29
Update on NOAA Precipita1on Algorithms and Products and their Contribu1on to GPM Ralph Ferraro* NOAA/NESDIS/STAR College Park, MD *Includes contribu1ons by other PI’s on the PMM Science Team, other NOAA researchers and those at ESSIC/CICS at the University of Maryland 47 August 2014 2014 PMM Science Team Mee1ng – Bal1more, MD 1

Update’on’NOAA Precipita1on ... - gpm.nasa.gov

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Update  on  NOAA  Precipita1on  Algorithms  and  Products  and  their  Contribu1on  to  GPM  

Ralph  Ferraro*  NOAA/NESDIS/STAR  College  Park,  MD  

*Includes  contribu1ons  by  other  PI’s  on  the  PMM  Science  Team,  other  NOAA    researchers  and  those  at  ESSIC/CICS  at  the  University  of  Maryland  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   1  

Page 2: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  

NOAA  Needs,  Ac1vi1es  and    Status  on  GPM  

•  R2O  and  O2R  •  Advocacy  and  Educa1on  •  Specific  user  request  and  early  data  prepara1on    

2  

Page 3: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   3  

Page 4: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

NOAA User Workshops on GPM

•  Three workshops (2010, 2011, 2013) have helped NOAA: –  Provide advocacy and education about GPM’s relevance to NOAA –  Determine specific user needs to support NOAA core mission goals –  Focus potential R2O for PPS and utilization of existing NOAA Proving Grounds and Testbeds to

accelerate use of GPM data at NOAA •  Fourth workshop – TBD (2015?) or do jointly with NASA?

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   4  

Page 5: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

•  At  a  minimum,  con.nuity  of  opera.ons  for  TRMM…  •  NWP/JSCDA  needs  include:  

–  Extending  CRTM  to  GMI  –  Timely  access  to  GMI  L1  data  and  conversion  to  BUFR  (done  in  house)  

–  “All  Weather”  use  into  data  assimila.on  •  NWS  top  priori.es  for  GMI  data  include:  

–  GMI  imagery  in  AWIPS  for  NHC  and  related  centers  –  2A12/L2  precipita.on  rates  for  NWSFO,  CPC,  etc.  

•  NESDIS  also  requires  L1/L2  to  enhance  “NOAA  Unique  Products”    delivered  in  McIDAS  and  AWIPS  

•  NWS/OHD  u.lizes  GOES-­‐based  (MW  enhanced)  ScAMPR  product  which  requires  the  L2  GPM  data  

–  IMERGE  for  NWS/OHD,  CPC,  etc.  

Ini1al  NOAA  Needs  for  GMI  Data  

2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   5  4-­‐7  August  2014  

Page 6: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

•  Ini1al  Implementa1on  –  Pull  GPM  GMI  L1B/L1C  and  GMI  L2  data  from  the  NASA  PPS  sever    –  Integrate  the  L1  and  L2  products  to  provide  McIDAS  tailoring  products  –  Distribute  the  GPM  GMI  L1  and  L2  data  to  users  through  DDS  

•  JCSDA  is  taking  care  of  the  BUFR  reforma^ng  to  meet  NWP  needs  

–  Distribute  the  GPM  GMI  L1B,  RR  and  TPW  in  McIDAS  through  ADDE  sever  and/or  DDS  depending  on  users’  requests.  

 •  Future  Implementa1on  

–  Follow  “implementa.on  protocol”  (annual  funding  cycle)  to  fully  meet  NOAA  users’    unique  needs  on  the  GPM-­‐related  data  and  products  

–  Eventually  transi.on  to  NOAA  Enterprise  PPS  through  the  NESDIS  Enterprise  Ground  System  effort  (s.ll  evolving)  

   

 

Current  NESDIS  GPM  Data  Plan  

2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   6 4-­‐7  August  2014  

Page 7: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  

Update  on  NOAA  Satellites,  Partner    Satellites  and  Precipita1on  Products  

