintenance crossovers

25,979.40 Berrien County ‐  I‐94 and I‐196 ‐ restore, resurface, relocate road and bit 

resurface and bit shoulders. Replace culvert ‐ location I‐94 to North of M‐63

25,979.40

MI MIM02 Oakland County ‐ I‐96/Wixom Road Interchange ‐ resurfacing maintenance 

crossovers

163,155.64 Wayne County ‐ I‐275 ‐ Concrete pavement repairs, joint sealing and 

miscellaneous work ‐ S. County Line to N. of Northline Road

163,155.64

*Subject to availability of funds upon additional research.

Total Amount Repurposed 52,963,484.42

Total # of Earmarks Repurposed 94

60

Page 64: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Minnesota

State Demo ID Project Description Amount  Project Description Amount

MN MN002 Bloomington Ferry Bridge 63,111.85 "MN120" Right of way Acquisition and Construction at CSAH 115/CR 116 for 

the TH 55 corridor protection project

63,111.85

MN MN031 Undertake improvements to Hennepin County Bikeway 251,087.72 Lake Street Access Project to 35W 251,087.72

MN MN107 Construct recreational visitor center on the Mesabi Trail, City of Virginia, 

Eveleth [ref P.L.110‐244, Sec 105(a)(5)]

178,726.80 **MN175"" Construct Mesabi Trail from McKinley to Bibwabik 178,726.80

MN MN111 Trail Extensions to Mesabi Trail, City of Aurora 135,455.37 St. Louis County CSAH 101 from County Road 955 to Kimberly Avenue in 

Eveleth

135,455.37

MN MN112 Right‐of‐way acquisition for TH 23 Paynesville Bypass 237,757.20 MN104/MN234, TH 4:TH55 to I‐94, mill & overlay & TH 55:Kandiyohi/Stearns 

Co Ln to the east

237,757.20

MN MN123 Construction of new highway between the bridge over Partridge River on 

County Road 565 in Hoyt Lakes to the intersection of CSAH 21 and 70 in 

Babbit

1,808,865.90 St. Louis County CSAH 110 from CSAH 16 to Hoyt Lakes Limits, 0.1 miles east 

from Hoyt Lakes

1,808,865.90

MN MN124 Construct Soo Line Trail from north of Bowlus to the east side of Mississippi 

River

58,618.00 SRTS project from US 10 to CSAH 54 in the city of Royalton 58,618.00

MN MN127 Ely Area Joint Public Works Complex 222,038.00 St. Louis County CSAH 101 from County Road 955 to Kimberly Avenue in 

Eveleth

222,038.00

MN MN135 Reconstruct I‐694 White Bear Avenue (CSAH 65) Interchange in White Bear 

Lake

59,210.00 *MN135* Lake St Access to I‐35W, purchase of R/W, PE, & Construction 59,210.00

MN MN150 Design, engineering, R/W acquisition, construction and construction 

engineering for the reconstruction of TH 95, from 12th Ave to CSAH 13, 

including bridge and approaches, ramps, intersecting roadways, signals, turn 

lanes, and multiuse trail, North Branch

1,527,086.09 *MN150* *MN214* MSAS 203 (Summit Av) from Syndicate St. to Griggs St. in 

St. Paul, Construction new bridge #62652 over Ayd Mill Rd & appr

1,527,086.09

MN MN152 Phase II/part II ‐  129,437.38 *MN152* *ELLA* TH 10: Access Management from Lake Park to Frazee, turn 

lanes, median closures

129,437.38

MN MN153 Reconstruct CSAH 4 and CSAH 5 (Forest Highway 11) between CSAH 15 and 

TH 61 Silver Bay

236,679.00 Lake County CSAH 2 from 0.3 miles North of Forest Highway 11 to 2.6 miles 

North, Grading and base

236,679.00

MN MN154 Roadway Improvements, City of Federal Dam 170,633.11 Reconstruct Cass Co CSAH 77 from south City Limits of Lakeshore to CSAH 78 170,633.11

MN MN159 MN159 Design and right‐of‐way acquisition for I‐35E CSAH 14 Main Street 

Interchange, City of Lino Lakes, Minnesota

124,209.57 Reconstruction of Hanson Boulevard from 139th Ln NW to 0.1 mi N of CR 18 124,209.57

MN MN166 Paul Bunyan Trail, Walker to Bemidji Segment 61,222.00 *MN166* *MN186* Bena Trail, Old Housing Drive NE west to North Winnie 

Road

61,222.00

MN MN178 Reconstruction of Airport Road from TH 53 to CR 296, Cirrus Drive from 

Airport Road to TH 53 and TH 53 from Airport Road to Stebner Road

446,006.63 North Shore Scenic Dive, from Brighton Beach Boulevard to McQuade Safe 

Harbor (Duluth city limit), shoulder widening

446,006.63

MN MN179 Reconstruct Grand Avenue (from Central Ave to 59th Ave W), Central Ave 

(from Grand Ave to I‐35) and Bristol Street (from Central Ave to Grand Ave, 

Duluth

88,815.00 North Shore Scenic Dive, from Brighton Beach Boulevard to McQuade Safe 

Harbor (Duluth city limit), shoulder widening

88,815.00

MN MN184 Construct ramps and new bridge over Interstate 35 at CSAH 17, and 

reconstruct CSAH 17 from west County Line to CSAH 30, Chisago County

792,088.77 CSAH 30 from CSAH 19 to CSAH 17, roadway reclamation, reconditioning and 

resurfacing

792,088.77

MN MN186 Construct Paul Bunyan Trail, Walker to Bemidji Segment 111,937.92 *MN166* *MN186* Bena Trail, Old Housing Drive NE west to North Winnie 

Road

111,937.92

MN MN187 Construction of Gitchi‐Gami State Trail from Silver Bay to Tettagouche State 

Park

892,213.00 Demo ID #MN102, Gitchi‐Gami State Trail from Cascade River to Grand 

Marais, Trail Construction

892,213.00

MN MN188 Construct bridge for Paul Bunyan Trail over Excelsior Road, Baxter 347,547.21 Baxter MSAS113, From Excelsior Road to Cottage Road in Baxter, 

Reconstruction

347,547.21

ToFrom

61

Page 65: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Minnesota

State Demo ID Project Description Amount  Project Description Amount

ToFrom

MN MN199 I‐494 Lane Addition 256,521.08 *MN199* Lake St Access to I‐35W, purchase of R/W, PE, & Construction 256,521.08

MN MN204 Phase II/part II ‐ CSAH 15 to East of Scenic Highway 7 (1.2 miles). Completion 

of Phase II/Part I of a project on Elizabeth Avenue in Coleraine to west of 

Itasca County State Aid Highway 15 in Itasca County [ref P.L.110, Sec 

105(a)(152)]

2,275,351.00 *MN204* TH 169, in Taconite from 0.3 mi. E Scenic Hwy 7 to 0.64 mi. E Jct TH 

65 in Penguilly, PE for Environmental impact statement along E segment of 

Cross Range Expressway

2,275,351.00

MN MN214 Design, engineering, R/W acquisition, construction and construction 

engineering for the reconstruction of TH 95, from 12th Ave to CSAH 13, 

including bridge and approaches, ramps, intersecting roadways, signals, turn 

lanes, and multiuse trail, North Branch

676,181.00 *MN150* *MN214* MSAS 203 (Summit Av) from Syndicate St. to Griggs St. in 

St. Paul, Construction new bridge #62652 over Ayd Mill Rd & appr

676,181.00

MN MN219 Planning, Design, and Construction for the Twin Cities Bioscience Corridor in 

St. Paul

2,942,618.42 Jackson Street Reconstruction from 11th Street to University Avenue in St. 

Paul

2,942,618.42

MN MN234 Right‐of‐way acquisition for TH 23 Paynesville Bypass 673,521.83 MN104/MN234, TH 4:TH55 to I‐94, mill & overlay & TH 55:Kandiyohi/Stearns 

Co Ln to the east

673,521.83

Total Amount Repurposed 14,766,939.85

Total # of Earmarks Repurposed 26

62

Page 66: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Mississippi

State Demo ID Project Description Amount  Project Description Amount

MS MS005 Norrell Road & I‐20 in Hinds County, MS 25,151.00 I‐55 from Byram to McDowell Road, Hinds County 25,151.00

MS MS007 Highway Study ‐ Madison County 16,250.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 16,250.00

MS MS011 Upgrading of US‐98 from County line of Pike and Walthall Counties to Lamar 

County, MS

54,032.00 I‐55 from SR 568 to US 98 West, Pike County 54,032.00

MS MS027 Upgrade Land Fill Road, Panola County 409,483.00 I‐55 Construct Truck Scales in Panola and Tate Counties 409,483.00

MS MS047 51‐43 Connector Canton, Mississippi 400,000.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 400,000.00

MS MS091 US 51 ‐ SR 43 Connector Road in Canton, Mississippi 63,619.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 63,619.00

MS MS098 Construct bicycle path, Petal 160,236.00 I‐59 from Lamar CL to US 98 East 160,236.00

MS MS104 Plan and Construct Highway 45 Bypass in Columbus 2,230,083.00 US 82 Interchange Improvements in Columbus, MS.   2,230,083.00

MS MS107 Upgrade roads in Terry, Edwards, Utica and Bolton, Hinds County 178,724.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 178,724.00

MS MS112 Upgrade Blue Cane Road in Tallahatchie County, and roads in Webb and 

Tutwiler

85,637.00 US 49E across Black Bayou [Bridge #278.4], Tallahatchie County 85,637.00

MS MS115 Gateways Transportation Enhancement Project, Hancock County 51,447.00 SR 43/603 Kiln Bypass from end of 4‐Lane to North of Kiln,  Hancock County 51,447.00

MS MS126 Upgrade Safety Devices at Front Street Rail Crossing, Ellisville 40,059.00 I‐59 Interchange at SR 42 ‐ Forrest County 40,059.00

MS MS136 Upgrade roads in Port Gibson (U.S. Highway 61), Claiborne County 88,508.00 I‐20 Mississippi River Bridge 88,508.00

MS MS154 Transportation improvements for Pearl‐Pirates Cove Interchange, Pearl  5,007,375.00 West Rankin Parkway  5,007,375.00

MS MSF02 Water Taxi Study, Barnett Reservoir, Mississippi  652,809.00 Improve access to the reservoir by way of expansion, repair and/or paving of 

the existing facilities; construction on public boat ramp and parking lot; 

milling and overlaying.

652,809.00

Total Amount Repurposed 9,463,413.00Total # of Earmarks Repurposed 15

ToFrom

63

Page 67: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Missouri

State Demo ID Project Description Amount  Project Description Amount

MO MO017 Upgrade eastern Jackson County 197,134.53 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

197,134.53

MO MO019 Construct Chouteau Bridge in Kansas City 3,332,885.82 Rt 29 Pavement improvements from Todd Creek to US 69 3,332,885.82

MO MO024 Construct Jefferson Ave viaduct over Mill Creek Valley in St. Louis 647,156.27 I‐70 pavement improvements from Fifth Street in St. Charles to Fee  Road in 

St. Louis County

647,156.27

MO MO036 Construct extension of bike path between Soulard Market area and 

Riverfront in St. Louis

219,610.58 Rt 30, pavement improvements from St. Louis City limits to I‐55 219,610.58

MO MO037 Construction of airport ground trans terminal for Springfield/Branson Airport 14,350.94 Bridge Improvements over Radio Lane north of Springfield on Rt. 13 14,350.94

MO MO040 Develop bike/ped paths for town of Kansas and Riverfront Park in Kansas City 103,422.37 I‐435 pavement improvements from Missouri River Bridge to Rt 24 103,422.37

MO MO041 Construct Cuivre River Bridge at Lincoln County 49,298.23 Rt MM improve deficient bridge over Crooked Creek 49,298.23

MO MO042 Construct Rt 13 Missouri River Bridge at Lexington 201,503.91 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

201,503.91

MO MO048 Resurface and maintain roads located in Missouri State Parks 88,580.29 Bridge Improvements over Radio Lane north of Springfield on Rt. 13 88,580.29

MO MO052 I‐55 Interchange project at Weaver Rd and River Des Peres 214,801.60 Rt 30, pavement improvements from St. Louis City limits to I‐55 214,801.60

MO MO064 Lewis and Clark Expressway, Jackson County 18,183.78 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

18,183.78

MO MO087 Construct 2 lanes on Chouteau Trafficway from MO 210 to I‐35 1,602,360.00 I‐35 pavement improvements from I‐70 to the Kansas State line 1,602,360.00

MO MO088 Rt 291 Outer road improvements 162,521.00 Pavement Improvements on I‐49 from Blue Ridge Blvd to 163rd Street 162,521.00

MO MO091 Widening, curb and gutter improvements on Hwy 92 9,665.00 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

9,665.00

MO MO095 Complete impact study for North Oak Highway Corridor redevelopment 77,979.61 Interchange and ramp improvements on Broadway at IS35/IS70 in Kansas City 77,979.61

MO MO097 Removal and replacement of Grand Ave Bridge in City of St. Louis 284,409.00 Shoulder and curve improvements from Rt 47 to Rt D on 94 284,409.00

MO MO103 Reconstruction of the Tucker Street Bridge in the city of St. Louis 806,729.63 Rt 30, pavement improvements from St. Louis City limits to I‐55 806,729.63

Rt 39 pavement and safety improvements from I‐44 to 0.2 miles north of 

Olive Street in Aurora and on Rt M from Rt 96 to Rt 74

800,000.00

Rt 76 bridge improvements over Bull Shoals lake 500,000.00

I‐49 bridge improvements over BNSF and Spring River 702,732.44

MO MO109 Relocation and reconstruction of Rt MM from Rt 21 to Rt 30 1,865,306.17 Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 1,865,306.17

Rt 29 Pavement improvements from Todd Creek to US 69 152,435.77

Rt 29 Pavement improvements from Todd Creek to US 70 347,564.23

Pavement Improvements on I‐49 from Blue Ridge Blvd to 163rd Street 1,196,374.77

MO MO112 Relocate the entrance to the Shaw Nature Reserve 40,630.00 Rt BB pavement improvements from Rt A to Rt 50 40,630.00

Rt 44 pavement improvements on various sections from 1.25 miles east of Rt 

37 to 0.5 miles east of Jasper Co

9,500,000.00

Rt 49 pavement improvements from Rt 59 near Goodman to near Bus 71 

south of Rt 76

1,298,801.00

Rt 59 slide repairs 1.7 miles south of Rt EE near Ginger Blue 1,218,900.00

MO MO119 Interchange design and construction ‐ Main Street extension at I‐55 Cape 

Girardeau

801,180.00 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from 

3 miles south of 162 to 0.8 miles south of I‐55

801,180.00

MO MO122 Construct an extension of Mo 740 from US 63 to I‐70 Lake of the Wookds 

interchange

2,002,950.00 I‐70 pavement improvements  on the eastbound and westbound lanes from 

MO River to near St. Charles Road

2,002,950.00

MO MO125 Construct Highway 465 to Highway 376 south from  376 to 76 4,807,080.00 Rt 76 bridge improvements over Bull Shoals lake 4,807,080.00

OR 44, pavement improvements on Antire Road near Eureka 500,000.007,511,800.00Improve Access to I‐55 Bayless Ave/Loughborogh AveMO126MO

1,696,374.77Construct Interstate flyover at Hughes Road and Liberty Drive to 76th StreetMO111MO

12,017,701.00Upgrade of Rt 71 from Pineville to Arkansas State lineMO118MO

To

2,002,732.44Study Highway 37‐60 entire corridorMO105MO

From

64

Page 68: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Missouri

State Demo ID Project Description Amount  Project Description Amount

ToFrom

I‐70 Pavement improvements along the reversible lanes from east of Union to 

Broadway

1,500,000.00

Rt 61 pavement and ADA improvements from Rt M to south of Church Road 2,000,000.00

Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 3,511,800.00

MO MO127 Kansas City Smartport ITS for highways 5,253.82 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

5,253.82

MO MO128 I‐35 Access Modification planning, city of Kearney 820,600.65 Rt 92 Pavement improvements from Rt 33 in Kearney to Rt 69 in Excelsior 

Springs

820,600.65

MO MO129 Construct additional exit ramp access lane from I‐44 to Kings highway, 

enhance Shaw Avenue

416,954.00 Rt 30, pavement improvements from St. Louis City limits to I‐55 416,954.00

MO MO130 South County Riverfront access and trails project, Lemay 325,039.00 Rt 30, pavement improvements from St. Louis City limits to I‐55 325,039.00

MO MO133 Redesign and reconstruct I‐170 interchange at Ladue Rd 38,912.63 Rt 30, pavement improvements from St. Louis City limits to I‐55 38,912.63

MO MO134 STE. GENEVIEVE CO., MISSOURI RTE 61 BRIDGE REPLACEMENT OVER 

ESTABLISHED CREEK

211,010.00 Rt 67 pavement improvements from St. Francois River Bridge to Jefferson 

County

211,010.00

MO MO135 Study for RR crossing reconfiguration to eliminate highway crossings in 

Springfield

801,180.00 I‐44 pavement improvements on disconnected sections from Greene Co line 

to 2.3 miles east of Rt M and J

801,180.00

MO MO136 Upgrade Rt 94‐St. Charles Co east of Harvester Rd to west of Mid‐Rivers Drive 243,365.82 Shoulder and curve improvements from Rt 47 to Rt D on 94 243,365.82

MO MO138 Construct 4 lanes for Hwy 60 from Willow Springs to Van Buren 205,357.01 Rt 49 pavement improvements from Rt 72 / Rt 21 to Rt 34 in Piedmont 205,357.01

MO MO144 I‐470/Strother Rd interchange in Lee's Summit 29,989.28 Rt W pavement and sidewalk improvements from I‐435 to the Kansas State 

line

29,989.28

Rt 24, pavement and shoulder improvements from Rt 5 in Keytesville to 

Randolph CO

2,600,000.00

Rt 61, pavement and intersection improvements from Warren Barrett Drive 

to 0.5 miles south of Rt 19

3,085,290.94

Bridge Improvements over BNSF and MNA railroads on Rt 96 1,000,000.00

Bridge improvements over Spring River Overflow on Rt 96 922,287.54

MO MO151 Interchange design and construction ‐ Main Street extension at I‐55 Cape 

Girardeau

1,501,525.60 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from 

3 miles south of 162 to 0.8 miles south of I‐55

1,501,525.60

Rt 8 pavement improvements from 0.2 miles east of Rt 19 at Steelville to Rt 

AA in Washington County

1,700,000.00

I‐70 pavement improvements from Fifth Street in St. Charles to Fee  Road in 

St. Louis County

302,950.00

MO MO154 Realign and bridge replacement over First Creek east of 2nd Street to Rt 169 

on MO92

2,002,950.00 I‐35 Pavement improvements from Fishing River Bridge to Rt 69/Pleasant 

Valley Interchange

2,002,950.00

MO MO156 Construct interstate flyover at Hughes Rd and Liberty Drive to 76th Street 4,005,900.00 Rt 29 Pavement improvements from Todd Creek to US 69 4,005,900.00

MO MO157 I‐55 redesign, Cape Girardeau County 2,002,950.00 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from 

3 miles south of 162 to 0.8 miles south of I‐55

2,002,950.00

Rt 61, new interchange at Rt P and Peine Road and safety improvements at 

median crossover north of Peine Road

3,031,187.93

Shoulder and curve improvements from Rt 47 to Rt D on 94 1,449,939.61

I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near 

Emma

2,000,000.00

4,481,127.54Page Avenue Extension, Phase II, St Charles CoMO160MO

2,886,072.95Lewis and Clark Expressway, 39th street to Hwy 24, Jackson CoMO162MO

1,922,287.54Upgrade to 4 lanes MO66 from Duquesne Rd to Rt 249 in Jasper CountyMO150MO

2,002,950.00Relocation and reconstruction of Rt MM from Rt 21 to Rt 30MO152MO

5,685,290.94Improve US 36 to divided four lane expressway from Macon to Rt 24MO145MO

65

Page 69: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Missouri

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Rt 10 pavement improvements, ADA transition plan sidewalks from Rt 69 to 

east of Fork Fishing River

886,072.95

MO MO165 I‐55 Interchange at Main Street, Cape Girardeau 549,807.93 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from 

3 miles south of 162 to 0.8 miles south of I‐55

549,807.93

MO MO167 Widen Rt 66 Duquesne Rd to Rt 249, Jasper Co 25,896.99 Rt 43, pavement improvements from south of Rt 171 to south of Murphy 

Boulevard.

25,896.99

MO MO168 Grand Ave Bridge replacement in St. Louis City 1,644,327.44 Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 1,644,327.44

MO MO172 Upgrades to Scott Rd (Rt TT) ‐ Rollins Rd and Brookview Terrace in Boone Co 8,195.04 Pavement improvements on east and westbound lanes of IS70 in Boone Co 

near Lake of the Woods Interchange

8,195.04

Total Amount Repurposed 72,593,291.12Total # of Earmarks Repurposed 49

66

Page 70: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Montana

State Demo ID Project Description Amount  Project Description Amount

MT MT002* US Highway 93 (Native Religious site) 20,000.00 8958‐Mittower Road N‐Route US 93‐Seal and Cover 20,000.00

MT MT022 US Highway 87 Improvements ‐ Value Added Commodity Processing Center, 

Montana

184,202.45 8966‐Great Falls N&S ‐ Multiple locations on I‐15‐Crack seal of the existing 

roadway & interchange ramps

184,202.45

MT MT025 Construction of S. 323 from Alzada to Ekalaka in Carter County. 10.01 8568‐Slide Repair S of Plevna‐Secondary Route 494‐stabilization of slide along 

existing roadway

10.01

MT MT028 Transportation improvements for Babcock to Kagy Project, Bozeman 507,876.00 1298 ‐ Mission Interchange North ‐ State Primary Route 59/US 89 ‐ 

Reconstruct of existing road & structure

507,876.00

MT MT029 Transportation improvements for Townsend‐South Project, U.S. 287 1,963,729.77 8101‐Pipestone to Whitehall‐NH Route 90‐Seal and cover of existing 

roadway, ramps and crossroads

1,963,729.77

MT MT032 Transportation improvements for Lonepine North and East Project, MT28 711,025.00 8955 ‐ Superior West ‐ Route I‐90 ‐ Microsurfacing  711,025.00

MT MT037 Develop and reconstruct Two Medicine Bridge, US 2, East of Glacier National 

Park

2,398,268.00 7636‐Kiowa Junction N&S‐State Primary Route 58/US 89‐reconstruct of 

roadway, new alignment, structure work

2,398,268.00

MT MT040 Taylor Hill Road reconstruction, Secondary 234, Montana 469,340.48 7983 ‐ Havre 7th Ave Bridge Deck rehabilitation/replacement 469,340.48

MT MT041 Develop and construct Shiloh Road reconstruction project, Billings 1,276,450.99 8721‐Billings NW‐NH Route 53/MT 3‐Crack seal, level, plant‐mix overlay with 

seal and cover of existing roadway

1,276,450.99

MT MT046 Reconstruct Marysville Road consistent with final environmental document, 

Lewis and Clark County

678,637.73 9197 ‐ Helena N Hill ‐ Sieben Int ‐ Route I‐15 seal and cover on the existing 

roadway

678,637.73

MT MT050 Develop and contruct Helena I‐15 corridor consistent with final 

environmental document and record of decision

1,276.00 9197 ‐ Helena N Hill ‐ Sieben Int ‐ Route I‐15 seal and cover on the existing 

roadway

1,276.00

MT MT053 Develop and construct parking lot and transportation enhancements 

including bicycle/pedestrian trails and urban plaza, serving the City of 

Bozeman Public Library

108,228.00 1298 ‐ Mission Interchange North ‐ State Primary Route 59/US 89 ‐ 

Reconstruct of existing road & structure

108,228.00

MT MT056 Conrad I‐15 North Interchange modifications to provide access east  of the 

current interchange, Pondera County

1,366,656.56 5805 ‐ N of Bynum N, State Primary Route 3/US 89 ‐ Reconstruction of the 

existing roadway

1,366,656.56

MT MT057 Develop and improve access road and structure serving the Port of Montana 

and Silicon Mountain Technology Park

384,810.00 8101‐Pipestone to Whitehall‐NH Route 90‐Seal and cover of existing 

roadway, ramps and crossroads

384,810.00

*Subject to availability of funds upon additional research. 10,070,510.99

Total Amount Repurposed 10,070,510.99Total # of Earmarks Repurposed 14

ToFrom

67

Page 71: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Nebraska

State Demo ID Project Description Amount  Project Description Amount

NE NE007 Corridor study for Plattsmouth Bridge area to US‐75 and Hornung Road 22,839.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 22,839.00

NE NE008 Conduct corridor study from Wayne to Vermillion‐Necastle bridge 244,766.98 State PN 32131,  Resurfacing and bridge work on N‐12 east and west of 

Wynot

244,766.98

NE NE011 Construct NE‐35 alternative and modified route expressway in Norfolk and 

Wayne

2,566,073.81 State PN 31817A, urban reconstruction in Jackson 2,566,073.81

NE NE012 Construct bridge in Newcastle 80,142.00 State PN 32131,  Resurfacing and bridge work on N‐12 east and west of 

Wynot

80,142.00

NE NE014 Replace US‐81 bridge between Yankton, South Dakota and Cedar County, 

Nebraska

97,883.00 State PN 32131,  Resurfacing and bridge work on N‐12 east and west of 

Wynot

97,883.00

NE NE016 Improve Nebraska Highways 8 and 15 in Fairbury 52,145.02 State PN 13184, replace viaduct west of Fairbury 52,145.02

NE NE034 Interstate 80 Interchange at Pflug Road, Sarpy County, Nebraska 1,602,360.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 1,602,360.00

NE NE037 Design, right‐of‐way and construction of rail‐grade separation throughout 

Nebraska as identified by Nebraska Dept. of Roads

1,218,900.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 1,218,900.00

NE NE040 Construction of the Columbus, Nebraska North Arterial Road 365,669.00 State PN 42609, Resurface L‐63A north of Genoa 365,669.00

NE NE042 Design, right‐of‐way and construction of the Louisville bypass, Nebraska 3,002,950.00 State PN 22467A, new viaduct east of Murray 3,002,950.00

NE NE043 Cuming Street Transportation improvement project in Omaha, Nebraska 2,259,231.00 State PN 22689, Resurface W Maple Rd between 156th and 108th St in 

Omaha

2,259,231.00

NE NE045 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 205,344.04 State PN 13159, Replace 4th Corso viaduct in Nebraska City 205,344.04

NE NE047 I‐80 Interchange at Pflug Road, Sarpy County, Nebraska 801,180.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 801,180.00

NE NE048 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 203,150.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 203,150.00

NE NE049 Construction of the Columbus, Nebraska North Arterial Road 763,023.91 State PN 42609, Resurface L‐63A north of Genoa 763,023.91

NE NE050 Design and construction of Missouri River Bridges between US‐34, I‐29 in 

Iowa and US‐75 in Nebraska

50,787.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 50,787.00

NE NE051 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 121,890.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 121,890.00

NE NE053 Transportation Improvements for US‐81 Meridian Bridge, Yankton 182,835.00 State PN 32131,  Resurfacing and bridge work on N‐12 east and west of 

Wynot

182,835.00

NE NE056 Design, right‐of‐way and construction of the Louisville bypass, Nebraska 400,590.00 State PN 22467A, new viaduct east of Murray 400,590.00

NE NE057 Construction of I‐80 ‐ Cherry Avenue Interchange and East bypass, Kearney, 

Nebraska

101,576.00 State PN 42575, Resurface N‐70 south or Ord 101,576.00

NE NE058 Interstate 80 Interchange at Pflug Road, Sarpy County, Nebraska 600,885.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 600,885.00

NE NE060 New roads and overpasses to relieve congestion and improve traffic flow 

Antelope Valley

752,100.21 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 752,100.21

NE NE062 Cuming Street Transportation improvement project in Omaha, Nebraska 644,392.52 State PN 22689, Resurface W Maple Rd between 156th and 108th St in 

Omaha

644,392.52

NE NE064 Midwest Roadside Safety Facility, UNL ‐ Lincoln, NE 101,576.00 State PN 00965, Infrastructure improvements to MwRSF facility  101,576.00

NE NE066 Design, right‐of‐way and construction of rail‐grade separation throughout 

Nebraska as identified by Nebraska Dept. of Roads

554,742.57 State PN 13159, Replace 4th Corso viaduct in Nebraska City 554,742.57

NE NE067 Lincoln East Beltway, NE 157,254.50 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 157,254.50

NE NE068 I‐80 six lane (I‐180 ‐ 56th St.) Lincoln, NE 304,725.00 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 304,725.00

State PN 22689, Resurface W Maple Rd between 156th and 108th St in 

Omaha

1,100,000.00

To

4,102,591.80Cuming Street Transportation improvement project in OmahaNE071NE

From

68

Page 72: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Nebraska

State Demo ID Project Description Amount  Project Description Amount

ToFrom

State PN 22690. Resurface W Maple Rd between Ramblewood and 156th St 3,002,591.80

NE NE075 Plan and design I‐80 Interchange at Pflug Road 1,001,475.00 State PN 22566, Resurface and bridge work on UUS‐30 between Fremont and 

Arlington

1,001,475.00

NE NE076 Design and construction of Missouri River Bridges between US‐34, I‐29 in 

Iowa and US‐75 in Nebraska

304,725.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 304,725.00

NE NE077 Construction of the North Arterial Road in Columbus 204,569.15 State PN 42609, Resurface L‐63A north of Genoa 204,569.15

NE NE078 Design and construction of Meridian Bridge between Nebraska and Yankton, 

South Dakota  

101,576.00 State PN 32131,  Resurfacing and bridge work on N‐12 east and west of 

Wynot

101,576.00

State PN 22690. Resurface W Maple Rd between Ramblewood and 156th St 1,100,000.00

State PN 22649. Resurface Military Ave from Benson ‐ Cuming St in Omaha 2,749,028.00

State PN 22710. Resurface Military Ave from Fort St ‐ 90th St in Omaha 850,000.00

State PN 22711. Resurface N‐133 from W Dodge Rd to I‐680 in Omaha 1,014,317.00

NE NE083 Construction of the North Arterial Road in Columbus 305,236.69 State PN 42609, Resurface L‐63A north of Genoa 305,236.69

Total Amount Repurposed 29,192,530.20Total # of Earmarks Repurposed 34

5,713,345.00Cuming Street Transportation improvement project in Omaha, NebraskaNE080NE

69

Page 73: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Hampshire

State Demo ID Project Description Amount  Project Description Amount

NH NH003 Bridge Capacity Improvements (NH): Nashua River Bridge ‐ second bridge 

(Public law 1000202, 1010164, 1000457, 1060346; Signed into law Dec 22, 

1987, Nov. 21, 1989, Sept. 30, 1988 and Oct. 23, 2000 respectively)

4,445,000.00 Nashua 41049 X‐A004(543) Pavement Rehabilitation: Somerset Parkway, 

NH101A, NH130, & NH111 (Fed‐Aid Eligible City Maintained)

4,445,000.00

NH NH022 Granite Street Bridge Project, New Hampshire (Public law 1080007; Signed 

into law Feb. 20, 2003)

44,032.00 Manchester 29811 X‐A004(311) ‐ Multi‐Use path along abandoned RR line 

from Gold St. to Perimeter Road.

