US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01, 430853-1-62-01, 424299-1-62-01 June 22, 2012 Presented by AECOM Technical Services, Inc. Presented to: Florida Department of Transportation District One

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Embed Size (px)

Citation preview

Page 1: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192Financial Project Number: 197534-4-62-01, 430853-1-62-01, 424299-1-62-01

June 22, 2012

Presented by

AECOM Technical Services, Inc.

Presented to:

Florida Department of TransportationDistrict One

Page 2: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Agenda

• Awareness of / Approach to Project Issues– Understanding the Scope – Identification of Unique Project Issues– Innovative Concepts

• Proposed Staffing– Quantity Proposed– Availability of Staff– Qualifications/Certifications of Staff– Quality/Experience on Similar Projects– Team’s Past Performance on Similar Projects

• Other Considerations– Communication Abilities– Commitment to Satisfy Department Needs

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 2

Page 3: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 3

Awareness of / Approach to Project Issues

Page 4: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Design-Build Acquisition Support

• Provide Qualified and Experienced Staff

• Serve as the Department’s Senior Project Engineer, Project Administrator, Contract Support Specialist and Inspectors

• Primary Role is to Take Charge, Lead and Manage the US 27 Widening Projects to a Successful Completion

• Administer the Construction Contract

• Provide On-site Inspection to Ensure the Project is Constructed in Reasonable Conformance with the Plans, Special Provisions, Specifications and all other Contract Documents

• Coordination with District 1 and District 5

• Coordination with District Office Prior to Final Acceptance – Warranties, Final Estimates, CIM, Material Certification

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 4

Page 5: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Experienced Team to Execute the Scope of Work

– Harold Dubon, PE, Senior Project Engineer *• Over 23 Years of Construction Experience with Design-Build Experience

– Heath Stocton, PE, Project Administrator • Over 7 Years of Construction Experience with Heavy Utility Coordination

– Gerry Rudewicz, Contract Support Specialist*• Over 23 Years of Construction Experience with Design-Build Experience

– Armando Alvarez, PE, Senior Bridge Inspector *• Over 20 Years of Construction Experience with Design-Build Experience

– John Hunt, Senior Roadway Inspector• Over 13 Years of Construction Experience with Design-Build Experience

– Gus Suteu, PE, Senior ITS Inspector• Over 25 Years of Construction Experience with Design-Build Experience

* Proven and Established Team from Past Design-Build Projects

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 5

Page 6: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Senior Project Engineer – Harold Dubon, PE– Work Hand-in-Hand with the FDOT Project Manager– Design Build Acquisition– Design Phase and Construction Coordination (D1 and D5)– “Released For Construction” Plans– Contract Administration– Full Construction Project Oversight– Project Document Coordination– CPM Schedule Reviews - for Compliance with the Contract– Claims Avoidance and Support– DRB Presentations and Issue Resolution– Final Estimates Certification

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 6

Page 7: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 7

• Project Administrator –– Utility/Preconstruction

Conference– Site Manager/EDMS/LIMS

Meeting– Utility Coordination– Pre-Activity Meetings– Staff Coordination– Meet with QC Manager– Weekly Progress Meetings– Construction Status Reporting

System (CSRS)

Heath Stocton, PE– Verify and Approve Daily

Reports/Site Manager/LIMS

– CPPR– Review QC Plan– Review Cost Proposals– Prepare/Review Proposed

Changes– Environmental Meetings– Public Awareness Meeting– Claims Avoidance and

Support

Page 8: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 8

• Contract Support Specialist - – Review all Contract Documents– Kickoff Meetings– Site Manager/LIMS/EDMS– Field Documentation– Engineering Menu/Multiline– Electronic Review Comments

(ERC)– Materials Documentation– Coordinate with District on

Monthly and Final Estimates– Coordinate As-Builts

Gerry Rudewicz– RFI/Issue Logs– Track Stockpiled Materials– Schedule of Values

Evaluation and Tracking– Shop Drawing Log– Contract Time Tracking– Contract Changes– Plan Revision

