UPDATE

THAILAND MARKET READINESS PROPOSAL (MRP)

PA 6 – Barcelona, 27-28th May 2013

Page 2: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Outline of Presentation

Overview • MRP Objective(s) and Focus • MRP Development Process Market Readiness Proposal • The Big picture and Country context • Conceptual design of Energy Performance Certificate Scheme (EPC) • Conceptual design of Low Carbon City Program (LCC)

Page 3: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

MRP Objective(s) and Focus

General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism Specific objectives: To design Market Mechanism to reduce energy consumption and GHG in Energy sector with the view to transform to Emission Trading if required To design new methodology and standard to assist local municipalities and communities to implement GHG mitigation actions in achieving sustainable development and low carbon society goals . To develop MRV and registry system for Market Mechanism proposed To implement PILOT Market Mechanism proposed

Page 4: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

MRP Development Process

Task Team

Study and conceptual design of Energy Performance Certificate scheme

ICF LLC

Study and conceptual design of Low Carbon City program

Factor CO2 + Asian Institute of Technology + ICLEI South-East Asia

Development of Thailand Market Readiness Proposal

Energy for Environment Foundation

Project management and coordination

TGO

Page 5: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

MRP Development Process

Data collection

Draft Conceptual

design of EPC and LCC

Consultation with related ministries

and local municipalities

Grant agreement

signing

Draft MRP development

Informal presentation

at PA6

Sep 2012 – Feb 2013 Jan - Mar 2013 Sep 2012 – Feb 2013 Mar 2013 Mar - May 2013 May 2013

Consultation with local municipalities in 4 more regions

(Central, Northern, Southern &

Northeastern)

Country visit Presentation of

draft MRP at PA7

Submission of Draft MRP to Secretariat

Consultation with related ministries and private sector

May - June 2013 June – July 2013 Oct 2013 Aug 2013

Rationale for postponing formal presentation to PA7

To implement PILOT Market Mechanism proposed, more details in

conceptual design are discussing.

To make a good and solid proposal that can engage private sector and local municipality to

participate in voluntary market mechanisms, more stakeholder consultations are needed.

Sep 2013

Page 6: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

GHG emission in 2000-2009 (Mt CO2e)

Increase 3.9% per year

241.14 257.37

268.32 281.61

298.78 307.42

312.28 319.79 320.49 326.43

Big picture & Country context

Page 7: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Thailand’s GHG emission trends

Page 8: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

National Climate Change Policy

Ministry of Energy Ministry of

Transport

Ministry of

Industry

Ministry of

Agriculture and

Cooperation

Energy Efficiency Development Plan

2011-2030

Alternative Energy Development Plan

2008-2022

National transport

Master Plan

2011-2020

National Industrial

Development

Master Plan

2010-2014

Draft Strategic Plan

on Climate Change

in the Agricultural

Sector

11th National Economic and Social Development

Plan 2012-2016

Government Policy of the Prime Minister

Ms. Yingluck Shinawatra

Ministry of Natural Resources and Environment (MoNRE)

National Environment Quality Management

Plan 2012-2016

Nation

al P

olic

ies/P

lans o

n

Clim

ate

Cha

nge

an

d

En

viro

nm

ent

Sp

ecific

Pla

n

Draft National Strategic Plan on climate change

2011-2050

Thailand Power Development Plan

(PDP2010 : Revision 3) 2012 – 2030

Page 9: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Thailand’s Voluntary Carbon Market

Energy Performance Certificate (EPC) Scheme

• To incentivize large energy consumers to set their energy conservation Targets and commitment To create demand for the voluntary carbon market

• To support Energy Efficiency Development Plan (EEDP 2011 – 2030) by preparing infrastructure as well as the large energy consumers to be ready for mandates in the future.

• EEDP 2011 – 2030: : Determination of the Energy Efficiency Resource Standards (EERS), or the minimum standards for large energy businesses … with a penalty clause

• Energy Conservation Promotion Act – Energy Conservation Promotion Fund & Powers to impose compulsory measures on large energy consumers classified as Designated Factories & Buildings

Multi-sector approach for green low-carbon cities

Source: NESDB & World Bank, 2011

Low Carbon City (LCC) Program

• To incentivize local municipalities and communities to implement mitigation actions.

• To support 11th National Economic and Social Development plan in achieving sustainable development and low carbon society goals.

• To promote small and micro Renewable Energy projects under Green City as part of Alternative Energy Development Plan (2008-2022).