44,032.00

NH NH026 NH DOT Londonderry South Road Advance, Mitigation/Wetland Creation 

(Public law 1080199; Signed into law Jan. 23, 2004)

36,873.37 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area  36,873.37

NH NH030 Reconstruction and relocation of the intersection of Maple Avenue and 

Charleston Road in Claremont (Public law 1080447; Signed into law Dec. 8, 

2004)

31,206.08 Claremont 13248 X‐MGS‐STP‐X‐013(039) ‐ NH12 and North Street 

intersection relocation

31,206.08

NH NH040 Reconstruction of NH11 and NH28 Intersection in Alton,                                        

ii.  Public law 1090059; Signed into law Aug 10, 2005)

286,806.77 Barnstead    14121E    X‐A001(174) ‐ NH28 intersection improvement project 

at Peacham Road

286,806.77

NH NH042 Construct Intersection at U.S. 3 and Pembroke Hill Road in Pembroke (Public 

law 1090059; Signed into law Aug. 10, 2005)

87,078.31 Loudon‐Canterbury 29613 X‐A004(201) ‐ NH106 improvements from Clough 

Hill Road to Shaws Road

87,078.31

NH NH044 South Road Mitigation in Londonderry (Public law 1090059; Signed into law 

Aug 10, 2005)

560,754.72 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area  560,754.72

NH NH046 Construct Park and Ride, Exit 5 on I‐93 ‐ Londonderry, NH (Public law 

1090059; Signed into law Aug. 10, 2005)

162,520.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area  162,520.00

NH NH047 Reconstruction and relocation of the intersection of Maple Avenue and 

Charleston Road in Claremont (Public law 1090059; Signed into law Aug. 10, 

2004)

40,631.00 Claremont 13248 X‐MGS‐STP‐X‐013(039) ‐ NH12 and North Street 

intersection relocation

40,631.00

NH NH049 Construct Pedestrian, Bicycle bridge in Keene (Public law 1090059; Signed 

into law Aug 10, 2005)

65,009.00 Keene 10309B  X‐STP‐0111(007) ‐ Winchester Street Reconstruction from 

NH101 to Pearl Street.

65,009.00

NH NH050 Hampton Bridge Rehabilitation ‐‐Hampton, NH (Public law 1090059; Signed 

into law Aug 10, 2005)

121,890.00 Hampton 40797  A004(490) ‐ Ocean Blvd Study and Design Project. 121,890.00

NH NH051 Environmental mitigation at Sybiak Farm in Londonderry to offset effects of I‐

93 improvements (Public law 1090059; Signed into law Aug 10, 2005)

121,890.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area  121,890.00

NH NH052 Environmental mitigation at Crystal Lake in Manchester to offset effects of I‐

93 improvements (Public law 1090059; Signed into law Aug 10, 2005)

154,394.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area  154,394.00

NH NH056 Reconstruction of NH11 and NH28 Intersection in Alton (Public law 1090059; 

Signed into law Aug 10, 2005)

201,038.10 Barnstead    14121E    X‐A001(174) ‐ NH28 intersection improvement project 

at Peacham Road

201,038.10

NH NH061  Construct Intersection at U.S. 3 and Pembroke Hill Road in Pembroke (Public 

law 1090059; Signed into law Aug. 10, 2005)

351,657.31 Loudon‐Canterbury 29613 X‐A004(201) ‐ NH106 improvements from Clough 

Hill Road to Shaws Road

351,657.31

Total Amount Repurposed 6,710,780.66Total # of Earmarks Repurposed 15

ToFrom

70

Page 74: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

NJ NJ002 Passaic Co ‐ Complete construction of Rt 21 512,288.61 Route 21, Dayton Street to Route 46 W, MP12.68‐14.35, Resurfacing 512,288.61

NJ NJ007* I‐280 Downtown Connector Interim Improvements bridges over Rt 4 368,144.70 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

368,144.70

NJ NJ009* Newark: To construct ramps to provide access to I‐78 26,835.01 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

26,835.01

NJ NJ012 Paramus: RT.17/4 Interchange Project 12,752.93 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

12,752.93

NJ NJ027 Construct New Jersey Exit 13A Flyover (extension of Kapowski Rd. to Trumbull 

St) 

1,886.17 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ 

to Industrial Hwy Carteret, NJ

1,886.17

NJ NJ033 Relocate and complete construction of new multi‐modal facility 122,373.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

122,373.00

NJ NJ034 Revitalize Route 130 from Cinnaminson to Willingboro 947,416.84 Route 130, Charleston Road/Cooper Street (CR 630) to Crafts Creek, 

Resurface, MP 43.01 ‐ 51.58

947,416.84

NJ NJ037 Construct road from the Military Ocean Terminal to the Port Jersey Pier, 

Bayonne

24,949.62 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

24,949.62

NJ NJ038 Design, construct, and expand industrial roads connecting Carteret with 

Woodbridge, Route 35 with Perth Amboy for increased truck traffic which will 

ease delays and traffic at Turnpike Exit 12 and Route 35 underpass east and 

for the NJ Carteret, NJ Ferry

1,065,112.12 Route 35, Perth Amboy Connector, Bridge Replacement‐MP52.3‐52.53 1,065,112.12

NJ NJ045 Replace Maple Grange Road bridge over Pochuck Creek in Sussex County 3,201.88 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

3,201.88

NJ NJ049 Improve Old York Road/Rising Run road Intersection in Burlington, Total 

TEA21 Authorization $5,111,145

76,472.82 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

76,472.82

NJ NJ058 Construct Collingswood Circle Eliminator, Camden 301,492.71 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

MP26.42‐27.8

301,492.71

NJ NJ060 Upgrade urban University Heights Connector, Newark 21,452.72 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

21,452.72

NJ NJ061 Construct Bicycle Trails and Riverside Improvements, West Deptford 171,543.78 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

171,543.78

NJ NJ068 Improvements at the Rosedal Road and Provinceline Road intersection in the 

Township of Princeton, New Jersey

249,450.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

249,450.00

NJ NJ072 NJCDC Training Facility Project in Paterson, New Jersey 46,209.69 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

46,209.69

NJ NJ074 Improvements to Route 35 at Clinton Avenue and other intersections in the 

Borough of Eatontown, New Jersey

498,900.00 Livingston Avenue Traffic Calming, New

Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78

498,900.00

NJ NJ076 Improvements to Route 641 in Hunterdon County, New Jersey 89,730.76 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

89,730.76

NJ NJ077 Spring Valley Road Project in Marlboro Township, New Jersey 1,197,360.00 Livingston Avenue Traffic Calming, New

Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78

1,197,360.00

NJ NJ080 Monroe Township Intersection Signalization Project, New Jersey 496,750.00 Livingston Avenue Traffic Calming, New

Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78

496,750.00

NJ NJ117* Rt 47 Chapel Heights Ave Goucester 96,546.83 Route 47, Grove St. to Route 130, Mill, Resurface & Sidewalk Repl.‐MP62.3‐

75.2

96,546.83

NJ NJ120 Construct Long Valley Bypass 801,180.00 Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 801,180.00

ToFrom

71

Page 75: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NJ NJ121 Rahway River Corridor Greenway bicycle and pedestrian path, South Orange 522,571.60 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

522,571.60

NJ NJ123 Construction of Route 206 Chester Township, NJ 570,007.49 Route 10, Hillside Ave (CR619 to Mt. Pleasant Tpk (CR665)‐Resurfacing & 

Bridge Preservation‐MP.93‐7.2

570,007.49

NJ NJ125 Replace Rockaway Road bridge, Randolph Township, New Jersey 448,364.34 Route 10, Hillside Ave (CR619 to Mt. Pleasant Tpk (CR665)‐Resurfacing & 

Bridge Preservation‐MP.93‐7.2

448,364.34

NJ NJ126 Rowan Boulevard Parking adjacent to Highway 322 Corridor in Glassboro 

Township

801,626.11 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

801,626.11

NJ NJ131 Construct CR 538 Coles Mill Road Bridge over Scotland Run, Gloucester 

County

189,512.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

189,512.00

NJ NJ132 Reconstruct Route 168 from Route 41 to 6th Avenue in Runnemede 346,384.57 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

346,384.57

NJ NJ137 University Heights Connector for improvements to First Street in Newark 

from Sussex Street to West Market Street

241,437.80 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 241,437.80

NJ NJ138 Construct Rt 56 Maurice River Bridge Replacement, Salem and Cumberland 

Counties

758,049.00 Route 49, Bridge over Maurice River, Replacement, MP 36.2 758,049.00

NJ NJ141 Union Boulevard revitalization and streetscape enhancements, Totowa 74,168.77 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 74,168.77

NJ NJ142 Construct Great Swamp National Wildlife Refuge road 57,776.00 Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 57,776.00

NJ NJ143 Pedestrian facilities and street lighting on Haddon Avenue from Albertson 

Avenue to Glenwood Avenue, Haddon Township

100,067.21 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

100,067.21

NJ NJ144 South Essex Street Bridge Pedestrian Access

Improvements, Orange

463,082.20 Main Street and Scotland Road Intersection Improvements, Orange, MP 0.0 

(Main St), MP 4.59 (Scotland Rd)

463,082.20

NJ NJ148 Broad Street streetscape project in Elizabeth to provide physical 

improvements and to enhance transportation flow and efficiency

161,772.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐

15.2

161,772.00

NJ NJ151 Widening of Route 1 and intersection improvements in South Brunswick 707,605.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement 

Resurfacing‐MP7.9‐14.5

707,605.00

NJ NJ154 Bicycle facilities in West Deptford Township 92,136.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

92,136.00

NJ NJ155 Riverwalk in Millburn along the West Branch of the Rahway River 149,113.00 Route 82, Rahway River Bridge, Replacement, MP 0.38 ‐ 0.58 149,113.00

NJ NJ157 Replacement of Monmouth County bridges W‐7, W‐8, and W‐10 2,403,540.00 Livingston Avenue Traffic Calming, New

Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78

2,403,540.00

NJ NJ158 Construct Rt. 49 Cohansey River Bridge Replacement, Cumberland County. 710,939.33 Route 49, Sarah Run Drive to Garrison Lane, Resurfacing & Sidewalk 

Replacement‐MP18.8‐40.1

710,939.33

NJ NJ160 Route 82 Union County streetscape and intersection improvements 379,024.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐

15.2

379,024.00

NJ NJ163 Construct I‐287, I‐80, Route 202 Interchange 231,102.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

231,102.00

NJ NJ164 Transportation improvements in Liberty Corridor   3,041,032.65 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ 

to Industrial Hwy Carteret, NJ

3,041,032.65

NJ NJ165 Expand Route 440‐‐State Street Interchange in Perth Amboy 1,416,897.78 Route 1, CR 533 (Quakerbridge Road) to

Ridge Road‐Design for Pavement

Resurfacing‐7.9‐14.5

1,416,897.78

NJ NJ168 Replacement of Signals at the intersections of Centennial Ave. at Lincoln Ave. 

and Walnut Ave. at Lincoln Ave., Cranford, NJ

113,240.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

113,240.00

72

Page 76: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St), 

MP 0.00‐0.16 (Philip St)

128,171.00

Passaic Main Avenue Bus Terminal, Upgrade and Relocation, Passaic County 2,500,000.00

Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 139,041.20

Main Street and Scotland Road, Intersection Improvements, MP 0.0 (Main St), 

MP 4.59 (Scotland Rd)

36,917.80

NJ NJ172 Quinn Road realignment, Clifton. Construct public access roadways and 

pedestrian safety improvements in and around Montclair State University in 

Clifton

243,780.00 Route 3, Route 46 Valley Road and Notch/Rifle Camp Road Interchange, 

Contract B, Widening MP 59.1 ‐ 60.6

243,780.00

NJ NJ176 Planning for Liberty Corridor 83,098.78 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ 

to Industrial Hwy Carteret, NJ

83,098.78

NJ NJ180 Construct waterfront walkway from North Sinatra Drive and 12th St. south to 

Sinatra Drive in Hoboken.

758,049.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

758,049.00

NJ NJ181 Bridge replacement on Section 6V of Route 1 from Ryders Lane to Milltown 

Road, North Brunswick

1,214,549.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement 

Resurfacing‐MP7.9‐14.5

1,214,549.00

NJ NJ182 Pedestrian facilities, street lighting and streetscaping improvements in 

downtown Laurel Springs

124,007.30 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

124,007.30

NJ NJ194 New Jersey Underground Railroad for preservation, enhancement and 

promotion of sites in New Jersey

256,378.00 Halls Mill Road, Realignment and Widening, Monmouth County, MP 0.00‐

1.31

256,378.00

NJ NJ196 Roadway and intersection modifications on New Jersey Route 82 379,024.00 Route 82, Rahway River Bridge, Replacement, MP 0.38 ‐ 0.58 379,024.00

Passaic‐Bergen Passenger Service Restoration, Technical Update and 

Assessment

1,000,000.00

Livingston Avenue, Traffic Calming, New Brunswick, MP 0‐06‐1.08, MP 2.07‐

2.78

600,357.20

Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83

(CR 517)

2,002.80

NJ NJ204 Construct Cape May and Supawana Meadows

National Wildlife Refuges Roadway and Parking

Improvements

173,327.00 Route 49, Sarah Run Drive to Garrison Lane, Pavement Mill, Resurface & ADA 

Compliant Curb Ramps‐MP18.8‐40.1

173,327.00

Halls Mill Road, Realignment and Widening, Monmouth County, MP 0.00‐

1.31

5,600,000.00

Livingston Avenue Traffic Calming, New Brunswick, MP 0‐06‐1.08, MP 2.07‐

2.78

809,440.00

NJ NJ207  Pedestrian and bicycle facilities and street lighting in Barrington and 

streetscape improvements to Clements Bridge Road from the circle at the 

White Horse Pike to NJ Turnpike overpass in Barrington [ref P.L. 110‐244, Sec 

105(a)(160)]

222,530.67 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

222,530.67

NJ NJ208 Maple Shade Township Streetscape Improvements of Mill Road, Rudderow 

Ave., North and South Coles Ave. and Schoolhouse Lane

81,259.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

81,259.00

NJ NJ211 Rehabilitation existing structure at the Bridge Street bridge over the CSX 

Railroad Trenton Line in Manville, NJ

526,420.00 Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A & 

15A)  MP 63.4‐66.4

526,420.00

NJ NJ212 Pedestrian facilities and street lighting on Route 551 from Route 130 to 

Chestnut Street, Brooklawn

320,472.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

320,472.00

2,804,130.00Improvements to Clove Road and Long Hill Road in Little Falls and Upper 

Mountain Ave. in Montclair

NJ171

6,409,440.00Reconfiguration of Bay Avenue and Polaris Street in Newark, NJNJ205NJ

NJ

1,602,360.00Construct Hackensack River Walkway in Bergen CountyNJ201NJ

73

Page 77: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NJ NJ213 Construct Rt 40 Reconstruction from Rt 77 to Elmer Lake, Elmer, Salem 

County

1,137,073.00 Route 40, Elmer Lake to Elmwood Ave, resurfacing from MP 20.44 ‐ 27.4  1,137,073.00

NJ NJ216 Pedestrian facilities and street lighting on Haddon Avenue from Vorhees 

Township line to Bater Avenue, Berlin Township

122,659.33 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ 

to Industrial Hwy Carteret, NJ

122,659.33

NJ NJ221 Design, plan and build a permanent pedestrian/bicycle path along the banks 

of the Elizabeth River

400,590.00 Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St), 

MP 0.0‐0.16 (Philip St)

400,590.00

NJ NJ233 Livingston pedestrian streetscape project along Mount Pleasant and 

Livingston Avenues

247,251.42 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

247,251.42

NJ NJ235 Construct parking facility at the Robert Wood Johnson University Hospital and 

UMDNJ with access to the intermodal train station, New Brunswick.

1,602,360.00 Route 280, Route 21 Interchange improvements & Bridge Rehab‐MP13.8‐15.2 1,602,360.00

NJ NJ237 Construct Parking Facility at McGinley Square in Jersey City 841,239.00 Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St), 

MP 0.0‐0.16 (Philip St)

841,239.00

NJ NJ239 Hudson County Fire and Rescue Department, North Bergen: Transportation 

critical incident mobile data collection device

112,286.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

112,286.00

NJ NJ242 Port Reading‐‐Improvements to air quality through reduction of engine idling 

behind Rosewood Lane

640,944.00 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ 

to Industrial Hwy Carteret, NJ

640,944.00

NJ NJ244 Weehawken Baldwin Avenue Improvements 423,605.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐

15.2

423,605.00

NJ NJ248 Route 18 Reconstruction in downtown New Brunswick 764,273.00 Route 18, East Brunswick, Drainage and Pavement Rehabilitation‐MP35.4‐

39.5

764,273.00

NJ NJ250 Construct waterfront walkway from North Sinatra Drive and 12th St. south to 

Sinatra Drive in Hoboken

3,790,618.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐

15.2

3,790,618.00

NJ NJ252 Route 29 conversion project to a full access freeway 2,357,765.88 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

MP26.42‐27.8

2,357,765.88

NJ NJ260 Construct Rt. 49 Cohansey River Bridge Replacement, Cumberland County. 509,946.46 Route 49, Sarah Run Drive to Garrison Lane, Resurfacing & Sidewalk 

Replacement‐MP18.8‐40.1

509,946.46

NJ NJ264 Route 18 Reconstruction in downtown New Brunswick 240,506.00 Route 18, East Brunswick, Drainage and Pavement Rehabilitation‐MP35.4‐

39.5

240,506.00

NJ NJ267 Route 29 conversion project to a full access freeway 2,044,225.31 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

MP26.42‐27.8

2,044,225.31

NJ NJ268 Improvements to River Road in Camden 1,002,341.00 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

26.42‐27.8

1,002,341.00

NJ NJ271 Expand TRANSCOM Regional ITS System in NJ, NY and CT 260,427.45 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐

15.2

260,427.45

NJ NJ292* Deleware Street Bridge Replacement Project, (CR640) Bridge Over Matthews 

Branch in West Deptfor Township, New Jersey

1,500,000.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

1,500,000.00

NJ NJ293 Resurfacing and safety improvements to Tanyard Road (CR 663) from 

Evergreen Avenue (CR 553) to Barlow Road in the Township of Deptford, 

Borough of Woodbury Heights, and the City of Woodbury, NJ

36,066.51 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to 

US Route 206, MP 0 to 2.68

36,066.51

*Subject to availability of funds upon additional research.

Total Amount Repurposed 54,344,501.15

Total # of Earmarks Repurposed 79

74

Page 78: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Mexico

State Demo ID Project Description Amount  Project Description Amount

NM NM001 Nuclear Waste Transportation Safety Demo (NM) 109.55 NM 502, Pavement Preservation 109.55

NM NM003  LOS ALAMOS TO SANTA FE HWY; PL 103‐211 RESCISSION $4 APPN 307 & $3 

APPN 309

19,890.46 NM 502, Pavement Preservation 19,890.46

NM NM005* Right‐of‐way ‐ El Salto & Related Roads 30,293.28 US 285 SF to Espanola 30,293.28

NM NM007* Los Alamos: Santa Fe relief route 292,736.25 NM 502, Pavement Preservation 292,736.25

NM NM008* Port of Entry‐ Columbus/Sundland Park 5,890.53 NM 273, Pavement Preservation 5,890.53

NM NM013 Improve I‐25 at Raton Pass 1,452,902.35 US 87, Pavement Preservation 1,452,902.35

NM NM017 Improve Uptown in Bernalillo County 303,574.29 Reconstruct US 550 303,574.29

NM NM018 Extend Unser Boulevard in Albuquerque 110,314.00 Reconstruct US 550 110,314.00

NM NM021 Northwest Albuquerque/ Rio Rancho high priority roads 2,882,606.88 Reconstruct US 550 2,882,606.88

NM NM023 Santa Teresa Port of Entry Hazmat 102,927.50 NM 273, Pavement Preservation 102,927.50

NM NM029 Double Eagle II Airport (Paseo del Volcan) Interchange and Roadway 

Rehabilitation, New Mexico

1,160,566.39 Reconstruct US 550 1,160,566.39

NM NM041 Coors I 40 Interchange Reconstruction, Albuquerque 5,322,338.56 Reconstruct US 550 5,322,338.56

NM NM042 Development of Paseo del Volcan corridor located in Sandoval County from 

Iris Road to U.S. Highway 550

146,156.60 Reconstruct US 550 146,156.60

NM NM043 Construct an interchange on I25 to provide access to Mesa del Sol in 

Albuquerque

5,608,260.00 Reconstruction interchange on I25 Rio Bravo interchange from NM500, Rio 

Bravo Blvd Exit #220 to University

5,608,260.00

NM NM044 NM 128 JCT NM 31 East to Texas State Line 341,689.38 NM 176, Pavement preservation 341,689.38

NM NM045 Widening of U.S. 491 from Navajo 9 to Colorado State border 320,472.00 US 64, Pavement Preservation 320,472.00

NM NM047 I‐40/Munoz Reconstruction in the City of Gallup. 461,706.51 NM 371, Pavement Preservation 461,706.51

NM NM049 I‐10 Reconstruction, Las Cruces to Texas State Line 243,780.12 NM 273, Pavement Preservation 243,780.12

NM NM050 U.S. 62‐180 Reconstruction, Texas State Line to Carlsbad 1,136,186.04 US 62/180, Pavement Preservation 1,136,186.04

NM NM051 Chaco Wash Bridge and Road Improvements on Navajo Route 46 162,520.00 US 491 & US 550, Striping 162,520.00

NM NM053 Ease traffic congestion and improve intersection safety by identifying 

alternative alignment to U.S. 84/285 and NM 68 through Espanola

1,602,360.00 US 285 SF to Espanola 1,602,360.00

NM NM054 Planning, Design and construction of bikeways and walkway at the City of 

Santa Fe's downtown railyard redevelopment project

244,205.91 NM 502, Pavement Preservation 244,205.91

NM NM055 Improvements to San Juan County Road 7950 466,420.63 US 64, Pavement Preservation 466,420.63

NM NM060 Double Eagle II aviation facility for road construction 507,875.05 Reconstruct US 550 507,875.05

NM NM061 For Construction work on NM 176 in Lea County 508,375.52 NM 176, Pavement preservation 508,375.52

NM NM062 Rio Rancho, Iris Rd to US Highway 550 5,692,875.02 Reconstruct US 550 5,692,875.02

NM NM063 For U.S. 62/180 in Carlsbad 724,983.49 US 62/180, Pavement Preservation 724,983.49

NM NM066 Transportation Improvement to FS 235 and access to Magdalena Ridge 

Observatory

142,206.00 US 60, Striping 142,206.00

NM NM068 Reconstruction of Canal St. and NM 524 South Truck Bypass in Carlsbad 579,399.40 US 62/180, Pavement Preservation 579,399.40

NM NM069 Reconstruction of I‐10 and I‐25 Interchange, Las Cruces 1,444,318.78 NM 273, Pavement Preservation 1,444,318.78

NM NM070 Extend College Blvd. Roswell 439,116.41 US 62/180, Pavement Preservation 439,116.41

NM NM072 Rehabilitate Espanola Main Street, Espanola 1,907,813.29 US 84/285, Pavement Preservation 1,907,813.29

NM NM073 I‐25/U.S. 64 Interchange rehabilitation in Raton 829,001.44 US 87, Pavement Preservation 829,001.44

NM NM074 Reconstruction of NM18 in Lea County 120,280.20 NM 176, Pavement preservation 120,280.20

NM NM075 Reconstruction of U.S. 180 in Grant County 164,685.42 US180 to Deming District Boundary, Striping 164,685.42

NM NM076 Reconstruction of U.S. 491 from Tohatchi to Shiprock 149,392.29 US 64, Pavement Preservation 149,392.29

NM NM077 Relocate the El Paso, TX rail yard to Santa Teresa 2,321,756.70 NM 273, Pavement Preservation 2,321,756.70

NM NMM01 I‐25/Tramway Interchange, Albuquerque, New Mexico  8,781.60 Reconstruct US 550 8,781.60

ToFrom

75

Page 79: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New Mexico

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NM NMM02 I‐40 and Paseo del Volcan Interchange and Access Road to Double Eagle II, 

Albuquerque, New Mexico

703,257.27 Reconstruct US 550 703,257.27

*Subject to availability of funds upon additional research.

Total Amount Repurposed 38,662,025.11Total # of Earmarks Repurposed 39

76

Page 80: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

NY NY008 Long Island Expwy Safety Demo (4th Lane); PL 102‐388 SEC 347 Provides for 

unspent balances from PL 100‐17 (149 (A)108) and PL 100‐457 To be used 

instead on Robert Moses Causeway or Loop Parkway Bridge rehab projects 

511,258.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

511,258.00

NY NY012* Schenectady: Exit 26 Bridge Project 1,159,343.00 PIN 108533 RT. 146 (Hamburg St):  RT. 7 to Schenectady South City Line, 

Safety Improvement (Median & Turn Lanes. Town of  Rotterdam, 

Schenectady County.

1,159,343.00

NY NY016* I‐87 Tappan Zee Br. Moveable Median Barrier  957,970.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

957,970.00

NY NY023 New York: Hell Gate Viaduct ‐ upgrade, repair and paint. (Administered by 

FRA ) (1998)

1,303,924.00 Bronx River Greenway Pedestrian Bridges (X027.08) 1,303,924.00

NY NY044 Buffalo: Buffalo River/Gateway Tunnel Project  456,506.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 456,506.00

NY NY055 Improve Route 9 in Dutchess County  259,472.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

259,472.00

NY NY077  Construct intermodal transportation hub in Patchogue  1,480,720.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

1,480,720.00

NY NY079 Construct CR‐82 from Montauk Highway to Sunrise Highway in Suffolk County  63,537.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

63,537.00

NY NY080 Construct CR‐85 from Foster Avenue to CR97 in Suffolk County  183,305.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

183,305.00

NY NY083 Construct County Road 50 in the vicinity of Windsor Avenue.  220,108.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

220,108.00

NY NY090 Replace Route 28 bridge over NY State Thruway, Ulster Co.  414,669.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

414,669.00

NY NY096 Construct sound barriers on both sides of Grand Central Parkway between 

172nd Street to Chevy Chase Road 

1,282,120.00 PIN X02708 Bronx River Greenway Segment Phase 2 1,282,120.00

NY NY113 Construct Hudson River scenic overlook from Route 9 to Waterfront in 

Poughkeepsie

36,456.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

36,456.00

NY NY114 Construct County Road 93 between NYS 27 and NYS 454.  160,599.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

160,599.00

NY NY116 Improve ferry infrastructure in Greenport  76,684.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

76,684.00

NY NY119 Construct Erie Canal Preserve I‐90 rest stop in Port Byron  579,738.00 PIN 375514 Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 579,738.00

NY NY127 Improve Broadway in North Castle in Westchester County  555,282.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

555,282.00

NY NY130 Construct sound barriers on Grand Central Parkway between 244th Street 

and Douglaston Parkway Provide landscaping along both sides of the Grand 

Central Parkway from 188th street to 172nd street [ref. P.L. 109‐059, Sec 

1703(a)(12) 

155,777.00 PIN X02708 Bronx River Greenway Segment Phase 2 155,777.00

NY NY131 Construct Bike Paths along the Bronx River in Bronx Park  187,475.00 PIN X02708 Bronx River Greenway Segment Phase 2 187,475.00

NY NY142 Improve access to I‐84/Dutchess intermodal facility in Dutchess County 686.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 686.00

NY NY143 Reconstruct 79th Street Traffic Circle, New York City 608,498.00 PIN X02708 Bronx River Greenway Segment Phase 2 608,498.00

NY NY147 Construct congestion mitigation project for Riverhead  944,406.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

944,406.00

ToFrom

77

Page 81: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Roadway improvements, including but not limited to, Palisades Interstate 

Pkwy. Mitigation Measures for New Square

560,000.00

Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 2,132,118.00

NY NY154 Improve Bedford‐Banksville Road from Millbrook to Connecticut State line  131,692.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway 

(T of Stony Point, Clarkstown)

131,692.00

NY NY156 Conduct feasibility study of new international bridges on the NY/Canada 

border

96,982.00 PIN 780601 Northern Tier Multi‐Use Path, Town of Champlain, Clinton 

County

96,982.00

NY NY162 Center for Advanced Simulation and Technology at Dowling College 76,618.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

76,618.00

NY NY164 Grade crossing eliminations along Route 17 in Chemung County, New York  213,525.00 PIN 6ADA02 ‐ Interstate Rest Stop ADA Compliance in Allegany and Steuben 

counties

213,525.00

NY NY260 Town of Fishkill Old Glenham Road (aka Washington Ave.) reconstruction 260,784.20 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 260,784.20

NY NY272 Westchester County, NY Rehabilitation of June Road Town of North Salem 520,767.00 ADA Sidewalks and Ramps ‐ Upper Westchester  520,767.00

Beekman Ave pedestrian improvements ‐ install sidewalks/ADA ramps, 

Village of Sleepy Hollow

291,401.00

Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 49,101.00

Construct sidewalks , Village of Nyack 982,520.00

Widen sidewalks along NY9W, Village of South Nyack 114,000.00

ST Bike RT 9: Rockland Lake River Tr & Dunderburg MTN Trailway (T of Stony 

Point, Clarkstown)

505,840.00

NY NY283 Utica Marsh‐Reestablish Water Street 1,941,832.00 Bagg's Square/Harbor Point Pedestrian Way 1,941,832.00

NY NY285 Realign Union Valley Road in Town of Carmel 264,389.00 Route 100‐North County Trailway Safety Improvements Westchester Co 264,389.00

NY NY288 Construct W. 79th St. Rotunda, New York City 1,602,360.00 ADA Requirements in Richmond, NY & Kings Cos., NYC 1,602,360.00

NY NY289 Reconstruct a historic bridge crossing Maxwell Creek in the Town of Sodus, 

NY 

65,644.00 PIN 403191 RT 31 From Turk Hill Rd to Wayne Cl Overlay, Town of Perinton, 

Monroe County

65,644.00

NY NY292 Rehabilitate a historic transportation‐related warehouse on the Erie Canal in 

the Town of Lyons, NY

480,708.00 RT 390 Multi‐Use Trail From the Canalway Trail to RT 104, Monroe County 480,708.00

NY NY295 Town of Greenville rehabilitation of Grahamtown Rd. and Burnt Corners Rd 100,147.00 Construct new accessible sidewalks, ADA ramps and pedestrian beacons 

along school route, Kingston

100,147.00

NY NY296 Town of Highlands reconstruction of bridge on School Street 180,266.00 Construct ADA compliant pedestrian mall , City of Port Jervis 180,266.00

NY NY301  Reconstruct Main Street in the Town of Lewisboro 72,106.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 72,106.00

NY NY302 Improvements to Clark Pl. and Cherry Ln.  Rt. 6 and 6 N in Putnam County 296,437.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 296,437.00

NY NY310 Conduct NYS 5 construction study 64,094.00 Bagg's Square/Harbor Point Pedestrian Way 64,094.00

NY NY312 Reconfiguration of intersection and redesign of traffic signal timing at 

Mohegan Ave. and Lakeland St

400,590.00 ADA Sidewalks and Ramps ‐ Upper Westchester  400,590.00

NY NY313 Improve bicycle and pedestrian safety on Main Street, Holbrook 100,148.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

100,148.00

NY NY318 Roadway improvements to Woodbury Rd. at intersection with Syosset‐

Woodbury Rd Roadway improvements to Jackson Avenue between Jericho 

Turnpike and Teibrook Avenue 

1,602,360.00 NY25A ADA Ramp Reconstruction N/S Line to BreadAndCheese Hollow Rd, 

Cold Spring Harbor to East Northport

1,602,360.00

2,692,118.00Reconstruct Stoneleigh Avenue in Putnam CountyNY153NY

340,502.00Installation of new turning lane from Mohansic Ave. onto eastbound Route 

202 and addition of new striped crosswalk

1,602,360.00Rockland County Hudson River Greenway Trail Project construction

NY275

NY276

NY

NY

78

Page 82: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

State St., Seneca St., Buffalo St. Surface Improvements, Tompkins County 1,103,150.00

Cecil A. Malone Dr. Flasher & Gate Improvement, Tompkins County 300,000.00

RR Grade Xing Improvement NS Ithaca Sec Station Road, Tompkins County 300,000.00

Cecil A. Malone Dr. Surface Improvement, Tompkins County 299,800.00

NY NY321 Roadway improvements on Woodbine Avenue between 5th Avenue and 

Beach Avenue

640,944.00 ADA Compliance in Nassau and Suffolk counties 640,944.00

Construct new sidewalks; install lighting and bike storage racks, City of Ithaca 367,720.00

Brindley St. Bridge Replacement Project, Tompkins County 1,234,640.00

NY NY328 Repair and repave the north side of the Mineola train station 120,177.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

120,177.00

NY NY333 Waterloo, NY by‐pass project 5,591,537.00 Extend Lake Trail from the NYS fairgrounds to the southern lakefront area, 

Onondaga County

5,591,537.00

NY NY338 Realignment of Clove Road and Rt. 208, access management improvements in 

Orange County

961,416.00 ADA Sidewalk & Ramps: Rockland County 961,416.00

Construct ADA compliant pedestrian mall , City of Port Jervis 166,371.00

Route 208 Sidewalk  RT 52 to Most Precious Blood School (V of Walden 

Orange Co)

53,954.00

NY NY342 Village of Unionville reconstruction of Main Street 64,094.00 Route 208 Sidewalk  RT 52 to Most Precious Blood School (V of Walden 

Orange Co)

64,094.00

NY NY345 Island Expressway access at Marcus Avenue and Lakeville Road and 

associated Park and Ride

4,807,080.00 Grand Ave in Baldwin, Nassau County 4,807,080.00

NY NY347 Transportation Enhancements to support development of Erie Canal in 

Orleans County, NY 

137,154.00 PIN 403191 RT 31 from Turk Hill Rd to Wayne Cl Overlay, Town of Perinton, 

Monroe Country

137,154.00

NY NY353 For the acquisition of ferry boats and ferry terminal facilities and operation of 

ferry service from Rockland County‐ Yonkers‐Manhattan. 