Coordination and Distribution

– Maintain Information Management System

Page 9: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Senior Inspectors– Supervision of Inspectors– Maintenance of Traffic– Field Activities Coordination with Prime/Subcontractors– Sampling, Testing and Maintaining Sample Logs– Coordination with QC Manager and QC Technicians– Coordination with District Materials Staff– QC/VT Log Book Reviews– Utilization of the CPPR Process– Site Manager– LIMS– Monthly and Final Estimate Quantity Field Records

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 9

Page 10: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Public Information Officer – Alice Ramos– Electronic Updates to the Public– Develop and Maintain Project Website – Press Releases / Newsletters– Site Visits– Attend Weekly Progress Meetings– Comment Logs– Public Meetings/Open House– Road Watch Updates

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 10

Page 11: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Pre-activity Meetings– Purpose: Compliance of QC Plan

• Pile Driving• Earthwork• Noise/Gravity Walls• Drainage Construction

– Pond at US 192 Interchange• Milling and Asphalt Paving

– MOT– Design Mix Options

• Bridge Construction• Concrete / Mass Concrete • Beam Erection• CIP Walls• Signing And Pavement Markings• Signalization• Landscaping

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 11

Page 12: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Structures– Structural Concrete– Field Inspection – Compliance with QA/QC Guidelist– Verify Construction Layout– Florida I-Beams– Check Beam Camber well in advance

(ASAP after fabrication)– Geotechnical Inspection/Review– Coordination with District Materials Office– Timely DDM’s/CNC’s Submittal– Bridge Load Rating Certification Prior to

Bridge Opening to Public

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 12

Page 13: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• SWPPP/Contamination– Erosion Control Plan Compliance– Post All Permits

– Weekly Reports– Inspection During and After Rain Events– Contamination

• Utility Coordination• Shaw/WRS - Remediation Contractors

– Field Staff Will Verify the Weekly Reports For Compliance. Then Scanned into EDMS

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 13

Page 14: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Maintenance of Traffic– Safety of the Traveling Public and the

Construction Team– Follow FDOT Incident Management Procedures– Ensure Compliance of all MOT Signage and

Equipment– Coordinate with Marshall Douberley and Earl

Taylor for Department Review and Compliance– Verify all MOT Reports Submitted by Contractor and

Entered into EDMS/Hummingbird– Coordinate MOT Phasing with Local Agencies Well

in Advance of Potential Impacts– No Lane Closures Between 7AM and 6PM

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 14

Page 15: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnderstanding of Scope

• Warranties– Between 30 To 90 Days Prior To Final Acceptance Of The Project,

The DWC, OCWC, And Project Administrator Will Meet To Review The

Document Requirements For The Project Warranty

– The Project Administrator Shall Provide A 3-ring Binder With The

Applicable Project Warranty Information.  The Information Shall

Include As A Minimum• The Applicable Specification For Each Warranty Item

• The Applicable Method Of Dispute Resolution For Each Warranty Item, If Not

Identified Within The Specification

• A Separate Tabbed Section Shall Be Provided For Each Warranty Item

• The Complete 3-ring Binder Shall Be Delivered To The District Construction

Office With The Final Estimates Documents

• Other Items To Be Included In The Binder

– Warranty Bond

– Surety Company/Performance BondUS 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 15

Page 16: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues

• Design-Build Process• Utility Relocation• Sound/Gravity Walls Conflicts with Utilities• Sound/Gravity Walls Conflicts with Tree Canopy• Maintenance of Traffic• Structures

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 16

Page 17: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• Design-Build Process– Selection Process

• Pre-Proposal Meeting• D/B Proposal Review

– Design Phase• Phase Submittals• Issue Escalation

– Construction Phase• “Released for Construction”• Plan Revisions• Shop Drawings• Issue Escalation

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 17

Page 18: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• Design-Build Coordination for US 27 Bridge– FDOT D1 and D5

• Pre-Proposal Meeting• D/B Proposal Review

– Design Phase• Scott McCall, P.E. (D1 Design PM)• Chris Dabson, P.E. (D5 Design PM)• Neil Kenis, P.E. (D5 Structures Design)

– Construction Phase• Ron Meade, P.E. (D5 Structures Maintenance)• Phil Maggio, P.E. (D5 Leesburg Operations)

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 18

Page 19: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• AECOM is an Industry Leader for Alternative Delivery in Transportation Infrastructure Projects.