Page 10: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

EPC-LCC Linkages

10

Thailand

Carbon

Market

EPC

Higher

Achieved

Lower

Achieved

EPC Participants:

Designated Factory &

Building

• Cement

• Ceramic

•Iron & Steel

• Petro-chemical

• Pulp & Paper

• Thermal Power Plant

• Large Commercial Building

Other buyers:

• Government

• CSR-oriented companies

• Foreign buyers: Mandatory

& Voluntary

Symbols:

• : Flow of Money

• : Flow of Credit

• EPC: Credit from energy efficiency activities

• GHC: Credit from other activities/schemes

• LCC unit: Credit from LCC program

LCC Participants:

Local municipality &

Community Energy conservation in

households, Gov. building

Small RE

Waste Management

A/R

Transportation

Other GHG Mitigation Activities : • CER • Energy Efficiency in Small- and

Medium- energy consumers • RE • Others

Investment Subsidies /

Grants for outputs that

can be MRV.

GHC

Fund

LCC

unit

Source of fund:

• Government

• CSR-oriented companies

• D F&Bs under EPC

scheme

• Donors

Agriculture

Page 11: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

11

Conceptual design of Energy Performance Certificate scheme

Page 12: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

THE EPC SCHEME ….. Approach

Designated

Factories/Buildings

Establish Baseline

Detail Review of Present Energy Scenario &

Bandwidth

Development of Baseline Formats

with System Boundaries

Data Collection, Compilation & Analysis

Verification of Data

Set Targets for SEC Reduction,

Allocation of Certificate

Achieve the Target Technology Transfer, EE Technology,

R&M, R&D, Fiscal Incentive

Verification Protocol

Trade the EPC unit for higher achieved saving

Page 13: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

13

THE EPC SCHEME ….. Key features

Features of the scheme

Nature of the scheme Voluntary

Participants Designated Factory and Building from energy intensive Factories in manufacturing sectors, Commercial building and Thermal power plant

Period Four years to achieve targets

Goal A part to achieve Energy Efficiency Development Plan that aim to reduce energy intensity 25% by 2030

Target for Participants Top-Down and Bottom-Up approaches (National target and Benchmarking with sectoral SEC)

Baseline year 2010-2012

Certificate issuance Ex-ante allocation of certificate

Page 14: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

14

THE EPC SCHEME ….. Key features

Features of the scheme

Carry over of certificate Carry over is permissible only for EPC unit. Certificate will remain valid till next cycle.

Borrowing Not permitted

Higher achieved EPC unit can be traded

Lower achieved • EPC unit • CERs and TVERs • Fund—LCC unit Not less than 50%

Unit Reserve 80%

Up to 50%

Page 15: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Selection of Target Sectors : Criteria

Criteria • Contribution in GDP • Share of energy consumption per year

Criteria • Share of energy consumption per year

Criteria • Under Designated Buildings and Factories • Comparatively easy to verify & convince to participate • Good Saving potential

Criteria • Share of energy consumption per year

Step 1: Select the Economic

Sector

Step 2 (a): Select the Category

in Industry Sector

Step 2 (b): Select the Category

in Building Sector

Step 2(c) : Select the

Category in Power Sector

(Supply Side)

Page 16: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Selection of Target Sectors : Summary of Analysis

Sectors No. Of Probable

Designated Factories & Buildings

Estimated Annual Energy Consumption

(ktoe) Remark

EPC - PHASE-I

Food & Beverage and Textile may be added in

2nd Phase

1 Cement 39 1,744

2 Ceramic 23 290

3 Iron & Steel 97 844

4 Petro-Chemical 10 231

5 Paper 125 1,580

294 (7.5%) 4689 (20.64%)

6 Commercial Building 861 (40.2%) 1397 (28%)

(Dept Str+Hotel+Hospital)

Demand Side Sub-TOTAL 1155 (19.2%) 6086 (17.7%)

7 Thermal Power Plant 86 15500 Refinery in 2nd Phase

Supply Side-Sub-TOTAL 86 (85.15%) 15500 (93.0%)

TOTAL 1,241 (20.4%) 21,586 (32.2%)

Page 17: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Setting up of Target

Target already set by National Policy up 2030

Estimate the national target for selected sectors

Present SEC level (from Baseline Study)

World Benchmark / Thailand Benchmark level

Estimation of Potential in 4 years

Set Sectoral Target

Both TOP-DOWN and BOTTOM-UP APPROACH to be used for establishing sectoral target

Keep the national target in view as per long term energy policy (i.e. 25% energy intensity reduction by 2030) : About 11300 kTOE from manufacturing sector and 2300 kTOE from commercial building sector

Apportionment of national target to selected sub sectors

Establish % reduction per year

Estimate the Potential saving w.r.t. present SEC and benchmark SEC

Define the cycle period of EPC (4 years)

Adjust the sectoral target based on national goal, potential available and pay-back period of energy efficient technologies

Page 18: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

18

Sector SEC reduction target (6.9% average in 4

years)

No. of Probable

DF&Bs

Annual Energy Consumption

(ktoe)

Saving as per National Target of 6% reduction in 4 years (ktoe)

