US Army Corps of Engineers

BUILDING STRONG®

Submitting a Local Adaptation

USACE SDSFIE Training

Prerequisites: Creating the local adaptation

Page 2: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Video sequence

2 of 28

Page 3: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Objectives

Describe the adaptation submission package

Describe the adaptation submission process

Describe the adaptation approval process

3 of 28

Page 4: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

THE ADAPTATION SUBMISSION PACKAGE

4 of 28

Page 5: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Creating the submission package

Export an XML workspace schema from the geodatabase of your adaptation

Create the submission package►The XML workspace schema file►The data dictionary of your adaptation►The spreadsheet file containing your

justifications for profiled elements and extensions

5 of 28

Page 6: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

6 of 28

Right click on geodatabase Select Export Select XML Workspace

Document In options GUI that appears:

► specify Schema Only► uncheck Export Metadata box► Click the folder icon to

“Specify output XML file” location

► In the “Save As” window:• Navigate to the file location

and type in the file name

• Click the Save button

► Press the Next button Press the Finish button Refresh the specified folder

location to see the XML file

Page 7: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps Right click on geodatabase

7 of 28

Page 8: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

8 of 28

Select Export

Page 9: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

9 of 28

Select XML Workspace Document

Page 10: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

10 of 28

In options GUI that appears:► Specify Schema Only

Page 11: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

11 of 28

In options GUI that appears:

► Uncheck Export Metadata

Page 12: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

12 of 28

In options GUI that appears:

► Click the folder icon to “Specify output XML file” location

Page 13: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

13 of 28

► In the “Save As” window:

• Click the Save button

• Navigate to the file location and type in the file name

Page 14: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

14 of 28

► Press the Next button

Page 15: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

15 of 28

Press the Finish button

Page 16: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Export Steps

16 of 28

Refresh the specified folder location to see the XML file

Page 17: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Create files for submission

SDSFIE web site workflow requires two files►XML workspace file►Documentation files

Both files must be in compressed or zipped format

17 of 28

Page 18: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

THE ADAPTATION SUBMISSION PROCESS

18 of 28

Page 19: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Submission adaptation

19 of 28

Page 20: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Submission part 1

20 of 28

Page 21: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Submission part 2

21 of 28

Page 22: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

THE ADAPTATION APPROVAL PROCESS

22 of 28

Page 23: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Review process overview

23 of 28

Page 24: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Review by the PDT

Review the adaptation package►Validate completeness of submission package►Validate compliance to adaptation policy►Validate uniqueness of adaptation extensions►Validate model & adaptation enumerations

Makes recommendation to the USACE GIS Coordinator

24 of 28

Page 25: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

USACE GIS Coordinator action

Receive PDT recommendation Review PDT findings and adaptation

submission Render approval action

►Approval►Deny approval

Notify USACE office of action

25 of 28

Page 26: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

SDSFIE web site action

Receives notification of adaptation approval

Opens the adaptation for use on the SDSFIE workflows►Validates adaptation contents in the SDSFIE

repository►Validates operation of the adaptation in the

SDSFIE workflows

26 of 28

Page 27: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Review

Describe the contents of an adaptation submission package

Describe the adaptation submission process

Describe the adaptation approval process

27 of 28

Page 28: US Army Corps of Engineers BUILDING STRONG ® Submitting a Local Adaptation USACE SDSFIE Training Prerequisites: Creating the local adaptation

BUILDING STRONG®

Next Steps

Video that should be seen next is►Registering a local adaptation

Contact [email protected] with comments or additional information