•  POES/JPSS  &  GOES  –  satellites  and  products  •  NASA  –  GPM  •  Interna1onal  Partners  –  GCOM-­‐W1  AMSR-­‐2,  M-­‐T  SAPHIR  

7  

Page 8: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

LEO  Flyout  Schedule  

     hap://www.nesdis.noaa.gov/FlyoutSchedules.html                            hap://www.jpss.noaa.gov    

GPM-­‐era  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   8  

Page 9: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

NESDIS  Opera1onal    Hydrological  Satellite  Products  

Geosta1onary  (Regional,  rapid  update)   Low  Earth  Orbi1ng  (Global,  3-­‐6  hourly)  

Visible,  IR  and  WV  loops   Visible,  IR  and  microwave  imagery  

Rain  Rate   Rain  and  Snowfall  Rate  

Total  Precipitable  Water  –  TPW  (cloud  free)   TPW  (all  weather;  ocean  only  in  some  cases)  

Snow  and  Ice  Cover   Snow  cover/water  equivalent/ice  concentra.on  

Soil  Moisture  

Blended  Products    

Blended  TPW  (with  LEO,  GPS  Met  and  GEO  data)  and  Rain  Rate  (LEO)  

Ensemble  Tropical  Rainfall  Poten.al  (eTRaP)  

Snow  and  Ice  Maps  (IMS)  

Global  Soil  Moisture  Map  (SMOPS)  

9 4-7 August 2014 2014 PMM Science Team Meeting – Baltimore, MD

Page 10: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Opera1onal  Product  Suites  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   10  

System   Products   Satellites/Sensors   Res   Type   Formats  MSPPS   Rainfall  rate,  Snowfall  rate,  

TPW,  CLW,  etc  NOAA-­‐18&NOAA-­‐19&Metop-­‐A  &  Metop-­‐B  /AMSU-­‐A&MHS  

16  km   Level-­‐2,  Level-­‐3  

HDF-­‐EOS,  McIDAS  area,  PNG  

MiRS   Rainfall  rate,  TPW,  CLW,  etc   NOAA-­‐18  &  NOAA-­‐19  &  Metop-­‐A  &  Metop-­‐B;  DMSP  F18;  S-­‐NPP  /AMSU-­‐A&MHS;  /ATMS;  /SSMIS  

16  &  45  km   Level-­‐2,  Level-­‐3  

HDF-­‐EOS,netCDF4,  McIDAS  area,  PNGs  

GHE   Rainfall  rate,  mul.-­‐hours  and  mul.-­‐  days  rainfall  total  

GOES-­‐E  &  GOES-­‐W  &  MTSAT  &  Meteosat-­‐7  &  Meteosat-­‐10  IR  Imager  

4  km   Level-­‐3   netCDF4,  McIDAS  area,  GRIB1/GRIB2,  GIFs  

bTPW   Global  Total  Precipitable  Water  Map  

NOAA-­‐18,  NOAA-­‐19,  Metop-­‐A  and  Metop-­‐B  /AMSU-­‐A&MHS,  GOES-­‐W/-­‐E,  GPS-­‐Met,  DMSP  F18/SSMIS  

16  km   Level-­‐4   HDF-­‐EOS,  McIDAS  area,  AWIPS,  PNGs  

bRR   Global  Rainfall  Rate  Map   NOAA-­‐18,  NOAA-­‐19,  Metop-­‐A  and  Metop-­‐B  /AMSU-­‐A&MHS,  DMSP  F18/SSMIS  

16  km   Level-­‐4   HDF-­‐EOS,  McIDAS  area,  AWIPS,  PNGs  

eTRAP   Prob-­‐matched  QPF,  Probability   NOAA-­‐18,  NOAA-­‐19,  Metop-­‐A  and  Metop-­‐B  /AMSU-­‐A&MHS,  GOES-­‐W/-­‐E,  DMSP  F17,  F18/SSMIS  

