US 97 Bend North Corridor ProjectFinal Environmental Impact Statement and Final Section 4(f ) Evaluation
July 2014
Federal-Aid Number: S004(112) • ODOT Key Number: 14020 • FHWA-OR-EIS-14-01-F
FHWA-OR-EIS-14-01-F
US 97 Bend North Corridor Project Deschutes County, Oregon ODOT Key Number: 14020
Federal Aid Number: S004(112) Final Environmental Impact Statement
and Final Section 4(f) Evaluation
Submitted Pursuant to 42 USC 4332 (2)(c) and where applicable, 49 USC 303 by US Department of Transportation, Federal Highway Administration (FHWA)
and Oregon Department of Transportation (ODOT)
Robert Bryant, ODOT Region 4 Manager Phillip A. Ditzler, FHWA Division Administrator
Date of Approval Date of Approval
The following persons may be contacted for additional information concerning this document:
Amy Pfeiffer ODOT Region 4 63055 N Highway 97, Bldg M Bend, OR 97701 (541) 388-6052
Anthony Boesen FHWA 530 Center Street NE, Suite 420 Salem, Oregon 97301 (503) 399-5749
The Oregon Department of Transportation (ODOT) and Federal Highway Administration (FHWA) plan to improve a segment of US 97 in Deschutes County, Oregon between the Deschutes Market Road/Tumalo Junction interchange and the Empire Avenue interchange. A Draft Environmental Impact Statement (EIS) for the US 97 Bend North Corridor Project was published in July 2011. The Preferred Alternative for the project is an approximately two-mile, access-controlled, four-lane bypass, expressway on a new alignment.
The Preferred Alternative will reroute US 97, from Empire Avenue to just north of Grandview Drive, east of its current alignment, adjacent to the existing railroad tracks. For this segment, the current US 97 roadway would become an extension of 3rd Street and local arterial. A new signalized intersection with US 97 and 3rd Street will be constructed at the northern end of the bypass. The project will reduce traffic congestion, improve traffic flow, and enhance public safety on US 97 between the Deschutes Market Road/Tumalo Junction interchange and the Empire Avenue interchange. Adverse impacts from the project will include the conversion of 82 acres of land to highway use; displacement of 44 businesses and 6 residences; relocation or removal of 1 historic resource; creation of 39 acres of new impervious surfaces while 95 acres of contributing impervious area will be treated; noise impacts to 55 residences and outdoor areas at 4 businesses that will not be abated; while noise abatement will be considered in final design for 12 residences that are noise impacted.
Total project construction cost for the Preferred Alternative is approximately $174 million in 2016 dollars, of which estimated right of way costs are approximately $74 million. The project will be constructed in phases. Specific phases have not yet been identified. Construction is planned to begin in 2016.
TO THOSE WHO HAVE EXPRESSED INTEREST IN THE:
US 97 Bend North Corridor Project Final Environmental Impact Statement and
Final Section 4(f) Evaluation Deschutes County, Oregon ODOT Key Number: 14020
Federal Aid Number: S004(112)
Thank you for your interest in the proposed US 97 Bend North Corridor Project.
The Federal Highway Administration (FHWA) and Oregon Department of Transportation (ODOT) have completed the Final Environmental Impact Statement (EIS) and Final Section 4(f) Evaluation for the project.
If you have questions or need additional information concerning the proposed project, please contact Amy Pfeiffer, ODOT Environmental Project Manager at: (541) 388-6052.
Thank you for your participation,
Robert Bryant
ODOT Region 4 Manager
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-2 | July 2014 US 97 Bend North Corridor Project
Executive Summary
This Executive Summary provides an overview of the project and its potential impacts. The US 97 North Bend Corridor Project Final EIS provides the information in greater detail.
ES.1 Proposed Action
ES.1.1 Project Identification and Description
US 97 is a strategic north-south highway that runs through the central portion of the state and complements the I-5 corridor, as shown in Exhibit ES1. It is designated as a statewide facility and freight route on the National Highway System, and as an expressway from the south end of the City of Redmond through Bend. US 97 is a critical link in moving goods and people through Central Oregon. In the Bend area, US 97 is used as a route for local residents to travel to and from home and work, and it is a connection to area shopping, dining, businesses, schools and recreation. Bend and Central Oregon have experienced significant population growth over the past decade. Between April 2000 and July 2006, Bend was the fourth-fastest growing metropolitan area in the United States (US Census Bureau 2007), although the recent economic downturn has slowed development in Bend over the last five years. Bend’s population growth, in combination with US 97 also serving as a regional facility that moves freight and traffic through the region, has led to an increase in traffic congestion and delay, disruptions in traffic flow, and an increase in the severity of vehicular crashes along US 97.
The Oregon Department of Transportation (ODOT) and Federal Highway Administration (FHWA) propose to improve an approximate 6-mile corridor on US 97 in Deschutes County, Oregon between the Deschutes Market Road/Tumalo Junction interchange and the Empire Avenue interchange to address congestion, traffic flow, and safety on this highway corridor. Exhibit ES-2 summarizes the proposed action’s location, funding, length, and project type.
This Draft Environmental Impact Statement (EIS) was prepared to analyze the environmental impacts of the proposed action.
This Final EIS documents all of the alternatives considered during the development and narrowing of alternatives. The Preferred Alternative includes modifications to the East DS2 Alternative, in response to comments received on the Draft EIS. The Draft EIS was published in July 2011 and circulated for public comment, including a public hearing. This Final EIS discloses the beneficial and adverse impacts resulting from the Preferred Alternative, identifies the Preferred Alternative, and responds to public and agency comments submitted on the Draft EIS.
DefinitionPractical Design
Practical design is a strategy to deliver focused benefits for the State’s transpor-tation system while working with the realities of a fiscally constrained funding environment.
DefinitionsArea of Potential Impact
The area of potential impact (API) is the area within which potential direct impacts from the proposed action may occur.Public Approach Road
Public approach road is an existing or planned city street or county road con-nection that provides vehicular access to and from a highway.Private Driveway
Private driveway is an approach that serves vehicular access to a roadway from one or more properties and that is not a public approach road.Peak Hour
A peak hour (or rush hour) is a part of the day with the highest traffic volume during which traffic congestion on roads is worst. Normally, the two peak hour periods (morning and evening) occur when people are traveling to or from work or school. The 2007 evening peak hour in the API is 4:00 to 5:00 pm. By 2035, the peak period will likely spread across multiple hours.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-3
Executive Summary
Exhibit ES-1: Proposed Action Corridor
ES.1.2 Purpose of and Need for the Proposed Action
Purpose of the ProjectThe purpose of the proposed action is to improve safety and mobility for trucks and automobiles on US 97 by implementing a practical design solution that is affordable within the potential 20-year funding opportunities and that meets the following performance objectives for
Deschutes River
BNSF
Rail
way
Tumalo Rd
Cooley Rd
Robal Rd
Des
chut
es M
arke
t R
d
Empire Ave
Butler Market Rd
Boy
d A
cres
Rd
Ft Thompson Ln
97
20
97
20TO SISTERS
TO R
EDM
OND
OREGON
Bend
I-84
20
97
I-5
0 1.0
Miles
Roadway Highway ImprovementsWaterRailway
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-4 | July 2014 US 97 Bend North Corridor Project
Executive Summary
the medium-term (5-10 years) and long-term (over 10 years) planning periods as defined by the Bend Metropolitan Planning Organization’s 2007–2030 Metropolitan Transportation Plan. Performance objectives for the proposed action include:
■ Makes incremental improvements to reduce delay, congestion, and the number and severity of crashes at the US 97/Cooley Road and US 97/Robal Road intersections within the medium-term planning period
■ Reduces delay and congestion, and improves safety and operations on US 97 as an expressway between the Deschutes Market Road/Tumalo Junction interchange and Empire Avenue interchange
■ Supports economic development consistent with local agency plans; minimizes impacts to existing and planned local economic base; and provides for existing and planned local connectivity within the long-term planning period.
Exhibit ES-2: Summary of the Proposed Action
Project Name: US 97 Bend North Corridor Project
State: Oregon Southern Milepost: 136.33
County: Deschutes Northern Milepost: 130.18
City: Bend Project Length: 6 miles
ODOT Region: 4 Improvement Type: Highway realignment (modernization)
Highway/Roadway: US 97 Number of Proposed Travel Lanes on US 97: 4
Funding Source: FHWA and ODOT
Need for the ProjectThe proposed action is needed to address:
■ Congestion at Approaches—Peak hour traffic volumes on US 97 within the area of potential impact (API) are at or exceed capacity of the current highway facility. If nothing is done by 2035, US 97 and the surrounding roadway systems, would experience severe congestion at public road approaches and private driveways during peak travel hours.
Since the publication of the Draft EIS, the 2011 Amended Oregon Highway Plan was published in January 2012. For the urban expressway portion of US 97 located within the Bend Metropolitan Planning Organization boundary the 2011 Amended Oregon Highway Plan revised the mobility standard from a v/c ratio of 0.80 to a mobility target of 0.85. On April 17, 2013 the Oregon Transportation Commission reviewed the expressway designation of this section of US 97 and decided to retain the expressway designation.
In the Final EIS the years of analysis for the No Build Alternative and the Preferred Alternative have been updated from 2007 to 2011 for the existing conditions, 2016 for the estimated year of opening, and
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-5
Executive Summary
2036 for the future design year. Based on a trend analysis of traffic count data between 2007 and 2011, ODOT and the Bend Metropolitan Planning Organization determined that applying a 10 percent reduction to the 2007 existing traffic volumes would more accurately represent the future conditions (2036). This reduction in traffic volumes is reflective of the reduced population change in the Bend area between 2007 and 2011. This updated traffic analysis for the No Build Alternative demonstrates that if the longterm needs are not addressed, by 2036 US 97 and other roadway systems in the project’s area of potential impact (API) would experience severe congestion during peak hours of travel.
Traffic Flow within the Corridor—Traffic flow on US 97 in the API is interrupted and slowed, especially during peak hours. By 2035, average daily traffic in the API is estimated to grow by over 40 percent. If no improvements are made, by 2035 travel times would increase substantially, average travel speeds would be reduced to less than 2 miles per hour (mph) in some areas, and longer traffic queues would further reduce traffic flow.
The result of the traffic analysis for the No Build Alternative in the Final EIS was similar to that for the No Build Alternative in the Draft EIS. If no improvements are made to US 97, the future (2036) traffic flow on US 97 would experience extensive delay and queuing; travel time would increase substantially; and average travel speeds would be reduced to 5 mph.
Safety—The number of severe injury or fatal crashes has increased in the API over the past six years. Specifically, the intersections of US 97 with Cooley Road and with Robal Road are listed in the top 5 percent of ODOT’s 2010 Safety Priority Index System, which represents the locations with the highest collision history and ODOT’s highest priorities for safety improvements. Also, the existing public road approaches and private driveways along US 97 are spaced substantially closer than current applicable design standards would recommend, further contributing to the increased risk of crashes as drivers encounter unanticipated congestion upon entering the API.
In October 2011, the Oregon Transportation Commission approved the Transportation Safety Action Plan, an element of the Oregon Transportation Plan. This document also serves as the State of Oregon’s Strategic Highway Safety Plan, a document required by federal law. The Transportation Safety Action Plan envisions a future where Oregon’s transportation-related death and injury rate continues to decline.