182,846.00 PIN X02708 Bronx River Greenway Segment Phase 2 182,846.00

NY NY355 Reconstruction of Tappan Street Bridge in Town of Newark Valley.  491,203.00 PIN 6108.58 SR 14 MBC Paving Watkins Glen 491,203.00

NY NY359 Town of Chester Surrey Meadow subdivision road improvements 420,354.00 Route 208 Sidewalk  RT 52 to Most Precious Blood School (V of Walden 

Orange Co)

420,354.00

NY NY363 Construct sidewalks and curbing on Tate Avenue in Village of Buchanan. 300,443.00 ADA Sidewalk & Ramps: Rockland County 300,443.00

NY NY366 Rehabilitate the Pines Bridge Road and Lake Avenue and Ryder Road, in 

Ossining, York‐town, and New Castle

2,215,263.00 ADA Sidewalks and Ramps ‐ Upper Westchester  2,215,263.00

NY NY372  Town of Fishkill reconstruct Maple Ave. 19,628.80 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 19,628.80

Route 100‐North County Trailway Safety Improvements Westchester Co 160,000.00

ADA Sidewalks and Ramps ‐ Upper Westchester  641,180.00

NY NY377 State of NY Village of Kiryas Joel sidewalk project.  429,009.00 PIN 8T0342 ADA Sidewalk & Ramps: Rockland County 429,009.00

Bronx River Greenway Segment Phase 2 5,000,000.00

Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 2,370,856.00

Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 381,530.00

PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland, 

Ulster and Westchester counties 

259,414.00

NY NY383 Land acquisition and improvements on Louisa Street, Peekskill, NY. 990,692.00 Route 100‐North County Trailway Safety Improvements Westchester Co 990,692.00

NY NY385 Village of Goshen Hatfield Lane reconstruction. 200,295.00 Wallkill Hamlet Sidewalks, Ulster County 200,295.00

NY319NY

NY323NY

2,002,950.00Rehabilitate highway bridges at Ithaca secondary line

1,602,360.00Peruville Road/Creating overpass to address intersection safety issue

220,325.00Town of Minisink South Plank RoadNY340NY

801,180.00Replace structurally deficient bridge over the Pocantico River, the Village of 

Pleasantville Briarcliff Manor 

NY375NY

7,370,856.00Preliminary design and environmental impact study for a collector‐ 

distributor road along I‐ 95 from Westchester Ave. to Bartow Ave.

NY381NY

640,944.00Town of East Fishkill new construction Bypass roadNY382NY

79

Page 83: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NY NY388 Westchester County, NY Rehabilitation of Lexington Ave, Mount Kisco 400,590.00 Route 100‐North County Trailway Safety Improvements Westchester Co 400,590.00

Route 100‐North County Trailway Safety Improvements Westchester Co 280,335.00

PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland, 

Ulster and Westchester counties 

240,432.00

NY NY390 Construct sidewalks and roadway improvements on Oscawana Lake Road in 

the Town of Putnam Valley.

480,708.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 480,708.00

ADA Compliance in Nassau and Suffolk counties 420,000.00

NY27 ADA Southampton Main Street to Post Office 1,683,098.00

NY NY394 Install Improvements for Pedestrian Safety including in the vicinity of PS K124 50,000.00 Grand Concourse Pedestrian Safety Improvement, PH.3, Bronx 50,000.00

NY NY395 Page Green‐‐Phase III‐‐ Reconstruction of 2.6 miles. Town of Virgil, Cortland 

County. 

462,347.00 PIN 375514 Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 462,347.00

Construct sidewalks linking public schools on Scotchtown Road from Rte 207 

to Murray Ave, Town of Goshen

179,740.00

Construct sidewalks/ADA compliant ramps, Town of Middletown 421,145.00

NY NY408 Enhance road and transportation facilities in the vicinity of the Brooklyn 

Children's Museum

550,811.00 Grand Concourse Pedestrian Safety Improvement, PH.3, Bronx 550,811.00

NY24 ADA Ramp Reconstruction MSP to NY110, East Meadow to East 

Farmingdale

1,682,835.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

119,820.00

NY NY416 Study on extending Rt. 5 to Auburn 120,177.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga Count 120,177.00

Burrstone Rd Pedestrian Walk Improvements (Utica College to North/South 

Arterial)

128,236.00

Bagg's Square/Harbor Point Pedestrian Way 32,000.00

NY NY419 Repair Silver Mine Bridge in the Town of Lewisboro 120,177.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 120,177.00

Pedestrian/school crossing signal/ADA compatible, Town of Fallsburg 172,500.00

Rt 97 Scenic Byway/NYS Bike Route 17 Shoulder Restoration, Delaware and 

Sullivan counties

428,385.00

NY NY424 Construct sidewalks and curbing on Westchester Avenue in Village of 

Buchanan

220,325.00 Wallkill Hamlet Sidewalks 220,325.00

NY NY430 Big Ridge Road: Spencerport Village Line to Gillet Road in the Town of Ogden.  141,475.00 PIN 403191 RT 31 From Turk Hill Rd to Wayne Cl Overlay, Town of Perinton, 

Monroe County

141,475.00

NY NY432 Suffolk County ITS arterial monitoring and performance measures 500,738.00 ADA Compliance in Nassau and Suffolk counties 500,738.00

NY NY438 Remediate road runoff in vicinity of Peconic Estuary watershed. 1,001,475.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

1,001,475.00

NY NY439 Mount Vernon Railroad Cut 2,002,950.00 Construct sidewalks/ADA compliant ramps, Town of Middletown 2,002,950.00

NY NY442 Construct visitor center, access road, and parking at Sam's Point Preserve, 

Ellenville

400,590.00 Wallkill Hamlet Sidewalks 400,590.00

NY NY451 Construct Wayne County, NY rails to trails initiative 276,407.00 RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 276,407.00

NY NY452 Access improvements for terminal located on 12th Ave. between W. 44th and 

W. 54th St. in Manhattan

897,017.00 PIN X02708 Bronx River Greenway Segment Phase 2 897,017.00

Linear safety project Village of Wappingers Falls 561,683.00

ADA Sidewalks and Ramps: Rockland County 39,202.00

2,103,098.00Improve Long and Short Beach Road, Southampton.NY391NY

600,885.00Improve Rt. 17M access, safety and traffic managementNY400NY

1,802,655.00Roadway improvements to Jackson Avenue between Jericho Turnpike and 

Teibrook Avenue.

NY413NY

160,236.00Construct improvements in Sight Distance at Road Grade and Trail Crossings 

in Oneida and Herkimer Counties

NY418NY

520,767.00Construct Bicycle Path in Town of Bedford.NY389NY

600,885.00Design and construct Upper Delaware Scenic Byway Visitor Center, 

Cochecton.

NY423NY

600,885.00Palisades Interstate Parkway Mitigation Measures for New Square.NY453NY

80

Page 84: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NY NY455 Deer Avoidance System, to deter deer from milepost marker 494.5, Ripley, 

PA, to 304.2., Weedsport, NY along I‐90

200,295.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga Count 200,295.00

NY NY458 Town of Warwick, NY. Bridge replacement on Buttermilk Falls Rd 140,207.00 Wallkill Hamlet Sidewalks 140,207.00

NY NY459 Town of Warwick, NY East Shore Road reconstruction.  464,955.00 PIN 848743 Route 208 Sidewalk: Rt 52 to Most Precious Blood School (V of 

Walden Orange Co)

464,955.00

NY NY461 Traffic mitigation on Bridge Street and Maple Avenue, Florida, NY. 120,177.00 Wallkill Hamlet Sidewalks 120,177.00

Construct new accessible sidewalks, ADA ramps and pedestrian beacons 

along school route, Kingston

270,011.00

Wallkill Hamlet Sidewalks 50,461.00

NY NY464 Rockland County and City of Yonkers to Lower‐Manhattan Ferry Boat project  113,180.00 PIN X02708 Bronx River Greenway Segment Phase 2 113,180.00

Reconstruct 1,200 linear ft. of Oakwood Drive and repair deteriorated 

sidewalks. City of Peekskill

562,853.00

Beekman Ave pedestrian improvements ‐ install sidewalks/ADA ramps, 

Village of Sleepy Hollow

318,445.00

NY NY470 Town of Wawayanda reconstruction of McVeigh Road 400,590.00 Wallkill Hamlet Sidewalks 400,590.00

NY NY479 Improve Maple Avenue, Smithtown.  155,413.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

155,413.00

NY NY480 Comprehensive traffic congestion mitigation study of Hauppauge Industrial 

Park and surrounding area

349,425.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

349,425.00

NY NY482 Improvements at highway‐ rail crossings along the Southern Tier Extension 

Railroad in Allegany, Cattaraugus, and Steuben Counties 

182,128.00 Pedestrian movements along the Jamestown Riverwalk, and surrounds, City 

of Jamestown

182,128.00

NY NY484 Deploy intermodal chassis ITS project in New York. 712,039.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 712,039.00

NY NY489 Warburton Avenue Bridge over Factory Lane, Hastings‐on‐Hudson, New York 500,738.00 Route 100‐North County Trailway Safety Improvements Westchester Co 500,738.00

NY NY490 Improve intersection of Old Dock and Church Street, Kings Park Road 

improvements for Church Street between NY State Route 25A and Hilden 

Street in Kings Park

400,590.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

400,590.00

NY NY496 Riverwalk in Irvington development. 200,295.00 Wallkill Hamlet Sidewalks 200,295.00

NY NY500 Construct the Auburn Connector Road Corridor, Auburn, NY 801,180.00 N. Division St/Owasco River Br. Replace., Cayuga County 801,180.00

NY NY504 Subsurface environmental study to measure presence of methane and 

benzene gasses in vicinity of Greenpoint, Brooklyn, and the Kosciusko Bridge, 

resulting from the Newtown Creek oil spill.

867,765.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 867,765.00

NY NY506 Improve bicycle and pedestrian safety, NY 25, Jamesport. 240,354.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

240,354.00

Construction of streetscape improvements to Main Street, Port Washington 500,000.00

Upgrade roads to the Garden City Industrial, Town of North Hempstead 297,827.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

678,858.00

NY NY512 Portageville Bridge‐‐ Purchase existing bridge to convert to pedestrian bridge 1,466,159.00 RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 1,466,159.00

NY NY513 Town of Southeast construction and repaving of town roads. 252,372.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 252,372.00

NY NY515 Little Falls Access: Repair and reconstruct High School and Lower School Road 192,283.00 Burrstone Rd Pedestrian Walk Improvements (Utica College to North/South 

Arterial)

192,283.00

881,298.00

NY NY509 Road and pedestrian safety improvements Main Street, Village of Patchogue 

$600,000 for road and pedestrian safety improvements on Main Street in the 

Village of Patchogue; $900,000 for road and pedestrian safety improvements 

on Montauk Highway, between NYS Route 112 and Suffolk County Road 101 

in Suffolk County 

1,476,685.00

NY NY469 Rehabilitation of NY Route 100 from Virginia Road to Westchester 

Community College.

320,472.00Town of Goshen Orzeck Road reconstructionNY463NY

81

Page 85: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NY NY524 Town of North Salem improvements and repaving to Hawley Road 

Rehabilitation of Sugar Hill Road in North Salem, NY [ref P.L. 110‐244, Sec 

105(a)(94)]

160,236.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 160,236.00

ADA Compliance in Nassau and Suffolk counties 739,640.00

NY25A ADA Ramp Reconstruction N/S Line to BreadAndCheese Hollow Rd, 

Cold Spring Harbor to East Northport

1,263,310.00

NY NY527 Rehabilitation of North and South Ridge Street and Wappanocca Avenue in 

the Village of Rye Brook and City of Rye.

1,730,549.00 Route 100‐North County Trailway Safety Improvements Westchester Co 1,730,549.00

Extend Wassaic Trail to MNR station: Dutchess County 250,000.00

Improve ADA access of existing pedestrian facilities within the village of Red 

Hook

88,256.00

ADA Sidewalk & Ramps: Rockland Country 863,514.00

NY NY531 Town of Southeast construction and repaving of town roads. 240,354.00 ADA Sidewalk & Ramps: Rockland Country 240,354.00

NY NY535 Kingston, Construct pedestrian waterfront walkway. 262,548.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dundergurb Mtn Trailway 

(T of Stony Point, Clarkstown)

262,548.00

NY NY538 Stabilize Poughkeepsie Railroad Bridge and construct a pedestrian walkway 

linking the two sides of the Hudson River, Poughkeepsie Total:

123,352.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dundergurb Mtn Trailway 

(T of Stony Point, Clarkstown)

123,352.00

NY NY544 Rehabilitate Guy Lombardo Avenue and construct drainage improvements 

and new sidewalks and curb cuts in Freeport, NY Traffic calming and safety 

improvements to Lido Boulevard, Town of Hampstead, Nassau County 

957,410.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

957,410.00

NY NY546 Great Neck Road Traffic Calming Project. 320,472.00 ADA Compliance in Nassau and Suffolk counties 320,472.00

Coeymans Hamlet ADA improvements and Pavement. Maintenance. 1,200,000.00

Rt. 4 Bike/Ped Improvements HVCC South Drive to Rt 43, Rensselaer County 1,000,000.00

Intersection improvements Rt.4 and Bloomingrove Road, North Greenbush 2,607,080.00

NY NY551 Harlem River Park and Bikeway. 801,180.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 801,180.00

NY NY555 Town of Chester, Lake Hill Farms subdivision road improvements 220,177.00 Wallkill Hamlet sidewalks 220,177.00

NY NY556 Elevation of road and construction of drainage improvements on Sequams 

Lane Center and Sequams Lane West in the Town of Islip, NY. Total:

122,082.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

122,082.00

ADA Sidewalk & Ramps: Northern Westchester County 469,033.00

PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland, 

Ulster and Westchester counties 

131,852.00

NY NY565 Realign Kirk Lake Drive in Carmel 88,130.00 Route 100‐North County Trailway Safety Improvements Westchester Co 88,130.00

NY NY575 Village of Highland Falls repaving and sidewalk construction of Berry Hill Road 60,088.00 Construct ADA compliant pedestrian mall , City of Port Jervis 60,088.00

NY NY577 Construct access to the NYS Thruway‐‐Montezuma National Wildlife Reserve. 1,201,770.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga County 1,201,770.00

Complete Plandome Rd Culvert reconstruction project, Town of North 

Hempstead

500,000.00

Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail, Town of 

North Hempstead

838,142.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

23,864.00

1,201,770.00NYSDOT Route 55 construction over Fishkill Creek and left turn lane 

construction

NY528NY

4,807,080.00Construct Phase II I‐90 Connector ITS Laboratory in Rensselaer CountyNY547NY

2,002,950.00Construct access road and exit lanes for Center for Advanced Medicine: North 

Shore LIJ Health System

NY525NY

NY

1,362,006.00Construct Northern State Parkway and LIE access at Marcus Ave. and Lakeville 

Rd. and associated Park and Ride

NY587NY

600,885.00Reconfigure intersection of Ridge Street and Hallocks Mill Road and install 

new traffic signal

NY557 

82

Page 86: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NY NY591 Transportation Initiative to provide for a parking facility, in the vicinity of the 

Manhattan College Community. 

70,738.00 PIN X02708 Bronx River Greenway Segment Phase 2 70,738.00

ADA Sidewalk & Ramps: Rockland County 711,587.00

ST Bike RT 9: Rockland Lake RVR TR & Dundergurg Mtn Trailway (T of Stony 

Point, Clarkstown)

89,593.00

NY NY597 Construction of and improvements to Amherst Street, Buffalo.  52,479.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 52,479.00

NY NY598 Construction of and improvements to Grant Street, Buffalo. Total: 25,177.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 25,177.00

NY NY599 Construction of and improvements to Hertel Avenue, Buffalo.  52,479.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 52,479.00

NY NY606 Construction of Bicycle Path and Pedestrian Trail in City of Buffalo  106,567.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 106,567.00

NY NY611 Construct multi‐modal facility in the vicinity of Brooklyn Children's Museum 240,354.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 240,354.00

NY NY617 Planning and design, construction, and relocations for Southtowns Connector‐

‐NY Route 5 from Coast Guard Base to Ohio St, including Fuhrmann Blvd. 

Improving Outer Harbor access through planning, design, construction, and 

relocations of Southtowns Connector‐NY Route 5, Fuhrmann Boulevard, and a 

bridge connecting the Outer Harbor to downtown Buffalo at the Inner Harbor

113,180.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 113,180.00

NY NY620 Improve Clover Ln. from Bay Ave. to Bay Rd., Hamlet of Brookhaven 216,319.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

216,319.00

NY NY622 Improve intersection of Old Dock and Church Street, Kings Park 100,148.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

100,148.00

Reconstruction of Nichols Road Town of Smithtown 582,479.00

ADA Compliance Nassau and Suffolk counties 230,719.00

NY NY627 Road improvements, Hamlet of Gordon Heights, Town of Brookhaven 344,507.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

344,507.00

NY NY629 Roadway improvements, Hamlet of Mastic Beach 320,472.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

320,472.00

ADA Compliance in Nassau and Suffolk counties 859,630.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

41,698.00

NY NY632 Improve town weatherization capabilities on Tucker Drive, Poughkeepsie, NY. 200,295.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 200,295.00

NY NY633 Bedell Road improvements, Poughkeepsie, NY 104,153.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 104,153.00

NY NY634 Land acquisition and improvements on Main Street, Beacon, NY 400,590.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 400,590.00

NY NY644 Improvements to Route 12 in Broome and Oneida Counties  5,310,194.00 PIN 208805 RT 921B (Burrstone RD) / RT 5,8,12 (North‐South Art) Utica  5,310,194.00

NY NY646 Enhance Road and Transportation Facilities Near W. 65th Street and 

Broadway, New York City (2005)

507,878.00 The Brooklyn‐Queens Expressway (BQE) Triple Cantilever Replacement 

Project.

507,878.00

NY NY650 Road and transportation improvements near the Brooklyn Children's Museum 5,007,375.00 4th Avenue Safety Improvements Phase II‐ Vision Zero Great Streets: 18th ‐ 

33rd Streets, 52nd ‐ 60th Streets, Brooklyn

5,007,375.00

City of Rochester Eastman Trail‐Ridgeway Segment 1,400,000.00

Quaker Road Crossing Improvements, Wayne County 432,486.00

RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 59,992.00

813,198.00Improve Old Willets Path from NY 454 to Rabro Dr., Smithtown.NY624NY

801,180.00High‐Speed EZ pass at the New Rochelle Toll Plaza, New RochelleNY595NY

901,328.00WLIU Public Radio Emergency and Evacuation Transportation Information 

Initiative, Southampton.

NY630NY

1,892,478.00For research at the Rochester Institute of Technology Alternative Fuels and 

Life‐Cycle Engineering.

NY652NY

83

Page 87: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

New York

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NY NY659 Southtown connector improvements on NY Route 5 from the Coast Guard 

Base to Ohio Street, Buffalo, NY/Buffalo Outer Harbor Road improvements. 

895,502.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 895,502.00

NY NY663 Reconstruction of East Avenue from Main Street to Henry Street in Hornell.  303,406.00 PIN 6ADA02 ‐ Interstate Rest Stop ADA Compliance in Allegany and Steuben 

counties

303,406.00

NY NY664 Improvements to Widmer Road in the Town of Wappinger 500,738.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 500,738.00

NY NY668 Design, Planning, and Construction of a Community Transportation Center 

from Broadway to Manhattan College Parkway. 

707,375.00 PIN X02708 Bronx River Greenway Segment Phase 2 707,375.00

NY NY670 For the CargoWatch Transportation Management Project for Study and 

Implementation

355,536.00 ADA Requirements in Queens & Bronx Cos., NYC 355,536.00

NY NY671 Preparation, demolition, disposal and site restoration of Alert Facility on 

Access Road to Plattsburgh International Airport 

70,738.00 PIN 780601 Northern Tier Multi‐Use Path, Town of Champlain, Clinton 

County

70,738.00

NY NY678 Roadway and Traffic Improvements for Suffolk County  212,613.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

212,613.00

NY NY683 Repair and Restoration of the Outdoor Area on 82nd Street and 5th Avenue  634,646.00 PIN X02708 Bronx River Greenway Segment Phase 2 634,646.00

Construct sidewalks/ADA ramps.  Dobbs Ferry Village 329,000.00

Construction of new ADA sidewalks/provide access to MNR station, Town of 

Harrison

165,000.00

Construct ADA compliant ramps and crosswalks , Town of Irvington 140,000.00

Reconstruct 1,200 linear ft. of Oakwood Drive and repair deteriorated 

sidewalks. City of Peekskill

368,341.00

Reconstruction of E. Genesee Street connective corridor to Syracuse 

University, Syracuse

475,000.00

Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 4,536,707.00

ADA Compliance in Nassau and Suffolk counties 6,184.00

Grand Ave in Baldwin, Nassau County 467,680.00

Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, 

Oyster Bay towns

26,136.00

NY NY746 Improve NY State Route 112 from Old Town Road to NY State Route 347 1,604,932.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in 

Babylon, Islip, Oyster Bay towns

1,604,932.00

NY NYF01 Twin Forks Passenger Commuter Ferry Terminal (Greenport and Sag Harbor 

ferry service)

351,600.00 ADA Compliance in Nassau and Suffolk counties 351,600.00

*Subject to availability of funds upon additional research.

Total Amount Repurposed 125,364,773.00Total # of Earmarks Repurposed 162

5,011,707.00Various transportation projects related to the DestiNY USA projectNY692NY

500,000.00Road repair and maintenance in the Town of SouthamptonNY745NY

1,002,341.00South Lexington and Post Road Streetscape Expansion in White PlainsNY687NY

84

Page 88: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

North Carolina

State Demo ID Project Description Amount  Project Description Amount

NC NC026 Upgrade US‐158 in Warren and Halifax Counties 4,612,948.00 I‐85 from North of SR 1237 (Drewry‐Manson Rd) to Virginia State Line 4,612,948.00

NC NC033 Relocate US 1 from North of Lakeview to SR 1180, Moore and Lee Counties.  125,970.00 Replace Bridge 620002 over CSX Transportation in Aberdeen 125,970.00

NC NC038 Concord Parkway Traffic Signals System Integration, Concord.  North Carolina 

(used on U‐4448)

4,549.00 George Liles Parkway, SR 1304 (Roberta Road) to SR 1431 (Weddington 

Road). (R‐2246B)

4,549.00

NC NC040 Hatteras Inlet ferry connecting Ocracoke Island and North Carolina Outer 

banks, North Carolina

339,989.00 Construct River Class Ferry in Dare and Hyde Counties. 339,989.00

NC NC043 North Carolina State University Transportation Center 13,403.00 Crossing #628547G, West North Street, and Crossing #628551W, West South 

Street, in Fremont.  Crossing closures.

13,403.00

NC NC044 Southport and Fort Fisher Ferry Terminals, North Carolina 19,805.00 NC 211, SR 1500 (Midway Road) to NC 87 in Brunswick County 19,805.00

NC NC045 US Highway 29 Signal Integration ‐ Kannapolis, North Carolina (used on U‐

4448)

1,934.00 George Liles Parkway, SR 1304 (Roberta Road) to SR 1431 (Weddington 

Road). (R‐2246B)

1,934.00

NC NC050 Marine Maintenance Facility Phase I, Manns Harbor, North Carolina 28,102.00 Construct River Class Ferry in Dare and Hyde Counties. 28,102.00

NC NC052 U.S. Highway 276 Project Study (NC) 113,500.00 US 64 Business, SR 1348 (Probart St) to US 64 in Brevard.  (U‐5104) 113,500.00

NC NC055 Belmont Infrastructure and Streetscape Improvement, North Carolina 227,178.00 Main St, NC 115 (Old Statesville Rd)/SR 2004 (Mount Holly‐Huntersville Rd) to 

south of Ramah Church Rd

227,178.00

NC NC067 Extend M.L. King, Jr. Boulevard in Monroe 162,520.00 NC 84, NC 16 to SR 1008 (Waxhaw‐Indian Trail Rd) in Wesley Chapel. (U‐

3467)

162,520.00

NC NC070 Upgrade US 1 in Rockingham  812,739.00 Future I‐73/I‐74 / US 220 Rockingham Bypass, SW of SR 1304 (Harrington 

Road) to I‐73 / I‐74 interchange S of Ellerbe

812,739.00

NC NC075 Install ITS on U.S. 70 Clayton Bypass 81,259.00 I‐40,  I‐440/US 64 in Wake County to NC 42 in Johnston County (STIP I‐5111) 81,259.00

NC NC084 Greensboro Signal System Replacement ITS Enhancement Project 1,015,749.00 SR 1008 (West Market St) from SR 2007 (Bunker Hill Rd) at Colfax to NC 68 in 

Greensboro

1,015,749.00

NC NC085 Continued development of Cary, NC pedestrian bike paths 147,542.00 Crossing #628547G, West North Street, and Crossing #628551W, West South 

Street, in Fremont.  Crossing closures

147,542.00

NC NC086 Eliminate highway‐railway crossings in the City of Fayetteville NC 81,259.00 CSX, Closure of Plank Street.  Signalize Yancey Street, Dudley Street, and 

Chelly Street in Warsaw, Duplin County.

81,259.00

NC NC093 Construct Endor Iron Furnace Greenway enhancements from Deep River to 

Sanford  

179,526.00 US 1 / US 15 / US 501 from South of NC 78 (Tramway Rd) / SR 1303 (Center 

Church Rd) to SR 1334 (Pendergrass Rd) in Sanford

179,526.00

NC NC099 To construct an interchange at an existing grade separation at SR 1602 (Old 

Stantonsburg Rd.) and U.S. 264 Bypass in Wilson County, NC

492,515.60 US 301, Black Creek Road to SR 1515 in City of Wilson 492,515.60

NC NC103 Pack Square Pedestrian and Roadway Improvements, Asheville. 390,049.00 NC 63 (Leicester Highway), SR 1615 (Gilbert Rd) to west of SR 1004 

(Newfound Rd) (U‐3301)

390,049.00

NC NC107 Construct new Route from Beach Drive (SR 1104) to NC 211 in Brunswick 

County

325,039.00 NC 211, SR 1500 (Midway Road) to NC 87 in Brunswick County 325,039.00

NC NC108 Widen NC 150 from Cherryville to Lincolnton. 471,445.00 NC 273 (S. Main St), Tuckaseegee Rd (at Beatty Dr) to Highland St (at A & E 

Dr) in Mounty Holly.  (U‐3633)

471,445.00

NC NC109 Study feasibility of widening US 221/NC 226 from Woodlawn to Spruce Pine, 

start planning and design, and make upgrades to improve safety.

630,502.00 Replacement of bridge 580017 carrying US 221 over Second Broad River in 

McDowell County.  (B‐3673)

630,502.00

NC NC116 North Carolina.  Repair and improve safety features on U.S. Highway 19 from 

Maggie Valley to Cherokee.

1,153,891.00 NC 209, US 23 Bus. to north of SR 1523 (Old Clyde Rd) at Lake Junaluska.  (R‐

4047)

1,153,891.00

NC NC117 Northern Loop Project, City of Wilson 801,180.00 US 301, Black Creek Road to SR 1515 in City of Wilson 801,180.00

NC NC119 Construct relocated NC 16 in Lincoln and Catawba Counties, NC. 138,142.00 NC 16, SR 1895 to SR 1800 southeast of Newton.  (R‐3100) 138,142.00

NC NC120 Battleground Rail to Trail Project, Guilford County, NC 81,259.00 SR 1008 (West Market St) from SR 2007 (Bunker Hill Rd) at Colfax to NC 68 in 

Greensboro

81,259.00

ToFrom

85

Page 89: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

North Carolina

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NC NC136 Norfolk Southern Intermodal System, Charlotte 25,267.00 I‐85, NC 73 (Exit 55) to SR 2180 (Lane Street).  (I‐3802A) 25,267.00

CSX, Closure of Plank Street.  Signalize Yancey, Dudley, and Chelly Streets in 

Warsaw, Duplin County. (Y‐5500CB)

242,381.00

CSX, Closure of 3rd Street.  Signalize 1st and Malloy, Robeson County          (Y‐

5500 FC)

650,000.00

CSX, NC 711 (Third Street).  Crossing Signal Upgrade in Pembroke, Robeson 

County (Z‐5400FT).

582,000.00

CSX, NC 20 (West Broad Street).  Crossing Signal Upgrade in Saint Paul, 

Robeson County (Z‐5400FV).

270,000.00

CSX, US 501 (Main Street).  Crossing Signal Upgrade in Rowland, Robeson 

County. (Z‐5400FW)

350,000.00

US 401, West of Hampton Oaks Drive to East of Fairway Drive in Fayetteville, 

Cumberland County (U‐4405).

931,460.00

NS, Dobson Drive. Crossing Signal Upgrade in Fayetteville, Cumberland 

County (Z‐5400FX).

250,000.00

CSX, Brissom Drive.  Crossing Signal Upgrade in Fayetteville, Cumberland 

County (Z‐5400FY).

200,000.00

Short Line, NC 20 (Saint Paul Road)/SR 1458 (Scott Currie Road) in Raeford, 

Hoke County (Z‐5400HD)

95,000.00

Upgrade to LED fixtures at various locations in Cumberland, Richmond and 

Chatham Counties (Z‐5400ZZ)

200,000.00

Installation of railroad warning signage in Cumberland, Hoke, Moore, 

Montgomery, Lee, Scotland (Z‐5400ZY)

50,000.00

NC NC144 Northern Loop Project, Wilson 3,004,425.00 US 301, Black Creek Road to SR 1515 in City of Wilson 3,004,425.00

NC NC145 Rail Track Replacement, Spencer. 74,336.00 I‐85 from North of SR 2180 (Lane St.) to US 29 / US 601 Connector in Rowan 

County

74,336.00

NC NC151 Transportation Improvements for Peters Creek Pkwy, 1st St., 2nd St., and 

Brookstown Ave., in Winston‐Salem  

2,002,950.00 Winston‐Salem Northern Beltway ‐Eastern Section, US 421 / NC 150 / 

Business 40 to US 158

2,002,950.00

NC NC155 Acquisition of rail corridors for use as bicycle and pedestrian trails, Durham.   2,002,950.00 SR 2220 (Old Chapel Hill Rd) from SR 1113 (Pope Rd) to SR 1116 (Garrett Rd) 

in Durham County.

2,002,950.00

NC NC156 Construct an interchange at an existing grade separation at SR 1602 (Old 

Stantonsburg Rd.) and US 264 Bypass in Wilson County

903,840.00 US 301, Black Creek Road to SR 1515 in City of Wilson 903,840.00

NC NC161 Pack Square Pedestrian and Roadway Improvements, Asheville. 1,033.00 NC 63 (Leicester Highway), SR 1615 (Gilbert Rd) to west of SR 1004 

(Newfound Rd) (U‐3301)

1,033.00

NC NC162 Study feasibility of widening US 221/NC 226 from Woodlawn to Spruce Pine, 

start planning and design, and make upgrades to improve safety.

