UPPER ZAKUM 750
ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT NO. P7512
MATERIAL ACCEPTANCE REPORT FOR HV / MV CABLE CLAMPS
Doc. No.: P7512-04-001-EL-MAR-0020 REV. A PAGE: 1 OF 31
UPPER ZAKUM 750
ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT NO. P7512
CONTRACT NO. : CT750 UZ110110 PETROFAC JOB NO.: PE-103
MATERIAL ACCEPTANCE REPORT FOR HV / MV CABLE CLAMPS
SUBCON. Document. No. DES-1358-MAR-E-020 Document Rev. A
LOGO SUBCON. NO. SUBCON NAME SUBCONTRACT TITLE
04-001 DESCON ENGINEERING EIT WORK FOR ELECT., INSTR., CP & TELECOM WORK AT CENTRAL ISLAND, UZ-750
REVIEW CODE 1 2 3 4 5
Legend: 1. Approved; 2. Approved With Comments; 3. Reviewed With Comments, Correct & Re-Submit; 4. Information Only, Review Not Required; 5. Rejected
Name: Signature: Date:
A 30-MAY-2017 ISSUED FOR REVIEW & APPROVAL ZK NA MK
REV. DATE DESCRIPTION PRPD CHKD APPD PROJ. APPD
UPPER ZAKUM 750
ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT NO. P7512
MATERIAL ACCEPTANCE REPORT FOR HV / MV CABLE CLAMPS
Doc. No.: P7512-04-001-EL-MAR-0020 REV. A PAGE: 2 OF 31
TABULATION OF REVISED SECTIONS / PAGES
Revision Page / Section Description
A 1ST ISSUE FOR REVIEW AND APPROVAL
TABULATION OF HOLDS
Page / Section Description
UPPER ZAKUM 750
ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT NO. P7512
MATERIAL ACCEPTANCE REPORT FOR HV / MV CABLE CLAMPS
Doc. No.: P7512-04-001-EL-MAR-0020 REV. A PAGE: 3 OF 31
TABLE OF CONTENTS
1. MAR ..........................................................................................................................04
2. ATTACHMENT 1 (MATERIAL COMPARISON TABLE) ...........................................05
3. MATERIAL DATA SHEET ........................................................................................26
4. REFERENCE DRAWING ………………………………………………………………… 31
MAR No. Rev. Date:
No.
1 PLQ / UAE
Attachments:
Yes No Yes No Yes No
1
2
3
SUBCONTRACTOR / VENDOR (As Applicable)
Signature: Date: 30-May-2017
SUBCONTRACTOR Representative Designation: Sr: Engineer E&I …...…………………………………………………..
Signature:…………………………… Date:
Reviewed By: Signature:…………………………… Date:
Designation:
COMPANY
Comments:
Name: ………………………………… Name: ……………………………….
Designation: …………………………. Designation: ………………………..
Signature: ……………………………. Signature: ………………………….
Date: …………………………………. Date: ………………………………..
CONTRACTOR
17-MAY-2017
Proposed Material and Vendor Details:
Test Certificates / Other Documents (As applicable)
CABLE CLEAT CLAMP
Prepared By:
Designation:
Submitted By: OMAR SARFRAZ
Manufacturer's Catalog
Name of SUBCONTRACTOR : Descon Engineering UAE
Notes / Comments:
Material Samples
ComplianceChecklist
Compliance with Specification / Technical Material Details
A3-2000-E-2024-001 -B2 PAGE 05 to 09
Quality and Safety credentials of Manufacturer
For UZ 750 Island Surface Facilities Project - EPC2, Central Island.
Comply
Specification Requirement / Details
Description of Material
Location of Use (Site & Unit Details)
SS ENGINEERING / INDIA
P7512-04-001-EL-MAR-0020
Manufacturer / Country Vendor / Supplier / Stockist / Country
UPPER ZAKUM 750 - ISLANDS SURFACE FACILITIES PROJECT -
EPC2 PROJECT No. P7512CONTRACT No. CT750 UZ110110
MATERIAL ACCEPTANCE REPORT (MAR)A
MAR No. P7512 04 001 EL MAR 0020 Rev ASr. No. Material Description / Type Specification Requirements Proposed Material Remarks
1 CABLE CLEAT CLAMP A3 2000 E 2024 001 B2 PAGE 05 to 09Vendor : SS EngineeringMaterial : Aluminium Alloy LM6 (Non Magnetic)
Aluminium material will be use instead ofSS.Proposed aluminium material meet the projectspecfication.
MATERIAL COMPARISON TABLEATTACHMENT 1