The Updated Traffic Analysis Report prepared for the Final EIS includes an updated crash analysis and a new predictive analysis that identifies crash frequencies expected for the No Build and Preferred
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-6 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Alternatives. The updated traffic analysis shows that number of severe injury or fatal crashes in the API has remained relatively constant, with a spike in 2008. The US 97 at Robal Road intersection has consistently been in the top 5 percent of crash locations in the state, while the US 97 at Cooley Road intersection alternates between the top 10 percent and top 5 percent. The predictive crash analysis prepared for the Final EIS also identified safety issues on the current facility, particularly at the US 97 and Cooley Road and US 97 and Robal Road intersections.
ES.1.3 Background
Project stakeholders have consistently requested the transportation infrastructure improvements associated with the proposed action should be economically feasible and support economic development.
Ability to Implement the Proposed Action within the Medium-term and Long-term Planning Periods—Based on past experience and forecasts for Central Oregon, it is conceivable that the proposed action could receive up to $250 million over a 20 to 30 year timeframe. It is not reasonable to assume that such a significant amount of funding could be raised within the first 10 years. Therefore, the ability to make fundable improvements by 2020 is critical in order to begin to provide some congestion relief and improve traffic flow and safety.
Current and Future Economic Lands—The City of Bend has identified the economic lands between US 97 and US 20 as an important component to its current and future economic base. In this vicinity, land can be generally described as being inside the current urban growth boundary (UGB) or being inside a proposed expansion of the UGB that was approved by the Bend City Council on January 5, 2009. Minimizing impacts to these economic lands, such as avoiding the bisection of parcels greater than 5 acres in size, is a key factor in understanding economic impacts associated with the proposed action.
ES.2 Alternatives ConsideredFHWA and ODOT are considering three alternatives for the proposed action including two build alternatives and the No Build Alternative as required by the National Environmental Policy Act.
Based on the Draft EIS and comments received from agencies and the public, the East DS2 Alternative was modified to minimize impacts to neighborhoods east of US 97, and substantially minimize impacts to rural residential properties north of Cooley Road and west of US 97 by containing all improvements within the adopted UGB, except for the extension of Britta Street west of US 20 and the intersection improvements at Cooley Road and O.B. Riley Road. The East DS2 Modified Alternative is identified as the Preferred Alternative in the Final EIS.
More InformationThe traffic analysis for the No Build Alternative assumes construction of approximately 30 publicly-funded and privately-funded road improve-ment projects. These include widening, realignment or extensions of existing roads, new roads, and new signals or roundabouts. For additional detail on the publicly- funded and privately-funded roadway improvements assumed for the No Build Alternative see the UpdatedTraffic Analysis Report (ODOT 2014o), listed in Appendix K and available in the document library of the project’s website (www.us97solutions.org).
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-7
Executive Summary
ES.2.1 No Build Alternative
The No Build Alternative would maintain the current US 97 facility as it presently exists (Exhibit ES-3). The No Build Alternative consists of assigning design year 2036 travel forecasts to the financially constrained Bend Metropolitan Transportation Plan scenario. The transportation analysis for the No Build Alternative assumes construction of both publicly-funded and privately-funded roadway improvements and traffic signal projects, which include projects funded through the Oregon Statewide Transportation Improvement Program or the City of Bend’s Capital Improvement Plan, and roadway improvements in approved private developments.
ES.2.2 Build Alternatives
Two build alternatives are being considered for the proposed action: the East DS1 Alternative and the East DS2 Alternative. Both alternatives would reroute US 97 east of its current alignment, adjacent to the existing railroad tracks. Where US 97 is realigned, the current US 97 roadway would be used as a portion of the extension of 3rd Street. Within the City of Bend UGB, jurisdiction over this converted segment of US 97 is proposed to be transferred to the City of Bend under either the East DS1 or East DS2 Alternatives. ODOT would retain jurisdiction of the newly realigned portion of US 97.
The Preferred Alternative will also involve transferring the jurisdiction of the current US 97 facility to the City of Bend; this facility will become an extension of 3rd Street as a result of the Preferred Alternative. ODOT will retain jurisdiction of the newly realigned portion of US 97.
Most of the common design features of the East DS1 and East DS2 Alternatives are located south of Cooley Road. These alternatives differ in the location and type of northern interchange. The commonalities and unique features of each build alternative are described below. The East DS1 and East DS2 Alternatives are shown in Exhibit ES-4 and Exhibit ES-5.
The Preferred Alternative does not include a northern interchange as contained in either the East DS1 or East DS2 Alternatives. As a result of the Preferred Alternative, US 97 connects to 3rd Street at a signalized intersection. Other design elements of the Preferred Alternative include enhanced pedestrian and bicycle improvements, design improvements for Empire Avenue, and a signalized intersection at 3rd Street and Mervin Sampels Road (Exhibit ES-5 FEIS).
Common Design Features of the Build AlternativesBetween Butler Market Road and Cooley Road, the East DS1 and East DS2 Alternatives have a similar design. Design features that are
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-8 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhibit ES-3: No Build Alternative
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-9
Executive Summary
Exhibit ES-4: East DS1 Alternative
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-10 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhibit ES-5: East DS2 Alternative
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-11
Executive Summary
Exhibit ES-5 FEIS: Preferred Alternative Mapset Index
Note: This new exhibit was added to the Final EIS to show the design of the Preferred Alternative.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-13
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 1)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Lane Median Lane Bike &Shoulder
Shdr Shdr
8 ft 12 ft 12 ft Varies (2 - 90 ft) 12 ft 12 ft 12 ft 8 ft
Bike & Shoulder
Lane Lane Lane
4 ft 4 ft
Roadway Width (86 - 174 ft)
US 97 south of Empire Avenue1
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-15
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 2)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Lane Lane Bike Sidewalk
6 ft 6 ft 12 ft 12 ft 16 ft 12 ft 12 ft 5 ft 6 ft5 ft 6 ft
Right of Way
Sidewalk Bike Lane Lane Median
Roadway Width (98 ft)
3rd Street south of Loco Road32
12 ft
Lane
16 ft
Median
Right of Way
6 ft
Sidewalk
6 ft
Bike
12 ft
Lane
6 ft
Bike
6 ft
Sidewalk
5 ft
Empire Avenue between O.B. Riley Road and 3rd Street 3
Roadway Width (69 ft)
Empire Avenue east of 3rd Street
6 ft
Sidewalk
14 ft
Turn Lane
6 ft
Bike
12 ft
Lane
12 ft
Lane
14 ft
Turn Lane
14 ft
Turn Lane
12 ft
Lane
12 ft
Lane
6 ft
Bike
6 ft
Sidewalk
4
Roadway Width (114 ft)
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-17
Executive Summary
Exhibit ES-5 FEIS: Preferred Alternative (Map 3)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-19
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 4)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Britta Street
Roadway Width (52 ft)
Median Lane
6 ft 12 ft 16 ft 12 ft
Shoulder Lane
6 ft
Shoulder
5
Lane Median / Turn Lane Shoulder Multi-use Path
8 ft 12 ft 12 ft 20 ft 12 ft 12 ft 5 ft 10 ft8 ft
Shoulder Lane Lane Lane
Right of Way
US 20 between Cooley Road and Robal Road6
Roadway Width (99 ft)
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-21
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 5)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-23
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 6)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
US 97 between Empire Avenue and 3rd Street 7
Lane MedianBike / Shoulder
Lane
8 ft 12 ft 12 ft 10 ft 12 ft
Lane
12 ft 8 ft
Bike / Shoulder
Roadway Width (74 ft)
Lane Lane Bike Sidewalk
6 ft 6 ft 12 ft 12 ft 16 ft 12 ft 12 ft 5 ft 6 ft5 ft 6 ft
Right of Way
Sidewalk Bike Lane Lane Median
Roadway Width (98 ft)
3rd Street south of Loco Road32
Lane Lane Bike Sidewalk
6 ft 6 ft 12 ft 12 ft 16 ft 12 ft 12 ft 5 ft 6 ft5 ft 6 ft
Right of Way
Sidewalk Bike Lane Lane Median / Turn Lane
Roadway Width (98 ft)
Cooley Road east of Hunnell Road38
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
Executive Summary
US 97 Bend North Corridor Project July 2014 | ES-25
Ch
apter 2
Alternatives
Exhibit ES-5 FEIS: Preferred Alternative (Map 7)
Note: The design shown in this exhibit is conceptual in nature. Further refinements may be made during the final design process.Where roadway improvements shown in this exhibit end, the improvements will transition to the existing roadway cross section.
Lane Lane Bike Sidewalk
6 ft 6 ft 12 ft 12 ft 16 ft 12 ft 12 ft 5 ft 6 ft5 ft 6 ft
Right of Way
Sidewalk Bike Lane Lane Median
Roadway Width (98 ft)
3rd Street south of Loco Road32
US 97 between Empire Avenue and 3rd Street 7
Lane MedianBike / Shoulder
Lane
8 ft 12 ft 12 ft 10 ft 12 ft
Lane
12 ft 8 ft
Bike / Shoulder
Roadway Width (74 ft)
3rd Street north of Loco Road
Roadway Width (87 ft)
6 ft 12 ft
Lane MedianBike Lane Lane
12 ft 16 ft 12 ft 12 ft
Lane
6 ft
Bike
6 ft5 ft
Sidewalk
9
US 97 north of 3rd Street
Lane
6 ft 12 ft 13 ft 12 ft Varies (13 - 19 ft) 12 ft 12 ft 8 ft 5 ft 10 ft
Multi-usePath
ShoulderLaneShoulder Turn Lane Lane Lane Median
Roadway Width (103 - 109 ft)
10
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-27
Executive Summary
common include some intersection configurations, ramps, auxiliary lanes, grade-separations, and pedestrian and bicycle facilities.
Between Butler Market Road and Empire Avenue, US 97 would be a free flow highway facility with access to and from the highway provided at the Butler Market Road and Empire Avenue interchanges. The Empire Avenue interchange would retain its configuration as a partial diamond interchange, with a widened Empire Avenue crossing over US 97 in the East DS1 and East DS2 Alternatives. An off-ramp would allow vehicles on northbound US 97 to exit the highway at Empire Avenue; there would be no off-ramp from southbound US 97 to Empire Avenue. On-ramps would allow eastbound and westbound vehicles on Empire Avenue to enter northbound or southbound US 97.
About half way between Empire Avenue and the Sisters loop ramp, the US 97 northbound travel lanes would split; the two right lanes would continue on northbound US 97, and the left lane would cross under the southbound travel lanes on US 97 to access US 20 and 3rd Street. Southbound US 97 would cross over the left lane exiting from northbound US 97 to northbound 3rd Street/westbound US 20 on an elevated structure.
Between Nels Anderson Place and Cooley Road, US 97 would shift east to be immediately adjacent to the railroad tracks; the northbound and southbound travel lanes would be separated by a median barrier. An undercrossing would be constructed for Cooley Road to pass under US 97 and the railroad tracks. There would be no connection to US 97 at Cooley Road.
North of Grandview Drive, a number of new local road connections or new local roads would be constructed under the East DS1 and East DS2 Alternatives.
An emergency service turnaround on US 97 would be provided at Fort Thompson Lane. There would be a break in the median barrier for emergency vehicles only. Expanded shoulders in this area would accommodate emergency vehicles turning around to change direction.
The build alternatives would also have access management, stormwater management, and aesthetic treatments.