100% participation

Cement 6.8% 39 1744 105 119

Ceramic 7.8% 23 290 17 23

Iron & Steel 6.8% 97 844 51 57

Petrochemical 6.4% 10 231 14 15

Paper 6.8% 125 1579 95 107

Commercial Building

6.8% 861 1397 84 95

Thermal Power Plant

6.8% 86 15500 930 1054

Total 1241 21586 1295 1470

Saving above National Target 175

Estimation of Energy Saving

Page 19: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Institutional structure of EPC implementation

Page 20: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Roadmap for EPC implementation

Finalization of participating sectors

Analysis and Stakeholder consultation

Data collection, Database development, Target fixation of these sectors

Baseline study, Data verification, Energy Audit

Scheme design

EPC consultation document

Preparation of EPC design document

Scheme notification after consultation

Accreditation of EPC participants (factories , buildings)

Implementation of M&V system

Empanelment of EPC verifiers (Energy Auditors), Registry

Annual Monitoring and Verification

Capacity Building ( all stakeholders)

Page 21: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

Conceptual design of Low Carbon City program

Page 22: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

• In case of lower achieved

saving, participants will transfer money to the fund and receive LCC unit for compliance

Conceptual design of LCC program

Fund

LCC

unit

Source of fund:

• Government

• CSR-oriented companies

• D F&Bs under EPC

scheme

• Donors

Designated Factory & Building

Page 23: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

• General criteria:

o Geographical balance

o City size

o Degree of socio-economic development

• Specific selection criteria:

o Green governance leadership

o Readiness to prepare GHG inventory

o GHG emission reduction goal/target

o Institutional strengths

Participation in LCC program

Some

municipalities will

be selected in pilot phase

Page 24: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

24

Scope

CO2

CH4

SF6

PFCs

HFCs

N2O

Energy Efficiency

Waste Management

Renewable Energy

Agriculture

A/R

Transportation

• Indoor lighting • Street lighting • Air conditioning • Refrigerator

• Solar PV

• LFG to energy • Waste water to

energy

• Urban green area • A/R

• Fertilizer • Animal manure

management

• Bio-fuel

Page 25: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

25

Baseline Setting: Area-based approach

Page 26: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

1 • GHG Inventory preparation

2 • Evaluation of GHG mitigation potential

3 • Identification of GHG mitigation activity

4 • Project Design Document preparation

5 • Evaluation of GHG emission in city

6 • Evaluation of GHG emission reduction in city

7 • Implementation of GHG mitigation activity in city

8 • Monitoring of GHG emission reduction

9 • Verification of GHG emission reduction

10 • Issuance of credit

GHG database

Implementation

Evaluation & analysis

Mu

nic

ipal

ity/

Co

mm

un

ity

Verifier

TGO

LCC Process

Evaluation & analysis

Page 27: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

27

THE LCC PROGRAM…Key features

Key features

Participation Local municipality and community

Scope EE, RE, Waste, A/R, Agriculture and Transportation

Type Small scale, Micro scale and PoA

Base year Recently available

Boundary Setting Area-based, Inventory concept

Methodology Baseline: sector-based, standardization concept Emission reduction: project-based

Verification Third party auditor

Registry LCC registry separated from EPC registry

Carbon pricing and Incentive

Set floor price for carbon credit generated from LCC program and investment subsidy to be supported to participants using analysis from MAC and co-benefits

Page 28: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

28

Tracking and registry system

• The EPC Registry and the LCC Registry will be developed separately

(different accounting unit, toe vs. tCO2e).

• LCC Units (=1 tCO2e) will be not tradable among EPC participants but

retired by the LCC Registry on behalf of EPC Buyers.

• The LCC Registry will consist of crediting accounts and a domain of

public information.

EPC Registry

LCC Registry

LCC Unit Crediting Accounts

Buyers of LCC Units (EPC)

Sellers of LCC Units (LCC)

Project Information

Page 29: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism

CENTRAL ENTITYMinistry of Natural Resources and Environment

COORDINATING AGENGYThailand Greenhouse Gas Management Organization (TGO)

CROSS-MINISTERIAL TASKFORCENational Climate Change Committee

Ministries of Natural Resources and Environment, Energy, Industry, Agriculture and Cooperatives, Public health, Transport, Information and Communication Technology, and Finance

CONSULTANTSAGENCIES(DEDE, PEA, etc.)

ASSOCIATIONSNMT

COORDINATING AGENGYThailand Greenhouse Gas Management Organization (TGO)

DIRECT STAKEHOLDERS Municipalities and Communities

PRIVATE SECTOR (Business Associations, Political Parties, NGOs, Universities, think-tanks, media)

SOCIETY

CONSULTANTSAGENCIES(DEDE, PEA, etc.)

ASSOCIATIONSNMT

Stakeholder consultation

Page 30: UPDATE THAILAND MARKET READINESS PROPOSAL (MRP) · MRP Objective(s) and Focus General objective: to prepare readiness of Thailand in developing Voluntary Mitigation Market Mechanism