• Foundation laid by Dr. Abdul Qadir Khan On December 02, 2012

Key Operational Dates

Fully Functional: December 2014

Out Patient Dept. (OPD):March 2014

Mobile Field Hospital: March 2014

Architectural and Structural Design: Designmen Ltd, Islamabad

Construction Contractors:Capital Construction Ltd, Islamabad

Expenditure Details

Item Expenditure

(PKR)

Steel 7,170,500

Cement 986,000

Other Construction Material 758,843

Labour 335,672

Misc. (all exp other than above 4 Heads)271,617

Contractor Fee (15% of till date expense) -

Total 9,522,632

Target - A (up to 03 August)

ItemExpected Expenditure

(PKR)

Cement 500,000

Other Material 350,000

Form Work 800,000

Conducting 50,000

Labour 350,000

Total Target - A 2,050,000

Target -B (03 August to September)

ItemExpected Expenditure

(PKR)

Bricks 2,600,000

Cement 1,200,000

Millenniums Material 500,000

Door Frames & Windows Frame 600,000

Labour 900,000

Total Target -B 5,800,000

Project Execution Plan