12
OP- Navigation.ppt 1 U.S Army Corps of U.S Army Corps of Engineers Engineers Savannah District Savannah District

U.S Army Corps of Engineers Savannah District

  • Upload
    gabby

  • View
    70

  • Download
    1

Embed Size (px)

DESCRIPTION

U.S Army Corps of Engineers Savannah District. Civil Works & Navigation Boundaries. SC. Savannah R. ATLANTIC OCEAN. GA. Savannah Harbor. AIWW. Brunswick Harbor. St. Mary’s R. Navigation Projects. Sav’h Harbor 32.5 Miles AIWW 161 Miles Brunswick 24 Miles Total 217.5 Miles. - PowerPoint PPT Presentation

Citation preview

Page 1: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 1

U.S Army Corps of U.S Army Corps of EngineersEngineers

Savannah DistrictSavannah District

Page 2: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 2

SCSC

GAGA

ATLANTIC O

CEAN

Savannah R

.

St. Mary’s R.St. Mary’s R.

Savannah HarborSavannah Harbor

Brunswick Brunswick HarborHarbor

AIWWAIWW

Civil Works & NavigationCivil Works & Navigation BoundariesBoundaries

Page 3: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 3

Sav’h HarborSav’h Harbor 32.5 Miles32.5 Miles

AIWWAIWW 161 Miles161 Miles

Brunswick Brunswick 24 Miles24 Miles

TotalTotal 217.5 Miles217.5 Miles

Navigation ProjectsNavigation Projects

Page 4: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 4

ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor

FY07 Savannah &FY07 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl

Brunswick Deepening Brunswick Deepening Sta 20 to 46, E. River to 36 ft. Sta 20 to 46, E. River to 36 ft.

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Sea Turtles-screens & observersSea Turtles-screens & observers

Striped bass spawningStriped bass spawning

Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging

Est. 5,180K CYEst. 5,180K CY

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeNew Work DredgingNew Work Dredging

BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY

Est. 5,063K CYEst. 5,063K CY

BOBO99

BOBO1515

Page 5: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 5

Savannah DistrictSavannah District

FY 07 Hopper Dredge ProgramFY 07 Hopper Dredge Program

Page 6: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 6

ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

FY07 Savannah &FY07 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Sea Turtles-screens & observersSea Turtles-screens & observers

Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging

BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY

BOBO99

Page 7: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 7

Savannah DistrictSavannah District

Project: Savannah Entrance ChannelProject: Savannah Entrance Channel Type of work: MaintenanceType of work: Maintenance Depth: 42/44 ftDepth: 42/44 ft Width: 600 ftWidth: 600 ft Length: 11.4 milesLength: 11.4 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: sand/silt/clayType of Material: sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean

site and near shore sitessite and near shore sites Distance to Placement Area: up to 11.5 Distance to Placement Area: up to 11.5

milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: Dec 15- March Environmental Window: Dec 15- March

3131 Reason for Window: Right Whales and Reason for Window: Right Whales and

Sea TurtlesSea Turtles

Page 8: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 8

Savannah DistrictSavannah District

Project: Brunswick Entrance ChannelProject: Brunswick Entrance Channel Type Work: MaintenanceType Work: Maintenance Depth: 32/36/38 feetDepth: 32/36/38 feet Width: 500 feetWidth: 500 feet Length: 16.8 milesLength: 16.8 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean

site and near shore sitessite and near shore sites Distance to Placement Area: up to 19 Distance to Placement Area: up to 19

milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: 15 Dec-13 Environmental Window: 15 Dec-13

MarchMarch Reason for Window: Right Whales and Reason for Window: Right Whales and

Sea TurtlesSea Turtles

Page 9: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 9

Savannah DistrictSavannah District

FY07 Hydraulic Cutter Head FY07 Hydraulic Cutter Head Dredge ProgramDredge Program

Page 10: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 10

ScheduledScheduled FY07 Dredging Work in FY07 Dredging Work in Savannah District Savannah District

South Atlantic DivisionSouth Atlantic Division

Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor

Brunswick Deepening Brunswick Deepening Sta 20 to 46, E. River to 36 ft. Sta 20 to 46, E. River to 36 ft.

OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP

Striped bass spawningStriped bass spawning

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging

Est. 5,180K CYEst. 5,180K CY

Hydraulic Pipeline DredgeHydraulic Pipeline DredgeNew Work DredgingNew Work Dredging

Est. 5,063K CYEst. 5,063K CY

BOBO1515

Page 11: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 11

Savannah DistrictSavannah District Project: Savannah & Brunswick Inner Project: Savannah & Brunswick Inner

HarborsHarbors Type of work: MaintenanceType of work: Maintenance Depth: (SH)40/46 ft, (BH)30/36 ftDepth: (SH)40/46 ft, (BH)30/36 ft Width: (SH)500 ft, (BH)350/400 ftWidth: (SH)500 ft, (BH)350/400 ft Length: (SH)21.3 miles, (BH)3 milesLength: (SH)21.3 miles, (BH)3 miles Quantity: 5.2 mcyQuantity: 5.2 mcy Type of Material: sand/silt/mudType of Material: sand/silt/mud Placement Area: Upland placement Placement Area: Upland placement

sitessites Distance to Placement Area: up to 2 Distance to Placement Area: up to 2

milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic

cutterhead pipelinecutterhead pipeline Small Business Set Aside: YesSmall Business Set Aside: Yes Last Dredged: FY06Last Dredged: FY06 Environmental Window: (SH) March 15-Environmental Window: (SH) March 15-

May 30 (above Station 63+000) (BH)April May 30 (above Station 63+000) (BH)April 1-August 11-August 1

Reason for Window: (SH)Striped Bass Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nestingSpawning (BH) Least tern nesting

Page 12: U.S Army Corps of  Engineers Savannah District

OP-Navigation.ppt 12

Savannah DistrictSavannah District

Project: Brunswick Deepening Inner Project: Brunswick Deepening Inner HarborHarbor

Type Work: UnclassifiedType Work: Unclassified Depth: 36 feetDepth: 36 feet Width: 400 feetWidth: 400 feet Length: 12.3 milesLength: 12.3 miles Quantity: 8.0 MCYQuantity: 8.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: New Bird Island & Placement Areas: New Bird Island &

Andrews IslandAndrews Island Distance to Placement Area: up to 5 Distance to Placement Area: up to 5

milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic

cutterhead pipeline cutterhead pipeline Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: N/ALast Dredged: N/A Environmental Window: NoneEnvironmental Window: None Reason for Window: N/AReason for Window: N/A