4  km   Level-­‐3   ASCII,  McIDAS  area,  GIFs  

SMOPS   Global  Soil  Moisture  Map   Metop-­‐A/ASCAT,  Coriolis/Windsat,  SMOS   0.25  degree  

Level-­‐4   netCDF4,  GRIB2,  GIFs  

GPDS   Rainfall  Rate,  TPW,  CLW,  etc.   GCOM-­‐W  AMSR2   5  -­‐  30  km   Level-­‐2,  

Level-­‐3  

netCDF4,  McIDAS  

MToPS   Rainfall  Rate  and  TPW  (MiRS  retrieval)  

M-­‐T  SAPHIR   10  km   Level-­‐2,  

Level-­‐3  

netCDF4,  McIDAS  

Page 11: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

•  NASA  –  Formal  MOU  on  GPM  signed  9/30/13  –  R20  Transi1on  Planning  con1nues  –  Early  adopters  for  GPM  data  –  PMM  Science  Team  

•  MOU  can  help  get  a  “few  more  things”  done  on  the  NOAA  side  to  support  the  team…  

•  Interna1onal:  –  Japan  –  GCOM-­‐W1  

•  Part  of  JPSS  program,  real-­‐1me  products  imminent  from  NOAA  (GPROV2010V2)  

–  India/France  (EUMETSAT)  -­‐  M-­‐T  •  SAPHIR  only  MiRS  (TPW,  rain  rate)  •  Awai1ng  finaliza1on  of  data  agreement  •  SAPHIR  –  ATMS  cross  calibra1on  

 

Partners  &  Status  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   11  

Page 12: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Opera1onal  Product  Examples  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   12  

Products  are  available  to  PMM  team:      •  Comparison  purposes    •  Day-­‐1  proxies,  if  

needed  (we  can  provide  code)  

 •  As  poten1al  input  for  

IMERGE  

ATMS  Snowfall  Rates  –  Direct  Broadcast  

AMSR-­‐2  Rainfall  Rates  

ATMS  Rainfall  Rates  

Courtesy  of    P.  Meyers,  T.  Islam.  H.  Meng  

Poster    104     Poster    121    

Page 13: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Progress  on  GMI  DA  at  JCSDA    JCSDA  effort  focused  on  assimila1on  of  Level  1C-­‐R  brightness  temperatures  (or  1B-­‐R  if  available)  in  NCEP  GDAS/GFS  –  BUFR  encoder  wrijen  for  1C-­‐R  HDF5  

data  –  Ingest  into  GSI  ongoing  –  Currently  assessing  data  quality  (bias,  

standard  devia1on,  GSI  QC/filtering)  

 Extension  of  GMI  to  GSI  1DVAR  preprocessor  (MIIDAPS)  

–  Provide  surface/atmospheric  characteriza1on  for  surface  sensi1ve/non  ocean  and  cloudy  radiances  

–  Provide  QC,  filtering  for  GMI  data  –  Focus  on  resampled  data  to  u1lize  all-­‐

channels  in  1DVAR  Figure  2.  MIIDAPS  applied  to  GMI  Level  1C-­‐R  showing    a)  Rain,  b)  Ice,  and  c)  ChiSq  quality  control  flag  over  Hurricane  Arthur  on  July  3,  2014.  

a)  

b)  

c)  

Figure  1.  Comparison  of  GMI  Channel  5  (23.8  GHz)  observed  versus  simulated  brightness  temperatures  using  GFS  6-­‐hour  forecast  and  CRTM  for  a)  scaaer  plot  obs  vs.  sim  and  b)  O-­‐F  versus  GMI  scan  posi.on  with  mean  bias  (red)  and  standard  devia.on  (dashed  red).  

a)   b)  

Poster    204    Courtesy  of    K.  Garre9,  E.  Jones,  S.  Boukabara  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   13  

Page 14: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

MiRS  SAPHIR  Rain  vs.  TRMM  2A12  March  –  August  2013  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   14  