636,783.00 Replacement of bridge 580017 carrying US 221 over Second Broad River in 

McDowell County.  (B‐3673)

636,783.00

NC NC174 Eliminate highway‐railway crossings in the City of Fayetteville NC 276,360.00 CSX, Closure of Plank Street.  Signalize Yancey Street, Dudley Street, and 

Chelly Street in Warsaw, Duplin County.

276,360.00

NC NC177 Acquire right‐of‐way and construct a new highway that will begin at NC 58 

and follow east to U.S. 301, Wilson

2,004,683.00 US 301, Black Creek Road to SR 1515 in City of Wilson 2,004,683.00

NC NC178 Transfer of the Williams Street railroad switching operation to the Milan Yard 

switching operation site, Fayetteville.

3,007,025.00 NCDOT Capital Yard South End Track Improvements 3,007,025.00

NC NCF01 North Carolina State Ferry (dredging and environmental studies). 144,547.00 Hatteras Ferry Dock in Dare County to Ocracoke Ferry Docks in Hyde County. 144,547.00

Total Amount Repurposed 30,357,034.60

3,820,841.00Eliminate highway‐railway crossings in the City of Fayetteville NCNC140NC

86

Page 90: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

North Carolina

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Total # of Earmarks Repurposed 39

87

Page 91: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Ohio

State Demo ID Project Description Amount  Project Description Amount

OH OH003 PE DEMO ‐ Hubbard Expressway ‐ Youngstown (OH) 393,649.39 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 393,649.39

OH OH004 PE Demo ‐ I‐680 Access Ramps ‐ Youngstown (OH) 170,826.94 Resurface and replace Meridian Road from I‐680 to Trumbull County Line.  170,826.94

OH OH009 Brook Park‐Aerospace Tech. Prk Acc. 560,953.43 Repair and resurface Smith Road in the City of Brook Park from Snow Road to 

Elm Ave.

560,953.43

OH OH015* Clark, Champaign and Logan Counties: US 68 Bypass 334,509.36 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

334,509.36

OH OH022* East Canton/Minerva: Route 30 Extension 1,199,730.13 Horizontal curve correction to mitigate the crashes that are occurring in the 

curve on US 30 at SLM 11.70. 

1,199,730.13

OH OH027 Lancaster Bypass  240,995.95 Installation of tower lighting at the Hill/Diley Interchange on US 33  240,995.95

OH OH044 Relocate SR 60 from Zanesville to Dresden 497,670.50 Resurfacing and related work to Northpointe Drive from SR146 to Maple 

Avenue (SR60) 

497,670.50

OH OH049 Upgrade Western Reserve Road, Mahoning County 84,769.64 Resurface and replace Meridian Road from I‐680 to Trumbull County Line.  84,769.64

OH OH066 Construct traffic signal in Hebron 10,065.41 Village of Hebron sidewalks on CR 79 north of US 40 to Enterprise Drive  10,065.41

OH OH078 Construct interchange at SR 11 and King Graves Rd. in Trumball Co. 729,706.43 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 729,706.43

OH OH082 Construct access and related improvements to Downtown Riverfront Area, 

Dayton

92,240.00 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

92,240.00

OH OH095 Construct intermodal transit center in Cincinnati 372,840.00 Replacement of the existing Western Hills Viaduct.  372,840.00

OH OH096 High Priority highway and bridge projects 4,610,686.37 Interchange modification.  Includes Bridge replacements 1)SR 541 over SR16 

and 2) SR 541 over Muskingum River

4,610,686.37

OH OH098 Construct necessary connections for the Taylor Southgate Bridge in Newport 

and the Clay Wade Bailey Bridge in Covington

481,986.01 Replacement of the existing Western Hills Viaduct.  481,986.01

OH OH099 Construction of, and improvements to, the Fort Washington. Way 

reconfiguration project, Cincinnati, Ohio

646,116.00 Replacement of the existing Western Hills Viaduct.  646,116.00

OH OH105 Develop of Elyria Downtown Waterfront Walk, Elyria, Ohio 2,580.73 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

2,580.73

OH OH107 Mahoning River Corridor of Opportunity Industrial Park Roadway 

Improvement, Ohio

9,514.01 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 9,514.01

OH OH134 I‐675 Corridor Improvements 108,266.29 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

108,266.29

OH OH147 Renovate and expand national Packard Museum and adjacent historic 

Packard facilities

310,477.59 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 310,477.59

OH OH159 Purchase of right of way for transportation enhancement activities in 

Bainbridge Township, OH 

107,476.00 Purchase of a portable messaging board to alert traveling public for 

Bainbridge Township

107,476.00

OH OH160 Highway grade crossing improvement on Summit Road at Pataskala, OH 18,474.80 Reconstruction of Mink St from SR 16/Mink Street intersection improvement, 

north to bridge just north of Havens Corner Rd

18,474.80

OH OH162 Construction of Gracemont Street Exchange Interstate 77 ‐ Bethlehem 

Township and Pike Township, Ohio 

231,435.29 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg, 

and 30th Street in Plain Township, Stark County

231,435.29

OH OH163 Construct bike and walking path from West 210 St to Metroparks Fairview 

Park

280,413.00 Lorain Road Streetscape Project aka CUY‐10‐6.00 280,413.00

OH OH166 Construction of safety and related improvements on Rutlege Transfer Road in 

Vernon Township, OH

96,142.00 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 96,142.00

OH OH168 Conduct Miami Street along SR 53 safety enhancement project to improve 

access to railroad crossing

76,879.36 Demolition of former CSX RR bridge over the Maumee River leading to the 

construction of bike/hike trail 

76,879.36

ToFrom

88

Page 92: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Ohio

State Demo ID Project Description Amount  Project Description Amount

ToFrom

OH OH170 Construct Waverly, Ohio South Connector from U.S. 23 to SR 104 to SR 220   2,563,776.00 New Alignment to extend SR207 from US 23 to SR159 & SR180.    Bridge 

Replacement Project ROS‐23‐16.12

2,563,776.00

OH OH177 Construct connector roadway between SR 13 and Horns Hill Road in north 

Newark

1,001,475.00 Replacement of the Cherry Valley Road Bridge  1,001,475.00

OH OH179 Construct Ohio River Trail from downtown Cincinnati, Ohio to Salem Road 335,994.10 Replacement of the existing Western Hills Viaduct.  335,994.10

OH OH187 Construct SR 104 into a 4‐lane facility with a turning lane in Ross County 773,187.93 Intersection project at ROS 159 SLM 5.23 & Delano Rd and Intersection 

Project at ROS US 50 SLM 21.75

773,187.93

OH OH191 Construction of roadways and transportation improvements for downtown 

Springfield, OH

330,811.89 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

330,811.89

OH OH192 Jackson Township, Ohio ‐ Hill and Dales Road widening 167,888.00 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg, 

and 30th Street in Plain Township, Stark County

167,888.00

OH OH199 Medina, Ohio ‐ Guilford Avenue urban road collector pavement 

reconstruction

50,519.47 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

50,519.47

OH OH200 Planning and construction of a network of recreational trails in Perry 

Township

69,521.00 Continuation of trail funded by this earmark. Extend the path to improve 

access to area in Perry Township in Lake County.

69,521.00

OH OH202 Conduct Phase II of US Route 68 bypass project in Urbana 1,842,714.00 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

1,842,714.00

OH OH206 Safety improvements to Paris Avenue intersections and Meese Road and 

Easton Street ‐ Nimishillen Township, Ohio

509,912.27 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg, 

and 30th Street in Plain Township, Stark County

509,912.27

OH OH208 Construct new two lane road to Sycamore Street in Gallia County 1,001,475.00 PE, RW , and CO related to Interchange for GAL 35/7/735.  1,001,475.00

OH OH209 Road improvements, streetscapes and pedestrian safety additions to 

Ashtabula Harbor

206,551.34 Improve lighting of the IR‐90 and SR‐534 interchange, in Harpersfield 

Township, Ashtabula County, Ohio. 

206,551.34

OH OH211 Pike County, OH Fog Road upgrade 454,829.00 Intersection project at ROS 159 SLM 5.23 & Delano Rd and Intersection 

Project at ROS US 50 SLM 21.75

454,829.00

OH OH215 North Huntington Street improvements, Medina, OH 131,792.19 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

131,792.19

OH OH222 Construct access improvements at I‐680 and internal roadways for Corridor of 

Opportunity, Mahoning County

390,790.22 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 390,790.22

OH OH225 Reconstruct Broadway Avenue in Lorain 83,285.63 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

83,285.63

OH OH231 Construct a 4‐lane limited access road to link Newcomerstown and Cadiz 80,086.13 Replace existing bridge over US 250.  80,086.13

OH OH235 Upgrade Manchester Road in Akron 288,864.50 Resurface and replace Meridian Road from I‐680 to Trumbull County Line.  288,864.50

OH OH236 Structural improvements to two bridges over the Zimber Ditch between 38th 

St. and Whipple Avenue in Canton, Ohio

40,630.00 Adding center TWLTL to State Route 800 in Canton Township between SLM 

8.03 to SLM 8.35.

40,630.00

OH OH244 Construct road projects and transportation enhancements as part of 

Riverscape Phase 3, Montgomery County, Ohio

538,701.24 Improve Safety and congestion at the existing US 35 Factory and Orchard 

intersections in Greene County

538,701.24

OH OH246 Improvements to SR 91 in City of Twinsburg, OH 186,348.69 Improve the intersection of State Route 162 and Cleveland Massillon Road  186,348.69

OH OH249 Construct highway‐rail crossing safety upgrades at 3 grade crossings in 

Madison Village, OH

28,034.39 Remove and replace with ADA compliant ramp ‐ SW corner of SR528 and 

SR84 in the Village of Madison

28,034.39

OH OH257 Construct Eagle Avenue Viaduct ‐ demolition bridge, realignment of roadway 

to replace bridge and reconstruction of two other bridges, Cleveland

400,590.00 Minor rehabilitation Main Ave ‐ W. 25th St to Center Street in City of 

Cleveland

400,590.00

89

Page 93: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Ohio

State Demo ID Project Description Amount  Project Description Amount

ToFrom

OH OH266 Bicycle paths for the Magic Mile in Willougby, OH 640,944.00 Reconstruction of Erie Street in the City of Willoughby. 640,944.00

OH OH274 Construction of access road along east side of SR 8 in Summit County, OH 801,180.00 Improve the intersection of State Route 162 and Cleveland Massillon Road  801,180.00

OH OH276 Construct interchange improvements at SR 46 and 82 in Howland Township, 

Trumbull County

41,164.00 Resurface and replace Meridian Road from I‐680 to Trumbull County Line.  41,164.00

OH OH279 Upgrade grade crossing safety devices in Elyria and North Ridgeville 77,358.80 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

77,358.80

OH OH283 Construct roadway improvement project along state routes 37 and 78 

through Fairfield, Perry, Morgan, Noble, Monroe Counties

30,172.37 PE, RW , and CO related to Interchange for GAL 35/7/735.  30,172.37

OH OH284 Feasibility study to construct a bridge over the Muskingum River in the 

vicinity of McConnelsville

18,295.00 PE, RW , and CO related to Interchange for GAL 35/7/735.  18,295.00

OH OH285 Construct replacement of Morgan Township Road 209 between SR 60 and SR 

78 in Morgan County.

809,925.95 Relocate CR 20 and TR 224 on ATH 690 1.60 to improve sight distance. Safety 

project ‐ Spot pave on SR690. 

809,925.95

OH OH289 Rehabilitation of SR 53 from Miami Street to north city limits including 

approaches to the CSX railroad bridge, City of Tiffin 

72,970.62 Demolition of former CSX RR bridge over the Maumee River leading to the 

construction of bike/hike trail 

72,970.62

OH OH293 Calm traffic on Greenfield St in City of Tiffin and improve intersection of 

Greenfield St with routes 18 and 101

730,363.75 Demo CSX bridge over Maumee River to construct bike/hike Trail.  Construct 

Bikepath between Heidleberg University and a rec trail 

730,363.75

OH OH297 Riversouth street network improvements in Columbus 609,519.28 Major widening from 4 to 6 lanes. Multi‐use path and sidewalk. Widen south 

leg of Orion Place to provide 2 left turn lanes on WB Polaris Pkwy. 

609,519.28

OH OH300 Land acquisition for construction of pedestrian and bicycle trails at Mentor 

Marsh in Ohio

52,245.00 City of Mentor Marina & Nature Preserve ancillary trail improvements 52,245.00

OH OH302 Design and construct road enhancements Cleveland Port Authority in 

Cleveland, Ohio

2,503,688.00 Main Gate realignment Improvements that are eligible for STBG 2,503,688.00

OH OH306 Ramp and roadway approaches on I‐75 toward Brent Spence bridge, 

Cincinnati, OH

1,974,390.41 Reconstruction of I‐75 from Ohio River through the Western Hills Viaduct. 

Brent Spence Bridge DD, RW & CO

1,974,390.41

OH OH314 South Connector in Waverly from U.S. 23 to SR 104 to SR 220 for new 

development areas in a depressed Appalachian region. Waverly, OH

3,732,569.81 New Alignment to extend SR207 from US 23 to SR159 & SR180.    Bridge 

Replacement Project ROS‐23‐16.12

3,732,569.81

OH OH341 Delaware County SR 750 realignment and safety improvements  680,652.23 Major widening from 4 to 6 lanes. Multi‐use path and sidewalk. Widen south 

leg of Orion Place to provide 2 left turn lanes on WB Polaris Pkwy. 

680,652.23

OH OH342 Highway rail crossing safety upgrades at three locations in Madison Village, 

OH

110,162.00 Highway Rail Crossing Safety Upgrades at Bessemer Ave/Norfolk Southern 

Crossing in Cleveland, Ohio

110,162.00

OH OH345 Columbiana County Port Authority construct intermodal facility, 

transportation safety improvements

93,296.00 Horizontal curve correction to mitigate the crashes that are occurring in the 

curve on US 30 at SLM 11.70. 

93,296.00

OH OH347 Transportation improvements for Ohio River Trail from Salem to downtown 1,001,475.00 Replacement of the existing Western Hills Viaduct.  1,001,475.00

OH OH349 Medina County US 224 turn lane addition, resurfacing, signage and other 

improvements

385,696.55 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals 

in Village of Sheffield

385,696.55

OH OH351 Establish a Trans‐Erie ferry line from Cleveland, OH to Port Stanley, Ontario   1,001,475.00 Improvements to the surface transportation elements of the bulk pier 

including pier rail, and bulk head as eligible under STBG funds.

1,001,475.00

90

Page 94: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Ohio

State Demo ID Project Description Amount  Project Description Amount

ToFrom

OH OH360 Construction, including design and engineering of an approx. 30,000 sq ft 

terminal building to accommodate the Trans‐Erie ferry service which departs 

the Cleveland‐Cuyahoga County Port Authority, Cleveland, OH  

6,014,048.00 Improvements to the surface transportation elements of the bulk pier 

including pier rail, and bulk head as eligible under STBG funds.

6,014,048.00

OH OHF01 Toledo‐Lucas County Port Authority Marina Ferry (3)  247,623.77 Demolition of former CSX RR bridge over the Maumee River leading to the 

construction of bike/hike trail 

247,623.77

*Subject to availability of funds upon additional research.

Total Amount Repurposed 44,775,398.16Total # of Earmarks Repurposed 70

91

Page 95: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Oklahoma

State Demo ID Project Description Amount  Project Description Amount

OK OK013 PE Demo ‐ Interstate 66 Feasibility: (15 States) 2,500.00 ACSTP ‐156C (136)SS   US‐75A: FROM 0.6 MI. NORTH OF SH‐16 NORTH 7.5  

MILES

2,500.00

OK OK039 I‐44 Exit ramp in the Luther area, Oklahoma 102,392.43 I‐35 at Waterloo Road, interchange reconstruction, Oklahoma County 102,392.43

OK OK047 Pogue Airport Access Road, Oklahoma 299,711.83 Claremore OK‐ rail/city street crossing improvements for increased safety and 

a quiet zone

299,711.83

OK OK088 Construction of rail crossing in Claremore at Blue Star Drive and SH 66 1,602,360.00 Claremore OK‐ rail/city street crossings improvements for increased safety 

and a quiet zone

1,602,360.00

OK OK096 Construction vehicular bridge over the Burlington Northern RR at War Bonnet 

Crossing, Mannford, OK

801,180.00 Claremore OK‐ rail/city street crossings improvements for increased safety 

and a quiet zone

801,180.00

OK OK099 Construct interchange south of I‐40 along Indian Nation Turnpike near 

Henryetta

200,295.00 ACSTP ‐156C (136)SS   US‐75A: FROM 0.6 MI. NORTH OF SH‐16 NORTH 7.5  

MILES

200,295.00

OK OK113 Construction of rail crossing in Claremore at Blue State Drive and SH 66 400,590.00 Claremore OK‐ rail/city street crossing improvements for increased safety and 

a quiet zone

400,590.00

OK OK121 Construct vehicular bridge over the Burlington Northern RR at War Bonnet 

Crossing, Mannford

200,295.00 Claremore OK‐ rail/city street crossing improvements for increased safety and 

a quiet zone

200,295.00

OK OK126 Navajoe Gateway Improvements Projects, U.S. 62 in Altus, OK 200,295.00 Tamarak Road and US‐283 intersection in Altus, OK; Developing improvement 

project

200,295.00

OK OK129 Transportation improvements to Idabel Industrial Park Rail Spur, Idabel 300,443.00 US‐259 South of Idabel OK, reconstruction and preliminary activities 300,443.00

Total Amount Repurposed 4,110,062.26Total # of Earmarks Repurposed 10

ToFrom

92

Page 96: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Oregon

State Demo ID Project Description Amount  Project Description Amount

OR OR090 Rockwood Town Center for Stark Street from 190th to 197th 297,203.59 Cleveland St: Stark to Powell 297,203.59

OR OR093 Lake Road Reconstruction and Safety Improvements, Milwaukie 589,846.68 17th Ave ‐ Multi‐Use Trail 589,846.68

OR OR101 Study to evaluate alternatives in support of an eventual Astoria bypass, 

Astoria

69,908.34 US30: Wonderly‐Swedetown & Gnat Creek‐Burnside Loop Section 69,908.34

OR OR106 Culvert Replacement, Sweet Home 130,192.00 US20 Mid‐block pedestrian crossing 130,192.00

OR OR109 Weaver Road Extension and Bridge Project, Douglas County 2,270,700.09 Repavement of Garden Valley Road 2,270,700.09

OR OR112 Construct turn lane on Gateway Boulevard, Cottage Grove 90,133.00 OR99 Urban Upgrade Project , which includes ramp and streetscape work 90,133.00

OR OR122 Construction of access road including sidewalks, bike lanes and railroad 

crossing from Highway 99W to industrial zoned property, Corvallis

178,891.96 Bike/pedestrian/ADA improvements on collectors and arterials in City of 

Corvallis

178,891.96

OR OR125 Hwy 99E/Geary Street Safety Improvements, Albany 123,515.86 Bike/pedestrian/ADA improvements on collectors and arterials in City of 

Corvallis

123,515.86

OR OR132 U.S. Highway 20 and Airport Road Intersection 109,619.49 US20 Mid‐block pedestrian crossing 109,619.49

Total Amount Repurposed 3,860,011.01Total # of Earmarks Repurposed 9

ToFrom

93

Page 97: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

PA PA005 Blair Co: US‐220 Altoona to Tyrone (Authorized via STURRA) 9,556.51 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown 

Township, Blair County

9,556.51

PA PA014 Climbing Lane Safety Demo (PA) (US 15 in Tioga Co.) (Authorized via ISTEA) 16,494.98 SR 6, Milling and Resurfacing, Troy Township, Bradford County 16,494.98

PA PA015* Donora Industrial Park Access Rd. (Donora‐Monessen Bridge/I‐70) Authorized 

via ISTEA

91,493.04 Interstate 70 at Bentleyville, Washington, PA, Interchange reconfiguration 91,493.04

PA PA021* Pennsylvania Quakertown Bypass (Bucks Co) (Authorized under ISTEA) 457,575.21 SR2038 (County Line Rd) Widening & rehabilitation, Horsham, Montgomery & 

Warrington Townships, Bucks County

457,575.21

PA PA022* PA North Philadelphia Intermodal Facility (Authorized under ISTEA) 813,868.79 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

813,868.79

PA PA045* Aliquippa:  Various 3‐R projects (Authorized via ISTEA). 30,712.43  SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; 

Beaver County

30,712.43

PA PA056 Carroltown/DuBois: US 219 Improvements (Authorized via TEA‐21) 263,467.60 SR 56 over St. Clair Run, Culvert Replacement, City of Johnstown, Cambria 

County

263,467.60

PA PA057* Robinson Township: Design work in Town Center (Authorized via TEA‐

21/ISTEA)

1,708,269.57 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

1,708,269.57

PA PA061 Upgrade US 30 from OH border to Pittsburgh Int. Airport (Authorized via 

ISTEA)

2,353,200.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

2,353,200.00

PA PA062 Philadelphia: Reconstruct Old Delaware Avenue Service Road (Authorized via 

ISTEA).

15,820.56 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 15,820.56

PA PA063 Allegheny Co.: Expansion of M.L. King Busway to serve Pittsburgh Airport & 

community (Authorized via TEA‐21)

1,209,947.00  7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

1,209,947.00

PA PA065 Philadelphia: Improve mobility in vicinity of Pennsylvania Convention Center 

(Authorized via ISTEA).

18,844.39 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 18,844.39

PA PA076 Construct Ardmore Streetscape project (Authorized via TEA‐21) 11,295.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

11,295.00

PA PA080 Renovate Harrisburg Transportation Center in Dauphin County (Authorized 

via TEA‐21)

28,153.85 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

28,153.85

PA PA085 Construct highway‐transit transfer facility in Lemoyne (Authorized via TEA‐21) 194,503.00 Shirley Ave to Cumberland Valley Rail Trail, Bike/Ped Trail, Carlisle Borough, 

Cumberland County

194,503.00

PA PA100 PA 26 over Piney Creek 2‐bridges in Bedford County (Authorized via TEA‐21) 113,260.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and 

Mills Lane in Huntingdon County

113,260.00

PA PA102 Conduct highway research, Drexel University [Under TEA‐21 Section 5118(b), 

these funds shall be available for funding the establishment of the Intelligent 

Infrastructure Institute at Drexel University] (Authorized via TEA‐21)

334,097.46 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

334,097.46

PA PA103 Construct Philadelphia Intermodal Gateway Project at 30th St. Station 

(Authorized via TEA‐21)

363,637.90 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

363,637.90

PA PA106 Eliminate 16 at‐grade rail crossings through Erie (Authorized via TEA‐21) 486,928.00 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout, 

Millcreek/Fairview Twp. Erie County

486,928.00

PA PA111 Construct access to Tioga Marine Terminal, Ports of Philadelphia and Camden 

(Authorized via TEA‐21)

1,045,526.58 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,045,526.58

PA PA114 Construct improvements to the Park Road extension connecting U.S. 222 and 

U.S. 422, Spring Township (Authorized via TEA‐21)

343,920.45 SR 662 & SR 1010, Highway Restoration, Fleetwood Borough, Berks County 343,920.45

PA PA120 Construct Newton Hamilton SR 3021 over Juniata River in Mifflin County 

(Authorized via TEA‐21)

37,649.00 SR 1005 over Laurel Run, Bridge Replacement, Armagh Township, Mifflin 

County

37,649.00

ToFrom

94

Page 98: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA123 Improve PA 16 including intersection with Antrim Church Road (Authorized 

via TEA‐21)

593,100.00 US 11 over Conococheague Creek, Bridge Replacement, Greene Township, 

Franklin County

593,100.00

PA PA125 West Philadelphia congestion mitigation initiative (Authorized via TEA‐21) 7,080.04 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

7,080.04

PA 896, Resurface & widen shoulders, Strasburg Boro, Strasburg Twp, & East 

Lampeter Twp, Lancaster County

1,250,000.00

PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township, 

Lancaster County

1,312,748.00

PA PA131 Construct road connector and bridge over Allegheny River to link New 

Kensington with Allegheny Valley Expressway (Authorized via TEA‐21)

2,827,679.74 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County

2,827,679.74

PA PA132 Construct Lackawanna River Heritage Trail in Lackawanna (Authorized via TEA‐

21)

13,918.08 SR 11, SR 3023, SR 2004 Resurfacing, City of Scranton & City of Wilkes Barre, 

Lackawanna & Luzerne County

13,918.08

PA PA133 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township, 

Franklin County

14,253.92 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township, 

Franklin County

14,253.92

PA PA134 Improve PA‐8 between Cherry Tree and Rynd Farm (Authorized via TEA‐21) 611,213.49 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest 

County

611,213.49

PA PA135 Realign West 38th Street from Shunpike Road to Myrtle Street in Erie County 

(Authorized via TEA‐21)

12,555.62 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout, 

Millcreek/Fairview Twp. Erie County

12,555.62

PA PA140 Gettysburg comprehensive road improvement study and construction of 

projects identified in the study (Authorized via TEA‐21)

794,447.98 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

794,447.98

PA PA141 Improve access to Raystown in Huntingdon County (Authorized via TEA‐21) 556,756.21 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement, 

Huntingdon County

556,756.21

PA PA143 Conduct study and construct FT. Washington Transportation improvements, 

Upper Dublin, PA (Authorized via TEA‐21)

91,456.99 SR 422 over Schuylkill River, Bridge Restoration, West Norriton and Upper 

Merion Townships, Montgomery County 

91,456.99

PA PA150 Allegheny Trail from Pittsburgh, PA to Cumberland MD (Authorized via TEA‐

21)

1,553,455.95 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

1,553,455.95

PA PA151 Construct Western Innerloop from PA‐26 to State Route 3014 (Authorized via 

TEA‐21)

105,317.88 SR 144 over SEDACOG JRA/Nittany Bald Eagle RR, Bridge Replacement, 

Milesburg Borough, Centre County

105,317.88

PA PA153 Improve T‐344 Bridge over Mahantango Creek in Snyder County (Authorized 

via TEA‐21)

86,743.50 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township, 

Snyder County

86,743.50

PA PA156 Complete Broad Street ramps at Route 611 bypass in Bucks County 

(Authorized via TEA‐21)

401,824.71  SR 2038 (County Line Road) widening & rehabilitation, Horsham, 

Montgomery & Warrington Townships, Bucks County

401,824.71

PA PA161 Construct I‐95 access ramps at and around Philadelphia Int'l Airport 

(Authorized via TEA‐21)

1,200,797.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia, 

Philadelphia County

1,200,797.00

PA PA162 Construct park and ride facilities in Lower Bucks County (Authorized via TEA‐

21)

28,237.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham, 

Montgomery & Warrington Townships, Bucks County

28,237.00

PA PA163 Widen US‐11/15 between Mt. Patrick and McKees Half Falls in Perry County 

(Authorized via TEA‐21)

11,769.88 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

11,769.88

PA PA165 Construct exit ramp on I‐180 at State Route 2049 in Lycoming County 

(Authorized via TEA‐21)

1,102,666.56 I‐180 Resurfacing, Muncy & Muncy Creek Townships, Lycoming County  1,102,666.56

PA PA166 Construct bicycle and pedestrian facility between Washington's Landing and 

Millvale Borough, Allegheny Co. (Authorized via TEA‐21)

232,620.94 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County

232,620.94

PA PA169 Construct PA 36 Convention Center Connector in Blair County (Authorized via 

TEA‐21)

18,825.00 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown 

Township, Blair County

18,825.00

PA PA175 Construct access road to Hastings Industrial Park, Cambria Co. (Authorized via 

TEA‐21)

683,644.88 SR 56 over St. Clair Run, Culvert Replacement, City of Johnstown, Cambria 

County

683,644.88

2,562,748.00Improve PA 23 Corridor from US 30 bypass between Lancaster Co line & 

Morgantown (Authorized via TEA‐21)

PA129PA

95

Page 99: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA176 Construct I‐81 noise abatement program in Dauphin County (Authorized via 

TEA‐21)

41,243.03 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

41,243.03

PA PA177 Install citywide signalization (SAMI) project in Lebanon (Authorized via TEA‐

21)

88,499.00 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements, 

Bethel Township, Lebanon County

88,499.00

PA PA182 Install Traffic Signal upgrade in Clearfield Borough in Clearfield County 

(Authorized via TEA‐21)

17,258.39 SR 0879 over Trout Run, Bridge Rehabilitation, Goshen Township, Clearfield 

County

17,258.39

PA PA185 Construct PA16 Truck Climbing Lane in Franklin County (Authorized via TEA‐

21)

571,656.10 US 11 over Conococheague Creek, Bridge Replacement, Greene Township, 

Franklin County

571,656.10

PA PA188 Improve Intersection of U.S. 30, S.R. 3066, and West Allegheny Road, North 

Fayette Townshipt(Authorized via TEA‐21)

1,584,479.03 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

1,584,479.03

PA PA189 Construct Independence Gateway Transportation Ctr project, Philadelphia 

(Authorized via TEA‐21)

182,592.48 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 182,592.48

PA PA191 Construct Abbey Trails in Abington Township (Authorized via TEA‐21) 393,628.60 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

393,628.60

PA PA210 Rehabilitate Streets Run Road, Pittsburgh, for emergency access (Authorized 

via TEA‐21)

114,119.15 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

114,119.15

PA PA245 Urban Education Development Research & Retreat Center, Transportation 

Education and Career Institute (Authorized as part of 2003 Appr (108‐7))

99,350.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 99,350.00

PA PA246 US 15 Market Street Bridge Replacement, Williamsport, Lycoming County, 

Pennsylvania (Authorized via 2003 Appr (108‐7))

5,148.67 I‐180 Resurfacing, Muncy & Muncy Creek Townships, Lycoming County  5,148.67

PA PA269 Streetscape/Roadway Improvements to the Chester City (PA) Waterfront 

(Authorized via 2004 Appr)

41,475.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 41,475.00

PA PA276 Campbelltown Connector and U.S. 322 Improvement Project, Pennsylvania 

(Authorized via 2005 Appr)

33,372.72 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements, 

Bethel Township, Lebanon County 

33,372.72

PA PA279 City of Reading, Pennsylvania (Authorized via 2005 Appr) 15,607.91 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 15,607.91

PA PA301 Street improvements, Abington Township (Authorized via SAFETEA‐LU) 14,042.68  SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

14,042.68

PA PA304 Design and construct relocation of U.S. 11 between Ridge Hill and Hempt 

Roads (Authorized via SAFETEA‐LU)

54,550.03 Shirley Ave to Cumberland Valley Rail Trail, Bike/Ped Trail, Carlisle Borough, 

Cumberland County

54,550.03

PA PA305 Mercer County, PA I 79 and PA 208 Interchange Improvement Project 

(Authorized via SAFETEA‐LU)

3,540.00 SR 18, SR 62, SR 3008 Resurfacing and Curb Ramps in The City of Hermitage 3,540.00

PA PA313 Reconstruction and repair of Haverford Ave. between 68th St. and 

Lansdowne Ave. (Authorized in 2005 via SAFETEA‐LU)

240,354.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

240,354.00

PA PA314 South Phila. Access Rd. Design and construction of port access road from 

South Phila Port and intermodal facilities, Pennsylvania

2,403,540.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 2,403,540.00

PA PA317 Development of Northwest Lancaster County River Trail (Authorized in 2005 

via SAFETEA‐LU)

200,295.00 PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township, 

Lancaster County

200,295.00

PA PA323 Hazle Twp.: streetscaping, paving, lighting, safety improvements, parking, 

roadway redesign and cross pipe and catch basin restoration and 

replacement on Northgate, Mandy Court, Vine St., and 36th St. in Milnesville 

West, and on Hillside Drive (including widening of rht bridge on Hillside Drive, 

Club 40 Road, Sunburst and Venisa Drives, and Stockton #7 in Hazle 

Township, Luzerne County (Authorized in 2005 via SAFETEA‐LU)

480,708.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

480,708.00

96

Page 100: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA324 Larksville Boro., Luzerne City.: streetscaping, paving, lighting, safety 

improvements, parking, roadway redesign, replacement of the Nesbitt St. 