The Preferred Alternative will not include the following design elements that were common to the East DS1 and East DS2 Alternatives:
■ A widened Empire Avenue crossing
■ New local road connections or new local roads north of Grandview Drive
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-28 | July 2014 US 97 Bend North Corridor Project
Executive Summary
■ An emergency service turnaround on US 97 at Fort Thompson Lane.
Design Features Unique to the East DS1 AlternativeUnder the East DS1 Alternative, between Cooley Road and the City of Bend’s UGB, 3rd Street would extend north with two travel lanes in each direction. North of the UGB, 3rd Street would have one northbound and one southbound travel lane and would be routed around the west side of the Deschutes Memorial Gardens and Chapel. Just north of Bowery Lane, US 97 would have a full diamond interchange with the new extension of 3rd Street. The interchange would allow all northbound and southbound movements on to and off of US 97. At the interchange, 3rd Street would be elevated to cross over US 97 and would terminate just west of the BNSF Railway.
New local road connections and new local roads that would be constructed between Grandview Drive and Fort Thompson Lane include:
■ A new road would extend east of 3rd Street to access existing properties north of the Deschutes Memorial Gardens and Chapel
■ A new road would connect Bowery Lane to Suzanne Lane
■ A new road would extend east of Harris Way to access existing properties between Harris Way and US 97
■ An upgraded connection would be provided between Fort Thompson Lane and Harris Way, and between Harris Way and Hunnell Road
■ A new road would extend north and south of 3rd Street to access existing properties east of US 97.
New county roads and private driveways have been designed to meet the appropriate standards within this urban area. Existing substandard county roads would not be upgraded by this project, but would be prioritized and developed as standalone projects in the Deschutes County Transportation System Plan and Statewide Transportation Improvement Program projects.
Design Features Unique to the East DS2 Alternative Under the East DS2 Alternative, 3rd Street would extend north with two travel lanes in each direction with a median that would also serve as a turn lane. The new extension of 3rd Street would connect with US 97 through a directional interchange on the southeast side of the Deschutes Memorial Gardens and Chapel, where 3rd Street would terminate. The directional interchange would allow southbound US 97 traffic to flow freely via an off-ramp to southbound 3rd Street.
Key PointUnique features of the East DS1 Alternative would include:
■ Diamond interchange north of Bowery Lane allowing movements in all directions
■ 3rd Street routed around the west side of Deschutes Memorial Gardens and Chapel
■ 3rd Street extension east across US 97.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-29
Executive Summary
Northbound 3rd Street traffic would cross over US 97 and flow freely onto northbound US 97 via an on-ramp.
New local road connections and new local roads that would be constructed between Grandview Drive and Fort Thompson Lane include:
■ Bowery Lane would be upgraded and extended to the east, across US 97
■ A new road would extend north and south of Bowery Lane to access existing properties east of US 97
■ A new road would extend south of Bowery Lane to access existing properties north of Deschutes Memorial Gardens and Chapel
■ A new road would extend north of Bowery Lane to access existing properties northwest of the Bowery Lane overcrossing of US 97
■ A new road would extend east of Harris Way to access existing properties between Harris Way and US 97
■ An upgraded connection would be provided between Fort Thompson Lane and Harris Way, and between Harris Way and Hunnell Road.
New county roads and private driveways have been designed to meet the appropriate standards within this urban area. Existing substandard county roads would not be upgraded by this project, but would be prioritized and developed as standalone projects in the Deschutes County Transportation System Plan and Statewide Transportation Improvement Program projects.
Design Features Unique to the Preferred Alternative—East DS2 Modified Alternative As a result of the Preferred Alternative, 3rd Street will extend north with two travel lanes in each direction with a two-way left turn lane. Approximately 0.6 mile north of Cooley Road, the new extension of 3rd Street will connect with US 97 through a signalized intersection on the south side of the Deschutes Memorial Gardens and Chapel, where 3rd Street will terminate.
Empire Avenue improvements will include utilizing the existing bridges and containing widening work between US 97 and 3rd Street. In addition a new signal will be added at 3rd Street and Mervin Sampels Road to provide access into the Empire Avenue/Sherman Road business area.
The Preferred Alternative will extend Britta Street to US 20 at Robal Road, whereas the East DS1 and East DS2 Alternatives would extend Robal Road to O.B. Riley Road. The Preferred Alternative will also add
Key PointUnique features of the East DS2 Alternative would include:
■ Directional interchange south of Bowery Lane allowing free flow move-ments between 3rd Street and US 97
■ Termination of 3rd Street south-east of Deschutes Memorial Gardens and Chapel
■ Bowery Lane extension east across US 97.
Key PointUnique features of the Preferred Alternative include:
■ Signalized intersection at 3rd Street and US 97
■ Termination of 3rd Street south of Deschutes Memorial Gardens and Chapel.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-30 | July 2014 US 97 Bend North Corridor Project
Executive Summary
intersection improvements at O.B. Riley Road and Cooley Road. The Preferred Alternative will provide new facilities for serving bicycles and pedestrians.
ES.2.3 Other Alternatives Considered
The alternatives development phase gathered input from technical staff, project committees, participating agencies, and the public to identify alternatives that would address the purpose and need for the proposed action. Initially, a preliminary range of alternatives was developed that comprised 21 build alternatives located along three project corridors:
■ West corridor—Reroute US 97 west of its existing alignment and closer to US 20
■ Existing corridor—Retain US 97 on its existing alignment
■ East corridor—Reroute US 97 east of its existing alignment and closer to the BNSF Railway.
A No Build Alternative was also considered and was automatically forwarded into the Draft EIS for evaluation per requirements under the National Environmental Policy Act.
This preliminary range of 21 build alternatives was assessed in terms of engineering feasibility, significant environmental impacts, and economic feasibility. From this initial assessment, the range of alternatives was revised based on how the alternatives compared to one another, and the best performing alternative(s) in each corridor were carried forward. The result yielded a combined preliminary range of 11 alternatives. Nine of the 11 build alternatives that were screened against the purpose and need and other criteria were eliminated from further consideration (Exhibit ES-6). Only the East DS1 and East DS2 Alternatives passed the screening and were carried forward for further analysis in the Draft EIS.
The Preferred Alternative was evaluated against the same screening criteria and demonstrated it addressed the purpose and need for the proposed action.Exhibit ES-6: Build Alternatives Considered but Eliminated from Further Study
West Corridor Existing Corridor East Corridor
WS West ModifiedWS West E (Modified)West 1West DS1
GM2Existing AExisting DS1TSM/TDM
WS East A Modified
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-31
Executive Summary
ES.3 Other ActionsThere are a number of current and reasonably foreseeable major development actions that are scheduled to take place in the project vicinity and may also influence future traffic conditions within the API. These projects include:
■ Juniper Ridge—Juniper Ridge is a 1,500 acre site owned by the City of Bend east of the API, of which approximately 500 acres are located within the current City of Bend limits and UGB. The master plan for the project includes area for employment, educational and research opportunities, a town center, and residential neighborhoods.
■ Roadway—Many streets and roadways under City of Bend and Deschutes County jurisdiction are scheduled for widening and/or extension, as planned in the City’s and County’s Transportation System Plans and the Bend Metropolitan Planning Organization’s 2007–2030 Metropolitan Transportation Plan. Other roadway projects include the installation of traffic signals and/or roundabouts on local streets throughout the API and greater Bend area.
■ Transit—A new park and ride facility is planned within the API by the Bend Metropolitan Planning Organization.
The Central Oregon Intergovernmental Council identified a priority need for a park and ride lot in the Cascade Village shopping center area. The Bend Metropolitan Planning Organization also identified the near-term need for a Redmond – Bend Community Connector (Route #24) stop serving Cascade Village and a future transit hub at the same location.
■ Utility—Various stormwater and wastewater facility improvements are scheduled for construction throughout the City of Bend and Deschutes County
■ Parks and Trails—Several smaller community parks and one larger regional park are scheduled for development by the Bend Park and Recreation District outside the API. As described in Section 3.6 Parks and Recreational Facilities, Bend Park and Recreation District’s Parks, Recreation, and Green Spaces Comprehensive Plan and the Bend Area General Plan Bicycle and Pedestrian System Map include pedestrian and bicycle trails planned throughout the API and beyond to connect to local and regional destinations.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-32 | July 2014 US 97 Bend North Corridor Project
Executive Summary
ES.4 Summary of Adverse and Beneficial Impacts of the Alternatives
The No Build, East DS1, and East DS2 Alternatives were studied and analyzed to identify their long-term and temporary impacts to the local environment. Adverse and beneficial impacts of the alternatives are summarized in Exhibit ES-7 FEIS. Adverse impacts would be mitigated to the extent practicable and as required by applicable regulations.
This Final EIS has been updated to disclose the beneficial and adverse impacts associated with the updated 2036 No Build Alternative and the Preferred Alternative. The adverse and beneficial impacts of the Preferred Alternative are summarized in Exhibit ES-7 FEIS.
More Information
Learn more about the proposed action and view the Draft EIS by visiting the project website at: www.us97solutions.orgThe Final EIS is also available on the project website.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-33
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Tran
spor
tati
on
Long-term impacts
■
Seve
re c
onge
stio
n du
ring
peak
pe
riod
s in
muc
h of
the
sout
hern
pa
rt o
f the
API
due
to su
bsta
ntia
l in
crea
se in
traffi
c vo
lum
es
■Si
gnifi
cant
que
uing
on
wes
tbou
nd
Empi
re A
venu
e du
e to
bot
tlene
ck
at 3
rd S
tree
t/Em
pire
Ave
nue
inte
rsec
tion
■
US
97 o
ver c
apac
ity d
urin
g pe
ak p
erio
ds fr
om so
uth
of
Butle
r Mar
ket R
oad
thro
ugh
the
US
20/3
rd S
tree
t int
erch
ange
due
to
incr
ease
in tr
affic
volu
mes
, aff
ectin
g m
erge
/div
erge
are
as fo
r th
e ra
mps
to a
nd fr
om E
mpi
re
Aven
ue
■Fr
eigh
t trip
s del
ayed
up
to 1
5 m
inut
es d
urin
g pe
ak p
erio
ds d
ue
to c
onge
stio
n al
ong
the
US
97/3
rd
Stre
et c
orrid
or
■In
crea
sed
risk
of v
ehic
le/t
rain
co
llisio
ns a
t Coo
ley
Road
atg
rade
cr
ossin
g du
e to
incr
easin
g tr
affic
and
curr
ent r
ail v
olum
es
■Su
bsta
ntia
l del
ays t
o bu
ses
trav
elin
g on
US
97, U
S 20
, and
Ro
bal R
oad
duri
ng p
eak
perio
ds,
with
cor
resp
ondi
ng d
ecre
ase
in o
ntim
e pe
rfor
man
ce d
ue to
ex
trem
e tr
affic
cong
estio
n in
the
API
■
No
impr
ovem
ents
to th
e ex
istin
g bi
cycl
e an
d pe
dest
rian
faci
litie
s
■
Alle
viat
ion
of m
ost o
f the
art
eria
l sys
tem
que
uing
not
ed in
the
No
Build
Alte
rnat
ive
as a
resu
lt of
real
ignm
ent a
nd a
cces
s m
anag
emen
t im
prov
emen
ts th
at sh
ift tr
affic
from
the
loca
l art
eria
l sys
tem
ont
o lim
ited
acce
ss a
nd a
cces
s con
trol
led
faci
litie
s
■Fr
eigh
t del
ays r
educ
ed to
less
than
5 m
inut
es, r
esul
ting
from
sepa
rate
faci
lity
for t
hrou
gh tr
ips
■
Impr
oved
ont
ime
bus p
erfo
rman
ce d
ue to
dec
reas
ed c
onge
stio
n le
vels
in th
e A
PI
■Im
prov
ed m
otor
ist s
afet
y re
sulti
ng fr
om g
rade
sepa
ratin
g C
oole
y Ro
ad u
nder
the
BNSF
Rai
lway
■
Impr
oved
ped
estr
ian
and
bicy
cle
faci
litie
s
■Q
ueui
ng re
duce
d on
wes
tbou
nd E
mpi
re A
venu
e, b
ut m
ore
cong
estio
n at
Em
pire
Ave
nue/
O.B
. Rile
y Ro
ad in
ters
ectio
n re
sults
from
relie
f of 3
rd S
tree
t/Em
pire
Ave
nue
bottl
enec
k.
