January 9,2002 Mr. Dean Tagliaferro US Environmental Protection Agency C/O Roy Weston, Inc. One Lyman Street Pittsfield, MA 0 120 1 0t-ooSy Corporate Environmental Programs General Electric Company 100 Woodlawn Avenue, Pinsfield, MA 01201 Ms. J. Lyn Cutler Department of Environmental Protection 436 Dwight Street Springfield, MA 01 103 Re: Upper %-Mile Reach of Housatonic River ReniovaI Action (GECD800) Monthly Report - December 200 I Dear Mr. Tagliaferro and Ms. Cutler: In accordance with the approved Removal Action Work Plan - Upper % Mile Reach of Wousatonic River, enclosed please find the December 2001 Monthly Report. Please call me with any questions. Yours truly, V Andrew T. Silfer, P.E. Senior Technical Manager ATSidmn Ellclosures cc: J. R. Bieke, Esquire, Sliea & Gardner M. T. Carroll, GE R. Goff, ACE R. Howell, EPA H. Inglis, EPA D. Jallwos, Weston J. H. Maxymiliian Technologies T. B. McKinsey, BBL R. McLaren, Esquire, GE S. Messur, BBL K. C. Mitkevicius, USACE T. O'Brien, MA EOEA B. Olson, EPA S. Steenstrup, DEP A. Weinberg, DEP

UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

January 92002

Mr Dean Tagliaferro US Environmental Protection Agency CO Roy Weston Inc One Lyman Street Pittsfield MA 0 120 1

0t-ooSy Corporate Environmental Programs General Electric Company 100 Woodlawn Avenue Pinsfield MA 01201

Ms J Lyn Cutler Department of Environmental Protection 436 Dwight Street Springfield MA 01 103

Re Upper -Mile Reach of Housatonic River ReniovaI Action (GECD800) Monthly Report -December 200 I

Dear Mr Tagliaferro and Ms Cutler

In accordance with the approved Removal Action Work Plan - Upper Mile Reach of Wousatonic River enclosed please find the December 2001 Monthly Report

Please call me with any questions

Yours truly

V Andrew T Silfer PE Senior Technical Manager

ATSidmn Ellclosures

cc J R Bieke Esquire Sliea amp Gardner M T Carroll GE R Goff ACE R Howell EPA H Inglis EPA D Jallwos Weston J H Maxymiliian Technologies T B McKinsey BBL R McLaren Esquire GE S Messur BBL K C Mitkevicius USACE T OBrien MA EOEA B Olson EPA S Steenstrup DEP A Weinberg DEP

Upper 112 -Mile Reach Removal Action Monthly Progress Report December 2001

Page 1

10 Overview

During December 2001 General Electric Company (GE) and its contractor Maxymillian Teclmologies Incorporated (MTI) continued work on the Upper 4 Mile Reach Removal Action The primary work included performing response activities to address the presence of dense non-aqueous-phase liquid (DNAPL) in Cell J1 In addition work tasks associated with the Lyrnan Street Source Control activities were continued this month Although the Lylnan Street Source Control activities are not part of the Upper 2 Mile Reach Removal Action as described in the Work Plan they were undertaken to facilitate work in the Upper 4Mile Reach in the vicinity of the Lyman Street Bridge

Weekly status meetings were held on December 3 10 and 17 2001 No work was perfor~ned on December 24 25 and 31 2001 due to the Christmas and New Years holidays

20 Chronological description of the tasks performed

Refer to the figure (Exhibit A) referenced in Section 40 and attached to this report for an orientation of the sheetpile cells and their respective locations

Balk soil renioval activities in Cell 52 were initiated and completed during the month of December The post-removal survey was also performed the results will be reported with the sedinlent relnoval survey results when complete

Response and investigation activities to address the presence of DNAPL in Cell J1 were also continued during the lnonth of December After the centerline sheetpiles were driven deeper (in the inonth of November) the water pumps were turned back on and Cell 51 was dewatered Following dewatering of the cell the low lifting holes were sealed and leaks were plugged along the centerline slleetpiles of Cell J1 The Waterloo source control sheetpile wall installation activities were then initiated

The Waterloo contaimnent wall installation activities began by completing excavation of balk soils and river sediments along the alignment of the source control sheetpile wall in Cell J1 A preliminary survey was then performed to locate the layout of the Waterloo sl~eetpile wall Installation of the sheetpiles for the Waterloo wall was initiated at the downstream wing wall near the Cell J1 sewer crossing Approximately 20 linear feet of sheetpiles were driven in place down the slope of the bank at 90 to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approxilnately 90 feet and then turned 45 up the bank to install approximately 30 feet of tlie upstream wing wall Connector cutoff sheetpiles were driven near the downstream wing wall of the Waterloo wall and the upstream sewer crossing sheetpile wall to provide a sealed connection between the two walls Following installation of the Waterloo sheetpiles the tops of the sheets were cut to design elevation and removed A

Upper 12 -Mile Reach Removal Actioil Monthly Progress Report Deceinber 2001

Page 2

work stand for future grouting activities was constructed along the bank side of the Waterloo wall

At the request of the Environmental Protection Agency (EPA) to continue the DNAPL investigation program in Cell J1 and to identifj the depth to the gray fine sand layer (an apparent confining layer) six additional sediment borings were installed in the riverbed Three borings were completed in the dow~lstream riverbed area and three borings were completed in the upstreanl riverbed area In addition a suppleinental survey was performed in Cell IS to record restored riverbed elevations along the centerline sheetpile wall for use in determining final restored elevations and depth of backfill to be placed for Cell JS