Bridge, and placement of a guiderail adjacent to St. Vladimir's Cemetery on 

Mountain Road (SR 1007) in Larksville Borough, Luzerne County (Authorized 

in 2005 via SAFETEA‐LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA325 Rt 60 Millennium Park Interchange, construct new interchange on Rt 60 to 

provide access to new Lawrence County Industrial Park (Authorized in 2005 

via SAFETEA‐LU)

640,944.00 SR 18 over Shenango River & CSX RR, Bridge Rehabilitation, City of New 

Castle, Lawrence County

640,944.00

PA PA326 Purchase of right‐of‐way, utilities and construction for Northern Access to 

Altoona from Interstate 99, Blair County, PA

69,537.80 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown 

Township, Blair County

69,537.80

SR2021 (Ducktown Road) over Kruetz Creek; Hellam Township 2,000,000.00

I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

804,130.00

PA PA329 Conduct Environmental Impact Statement study for Parkway West corridor 

(Authorized in 2005 via SAFETEA‐LU)

24,705.10 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

24,705.10

PA PA334  Two‐lane Extension of Bristol Road, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,602,360.00

PA PA337 Duryea Boro, Luzerne County, streetscaping enhancements, paving, lighting, 

safety improvements, parking, garage & roadway redesign (Authorized in 

2005 via SAFETEA‐LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA339 Design, engineering, right‐of‐way acquisition and construction of 

streetscaping enhancements, paving, lighting, safety improvements, parking 

and roadway redesign on Sampson Street, Dunn Avenue, Powell Street, 

Josephine Street, Pittston Avenue, Railroad Street, McClure Avenue and 

Baker Street in Old Forge Borough, Lackawanna County

160,236.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR 

2004 , Luzerne County.

160,236.00

PA PA346 SR 10 Widening, New Morgan Borough & Caernarvon Township (Authorized 

in 2005 via SAFETEA‐LU)

1,602,360.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 1,602,360.00

PA PA347 Widening of Rt. 22 and SR 26 in Huntingdon. Upgrades to the interchange at 

U.S. Rt. 22 and SR 26 [ref P.L. 110‐244, Sec 105(a)(81)] (Authorized in 2005 

via SAFETEA‐LU)

2,413,983.00 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement, 

Huntingdon County

2,413,983.00

PA PA348 Extension of Third Street from Interstate 83 to Chestnut St., Harrisburg 

(Authorized via SAFETEA‐LU)

4,326,372.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

4,326,372.00

PA PA350 Widening of SR 1001 Section 601 in Clinton County (Authorized via SAFETEA‐

LU)

801,180.00 SR 0322, Intelligent Transportation System Devices, Armagh & Brown 

Townships, Mifflin County

801,180.00

PA PA352 Construct PA 706 Wyalusing Bypass Bradford County (Authorized via SAFETEA‐

LU)

801,180.00 SR 6, Milling and Resurfacing, Troy Township, Bradford County 801,180.00

PA PA353 Plains Twp., Luzerne County, streetscaping, paving, lighting, safety 

improvements, parking & roadway redesign on Oak St. from Stark St. to the 

Twp. Line at Mayock St. and on East Mountain Blvd. (Authorized in 2005 via 

SAFETEA‐LU)

160,621.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,621.00

PA PA356 Create a direct connection between State Road 29 and State Route 113 

(Authorized in 2005 via SAFETEA‐LU)

213,784.86 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

213,784.86

PA PA357 Conduct environmental review and acquire right‐of‐way for preferred 

alternative to improve PA 41 (Authorized via SAFETEA‐LU)

2,614,956.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West 

Whiteland Twp, Chester County

2,614,956.00

2,804,130.00Design and construct interchange and related improvements to I‐83 Exit 4PA327PA

97

Page 101: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA363 Intersection improvements at PA Route 209 and Water Company Road, 

construction of a bridge and access enhancements to Nature and Arts Center, 

Upper Paxton Township (Authorized via SAFETEA‐LU)

128,066.20 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

128,066.20

PA PA366 Plymouth Borough, streetscaping enhancements, paving, lighting, safety 

improvements, parking, roadway redesign and catch basin restoration and 

replacement on Cherry St, Willow St, Eno St, Flat Rd, Krispin St, Parrish St, 

Carver St, Church St, Franklin Street, Carolina St, East Main St and Rear 

Shawnee Ave (Authorized in 2005 via SAFETEA‐LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA368 Design, engineering, ROW acquisition, and construction of streetscaping 

enhancements, paving, lighting, safety improvements, parking, and roadway 

redesign on Old Ashley Rd, Ashley St, Phillips St, First St, Ferry Rd, and 

Division St in Hanover Twp, Luzerne County [ref P.L. 110‐244, Sec 

105(a)(128)] (Authorized in 2005 via SAFETEA‐LU)

66,841.56 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

66,841.56

PA PA369 Acquisition of adjacent property to planned Park‐n‐ Ride at Kressler and 

Hamilton Boulevards in Wescosville, PA. (Authorized in 2005 via SAFETEA‐LU)

646,962.87 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

646,962.87

PA PA371 CUPSS, Pennsylvania, Urban Maglev Demonstration Test Project (Authorized 

in 2005 via SAFETEA‐LU)

4,005,900.00 Interstate 70, Interchange Reconfiguration, Borough of Bentleyville, 

Washington County

4,005,900.00

PA PA374 Modernize traffic signals, complete minor roadway realignment, and improve 

channelization at U.S. 322 and PA 10 intersection (Authorized via SAFETEA‐

LU)

54,360.83 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West 

Whiteland Twp, Chester County

54,360.83

PA PA377 Bethlehem Pike improvements from Valley Green Road to South of Gordon 

Lane, Springfield Township (Authorized in 2005 via SAFETEA‐LU)

134,942.34 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

134,942.34

PA PA378 Design, engineering, ROW acquisition and construction of streetscaping 

enhancements, paving, lighting, safety redesign on Mill Street from Prince 

Steet to Roberts Street, John Street, from Roberts Street to end, Thomas St. 

from Roberts St. to end, Williams St. from Roberts St. to end, etc. (Authorized 

in 2005 via SAFETEA‐LU)

24,656.53 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

24,656.53

PA PA379 Construction SR 3024, Middle Creek Bridge II, South Canaan, Wayne County 

(Authorized via SAFETEA‐LU)

289,712.30 SR 7206 over N Branch Calkins Creek, Bridge Replacement, Damascus 

Township, Wayne County

289,712.30

PA PA380 Installation of comprehensive signage system across 1700 acres of urban 

parks in Pittsburgh (Authorized in 2005 via SAFETEA‐LU)

73,134.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

73,134.00

PA PA384 Reconstruct Highway and replace bridge on US 422 between Berks County 

Line and Schuylkill River in Montgomery and Chester Counties (Authorized in 

2005 via SAFETEA‐LU)

1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,201,770.00

PA PA389 Construct Cameron Street Bridge Northumberland County, Pennsylvania 

(Authorized via SAFETEA‐LU)

1,180.00 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township, 

Snyder County

1,180.00

PA PA390 Edwardsville Borough, streetscaping, paving, lighting, safety improvements, 

handicap access ramps, parking & roadway redesign on Bilbow St from 

Church St to Pugh St, on Pugh St from Swallow St to Main St, Jones Lane from 

Main St to Hoblak St, etc. (Authorized in 2005 via SAFETEA‐LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA395 Bridge reconstruction and road widening on Route 252 and Route 30 in 

Tredyffrin Twp., PA. In conjunction with the Paoli Transportation Center 

Project (Authorized in 2005 via SAFETEA‐LU)

1,226,425.60 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,226,425.60

98

Page 102: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA396 Design, engineering, ROW acquisition, and construction of streetscaping 

enhancements, paving, lighting, safety improvements, parking and roadway 

redesign at the intersection of Quincy/West Drinker/Electric Streets near the 

Dunmore School complex in Dunmore Borough, Lackawanna County

320,472.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR 

2004 , Luzerne County.

320,472.00

PA PA397 Add turn lane, modify signals and install pavement markings at intersection of 

PA 422 and PA 662 in Amity Township (Authorized via SAFETEA‐LU)

2,867.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 2,867.00

PA PA398 Improvements to 8th and 9th Street bridges between Pleasant Valley Blvd. 

and Valley View Blvd., Altoona, PA. [ref P.L. 110‐244, Sec 105(a)(84)] 

(Authorized in 2005 via SAFETEA‐LU)

161,251.94 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown 

Township, Blair County

161,251.94

PA PA408 Completion of beltway interchanges along Business Route 60 in Moon 

Township, Allegheny County

801,180.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

801,180.00

PA PA411 Construct Dubois Regional Medical Center Access Road (Authorized via 

SAFETEA‐LU)

48,756.00 SR 0879 over Trout Run, Bridge Rehabilitation, Goshen Township, Clearfield 

County 

48,756.00

PA PA418 Design, engineering, ROW acquisition, and construction of streetscaping 

enhancements, paving, lighting, safety improvements, parking and roadway 

redesign in Exeter Borough, Luzerne county

160,236.00 Intersection improvements on SR 415 and SR 309, Dallas Borough and 

Township, Luzerne County

160,236.00

PA PA420 Route 89 Curve Realignment one mile north of Titusville on Route 89 

(Authorized via SAFETEA‐LU)

24,377.00 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest 

County

24,377.00

PA PA421 Provide access to HOV ramp from Reedsdale Street with traffic signals, 

pavement markings, lane control and fast acting gates. (Authorized in 2005 

via SAFETEA‐LU)

446,476.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

446,476.00

PA PA427 David Lawrence Convention Center Phase IV reconstruction (Authorized in 

2005 via SAFETEA‐LU)

961,416.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

961,416.00

PA PA428 Crows Run Relocation from SR 65 to Freedom Crider Road (Authorized in 

2005 via SAFETEA‐LU)

3,084,543.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

3,084,543.00

PA PA429 Avoca Borough, streetscaping enhancements, paving, lighting, safety 

improvements, parking & roadway redesign on Third St. from Pittston Ave. to 

Packer St.; Swift St. from Packer St. to Railroad St.; Clark St. from Main St. to 

South St.; School st. from Ma (Authorized via SAFETEA‐LU)

9,459.42 Intersection improvements on SR 415 and SR 309, Dallas Borough and 

Township, Luzerne County

9,459.42

PA PA435 Rail Crossing signalization upgrade, East Wesner Road, Maidencreek Twp, 

Berks County (Authorized in 2005 via SAFETEA‐LU)

16,764.92 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 16,764.92

PA PA436 Construct additional northbound lane on Rt. 28 between Harmar and 

Creighton Interchange (Authorized via SAFETEA‐LU)

4,587.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County

4,587.00

PA PA437 North Atherton Signal Coordination Project in Centre County (Authorized via 

SAFETEA‐LU)

2,005,900.00 SR 1044 over SEDACOG JRA/Nittany Bald Eagle RR, Bridge Replacement, 

Milesburg Borough, Centre County

2,005,900.00

PA PA444 Swamp Road Corridor Safety and Roadway Improvements, Bucks County 2,403,540.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

2,403,540.00

PA PA450 Highway rail‐crossing replacement in Osborne Borough (Authorized in 2005 

via SAFETEA‐LU)

1,722,537.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

1,722,537.00

PA PA451 Valmont Industrial Park & PA Route 924 at Cranberry Creek connector road 

(Authorized in 2005 via SAFETEA‐LU)

400,590.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

400,590.00

PA PA453 Street improvements, Whitemarsh Township 1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,201,770.00

99

Page 103: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA468 Ashley Borough, streetscaping enhancements, paving, lighting, safety 

improvements, parking & roadway redesign on West Cemetery St. and 

Fredrick Courts (Authorized in 2005 via SAFETEA‐LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA472 Moosic Borough, streetscaping enhancements, paving, lighting, safety 

improvements, parking and roadway redesign (Authorized in 2005 via 

SAFETEA‐LU)

160,236.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR 

2004 , Luzerne County.

160,236.00

PA PA475 Reconstruct intersection of SR 51 and Franklin Ave (Authorized in 2005 via 

SAFETEA‐LU)

1,722,537.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

1,722,537.00

PA PA480 Construct Campbelltown Connector, Lebanon County. (Authorized via 

SAFETEA‐LU)

203,150.00 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements, 

Bethel Township, Lebanon County

203,150.00

PA PA481 Eliminate existing rail line in Indian, PA to eliminate 37 at grade crossings and 

reconstruct the line outside the town from Glenn Lock to Middletown 

(Authorized in 2005 via SAFETEA‐LU)

325,039.03 US 119 over B&P Railroad, Bridge Replacement, Rayne Township, Indiana 

County

325,039.03

PA PA483 Jeanette Truck Route (Authorized in 2005 via SAFETEA‐LU) 400,590.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

400,590.00

PA PA488 Design, engineering, land acquisition, right‐of‐way acquisition, and 

construction of a parking garage, streetscaping enhancements, paving, 

lighting, safety improvements, parking, and roadway redesign in the city of 

Wilkes‐Barre [ref P.L. 110‐244, Sec 105(a)(169)] (Authorized in 2005 via 

SAFETEA‐LU)

213,587.14 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

213,587.14

PA PA489 Mount Joy Bridge Replacement on Route 230 (Authorized in 2005 via 

SAFETEA‐LU)

82,794.68 PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township, 

Lancaster County

82,794.68

PA PA490 Transportation Enhancements along the Delaware Canal between Yardley, PA 

and Bristol, PA

2,403,540.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham, 

Montgomery & Warrington Townships, Bucks County

2,403,540.00

PA PA491 Provide 4 through‐lanes on PA 100 by constructing two thru lanes to the east 

of Ludwigs Corner (Authorized via SAFETEA‐LU)

4,005,900.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West 

Whiteland Twp, Chester County

4,005,900.00

PA PA492 Completion of construction of final 2 ramps of I‐79 interchange with Parkway 

West; widening of 1 mile of Parkway West leading to ramps. (Authorized in 

2005 via SAFETEA‐LU)

194,271.73 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

194,271.73

PA PA495 Design and Construction of Portzer Road Connector, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,602,360.00

PA PA498 Reconstruction of 11 mile segment of the Lower Trail between Williamsport 

and Mt Edna, Blair County, Pa.

94,360.96 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown 

Township, Blair County

94,360.96

PA PA500 Wright Township, streetscaping enhancements, paving, lighting, safety 

improvements, parking & roadway redesign (Authorized in 2005 via SAFETEA‐

LU)

160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

160,236.00

PA PA505 Relocation and upgrade of Beaner Hallow Rd., Beaver County, PA 85,469.41 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

85,469.41

PA PA506 4‐lane limited access facility connecting SR 119 to the PA Turnpike (Sony 

Connector) (Authorized in 2005 via SAFETEA‐LU)

3,204,720.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

3,204,720.00

PA PA507 Widen Route 666 in Forest Warren County [ref P.L. 110‐244, Sec 105(a)(56)] 

(Authorized via SAFETEA‐LU)

95,056.92 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest 

County

95,056.92

PA PA510 Road and pedestrian improvements and realignment, through construction, 

in York City NW Triangle. (Authorized in 2005 via SAFETEA‐LU)

261,215.54 US 30 over Paradise Creek, Bridge Replacement, Jackson & Paradise 

Townships, York County

261,215.54

100

Page 104: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA512 Construct highway safety and capacity improvements to improve the access 

to the KidsPeace Broadway Campus (Authorized in 2005 via SAFETEA‐LU)

276,603.17 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

276,603.17

PA PA513 Construct interim U.S. 422 improvements at Valley Forge river crossing 

(Authorized in 2005 via SAFETEA‐LU)

458,180.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

458,180.00

PA PA514 Northfield site roadway extension from Rt 60 to Industrial Park near the 

Pittsburgh International Airport (Authorized in 2005 via SAFETEA‐LU)

400,590.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay 

Townships, Allegheny County

400,590.00

PA PA515 Slatelick Interchange for PA 28 at SR 3017, Armstrong County (Authorized via 

SAFETEA‐LU)

1,922,832.00 SR 422, Roadway Realignment, Kittanning & Manor Townships, Armstrong 

County

1,922,832.00

PA PA518 Street improvements to Ridge Pike and Joshua Road, Whitemarsh Township 640,944.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

640,944.00

PA PA520 Street Improvements, Upper Dublin Township 1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,201,770.00

PA PA522 Construct improvements to Chambers Hill Road and Lindle Road (SR 441) at 

its intersections with Interstate 283 and Eisenhower Boulevard (Authorized 

via SAFETEA‐LU)

1,180.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

1,180.00

PA PA526 Safety improvements at Liberty Street with intersection with PA Rt. 61 in W. 

Brunswick & N. Manheim Township (Authorized via SAFETEA‐LU)

1,526,808.88 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

1,526,808.88

PA PA527 Replace Stossertown Bridge (Main Street) over West Creek in Branch 

Township, Schuylkill County (Authorized via SAFETEA‐LU)

400,590.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

400,590.00

PA PA528 Replace bridge over Little Mahantongo Creek at intersection of Hepler & 

Valley Roads in Upper Mahantongo Twp. (Authorized via SAFETEA‐LU)

200,295.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

200,295.00

PA PA529 Replace Union Street Bridge over Middle Creek in the borough of Tremont 

(Authorized via SAFETEA‐LU)

400,590.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

400,590.00

PA PA533 East‐West Corridor Rapit Transit, Pittsburgh‐planning, environment & 

preliminary engineering (Authorized in 2005 via SAFETEA‐LU)

1,001,475.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

1,001,475.00

PA PA535 New interchange off Rt. 60 into proposed industrial park in Neshannock 

Township (Authorized in 2005 via SAFETEA‐LU)

200,295.00 SR 18 over Shenango River/CSX RR, Bridge Rehabilitation, City of New Castle, 

Lawrence County

200,295.00

PA PA537 Streetscape improvements, Geneva College (Authorized in 2005 via SAFETEA‐

LU)

1,346,984.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

1,346,984.00

PA PA538 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via 

SAFETEA‐LU)

1,001,475.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County 

1,001,475.00

PA PA542 Crows Run Relocation from SR 65 to Freedom Crider Road (Authorized in 

2005 via SAFETEA‐LU)

400,590.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

400,590.00

PA PA543 Transportation Improvements to Jeannette Truck Route (Authorized in 2005 

via SAFETEA‐LU)

100,148.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

100,148.00

PA PA558 Widening of Rt. 22 and SR 26 in Huntingdon, upgrades to the interchange at 

U.S. Rt. 22 and SR 26 (Authorized in 2005 via SAFETEA‐LU)

801,475.00 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement, 

Huntingdon County

801,475.00

PA PA559 Road impact improvements along Potomac River tributaries (Authorized in 

2005 via SAFETEA‐LU)

250,369.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and 

Mills Lane in Huntingdon County

250,369.00

PA PA571 Design, engineering, ROW acquisition construction of streetscaping 

enhancements, paving, lighting, safety improvements, parking and roadway 

redesign in Wilkes‐ Barre. (Authorized in 2005 via SAFETEA‐LU)

18,014.63 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township, 

Luzerne County

18,014.63

101

Page 105: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA573 Construct PA 706 Wyalusing Bypass Bradford County (Authorized in 2005 via 

SAFETEA‐LU)

200,295.00 SR 6, Milling and Resurfacing, Troy Township, Bradford County 200,295.00

PA PA575 Modernize traffic signals, complete minor roadway realignment, and improve 

channelization at U.S. 322 and PA 10 intersection (Authorized via SAFETEA‐

LU)

60,784.35 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West 

Whiteland Twp, Chester County

60,784.35

PA PA577 Construction SR 3024, Middle Creek Bridge II, South Canaan, Wayne County 

(Authorized in 2005 via SAFETEA‐LU)

140,207.00 SR 191 over Dyberry Creek, Bridge Rehabilitation, Honesdale Borough, Wayne 

County

140,207.00

PA PA579 Widening and improvements to SR 10, New Morgan Borough (Authorized in 

2005 via SAFETEA‐LU)

1,001,475.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 1,001,475.00

PA PA580 Construct parking facility in Norristown, Montgomery County (Authorized in 

2005 via SAFETEA‐LU)

5,143.27 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

5,143.27

PA PA582 Design and Construction of Portzer Road Connector, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper 

Merion Townships, Montgomery County

1,602,360.00

PA PA583 Construction of pedestrian tunnel under Cherry Street in Philadelphia 

(Authorized in 2005 via SAFETEA‐LU)

2,002,950.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

2,002,950.00

PA PA585 Two‐lane Extension of Bristol Road, Bucks County 400,590.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham, 

Montgomery & Warrington Townships, Bucks County

400,590.00

PA PA594 Improvements from US 11 southbound ramp to I‐81 in Antrim Township 

(Authorized in 2005 via SAFETEA‐LU)

250,369.00 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township, 

Franklin County 

250,369.00

PA PA595 Construction of the Montour Trail, Great Allegheny Passage. (Authorized in 

2005 via SAFETEA‐LU)

1,999.85 Interstate 70, Interchange Reconfiguration, Borough of Bentleyville, 

Washington County 

1,999.85

PA PA596 Transportation Improvements for Armstrong County, PA, Slatelick 

Interchange for PA 28 at SR 3017 (Authorized in 2005 via SAFETEA‐LU)

442,234.70 SR 422, Roadway Realignment, Kittanning & Manor Townships, Armstrong 

County

442,234.70

PA PA600 Reconstruct intersection of SR 51 and Franklin Ave. (Authorized in 2005 via 

SAFETEA‐LU)

400,590.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver 

County

400,590.00

PA PA601 South Phila. Access Rd. Design and construction of port access road from 

South Phila Port and intermodal facilities, Philadelphia

500,738.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 500,738.00

PA PA605 Construct a road along the North Delaware Riverfront Corridor from Buckius 

Street to Poquessing Creek

3,965,900.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 3,965,900.00

PA PA616 Improvements to the Pleasant Valley & Sandy Hill Roads intersection with SR 

130 in Penn Township

2,002,950.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

2,002,950.00

PA PA617 Construct an intermodal facility servicing Children's Hospital of Pittsburgh 

(Authorized in 2005 via SAFETEA‐LU)

1,750.42 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation, 

City of Pittsburgh

1,750.42

PA PA621 For the Children's Hospital of Philadelphia Partners for Child Passenger Safety 

program. (Authorized in 2005 via SAFETEA‐LU)

202,136.75 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

202,136.75

PA PA624 Improvements to access roads at the Please Touch Museum, Philadelphia 

(Authorized in 2005 via SAFETEA‐LU)

1,001,475.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

1,001,475.00

PA PA625 Construction of the Schuylkill Gateway Project in Philadelphia, Pennsylvania 

(Authorized in 2005 via SAFETEA‐LU)

13,335.18 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia, Philadelphia County

13,335.18

PA PA626 Security improvements to the Commodore Barry Bridge, Pennsylvania 

(Authorized in 2005 via SAFETEA‐LU)

1,475.01 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,475.01

PA PA628 Bucknell University main campus entrance road & SR 15 intersection‐study & 

construct improvements (Authorized in 2005 via SAFETEA‐LU)

1,001,475.00 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township, 

Snyder County

1,001,475.00

PA PA634 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via 

SAFETEA‐LU)

1,001,475.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County 

1,001,475.00

102

Page 106: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PA640 Repair and upgrade Cresheim Valley Drive, Philadelphia (Authorized in 2005 

via SAFETEA‐LU)

450,664.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

450,664.00

PA PA641 Improvements to Penn's Landing Ferry Terminal, Philadelphia (Authorized in 

2005 via SAFETEA‐LU)

400,590.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 400,590.00

PA PA643 To incorporate a portion of Old Delaware Avenue as the South Philadelphia 

Port Access Road

400,590.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 400,590.00

PA PA646 Study the future needs of east‐west road infrastructure in Adams County 

(Authorized in 2005 via SAFETEA‐LU)

500,738.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

500,738.00

PA PA648 Road impact improvements along Potomac River tributaries (Authorized in 

2005 via SAFETEA‐LU)

200,295.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and 

Mills Lane in Huntingdon County

200,295.00

PA PA649 Davinci Center hydrogen fueled transit vehicles (Authorized in 2005 via 

SAFETEA‐LU)

40,000.00 US 22, Reconstruction and rehabilitation, Whitehall & Hanover Township, 

Lehigh County

40,000.00

PA PA651 Relocation of East Lake Road in Pyamatuning Township (Authorized in 2005 

via SAFETEA‐LU)

100,148.00 SR 18, SR 62, SR 3008 Resurfacing and Curb Ramps in The City of Hermitage 100,148.00

PA PA661 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via 

SAFETEA‐LU)

1,503,512.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny 

County

1,503,512.00

PA PA663 For interpretive signage and trails in Pittsburgh urban park land (Authorized 

in 2005 via SAFETEA‐LU)

43,227.08 7th Street over the Allegheny River and the 10th Street bypass in the City of 

Pittsburgh, Allegheny County.

43,227.08

PA PA665 Construction of the Schuylkill Gateway Project (Authorized in 2005 via 

SAFETEA‐LU)

113,133.55 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

113,133.55

PA PA666 Davinci Center hydrogen fueled transit vehicles (Authorized in 2005 via 

SAFETEA‐LU)

40,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

40,000.00

PA PA667 Construct a road along the North Delaware Riverfront Corridor from Buckius 

Street to Poquessing Creek

1,002,341.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,002,341.00

PA PA669 Improvements to the Pleasant Valley and Sandy Hill Rds. Intersection with SR 

130 in Penn Twp.

300,702.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland 

County

300,702.00

PA PA670 Improvements to access roads at the Please Touch Museum (Authorized in 

2005 via SAFETEA‐LU)

300,703.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of 

Philadelphia

300,703.00

PA PA715 UPMC Heliport in Bedford (Authorized in 2005 via SAFETEA‐LU) 750,000.00  SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement, 

Huntingdon County

750,000.00

PA PA718 Roadway construction improvements to Route 222 relocation, Lehigh County 

(Authorized in 2005 via SAFETEA‐LU)

1,313,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

1,313,000.00

PA PA719 Construction of a bridge over Brandywine Creek as part of the Boot Road 

extension project, Downington Boro. (Authorized via SAFETEA‐LU)

698,768.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West 

Whiteland Twp, Chester County

698,768.00

PA PA722 Intersection signalization at SR 3020 (Newburg Road)/ Country Club Road, 

Northampton Cty. (Authorized in 2005 via SAFETEA‐LU)

250,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

250,000.00

PA PA723 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

168,258.73 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover 

Townships, Lehigh County

168,258.73

PA PA724 Study future needs of East‐West road infrastructure in Adams County 

(Authorized via SAFETEA‐LU)

115,200.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower 

Paxton Township, Dauphin County

115,200.00

PA PAF01 Riverlink Transit System ‐ Water Shuttle Component (Penns Landing dock 

improvements)  (2001 Appropriations Ferry Boat Award)

703,200.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 703,200.00

PA PAF02 Erie‐Western Pennsylvania Port Authority Ferry Vessel Acquisition  (2004 

Appropriations Ferry Boat Award)

704,618.00 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout, 

Millcreek/Fairview Twp. Erie County

704,618.00

PA PAF03 Pittsburgh Water Taxi  (2004 Appropriations Ferry Boat Award) 440,386.00 7th Street over the Allegheny River and the 10th Street bypass in the City of 

Pittsburgh, Allegheny County.

440,386.00

103

Page 107: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Pennsylvania

State Demo ID Project Description Amount  Project Description Amount

ToFrom

PA PAM01 Interstate 80‐Exits 298‐299 Renovation Project, Pennsylvania (2004 

Appropriations Interstate Maintanence Discretionary Award)

705,314.00 SR 611, Pocono Township, Monroe County, Reconstruction & Safety 

Improvements

705,314.00

PA PAM02 I‐80 Exit at Stoney Hollow Road (2002 Appropriations Interstate Maintanence 

Discretionary Award)

2,164,721.02 SR 611, Pocono Township, Monroe County, Reconstruction & Safety 

Improvements

2,164,721.02

*Subject to availability of funds upon additional research.

Total Amount Repurposed 128,091,090.75Total # of Earmarks Repurposed 197

104

Page 108: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

South Carolina

State Demo ID Project Description Amount  Project Description Amount

SC SC009 Widen and relocate SC‐6 in Lexington County 624,103.24 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate 

Preservation in Lexington & Richland ‐ 5105690

624,103.24

SC SC011 Construct pedestrian walkway and safety improvements along SC 277, 

Richland Co.

81,029.41 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate 

Preservation in Lexington & Richland ‐ 5105690

81,029.41

SC SC017 Construct Calhoun/Clarendon Causeway 4,882,995.91 I‐95 (Near MM 100 to Near MM 134) Interstate Preservation in Clarendon ‐ 

STIP FY 2017

4,882,995.91

I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate 

Preservation in Lexington & Richland ‐ 5105690

12,887,719.00

I‐95 (Near MM 100 to Near MM 134) Interstate Preservation in Clarendon ‐ 

STIP FY 2017

3,216,000.00

SC SC074 Widening and improvements of SC Highway 5 Bypass in York County 162,521.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP 

FY 2017

162,521.00

SC SC076 Engineering, design, and construction of I‐73 from the North Carolina State 

Line to I‐95

812,600.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 812,600.00

SC SC078 Widening of Frontage Road from U.S. 72 to U.S. 56, Laurens, SC 227,526.00 I‐85 (Near MM 69 to Near MM 77) Interstate Reconstruction P029074 227,526.00

SC SC079 Medical University of South Carolina Roadway Enhancement 717,103.12 I‐526 Widening and Interchange Improvements P027507 717,103.12

SC SC082 Plan and build Interstate 73 from NC line to Myrtle Beach, SC. 812,600.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 812,600.00

SC SC083 Extension of Wells Highway, Oconee County, South Carolina 162,521.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson 

P029510

162,521.00

SC SC085 Construct I‐85 Brockman‐McClimon Interchange between Greenville 

Spartanburg Airport and SC Highway 101 Interchanges

81,259.00 I‐85 (Near MM 69 to Near MM 77) Interstate Reconstruction P029074 81,259.00

SC SC086 Replace Milford Road Bridge, Anderson, SC 40,630.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson 

P029510

40,630.00

SC SC087 Replace Murphy Road West Bridge, Anderson, SC 188,277.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson 

P029510

188,277.00

SC SC088 Replace Murphy Road West Bridge, Anderson, SC 212,313.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson 

P029510

212,313.00

SC SC091 Construct grade separation and interchange improvements at U.S. 521, 

Lancaster County

801,180.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP 

FY 2017

801,180.00

I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 82,734.80

I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation 

P027060609449

609,449.00

I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation 

P027060238152.96

238,152.96

I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation 

P027060162521

162,521.00

SC SC113 Harden Street Improvements in Columbia. Specific improvements will 

include: modern traffic control signals, intersections, improved street lighting, 

driveways, etc.