■9
inte
rsec
tions
bel
ow o
pera
tiona
l st
anda
rds
(2—
US
97, 4
—U
S 20
, 3—
loca
l roa
d sy
stem
) 1
■
4 U
S 97
mai
nlin
e an
d m
erge
/di
verg
e/w
eave
segm
ents
ove
r st
anda
rds1
■
7 in
ters
ectio
ns b
lock
ed b
y qu
eues
1
■
25 m
ph o
vera
ll av
erag
e ne
twor
k sp
eed
■
30,4
00 o
vera
ll ne
twor
k st
ops
■
800
hour
s ove
rall
netw
ork
dela
y
■1,
800
hour
s ove
rall
netw
ork
trav
el
time.
1 Beca
use
low
er e
xist
ing
cond
ition
s tr
affic
volu
mes
wer
e as
sum
ed fo
r the
up
date
d N
o Bu
ild A
ltern
ativ
e an
d Pr
efer
red
Alte
rnat
ive
traffi
c an
alys
is,
thes
e pa
rtic
ular
mea
sure
s are
not
di
rect
ly c
ompa
rabl
e to
the
No
Build
A
ltern
ativ
e an
d Pr
efer
red
Alte
rnat
ive.
■
8 in
ters
ectio
ns b
elow
ope
ratio
nal
stan
dard
s (1
—U
S 97
, 4—
US
20, 3
—lo
cal r
oad
syst
em) 1
■
4 U
S 97
mai
nlin
e an
d m
erge
/di
verg
e/w
eave
segm
ents
ove
r st
anda
rds1
■
19 in
ters
ectio
ns b
lock
ed b
y qu
eues
1
■
22 m
ph o
vera
ll av
erag
e ne
twor
k sp
eed
■
45,1
00 o
vera
ll ne
twor
k st
ops
■
1,00
0 ho
urs o
vera
ll ne
twor
k de
lay
■
2,00
0 ho
urs o
vera
ll ne
twor
k tr
avel
tim
e.
1 Beca
use
low
er e
xist
ing
cond
ition
s tr
affic
volu
mes
wer
e as
sum
ed fo
r the
up
date
d N
o Bu
ild A
ltern
ativ
e an
d Pr
efer
red
Alte
rnat
ive
traffi
c an
alys
is,
thes
e pa
rtic
ular
mea
sure
s are
not
di
rect
ly c
ompa
rabl
e to
the
No
Build
A
ltern
ativ
e an
d Pr
efer
red
Alte
rnat
ive.
■
5 in
ters
ectio
ns b
elow
ope
ratio
nal
stan
dard
s (1
—U
S 97
, 3—
US
20, 1
—lo
cal r
oad
syst
em)
■
2 U
S 97
mai
nlin
e an
d m
erge
/div
erge
/w
eave
segm
ents
ove
r sta
ndar
ds
■0
inte
rsec
tions
blo
cked
by
queu
es
■19
mph
ove
rall
aver
age
netw
ork
spee
d
■35
,500
ove
rall
netw
ork
stop
s
■1,
100
hour
s ove
rall
netw
ork
dela
y
■1,
900
hour
s ove
rall
netw
ork
trav
el ti
me.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-34 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Long-term impacts
■
12 in
ters
ectio
ns b
elow
ope
ratio
nal
stan
dard
s (2—
US
97, 4
—U
S 20
, 6—
loca
l roa
d sy
stem
) due
to in
crea
sed
cong
estio
n du
ring
pea
k pe
riod
s
■15
inte
rsec
tions
blo
cked
by
queu
es
■5
mph
ove
rall
aver
age
netw
ork
spee
d
■66
,100
ove
rall
netw
ork
stop
s
■4,
700
hour
s ove
rall
netw
ork
dela
y
■5,
300
hour
s ove
rall
netw
ork
trav
el
time.
Temporary construction
impacts
Non
e.C
onge
stio
n re
sulti
ng in
del
ay, r
educ
ed tr
avel
spee
ds, a
nd in
crea
sed
trav
el ti
me
duri
ng c
onst
ruct
ion
(23
year
s) o
f im
prov
emen
ts to
inte
rsec
tions
and
exi
stin
g ro
adw
ays
Del
ays a
nd o
ther
impa
cts t
o tr
ansit
serv
ice
alon
g Ro
bal R
oad
and
into
and
out
of C
asca
de V
illag
e Sh
oppi
ng C
ente
r dur
ing
cons
truc
tion
Tem
pora
ry c
hang
es to
priv
ate
driv
eway
s for
bus
ines
ses o
n N
els A
nder
son
Road
, Coo
ley
Road
, and
Rob
al R
oad
duri
ng
cons
truc
tion.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-35
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Lan
d U
se
Long-term impacts
■
Inco
nsis
tent
with
stat
e, c
ount
y, re
gion
al, a
nd c
ity tr
ansp
orta
tion
plan
s, U
S H
ighw
ay 9
7 C
orri
dor
Stra
tegy
, Ore
gon
Hig
hway
Pla
n,
Bend
Are
a G
ener
al P
lan,
and
N
orth
east
Ben
d Tr
ansp
orta
tion
Stud
y
■N
o ex
cept
ions
to st
atew
ide
plan
ning
goa
ls, b
ut in
cons
iste
nt
with
Goa
l 12
■
No
exis
ting
land
use
s con
vert
ed
■N
o pr
ime
farm
land
con
vert
ed.
■
Gen
eral
ly c
onsi
sten
t with
stat
e, c
ount
y, re
gion
al, a
nd c
ity la
nd u
se p
lans
.
■In
cons
iste
nt w
ith c
ount
y, re
gion
al, a
nd c
ity tr
ansp
orta
tion
plan
s. A
men
dmen
ts to
200
7-20
30 M
etro
polit
an T
rans
port
atio
n Pl
an, D
esch
utes
C
ount
y Tr
ansp
orta
tion
Syst
em P
lan,
and
Ben
d U
rban
Are
a Tr
ansp
orta
tion
Syst
em P
lan
requ
ired.
■In
cons
iste
nt w
ith st
atew
ide
plan
ning
goa
ls. 2
exc
eptio
ns to
Sta
tew
ide
Plan
ning
Goa
ls 11
and
14
from
Des
chut
es C
ount
y re
quire
d fo
r con
stru
ctio
n of
a n
ew ro
ad a
nd n
ew in
terc
hang
e ou
tsid
e of
the
UG
B.
■
Con
sist
ent w
ith st
ate,
cou
nty,
regi
onal
, and
city
land
use
and
tr
ansp
orta
tion
plan
s
■N
o ex
cept
ions
to th
e st
atew
ide
plan
ning
goa
ls re
quire
d.
■
180
acre
s of l
and
conv
erte
d to
righ
t of
way
■
10 a
cres
of p
rime
farm
land
and
12
4 ac
res o
f far
mla
nd o
f sta
tew
ide
impo
rtan
ce c
onve
rted
to ri
ght o
f w
ay.
■
131
acre
s of l
and
conv
erte
d to
righ
t of
way
■
2 ac
res o
f prim
e fa
rmla
nd a
nd
90 a
cres
of f
arm
land
of s
tate
wid
e im
port
ance
con
vert
ed to
righ
t of
way
.
■
App
roxi
mat
ely
82 a
cres
of l
and
conv
erte
d to
righ
t of w
ay
■A
ppro
xim
atel
y 0.
07 a
cre
of p
rim
e fa
rmla
nd a
nd a
ppro
xim
atel
y 59
acr
es
of fa
rmla
nd o
f sta
tew
ide
impo
rtan
ce
conv
erte
d to
righ
t of w
ay.
Temporary construction
impacts
■
Non
e.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-36 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Rig
ht
of W
ay a
nd
Uti
liti
es
Long-term impacts
■
No
right
of w
ay a
cqui
sitio
n
■N
o ut
ility
relo
catio
ns.
■
Acq
uisit
ion
of 1
62 p
arce
ls to
talin
g ap
prox
imat
ely
180
acre
s of r
ight
of
way
.
■
Acq
uisit
ion
of 1
42 p
arce
ls to
talin
g ap
prox
imat
ely
131
acre
s of r
ight
of
way
.
■
Acq
uisit
ion
of a
n es
timat
ed
103
parc
els t
otal
ing
appr
oxim
atel
y 82
acr
es o
f rig
ht o
f way
.
■Re
loca
tion
of u
tility
faci
litie
s.
Temporary construction
impacts
■
Non
e.
■Sh
ort i
nter
rupt
ions
to u
tility
serv
ices
.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-37
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Envi
ron
men
tal J
ust
ice
Long-term impacts
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-in
com
e po
pula
tions
.
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-in
com
e po
pula
tions
■
Envi
ronm
enta
l jus
tice
popu
latio
ns
and
othe
rs w
ould
acc
ess U
S 97
th
roug
h th
e no
rthe
rn in
terc
hang
e,
a fu
ll di
amon
d in
terc
hang
e,
with
acc
ess t
o no
rthb
ound
and
so
uthb
ound
US
97.
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-in
com
e po
pula
tions
■
Envi
ronm
enta
l jus
tice
popu
latio
ns
and
othe
rs w
ould
trav
el fa
rthe
r on
loca
l str
eets
, inc
ludi
ng B
ower
y La
ne
and
Hun
nell
Road
, to
acce
ss U
S 97
. Se
gmen
ts o
f Bow
ery
Lane
and
H
unne
ll Ro
ad w
ould
be
unpa
ved.
A
cces
s to
sout
hbou
nd U
S 97
wou
ld
occu
r at E
mpi
re A
venu
e. A
cces
s to
nort
hbou
nd U
S 97
wou
ld o
ccur
at
Empi
re A
venu
e or
via
3rd
Str
eet
nort
h of
Coo
ley
Road
.
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-in
com
e po
pula
tions
■
Envi
ronm
enta
l jus
tice
popu
latio
ns
and
othe
rs w
ill m
aint
ain
exis
ting
acce
ss to
nor
thbo
und
and
sout
hbou
nd U
S 97
. The
new
sig
naliz
ed in
ters
ectio
n at
US
97 a
nd
3rd
Stre
et w
ill p
rovi
de a
con
nect
ion
to lo
catio
ns w
ithin
the
API
and
gr
eate
r Ben
d.
■
A m
ulti-
use
path
will
con
nect
the
mob
ile h
ome
park
s to
the
signa
lized
in
ters
ectio
n, a
llow
ing
safe
r tra
vel f
or
pede
stri
ans a
nd b
icyc
lists
alo
ng U
S 97
an
d a
safe
r cro
ssin
g of
US
97.
