Upload
sheena-karen-mcdonald
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
US Army Corpsof Engineers
CERP Guidance MemorandumCERP Guidance Memorandum
Recreation and Public UsePlanningRecreation and Public UsePlanning
CERP Goals and ObjectivesCERP Goals and Objectives
Goal: Enhance Ecological Values Increase the total spatial extent of natural areas Improve habitat and functional quality Improve native plant and animal species
abundance and diversity
Goal: Enhance Economic Values And Social Well Being Increase availability of fresh water Reduce flood damages (agricultural/urban) Provide recreational and navigation opportunities Protect cultural and archeological resources and
values
Goal: Enhance Ecological Values Increase the total spatial extent of natural areas Improve habitat and functional quality Improve native plant and animal species
abundance and diversity
Goal: Enhance Economic Values And Social Well Being Increase availability of fresh water Reduce flood damages (agricultural/urban) Provide recreational and navigation opportunities Protect cultural and archeological resources and
values
DESCRIPTIONDESCRIPTION
Provides Guidance to Project Delivery Teams for: Evaluating impacts of alternative designs
on existing recreation and public use
Evaluating new public use and recreation opportunities for potential inclusion in project designs
Provides Guidance to Project Delivery Teams for: Evaluating impacts of alternative designs
on existing recreation and public use
Evaluating new public use and recreation opportunities for potential inclusion in project designs
GUIDANCEGUIDANCE
Current list of topics
Philosophy and Checklist
Minimum Design Considerations
Evaluation of Project Impacts
Interaction Between Teams
Current list of topics
Philosophy and Checklist
Minimum Design Considerations
Evaluation of Project Impacts
Interaction Between Teams
GUIDANCE -Philosophy and ChecklistGUIDANCE -Philosophy and Checklist
Include statement that, where possible, Project Delivery Teams should :
Attempt to minimize negative impacts on existing public use and recreation
Attempt to provide new public use and recreation opportunities
Summarize guidance from Corps Engineering Regulation ER-1105-2-100
Include checklist of cost-sharable recreation/public use features
Include statement that, where possible, Project Delivery Teams should :
Attempt to minimize negative impacts on existing public use and recreation
Attempt to provide new public use and recreation opportunities
Summarize guidance from Corps Engineering Regulation ER-1105-2-100
Include checklist of cost-sharable recreation/public use features
GUIDANCE -Minimum Design Considerations
GUIDANCE -Minimum Design Considerations
General Criteria
American with Disabilities Accessible
Threatened and endangered species
Compatibility with project purposes, goals and objectives
General Criteria
American with Disabilities Accessible
Threatened and endangered species
Compatibility with project purposes, goals and objectives
GUIDANCE -Minimum Design Considerations
GUIDANCE -Minimum Design Considerations
Feature specific design criteria for:
Bird watching Canoe/KayakingPicnicking HikingNature/Interpretive Trails BicyclingEquestrian Trails Off-Road BikingBoat Ramps Bank FishingHunting FroggingCamping AirboatingOff-Road Vehicles SoccerFootball Skeet shootingRifle Ranges Archery
Feature specific design criteria for:
Bird watching Canoe/KayakingPicnicking HikingNature/Interpretive Trails BicyclingEquestrian Trails Off-Road BikingBoat Ramps Bank FishingHunting FroggingCamping AirboatingOff-Road Vehicles SoccerFootball Skeet shootingRifle Ranges Archery
GUIDANCE -Evaluation of Project Impacts
GUIDANCE -Evaluation of Project Impacts
Recreation Planning Team: Regional inventory of existing public use and
recreation opportunities Regional evaluation of CERP project impacts
and opportunities
Project Delivery Teams - Project Specific Evaluations: Baseline Assessment of existing public access
in project area Effects of Alternative Designs Compensation Proposals
Recreation Planning Team: Regional inventory of existing public use and
recreation opportunities Regional evaluation of CERP project impacts
and opportunities
Project Delivery Teams - Project Specific Evaluations: Baseline Assessment of existing public access
in project area Effects of Alternative Designs Compensation Proposals
GUIDANCE -Interaction Between TeamsGUIDANCE -Interaction Between Teams
Describe and differentiate between roles of the following teams:
Recreation Planning Team
Project Delivery Teams
Recreation Sub-Team of the RECOVER Regional Evaluation Team
Describe and differentiate between roles of the following teams:
Recreation Planning Team
Project Delivery Teams
Recreation Sub-Team of the RECOVER Regional Evaluation Team
APPLICATIONAPPLICATION
Primary application is for the plan formulation phase: Project Implementation Reports
Feasibility Reports
May also be applicable for detailed design phase
Primary application is for the plan formulation phase: Project Implementation Reports
Feasibility Reports
May also be applicable for detailed design phase
Schedule for DevelopmentSchedule for Development
Draft guidance memo for Regional Planning Team review in October
Draft guidance memo for Corps and SFWMD internal review in November
Final guidance memo for CERP Program Manager approval in December
Draft guidance memo for Regional Planning Team review in October
Draft guidance memo for Corps and SFWMD internal review in November
Final guidance memo for CERP Program Manager approval in December