363,346.58 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate 

Preservation in Lexington & Richland ‐ 5105690

363,346.58

SC SC117 I‐95/SC 327 in Florence, SC, to construct northbound ramp and expand 

existing ramps

3,004,425.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 3,004,425.00

SC SC118 Transportation Improvements for Highway 901, York County, SC 1,000,923.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP 

FY 2017

1,000,923.00

Total Amount Repurposed 31,371,930.02Total # of Earmarks Repurposed 20

To

400,673.96Pine Needles Widening and Bridge ReplacementSC095SC

16,103,719.00Construct Briggs‐Pearson‐Delaine ConnectorSC071SC

692,183.80Upgrade of the I‐95/SC 327 Interchange near Florence.SC094SC

From

105

Page 109: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

South Dakota

State Demo ID Project Description Amount  Project Description Amount

SD SD122 Construction of four‐lane highway on U.S. 79 between Maverick Junction and 

the Nebraska border

746,751.11 US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)68 PCN 027C 746,751.11

SD SD126 Pave and curb Cheyenne River Tribe Route 900, ``Chinatown'' in Eagle Butte 121,890.00 SD65 from US212 to SD20, Mill & AC Resurfacing and Fault Repair, P 

0065(16)164 ‐ PCN 04F1

121,890.00

SD SD127 Railroad‐highway crossings in Pierre 881,298.00 I‐90 PCC Surfacing Jones County IM 0904(57)189 PCN 035E 881,298.00

SD SD129 Extend the Sioux Falls Bike Trail to Great Bear Rec Area 97,512.00 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102 

PCN 025C

97,512.00

SD SD130 Redesign T corner on BIA #2 5 miles SW of Kyle on the Pine Ridge Reservation 60,945.00 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐ 

NH‐PH 0018(177)104 PCN 02QC

60,945.00

SD SD131 Extend bike trail in Pine Ridge to the SuAnne Big Crow Boys and Girls Center 20,315.00 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐ 

NH‐PH 0018(177)104 PCN 02QC

20,315.00

SD SD132 Extend Bicycle trail system in Aberdeen 65,009.00 SD26 from Hand/Spink County Line to US281, Mill and AC Resurfacing‐ 

P0026(01)267 PCN 026Q

65,009.00

US16 AC Resurfacing Near Wyoming State Line; NH 0016(88)0 PCN 05ML 600,000.00

US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)88 PCN 027C 841,917.39

SD SD141 Reconstruction and paving of BIA Route 27, Wounded Knee‐Porcupine Butte 497,080.76 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐ 

NH‐PH 0018(177)104 PCN 02QC

497,080.76

SD SD143 Reconstruction and paving of streets on the Flandreau Indian Reservation 165,693.59 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102 

PCN 025C

165,693.59

SD SD144 Construct Exit 61 I‐90 Rapid City (Heartland Expressway) 647,461.38 I‐90/US14A Exit 14 (Spearfish) Reconstruct Interchange, Reconfigure Ramps ‐ 

IM 0901(162)14 PCN 020U

647,461.38

SD SD146 Construct Wagner Community Streets, Yankton Reservation 16,569.36 US281 ‐ From the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐ 

NH 0281(111)48 PCN 04WF

16,569.36

SD SD147 Construct Marty Community Streets, Yankton Reservation 16,569.36 US281 ‐ From the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐ 

NH 0281(111)48 PCN 04WF

16,569.36

SD SD148 Construct Riverfront Walking trail between 4th Ave. and Main Street, 

Mobridge 

85,610.01 SD20 Urban Reconstruction in and near Hoven ‐ P 0020(117)254 PCN 02R9 85,610.01

SD SD155 Roadway improvements on I‐90 loop in Mitchell along Haven Street from 

near Burr Street to near Ohlman Street

1,036,594.22 US281 AC Resurfacing in Aurora & Douglas Counties  ‐ NH 0281(111)48 PCN 

04WF

1,036,594.22

SD SD159 BIA route 15 resurfacing between Red Scaffold and Cherry Creek to Ziebach 

County Road 33

414,233.97 SD65 from US212 to SD20, Mill & AC Resurfacing and Fault Repair, P 

0065(16)164 ‐ PCN 04F1

414,233.97

SD20 Urban Reconstruction in and near Hoven ‐ P 0020(117)254 PCN 02R9 100,317.88

Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐ 

NH‐PH 0018(177)104 PCN 02QC

100,317.87

US18 Reconstruction in and near Mission ‐ NH 0018(176)206 PCN 039G 100,317.87

SD SD163 Construct Rail Spur in Brookings 751,106.00 US81 ‐ From 3rd Ave. NE to 18th Ave. NE in Watertown;  Urban 

Reconstruction ‐ NH 0081(93)157 PCN 026X

751,106.00

US16 Mill & AC Resurfacing Near Custer NH 0016(85)22 PCN 04E6  500,000.00

I‐190 Exit 1 to Jct of US16/SD44 in Rapid City; Urban Reconstruction; IM 

1902(61)0 PCN 1162

520,462.51

US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)68 PCN 027C 1,300,000.00

SD SD167 Rosebud community streets reconstruction and paving 577,214.60 I90 ‐ Jackson Co; Replace Surfacing, Flatten Inslope, Edge Drains, Pipe work ‐ 

IM 0903(101)153 PCN 03W4

577,214.60

From

2,320,462.51Construction of four‐lane highway on U.S. 79 between Maverick Junction, and 

the Nebraska border

SD166SD

1,441,917.39Construction of four‐lane highway on U.S. 79 between Maverick Junction, and 

the Nebraska border

SD133SD

Acquisition of road maintenance equipment for Oglala, Rosebud and 

Cheyenne River Sioux Tribes

300,953.62SD161SD

106

Page 110: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

South Dakota

State Demo ID Project Description Amount  Project Description Amount

From

SD SD169 Whether or not otherwise eligible in title 23, construct Phase II and III of 

Phillips to the Falls Project. Notwithstanding any other provision of law, with 

respect to costs for Phase II and III of this project paid for from this $40 

million, the Federal share of project costs shall be 100 percent.

11,496,777.11 Sioux Falls I‐29 & I‐229 Reconstruction IM 0293(96)73 PCN 01QS 11,496,777.11

SD SD170 Rapid City Greenway Pedestrian and bike path expansion 192,404.90 I‐90/US14A Exit 14 (Spearfish) Reconstruct Interchange, Reconfigure Ramps ‐ 

IM 0901(162)14 PCN 020U

192,404.90

SD SD171 Brookings bike path 9,620.23 US81 ‐ From 3rd Ave. NE to 18th Ave. NE in Watertown;  Urban 

Reconstruction ‐ NH 0081(93)157 PCN 026X

9,620.23

SD SD172 Sioux Falls Bike Path‐‐Dunham Park, Skunk Creek, 12th St., and I‐29 to 

Sertoma Park

112,556.81 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102 

PCN 025C

112,556.81

Total Amount Repurposed 22,076,545.93

Total # of Earmarks Repurposed 24

107

Page 111: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Project Description Amount

TN TN052 Reconstruct Road and Causeway in Shiloh Military Park in Hardin County, 

Tennessee.

980,337.58 Hardin Co., TN, New construction on SR‐128, From S. of One Stop Drive to S. 

of Opel Loop

980,337.58

TN TN203 Construct force protection barriers along US‐41A at Fort Campbell in 

Montgomery County, Tennessee.

406,300.00 Montgomery Co., TN, Widening on SR‐374, From S. of Dunbar Cave Road to 

W. of Stokes Road

406,300.00

TN TN251 Improve streetscape and pavement repair in Scott County, Tennessee. 50,787.00 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River, LM 

10.71.

50,787.00

Total Amount Repurposed 1,437,424.58

Total # of Earmarks Repurposed 3

ToFrom

108

Page 112: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Texas

State Demo ID Project Description Amount  Project Description Amount

TX TX187 Extension of SH 349 of US 87 Relief Route in Dawson Country 2,002,950.00 Extension of SH 349 from SH 137 to US 87. Project is in Dawson County and is 

adjacent to the US 87 Relief Route project

2,002,950.00

TX TX202 Acquire Kelly Parkway Corridor Right of Way through San Antonio 400,590.00 Upgrade from continuous illumination to high mast illumination, (LP 13 to SH 

151)

400,590.00

TX TX236 Munn Street from Demaree Lane to Gellhorn Drive 801,180.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

801,180.00

TX TX260 Hike and bike trail will tie into the Gellhorn Drive project providing an 

improved multi‐modal transportation facility

801,180.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

801,180.00

New project on Airport Blvd from Hiram Clark to FM 521. Project will 

construct a 4 lane divided Urban Street Facility on a Urban Street Facility on a 

new location.

342,189.00

Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

1,660,761.00

TX TX270 Right of Way acquisition for US 87 Relief Route 1,201,770.00 Extension of SH 349 from SH 137 to US 87. Project is in Dawson County and is 

adjacent to the US 87 Relief Route project

1,201,770.00

TX TX281 Construction of four‐lane divided concrete arterial with drainage 

improvements ‐ Sandy Lake Road: from Denton Tap Road to North Coppell 

Road

801,180.00 Construction of 4 lane bridge and ramp modifications on SH 114 at Texas 

Plaza in the City of Irving.

801,180.00

TX TX295 Acquisition of ROW and environmental preservation from IH 45 to US 59 for 

Grand Parkway

11,216,521.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

11,216,521.00

TX TX307 Construct 25 mile stretch for the 177 mile loop, between IH 45 south and SH 

288

9,213,570.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

9,213,570.00

TX TX318 Relocation of 10th Street near McAllen‐Miller International Airport. 600,885.00 Bicentennial Road from SH 107 to Trenton Rd Construct 4 Lane Urban 

Roadway

600,885.00

TX TX324 SH 80/123 Overpass at US 181 in Karnes County 240,354.00 Rehab/pavement repair at SH 80/US 181 intersection 240,354.00

TX TX328 Conduct study of I‐10 and US 190 with a focus on congestion relief and the 

need for a military & emergency relief transportation corridor.

160,236.00 I‐14 study to focus on the Central Texas Corridor.  160,236.00

TX TX335 Reconstruct Ella/Wheatley from Little York to West Gulf Bank 1,001,475.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

1,001,475.00

TX TX336 Construct Santa Fe Trail DART Light Rail Overpass from Hill Street to 

Commerce Street along abandoned Santa Fe Rail Right of Way in Dallas.

801,180.00 Preliminary engineering for a grade separation on Prairie Creek Road at the 

UP Railroad in the City of Mesquite 

801,180.00

TX TX354 Construct Park Row bypass from Texas State Highway 6 to the Eldridge 

Parkway in Houston, TX

1,602,360.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

1,602,360.00

TX TX371 Conduct feasibility study for an off ramp on IH 30 on to Hall Street for direct 

access to Baylor University Medical Center in Dallas

801,180.00 Preliminary engineering for a grade separation on Prairie Creek Road at the 

UP Railroad in the City of Mesquite 

801,180.00

To

2,002,950.00Construct highway improvements on East Tidwell Ley Road and East Little 

York Road

TX267TX

From

109

Page 113: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Texas

State Demo ID Project Description Amount  Project Description Amount

ToFrom

TX TX374 Replacement of Galveston Causeway RR Bridge in Galveston. The Secretary of 

Transportation. shall transfer to the Commandant of the Coast Guard 

amounts made available to carry out the project described in item #4985 

contained in Section 1702 of SAFETE‐LU (119 Stat. 1447) to carry out project, 

in accordance with the Act of June 21, 1940

1,532,500.97 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project 

will construct a 4 lane divided Urban Street Facility on a Urban Street Facility 

on a new location.

1,532,500.97

TX TX389 Beaumont, TX Washington Blvd. Improvements 1,001,475.00 Resurface Roadway on Various Locations.  See comments below for full 

project description.

1,001,475.00

Total Amount Repurposed 36,183,536.97Total # of Earmarks Repurposed 18

110

Page 114: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Utah

State Demo ID Project Description Amount  Project Description Amount

UT UT007 I‐15 / University Avenue Interchange, Provo. 3,299.42 SR‐68; Saratoga Springs to Stillwater Parkway 3,299.42

UT UT015 Widen and improve 123rd/126th South from Jordan River to Bangerter 

Highway in Riverton

3,587.58 I‐80: Lambs to Kimbals 3,587.58

UT UT035 US‐6, MP 256 Junction of US‐6 and SR‐123, Emery County, Utah 424,588.29 SR‐29; Cottonwood Cyn Rd to SR‐10 424,588.29

UT UT039 Construction to Bingham Junction Boulevard in Midvale City 737,359.69 I‐80: Lambs to Kimbals 737,359.69

UT UT042 Construct 2‐lane divided highway from the Atkinville Interchange to the new 

replacement airport access road in St. George

407,067.00 I‐15; Washington County Line to Hamilton Fort 407,067.00

UT UT050 I‐15 Freeway Reconstruction ‐ Springville 200 South Interchange. 400 South 

Interchange [ref P.L. 110‐244, Sec 105(a)(69)]

366,361.00 SR‐68; Saratoga Springs to Stillwater Parkway 366,361.00

UT UT053 Expand Redhills Parkway from 2 to 5 lanes and improve alignment within 

rights‐of‐way in St. George , St. George [ref P.L. 110‐244, Sec 105(a)(48)]

406,686.00 I‐15; Washington County Line to Hamilton Fort 406,686.00

UT UT057 Add lighting on Highway 262 on the Navajo Nation in Aneth. Roadway 

improvements on Highway 262 on the Navajo Nation in Aneth [ref P.L. 110‐

244, Sec 105(a)(103)]

17,776.00 US‐491; Monticello to Colorado State Line 17,776.00

UT UT058 SR 158 Improvements, Pine View Dam, Weber  County, Utah [ref P.L. 110‐

244, Sec 105(a)(330)]

170,968.00 US‐91; 10th North to S. Smithfield 170,968.00

UT UT059 Construct pedestrian safety project and roadway improvements on the 

Navajo Nation in Montezuma Creek. [ref P.L. 110‐244, Sec 105(a)(53)]

33,012.40 US‐491; Monticello to Colorado State Line 33,012.40

UT UT063 Reconstruct 500 West/Kane Creek Boulevard, including pedestrian and 

bicycle access, in Moab. [ref P.L. 110‐244, Sec 105(a)(63)]

25,442.20 US‐191; Monticello to Wilson Arch 25,442.20

UT UT072 I‐15 Reconstruction; Salt Lake County. 356,532.97 SR‐67; 500 South to I‐15 356,532.97

UT UT073 I‐15 North and Commuter Rail Coordination, Davis County 1,782,011.75 SR‐67; 500 South to I‐15 1,782,011.75

UT UT095 Construction of 200 North Street highway‐rail graded crossing separation. 

Kaysville.

508,834.00 SR‐67; 500 South to I‐15 508,834.00

UT UT097 Bear River Migratory Bird Refuge Access Road Improvements, Box Elder 

County

558,662.30 US‐91; 10th North to S. Smithfield 558,662.30

Total Amount Repurposed 5,802,188.60Total # of Earmarks Repurposed 15

ToFrom

111

Page 115: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Vermont

State Demo ID Project Description Amount  Project Description Amount

VT VT027 Main Street Bridge, Johnson 497,417.31 Johnson BF 0248(7) ‐ Rehab Br2 on VT 100C 497,417.31

VT VT036 Design and construction of dry span bridge in Swanton  3,710,405.50 Georgia IM Culvert(25) ‐ Replace Culvert Br Nos. 83‐1 N&S ON I‐89 in Georgia  3,710,405.50

VT VT051 Vermont Institute of Natural Science turning lane on U.S. Rt. 4 in Woodstock   300,702.00 Rockingham‐Clarendon NH SURF(49) ‐ Resurface VT 103 Rockingham to 

Clarendon

300,702.00

Total Amount Repurposed 4,508,524.81

Total # of Earmarks Repurposed 3

ToFrom

112

Page 116: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Virginia

State Demo ID Project Description Amount  Project Description Amount

VA VA007 Danville: Replace bridges on Main and Worsham Streets 219,877.29 Mt Cross Road Widening in Danville 219,877.29

VA VA018 Fairfax County expressway 3,989,015.51 Widen Rt. 28 in Fairfax County 3,989,015.51

VA VA026 Widen I‐64 Bland Boulevard Interchange 106.35 Longhill Road Widening in James City County 106.35

VA VA029 Upgrade Virginia Route 10, Surrey Co. 281,064.00 I‐564 Intermodal Connector in Norfolk 281,064.00

VA VA030 Improve Harrisonburg East Side roadways in Harrisonburg 34,057.00 I‐81  Interchange Improvements in Harrisonburg 34,057.00

VA VA031 Repair historic wooden bridges along portion of Virginia Creeper Trail 

maintained by Town of Abingdon

163,257.00 Widen Rt. 11 in Bristol 163,257.00

VA VA032 Construct road improvement, trailhead development and related facilities for 

Haysi to Breaks Interstate Bicycle and Pedestrian Trail between Haysi and 

Garden Hole area of Breaks Interstate Park

177,580.78 Widen Rt. 11 in Bristol 177,580.78

VA VA033 Conduct Williamsburg 2007 transportation study 8,158.00 I‐564 Intermodal Connector in Norfolk 8,158.00

VA VA036 Replace Shore Drive Bridge over Petty Lake, Norfolk 873,908.00 Longhill Road Widening in James City County 873,908.00

VA VA037 Downtown Staunton Streetscape Plan ‐ Phase I in Staunton 38,157.47 I‐81  Interchange Improvements in Harrisonburg 38,157.47

VA VA038 Upgrade Route 501 in the counties of Bedford, Halifax, and Campbell 95,120.00 Rt 460 Improvements in Bedford County 95,120.00

VA VA042 Construct the Lynchburg/Madison Heights bypass in Lynchburg 252,394.00 Rt 501  Safety and Operational Improvements in Campbell County 252,394.00

VA VA045 Conduct preliminary engineering on I‐73 between Roanoke and 

Virginia/North Carolina State line

4,957,167.00 Rt. 220 Corridor Safety Improvements in Botetourt County 4,957,167.00

VA VA046 Conduct historic restoration of Roanoke Passenger Station in Roanoke 12,550.00 Rt. 122 and Rt 636 Intersection Improvements in Franklin County 12,550.00

VA VA048 Enhance Maple Avenue streetscape in Vienna, Virginia 127,697.00 Widen Rt. 28 in Fairfax County 127,697.00

Rt. 52 Improvements in Carroll County 298,079.00

Rt. 52 Improvements in Carroll County 928,102.53

VA VA054 Construct Southeastern Parkway and Greenbelt in Virginia Beach 4,473,020.15 Lynnhaven Parkway Widening in Virginia Beach 4,473,020.15

VA VA064 Route 7 and 123 Improvements in Northern Virginia 5,000,000.00 Widen Rt. 28 in Fairfax County 5,000,000.00

VA VA065 Analysis and improvements on consistent shoulder width on Route 9, Virginia 15,322.28 Widen Rt. 28 in Fairfax County 15,322.28

VA VA083 Lombardy Street Renovation between Route 1 and Admiral Street (Richmond, 

VA)

2,755.98 Bus Rapid Transit (BRT)   in Richmond and Henrico County 2,755.98

VA VA090 Truck Inspection pull‐off on Route 9 in Loudon County, Virginia 4,262.56 Widen Rt. 28 in Fairfax County 4,262.56

I‐564 Intermodal Connector in Norfolk 797,710.00

Longhill Road Widening in  James City County 3,470.00

VA VA119 Upgrade DOT crossing #467662S to constant warning time devices 65,783.48 I‐564 Intermodal Connector in Norfolk 65,783.48

VA VA122 Liberty Street Construction in Martinsville, Virginia 25,080.40 Rt. 122 and Rt 636 Intersection Improvements in Franklin County 25,080.40

VA VA123 High Knob Horse Trails Construction of horse riding trails and associated 

facilities in High Knob area of Jefferson National Forest

61,002.00 Widen Rt. 11 in Bristol 61,002.00

VA VA124 Construction of Virginia Blue Ridge Trail in Amherst County, VA 230,354.00 Rt 501  Safety and Operational Improvements in Campbell County 230,354.00

VA VA128 Craig County Trail Improvements to trail in Craig County 17,981.80 Rt 460 Improvements in Bedford County 17,981.80

VA VA130 Widen Route 820 in Bergton, Virginia 171,216.71 I‐81  Interchange Improvements in Harrisonburg 171,216.71

VA VA136 Town of St. Paul Restoration of historic Hillman House to serve as trail system 

information center and construction of stations on trails

15,486.00 Widen Rt. 11 in Bristol 15,486.00

Bus Rapid Transit (BRT)   in Richmond and Henrico County 115,826.00

I‐95/64 Overlap Improvements in Richmond 3,470.00

VA VA139 Mill Road Slip Ramp 400,590.00 Widen Rt. 28 in Fairfax County 400,590.00

VA VA141 Install Transpiration Critical Incident Mobile Data Collection Device in 

Charlottesville.

50,415.90 Fontaine Avenue Improvements in Charlottesville 50,415.90

VA VA143 Bristol Train Station‐‐ Historic preservation and rehabilitation of former 

Bristol, VA train station.

52,617.00 Widen Rt. 11 in Bristol 52,617.00

To

801,180.00Final Design and Construction for improvements at I 64 and City Line Road, 

Virginia Beach and Chesapeake

VA117VA

1,226,181.53Construct connector road from the proposed U.S. 58 Stuart bypass to Route 8 

South beginning at the intersection of Johnson Street in Stuart to Route 652.

VA049VA

From

VA 119,296.00Construction of transportation related enhancements and infrastructure of 

the VMFA project.

VA137

113

Page 117: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Virginia

State Demo ID Project Description Amount  Project Description Amount

ToFrom

I‐564 Intermodal Connector in Norfolk 1,196,567.00

Longhill Road Widening in James City County 5,203.00

VA VA148 Upgrade DOT crossing #467665M to constant warning time devices 16,084.64 Longhill Road Widening in James City County 16,084.64

VA VA151 National Park Service transportation improvements to Historic Jamestowne, 

Virginia

2,153,815.00 Longhill Road Widening in James City County 2,153,815.00

Construct Connector Road  in Wytheville 106,203.12

Construct Connector Road  in Wytheville 12,190.00

VA VA156 Construct South Airport Connector, Richmond International Airport. 40,704.00 Bus Rapid Transit (BRT)   in Richmond and Henrico County 40,704.00

VA VA162 Halifax Co: Upgrade DOT Crossing #470515 To Constant Warning Devices PE 

for upgrade of Rail Road Crossing

35,091.96 Rt 501  Safety and Operational Improvements in Campbell County 35,091.96

Bus Rapid Transit (BRT)   in Richmond and Henrico County 477,143.00

I‐95/64 Overlap Improvements in Richmond 423,809.00

VA VA172 Improve transportation infrastructure for visitors to Jamestown 2007 269,557.00 Longhill Road Widening in James City County 269,557.00

VA VA173 Route 11 improvements in Maurertown, Virginia 331,062.00 Rt. 11  Intersection Improvements in Frederick County 331,062.00

I‐564 Intermodal Connector in Norfolk, VA 1,595,422.00

Longhill Road Widening in James City County 6,938.00

VA VA176 Construct 3.6 miles of Interstate 73 near Martinsville 616,588.64 Rt. 581 – Valley View Interchange in Roanoke 616,588.64

VA VA178 Engineering and Right‐of‐ Way for Interstate 73 in Roanoke County 1,201,770.00 Rt. 220 Corridor Safety Improvements in Botetourt County 1,201,770.00

I‐564 Intermodal Connector in Norfolk 33,644.28

Longhill Road Widening in James City County 596.46

VA VA184 Chestnut Mountain Road‐‐ Feasibility study, design, and construction start for 

road improvement on National Forest lands.

132,213.00 Widen Rt. 11 in Bristol 132,213.00

VA VA188 Replacement of Robertson Bridge in Danville 1,131,738.36 Rt. 501  Operational and Safety Improvements  in Halifax County 1,131,738.36

VA VA190 Construct improvements at I‐ 264 interchange in Virginia Beach 3,170,062.49 Longhill Road Widening in James City County 3,170,062.49

I‐564 Intermodal Connector in Norfolk 254,550.00

Longhill Road Widening in James City County 47,273.55

VA VA202 I‐264/Lynnhaven Parkway/ Great Neck Road Interchange. 1,153,457.00 Longhill Road Widening in James City County 1,153,457.00

VA VA205 National Park Service transportation improvements to Historic Jamestowne in 

FY 2006.

1,266,950.00 Longhill Road Widening in James City County 1,266,950.00

VA VA208 Smart Road Research and Operations, Blacksburg 895,290.00 Rt. 52 Improvements in Carroll County 895,290.00

VA VA209 Replacement of Robertson Bridge in Danville 1,561,825.30 Rt. 501  Operational and Safety Improvements  in Halifax County 1,561,825.30

VA VA210 I‐64/City Line Road Interchange. 5,007,375.00 I‐564 Intermodal Connector in Norfolk 5,007,375.00

VA VA214 Construct I‐73 near Martinsville. 7,010,325.00 Rt. 581 – Valley View Interchange in Roanoke 7,010,325.00

VA VA224 Route 11 improvements in Maurertown (Shenandoah County). 187,405.00 Rt. 11  Intersection Improvements in Frederick County 187,405.00

VA VA227 Engineering and right‐of‐ way for Interstate 73 in Roanoke County 1,001,475.00 Rt. 220 Corridor Safety Improvements in Botetourt County 1,001,475.00

VA VA230 Route 221 improvements in Forest 51,536.00 Rt 460 Improvements in Bedford County 51,536.00

I‐564 Intermodal Connector in Norfolk 4,992,430.31

Longhill Road Widening in James City County 19,276.69

VA VA251 Property acquisition and improvements for public access and viewshed 

protection for the Cedar Creek Vermont Monument at the Cedar Creek and 

Belle Grove National Historical Park in Virginia.

192,396.00 Rt. 11  Intersection Improvements in Frederick County 192,396.00

VA VAF01 Mid‐Chesapeake Bay Ferry, Virginia (6) 173,472.00 Longhill Road Widening in James City County 173,472.00

VA VAF02 Ferry for Jamestown 2007 Festivities, Virginia ‐ Project will not advance (6) 173,472.00 Longhill Road Widening in James City County 173,472.00

Total Amount Repurposed 60,907,566.99

34,240.74Upgrade DOT crossing #467661K to constant warning time devicesVA183VA

118,393.12VA155VA

900,952.00Construct I‐95 Interchange at Temple Ave, Colonial Heights.VA167VA

Ceres Recreation Trail and Center‐‐Design and construct pedestrian/ bicycle 

trail in community of Ceres and establish trail center

1,602,360.00Construct Maersk Terminal interchange in Portsmouth. Construct sound walls 

on Route 164 at and near the Maersk interchange

VA174VA

1,201,770.00Eastern Seaboard Intermodal Transportation Applications Center (ESITAC) in 

Hampt

VA144VA

301,823.55Purchase specialized tunnel fire safety equipment, Hampton Roads.VA196VA

5,011,707.00I‐64/City Line Road Interchange in Virginia BeachVA237VA

114

Page 118: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Virginia

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Total # of Earmarks Repurposed 63

115

Page 119: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

WA WA007 Snohomish Co: HOV lanes 740.96 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 740.96

WA WA010 Bellevue:  Conduct Phase I design study for I‐405 interchange at NE 8th Street

(WSDOT PIN 140541D, 140541E)

106,452.91 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving

(WSDOT PIN 140504E)

106,452.91

WA WA015 Bainbridge Island, State Road 305 Improvements 0.92 Roxbury Street Sidewalks in Seattle ‐ Construct sidewalks, curb, and gutter. 0.92

WA WA024 Construct I‐5 Interchanges in Lewis Country 5.84 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

5.84

WA WA026 Widen SR‐99 between 148th Street and King County Line in Lynnwood 178.00 Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared 

pedestrian/bicycle path.

178.00

WA WA031 Undertake SR 166 slide repair 30,886.48 SR 160/Ramsey Rd SE to E of Estonia CT SE ‐ Paving 30,886.48

112th Street E. & A Street E. Signal in Pierce Co ‐ Install signal system and 

turn lanes.

142,448.98

SR 99/Roy St to N 60th St ‐ Paving 2,333,728.70

WA WA037 Edmonds Crossing multi‐modal transportation project 3,432,188.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

3,432,188.00

WA WA039 Widen SR 522 in Snohomish County: $3,650,000 for phase 1 from SR 9 to 

Lake Road; $1,550,000 to construct segment from Paradise Lake Road to 

Snohomish River Bridge

564,790.29 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 564,790.29

WA WA043 Construct Peach Arch Crossing of Entry (PACE) lane in Blaine 14.07 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated 

approach work.

14.07

WA WA044 Widen SR‐543 from I‐5 to International Boundary, Washington 0.03 I‐5/SB North Fork Lewis River Bridge ‐ Resurfacing 0.03

WA WA046 Reconstruct I‐82/SR‐24 intersection and add lanes on SR 24 to Keys Rd 0.70 I‐82/SR 821/Thrall Road Bridge EB ‐ Deck Rehabilitation 0.70

WA WA048 Conduct feasibility study of State Route 35 Hood River bridge in White 

Salmon.

0.64 SR 14/SE 164th Ave to NW 6th Ave ‐ Paving 0.64

WA WA049 Construct Sequim/Dungeness Valley trail project 1.00 Bremerton Highway Safety Improvements in Bremerton ‐ Safety 

improvements.

1.00

WA WA050 Construct SR 167 Corridor, Tacoma 27.97 SR 509/NB S 160th St to S 112th St Vic, Paving 27.97

WA WA051 Design and implement report and environmental study of the I‐5 corridor in 

Everett, Washington

20,725.33 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

20,725.33

WA WA055 For the costs associated with the long term improvement, restoration, or 

replacement for damage to the Magnolia Bridge in Seattle

5,125.82 Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared 

pedestrian/bicycle path.

5,125.82

WA WA065 Sunnyside South First St Reconstruction 1.26 North Meyers Road Bridge in Yakima County ‐ Replace bridge and associated 

approach work.

1.26

WA WA102 Bellevue Access Downtown, Phase Two, Washington 1,608.62 120th NE Corridor Stage 2 in Bellevue ‐ Widen and re‐align roadway. 1,608.62

WA WA103 Bellevue Access Downtown, Phase Two, Washington 52,997.95 120th NE Corridor Stage 2 in Bellevue ‐ Widen and re‐align roadway. 52,997.95

WA WA140 Interstate 5 and 41st Street/Broadway Interchange and Arterial Improvement 

Project, Everett

323,009.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

323,009.00

WA WA141 SR 704 Cross‐Base Highway, Spanaway Loop Road to SR 7 747,807.31 SR 512/E of Pacific Ave S to E of Canyon Rd E ‐ Paving 747,807.31

WA WA142 Plan to relieve traffic until North‐South freeway Hwy 2 440,649.00 I‐90/Sprague Ave I/C to Argonne Rd I/C ‐ PCCP Rehabilitation Grinding 440,649.00

WA WA143 Widening SR 527 from 2 lanes to 5 from Bothell to Mill Creek 121,890.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

121,890.00

WA WA145 Coal Creek Parkway Bridge Replacement, Newcastle WA 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

81,259.00

WA WA146 SR 9 and 20th St. SE Intersection Reconstruction in Snohomish County 25,393.00 US 2/Bickford Ave Vic ‐ Stormwater Pipe Replacement 25,393.00

ToFrom

2,476,177.68Undertake FAST Corridor improvements with the amounts provided as 

follows $12,000,000. To construct the North Duwamish Intermodal Project, 

$3,375,000. For the Port of Tacoma Road Project, $2,250,000 for the SW 

WA034WA

116

Page 120: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

ToFrom

WA WA147 Issaquah Historical Society, Issaquah Valley Trolley Project 20,315.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

20,315.00

27th Street Overpass in Washougal, WA ‐ All activities related to the 

construction of an overpass.

863,178.00

NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new 

travel lanes, bike lanes, and sidewalks.

152,362.00

WA WA149 Port of Tacoma Rd. Construct a second left turn lane for traffic from 

westbound Pac. Hwy E. to Port of Tacoma Rd. and I 5

40,630.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

40,630.00

WA WA150 Granite Falls Alternate Freight Route in Granite Falls 287,863.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

287,863.00

WA WA151 Auburn, Washington M Street SE rehabilitation between 29th Street SE and 

37th Street SE

40,630.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

40,630.00

WA WA152 Tukwila Urban Access Improvement Project Address necessary improvements 

to Southcenter Parkway in Tukwila to relieve congestion

81,259.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

81,259.00

WA WA153 Design and construct improved I 182 interchange ramps at Broadmoor Blvd. 

in Pasco, WA

162,521.26 I‐182/SR 240 and George Washington Way Interchange ‐ Paving 162,521.26

WA WA154 Conduct route analysis for community pathway through Chehalis 7,349.33 Lincoln Creek Bridge in Lewis County ‐ Replace bridge and associated 

approach work.

7,349.33

WA WA155 Construct a multi‐jurisdictional non‐motorized transportation project parallel 

to SR 99 called the Interurban Trail

162,521.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

162,521.00

WA WA156 SR 2/Main Street/Old Owen Road Intersection in Monroe 40,538.00 Chain Lake Road Phase 2A in Monroe ‐ Construction of a pedestrian/bicycle 

path.

40,538.00

WA WA157 Congestion relief on I 405 with added lanes from SR 520 SR 522 including 2 

lanes each way from NE 85th‐NE 124th

81,259.00 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving 81,259.00

WA WA158 Buckley, WA; New Road alignments on 112th Street Corridor 162,521.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

162,521.00

WA WA159 Extension of Waaga Way west to Old Frontier Rd 355,512.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

355,512.00

WA WA161 The West Corridor Coalition in Washington State 57,077.84 SR 539/I‐5 to Kellogg Road ‐ Paving 57,077.84

WA WA163 Widen I‐5 through Lewis County 397,784.14 Lincoln Creek Bridge in Lewis County ‐ Replace bridge and associated 

approach work.