Samplingmonitoring activities completed during the 111ont11 of December iilcluded backfill waste characterization air and water column Isolation sand layer backfill samples were collected and submitted for Total Organic Carboil (TOC) and polychlorinated biphenyl (PCB) analysis and a general backfill soil sample was collected and submitted for PCB analysis Waste cllaracterization samples were collected froin the DNAPL-impacted material removed from Cell J l and submitted for analysis of PCBs volatile organic compounds (VOCs) senlivolatile organic compounds (SVOCs) and metals Air rnonitoriilg for particulate matter was conducted on a daily basis The monthly PCB air monitoring event was conducted on Deceinber 13 and 14 200 1 Water colunln [PCB and total suspended solids (TSS)] monitoring was also continued during removal activities in the month of December

During the month of December CE Buildings 33X and 33-north were ~lsed as tenlporary storage facilities for Toxic Substances Control Act (TSCA) material and non-TSCA material respectively prior to final disposition at the appropriate On-Plant Consolidation Area (OPCA) I11 addition Buildiilg 65 and a storage area near Building 68 were used as a temporary storage areas for DNAPL-impacted material removed from Cell JS During December the transfer of excavated TSCA material temporarily staged in Building 33X was initiated and con~pleted The soilisediment was subjected to a paint filter test to confirm that the material did not contain excess water prior to transfer to the Building 71 OPCA In addition approximately 670 tons of DNAPL-impacted nlaterial removed froin Cell JS and temporarily stockpiled in Building 65 and near Building 68 were transported off-site for appropriate disposal

Lyman Street Source Control Activities

Work efforts for the Lyinan Street source control barrier wall installation were continued during December Initial activities involved performance of bank soil removal activities along the wall alignment as well as performance of the Cell 53 bank soil removal activities During removal activities in this area seven piezometers (PI - P7) located near the Waterloo source control wall alignment were removed and abandoned Installation activities for the source control wall began by placing a templatework stand to aid in

FUsersUMCGlWMN0201021550doc 118102

Upper 12 -Mile Reach Reinoval Action Monthly Progress Report December 2001

Page 3

locating and driving the Waterloo sheetpiles A preliminary survey was then performed to locate the layout of the Lyman Street source control wall Installation of the sheetpiles for the Waterloo wall began at the downstream end wing wall (near the Lyman Street Bridge) and continued in the upstream direction InitiaIly subsurface obstructions were encountered in the downstream installation area and the obstructions (boulders and a concrete thrust block) were removed to facilitate driving the sheetpiles in this area Approximately 40 linear feet of sheetpiles were driven in place along Lyman Street to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approximately 300 feet and then turned 45 up the bank for approximately 40 feet to form the upstream wing wall The total length of the installed Waterloo source control sheetpile wall is approximately 380 feet

After the sheetpiles were completely driven the tops of Waterloo sheetpiles were trimmed to design elevation and removed In addition the toe of the bank (between the Waterloo source control barrier wall and the silt fence along the edge of the river) was stabilized by placing seed and erosion control mats over the area

30 Samplingtest results received

Table 1 presents the general backfill sample results

Table 2 presents the isolatioll sand backfill soil sample results

Tables 3 through 5 present the disposal cliaracterization sample results for Cell JI DNAPL- impacted illaterial

Tables 6A and 6 8 present the daily water coluinn monitoring results for turbidity and the results of the water column samples collected for TSS and PCB analysis

Table 7 presents ambient air monitoring results for PCBs for monitoring event conducted on December 13 and 14200 1

Table 8 presents the results of the December air monitoring for particulate matter

40 Diagrams associated with the tasks performed

A figure presented as Exhibit A shows the location and the progress of work for Cells H I and J along the Upper Mile Reach and is attached to this report for reference

Upper 12 -Mile Reach Removal Action Monthly Progress Report December 200 1

Page 4

A suinmary chart (Exbibit B) has been developed to assist in tracking the analytical and pl~ysical testing requirements of the various sources of backfill (eg isolation material soil back fill riprap rock etc) Exhibit B includes the volulne of backfill materials used the analytical and physical testing frequencies required by the Work Plan and the testing that has been performed to date

50 Identification of reports received and prepared

During the month of December meeting sunmaries from the weekly project status meetings were submitted Also for work completed ill November 2001 the monthly reports required by the Coilsent Decree and the Upper -Mile Reach Removal Action Work Plan were both submitted In addition during December GE submitted the following documents

2001 Annual Vegetation Monitoring Report dated December 14 2001 Analytical sainple results for general bacltfill soil (Submittal 25) Analytical sample results for isolation sand backfill (Srtbinitta126) Revised Figure 2 of Cell J1 DNAPL Proposal presenting boring locatioils and approxilnate depth to the gray fine sand layer and Figure presenting suppleinelltal survey inforinatioil for Cell 11

60 Photo documentation of activities performed

See attached Figure 1

70 Brief description of work to be performed in January 2002

For tlie next reporting period the following activities are anticipated to be performed

Coiltiilue response activities to address DNAPL encountered in Cell J1 Possibly initiate restoration activities in Cell J1 Continue source control activities for the Lyman Street parking area Maintain temporary stockpiles of material in Buildings 33-north 33X and 65 (non-TSCA TSCA and DNAPL-impacted material respectively) and Continue to conduct air monitoring and water column monitoring associated with response activities for the Upper -Mile Reach

80 Attachments to this report

Table 1 -General backfill sample results Table 2 - Isolation sand backfill soil sample results

F~UsersWCG1V3MNO201021550doc 1802

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 2: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Upper 112 -Mile Reach Removal Action Monthly Progress Report December 2001