Courtesy  of    T.  Islam  

Page 15: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

AMSR-­‐2  vs.  GMI  •  G14  V1.4/2A12  V03B;  G10V2  

using  AMSR-­‐2  L1B  •  Ini1al  assessment  

–  Ocean  very  similar,  as  expected  –  General  agreement  for  spa1al  

extent  of  precip  –  G10V2  creates  a  larger  area  

with  high  precipita1on  for  convec1ve  systems  

–  G14  has  more  focused  area  of  convec1on  

–  G14  creates  lighter  precipita1on  in  stra1form  regimes  

•  G10V2  typically  has  minimum  rain  rate  near  1  mm/hr  

–  G14  has  less  low-­‐end  noise  –  Possibly  due  to  L1C  use  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   15  

Poster    104    

Courtesy  of    P.  Meyers  23  July  2014  

Page 16: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  

Science  Team  and    Related  Ac1vi1es  

•  PMM  Science  Team  •  GOES-­‐R  and  JPSS  PGRR  Ac1vi1es  •  AMSU/MHS  Climate  Data  Records  •  Valida1on  Ac1vi1es  

16  

Page 17: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

•  NASA-­‐NOAA  Algorithm  Synergy  &  NWP  Impact  Assessment  In  support  of  GPM  –  S.  Boukabara  (PI),  K.  Garre9,  V.  Tallapragada  (co-­‐PI),  In-­‐Hyuk  Kwon,  Erin  Jones  

•  NOAA  GPM  Proving  Ground  and  U1liza1on  for  HMT-­‐SEPS  –  R.  Cifelli,  S.  Rudlosky,  R.  Ferraro,  P.  Xie  

•  Contribu1ons  to  the  MW-­‐RE  Precipita1on  over  Land  Algorithm  –  R.  Ferraro,  N-­‐Y.  Wang,  Y.  You,  H.Meng  

•  WiMerge:  Research  and  Development  of  Unified  CONUS  3-­‐D  Mosaics  and  QPE  products    –  J.  Gourley,  Y.  Zhang,  P.  Xie,  D.  Kitzmiller,  B.  Kuligowski,  P.  Kirste9er  

•  Characteriza1on  of  Precipita1on  Field  in  High  La1tudes  of  the  Northern  Hemisphere  for  the  Future  Use  with  the  GPM  Mission  Products  for  Hydrological  &  Climate  Change  Assessments  

–  P.  Groisman,  D.  Easterling,  B.  Nelson,  D.  Yang,  V.  Alexeev,  et  al.  

•  Calibra1on  of  GMI  Sounding  Channels  and  Global  Detec1on  of  Radio  Frequency  Interference    

–  Fuzhong  Weng    (NESDIS/STAR),  Xiaolei  Zou  (FSU)  and  Tiger  Yang  (ESSIC/UMD)  

•  Pole-­‐to-­‐Pole  CMORPH  and  Integrated  Regional  Precipita1on  Analyses    –  P.Xie  and  R.Joyce  

•  Analysis  and  Valida1on  of  GPM  in  LAPS  Data  Assimila1on  System  –  Y.  F.  Xie,  S.  Albers,  S.  Gutman,  D.  Birkenheuer,  H.  L.  Jiang,  and    Z.  Toth  

•  Contribu1ons  to  GPM  at  NOAA  NWS/OHD  &    NESDIS/STAR  –  Data  Fusion  and  Applica1ons  –  Y.  Zhang,  J.  Gourley,  R.  Kuligowski,  D.  Kitzmiller,  P.  Xie  

NOAA  Projects  for  PMM  

17  2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  4-­‐7  August  2014  

Nine  subtasks  submi9ed  as  a  single,  no-­‐cost  to  NASA,  proposal  

Poster    115    

Poster  118    

Poster    204    

Posters    213&214    

Wed  920  am  

Wed  1050  am  

Page 18: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

     

Data  Fusion  

Satellite  

Radar  Gauge  

Best  QPE  

NOAA  GPM  Proving  Ground  and  HMT-­‐SEPS:  QPE  Research  

2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   18  

• Purpose:    • Test  new  algorithms  and  products  •   Evaluate  product  performance  •   Facilitate  exchange  of  GPM  products  within  NOAA    