Temporary construction
impacts
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-in
com
e po
pula
tions
.
■
No
disp
ropo
rtio
nate
ly h
igh
and
adve
rse
effec
ts o
n m
inor
ity o
r low
-inco
me
popu
latio
ns
■Pe
rson
s with
lim
ited
Engl
ish p
rofic
ienc
y co
uld
be m
ore
affec
ted
if th
ey a
re u
nabl
e to
und
erst
and
notifi
catio
ns a
bout
co
nstr
uctio
n ac
tiviti
es; h
owev
er, n
otifi
catio
ns w
ould
be
prov
ided
in E
nglis
h an
d Sp
anish
, the
pre
dom
inan
t lan
guag
es o
f th
e A
PI
■Te
mpo
rary
stre
et c
ross
ings
in c
onst
ruct
ion
zone
s cou
ld b
ecom
e ob
stac
les f
or d
isab
led
and
elde
rly in
divi
dual
s.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-38 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Soc
ioec
onom
ic A
nal
ysis
Long-term impacts
■
Resid
ents
’ qua
lity
of li
fe im
pact
ed
by fa
ilure
to a
ddre
ss v
ehic
ular
sa
fety
con
cern
s with
in th
e A
PI
■N
o ch
ange
to c
omm
unity
coh
esio
n
■Im
peda
nce
of tr
avel
rout
es to
an
d fr
om d
estin
atio
n bu
sines
ses,
dete
rren
ce o
f new
dev
elop
men
t, di
fficu
lty a
ttrac
ting
and
reta
inin
g bu
sines
ses,
and
decr
ease
d effi
cien
cy o
f loc
al a
nd re
gion
al
frei
ght m
ovem
ent a
s con
gest
ion
wor
sens
and
traffi
c flo
w sl
ows
■
No
resid
ence
s, bu
sines
ses,
or
rent
al st
orag
e un
its d
ispl
aced
■
PM p
eak
traffi
c vo
lum
es B
ower
y La
ne b
etw
een
Hun
nell
Road
and
3r
d St
reet
: 7 v
ehic
les/
hour
.
■H
unne
ll Ro
ad: 2
70-9
20 v
ehic
les/
hour
.
■Em
erge
ncy
serv
ice
prov
ider
re
spon
se ti
mes
wou
ld in
crea
se
as c
ompa
red
with
the
exis
ting
cond
ition
s.
■
Incr
ease
d ai
r, no
ise,
and
vis
ual
impa
cts o
f new
and
exp
ande
d lo
cal
road
s, el
evat
ed st
ruct
ures
, and
th
e re
alig
nmen
t of U
S 97
clo
ser t
o re
siden
tial n
eigh
borh
oods
cou
ld
impa
ct q
ualit
y of
life
for r
esid
ents
in
the
API
■
Con
nect
ivity
and
safe
ty fo
r ve
hicl
es, p
edes
tria
ns, a
nd
bicy
clis
ts g
ener
ally
impr
oved
pa
rtic
ular
ly a
ssoc
iate
d w
ith th
e lo
cal s
tree
t net
wor
k (in
clud
ing
trav
el to
and
from
are
a bu
sines
ses)
. H
owev
er, i
n th
e vi
cini
ty o
f 3rd
St
reet
nor
th o
f Coo
ley
Road
, the
H
unne
ll N
eigh
borh
ood
wou
ld b
e bi
sect
ed b
y 3r
d St
reet
, dec
reas
ing
com
mun
ity c
ohes
ion
in th
is
loca
lized
are
a
■In
crea
sed
effici
ency
of l
ocal
an
d re
gion
al fr
eigh
t mov
emen
t, cr
eatin
g op
port
uniti
es to
enh
ance
lo
cal a
nd re
gion
al e
cono
mie
s.
■
Incr
ease
d ai
r, no
ise,
and
vis
ual
impa
cts o
f new
and
exp
ande
d lo
cal
road
s, el
evat
ed st
ruct
ures
, and
th
e re
alig
nmen
t of U
S 97
clo
ser t
o re
siden
tial n
eigh
borh
oods
cou
ld
impa
ct q
ualit
y of
life
for r
esid
ents
in
the
API
■
Con
nect
ivity
and
safe
ty fo
r veh
icle
s, pe
dest
rian
s, an
d bi
cycl
ists
gen
eral
ly
impr
oved
par
ticul
arly
ass
ocia
ted
with
the
loca
l str
eet n
etw
ork
(incl
udin
g tr
avel
to a
nd fr
om a
rea
busin
esse
s). H
owev
er, c
omm
unity
co
hesio
n w
ould
dec
reas
e in
the
vici
nity
of B
ower
y La
ne b
etw
een
Hun
nell
Road
and
3rd
Str
eet
beca
use
of th
e in
crea
sed
pres
ence
of
cut-
thro
ugh
traffi
c.
■In
crea
sed
effici
ency
of l
ocal
and
re
gion
al fr
eigh
t mov
emen
t, cr
eatin
g op
port
uniti
es to
enh
ance
loca
l and
re
gion
al e
cono
mie
s.
■D
ispl
acem
ent o
f 13
resid
ence
s, 51
bu
sines
ses,
3 bi
llboa
rds,
and
200
250
rent
al st
orag
e un
its
■PM
Pea
k Tr
affic
◆
Bow
ery
Lane
bet
wee
n H
unne
ll Ro
ad a
nd 3
rd S
tree
t: 60
—90
ve
hicl
es/h
our.
◆
Hun
nell
Road
: 180
—26
0 ve
hicl
es/h
our.
■
Incr
ease
d ai
r, no
ise,
and
vis
ual
impa
cts o
f new
and
exp
ande
d lo
cal
road
s, pr
imar
ily lo
cate
d w
ithin
the
Bend
UG
B, a
nd th
e re
alig
nmen
t of
US
97 c
lose
r to
the
Boyd
Acr
es
Nei
ghbo
rhoo
d co
uld
impa
ct q
ualit
y of
lif
e fo
r res
iden
ts in
the
API
■
Com
mun
ity c
ohes
ion
enha
nced
w
ith im
prov
ed c
onne
ctiv
ity fo
r ve
hicl
es, p
edes
tria
ns a
nd b
icyc
lists
. C
omm
unity
coh
esio
n ad
vers
ely
affec
ted
by p
rope
rty
acqu
isiti
ons
and
resid
entia
l dis
plac
emen
ts; t
he
mag
nitu
de o
f thi
s im
pact
is le
ss th
an
unde
r the
Eas
t DS1
and
Eas
t DS2
A
ltern
ativ
es.
■
Incr
ease
d effi
cien
cy o
f loc
al a
nd
regi
onal
frei
ght m
ovem
ent,
crea
ting
oppo
rtun
ities
to e
nhan
ce lo
cal a
nd
regi
onal
eco
nom
ies.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-39
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Long-term impacts
■D
ispl
acem
ent o
f 19
resid
ence
s, 43
bu
sines
ses,
4 bi
llboa
rds,
and
200
250
rent
al st
orag
e un
its
■PM
pea
k tr
affic
volu
mes
◆Bo
wer
y La
ne b
etw
een
Hun
nell
Road
and
3rd
Str
eet:
20—
50
vehi
cles
/hou
r.
◆H
unne
ll Ro
ad: 8
0—14
0 ve
hicl
es/h
our.E
mer
genc
y se
rvic
e pr
ovid
er re
spon
se ti
mes
w
ould
dec
reas
e w
hen
com
pare
d to
the
No
Build
Alte
rnat
ive
for
2 ou
t of 6
sam
pled
rout
es a
nd
wou
ld in
crea
se fo
r 4 o
ut o
f 6
rout
es. R
espo
nse
times
wou
ld
incr
ease
com
pare
d to
exi
stin
g co
nditi
ons d
ue to
incr
ease
d tr
affic
volu
mes
and
out
-of-
dire
ctio
n tr
avel
.
■A
cces
s to
US
97 w
ould
requ
ire
long
er ro
utes
on
loca
l str
eets
, in
clud
ing
Bow
ery
Lane
and
H
unne
ll Ro
ad. S
egm
ents
of B
ower
y La
ne a
nd H
unne
ll Ro
ad w
ould
be
unpa
ved.
Acc
ess t
o so
uthb
ound
U
S 97
wou
ld o
ccur
at E
mpi
re
Aven
ue. A
cces
s to
nort
hbou
nd
US
97 w
ould
occ
ur a
t Em
pire
Av
enue
or v
ia 3
rd S
tree
t at t
he
nort
hern
inte
rcha
nge.
■
Emer
genc
y se
rvic
e pr
ovid
er
resp
onse
tim
es w
ould
dec
reas
e w
hen
com
pare
d to
the
No
Build
A
ltern
ativ
e fo
r 2 o
ut o
f 6 sa
mpl
ed
rout
es a
nd w
ould
incr
ease
for 4
out
of
6 ro
utes
. Res
pons
e tim
es w
ould
in
crea
se c
ompa
red
to e
xist
ing
cond
ition
s due
to in
crea
sed
traffi
c vo
lum
es a
nd o
ut-o
f-di
rect
ion
trav
el.
■
Acc
ess t
o U
S 97
wou
ld re
quire
lo
nger
rout
es o
n lo
cal s
tree
ts,
incl
udin
g Bo
wer
y La
ne a
nd H
unne
ll Ro
ad. S
egm
ents
of B
ower
y La
ne a
nd
Hun
nell
Road
wou
ld b
e un
pave
d.
Acc
ess t
o so
uthb
ound
US
97 w
ould
oc
cur a
t Em
pire
Ave
nue.
Acc
ess t
o no
rthb
ound
US
97 w
ould
occ
ur a
t Em
pire
Ave
nue
or v
ia 3
rd S
tree
t at
the
nort
hern
inte
rcha
nge.
■
Dis
plac
emen
t of 6
resid
ence
s, 44
bus
ines
ses,
2 bi
llboa
rds,
and
250
rent
al st
orag
e un
its
■PM
pea
k tr
affic
volu
mes
◆
Hun
nell
Road
: 100
-595
veh
icle
s/ho
ur
■Em
erge
ncy
serv
ice
prov
ider
resp
onse
tim
es w
ill d
ecre
ase
whe
n co
mpa
red
to th
e N
o Bu
ild A
ltern
ativ
e fo
r 5 o
ut
of 6
sam
pled
rout
es a
nd w
ill in
crea
se
for 1
out
of 6
rout
es. R
espo
nse
times
w
ill in
crea
se c
ompa
red
to e
xist
ing
cond
ition
s due
to in
crea
sed
traffi
c vo
lum
es.
■
Acc
ess t
o no
rthb
ound
and
so
uthb
ound
US
97 w
ill o
ccur
at
Empi
re A
venu
e an
d th
e no
rthe
rn
signa
lized
inte
rsec
tion
of U
S 97
and
3r
d St
reet
.
Temporary construction
impacts
■
Non
e.
■Re
siden
ces a
ffect
ed b
y te
mpo
rary
road
clo
sure
s, de
tour
s, de
lay
and
cong
estio
n, m
odifi
ed tr
avel
rout
es, a
ppro
ach
chan
ges
■
Busin
esse
s affe
cted
by
tem
pora
ry ro
ad c
losu
res,
deto
urs,
dela
y an
d co
nges
tion,
mod
ified
trav
el ro
utes
, app
roac
h ch
ange
s.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-40 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Park
s an
d R
ecre
atio
nal
Fac
ilit
ies
Long-term impacts
■
Non
e.