Page 1

10 Overview

During December 2001 General Electric Company (GE) and its contractor Maxymillian Teclmologies Incorporated (MTI) continued work on the Upper 4 Mile Reach Removal Action The primary work included performing response activities to address the presence of dense non-aqueous-phase liquid (DNAPL) in Cell J1 In addition work tasks associated with the Lyrnan Street Source Control activities were continued this month Although the Lylnan Street Source Control activities are not part of the Upper 2 Mile Reach Removal Action as described in the Work Plan they were undertaken to facilitate work in the Upper 4Mile Reach in the vicinity of the Lyman Street Bridge

Weekly status meetings were held on December 3 10 and 17 2001 No work was perfor~ned on December 24 25 and 31 2001 due to the Christmas and New Years holidays

20 Chronological description of the tasks performed

Refer to the figure (Exhibit A) referenced in Section 40 and attached to this report for an orientation of the sheetpile cells and their respective locations

Balk soil renioval activities in Cell 52 were initiated and completed during the month of December The post-removal survey was also performed the results will be reported with the sedinlent relnoval survey results when complete

Response and investigation activities to address the presence of DNAPL in Cell J1 were also continued during the lnonth of December After the centerline sheetpiles were driven deeper (in the inonth of November) the water pumps were turned back on and Cell 51 was dewatered Following dewatering of the cell the low lifting holes were sealed and leaks were plugged along the centerline slleetpiles of Cell J1 The Waterloo source control sheetpile wall installation activities were then initiated

The Waterloo contaimnent wall installation activities began by completing excavation of balk soils and river sediments along the alignment of the source control sheetpile wall in Cell J1 A preliminary survey was then performed to locate the layout of the Waterloo sl~eetpile wall Installation of the sheetpiles for the Waterloo wall was initiated at the downstream wing wall near the Cell J1 sewer crossing Approximately 20 linear feet of sheetpiles were driven in place down the slope of the bank at 90 to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approxilnately 90 feet and then turned 45 up the bank to install approximately 30 feet of tlie upstream wing wall Connector cutoff sheetpiles were driven near the downstream wing wall of the Waterloo wall and the upstream sewer crossing sheetpile wall to provide a sealed connection between the two walls Following installation of the Waterloo sheetpiles the tops of the sheets were cut to design elevation and removed A

Upper 12 -Mile Reach Removal Actioil Monthly Progress Report Deceinber 2001

Page 2

work stand for future grouting activities was constructed along the bank side of the Waterloo wall

At the request of the Environmental Protection Agency (EPA) to continue the DNAPL investigation program in Cell J1 and to identifj the depth to the gray fine sand layer (an apparent confining layer) six additional sediment borings were installed in the riverbed Three borings were completed in the dow~lstream riverbed area and three borings were completed in the upstreanl riverbed area In addition a suppleinental survey was performed in Cell IS to record restored riverbed elevations along the centerline sheetpile wall for use in determining final restored elevations and depth of backfill to be placed for Cell JS

Samplingmonitoring activities completed during the 111ont11 of December iilcluded backfill waste characterization air and water column Isolation sand layer backfill samples were collected and submitted for Total Organic Carboil (TOC) and polychlorinated biphenyl (PCB) analysis and a general backfill soil sample was collected and submitted for PCB analysis Waste cllaracterization samples were collected froin the DNAPL-impacted material removed from Cell J l and submitted for analysis of PCBs volatile organic compounds (VOCs) senlivolatile organic compounds (SVOCs) and metals Air rnonitoriilg for particulate matter was conducted on a daily basis The monthly PCB air monitoring event was conducted on Deceinber 13 and 14 200 1 Water colunln [PCB and total suspended solids (TSS)] monitoring was also continued during removal activities in the month of December

During the month of December CE Buildings 33X and 33-north were ~lsed as tenlporary storage facilities for Toxic Substances Control Act (TSCA) material and non-TSCA material respectively prior to final disposition at the appropriate On-Plant Consolidation Area (OPCA) I11 addition Buildiilg 65 and a storage area near Building 68 were used as a temporary storage areas for DNAPL-impacted material removed from Cell JS During December the transfer of excavated TSCA material temporarily staged in Building 33X was initiated and con~pleted The soilisediment was subjected to a paint filter test to confirm that the material did not contain excess water prior to transfer to the Building 71 OPCA In addition approximately 670 tons of DNAPL-impacted nlaterial removed froin Cell JS and temporarily stockpiled in Building 65 and near Building 68 were transported off-site for appropriate disposal

Lyman Street Source Control Activities

Work efforts for the Lyinan Street source control barrier wall installation were continued during December Initial activities involved performance of bank soil removal activities along the wall alignment as well as performance of the Cell 53 bank soil removal activities During removal activities in this area seven piezometers (PI - P7) located near the Waterloo source control wall alignment were removed and abandoned Installation activities for the source control wall began by placing a templatework stand to aid in

FUsersUMCGlWMN0201021550doc 118102

Upper 12 -Mile Reach Reinoval Action Monthly Progress Report December 2001

Page 3

locating and driving the Waterloo sheetpiles A preliminary survey was then performed to locate the layout of the Lyman Street source control wall Installation of the sheetpiles for the Waterloo wall began at the downstream end wing wall (near the Lyman Street Bridge) and continued in the upstream direction InitiaIly subsurface obstructions were encountered in the downstream installation area and the obstructions (boulders and a concrete thrust block) were removed to facilitate driving the sheetpiles in this area Approximately 40 linear feet of sheetpiles were driven in place along Lyman Street to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approximately 300 feet and then turned 45 up the bank for approximately 40 feet to form the upstream wing wall The total length of the installed Waterloo source control sheetpile wall is approximately 380 feet

After the sheetpiles were completely driven the tops of Waterloo sheetpiles were trimmed to design elevation and removed In addition the toe of the bank (between the Waterloo source control barrier wall and the silt fence along the edge of the river) was stabilized by placing seed and erosion control mats over the area