• AECOM Regularly Teams with Major Developers and Concessionaires in Providing Alternative Delivery Services. Overall Design-Build Work Includes Over $20 Billion in Construction Costs.

• AECOM Provides and Offers Owner Services, Planning, and Design Review Services for all Types of Transportation Including Highway, Bridge, Marine, Transit, Rail And Aviation Projects.

• AECOM’s Staff of Seasoned, Alternative Delivery Experts, Specialize in the Management and Engineering of Large, Complex Transportation Projects. The Skills of Our Core Team, Combined with our Local Knowledge and Resources, Bring Distinct Advantages to District One.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 19

Page 20: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• AECOM Offers our Key Senior Managers/Engineers to Assess the Qualifications of LOI’s The Submitting Design-Build Teams and to Assist the Department in Evaluating the Technical Proposals of the Shortlisted Teams.

• During the LOI phase, we will Assist The Department In Evaluating Each Design-Build Team as to the Selection Criteria and we will Provide AECOM’s Insight to Various Design-build Teams Strengths and Weaknesses for Consideration.

• Assist in the Review of the Design-Build Technical Proposals and Participate in Design-Build Meetings.

• Harold Dubon P.E. in Coordination With AECOM’s Design-Build Support Team will Ensure that the Design-Build Plan Submittals During the ERC Process meet the RFP/Contract Requirements.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 20

Page 21: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• AECOM will Provide a Cadre of Senior Engineering Professionals to Assist the Department in Reviewing, and Evaluating any Submitted Alternative Delivery Concepts (ATC) for Conformance with Criteria, Feasibility and Cost Savings.

• We will Provide our Recommendations for Acceptance or Rejection on Each ATC to the Department.

• The Review of The Tender Phase Documents will Serve a Number of Critical Purposes:

• Verify Conformance to The Programmatic and Operational Requirements and Performance Specifications, the Design Meets Minimum Criteria and “Scope Creep” is Contained.

• Ensure that Construction Cost Savings are not Unnecessarily Impacting Quality and that the Project does not Suffer from “Scope Deficit.”

• Verify Compliance with Regulatory and other Commitments.

• Ensure that Design of the Various Project Elements is Coordinated, Including Assessment Of Other Construction Projects that Could Impact this Work.

• Verify Design and Functionality Requirements are Met With Respect to Operations, Life Cycle Costs and Turn-Over Requirements.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 21

Page 22: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Design-Build Process

• The Review will Cover all Facets of the Work, from the Technical Engineering Disciplines such as Grading, Surfacing, Noise Management, Drainage, Signals, Lighting, Signage, Bridge Construction, Maintenance Of Traffic, Environmental and Utilities Coordination, Geotechnical, Surveying and Permitting, to Constructability and Construction Sequencing/Scheduling, as well as Assuring the Opportunity for the Department Reviewers to Comment.

• One of the Key Benefits to the Department of our Team is their Familiarity With your Key Roadway and Bridge Engineers (D1 and D5) and with the Department Procedures and Policies.

• AECOM will Meet with Design-Build EOR, Contractor and Utility Owners (if needed) to Discuss Need for Relocation of Utilities which are Close to Construction Limits but not in Conflict, to Avoid Additional Costs to the Department.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 22

Page 23: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Utility Relocation

• Power Pole Location

– Discrepancy Between Plans and UWS (Approximately 20 Pole Locations)

– UWS Shows Pole Location at Sta. 800+00

– Plan Sheets Shows Pole at 799+10

– AECOM Will Coordinate with D/B Team and Progress Energy

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 23

Page 24: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Utility Relocation

• Power Pole Relocation– Discrepancy Between Plans and

UWS– UWS Shows Pole Location at

Sta. 839+40– Plan Sheet Shows Pole at

838+40– AECOM Will Coordinate with

D/B Team and Progress Energy

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 24

Page 25: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Sound Barrier Wall– Wall Conflicts With Existing

Utilities– Over 2500’ Section of Sound

Wall– Sta. 712+00 to Sta. 737+40

LT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 25

Page 26: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Sound Barrier Wall– Foundation Conflicts With

