UPR-R(river) P(rock) X. Progress Report April 28, 2011. Team Members. Students :. Faculty Support:. Angelica Betancourt Joseph Casillas Luis Maldonado Pedro Melendez Marisara Morales Joshua Nieves Oscar A. Resto Omar Rocafort Carlos Rodriguez Esteban Romero Samalis Santini - PowerPoint PPT Presentation

Citation preview

Page 1: UPR-R(river) P(rock) X

1

UPR-R(river) P(rock) X

Progress ReportApril 28, 2011

Page 2: UPR-R(river) P(rock) X

2

Team Members

Angelica Betancourt Joseph Casillas Luis Maldonado Pedro Melendez Marisara Morales Joshua Nieves Oscar A. Resto Omar Rocafort Carlos Rodriguez Esteban Romero Samalis Santini Marimer Soto Yashira Torres

Students:

Vladimir Makarov Gerardo Morell Ricardo Morales Gladys Muñoz Guillermo Nery Oscar Resto

Faculty Support:

Page 3: UPR-R(river) P(rock) X

In representation of the University of Puerto Rico, as a team we intend to get involved in the pilot project RockSat X 2011 to expand our knowledge and that of others in aerospace related areas. Carefully selected, the experiment that will be carried out includes mass spectroscopy to analyze molecular species and their respective partial pressures in near space. In this way we will contribute with valuable information for interstellar travel and advances benefiting the space bound crew to collect and replenish essential resources such as water and fuel.

3

Mission Overview

Page 4: UPR-R(river) P(rock) X

Functional Block Diagram

Page 5: UPR-R(river) P(rock) X

Mass Spectrometer to plate Interface

Page 6: UPR-R(river) P(rock) X

Payload Plate

Page 7: UPR-R(river) P(rock) X

Plate/MS Assembly

Page 8: UPR-R(river) P(rock) X

Mass Spectrometer Inspection

Page 9: UPR-R(river) P(rock) X

Mass Spectrometer Integration

Page 10: UPR-R(river) P(rock) X

Medium Power Speakers just 500kW20 to 20k Hz

Page 11: UPR-R(river) P(rock) X

Real Test Up to 150 G’s, op’s…

Page 12: UPR-R(river) P(rock) X

Environmental Video

Page 13: UPR-R(river) P(rock) X

What we found at the end of the Day

Page 14: UPR-R(river) P(rock) X
Page 15: UPR-R(river) P(rock) X

- What went wrong?- The ceramics in our Mass Spectrometer did not

survive the vibrations of the environmental test.

- What went right?- The filament of the RGA survived the environmental

test. - Mass spectrometer tests with some compounds.- RockSat-X Plate fits well with the base and the

mass spectrometer.

Results of Environmental test

Page 16: UPR-R(river) P(rock) X

Our main concern will be to make the deadline of May 16, because we are still waiting for some of the materials that are crucial for the test. First, the ceramics that will be used to fix the RGA that was destroyed in the environmental test.

We are also waiting for different parts to arrive. The ones that we will be using to construct the boom arms.

Issues and Concerns