■N
one
No
conv
ersio
n of
exi
stin
g pa
rk o
r rec
reat
iona
l fac
ilitie
s or a
ltera
tion
of e
xist
ing
trai
ls
■C
onne
ctiv
ity a
nd fu
nctio
n of
pla
nned
trai
ls re
tain
ed
■Re
quire
s refi
nem
ent o
f the
con
cept
ual a
lignm
ent o
f the
Rai
ls w
ith T
rails
Cor
rido
r at c
ross
ing
with
Coo
ley
Road
■
No
impa
cts t
o Se
ctio
n 4(
f) o
r Sec
tion
6(f)
reso
urce
s.
■Re
quire
s refi
nem
ent o
f con
cept
ual a
lignm
ent o
f the
ext
ensio
n of
the
Nor
th
Park
way
Tra
il be
twee
n Em
pire
Ave
nue
and
Roba
l Roa
d.
■
Requ
ires r
efine
men
t of c
once
ptua
l al
ignm
ent o
f the
ext
ensio
n of
the
Nor
th P
arkw
ay T
rail
betw
een
Empi
re A
venu
e an
d Ro
bal R
oad;
tr
ail u
nder
cros
sing
incl
uded
in
desig
n of
Pre
ferr
ed A
ltern
ativ
e w
ill
acco
mm
odat
e re
alig
nmen
t of t
his
futu
re tr
ail
Temporary construction
impacts
■
Non
e.
■Tr
ail u
sers
exp
osed
to c
onst
ruct
ion
nois
e, v
ehic
le, a
nd w
ork
light
illu
min
atio
n, a
nd a
ir an
d du
st e
mis
sions
.
His
tori
c R
esou
rces
Long-term impacts
■
Non
e.
■Fi
ndin
g: A
dver
se e
ffect
to o
ne h
isto
rical
ly si
gnifi
cant
pro
pert
y, re
sulti
ng in
a
“use
” und
er S
ectio
n 4(
f)
■
Find
ing:
No
adve
rse
effec
t to
four
five
his
toric
ally
sign
ifica
nt p
rope
rtie
s, re
sulti
ng in
a “d
e min
imis
impa
ct” u
nder
Sec
tion
4(f)
.
■
Sect
ion
106
findi
ng o
f adv
erse
effe
ct
and
Sect
ion
4(f)
indi
vidu
al e
valu
atio
n fo
r the
Nel
s and
Lill
ian
And
erse
n H
ouse
impa
cted
by
relo
catio
n or
re
mov
al.
■
Sect
ion
4(f)
de
min
imis
find
ings
for:
Ore
gon
Trun
k Ra
ilway
and
Sw
alle
y Ri
ley
Late
ral.
Temporary construction
impacts
■
Non
e.
■Te
mpo
raril
y aff
ect h
isto
ric re
sour
ces w
ith d
ust,
nois
e an
d vi
brat
ion.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-41
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Vis
ual
Res
ourc
es
Long-term
impacts
■N
one.
■
Dec
reas
e th
e vi
sual
qua
lity
in th
e ar
ea b
etw
een
Coo
ley
Road
and
For
t Th
omps
on L
ane,
incl
udin
g th
e H
unne
ll ne
ighb
orho
od.
■
Min
imal
dec
reas
e in
vis
ual q
ualit
y w
ithin
the
API
.
Temporary construction
impacts
■
Non
e.
■Te
mpo
rary
vis
ual i
mpa
cts d
ue to
con
stru
ctio
n eq
uipm
ent,
mat
eria
ls, a
nd w
ork
activ
ities
■
Gla
re fr
om c
onst
ruct
ion
light
s.
Wat
er Q
ual
ity,
Sto
rmw
ater
Ru
nof
f, an
d H
ydro
logy
Long-term impacts
■
44 a
cres
of i
mpe
rvio
us su
rfac
es
■50
% st
orm
wat
er tr
eatm
ent
(inci
dent
al tr
eatm
ent o
nly)
■
0 st
orm
wat
er p
onds
and
0
stor
mw
ater
swal
es
■N
o ch
ange
to ro
adw
ay p
ollu
tant
lo
ads p
er y
ear
■
No
dryw
ells
and
drai
nwel
ls re
mov
ed o
r sto
rmw
ater
trea
tmen
t in
stal
led.
■
49 a
cres
of n
et n
ew im
perv
ious
su
rfac
es
■99
acr
es o
f im
perv
ious
surf
aces
tr
eate
d
■10
0% st
orm
wat
er tr
eatm
ent (
56%
fo
rmal
trea
tmen
t, 44
% in
cide
ntal
tr
eatm
ent)
■
6 st
orm
wat
er p
onds
and
3
stor
mw
ater
swal
es (2
.3 a
cres
)
■In
crea
sed
road
way
pol
luta
nt lo
ads
per y
ear.
■
40 a
cres
of n
et n
ew im
perv
ious
su
rfac
es
■90
acr
es o
f im
perv
ious
surf
aces
tr
eate
d
■10
0% st
orm
wat
er tr
eatm
ent (
63%
fo
rmal
trea
tmen
t, 37
% in
cide
ntal
tr
eatm
ent)
■
6 st
orm
wat
er p
onds
and
4
stor
mw
ater
swal
es (2
.4 a
cres
)
■In
crea
sed
road
way
pol
luta
nt lo
ads
per y
ear.
■
39 a
cres
of n
et n
ew im
perv
ious
su
rfac
es
■95
acr
es o
f im
perv
ious
surf
aces
tr
eate
d
■10
0% st
orm
wat
er tr
eatm
ent (
59%
fo
rmal
ly tr
eate
d, 4
1% in
cide
ntal
ly
trea
ted)
■
15 st
orm
wat
er p
onds
and
6
stor
mw
ater
swal
es (2
.7 a
cres
)
■In
crea
sed
road
way
pol
luta
nt lo
ads
per y
ear.
■
Exis
ting
dryw
ells
and
drai
nwel
ls re
mov
ed a
nd st
orm
wat
er tr
eatm
ent f
acili
ties i
nsta
lled
to b
enefi
t gro
undw
ater
by
rem
ovin
g a
rout
e fo
r con
tam
inan
ts to
reac
h gr
ound
wat
er a
nd d
rink
ing
wat
er
Temporary construction
impacts
■
Non
e.
■Po
tent
ial s
oil e
rosio
n, in
crea
sing
sedi
men
t and
susp
ende
d so
lids f
rom
cle
arin
g an
d gr
adin
g of
115
–140
acr
es
■Po
tent
ial c
oncr
ete
spill
s or c
onta
min
ant m
ovem
ent f
rom
stor
mw
ater
runo
ff.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-42 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Nat
ura
l Sys
tem
s an
d C
omm
un
itie
s
Long-term impacts
■
No
rem
oval
of s
trat
egy
habi
tat
■
No
loss
of h
abita
t lin
kage
feat
ure
■
Rem
oval
of 6
6 ac
res o
f wes
tern
ju
nipe
r woo
dlan
ds h
abita
t and
sa
gebr
ush
shru
blan
ds/s
hrub
-st
eppe
stra
tegy
hab
itat
■
Loss
of a
ppro
xim
atel
y 95
0 lin
ear
feet
of h
abita
t lin
kage
feat
ure
thro
ugh
pipi
ng o
f the
Sw
alle
y C
anal
.
■Lo
ss o
f app
roxi
mat
ely
70 li
near
feet
of
hab
itat l
inka
ge fe
atur
e th
roug
h pi
ping
of t
he S
wal
ley
Rile
y La
tera
l.
■
Rem
oval
of 6
2 ac
res o
f wes
tern
ju
nipe
r woo
dlan
ds h
abita
t and
sa
gebr
ush
shru
blan
ds/s
hrub
-ste
ppe
stra
tegy
hab
itat
■
Loss
of a
ppro
xim
atel
y 2,
300
linea
r fe
et o
f hab
itat l
inka
ge fe
atur
e th
roug
h pi
ping
of t
he S
wal
ley
Can
al.
■
Loss
of a
ppro
xim
atel
y 70
line
ar fe
et
of h
abita
t lin
kage
feat
ure
thro
ugh
pipi
ng o
f the
Sw
alle
y Ri
ley
Late
ral.
■
Rem
oval
of 1
6 ac
res o
f wes
tern
ju
nipe
r woo
dlan
ds h
abita
t and
sa
gebr
ush
shru
blan
ds/s
hrub
-ste
ppe
stra
tegy
hab
itat
■
Loss
of a
ppro
xim
atel
y 70
line
ar fe
et o
f ha
bita
t lin
kage
feat
ure
thro
ugh
pipi
ng
of th
e Sw
alle
y Ri
ley
Late
ral.
Temporary construction
impacts
■
Non
e.
■St
rate
gy h
abita
ts te
mpo
raril
y ex
pose
d to
incr
ease
d no
ise,
dus
t, an
d hu
man
act
ivity
dur
ing
cons
truc
tion.
Wet
lan
ds
and
Oth
er W
ater
s
Long-term impacts
■
No
new
can
al p
ipin
g as
a re
sult
of
the
prop
osed
act
ion.
■
Pipe
app
roxi
mat
ely
950
feet
of t
he
Swal
ley
Can
al.
■
New
pip
ing
of la
tera
l lin
es
conn
ectin
g to
Sw
alle
y M
ain
Can
al
Pipe
line:
515
feet
.
■
Pipe
app
roxi
mat
ely
2,30
0 fe
et o
f the
Sw
alle
y C
anal
.
■N
ew p
ipin
g of
late
ral l
ines
co
nnec
ting
to S
wal
ley
Mai
n C
anal
Pi
pelin
e: 5
15 fe
et.
■
New
pip
ing
of la
tera
l lin
es c
onne
ctin
g to
Sw
alle
y M
ain
Can
al P
ipel
ine:
380
fe
et.
Temporary construction
impacts
■
Non
e.
■N
o im
pact
s to
wet
land
s and
oth
er w
ater
s bec
ause
con
stru
ctio
n of
can
al c
ross
ings
wou
ld o
ccur
dur
ing
dry
cond
ition
s.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-43
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Th
reat
ened
an
d E
nd
ange
red
Sp
ecie
sLong-term impacts
■
No
habi
tat r
emov
al fo
r thr
eate
ned
and
enda
nger
ed sp
ecie
s.
■Re
mov
al o
f 1 a
cre
of m
argi
nal h
abita
t for
a st
ate
thre
aten
ed p
lant
.
Temporary construction
impacts
■
Non
e.
■N
one.
Non
-Th
reat
ened
an
d E
nd
ange
red
Sp
ecie
s
Long-term impacts
■
No
loss
of h
abita
t for
stra
tegy
sp
ecie
s
■N
o lo
ss o
f urb
an h
abita
t.
■
Loss
of 6
6 ac
res o
f hab
itat f
or
non-
thre
aten
ed a
nd e
ndan
gere
d,
stra
tegy
spec
ies a
ssoc
iate
d w
ith th
e w
este
rn ju
nipe
r woo
dlan
ds h
abita
t an
d sa
gebr
ush
shru
blan
ds/s
hrub
-st
eppe
stra
tegy
hab
itat.