30 Samplingtest results received

Table 1 presents the general backfill sample results

Table 2 presents the isolatioll sand backfill soil sample results

Tables 3 through 5 present the disposal cliaracterization sample results for Cell JI DNAPL- impacted illaterial

Tables 6A and 6 8 present the daily water coluinn monitoring results for turbidity and the results of the water column samples collected for TSS and PCB analysis

Table 7 presents ambient air monitoring results for PCBs for monitoring event conducted on December 13 and 14200 1

Table 8 presents the results of the December air monitoring for particulate matter

40 Diagrams associated with the tasks performed

A figure presented as Exhibit A shows the location and the progress of work for Cells H I and J along the Upper Mile Reach and is attached to this report for reference

Upper 12 -Mile Reach Removal Action Monthly Progress Report December 200 1

Page 4

A suinmary chart (Exbibit B) has been developed to assist in tracking the analytical and pl~ysical testing requirements of the various sources of backfill (eg isolation material soil back fill riprap rock etc) Exhibit B includes the volulne of backfill materials used the analytical and physical testing frequencies required by the Work Plan and the testing that has been performed to date

50 Identification of reports received and prepared

During the month of December meeting sunmaries from the weekly project status meetings were submitted Also for work completed ill November 2001 the monthly reports required by the Coilsent Decree and the Upper -Mile Reach Removal Action Work Plan were both submitted In addition during December GE submitted the following documents

2001 Annual Vegetation Monitoring Report dated December 14 2001 Analytical sainple results for general bacltfill soil (Submittal 25) Analytical sample results for isolation sand backfill (Srtbinitta126) Revised Figure 2 of Cell J1 DNAPL Proposal presenting boring locatioils and approxilnate depth to the gray fine sand layer and Figure presenting suppleinelltal survey inforinatioil for Cell 11

60 Photo documentation of activities performed

See attached Figure 1

70 Brief description of work to be performed in January 2002

For tlie next reporting period the following activities are anticipated to be performed

Coiltiilue response activities to address DNAPL encountered in Cell J1 Possibly initiate restoration activities in Cell J1 Continue source control activities for the Lyman Street parking area Maintain temporary stockpiles of material in Buildings 33-north 33X and 65 (non-TSCA TSCA and DNAPL-impacted material respectively) and Continue to conduct air monitoring and water column monitoring associated with response activities for the Upper -Mile Reach

80 Attachments to this report

Table 1 -General backfill sample results Table 2 - Isolation sand backfill soil sample results

F~UsersWCG1V3MNO201021550doc 1802

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 3: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Upper 12 -Mile Reach Removal Actioil Monthly Progress Report Deceinber 2001

Page 2

work stand for future grouting activities was constructed along the bank side of the Waterloo wall

At the request of the Environmental Protection Agency (EPA) to continue the DNAPL investigation program in Cell J1 and to identifj the depth to the gray fine sand layer (an apparent confining layer) six additional sediment borings were installed in the riverbed Three borings were completed in the dow~lstream riverbed area and three borings were completed in the upstreanl riverbed area In addition a suppleinental survey was performed in Cell IS to record restored riverbed elevations along the centerline sheetpile wall for use in determining final restored elevations and depth of backfill to be placed for Cell JS

Samplingmonitoring activities completed during the 111ont11 of December iilcluded backfill waste characterization air and water column Isolation sand layer backfill samples were collected and submitted for Total Organic Carboil (TOC) and polychlorinated biphenyl (PCB) analysis and a general backfill soil sample was collected and submitted for PCB analysis Waste cllaracterization samples were collected froin the DNAPL-impacted material removed from Cell J l and submitted for analysis of PCBs volatile organic compounds (VOCs) senlivolatile organic compounds (SVOCs) and metals Air rnonitoriilg for particulate matter was conducted on a daily basis The monthly PCB air monitoring event was conducted on Deceinber 13 and 14 200 1 Water colunln [PCB and total suspended solids (TSS)] monitoring was also continued during removal activities in the month of December

During the month of December CE Buildings 33X and 33-north were ~lsed as tenlporary storage facilities for Toxic Substances Control Act (TSCA) material and non-TSCA material respectively prior to final disposition at the appropriate On-Plant Consolidation Area (OPCA) I11 addition Buildiilg 65 and a storage area near Building 68 were used as a temporary storage areas for DNAPL-impacted material removed from Cell JS During December the transfer of excavated TSCA material temporarily staged in Building 33X was initiated and con~pleted The soilisediment was subjected to a paint filter test to confirm that the material did not contain excess water prior to transfer to the Building 71 OPCA In addition approximately 670 tons of DNAPL-impacted nlaterial removed froin Cell JS and temporarily stockpiled in Building 65 and near Building 68 were transported off-site for appropriate disposal

Lyman Street Source Control Activities

Work efforts for the Lyinan Street source control barrier wall installation were continued during December Initial activities involved performance of bank soil removal activities along the wall alignment as well as performance of the Cell 53 bank soil removal activities During removal activities in this area seven piezometers (PI - P7) located near the Waterloo source control wall alignment were removed and abandoned Installation activities for the source control wall began by placing a templatework stand to aid in

FUsersUMCGlWMN0201021550doc 118102

Upper 12 -Mile Reach Reinoval Action Monthly Progress Report December 2001

Page 3

locating and driving the Waterloo sheetpiles A preliminary survey was then performed to locate the layout of the Lyman Street source control wall Installation of the sheetpiles for the Waterloo wall began at the downstream end wing wall (near the Lyman Street Bridge) and continued in the upstream direction InitiaIly subsurface obstructions were encountered in the downstream installation area and the obstructions (boulders and a concrete thrust block) were removed to facilitate driving the sheetpiles in this area Approximately 40 linear feet of sheetpiles were driven in place along Lyman Street to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approximately 300 feet and then turned 45 up the bank for approximately 40 feet to form the upstream wing wall The total length of the installed Waterloo source control sheetpile wall is approximately 380 feet