Existing Underground Utilities– 800’ Section of Sound Wall– Sta. 738+50 to Sta. 746+50 LT– AECOM Will Coordinate with

D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 26

Page 27: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Sound Barrier Wall– Foundation Conflicts With

Existing Underground Utilities

– 1000’ Section of Sound Wall– Sta. 808+00 to Sta. 818+22

LT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 27

Page 28: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Sound Barrier Wall– Foundation Conflict With

Existing Underground Utilities

– 740’ Section of Sound Wall

– Sta. 839+08.52 to Sta. 846+47.59 LT

– AECOM Will Coordinate with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 28

Page 29: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Gravity Wall– Conflict With Existing

Underground Utilities– 1100’ Section of Gravity

Wall– Sta. 709+60 to Sta. 720+25

RT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 29

Page 30: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Gravity Wall– Conflict With Existing

Underground Utilities– 240’ Section of Gravity Wall– Sta. 726+50 to Sta.

728+90.15 RT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 30

Page 31: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project

Unique Project Issues - Sound/Gravity Wall Conflicts with Utilities

• Gravity Wall– Conflict With Existing

Underground Utilities– 825’ Section of Gravity Wall– Sta. 833+75 to Sta. 842+00

LT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 31

Page 32: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues - Conflicts with Tree Canopy

• Sound and Gravity Wall– Existing Tree Canopy

Conflict– Over 500’ Section of Wall– Sta. 832+00 to Sta.

837+38.06 RT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 32

Page 33: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues - Conflicts with Tree Canopy

• Sound Barrier Wall– Foundation Conflicts With

Existing Tree Canopy– Over 2500’ Section of Sound

Wall– Sta. 712+00 to Sta. 737+40

LT– AECOM Will Coordinate

with D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 33

Page 34: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues - Conflicts with Tree Canopy

• Sound Barrier Wall– Conflict With Existing Tree

Canopy– Over 1000’ Section of

Sound Wall– Sta. 807+26 to Sta.

817+85.65 RT– AECOM Will Coordinate

With D/B Team and Utility Owners

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 34

Page 35: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Maintenance of Traffic (Phase I)

– Stage I will consist of milling and resurfacing the existing lanes, construct the walls along the r/w line, construct the stormwater management facilities and conveyance

systems to drain the pavement. – Stage II will consist of removing

the median curb and gutter and the placement of temporary asphalt. It will also include the placement of temporary pavement markings and shifting existing signal heads for Phase II.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 35

Page 36: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Maintenance of Traffic (Phase II)

• Stage I, northbound traffic will be shifted onto the temporary pavement and inner lanes, construct widening, sidewalks, drainage along the outside of the existing roadway.

• Stage II will consist of shifting traffic to the inside two lanes and shifting southbound traffic to the temporary pavement and inner lanes. Construct widening, sidewalk and drainage along the outside of the existing roadway, place signal foundations, mast arms and equipment; place the temporary pavement markings and final signage. Shift southbound traffic over inside two lanes, place remaining temporary pavement markings and shift existing signal heads for Phase III.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 36

Page 37: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Maintenance of Traffic (Phase III)

• Stage I will consist of shifting northbound traffic to the previously constructed outer lanes, remove temporary pavement constructed in the medians, place friction course and final pavement markings for the inside lanes. Construct, remove and replace remaining drainage construction in the median areas, complete construction of the median shoulders and ditches.

• Stage II will consist of shifting southbound traffic to the previously constructed outer lanes, remove temporary pavement from the medians, place friction course and final pavement markings for the inside lanes, construct, remove and replace the remaining median drainage, complete construction of the median shoulders and ditches.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 37

Page 38: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to Project Unique Project Issues - Maintenance of Traffic (Phase IV)

• During Stage I, shift northbound traffic onto inside lanes, place friction course and final pavement markings for outside lanes.