■
Loss
of 6
2 ac
res o
f hab
itat f
or n
on-
thre
aten
ed a
nd e
ndan
gere
d, st
rate
gy
spec
ies a
ssoc
iate
d w
ith th
e w
este
rn
juni
per w
oodl
ands
hab
itat a
nd
sage
brus
h sh
rubl
ands
/shr
ub-s
tepp
e st
rate
gy h
abita
t.
■
Loss
of 1
6 ac
res o
f hab
itat f
or n
on-
thre
aten
ed a
nd e
ndan
gere
d, st
rate
gy
spec
ies a
ssoc
iate
d w
ith th
e w
este
rn
juni
per w
oodl
ands
hab
itat a
nd
sage
brus
h sh
rubl
ands
/shr
ub-s
tepp
e st
rate
gy h
abita
t.
■
Loss
of 3
4 ac
res o
f urb
an h
abita
t.
■Lo
ss o
f 24
acre
s of u
rban
hab
itat.
Temporary construction
impacts
■
Non
e.
■N
on-t
hrea
tene
d an
d en
dang
ered
spec
ies t
empo
raril
y ex
pose
d to
incr
ease
d no
ise,
dus
t, an
d hu
man
act
ivity
.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-44 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Inva
sive
Sp
ecie
s
Long-term impacts
■
No
impr
ovem
ents
to ro
adw
ays
near
prio
rity
inva
sive
spec
ies.
■
Incr
ease
d ro
adw
ay a
ctiv
ity a
long
Coo
ley
Road
and
Cla
usen
Dri
ve re
sulti
ng fr
om ro
adw
ay im
prov
emen
ts, p
oten
tially
sp
read
ing
prio
rity
inva
sive
spec
ies.
Temporary construction
impacts
■
Non
e.
■A
ppro
xim
atel
y 15
2 14
0 ac
res
of g
roun
d di
stur
bed
durin
g co
nstr
uctio
n, re
sulti
ng in
the
pote
ntia
l spr
ead
of in
vasiv
e sp
ecie
s.
■
App
roxi
mat
ely
132
acre
s of g
roun
d di
stur
bed
durin
g co
nstr
uctio
n,
resu
lting
in th
e po
tent
ial s
prea
d of
in
vasiv
e sp
ecie
s.
■
App
roxi
mat
ely
115
acre
s of g
roun
d di
stur
bed
duri
ng c
onst
ruct
ion,
re
sulti
ng in
the
pote
ntia
l spr
ead
of
inva
sive
spec
ies.
Air
Qu
alit
y
Long-term impacts
■
Redu
ctio
n of
regi
onal
and
loca
l lev
el m
obile
sour
ce a
ir to
xic
emis
sion
s due
to n
atio
nal e
mis
sions
con
trol
pro
gram
s reg
ardl
ess o
f any
loca
l inc
reas
e in
veh
icle
-m
iles t
rave
led
on U
S 97
■
Sinc
e no
alte
rnat
ive
is p
redi
cted
to a
ffect
regi
onal
VM
T, b
ackg
roun
d po
lluta
nt c
once
ntra
tions
are
not
exp
ecte
d to
incr
ease
and
loca
lized
pol
luta
nt
conc
entr
atio
ns a
re n
ot e
xpec
ted
to e
xcee
d th
e N
atio
nal A
mbi
ent A
ir Q
ualit
y St
anda
rds (
NA
AQ
S).
Temporary construction
impacts
■
Non
e.
■Te
mpo
rary
deg
rada
tion
of a
ir qu
ality
resu
lting
from
exc
avat
ion,
gra
ding
, hau
ling
and
vari
ous o
ther
act
iviti
es
■Sh
ort-
term
em
issio
ns fr
om c
onst
ruct
ion
equi
pmen
t, in
clud
ing
carb
on m
onox
ide,
nitr
ogen
oxi
des,
vola
tile
orga
nic
com
poun
ds, d
irect
ly-e
mitt
ed re
spira
ble
and
fine
part
icul
ate
mat
ter,
and
toxi
c ai
r con
tam
inan
ts su
ch a
s die
sel e
xhau
st
part
icul
ate
mat
ter.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-45
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Noi
seLong-term impacts
■
Noi
se im
pact
s at 1
8 sit
es, i
nclu
ding
46
resid
ence
s and
5 b
usin
esse
s.
■N
oise
impa
cts a
t 23
sites
, inc
ludi
ng
59 re
siden
ces a
nd 5
bus
ines
ses.
N
oise
impa
cts a
t 26
sites
, in
clud
ing
63 re
siden
ces a
nd
5 bu
sines
ses.
■
Noi
se im
pact
s at 2
1 sit
es, i
nclu
ding
67
resid
ence
s and
out
door
are
as a
t 8
busin
esse
s.
Temporary construction
impacts
■
Non
e.
■N
oise
tem
pora
rily
gene
rate
d by
con
stru
ctio
n ac
tiviti
es, e
quip
men
t, an
d de
liver
y ve
hicl
es.
Ener
gy
Long-term impacts
■
Vehi
cle-
mile
s tra
vele
d in
the
API
: 41
1,28
4 m
iles/
day
■
Fuel
con
sum
ptio
n: 1
5,66
3 ga
llons
/da
y
■En
ergy
con
sum
ptio
n: 2
,022
mill
ion
Briti
sh Th
erm
al U
nits
(Btu
)/da
y.
■
Vehi
cle-
mile
s tra
vele
d in
the
API
: 67
0,44
9 m
iles/
day
■
Fuel
con
sum
ptio
n: 2
5,48
7 ga
llons
/da
y
■En
ergy
con
sum
ptio
n: 3
,293
mill
ion
Btu/
day.
■
Vehi
cle-
mile
s tra
vele
d in
the
API
: 63
4,14
4 m
iles/
day
■
Fuel
con
sum
ptio
n: 2
4,22
0 ga
llons
/da
y
■En
ergy
con
sum
ptio
n: 3
,128
mill
ion
Btu/
day.
■
Vehi
cle-
mile
s tra
vele
d in
the
API
: 43
6,45
7 m
iles/
day
■
Fuel
con
sum
ptio
n: 1
6,44
2 ga
llons
/day
■
Ener
gy c
onsu
mpt
ion:
2,1
19 m
illio
n Bt
u/da
y.
Temporary construction
impacts
■
Non
e.
■Fu
el c
onsu
mpt
ion:
7.5
mill
ion
gallo
ns
■En
ergy
con
sum
ptio
n: 9
32,1
70
mill
ion
Btu.
■
Fuel
con
sum
ptio
n: 7
.6 m
illio
n ga
llons
■
Ener
gy c
onsu
mpt
ion:
953
,114
m
illio
n Bt
u.
■
Fuel
con
sum
ptio
n: 7
.0 m
illio
n ga
llons
■
Ener
gy c
onsu
mpt
ion:
880
,245
mill
ion
Btu.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-46 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhi
bit E
S-7
FEIS
: Sum
mar
y of
Adv
erse
and
Ben
efici
al Im
pact
s of t
he P
ropo
sed
Act
ion
Res
ourc
e El
emen
tN
o B
uil
d A
lter
nat
ive
East
DS
1 A
lter
nat
ive
East
DS
2 A
lter
nat
ive
Pref
erre
d A
lter
nat
ive
Geo
logy
Long-term impacts
■
No
grou
nd d
istu
rban
ce.
■
152
140
acre
s of g
roun
d di
stur
banc
e.
■13
2 ac
res o
f gro
und
dist
urba
nce.
■
115
acre
s of g
roun
d di
stur
banc
e.
Temporary construction
impacts
■
Non
e.
■Er
osio
n of
exp
osed
soils
.
Haz
ard
ous
Mat
eria
ls
Long-term impacts
■
No
dist
urba
nce
or re
med
iatio
n of
kn
own
cont
amin
ated
site
s.
■Po
tent
ial d
istu
rban
ce a
nd re
med
iatio
n of
1 in
divi
dual
and
3 m
ulti-
prop
erty
kno
wn
cont
amin
ated
site
s.
Temporary construction
impacts
■
Non
e.
■Po
tent
ial e
xpos
ure
or m
obili
zatio
n of
con
tam
inan
ts fr
om g
radi
ng
■Po
tent
ial c
onta
min
atio
n of
wat
er d
isch
arge
are
as fr
om d
ewat
erin
g
■Po
tent
ial d
istu
rban
ce o
f unk
now
n co
ntam
inat
ion
(und
ocum
ente
d st
orag
e ta
nks,
asbe
stos
-con
tain
ing
mat
eria
ls an
d le
ad-b
ased
pai
nt) f
rom
exc
avat
ion,
ear
thw
ork,
gra
ding
, and
util
ity w
ork
■
Pote
ntia
l mer
cury
gro
undw
ater
con
tam
inat
ion
and
wor
ker e
xpos
ure
to m
ercu
ry fr
om h
igh
inte
nsity
disc
harg
e m
ercu
ry
vapo
r lam
ps.
Not
e: Th
is re
vise
d ex
hibi
t refl
ects
cor
rect
ions
to th
e im
pact
s tha
t wou
ld re
sult
from
the
East
DS1
and
Eas
t DS2
Alte
rnat
ives
, inc
lude
s upd
ated
info
rmat
ion
for t
he 2
036
No
Build
Alte
rnat
ive
whe
re
appl
icab
le, a
nd in
clud
es th
e im
pact
s and
ben
efits
of t
he P
refe
rred
Alte
rnat
ive.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-47
Executive Summary
ES.5 Unresolved Issues There are several outstanding issues that will need to be resolved prior to publishing the Final EIS. These issues were identified by the project team earlyon and are expected to be successfully resolved.
All of the unresolved issues identified in the Draft EIS have been resolved for the Preferred Alternative, as demonstrated in the following sections.
Goal Exceptions Construction of roadways outside of the UGB would require exceptions to Oregon Statewide Planning Goals 11 (public facilities and services) and 14 (urbanization). Two goal exceptions are anticipated for the East DS1 and East DS2 Alternatives: one for the new US 97/3rd Street interchange and one for the Robal Road extension west of US 20 to OB Riley Road. Through the goal exception process, the proposed action would need to demonstrate that it meets the applicable standards for exceptions for transportation improvements, which are listed in OAR 660-012-0070. They require the applicant to:
■ Identify the transportation need
■ Demonstrate that the need cannot “reasonably be accommodated” through alternatives not requiring goal exceptions, such as through improvements to existing facilities or in locations not requiring new exceptions (such as on lands inside the UGB)
■ Compare the economic, social, environmental and energy consequences of the recommended alternative with other alternatives, and select the recommended alternative only if the net economic, social, environmental and energy consequences of that alternative, with mitigation, are not significantly more adverse than the net consequences of the other alternatives
■ Provide measures to minimize development pressures on rural lands and protect such lands for rural uses.
The Preferred Alternative will not require any exceptions to the statewide planning goals. All of the improvements will be contained within the City of Bend’s UGB except for the extension of Britta Street and the modification of the Cooley Road/O.B. Riley Road intersection to construct a roundabout, which will be constructed to County standards.