•  Infrastructure:    • Ground  based  instrumenta.on  • Computer  networks  •   NOAA  personnel  

• Strategy  for  success:  • PG  will  combine  resources  across  NOAA  (NWS,  NESDIS,  and  OAR)  

•  leverage  NOAA’s  testbed  infrastructure,  including  HMT-­‐SEPS  

Quan1ta1ve  Precipita1on  Es1ma1on  (QPE)  •  HMT-­‐SEPS  provides  opportunity  to  test,  evaluate,  and  compare  QPE  as  well  as  opportunity  to  improve  QPE  algorithms  

•  Goal:  develop  best  possible  QPE  forcing  for  opera.onal  users  

 

Courtesy  of  R.  Cifelli  

4-­‐7  August  2014  

Page 19: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Seamless  Merging  of  GOES-­‐R,  GPM,  and  Ground  Radar  Derived  QPE  for  the  MRMS  System  

Distribu.on  of    VPRs/hydrometeors  from    GPM  and  MRMS  

Distribu.on  of  surface  rainfall  rates  from  MRMS  

ALTITU

DE  

GOES-­‐R  observa.ons  near  cloud  top  +  GLM  

Probability  Matching  of  GOES  Cloud    Proper.es  to  Surface  Rain  Rates  

GOES  Coverage  in  Ground  Network  Gaps  

GPM  

Weight  toward  best  available    sensor  for  seamless  coverage  

The  Mul.-­‐Radar/Mul.-­‐Sensor  System  (MRMS)  §  hjp://mrms.ou.edu  §  Opera1onal  at  NCEP:  10/2014  §  Resolu1on  over  CONUS:  

§  0.01°  lat  x  0.01°  long  §  2  min  update  cycle  §  33  ver.cal  reflec.vity  levels  

§  Real-­‐1me  QPE  Products:  §  Instantaneous  precip  type/rate  §  Radar  QPE  (1  hr  –  10  day  accums)  §  Gauge  QPE    §  Local  gauge-­‐adjusted  radar  QPE  §  Orographic  climatology  gauge  QPE  (Mountain  

Mapper)    

Mo1va1on:  §  Ground  sensor  (radar  and  gauge)  coverage  is  limited  

in  Western  U.S.,  especially  in  cool  season.    §  Need  real-­‐.me  detec.on  of  heavy  rainfall  in  data  

sparse  areas  for  flash  flood  forecasts  and  warnings  

§  Ground  radar  networks,  GPM,  and  GOES-­‐R  provide  complementary  observa.ons  

           

Heather Grams and Pierre Kirstetter (CIMMS, University of Oklahoma), "Jonathan J. Gourley and Robert Rabin (NOAA/OAR/NSSL)"

Wed  920  am  

Page 20: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

A  Revised  Low-­‐Latency,  GPM-­‐Ready  Precipita1on  Algorithm:  Layout  and  Preliminary  Evalua1on  

Robert  J.  Kuligowski,  Yu  Zhang,  Yaping  Li,  and  Yan  Hao  

•  NESDIS  has  developed  an  IR-­‐based,  MW-­‐calibrated  rain  rate  algorithm  with  very  short  latency  (minutes)  

•  Previous  PMM  Science  Team  work  demonstrated  improvements  from  adding  TRMM  data  for  calibra1on  

•  Numerous  improvements  to  the  algorithm  since  then  in  prepara1on  for  use  on  GOES-­‐R  

•  Currently  evalua1ng  the  impact  of  these  improvements  on  a  mul1-­‐year  reprocessed  data  set  

•  Longer-­‐term:  integrate  into  a  mul1-­‐sensor  (satellite-­‐radar-­‐gauge)  product  

Less  false  alarm  rainfall  in  improved  algorithm  

Higher  skill  at  all  intensi1es  in  improved  algorithm  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   20  