After the sheetpiles were completely driven the tops of Waterloo sheetpiles were trimmed to design elevation and removed In addition the toe of the bank (between the Waterloo source control barrier wall and the silt fence along the edge of the river) was stabilized by placing seed and erosion control mats over the area

30 Samplingtest results received

Table 1 presents the general backfill sample results

Table 2 presents the isolatioll sand backfill soil sample results

Tables 3 through 5 present the disposal cliaracterization sample results for Cell JI DNAPL- impacted illaterial

Tables 6A and 6 8 present the daily water coluinn monitoring results for turbidity and the results of the water column samples collected for TSS and PCB analysis

Table 7 presents ambient air monitoring results for PCBs for monitoring event conducted on December 13 and 14200 1

Table 8 presents the results of the December air monitoring for particulate matter

40 Diagrams associated with the tasks performed

A figure presented as Exhibit A shows the location and the progress of work for Cells H I and J along the Upper Mile Reach and is attached to this report for reference

Upper 12 -Mile Reach Removal Action Monthly Progress Report December 200 1

Page 4

A suinmary chart (Exbibit B) has been developed to assist in tracking the analytical and pl~ysical testing requirements of the various sources of backfill (eg isolation material soil back fill riprap rock etc) Exhibit B includes the volulne of backfill materials used the analytical and physical testing frequencies required by the Work Plan and the testing that has been performed to date

50 Identification of reports received and prepared

During the month of December meeting sunmaries from the weekly project status meetings were submitted Also for work completed ill November 2001 the monthly reports required by the Coilsent Decree and the Upper -Mile Reach Removal Action Work Plan were both submitted In addition during December GE submitted the following documents

2001 Annual Vegetation Monitoring Report dated December 14 2001 Analytical sainple results for general bacltfill soil (Submittal 25) Analytical sample results for isolation sand backfill (Srtbinitta126) Revised Figure 2 of Cell J1 DNAPL Proposal presenting boring locatioils and approxilnate depth to the gray fine sand layer and Figure presenting suppleinelltal survey inforinatioil for Cell 11

60 Photo documentation of activities performed

See attached Figure 1

70 Brief description of work to be performed in January 2002

For tlie next reporting period the following activities are anticipated to be performed

Coiltiilue response activities to address DNAPL encountered in Cell J1 Possibly initiate restoration activities in Cell J1 Continue source control activities for the Lyman Street parking area Maintain temporary stockpiles of material in Buildings 33-north 33X and 65 (non-TSCA TSCA and DNAPL-impacted material respectively) and Continue to conduct air monitoring and water column monitoring associated with response activities for the Upper -Mile Reach

80 Attachments to this report

Table 1 -General backfill sample results Table 2 - Isolation sand backfill soil sample results

F~UsersWCG1V3MNO201021550doc 1802

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 4: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Upper 12 -Mile Reach Reinoval Action Monthly Progress Report December 2001

Page 3

locating and driving the Waterloo sheetpiles A preliminary survey was then performed to locate the layout of the Lyman Street source control wall Installation of the sheetpiles for the Waterloo wall began at the downstream end wing wall (near the Lyman Street Bridge) and continued in the upstream direction InitiaIly subsurface obstructions were encountered in the downstream installation area and the obstructions (boulders and a concrete thrust block) were removed to facilitate driving the sheetpiles in this area Approximately 40 linear feet of sheetpiles were driven in place along Lyman Street to form the downstream wing wall Waterloo sheetpile installation then proceeded upstream parallel to the river for a distance of approximately 300 feet and then turned 45 up the bank for approximately 40 feet to form the upstream wing wall The total length of the installed Waterloo source control sheetpile wall is approximately 380 feet

After the sheetpiles were completely driven the tops of Waterloo sheetpiles were trimmed to design elevation and removed In addition the toe of the bank (between the Waterloo source control barrier wall and the silt fence along the edge of the river) was stabilized by placing seed and erosion control mats over the area

30 Samplingtest results received

Table 1 presents the general backfill sample results

Table 2 presents the isolatioll sand backfill soil sample results

Tables 3 through 5 present the disposal cliaracterization sample results for Cell JI DNAPL- impacted illaterial

Tables 6A and 6 8 present the daily water coluinn monitoring results for turbidity and the results of the water column samples collected for TSS and PCB analysis

Table 7 presents ambient air monitoring results for PCBs for monitoring event conducted on December 13 and 14200 1

Table 8 presents the results of the December air monitoring for particulate matter

40 Diagrams associated with the tasks performed

A figure presented as Exhibit A shows the location and the progress of work for Cells H I and J along the Upper Mile Reach and is attached to this report for reference

Upper 12 -Mile Reach Removal Action Monthly Progress Report December 200 1

Page 4

A suinmary chart (Exbibit B) has been developed to assist in tracking the analytical and pl~ysical testing requirements of the various sources of backfill (eg isolation material soil back fill riprap rock etc) Exhibit B includes the volulne of backfill materials used the analytical and physical testing frequencies required by the Work Plan and the testing that has been performed to date

50 Identification of reports received and prepared

During the month of December meeting sunmaries from the weekly project status meetings were submitted Also for work completed ill November 2001 the monthly reports required by the Coilsent Decree and the Upper -Mile Reach Removal Action Work Plan were both submitted In addition during December GE submitted the following documents

2001 Annual Vegetation Monitoring Report dated December 14 2001 Analytical sainple results for general bacltfill soil (Submittal 25) Analytical sample results for isolation sand backfill (Srtbinitta126) Revised Figure 2 of Cell J1 DNAPL Proposal presenting boring locatioils and approxilnate depth to the gray fine sand layer and Figure presenting suppleinelltal survey inforinatioil for Cell 11