397,784.14

WA WA164 Redmond, WA City‐wide ITS 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

81,259.00

Bingen/White Salmon Circulation Study ‐ Traffic analysis in the SR 14 corridor. 23,835.76

NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new 

travel lanes, bike lanes, and sidewalks.

65,009.00

WA WA166 Pedestrian Sidewalk Construction in Snohomish. 14,221.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

14,221.00

WA WA167 Alaskan Way Viaduct and Seawall 1,137,639.00 SR 99/Roy St to N 60th St ‐ Paving 1,137,639.00

WA WA168 Improve I‐5 interchange at 134th Street in Clark County 1,094,165.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

1,094,165.00

WA WA169 SR 167‐‐Right‐of‐way acquisition for a new freeway connecting SR 509 to SR 

161.

203,150.00 SR 7/SR 507 to 114th St S ‐ Paving 203,150.00

College Way SR 538 @ I‐5 in Mount Vernon ‐ Add lanes beneath the I‐5 

overpass at College Way.

800,000.00WA

88,844.76Complete final Columbia River crossing Environmental Impact Statement for 

SR 35

1,015,540.00Complete preliminary engineering and environmental analysis for SR 14 

through Camas and Washougal

WA148WA

3,204,720.00

WA165WA

Roosevelt Extension at Urban Avenue to Cameron Way in Mount VernonWA171

117

Page 121: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

ToFrom

College Way/30th Street Signal in Mount Vernon ‐ Install signals. 850,000.00

College Way Signal System Improvements in Mount Vernon ‐ Upgrade signal 

system.

1,229,681.00

Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared 

pedestrian/bicycle path.

325,039.00

WA WA172 Design and construct pedestrian land bridge spanning SR 14 203,150.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

203,150.00

WA WA173 Install dual left turn lanes and intersection signal modifications at SR 432 and 

Columbia Blvd.

177,756.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

177,756.00

Newport Way, Maple to Sunset Way in Issaquah ‐ Roadway construction. 3,599,601.00

East Lake Sammamish Trail near Sammamish ‐ Trail construction. 406,299.00

WA WA175 Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St 162,521.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

162,521.00

WA WA179 Restore and construct historic Naches Depot and Trail project 60,590.00 Cheyne Road in Yakima County ‐ Reconstruct roadway. 60,590.00

WA WA180 Kent‐‐Construct a single point urban interchange (SPUI) under I‐5 at South 

272nd St

623,770.23 SR 99/N 60th St to N 145th St ‐ Paving 623,770.23

WA WA182 Tacoma‐‐Lincoln Avenue Grade Separation 81,259.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

81,259.00

Kent Regional Trail in Kent ‐ Construct trail with associated safety 

improvements.

300,000.00

SR 515/SE 208th I/S Safety in Kent ‐ Construct safety improvements at the 

intersection.

59,960.00

Puyallup River Bridge in Tacoma ‐ Replace segments of the Puyallup River 

Bridge.

40,630.00

WA WA184 Terry's Corner Park and Ride on Camano Island. 159,007.14 New County Road on Whidbey Island ‐ Construction of new roadway. 159,007.14

WA WA186 SR 538 (College Way) and North 26th St. Signal in Mount Vernon 14,221.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

14,221.00

WA WA188 Extension of Waaga Way west to Old Frontier Rd 40,630.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

40,630.00

WA WA189 Purchase of scenic easement or site at I‐90 and Highway 18 134,806.83 Roxbury Street Sidewalks in Seattle ‐ Construct sidewalks, curb, and gutter. 134,806.83

WA WA190 Fife‐‐Widen 70th Ave. East and Valley Ave. East 81,259.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

81,259.00

WA WA191 I‐90 Two‐Way Transit‐HOV Project 325,039.00 SR 99/Roy St to N 60th St ‐ Paving 325,039.00

WA WA192 U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion 

of U.S. 12

349,418.00 SR 125/Oregon State Line to 12th Ave N ‐ Paving 349,418.00

WA WA193 Construct an off‐ramp from I‐5 to the intersection of Alderwood Mall Blvd. 

and Alderwood Mall Pkwy.

363,405.00 Poplar Way Overcrossing in Lynnwood ‐ Construct bridge over I‐5 in vicinity of 

Alderwood Mall.

363,405.00

WA WA194 Improve Willapa Hills bicycle and pedestrian trail between Chehalis and 

Pacific County

71,383.84 2016 Mason County Overlays in Mason County ‐ Overlay and/or pavement 

repair.

71,383.84

WA WA196 SR 543 Interstate 5 to International Boundary Enhancement in Blaine (WSDOT 

PIN 154302E)

304,726.00 SR 539/I‐5 to Kellogg Road ‐ Paving(WSDOT PIN 153900P) 304,726.00

WA WA199 Complete analysis, permitting and right‐of‐ way procurement for I‐5/SR 501 

Interchange Replacement in Ridgefield.

60,945.00 Pioneer Street Rail Overpass in Ridgefield ‐ Construct overpass and associated 

approach work.

60,945.00

Kent, WA Willis Street BNSF Railroad Grade Separation ProjectWA183

4,005,900.00Issaquah SE BypassWA174WA

400,590.00WA

118

Page 122: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

ToFrom

WA WA200 Cultural and Interpretive Center (Hanford Reach National Monument) facility, 

Richland, WA

130,016.00 N. 20th Ave. Safety in Pasco ‐ Includes access management, pedestrian 

signals, and curb ramps.

130,016.00

WA WA201 Federal Way Triangle‐‐ Conduct final engineering work for the reconstruction 

of the I‐5‐‐ SR 18 interchange.

162,521.00 SR 99/N 60th St to N 145th St ‐ Paving 162,521.00

WA WA203 SR 18 Widening, Maple Valley to I‐90 609,449.00 SR 516/102nd Pl SE Vic to 132nd Ave SE ‐ Paving       609,449.00

WA WA204 Improvements in the SR 9 corridor in Snohomish County 121,891.00 I‐5/Southbound SR 531 Interchange ‐ Paving    121,891.00

WA WA205 Continuing construction of I‐90, Spokane to Idaho State Line 268,158.41 I‐90/Sprague Ave I/C to Argonne Rd I/C ‐ PCCP Rehabilitation Grinding      268,158.41

WA WA206 Rebuild and widen Cemetery Road bridge over U.S. Bureau of Reclamation 

canal near Othello, WA

23,194.53 McManamon Road Bridge, near Othello ‐ Replace existing bridge and 

associated approach work.

23,194.53

WA WA207 SR 2/Kelsey Street Intersection Improvements in Monroe. 84,510.00 Chain Lake Road Phase 2A in Monroe ‐ Construction of a pedestrian/bicycle 

path.

84,510.00

Enumclaw Foothills Trail in Enumclaw ‐ Construct Trail. 492,000.00

Battersby Trail in Enumclaw ‐ Construct Trail. 587,879.00

Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

121,891.00

WA WA209 Expand size and improve safety Lewis and Clark Discovery Trailhead and 

Scenic Overlook.

14,829.00 Elochoman Valley and Beaver Creek Roads in Wahkiakum Co ‐ Safety 

improvements.

14,829.00

Witte Road, Phase 4 in Maple Valley ‐ Roadway improvements. 39,658.36

Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

81,259.00

WA WA211 SR 28 and SR 285 Sellar Bridge Improvements: ramp and roadway network 

improvements at the west end and a new lane on the Sellar Bridge.

406,299.00 SR 285/Wenatchee Area ‐ Paving 406,299.00

WA WA212 International Mobility and Trade Corridor Project for Whatcom County 105,638.00 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated 

approach work.

105,638.00

WA WA213 Conduct study for I‐5 and SR 503 Interchange 139,468.72 I‐5/SR 503 Interchange Improvements in Woodland ‐ Relocation of 

intersection and signalization.

139,468.72

WA WA214 Implement Red Mountain Area Vision transportation plan, includes Webber 

Canyon Road realignment at existing I‐82 Kiona‐Benton interchange and new 

Red Mountain I‐82 interchange at SR 224.

492,883.19 I‐82/Red Mountain Vicinity ‐ Construct Interchange 492,883.19

WA WA215 Renton, WA SR 167 HOV, Strander Boulevard Connection 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

81,259.00

WA WA216 Extend 18th Street between 87th Avenue and NE 192nd Avenue in 

Vancouver.

325,039.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

325,039.00

WA WA217 U.S. 2/Sultan Basin Road Improvements in Sultan 48,756.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

48,756.00

WA WA218 Construct SR 9 Pedestrian Overpass in Arlington. 881,298.00 Arlington Valley Road in Arlington ‐ Construct new roadway. 881,298.00

WA WA219 Engineering and Construction of the Centennial Trail in Snohomish. 81,259.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

81,259.00

Barker Road/BNSF Grade Separation in Spokane Valley ‐ Construct grade 

separation over BNSF tracks.

719,921.00

Ben Burr Trail Connections in Spokane ‐ Construct trail and associated 

amenities.

81,259.00

WA WA221 267th Street NW Pedestrian Path in Stanwood 48,756.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

48,756.00

WA210

1,201,770.00Enumclaw, WA Welcome CenterWA208

120,917.36Maple Valley SR 169 and SR 516 Improvements

801,180.00Development of highway‐rail crossings in Spokane County, WA and Kootenai 

County, ID

WA220WA

WA

WA

119

Page 123: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

ToFrom

WA WA223 Improve Wahkiakum County Ferry landing. 25,393.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new 

bridge and associated approach work.

25,393.00

WA WA224 116th St/Interstate 5 Interchange Reconstruction in Marysville. 142,205.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

142,205.00

WA WA225 Guard Street Reconstruction Project in Friday Harbor 65,009.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

65,009.00

WA WA226 5th Street/US 2 Signalization Improvements in Sultan. U.S. 2/Sultan Basin 

Road improvements in Sultan [ref P.L. 110‐244, Sec 105(a)(54)]

8,126.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

8,126.00

SR 515/SE 208th I/S Safety in Kent ‐ Construct safety improvements at the 

intersection.

359,960.00

Puyallup River Bridge in Tacoma ‐ Replace segments of the Puyallup River 

Bridge.

40,630.00

WA WA230 I‐405‐SR 167 interchange‐‐ Rebuild the interchange and add additional lanes 

to relieve congestion.

162,521.00 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving 162,521.00

WA WA231 SR 704 Cross‐Base Highway, Spanaway Loop Road to SR 7 930,265.70 SR 7/SR 507 to 114th St S ‐ Paving 930,265.70

WA WA233 Fruitdale and McGarigle Arterial Improvements Project in Sedro Woolley, 

Washington

77,196.54 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated 

approach work.

77,196.54

WA WA234 Realign Airport Road/ Springhetti Ave./Marsh Road in Snohomish County, 

Washington

25,393.00 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 25,393.00

WA WA235 Olympia Infrastructure Enhancement Project. 69,477.00 Bremerton Highway Safety Improvements in Bremerton ‐ Safety 

improvements.

69,477.00

WA WA236 Improve Mill Plain Blvd. between SE 172nd and SE 192nd in Vancouver 1,251,844.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new 

travel lanes, bike lanes, and sidewalks.

1,251,844.00

WA WA237 Improve signage along scenic highways in Clark, Skamania and Pacific 

counties

6,095.00 Elochoman Valley and Beaver Creek Roads in Wahkiakum Co ‐ Safety 

improvements.

6,095.00

WA WA238 Widen SR 503 through Woodland 115,090.32 I‐5/SR 503 Interchange Improvements in Woodland ‐ Relocation of 

intersection and signalization.

115,090.32

WA WA240 Design and construct pedestrian land bridge spanning SR 14 in Vancouver 253,938.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new 

travel lanes, bike lanes, and sidewalks.

253,938.00

WA WA242 Hanford Reach National Monument Road Improvement. 152,362.00 N. 20th Ave. Safety in Pasco ‐ Includes access management, pedestrian 

signals, and curb ramps.

152,362.00

WA WA243 Town Square Roadway and Pedestrian Improvements, Burien 253,938.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

253,938.00

WA WA244 SR 704 Cross‐Base Highway Improvements, Spanaway Loop Road to SR 7. 2,002,950.00 SR 7/SR 507 to 114th St S ‐ Paving 2,002,950.00

WA WA245 Tukwila Southcenter Parkway Improvements, Tukwila. 304,726.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

304,726.00

WA WA246 Federal Way Triangle‐‐ Conduct final engineering work for the reconstruction 

of the I‐5‐‐ SR 18 interchange.

406,387.38 SR 99/N 60th St to N 145th St ‐ Paving 406,387.38

WA WA247 U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion 

of U.S. 12

253,938.00 SR 125/Oregon State Line to 12th Ave N ‐ Paving 253,938.00

WA WA248 Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St 101,576.00 Redmond Central Connector in Redmond ‐ Construct path and associated 

improvements.

101,576.00

Granary Avenue & Laurel Street in Bellingham ‐ Construct new and 

reconstruct existing roadways.

1,676,514.69

400,590.00

1,930,452.69Port of Bellingham Transportation Enhancement ProjectsWA251WA

Kent, WA Willis Street UP Railroad Grade Separation ProjectWA228WA

120

Page 124: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Washington

State Demo ID Project Description Amount  Project Description Amount

ToFrom

Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF 

bridge.

253,938.00

WA WA252 Toroda Creek Road Improvements, Ferry County 240,905.00 Ferry/River Street Overlay project in Ferry County ‐ Roadway overlay and 

storm drainage improvements.

240,905.00

WA WA253 Toroda Creek Road Improvements, Okanogan County 100,176.20 North Star Park City Lower Bridge B‐3 in Okanogan County ‐ Replace bridge 

and associated approach work.

100,176.20

WA WA254 Conduct preliminary engineering and EIS for Columbia River Crossing in WA 

and OR.

101,576.00 SR 501/I‐5 to SW 26th St Ext Vic Including Couplet ‐ Paving 101,576.00

WA WA255 U.S. 395, North Spokane Corridor Improvements. 203,150.00 US 2/Division Wye to Farwell Rd ‐ Paving 203,150.00

WA WA256 116th St/Interstate 5 Interchange Reconstruction in Marysville. 101,576.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new 

bridge and associated work.

101,576.00

WA WA257 SR 167‐‐Right‐of‐way acquisition for a new freeway connecting SR 509 to SR 

161.

761,812.66 SR 512/Golden‐Givens Rd to Jct SR 167 ‐ Paving 761,812.66

WA WA258 Roadway and Pedestrian Improvements at Burien Town Square, Burien 152,362.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated 

improvements.

152,362.00

WA WA259 Complete analysis, permitting and right‐of‐ way procurement for I‐5/SR 501 

Interchange Replacement in Ridgefield.

853,272.43 Pioneer Street Rail Overpass in Ridgefield ‐ Construct overpass and associated 

approach work.

853,272.43

WA WA261 Construct Intermodal Transit Facility, City of University Place 330,119.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

330,119.00

WA WA262 Streetscape University Place Downtown, City of University Place 284,410.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

284,410.00

WA WA263 Plan and Improve freight and goods transport‐‐The West Coast Corridor 

Coalition in Washington State.

50,787.00 I‐5/Stillaguamish River Br to Hill Ditch Br ‐ Concrete Pavement Rehab 50,787.00

WA WA265 Tukwila Urban Access Improvement Project Address necessary improvements 

to Southcenter Parkway in Tukwila to relieve congestion

177,757.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐

time travel information.

177,757.00

WA WA266 Tacoma‐‐Lincoln Avenue Grade Separation 152,362.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen 

highway.

152,362.00

WA WA267 Widen SR 202/SR 520 to Sahalee Way, King County 244,471.00 SR 202/Snoqualmie Falls Park to Boalch Ave NW Vic ‐ Paving 244,471.00

WA WA268 Improve Vancouver traffic management ‐ Vancouver Advanced Traffic 

Management System, Vancouver

50,788.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new 

travel lanes, bike lanes, and sidewalks.

50,788.00

Queensgate Drive Improvements, I‐182 to Keene Road in Richland ‐  2,356,344.88

North Meyers Road Bridge in Yakima County ‐ Replace bridge and associated 

approach work.

279,331.00

Total Amount Repurposed 46,319,394.16Total # of Earmarks Repurposed 126

WA 2,635,675.88SR 240/Stevens Drive Corridor Improvements, interchange construction and 

graded rail crossing separation at intersection of SR 240 and Van Giesen 

Street.

WA269

121

Page 125: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

Wyoming

State Demo ID Project Description Amount  Project Description Amount

WY WY004 #165. Jackson‐Teton Pathway ‐ HPP TEA‐21 ‐ 1998 177,706.00 Hoback Jct.‐ Jackson, Snake River North Section Pathway 177,706.00

WY WY005 #629 Cheyenne Norris Viaduct ‐ HPP TEA‐21 ‐ 1998 304,249.00 Cheyenne Streets ‐ Intersection of Prairie Ave. and Frontier Mall Drive 

Roundabout

304,249.00

WY WY017 #2508 US 85 Passing Lanes (Sec 1702) ‐ HPP SAFETEA‐LU ‐ 2005 24,081.47 Cheyenne South Greeley Highway, US 85 and I‐80 Ramps Left Turn Signal and 

Striping

24,081.47

WY WY019 #2781  Projects on or near Highway 26 in Riverton ‐ Section 1702 HPP 

SAFETEA‐LU ‐ 2005

11,986.57 Riverton Streets North Federal Blvd. Reconstruction 11,986.57

WY WY023 #5168 WYO 59 Douglas‐ Gillette Add Lanes‐ Sec 1702 HPP SAFETEA‐LU ‐ 2005 57,328.58 Gillette Streets Intersection of Warlow Drive and US 14/16 Traffic Signal 

Replacements

57,328.58

WY WY025 #5170 Rock Springs Marginal ‐ Section 1702 HPP SAFETEA‐LU ‐ 2005 1,266.50 Rock Springs‐ Rawlins Point of Rocks West Resurfacing 1,266.50

WY WY027 #5172 I‐90/Burma Road Overpass ‐ Section 1702 HPP SAFETEA‐LU ‐ 2005 11,745.91 Buffalo‐ Gillette Lowery Section Mill and Overlay 11,745.91

WY WY028 #5173 US 85 Passing Lanes Newcastle‐ Lusk ‐ Section 1702 HPP SAFETEA‐LU ‐ 

2005

0.45 Newcastle‐ 4 Corners Mill and Overlay 0.45

Total Amount Repurposed 588,364.48Total # of Earmarks Repurposed 8

From

122

Page 126: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

American Samoa

State Demo ID Project Description Amount  Project Description Amount

AS AS001 AS: Rehabilitation 8 miles of Tau Road from Falessao to Ftuita 9,375.21 Construct Roadway Projects on the Island of Tau, AS 9,375.21

AS AS007 Shoreline Protection and Drainage Mitigation for Nuuuli Village Roads 15,555.29 Construct Roadway Projects on the Island of Tutuila, AS 15,555.29

AS AS008 Village Road Improvements for Tau, Ofu, and Olosega‐Sili counties in Manua 

District

375,452.46 Construct Roadway Projects on the Island of Tau, AS 375,452.46

AS AS009 Shoreline Protection and Drainage mitigation for Aua Village Roads 8,583.80 Construct Roadway Projects on the Island of Tutuila, AS 8,583.80

AS AS015 Drainage Mitigation for Pago Pago village Roads 323,095.45 Construct Roadway Projects on the Island of Tutuila, AS 323,095.45

Total Amount Repurposed 732,062.21Total # of Earmarks Repurposed 5

ToFrom

123

Page 127: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 4th Quarter Report to Congress

U.S. Virgin Islands

State Demo ID Project Description Amount  Project Description Amount

VI VI003 Construction of Raphune Hill Bypass Project, Route 38, St. Thomas, USVI 1,673,972.00 Turpentine Run Bridge Approaches project, route 30, project no. VI‐A30(1) 1,673,972.00

Total Amount Repurposed 1,673,972.00Total # of Earmarks Repurposed 1

ToFrom

124

Page 128: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Summary

State # of Earmarks Repurposed Total Amount Repurposed

Idaho 1                                                 2,403,540.00                          

Kansas 1                                                 2,004,683.00                          

Maryland 1                                                 4,005,900.00                          

Michigan 1                                                 238,956.92                             

Minnesota 1                                                 154,291.17                             

New Jersey 41                                              49,577,132.55                        

North Carolina 1                                                 514,861.40                             

South Dakota 8                                                 7,551,711.26                          

Tennessee 99                                              74,090,597.77                        

Vermont 15                                              8,671,887.81                          

West Virginia 2                                                 577,222.00                             

Total 171                                              149,790,783.88                     

Page 129: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Idaho

State Demo ID Project Description Amount  Project Description Amount

ID ID034 Widen US 95 in Idaho from Jct SH 1 to Canadian Border 2,403,540.00 US 95, Alderson Ln to Madison St., Bonners Ferry ID 2,403,540.00

Total Amount Repurposed 2,403,540.00Total # of Earmarks Repurposed 1

ToFrom

2

Page 130: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Kansas

State Demo ID Project Description Amount  Project Description Amount

KS KS097 Construction of South Bypass for Highway 56 in Great Bend 2,004,683.00 US‐56 from West City Limits of Garfield NE to East City Limits of Garfield 2,004,683.00

Total Amount Repurposed 2,004,683.00

Total # of Earmarks Repurposed 1

ToFrom

3

Page 131: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Maryland

State Demo ID Project Description Amount  Project Description Amount

Widening I‐81 to six lanes in the existing median, and 

reconstructing/reconfiguring

800,000.00

Interchanges at US 11 (VA Avenue) and at I‐70 3,205,900.00

Total Amount Repurposed 4,005,900.00

Total # of Earmarks Repurposed 1

To

4,005,900.00US 40 Alternate, Middletown BypassMD MD085

From

4

Page 132: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Michigan

State Demo ID Project Description Amount  Project Description Amount

MI MI193 City of Negaunee, Croix Street reconstruction‐Streetscape and resurfacing 

from U.S. 41 to Maas Street

238,956.92 Croix Street reconstruction and resurfacing from west of Baldwin Ave to US 41 238,956.92

Total Amount Repurposed 238,956.92

Total # of Earmarks Repurposed 1

ToFrom

5

Page 133: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Minnesota

State Demo ID Project Description Amount  Project Description Amount

Feasibility Study for Proposed Mille Lacs Scenic Byway 61,240.00

Construct Cuyuna Lake Trail, Crow Wing CSAH 31 to TH6/Crow Wing CSAH 10 

in Deerwood

93,051.17

Total Amount Repurposed 154,291.17

Total # of Earmarks Repurposed 1

To

154,291.17Construct Bicycle and Pedestrian Trails in Cuyuna Recreation AreaMN173MN

From

6

Page 134: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

NJ NJ004 Corridor Safety Improvement; US Route 1 (NJ) 1,366,021.40 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 1,366,021.40

NJ NJ011* Route 70/38 Circle Elimination 1,500,000.00 Route 70, Route 38 to Cropwell Road Roadway construction, Culvert 

Replacement, MP 0.0‐7.7

1,500,000.00

NJ NJ018 Middlesex: Route 1 widening in Middlesex Co. from Raritan River to Rahway 

River

154,923.62 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 154,923.62

NJ NJ029 Widen Route 1 from Pierson Avenue to Inman Avenue in Middlesex County 1,816,414.06 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 1,816,414.06

NJ NJ041 Construct Route29/129 Bicycle, Pedestrian and landscape improvement plan 53,431.87 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 53,431.87

NJ NJ057 Construct, reconstruct and integrate multi‐transportation modes ‐‐ 

international airport and seaport, rail, national highway system and 

brownfields ‐‐ to establish an international intermodal transport

14,385.21 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐9.22 14,385.21

NJ NJ059 Construct Rt 17 bridge over the Susquehana and Western rail line in Rochelle 

Park

98,393.27  Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 98,393.27

NJ NJ073 Reconstruction of Institute Street, Lockwood Avenue, First Street, Second 

Street, Third Street, Ford Avenue, Liberty Street, and Bond Avenue in the 

Borough of Freehold, New Jersey

58,545.05 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐9.22 58,545.05

NJ NJ093 Route 17 congestion improvements from Route 3 to Linwood Avenue, Bergen 

Co. NJ

60,267.93 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

60,267.93

NJ NJ094 Route 17 improvements from Route 3 to Linwood Avenue, Bergen Co, New 

Jersey

637.62 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

637.62

NJ NJ108 Pompton Lakes Downtown Streetscape 584,260.77  Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

584,260.77

NJ NJ115* Delsea Drive Rt 47 Timber Creek 787,000.00  Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk 

Re[!lacement‐MP62. 3‐75.2

787,000.00

 Route 34, CR 537 to Washington Ave., Mill, Resurfacing & ADA Improvements‐ 

MP13.2‐26.5

719,921.00

 Route 34, CR 537 to Washington Ave., Mill, Resurfacing & ADA Improvements‐ 

MP13.2‐26.6

81,259.00

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 

bridges over Rt 3, MP 5.67 and MP 5.93

3,959,560.00

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 

bridges over Rt 3, MP 5.67 and MP 5.94

446,930.00

 Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐ ‐‐‐

MP26.42‐27.8

863,904.00

 Route 295/42/1‐76, Direct Connection,  Contract 3‐Design‐Reconstruction‐ ‐‐‐

MP26.42‐27.9

97,512.00

NJ NJ145 Construction Route 46 and Main Street intersection in Lodi 1,602,360.00  Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 

bridges over Rt 3, MP 5.67 and MP 5.95

1,602,360.00

NJ NJ147 Intermodal Access Improvements to the Peninsula at Bayonne Harbor 1,602,360.00 Route 40 Access Rd/40th Street to Mina Drive‐Aerial Photos for Base Mapping 

& Traffic Control‐21.5‐24.9

1,602,360.00

 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 1,439,840.00

 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.3 162,520.00

961,416.00Safety and operation improvements on Route 73 in Berlin, Voorhees and 

Evesham

NJ129NJ

1,602,360.00Rehabilitate Route 193 in New Jersey PortwayNJ152NJ

4,406,490.00Bergen County, NJ On Route 17, address congestion, safety, drainage, 

maintenance, signing, access, pedestrian circulation and transit access

NJ128NJ

To

801,180.00Laurel Avenue Bridge replacement in Holmdel

Township

NJ118NJ

From

7

Page 135: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

ToFrom

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rte 3

719,921.00

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rte 4

81,259.00

 Route 27 ADA Ramps Improvements, Evergreen St to Elizabeth River‐MP23.B‐

33.41

719,921.00

 Route 27 ADA Ramps Improvements, Evergreen St to Elizabeth River‐MP23.B‐

33.42

81,259.00

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

8,639,042.00

 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 4

975,119.00

NJ NJ173 Construct Sparta Stanhope Road Bridge (AKA Bridge K‐07)  229,181.40 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

229,181.40

 Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk 

Replacement‐MP62. 3‐75.3

431,952.00

 Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk 

Replacement‐MP62. 3‐75.4

48,756.00

NJ NJ186 Passaic‐Bergen intermodal transportation deployment initiative 1,218,900.00 Route 20 Paterson Safety, Drainage and Resurfacing‐MPO. 00‐4. 00 1,218,900.00

NJ NJ187 Construct 1‐195 Noise Barrier, Hamilton Township, Mercer County 2,002,950.00  Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement 

Resurfacing‐?. 9‐14. 5

2,002,950.00

NJ NJ190 Construction of new access roads along route 42/Blackhorse Pike in 

Washington Township

801,180.00 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

MP26.42‐28.8

801,180.00

NJ NJ193 Replacement and Alignment of Amwell Road Bridge over Neshanic River 339,871.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 339,871.00

NJ NJ195 Replace Route 7‐Wittpem Bridge, Hudson County 801,180.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 801,180.00

Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

26.42‐27.8

287,968.00

Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐

26.42‐27.9

32,504.00

 Route 15, Bridge over Paulins Kill. Replace Superstructure, and Scour. MP 

17.45‐17.65

2,519,721.00

 Route 15, Bridge over Paulins Kill. Replace Superstructure, and Scour. MP 

17.45‐17.66

284,409.00

NJ NJ217 Improvements to implement the Readington Tewksbury Transportation 

Improvement District

189,512.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 189,512.00

NJ NJ218 Replacement of the Magnolia Avenue Bridge over Routes 1 & 9 379,024.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 379,024.00

 Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A & 

15A) MP 63.4‐66.4

759,515.00

 Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A & 

15A) MP 63.4‐66.5

85,730.00

NJ NJ220 Upgrade of Turnpike/Route 440 Interchange in Bayonne 3,204,720.00 Route 40 Access Rd/40th Street to Mina Drive‐Aerial Photos for Base Mapping 

& Traffic Control‐21.5‐24.9

3,204,720.00

NJ NJ236 Construct Hudson River Waterfront Walkway over Long Slip Canal‐‐Hoboken 

and Jersey City

81,259.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 81,259.00

845,245.00Separation of the intersection of 13th Street and the Lehigh Rail Line through 

bridge or tunnel in Manville, NJ

NJ219NJ

320,472.00Rehabilitation of Benigno Boulevard from 1295 to Route 168 in BellmawrNJ203NJ

2,804,130.00 Sussex County, NJ, Vernon Township, Mountain Creek Rt. 94 Traffic Calming, 

Ped. Safety and Traffic Congestion, Circulation Improvement

NJ209NJ

NJ NJ153

480,708.00Construction of Rowan Boulevard from US Route 322

to Main Street, Glassboro

NJ183NJ

801,180.00

9,614,161.00

East Coast Greenway bicycle and pedestrian path from New Brunswick to 

Hudson River

Route 17 Congestion Improvements and Widening, from Williams Avenue to 

the Garden State Parkway and Route 4 in Bergen County

NJ156NJ

NJ159NJ

801,180.00Rte 605 extension to U.S. 206

8

Page 136: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

New Jersey

State Demo ID Project Description Amount  Project Description Amount

ToFrom

NJ NJ241  Jersey City 6th Street Viaduct Pedestrian and Bicycle Pathway Project 1,602,360.00   Partway, Fish House/Pennsylvania Avenue, CR 659, Roadway Reconstruction‐

MP 0.5‐1.4

1,602,360.00

NJ NJ251 Widening of Route 1 and intersection improvements in South Brunswick 2,287,975.15 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 2,287,975.15

NJ NJ255 Route 9W operational and safety improvements, including I‐95 Southbound 

entrance alterations

407,332.49 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

407,332.49

NJ NJ263 Route 46 Corridor upgrades 302,429.23 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

302,429.23

NJ NJ266 Widening of Rt. 1 and intersection improvements in South Brunswick 2,505,854.00  Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement 

Resurfacing‐?. 9‐14. 5

2,505,854.00

NJ NJ270 Route 9W operational and safety improvements, including I‐95 Southbound 

entrance alterations

85,881.48 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on 

Rt 3

85,881.48

*Subject to availability of funds upon additional research.