• Stage II will consist of shifting southbound traffic onto inside lanes, place friction course and final pavement markings for outside lanes and complete final signalization work.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 38

Page 39: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectUnique Project Issues – Structures

• Foundation Construction – Piles

– Pile Installation Plan Approval

– Lessons Learned

• Timely Review/Acceptance of Submittals

• Foundation Certification Packages

– Coordination of Test Pile Program

– Monitor Pile Driving Logs

– EDC’s are not Required Per 2012 Specs for Test Piles. Contractor may Choose PDA to Reduce Costs.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 39

Page 40: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts

• Information Management System– ePM – Electronic Project Management

– Collaborative and Web Based

– Client/Contract Coordination (Design, Maintenance, Traffic Ops, etc.)

– Collaborative Commenting and Mark-ups Using Adobe Acrobat

– RFI Log/Shop Drawing Tracking

– Submittals and Electronic Signatures

– Customizable Page Views and Data Drill Down

– Review and Approval Workflow Tracking

– Task Tracking Emails and Alerts

– Online Training and User Support

– GIS Mapping and Project Data

– Project Source File Storage – Up to 1.5 TB in Box.netUS 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 40

Page 41: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts

• No Additional Cost to Develop, Maintain or Operate ePM• AECOM’s Experience with ePM Include

– NASA Ames (>$1 Billion Construction/Design)

– Miami Airport (>$6 Billion Terminals/Runway)

– Denver Airport (>$1 Billion Light Rail / Hotel)

– Fort Lauderdale Airport ($800 Million Terminal / Runway)

– Tappan Zee Hudson River Crossing ($16 Billion Bridge/Tunnel)

• Expedites – Initial and Final Plans Preparation– RFI’s– Shop Drawing Review (15 Day Limit)

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 41

Page 42: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts – Collaborative Commenting & Markup

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 42

Over 370 Comments collected from 30+ Reviewers!

Page 43: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts – RFI Log Tracking

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 43

Page 44: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts – Submittals & Electronic Signatures

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 44

Page 45: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts – Review & Approval Workflows

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 45

DB Team CEI FDOT

Page 46: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Awareness/Approach to ProjectInnovative Concepts – Task Emails & Alerts

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 46

Page 47: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 47

Proposed Staffing

Page 48: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed StaffingKey Staff

• All Proposed Staff are Currently AECOM/Subconsultant Employees• Experienced Team Ready to Hit the Ground Running

– Harold Dubon, PE, Senior Project Engineer– Heath Stocton, PE, Project Administrator– Gerry Rudewicz, Contract Support Specialist – Armando Alvarez, PE, Senior Bridge Inspector/Lead Inspector– John Hunt, Senior Roadway Inspector

• AECOM Team Members have Relevant Design-Build Experience and have Worked Together as a Team

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 48

Page 49: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed StaffingQuantity

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 49

Page 50: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed Staffing Estimated Man-Hours

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 50

38,783.25

Page 51: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed Staffing Qualifications/Certifications & Availability

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 51

Page 52: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed StaffingTeam’s Experience on Similar Projects

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 52

• SR 559 Extension – Auburndale, FL– AECOM is Currently Providing CEI Services

on this $5.3 Million Project– Roadway Widening, Milling and Resurfacing– Storm Drainage – Retention Pond– Utility Relocations– Drilled Shaft Foundations (48” and 60”)– Type VI AASHTO Beams 140’ in Length– MSE Walls

• SR 44 – Wildwood, FL– Awarded “Best in Construction” for 2011– Construction Value: $12.5 Million– Roadway Widening, Milling and Resurfacing– Storm Drainage and Retention Pond– Utility Relocations– Five Span Continuous Bridge – MSE Walls– 24” Concrete Piles– Material Certification Completed in 12 Days– Zero Error Final Estimate/Submitted 7 Days Early– Completed 68 Days Ahead of Schedule and Received Early

Completion Bonus

Page 53: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed StaffingTeam’s Experience on Similar Projects

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 53

• SR 35 - Wildwood, FL– Construction Value: $12.6 Million– Roadway Widening, Milling and Resurfacing– Storm Drainage and Retention Pond– Utility Relocations– Three Span Continuous Bridge – MSE Walls– 24” Concrete Piles – Material Certification Completed in 12 Days– Zero Error Final Estimate/Submitted 7 Days Early– Completed 68 Days Ahead Of Schedule and