60 Photo documentation of activities performed

See attached Figure 1

70 Brief description of work to be performed in January 2002

For tlie next reporting period the following activities are anticipated to be performed

Coiltiilue response activities to address DNAPL encountered in Cell J1 Possibly initiate restoration activities in Cell J1 Continue source control activities for the Lyman Street parking area Maintain temporary stockpiles of material in Buildings 33-north 33X and 65 (non-TSCA TSCA and DNAPL-impacted material respectively) and Continue to conduct air monitoring and water column monitoring associated with response activities for the Upper -Mile Reach

80 Attachments to this report

Table 1 -General backfill sample results Table 2 - Isolation sand backfill soil sample results

F~UsersWCG1V3MNO201021550doc 1802

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 5: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Upper 12 -Mile Reach Removal Action Monthly Progress Report December 200 1

Page 4

A suinmary chart (Exbibit B) has been developed to assist in tracking the analytical and pl~ysical testing requirements of the various sources of backfill (eg isolation material soil back fill riprap rock etc) Exhibit B includes the volulne of backfill materials used the analytical and physical testing frequencies required by the Work Plan and the testing that has been performed to date

50 Identification of reports received and prepared

During the month of December meeting sunmaries from the weekly project status meetings were submitted Also for work completed ill November 2001 the monthly reports required by the Coilsent Decree and the Upper -Mile Reach Removal Action Work Plan were both submitted In addition during December GE submitted the following documents

2001 Annual Vegetation Monitoring Report dated December 14 2001 Analytical sainple results for general bacltfill soil (Submittal 25) Analytical sample results for isolation sand backfill (Srtbinitta126) Revised Figure 2 of Cell J1 DNAPL Proposal presenting boring locatioils and approxilnate depth to the gray fine sand layer and Figure presenting suppleinelltal survey inforinatioil for Cell 11

60 Photo documentation of activities performed

See attached Figure 1

70 Brief description of work to be performed in January 2002

For tlie next reporting period the following activities are anticipated to be performed

Coiltiilue response activities to address DNAPL encountered in Cell J1 Possibly initiate restoration activities in Cell J1 Continue source control activities for the Lyman Street parking area Maintain temporary stockpiles of material in Buildings 33-north 33X and 65 (non-TSCA TSCA and DNAPL-impacted material respectively) and Continue to conduct air monitoring and water column monitoring associated with response activities for the Upper -Mile Reach

80 Attachments to this report

Table 1 -General backfill sample results Table 2 - Isolation sand backfill soil sample results

F~UsersWCG1V3MNO201021550doc 1802

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 6: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Upper 12 -Mile Reach Removal Action Monthly Progress Report Deceinber 2001

Page 5

Table 3 -PCB disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 4 -VOCSVOC disposal characterization sample results for Cell J1 DNAPL- impacted material

Table 5 -Metals disposal characterization sample results for Cell J1 DNAPL-impacted material

Table 6A -Daily water column monitoring results Table 6B -Water columi~ samples for total suspended solids (TSS) and PCB analysis Table 7 -Ambient air monitoring results for PCBs for event conducted in December Table 8 -Results of the December air monitoring for particulate matter Exhibit A -Figure showing the progress of work within the Upper -Mile Reach Exhibit B -Backfill quantity and sample summary chart Figure 1 - Photo documentatio~i

F UsersWCGI~DMNM01021SSOdoc 1802

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 7: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELDfmARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 1

GENERAL ELECTRIC COkIPANY PITTSFIELD RLASSACHUSETTS

HOUSATONIC K N E R - UPPER 12 h1LLE REACH GENERAL BACKFILL SOIL SAMPLING

DATA RECEIVED DURWG DECEMBER 2001

(Results are presented In dry weight parts per million ppni)

Date Sample ID Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 ArocIor-1254 Aroclor-1260 Total PCBs

DH-BF-13 11126101 ND(0 055) (0 054)] ND(O 055) [ND(O 054)] ND(0 055) 054)] ND(0 055) w ( 0 054)] 1 ND(0 055) W ( O 054)]

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Notiheast Analytical Inc for analysis of PCBs 2 ND - Analyte was not detected The number in parentheses is the associated detection I~mit 3 Duplicate sample results are presented in brackets

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 8: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

Sample ID Parameter Date Collected PCBs Aroclor-1016 Aroclor-1221 Aroclor- 1232 Aroclor- 1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 TOGPCBs Total Organic Carbon (TOC) TOC - Repl~cate1 TOC - Replicate 2 TOC - Replicate 3 TOC - Repl~cate 4 TOC - Average TOC - RSD

Notes

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

ICOUSATONIC RIVER UPPER 12 MILE REACH ISOLATION SAND BACWILL SAMPLING

DATA RECERED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

BSG-UF-14 BSG-BF-15 112601 112601

NS I ND(0 056) NS ND(0 056)

ND(0 056) N S -----NS NS NS NS NS

4200 4100 1800 4900 3700 3 5

ND(0 056) ND(0 056) ND(0 056) ND(0 056)

ND(OP

NS NS NS

USG-BF-16 BSG-BF-17 1 12601 1 1260 1

N S N S N S NS NS NS

-NS NS NS NS NS N S NS NS NS NS

8500 11000 7100 9300 5200 7200

NS N A NA NS 6900 9100 NS 24 20

PRELIMINARY ANALYTICAL DATA SUBJECT TO VEMFICATION

BSG-BF-18 BSG-BF-19 112601 112601

NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(0 057) NS ND(O 057) NS ND(0 057) NS ND(0 057) NS ND(0 057)