Interchange Area Management PlansInterchange area management plans would be developed to protect the function of the existing interchange at Empire Avenue and a future interchange in the northern portion of the API. The interchange area management plan for the Empire Avenue interchange would
DefinitionOregon Statewide Planning Goals
The Oregon Statewide Planning Goals were established in 1973 and constitute the framework for the statewide land use planning program.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-48 | July 2014 US 97 Bend North Corridor Project
Executive Summary
help ensure that this facility continues to provide safe and efficient connections between US 97, US 20, and the local roadways within the vicinity of the interchange. The interchange area management plan for the new northern interchange under the East DS1 and East DS2 Alternatives would serve a similar function; to ensure that the US 97 facility would operate as intended over a long-range planning horizon. Both interchange area management plans would identify land use management strategies, short-term and long-term transportation improvements, access management goals, and strategies to fund identified improvements. The City of Bend and Deschutes County would adopt policies and ordinances necessary to implement the interchange area management plans prior to the publication of the Final EIS. The interchange area management plans would be adopted by the Oregon Transportation Commission prior to the beginning of construction.
Since the publication of the Draft EIS, ODOT determined that no changes to land use along Empire Avenue would occur, so an interchange area management plan would not be required for the US 97/Empire Avenue interchange. The Preferred Alternative does not include a northern interchange and no changes to land use along Empire Avenue will occur; thus an interchange area management plan is not required.
Highway DesignationsUS 97 is currently classified as a highway of statewide significance and is designated as an expressway and as a freight route on the National Highway System. The proposed new alignments associated with the build alternatives would be constructed and operated as an access controlled expressway consistent with the bypass policies in the Oregon Highway Plan and Bypass Policy. The remaining portion of US 97 would be reclassified by the Oregon Transportation Commission or transferred to the local jurisdiction.
ODOT will coordinate with the Oregon Transportation Commission to apply the bypass, expressway, and freight route designations to the portions of US 97 that will be realigned under the Preferred Alternative.
Local Plan Amendments and Land Use PermitsThe Preferred Alternative to be identified in the Final EIS would need to be adopted and amended into the Bend Metropolitan Planning Organization’s 2007–2030 Metropolitan Transportation Plan. The 2007–2030 Metropolitan Transportation Plan is a 20-year long-range transportation plan that addresses all modes of transportation, establishes transportation policy and project priorities, and includes a financially constrained project list. Part of the long-range planning process is development of a long-range revenue forecast. Only projects
DefinitionInterchange Area Management Plan
An interchange area management plan is a joint ODOT and local government long term (20+ years) transportation and land use plan to balance and manage transportation and land use decisions in interchange areas, and is an important tool in protecting the function of state highway interchanges and the support-ing local street network (ODOT 2006b).
DefinitionBypass
Bypasses are highways designed to maintain or increase mobility for through traffic. Generally they relo-cate the highway alignment around a downtown, an urban or metropolitan area or an existing highway to provide an alternative route for through traffic using that highway.
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-49
Executive Summary
that fit within or can be funded with forecasted revenues are included in the 2007–2030 Metropolitan Transportation Plan. ODOT is coordinating with the Bend Metropolitan Planning Organization for adoption of the Preferred Alternative into the next update of the plan (FHWA 2011).
The Preferred Alternative would also need to be adopted and amended into the Bend Area General Plan, Bend Urban Area Transportation System Plan, Deschutes County Comprehensive Plan, and Deschutes County Transportation System Plan. Any new local roads outside of existing right of way could require land use permits from the City and County.
Portions of the Preferred Alternative have identified funding and are included in the financially-constrained list in the 2007-2030 Metropolitan Transportation Plan. On August 15, 2013, the Bend Metropolitan Planning Organization voted to amend the 2007-2030 Metropolitan Transportation Plan to include the remaining portions of Preferred Alternative in the Plan’s illustrative list, thereby making the Preferred Alternative consistent with this plan.
As determined by Deschutes County in June 2013, the Britta Street extension in unincorporated Deschutes County, which is part of the Preferred Alternative, is already included in the Deschutes County Transportation System Plan (see Appendix M). The roundabout at Cooley Road and O.B. Riley Road has been designed in coordination with Deschutes County. On June 14, 2013, ODOT and Deschutes County agreed that this improvement will be added to the Deschutes County Transportation System Plan when the project is funded for construction. Therefore, the Preferred Alternative is consistent with the Deschutes County Transportation System Plan and the Deschutes County Comprehensive Plan.
The City of Bend’s Bend Urban Area Transportation System Plan has been amended to include the Preferred Alternative (March 5, 2014).
Areas Remaining to be SurveyedSome areas within the area of potential effect (APE) have not yet been surveyed for archaeological resources due to land owners not granting permission for surveys and design changes to the alternatives that occurred since the surveys were conducted. Upon gaining right of entry ODOT would survey all remaining areas and comply with Section 106 of the National Historic Preservation Act prior to construction.
All areas within the design footprint of the Preferred Alternative have been surveyed for archaeological resources, with the exception of small areas adjacent to the existing right of way on eight parcels that
DefinitionArea of Potential Effect (APE)
The APE is the area within which an undertaking may cause direct or indirect effects to the character or use of his-toric properties.
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-50 | July 2014 US 97 Bend North Corridor Project
Executive Summary
total approximately 1.8 acres. The Final EIS includes a commitment by ODOT to survey these remaining areas for archaeological resources prior to construction as ODOT purchases right of way and takes ownership.
ES.6 Identified Areas of Concern Throughout the alternatives development process a number of issues were raised by the public, participating agencies, and the ODOT-sponsored committees. Generally, the primary areas of concern were:
■ Changes to Approaches and Travel Routes—Visibility of businesses from the realigned US 97, travel routes to businesses from US 97, and changes to businesses’ private driveways, public street connections, and public approach roads are concerns that have been raised repeatedly
■ Emergency Service Providers—Impacts to emergency response time as a result of altered travel routes and loss of emergency response vehicle maneuvering (U-turn) on US 97 between Empire Avenue and Cooley Road have been raised as an area of concern by emergency service providers
■ Business and Residential Displacements—Representatives from individual businesses, established business areas, and the residential areas in and around the API have expressed concern about displacements resulting from right of way acquisition and availability of commercial, industrial and residential properties that would be suitable for relocation
■ Quality of Life—Concerns regarding potential impacts to quality of life have been raised by residents and business representatives throughout the API. These impacts could include:
● Increased air, noise, and visual impacts of new and expanded local roads, elevated structures, and the realignment of US 97 closer to residential neighborhoods
● Availability of affordable housing for relocated residents ● Roadway connectivity and travel routes to existing and future
destinations, including out-of-direction travel once access is modified and private driveways on US 97 are eliminated.
The Preferred Alternative was specifically developed to address many of these concerns either through avoidance, such as replacing the northern interchange with a signalized intersection that is wholly contained within the City of Bend UGB, or minimization, such as decreasing impacts to rural residential lands.
More InformationThree ODOT sponsored committees conducted formal meetings through-out development of the proposed action, including:
■ Citizen Advisory Committee ■ Agency Coordination Committee ■ Steering Team
Ch
apter 1
Purpose of and Need For Proposed Action
Ch
apter 2
Alternatives
Ch
apter 3
Affected Environment, Environm
ental Consequences and M
itigation
Ch
apter 4
Cumulative Im
pacts
Ch
apter 5
Local Short-term Uses and
Long-term Productivity
Ch
apter 6
Irreversible and Irretrievable Com
mitm
ent of Resources
Ch
apter 7
Comm
ents and Coordination
US 97 Bend North Corridor Project July 2014 | ES-51
Executive Summary
ES.7 Permits and Approvals NeededFederal, state, and local actions, permits, plan amendments, and approvals would be required for the proposed action, as listed in Exhibit ES-8 FEIS.
ODOT will obtain these permits, approvals, plan amendments, and licenses for the Preferred Alternative prior to initiating construction.
ES.8 Avoidance, Minimization, and/or Mitigation Commitments Incorporated into the Preferred Alternative
Avoidance, minimization, and mitigation commitments incorporated into the Preferred Alternative may be found in each subsection of Chapter 3.Exhibit ES-8 FEIS: Permits and Approvals Required
Agency Permit/Approval/License Updated Final EIS Status
Federal Highway Administration
Section 106 determination with Memorandum of Agreement Completed
Federal Highway Administration
Section 4(f ) Evaluation Approval Completed
Oregon Department of Environmental Quality
National Pollution Discharge Elimination System General Construction Permits (including 1200-CA)
To Be Obtained During Final Design
Oregon Department of Environmental Quality
Oversight of hazardous materials issues To Be Obtained During Final Design
Oregon Department of Environmental Quality
Site preparation permits for grading, erosion, blasting, and air and noise emissions
To Be Obtained During Final Design
Oregon Department of Transportation
Permit for relocation of utility lines in a state road right of way To Be Obtained During Final Design
Oregon Department of Transportation
Compliance with Oregon Senate Bill 408 To Be Obtained During Final Design
Oregon Department of Water Resources
Water Rights To Be Obtained During Final Design
State Historic Preservation Office
Section 106 Historic Resource Concurrence Completed
Bend Metropolitan Planning Organization
Amendment of 2007-2030 Metropolitan Transportation Plan Completed
Deschutes County Amendment of Deschutes County Comprehensive Plan Not Required for the Preferred Alternative
Deschutes County Amendment of Deschutes County Transportation System Plan Not Required for the Preferred Alternative
Deschutes County Compliance with Deschutes County Code To Be Obtained During Final Design
Deschutes County Goal Exception Application for Statewide Planning Goals 11 (Public Facilities and Services) and 14 (Urbanization)
Not Required for the Preferred Alternative
Deschutes County Grading Permit To Be Obtained During Final Design
Ch
apte
r 1
Purp
ose
of a
nd N
eed
For
Prop
osed
Act
ion
Ch
apte
r 2
Alte
rnat
ives
Ch
apte
r 3
Affe
cted
Env
ironm
ent,
Envi
ronm
enta
l Co
nseq
uenc
es a
nd M
itiga
tion
Ch
apte
r 4
Cum
ulat
ive
Impa
cts
Ch
apte
r 5
Loca
l Sho
rt-te
rm U
ses
and
Long
-ter
m P
rodu
ctiv
ity
Ch
apte
r 6
Irrev
ersi
ble
and
Irret
rieva
ble
Com
mitm
ent o
f Res
ourc
es
Ch
apte
r 7
Com
men
ts a
nd C
oord
inat
ion
ES-52 | July 2014 US 97 Bend North Corridor Project
Executive Summary
Exhibit ES-8 FEIS: Permits and Approvals Required
Agency Permit/Approval/License Updated Final EIS Status
Deschutes County Land Use Permit To Be Obtained During Final Design
Deschutes County Noise variance To Be Obtained During Final Design
Deschutes County Utility Permit To Be Obtained During Final Design
City of Bend Amendment of Bend Area General Plan Completed
City of Bend Amendment of Bend Urban Area Transportation System Plan Completed
City of Bend Approval of a Special Planned Areas application (Lava Ridge Refinement Plan Area)
To Be Obtained During Final Design
City of Bend Land Use Permit To Be Obtained During Final Design
City of Bend Landmarks Commission Approval for relocating or removing the Nels and Lillian Andersen House
To Be Obtained During Final Design
City of Bend Demolition Permit To Be Obtained During Final Design
City of Bend Noise variance To Be Obtained During Final Design
City of Bend Compliance with Bend Development Code To Be Obtained During Final Design
BNSF Railway Encroachment/Crossing Permit To Be Obtained During Final Design
Swalley Irrigation District Encroachment/Crossing Easements To Be Obtained During Final Design
Note: This exhibit was updated to identify the status of each permit or approval at the time of publication of the Final EIS. Additional permits and approvals identified during the development of the Final EIS are shown in the colored text.