Total Amount Repurposed 49,577,132.55

Total # of Earmarks Repurposed 41

9

Page 137: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

North Carolina

State Demo ID Project Description Amount  Project Description Amount

NC NC089 Downtown Redevelopment Project, City of Rocky Mount 514,861.40 US 301 Bypass from NC 43/48 to SR 1836 in Rocky Mount (U‐3330) 514,861.40

Total Amount Repurposed 514,861.40Total # of Earmarks Repurposed 1

From

10

Page 138: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

South Dakota

State Demo ID Project Description Amount  Project Description Amount

SD SD121 Construct an interchange on I‐90 at Marion Road west of Sioux Falls 568,820.00 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102 

PCN 025C

568,820.00

SD SD123 Design and construct new Meridian Bridge across the Missouri River at 

Yankton

1,000,024.81 SD17 ‐ SD44 Junction to Near Lennox; Municipal Reconstruction ‐ P 0017(08)42 

PCN 028V

1,000,024.81

SD SD124 Resurface 10 miles of U.S. 18 from Okreek to Carter on the Rosebud Indian 

Reservation

151,486.75 I‐90 Vivian to Oacoma; Asphalt Surface Treatment and Joint Reseal ‐ IM 

0904(59)210 PCN 04D

151,486.75

SD SD128 Design and construct new Meridian Bridge across the Missouri River south of 

Yankton, South Dakota

325,039.00 SD17‐SD44 Junction to near Lennox; Municipal Reconstruction ‐  P 001(08)42 

PNC 028V

325,039.00

SD SD136 Construct Rush Lake Crossing US 12 near Webster 1,497,256.71 US81 ‐ from 3rd Ave. NE to 18th Ave. NE in Watertown;  Urban Reconstruction ‐ 

NH 0081(93)157 PCN 026X

1,497,256.71

SD SD142 Purchase critical conservation easements along the Heartland Expressway 

(Highway 79) adjacent to Custer State Park and Wind Cave National Park

2,002,950.00 I‐190 Exit 1 to Jct of US16/SD44 in Rapid City; Urban Reconstruction; IM 

1902(61)0 PCN 1162

2,002,950.00

SD44 ‐ from SD47 to the Platte/Winner Bridge; Mill & AC Resurfacing ‐ P 

0044(191)274 PCN 04X2

932,615.36

I‐90 Vivian to Oacoma; Asphalt Surface Treatment & Joint Reseal ‐ IM 

0904(59)210 PCN 04D4

1,000,000.00

SD SD164 Asphalt overlay to extend Lewis and Clark Highway 1804 in Charles Mix County 

leading to Platte Creek Recreation Area.

73,518.63 US281 ‐ from the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐ NH 

0281(111)48 PCN 04WF

73,518.63

Total Amount Repurposed 7,551,711.26

Total # of Earmarks Repurposed 8

To

1,932,615.36To replace bridge over Missouri River, I‐90 in Chamberlain.SD151SD

From

11

Page 139: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description AmountTN021 Rutherford Co., TN, Intersection Improvement on SR‐2, At Dilton‐Mankin 

Road

464,800.00

TN021 Rutherford Co., TN, Resurfacing & Safety Improvements on SR‐266, From 

ramp to SR‐840 WB to SR‐10

423,710.24

TN TN026 Reconstruct Old Walland Highway Bridge over Little River in Townsend in 

Blount County, Tennessee.

146,039.00 TN026 Roane Co., TN, Intersection Improvement on SR‐1, At SR‐29 in Harriman. 146,039.00

TN TN035 SR‐22 Bypass, North Fork Obion River to SR‐3 in Union City, Tennessee 20,000.00 TN035 Lake Co., TN, Bridge Replacement on SR‐21, Bridge over Branch at LM 1.20 20,000.00

TN048 Dekalb and Wilson Cos., TN, Safety Improvements on SR‐26, From W. of 

Wilson County line to near SR‐96.

118,000.00

TN048 Davidson Co., TN, Safety Improvements on SR‐155, From Glastonbury Drive 

to N. of Karen Drive

160,170.00

TN TN066 SR‐21, From LM 7.00 to the Obion County line. 469,936.92 TN066 Lake Co., TN, Bridge Replacement on SR‐21, Bridge over Branch at LM 1.20. 469,936.92

TN TN080 Plough Boulevard Interchange at Winchester Road ‐ City of Memphis, 

Tennessee

491,964.00 TN080 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to 

SR‐385 (Paul Barrett Parkway)

491,964.00

TN TN086 Improve circuitry on vehicle protection device installed at highway R/R 

crossing in Athens, Tennessee. 

47,269.60 TN086 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd 

Road.

47,269.60

TN087 Pickett Co., TN, Resurface. & Safety Improvement. On SR‐28, From S. of 

Bridge over Holbert Creek to Kentucky State line

497,033.00

TN087 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River at 

LM 10.71

3,822,487.00

TN087 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River at 

LM 10.72

487,560.00

TN TN089 Addition of an interchange on I‐40 at Buttermilk Road in Roane County, 

Tennessee.

243,780.00 TN089 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to 

north of Ellis Avenue

243,780.00

TN TN091 Cessna Road, improve at‐grade highway‐railroad crossing in Knoxville, 

Tennessee.

76,913.40 TN091 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and 

Thompson School Road

76,913.40

TN TN093 Develop trails, bike paths and recreational facilities on Bird Mountain for 

Cumberland Trail State Park in Morgan County, Tennessee

186,295.00 TN093 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of 

Westchester Dr./Catoosa Blvd.

186,295.00

TN TN094 Widen Campbell Station Road in Knoxville, Tennessee. 146,268.00 TN094 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and 

Thompson School Road

146,268.00

TN TN095 Improve vehicle efficiencies at highway At‐Grade railroad crossing in Athens, 

Tennessee.

79,316.60 TN095 Blount Co., TN, Intersection Improvement on SR‐35, At Lincoln Road in Alcoa. 79,316.60

TN096 Cocke Co., TN, Safety Improvements on SR‐9, From LM 5,80 to LM 6.30 in 

Newport.

576,000.00

TN096 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road & 

Thompson School Road.

225,180.00

TN TN098 Plan and construct improvements, Livingston Public Square in Overton 

County, Tennessee.

12,641.66 TN098 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of 

Old Kentucky Road to Hitchcock Drive

12,641.66

TN104 Meigs Co., TN, Safety Improvements on SR‐304, From SR‐68 to near Euchee 

Road.

6,937.00

TN104 Meigs Co., TN, Safety Improvements on SR‐304, From SR‐68 to near Euchee 

Road.

17,441.00

TN TN109 Construction of Elizabethton Connector in Carter County, Tennessee. 801,180.00 TN109 Washington Co., TN, Intersection Improvement on SR‐34, At SR‐354 (Boones 

Creek Road) in Jonesborough.

801,180.00

TN TN112 Acquire and construct trail and bikeway along South Chickamauga Creek in 

Chattanooga

130,016.00 TN112 Hamilton Co., TN, Intersection Improvement on SR‐58, At Champion Road in 

Chattanooga

130,016.00

TN TN114 Conduct study for SR‐45 to SR‐386 Connector in Davidson and Sumner 

Counties, Tennessee

400,590.00 TN114 Macon Co., TN, Bridge Replacement on SR‐151, Bridge over Salt Lick Creek 400,590.00

801,180.00SR‐31 Reconstruction in Hawkins County, Tennessee.TN096TN

24,378.00TN TN104 Improve streetscape and pavement repair in Monroe County, Tennessee

4,807,080.00Add third lane on US‐27 (SR‐29) for truck‐climbing lane and realignment of 

roadway at Wolf Creek Road to old US‐27 north of Robbins in Scott County, 

Tennessee

TN087TN

To

888,510.24Stones River Greenway in Davidson County, TennesseeTN021TN

278,170.00Greenway and Bicycle Path Corridor in City of White House, Tennessee.TN048TN

From

12

Page 140: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description Amount

ToFrom

TN TN115 Bristol, TN highway‐R/R grade crossing improvement, Hazelwood Street in 

Sullivan County, Tennessee

80,118.00 TN115 Sullivan Co., TN, Intersection Improvements on SR‐36, At Moreland Drive and 

Hemlock Road in Kingsport

80,118.00

TN TN116 Construct new lighting on Veterans Memorial Bridge in Loudon County, 

Tennessee

20,315.00 TN116 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 20,315.00

TN119 Blount‐Monroe‐Loudon Cos., TN, Safety Imp. on SR‐33, From 

McMinn/Monroe CoL to Blount/Knox Co. 

1,160,000.00

TN119 Knox‐Sevier Cos., TN, Safety Improvements on SR‐71, From Evans Road to 

Burnett Lane

4,047,670.00

TN TN122 Plan and Construct Rutherford County Visitor's Center/Transportation 

Information hub in Murfreesboro, Tennessee.

40,630.00 TN122 Wilson Co., TN, Safety Improvement on SR‐26, At Bluebird Road/C.L. Manier 

Street in Lebanon.

40,630.00

TN TN124 North Second Street Corridor Upgrade in Memphis, Tennessee 1,602,360.00 TN124 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to 

SR‐385 (Paul Barrett Parkway)

1,602,360.00

TN TN125 Bristol, TN Highway R/R Grade Crossing Improvement, Cedar Street in 

Sullivan County, Tennessee

40,059.00 TN125 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93 

to SR‐36

40,059.00

TN TN126 Construct Transportation and Heritage Museum in Townsend, Tennessee. 81,259.00 TN126 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to 

north of Ellis Avenue.

81,259.00

TN TN127 Widen SR‐4 (US‐78) from Mississippi State line to Getwell Road (SR‐176) in 

Memphis, Tennessee

801,180.00 TN127 Fayette Co., TN, Resurfacing & Safety Improvements on SR‐15, From the 5‐

lane section to near Tomlin Road 

801,180.00

TN128 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From Miller 

Road to West 4th Street

427,200.00

TN128 Jackson Co., TN, Resurfacing & Safety Improvements on SR‐135, From S. of 

Spring Creek Road to SR‐53

1,012,000.00

TN128 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐60, From Meigs 

County line to Meigs County line

285,600.00

TN128 Meigs Co., TN, Resurfacing & Safety Improvements on SR‐60, From Bradley 

County line to Hamilton County line

13,674.58

TN128 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of 

Old Kentucky Road to Hitchcock Drive

626,400.00

TN TN129 Improve Vehicle Efficiencies at At‐Grade highway‐railroad crossing in Lenoir 

City, Tennessee.

83,322.60 TN129 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike.

83,322.60

TN TN132 Plan and construct a bicycle and pedestrian trail in Springfield, Tennessee 200,295.00 TN132 Robertson Co., TN, Safety Improvement. on SR‐76, From W. of Industrial Rd. 

to E. of Hester Dr. in White House.

200,295.00

TN TN133 Reconstruct connection with Hermitage Avenue to Cumberland River Bluff in 

Nashville, Tennessee.

41,512.13 TN133 Montgomery Co., TN, Intersection Improvement on SR‐13, At Wylma Van 

Allen Place in Clarksville.

41,512.13

TN TN134 Plan and construct a bicycle and pedestrian trail in Lewisburg, TN 8,126.00 TN134 Marshall Co., TN, Intersection Improvement on SR‐373, At Heil Quaker 

Avenue in Lewisburg

8,126.00

TN TN136 Construct and improve intersections in Niota, Tennessee. 80,118.00 TN136 McMinn Co., TN, Safety Improvements on SR‐2, From SR‐30 to SR‐305 80,118.00TN TN139 Construct interpretive visitor center for the Cherokee Removal Memorial 

Park Trail of Tears site in Meigs County, Tennessee

81,259.00 TN139 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 81,259.00

TN TN140 Provide Streetscape Improvements and Pavement Repair in Greenback, 

Tennessee.

200,295.00 TN140 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike.

200,295.00

TN TN141 Improve vehicle efficiencies at highway At‐Grade railroad crossing in Niota, 

Tennessee

45,666.80 TN141 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd 

Road.

45,666.80

TN TN142 Construct and Widen SR‐33 in Monroe County, Tennessee. 507,875.00 TN142 Rhea Co., TN, Resurface. & Safety Imp. on SR‐29, From the Hamilton County 

line to N. of Black Oak Estates Road

507,875.00

TN TN143 Improving vehicle efficiencies at At‐Grade highway‐railroad crossing in 

Philadelphia, Tennessee

79,316.60 TN143 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike

79,316.60

TN TN147 For each rail‐highway crossing: Improve circuitry on vehicle protection 

devices installed at crossing in Knoxville, Tennessee.

45,666.80 TN147 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and 

Thompson School Road

45,666.80

2,364,874.58Widen SR‐101, from two lane highway to five lanes between SR‐282 (Dunbar 

Road) and SR‐392 in Crossville, Tennessee

TN128TN

5,207,670.00Construct overpass at Highway 321 and Highway 11 in Loudon County, 

Tennessee.

TN119TN

13

Page 141: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description Amount

ToFrom

TN TN148 Complete construction and landscaping of visitor center on Cherohala 

Skyway in Monroe County, Tennessee

80,118.00 TN148 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 80,118.00

TN TN149 Improve circuitry on vehicle protection device installed at highway‐railroad 

crossing in Knoxville, Tennessee

126,586.20 TN149 Knox Co., TN, Intersection Improvement on SR‐169, At Weisgarber Road. 126,586.20

TN TN151 Cocke County, Tennessee, SR‐32 Reconstruction. 801,180.00 TN151 Cocke County, Tennessee, Resurfacing & Safety Improvements on SR‐9, From 

SR‐107 to the North Carolina State line.

801,180.00

TN TN152 Retrofit Noise Abatement Walls in Davidson County, Tennessee. 203,150.00 TN152 Marshall Co., TN, Intersection Improvement on SR‐373, At Heil Quaker 

Avenue in Lewisburg.

203,150.00

TN TN154 Improve Streetscape and Pavement Repair in Blount County, Tennessee. 240,354.00 TN154 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike.

240,354.00

TN156 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐29, From N. of 

Signal Mtn. Road of SR‐29

1,401,880.00

TN156 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐29, From N. of 

Signal Mtn. Road of SR‐30

208,520.00

TN156 Bradley Co., TN Resurfacing and Safety Improvement on SR‐2, From S. Lee 

Highway and Grove to the int. of 25th St. 

683,200.00

TN156 Sequatchie Co. TN. Resurfacing and Safety Improvement on SR‐28. From S. of 

Br. Over Woodcock Creek to SR‐8

782,200.00

TN156 Sequatchie Co. TN. Resurfacing and Safety Improvement on SR‐28. From S. of 

Br. Over Woodcock Creek to SR‐9

162,600.00

TN156 Marion Co. TN. Resurfacing and Safety Improvements on SR‐27, From N. of 

Big Fork Road to Suck Creek

360,220.00

TN156 Monroe Co., TN, Resurfacing on I‐75, From the McMinn County line to the 

Loudon County line

3,612,000.00

TN TN159 Restoration of historic L & N Depot in McMinn County, Tennessee. 16,024.00 TN159 Meigs Co., TN, Resurfacing & Safety Improvements on SR‐60, From Hamilton 

County line to Horner Hollow Road.

16,024.00

TN TN160 Construct welcome center in Macon County, Tennessee 16,252.00 TN160 Wilson Co., TN, Intersection improvement on SR‐10, At the entrance to Flea 

Market.

16,252.00

TN TN166 Construct interchange on I‐40 in Wilson County, Tennessee 81,259.00 TN166 Wilson Co., TN, Intersection improvement on SR‐10, At the entrance to Flea 

Market.

81,259.00

TN TN167 Construct and widen underpass at intersection of Boydstation, Harvey and 

McFee Roads in Knox County, Tennessee

396,023.12 TN167 Knox Co., TN, Resurfacing & Safety Improvements on SR‐62, From Texas 

Avenue to SR‐1

396,023.12

TN TN168 Construct SR‐1 (US‐70) to a four lane divided highway on new alignment 

from Centertown to McMinnville in Warren County, Tennessee

934,489.00 TN168 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐

24, Bridge over Caney Fork River.

934,489.00

TN TN169 Develop historic preservation transportation enhancement project in Sumner 

and surrounding Counties in Tennessee

108,159.00 TN169 Dekalb Co., TN, Br. Replacement advance construction conversion on SR‐56, 

Br. Ov Caney Fork River

108,159.00

TN TN170 Develop trails, bike paths and recreational facilities on the Crest of Black 

Mountain for Cumberland Trail State Park in Cumberland County, Tennessee

186,295.00 TN170 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of 

Westchester Dr./Catoosa Blvd.

186,295.00

TN TN172 Improving vehicle efficiencies at highway At‐Grade railroad crossing in 

Loudon, Loudon County, Tennessee

45,666.80 TN172 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike

45,666.80

TN TN173 Plan and construct a bicycle and pedestrian trail in Eagleville, in Rutherford 

County, Tennessee

160,236.00 TN173 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐50, From SR‐273 

to SR‐10 in Fayetteville

160,236.00

TN TN174 Continue Shelby Avenue ‐ Demonbreun Street project in Nashville, Tennessee 528,190.00 TN174 Marshall‐Maury Cos., TN, Br. Replacement Adv. Const. conversion on SR‐106, 

Br. Ov Duck River

528,190.00

TN TN176 Plan and Construct a Bicycle and Pedestrian Trail, Cannon County. 80,118.00 TN176 Cannon County, Tennessee, Resurfacing & Safety Improvements on SR‐281, 

From west of SR‐1 to SR‐146.

80,118.00

TN TN178 Construct streetscape improvements near TN. Theater in Knoxville, 

Tennessee

162,521.00 TN178 Knox Co., TN, Intersection Improvement on SR‐169, At Weisgarber Road. 162,521.00

7,210,620.00Engineer, design and construction of connector road from I‐75 interchange 

across Enterprise South Industrial Park to SR‐58 in Hamilton County, 

Tennessee.

TN156TN

14

Page 142: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description Amount

ToFrom

TN TN179 SR‐35 near SR‐449 intersection in Sevier County, Tennessee 801,180.00 TN179 Sevier Co., TN,  Resurfacing & Safety improvement on SR‐35, from near 

Foothills Drive to Fred king lane.

801,180.00

TN TN180 Improving vehicle efficiencies at At‐Grade highway railroad crossing in 

Loudon, Tennessee

45,666.80 TN180 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 45,666.80

TN TN183 Improve streetscape and pavement repair in Loudon County, Tennessee 24,378.00 TN183 Knox Co., TN, Safety Improvements on SR‐33, From near Edington Road to 

near Doyle Street.

24,378.00

TN TN186 Replace Unitia Bridge in Loudon County, Tennessee 73,134.00 TN186 Loudon Co., TN, Resurfacing & Safety Improvements on SR‐95, From SR‐33 to 

SR‐73

73,134.00

TN TN187 Highway railroad crossing grade improvement in Bristol (USDOT #731120J), 

Sullivan County, Tennessee.

80,118.00 TN187 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93 

to SR‐36.

80,118.00

TN TN188 Improving vehicle efficiencies at At‐Grade highway railroad crossings in 

Niota, Tennessee

79,316.60 TN188 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd 

Road.

79,316.60

TN TN189 Develop trails, bike paths and recreational facilities on Brady Mountain for 

Cumberland Trail State Park in Cumberland County, Tennessee

186,295.00 TN189 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of 

Westchester Dr./Catoosa Blvd.

186,295.00

TN TN190 Plan and construct a bicycle and pedestrian trail in Shelbyville, Tennessee 300,236.71 TN190 Williamson Co., TN, Intersection Improvement on SR‐11, At SR‐96. 300,236.71

TN TN191 Upgrade lights/gates/sensor controlling circuitry at the hwy. rail grade 

crossing located on Wenasoga Road/FAS8224 in Middleton, in Hardeman 

County, Tennessee.

160,236.00 TN191 Hardeman Co., TN, Safety Improvements on SR‐15, From Tate Road to Polk 

Street in Bolivar

160,236.00

TN TN192 Design, purchase land and construct sound walls along west side of I‐65 from 

approximately 950' south of Harding Place interchange south to Hogan Road 

in Davidson County, Tennessee

664,979.00 TN192 Rutherford Co., TN, Interchange improvements on SR‐96, At the I‐24 

Westbound Exit Ramp

664,979.00

TN TN194 Construct system of greenways in Nashville, Tennessee 90,289.63 TN194 Rutherford Co., TN, Interchange improvements on SR‐96, At the I‐24 

Westbound Exit Ramp

90,289.63

TN TN195 Improve existing two lane highway to a five lane facility on SR‐53, From south 

of I‐24 to near Parks Creek Road in Coffee County, Tennessee.

446,930.00 TN195 Coffee County, Tennessee, Resurfacing & Safety Improvements on SR‐16, 

From east of SR‐269 to SR‐130/SR‐55.

446,930.00

TN197 Sevier Co., TN, Intersection Improvement on SR‐338 at Pitner Road. 320,000.00TN197 Loudon Co., TN, Resurfacing & Safety Improvements on SR‐95, From SR‐33 to 

SR‐73.

1,157,599.80

TN197 McMinn Co., TN, Safety Improvements on SR‐30, From Denso Drive to Park 

Street.

320,000.00

TN197 Knox Co., TN, Resurfacing & Safety Improvements on SR‐1, From Towanda 

Trail (Sequoya Hills) to SR‐158.

256,147.79

TN199 Monroe Co., TN, Resurfacing & Safety Improvements on SR‐33, From Ramp 

at Warren Street to Stinnett Ridge Road

576,800.00

TN199 Blount Co., TN, Intersection Improvement on SR‐115, At Louisville Road 235,800.00TN TN201 North Second Street Corridor Upgrade in Memphis, Tennessee 10,014,750.00 TN201 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to 

SR‐385 (Paul Barrett Parkway)

10,014,750.00

TN TN205 Plan and construct Rutherford County Visitor's Center/Transportation 

Information Hub in Murfreesboro, Tennessee

315,844.96 TN205 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐15, From SR‐244 

to east of Old Bethel Road

315,844.96

TN TN206 Reconstruct Hermitage Avenue and pedestrian connection in Davidson 

County, Tennessee

569,290.65 TN206 Montgomery Co., TN, Intersection improvement on SR‐76, At Fire Station 

Road/Vaughn Road in Clarksville.

569,290.65

TN TN208 Plough Boulevard Interchange with Winchester Road in Memphis, Tennessee 2,503,688.00 TN208 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to 

SR‐385 (Paul Barrett Parkway)

2,503,688.00

TN TN210 Construct visitor interpretive center at the Gray Fossil Site in Gray, 

Tennessee.

182,835.00 TN210 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93 

to SR‐36.

182,835.00

2,053,747.79University of Tennessee Joint Institute for Advanced Materials in Knoxville, 

Tennessee.

TN197TN

TN199TN 812,600.00College Street Corridor, Phase II, Great Smoky Mountains Heritage Hwy. 

Cultural & Visitors Center in Maryville, Tennessee

15

Page 143: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description Amount

ToFrom

TN215 Montgomery Co., TN, Resurfacing & Safety Improvements on SR‐76, From SR‐

374 to SR‐12

935,370.00

TN215 Cheatham Co., TN, Resurfacing & Safety Improvements on SR‐12, From SR‐

455 to Bruce Bradley Road

834,981.00

TN215 Robertson Co., TN, Resurfacing & Safety Improvements on SR‐161, From SR‐

25 to the Kentucky State line

432,894.00

TN TN218 Warren County Mountain View Industrial Park Access Road in Warren 

County, Tennessee

341,207.01 TN218 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐

24, Bridge over Caney Fork River.

341,207.01

TN TN221 Construct interpretive visitor center for the Cherokee Removal Memorial 

Park Trail of Tears site in Meigs County, Tennessee

56,937.52 TN221 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 56,937.52

TN222 Campbell Co., TN, Resurfacing & Safety Improvements on SR‐9, From Stinking 

Creek Road to Duff Road

617,820.00

TN222 McMinn Co., TN, Resurfacing & Safety Improvements on SR‐305, From SR‐30 

to SR‐2

472,968.37

TN TN225 Construct the Melton Lake Greenway in Oak Ridge, Anderson County, 

Tennessee.

66,025.00 TN225 Blount County, Tennessee, Resurfacing & Safety Improvements on SR‐35, 

From SR‐115 to north of Ellis Road.

66,025.00

TN TN230 Acquire and construct trail and bikeway along South Chickamauga Creek in 

Chattanooga, Tennessee

50,787.00 TN230 Hamilton Co., TN Resurfacing and Safety improvement on SR‐153, From S of 

SR‐319 underpass to N. of Grubb Road

50,787.00

TN TN233 Improve streetscape and pavement repair in Maury County, Tennessee 500,738.00 TN233 Williamson Co., TN, Resurface. & Safety Imp. on SR‐6, From Maury CoL to N. 

of Thompsons Ridge Road/Buckner Road

500,738.00

TN TN234 Improve streetscape and pavement repair in Lincoln County, Tennessee. 50,787.00 TN234 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐50, From SR‐273 

to SR‐10 in Fayetteville.

50,787.00

TN TN236 Improve streetscape and pavement repair in Smith County, Tennessee. 245,769.95 TN236 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐

24, Bridge over Caney Fork River.

245,769.95

TN237 Humphreys Co., TN, Safety Imp. on SR‐1 & E. Railroad Rd., At Clydeton Rd., N. 

Cooley Ave., N. Powers Blvd. in Waverly

194,734.00

TN237 Carroll Co., TN, Bridge Replacement on SR‐424, Bridge over Roan Creek at LM 

11.61.

306,004.00

TN TN240 Replace Unitia Bridge in Loudon County, Tennessee 20,315.00 TN240 Loudon Co, TN, Resurfacing and Safety Improvement on SR‐95. From SR‐33‐

to SR‐73

20,315.00

TN TN247 Construct Transportation and Heritage Museum in Townsend, Blount County, 

Tennessee.

50,630.58 TN247 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old 

Knoxville Pike.

50,630.58

TN TN248 Plan and construct access road for the Overton County Industrial Park in 

Overton County, Tennessee

300,442.00 TN248 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐

24, Bridge over Caney Fork River.

300,442.00

TN TN249 Construct system of greenways in Nashville, Tennessee 243,822.99 TN249 Williamson Co., TN, Resurfacing & Safety Improvements on SR‐397, From SR‐

6 to SR‐96 in Franklin.

243,822.99

TN TN250 Improve streetscape and pavement repair in Roane County, Tennessee. 203,059.28 TN250 Meigs Co., TN, Resurfacing & Safety Imp. on SR‐60, From the Hamilton 

County line to Horner Hollow Road

203,059.28

TN TN252 Improve streetscape and pavement repair in Morgan County, Tennessee 142,227.08 TN252 Fentress Co., TN, Resurfacing & Safety Improvements on SR‐28, From N. of 

Old SR‐28 to S. of Bridge over Dry Branch

142,227.08

TN TN253 Improve streetscape and pavement repair in Fentress County, Tennessee 50,787.00 TN253 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of 

Old Kentucky Road to Hitchcock Drive

50,787.00

TN215TN 2,203,245.00Develop intelligent transportation signage for access points at Fort Campbell 

in Tennessee

1,090,788.37Construct overpass at Highway 321 and Highway 11 in Loudon County, 

Tennessee

TN222TN

500,738.00Improve Streetscape and Pavement Repair in Henry County, Tennessee.TN237TN

16

Page 144: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Tennessee

State Demo ID Project Description Amount  Demo ID Project Description Amount

ToFrom

TN254 Williamson Co., Resurface. & Safety Imp. on SR‐6, From N. of Thompsons 

Ridge Road/Buckner Road to S. of SR‐840

535,200.00

TN254 Davidson Co., Resurface. & Safety Imp. on SR‐45, From SR‐24 to N. of ramp 

from I‐40 EB

1,176,000.00

TN254 Sumner Co., Resurface. & Safety Imp. on SR‐25, From Halltown Road to West 

of Bradford Drive

734,400.00

TN254 Cannon Co., Resurface. & Safety Imp. On SR‐145, From SR‐1 to N. of Locke 

Creek Road overpass

300,000.00

TN254 Smith Co., Bridge Replacement Advance Construction Conversion on SR‐24, 

Bridge over Caney Fork River

3,263,250.00

TN255 Blount Co., TN, Intersection improvement on SR‐115, At SR‐73 (US‐321, W. 

Lamar Alexander Pkwy.)

1,120,000.00

TN255 Knox Co., TN, SR‐115, Widening of SR‐115, From Woodson Drive to Cherokee 

Trail Interchange

4,888,850.00

TN TN256 North Second Street Corridor Upgrade in Memphis, Tennessee 2,004,683.00 TN256 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to 

SR‐385 (Paul Barrett Parkway)

2,004,683.00

TN TN258 Plan and construct Rutherford County Visitor's Center/Transportation 

Information Hub in Murfreesboro, Tennessee

453,260.80 TN258 Rutherford Co., TN, Resurfacing & Safety Improvements on SR‐266, From 

Nolan Drive to SR‐102

453,260.80

TN TN259 Warren County Mountain View Industrial Park Access Road in Warren 

County, Tennessee

1,002,341.00 TN259 Dekalb Co., TN, Br. Replacement Advance Const. conversion on SR‐56, Br. Ov 

Caney Fork River

1,002,341.00

TN TN264 Construct Transportation and Heritage Museum in Townsend, Tennessee. 48,102.00 TN264 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to 

north of Ellis Avenue.

48,102.00

Total Amount Repurposed 74,090,597.57Total # of Earmarks Repurposed 99

6,008,850.00Improvements to the Blount/Sevier Corridor in Knoxville to support the South 

Waterfront Redevelopment project in Knox County, Tennessee

TN255TN

6,008,850.00Street improvements, streetscape features, signals & signage along 3rd 

Avenue North & Union Street in Nashville, Tennessee

TN254TN

17

Page 145: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Vermont

State Demo ID Project Description Amount  Project Description Amount

VT VT001 Vermont Certification of State Procedures Demo 9.24 Essex Junction STP 2956(1) 9.24

VT VT008 Construction of, and improvements to, Route 2 between St. Johnsbury, 

Vermont and the New Hampshire State Line

1,397.56 St. Johnsbury BRO 1447(30) 1,397.56

VT VT010 Marsh‐Billings‐Rockefeller Park Pedestrian Walkway, Vermont 297.02 Rockingham ‐ Clarendon NH SURF (49) 297.02

VT VT015 Vermont Covered Bridges 54,882.26 Rockingham‐Clarendon NH SURF(49) 54,882.26

VT VT018 Vermont Police and Fire Academy Training Skid Pad 1,396.51 Rockingham‐Clarendon NH SURF(49) 1,396.51

VT VT028 Pearl Street Bridge, Johnson 122,373.03 Montgomery BHO 1448(42) 122,373.03

VT VT029 Church Street improvements in Burlington 608,236.69 Burlington MEGC M 5000(1) 608,236.69

VT VT032 Essex Junction Downtown Transportation Improvements 151,475.00 Essex Junction STP 2956(1) 151,475.00

Jay BHF 0278(3) 950,000.00

St. Johnsbury BF 7000(20) 1,650,000.00

Johnson BF 0248(4) 1,550,000.00

Johnson BF 0248(7) 950,000.00

St. Johnsbury BRO 1447(30) 521,459.38

VT VT038 St. Lawrence and Atlantic Railroad Upgrades in Northeastern Vermont 507,876.00 St. Johnsbury BRO 1447(30) 507,876.00

VT VT047 Transportation Improvements to Bellows Falls Tunnel 342,954.16 Rockingham‐Clarendon NH SURF(49) 342,954.16

VT VT054 Improvements to the E. Alburg Railroad Trestle Swing Span 481,012.00 Georgia IM CULV(25) 481,012.00

VT VT055 Rehabilitation of Hartford Northbound and Southbound rest areas 223,947.00 Rockingham‐Clarendon NH SURF(49) 223,947.00

VT VT061 Streetscape and road improvements in the Village of Enosburg Falls 102,341.98 Georgia IM CULV (25) 102,341.98

To

5,621,459.38I‐91 Reconstruction at Derby Line, VT Port of Entry.VT034VT

From

18

Page 146: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

Vermont

State Demo ID Project Description Amount  Project Description Amount

ToFrom

VT VT062 Signalization and storm drainage improvements to Main Street in Brattleboro 452,229.98 Rockingham‐Clarendon NH SURF(49) 452,229.98

Total Amount Repurposed 8,671,887.81

Total # of Earmarks Repurposed 15

19

Page 147: U.S. Department of Transportation Federal Highway ...€¦ · U.S. Department of Transportation Federal Highway Administration Report to Congress Repurposed Earmark Submissions

Repurposed Earmarks 

FY 2016 3rd Quarter Report to Congress

West Virginia

State Demo ID Project Description Amount  Project Description Amount

WV WV036 US Route 33, West Virginia 450,054.00 Pendleton County, WV. US33, resurfacing, Bennett Gap‐Roots Run, CR5/6‐

CR9/5 STP‐0033(389)

450,054.00

WV WV037 US Route 220 Upgrade‐Pendleton county, West Virginia 127,168.00 Pendleton County, WV. US33, resurfacing, Bennett Gap‐Roots Run, CR5/6‐

CR9/5 STP‐0033(389)

127,168.00

Total Amount Repurposed 577,222.00Total # of Earmarks Repurposed 2

ToFrom

20