Page 21: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Pole-­‐to-­‐Pole  CMORPH  and  GOES-­‐enhanced  Regional  Precipita1on  Analyses    

P.Xie  and  R.Joyce  §  Pole-­‐to-­‐pole  CMORPH  

§  0.05olat/lon  over  the  globe    pole-­‐to-­‐pole  with  explicit  representaRon  of  snowfall  

§  Tests  with  March  2014  data  showed    very  good  results  

§  GOES-R Enhanced Regional CMORPH

§  Enhanced by precip estimates from GOES-R IR+ observations

§  Refined space / time resolution (2km / 15-min)

§  Products comprised of different latencies (15?-min to 18 hours)

MWCOMB (top); PMW rain + snow (middle); Stage IV (bottom) 09:00 UTC 3 March 2014 [mm/hr]

Synthe1c  GOES-­‐R  enhanced  regional  CMORPH  precipita1on  es1mates  for  July  1,  2013,  produced  on  a  4km  resolu1on  using  satellite  PMW  and  GOES  IR  data  available  at  a  latency  of  30  minutes.    

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   21  

Page 22: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

ESRL/GSD/FAB  Progress          

 Dan  Birkenheuer,  Yuanfu  Xie,  Kirk  Holub  

•  GOAL:  Assess  impact  of  GPM  radar  data  in  analysis  and  modeling  (vLAPS  and  WRF)  

•  Case  selected  –  TRMM  proxy  test  data  for  GPM  model  impact  (see  Figure  on  right)  

•  Obtained  TRMM  data  converted  to  Cartesian  coordinate  system  for  ingest  (courtesy  Bob  Morris  NASA).  

•  Discovered  more  favorable  op.on  to  recode  Bob’s  IDL  sotware  to  populate  full  vLAPS/WRF  domain  with  TRMM  reflec.vi.es.        Current  work  effort.  

•  Will  run  case  with  and  without  TRMM  data  and  include  ground  radar  in  both.    Desire  to  see  posi.ve  impact  adding  satellite  radar  data.  

•  Possibly  select  a  mountain  case  if  funding  permits.    Since  we  now  have  a  beaer  means  to  iden.fy  cases  ater  working  with  Bob  Morris.  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   22  

Case  selected  for  first  impact  study  showing  TRMM  proxy  overpass  with  perfect  storm  coverage  26  Jul  13.    Convec1ve  line  progressing  across  the  FL  peninsula  from  NW  to  SE.  Satellite  caught  radar  echoes  off  shore.    Next  case  planned  –  mountain  convec1on  in  which  there  is  lijle  or  no  ground  radar  available.  

Page 23: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

GOES-­‐R  &  JPSS  Risk  Reduc1on  Programs  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   23  

•  GOES-­‐R  (S.  Goodman)  –  Sensors  useful  for  rapid  refresh  precipita.on  es.ma.on  

and  storm  monitoring  •  ABI    &  GLM  

–  Ongoing  projects  of  interest  include  •  Use  of  GLM  to  improve  PMW  and  ABI  rainfall  •  Fusion  of  ground  radar  and  IR  rain  es.mates  •  Also  funds  NOAA  PMM  PI’s  

–  Contribu.ons/interest  in  GPM  GV  •  Ground  ligh.ng  sensors  in  support  of  CHUVA  

•  JPSS  (M.  Goldberg)  –  Key  sensors  to  precipita.on  

•  ATMS,  AMSR-­‐2,  (SSMIS),  (GMI)  –  Ongoing  projects  of  interest  include  

•  ATMS  snowfall  rates  •  CMORPH  enhancements  with  SFR  

–  Also  emphasizes  use  of  direct  broadcast  data  •  Proving  Grounds  and  Testbeds  

–  These  accelerate  the  use  of  new  products  to  NWS  –  PG’s  at  NCWCP  (and  an  emerging  one  at  CICS-­‐MD)  can  help  

accelerate  GPM  product  uses/applica.ons  •  Willing  to  work  closely  with  NASA  on  GPM  •  This  was  one  of  the  key  recommenda.ons  from  the  NOAA  GPM  User  