Received Early Completion Bonus

• SR 464 Ocala, FL – Construction Value $26.7 Million– Roadway Widening, Milling and Resurfacing– Storm Drainage – Retention Pond– Utility Relocations– Three Span Continuous Bridge – MSE Walls– 24” Concrete Piles– Material Certification Completed in 14 Days– Completed 100 Days Ahead of Schedule and Received

Early Completion Bonus

Page 54: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Proposed StaffingTeam’s Experience on Similar Projects

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 54

• I-95 Widening from SR 70 to Indrio Road– $78.5 Million Design-Build Project to add

2 Lanes and 10-foot Shoulders– Design-Build Acquisition Support– 18 Lane-Miles– Two Bridge Replacements– Six Bridge Widening's– Utilize SharePoint Website – Public Information

• I-95 Widening from Indrio Road to St. Lucie/ Indian County Line– $17.5 Million Design-Build Project to add 2 Lanes and

10 foot Shoulders– Design-Build Acquisition Support– 8 Lane-Miles– Over 8,000 Feet of 22-foot High Sound Barrier Walls– Two Bridge Widening's– Utilize SharePoint Website– Public Information

Page 55: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 55

Other Considerations

Page 56: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommunications

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 56

Public Information Plan (Blue Print) Proactive, Timely, Accurate

Stakeholder Database Contact Information Detailed Record of Correspondence (ACT)

Open House Promotion, Set-Up, Sign-In,

Interaction with Community Media Relations

Print, Television, Radio Stakeholder Communications

(Internal and External Efforts) Project Fact Sheet Open House Notification Fliers (changes in MOT, etc.) Civic Group Meetings/Association Meetings Face-to-Face Meetings with Businesses

and Residents

Page 57: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommunications

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 57

Median Closures

Access for Residents and Businesses

Lane Closures

Emergency Services Law Enforcement EMS Fire and Rescue

Safety

Noise and Dust

Page 58: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommitment to Satisfy Department Needs

• State-of-the-Art Communication – Our Entire Inspection Team will be provided with Laptops Equipped with Air

Cards for Broad Band 3G Internet Access. This Allows Our Inspection Staff to Access Site Manager and LIMS From the Field; they Do Not Have to Leave the Work Area to Complete their Paper Work.

– All Field Offices are Equipped with a Dedicated Server that Networks all Office Equipment.

– AECOM also Offers Every Employee Access to the AECOM Intranet. the Intranet is a Virtual Private Network (VPN) that Offers a Wealth of Information Pertaining to Job Activities, Procedures, Manuals, and Much More. With this VPN, the Inspectors Can Print their Reports Directly to the Office without Actually having to be in the Office.

– The AECOM Team will also Create a Website for the Project. This Website will be Created with State-of-the-art Web Designing Programs. The Website will be Updated Weekly with Lane Closures, Pictures, Detour Routes and other Public Information Relevant to the Project.

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 58

Page 59: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommitment to Satisfy Department Needs

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 59

• Quality– Corporate Supported Quality

Management Group

– Project Specific Quality Assurance Team

– ISO 9001:2008 Certified

– We will Develop a Project-Specific Quality Assurance Plan

• Submit within 30 Days of Award Notice

• CPAM Requirements

• Scope of Services

• Critical Guide Lists

• Corporate QA/QC Plan

– All Subconsultants shall Develop a Project-Specific Quality Assurance Plan

Page 60: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommitment to Satisfy Department Needs

• Embrace and Foster the Department’s Values, Mission, and Vision

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 60

Page 61: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Other ConsiderationsCommitment to Satisfy Department Needs

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 61

• Strong Team Members with District One Experience

Allied Engineering & Testing (Asphalt Plant Inspection)

Mehta and Associates (Surveying)

ValErin Group (PIO)

SAI Consulting Engineers

• 10% DBE Participation

• AECOM “A” for DBE Participation

Page 62: US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192 Financial Project Number: 197534-4-62-01,

Questions

US 27 from Barry Road to Lake C/L, US 27 at Student Drive, US 27 from Polk C/L to End of First Ramp N. of US 192

June 22, 2012 62

?