6200 NS 7300 NS 5300 NS NA N S 6200

I NS

16 I N S

1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical Services Inc for analysis of PCBs and TOC 2 NA - Not Analyzed - Laboratory did not report results for this analyte 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 NS -Not Sampled - Parameter was not requested on sample chain of custody form 5 RSD - Percent relative standard deviation

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 9: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

PCB SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Notes I Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-5 and 13-6 for a summary of volatile and semivolatile sample data

and TCLP-metals sample data respectivcly 3 ND - Analyte was not detected The number in parentheses is the associated detection limit

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 10: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 12 MILE REACH Cell J-1SEDIMENT DISPOSAL CHARACTERIZATION SAMPLING

VOC SVOC AND TCE SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

Sampie ID HR-J1-SP65-C1 HR-J1-SP68-C1 Parameter Date Collected 121101 1211 101

Volatile Organics None Detected I -- --I Semivolatile Organics 1t24-Trichlorobenzene 20 1281 14-Dichlorobenzene 0051 J

0057 J fND(035)] 0078 J

041 mD(035)] 075

- - - - ~ ~

Benzo(a)anthracene 12 10451 25 Benzo(a)py rene 11 f0371 18 Benzo(b)fluoranthene 087 1028 J] 13 Benzo(ghi)perylene 046 [0 17 J] 053 Benzo(k)fluoranthene 03 1 J [O 1 l J] 039 Chrysene 084 1035 J] 18 Dibenzo(ah)anthracene 028 J (hrD(035)] ND(037) Di-n-Butylphthalate 0092 J [0049 J] 0060 J Fluoranthene 18 [095] 48 Fluorene 03 1 J 10086 J] 12

0044 J

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northenst Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiIes and TCLP-metals 2 Please reference Tables 13-4 and 13-6 for a summary of PCB sample data and TCLP-metals

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 J - Indicates an estimated value less than the practical quantitation limit (PQL) 5 Duplicate sample results are presented in brackets 6 -- Indicates that all constituents for the parameter group were not detected

Page 1 of 1

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 11: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

--

PRELIMLNARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 5

GENEML ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH Cell J-1 SEDIMENT DISPOSAL CmRACTERIZATION SAMPLING

TCLP-METALS SAMPLE DATA RECEIVED DURING DECEMBER 2001

(Results are presented in dry weight parts per million ppm)

TCLP Sample ID Maximum HR-J 1-SP65-Cl HR-Jl-SP68-CI

Parameter Date Collected Concentrations 121101 121101 Inorganics Arsenic 5 ND(0187) [ND(O I 87)] ND(0187) Barium 100 00984 102121 0243 Cadmium 1 ND(00178) [ND(00 178)] ND(00178) Chromium 5 ND(00178) mD(O0 178)] ND(00178) Lead 5 ND(0191) [ND(O 191)] ND(0191) Mercury 0 2 ND(000200) D(000200)] ND(000200) Selenium 1 ND(0184) mD(O184)j ND(0184) Silver 5 ND(00308) ~D(0 0308)] ND(00308)

1

Notes 1 Samples were collected by Blasland Bouck amp Lee Inc and were submitted to Northeast Analytical

Services Inc for analysis of PCBs volatiles (including TCE) semivolatiles and TCLP-metals 2 Please reference Tables 13-4 and 13-5 for a summary of PCB sample data and volatile and semivolatile

sample data respectively 3 ND - Analyte was not detected The number in parentheses is the associated detection limit 4 Duplicate sample results are presented in brackets

Page 1 of 1

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 12: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

TABLE 6 r i

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

GENERAL ELECTRIC COhlPANY PITTSIcIELD MASSACIIIJSETTS

DECEMBER 2001

UPPER 112 MILE REACH REMOVAL ACTION ZIOUSATONIC RIVER PCBTSSTURBlDITY RIONITORING UlJRING CONSTRUCTION

PCB Concentration

01321550 Page 1 of 2

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 13: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELIItlINARY ANALYTICAL DATA SUBJECT T O VERIFICATION

TABLE 6A

GENERAL ELECTRIC COMPANY PITTSFIELD PMSSACAUSETTS

DECEMBER 2001

UPPER 112 MILE REACH REhIOVAL ACTION ifOUSATONIC RIVER PCBITSSflURBIDITY hlONITOKING DURIBG CONSTRUCTION

Location Date Water Water Estiinated Turbidity (ntu) Sample ID Total Filtered TSS

Depth Temp Flow l6 Daily PCB Concentration l 4 PCB Concentration

Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

121271200 121271200 121281200 12128200

(ft)

17 28 17 2 8

(OC) 0 0 0 0

(ch)

j3

39

High

3 3

NS 2

Low

2 2

NS 1

Composite

2 2

NS 2

------------

(ugl) ------------

(upl) ------------

------------

I

I PCB and TSS samples were collected by Blasiand Bouck amp Lee Inc and analyzed by Northeast Analytical Inc or on 92700 CTampE Environmental Services Inc 2 Water depth taken at sampling point (ie middle of river) 3 ft - Feet

4 OC - degrees Celsius 5 cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7 --- - N o data obtained 8 ND(025) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR -Not yet reported 10 ugil - micrograms per liter 11 mgl -milligrams per liter 12 [ I -Duplicate sample result 13 Turbidity Action Level =Turbidity downstream ITurbidity upstream i-50 ntu 14 PCB Action Level =PCBs downstream r PCBs upstream + 5 ugl 15 NS - Not sampled due to frozen river conditions or high flow 16 Flow data was obtained from the USGS Station 01 197000 in Coltsville MA at approximately midday (Flow data is provisional and may he subject to revision)

Page 2 of 2

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 14: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