Workshops  

 

Page 24: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Minute  Lightning  Density  with  2  Long-­‐track  Tornados    

DCLMA  Applica.ons  –  Synergy  from  GOES-­‐R  ABI  &  GLM,    &  JPSS  GCOM  AMSR2  

24  2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  4-­‐7  August  2014  

Lightning  Flashes  Each  Second  Overlaid  on  AMSR2  Precipita1on  

P.  Meyers,  Univ.  of  MD/CICS  S.  Rudlosky,  NESDIS/STAR  N.  Wang,  CICS,  IMSG  

Page 25: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Mo1on  Vectors  from  Lightning  Density  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   25  

Page 26: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Lightning-­‐Advected  Rain  Rates  from  AMSR2  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   26  

Page 27: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

AMSU/MHS  Climate  Data  Records  

•  Four  year  project  funded  by  NOAA/NCDC  nearing  comple.on  –  AMSU-­‐A  and  AMSU-­‐B/MHS  FCDR’s  

(L1C)  for  window  channel  –  2000-­‐2010,  all  satellites  –  Final  delivery  by  end  of  2014  

•  Data  would  be  available  to  NCDC  •  Beta  data  sets  now  available  

–  Will  also  generate  L2  products  via  MSPPS  “legacy”  system  

•  Rain  and  snow  rate  should  be  of  interest  to  the  IMERGE  team  

•  Would  like  to  conduct  impact  studies  

•  NCDC  to  con.nue  to  fund  during  2-­‐3  year  transi.on  period  –  Should  be  able  to  extend  data  sets  

through  2015  •  Looking  to  extend  to  NPP/ATMS  

–  Would  allow  for  reprocessing  of  en.re  MiRS  .me  series  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   27  

H.  Meng,  T.  Smith,  NESDIS/STAR  W.  Yang,  I.  Moradi,  J.  Beauchamp,  Univ.  MD/CICS  

Page 28: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

Precipita1on  Cal/Val  Center  

4-­‐7  August  2014   2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD   28  

hjp://cics.umd.edu/ipwg/index.html  

S.  Rudlosky,  NESDIS/STAR  &  J.J  Wang,  UMD/CICS  

Page 29: Update’on’NOAA Precipita1on ... - gpm.nasa.gov

•  NOAA  can  provide  NASA  several  useful  data  sets  that  can  contribute  to  GPM  program  –  POES  and  JPSS  L1  data  sets  –  MiRS,  SFR,  AMSR-­‐2  L2,  CDR’s,  HMT-­‐SEPS,  ancillary  data,  etc.  

•  Through  our  MOU  with  NASA,  NOAA  has  been  –  Developing  BUFR  formaaed  GMI  data  for  tes.ng  by  JCSDA  –  Providing  early  access  to  GPM  data/products  for  tes.ng  and  evalua.on  

•  NOAA  will  con.nue  its  ac.ve  par.cipa.on  on  PMM  Science  Team  –  Algorithm  teams  –  GV  ac.vi.es  –  …wherever  we  can  contribute  the  most…  

•  Several  emerging  new  R&D  efforts  supported  by  JPSS  and  GOES-­‐R  programs  –  Fusing  together  satellite  (including  GLM)  and  ground  data  

•  NOAA  Proving  Grounds  and  Testbeds  will  be  leveraged  to  –  Accelerate  the  use  of  GPM  data  by  NOAA/NWS  –  Accelerate  the  use  of  NOAA-­‐unique  products  using  GPM    

•  New  R2O  opportuni.es  emerging  from  NOAA/NESDIS  reconfigured  ground  segment  program  which  plans  to  integrate  all  satellites  into  common  system  

Summary/Take  Away  Points  

29  2014  PMM  Science  Team  Mee1ng  –  Bal1more,  MD  4-­‐7  August  2014