-- --

-- --

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 6B

GENERAL ELECTRIC COMPANY PITTSFIELD RfiSSACHUSETTS

HOUSATONIC RlVER - UPPER 112 MILE REACH EIOUSATONIC RlVER PCWTSS MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING DECEMBER 2001

(Results are presented in parts per million ppm)

Date Aroclor 1016 1221 Sample ID Location Collected 12321242 Jt 1248 Aroclor 1254

HR-11-20-01-U1 Upstream of Newel1 St Bridge 11120101 ND(00000250) 00000487 AF HR- 1 1-20-0 1 -D 1 Downstream of Lyman St Bridge 112001 ND(00000250) I 00000624 AF HR-11-20-01 -U1 (FILTERED) Upstream of Newell St Bridge 1 1120101 ND(00000250) ND(00000250) HR- 11-20-0 1-Dl (FILTERED) Downstream of Lyman St Bridge 11120101 ND(O0000250) ND(00000250) HR-12-6-01-U1 Upstream of Newell St Bridge 12610 1 ND(00000250) 0000123 AF HR-I 2-6-0 I-D I Downstream of Ly man St Bridge 121610I ND(00000250) 00003 16 AF HR-12-6-0 I-U 1 (FILTERED) Upstream of Newell St Bridge 1216101 ND(00000250) ND(00000250) HR-12-6-0 1 -Dl (FILTERED) Downstream of Lyman St Bridge 121610 1 ND(00000250) ND(00000250)

w 1 Samples were collected by Blasland Bouck amp Lee Inc and submitted to Northeast A~lalytical Services Inc

for analysis of filtered and unfiltered PCBs and Total Suspended Solids (ISS) 2 ND(O10) - Analyte was not detected The value in parentheses is the associated detection limit 3 AF - Aroclor 1254 is being reported as the best Aroclor rnatcli The sa~nple exhibits an altered PCB pattern 4 --- - Not analyzed

Aroclor 1260 ND(00000250)

00000407 ND(00000250) ND(00000250)

00000347 0000 100

ND(00000250) ND(00000250)

Total PCBs 00000487 0000103

ND(00000250) ND(00000250)

0000158 0000416

ND(00000250) ND(00000250)

TSS 230 240

290 410

Page 1 of I

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 15: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 7

GENERAL ELECTRIC COMPANY PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PCB DATA RECEIVED DURING DECEMBER 2001

Date BM-I ugm3

AM-5 ugm3

AM-5 co-located

ugm3

AM-6

uglm3

AM-7 uglm3

AM-8

ugm3

1211 3 - 1211 401 00072 00087 00076 00043 0011 00082 Notification Level 005 005 005 005 005 005

Notes BM-1 Background monitoring location west of Bldg 42 AM-5 Air monitoring location north bank east of Bldg 63 AM-6 Air monitoring location south bank north edge of GE Newel1 St parking area AM-7 Air monitoring location north bank south end of GE Lyman St Parking Lot AM-8 Air monitoring location south bank corner of Hathaway and Sackett Streets

Page 1 of 1

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 16: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATION

TABLE 8

GENERAL ELECTRIC COMPANY PIITSFIELD MASSACHUSETTS

BOUSATONIC RIVER - UPPER 112 MILE REACH AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING DECEMBER 2001

Date

120301

120401

120501

120601

12070 1

121001

1211 101

121201

121301

121401

121701

121801

121901

1220011

122101

12124101

122501 122601

122701

122801

Notification Level

Sampler Location

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (soutl~ side of river)

4M-6 (south side of river)

AM-6 (south side of rivet)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

AM-6 (south side of river)

Average Site Concentration

(mgm3) 0022 0025

0022

0017

001 1

0017

003 1

0017

NA

NA

NA

NA

001 1

NA

NA

NA

NA

0017

001 1

0017

0120

BM-1

(mgm3)

0021 0023

0022

0013

0010

0014

0024

0018

NA

NA

NA

NA

0007

NA

NA

NA

NA

0013

0009

0015

Average Period (HoursMin)

1045 9 15

1015

1045

1045 ~-~p

1030

9 15

945

NA

NA

NA

NA

1030

NA

NA

N A

NA

9OO

930

915

Predominant Wind Direction

SW SSW

WNW

W

-- NW

Calm

W E

E

NA

NA

NA

NA

W

NA

NA

NA

NA

SW

W

SW SSW

BM-I Background monitoring location west of Bldg 42

AM-6 Air monitoring location in the GE parking lot located off of Newell Street

Sampling was not performed due to precipitationlthreat of precipitation

Sampling was not performed due to the Christmas holiday

Page 1 of 1

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 17: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

EXHIBIT B General Electric Company Revision Date January 12002 Pittsneld Massacusetts

m M i l e Removal Action Backfill Trackina Log

I I 1 158 1 10l0400 1 19 1 1011W 092800 1 1 I I Rip-Rap (12) IGrain Size 1 2000 1 18 1 010400 1 ~etter( 010600 122999 1 1 I 2000 1 1020 1

Notes Quantities placed include Cells A BCD DNAPL EFG Hand I I NA = NotApplicable TBD = To be determined

I

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 18: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been

L EXHIBIT B General Electric Company Revision Date January 1 2002

Pittsfield Massacusetts

112-Mile Removal Action Backfill Trackins Log

Samples Collected as part of Allendale School Project

Notes Granular Fill and Soil Backfill have been combined as the same material Quantities placed include Cells A B C D DNAPL EF GH and 11 NA = Not Applicable TBD = To be determined

Page 2 of 2

  1. barcode 287046
  2. barcodetext SDMS Doc ID 287046
Page 19: UPPER 1/2 MILE REACH OF HOUSATONIC RIVER REMOVAL … · Upper 1/2 -Mile Reach Removal Action Monthly Progress Report: December 200 1 Page 4 . A suinmary chart (Exbibit B) has been