13
‘Update on development programme’ Amanda Norris Julian Fox

‘Update on development programme’ Amanda Norris Julian Fox

Embed Size (px)

Citation preview

Page 1: ‘Update on development programme’ Amanda Norris Julian Fox

‘Update on development programme’

Amanda NorrisJulian Fox

Page 2: ‘Update on development programme’ Amanda Norris Julian Fox

Last UG meeting – development prioritisation

• User feedback on data submission

• Website upgrade• User log-on• Menu review• Upgrade online help• Auto-upload of data

• LA Reports– PDFs, Excel, CSV– Regional grouping– Improved

Benchmarking around family groups

• External body reports

• Quarterly question management by LAs

Page 3: ‘Update on development programme’ Amanda Norris Julian Fox

Prioritisation exercise

02468

10121416

Use

rfe

ed

ba

ck o

nd

ata

sub

mis

sio

n

We

bsi

teu

pg

rad

e

Use

r lo

g-o

n

We

b m

en

ure

vie

w

Up

gra

de

on

-lin

e h

elp

Au

to-u

plo

ad

of d

ata

Re

po

rts

(LA

)-

form

at a

nd

fun

ctio

n

Da

ta o

utp

ut

for

ext

ern

al

bo

die

s

LA

qu

est

ion

ma

na

ge

me

nt

Development item

Nu

mb

er

of

vo

tes

Page 4: ‘Update on development programme’ Amanda Norris Julian Fox

• LA default question management– Spec developed

• Auto-upload of data– Most complex to develop, not been taken forward yet

• User notification on data submission– Spec developed

• Reporting review and Data output for external users– Review report delivered, to discuss in break-out.

England user group prioritisation led to:

Page 5: ‘Update on development programme’ Amanda Norris Julian Fox

LA default question

• In development: when first entering data for a period, presented with template

• Template lists all questions available for all authority types

• Each question has tick-box to exclude it for the period• Template saved across periods• Quarter can be rolled up when all included questions

are completed• List will show whether a question is answered or not• Questions in the list hyperlink to data entry

Page 6: ‘Update on development programme’ Amanda Norris Julian Fox

Screen shot of default question

Page 7: ‘Update on development programme’ Amanda Norris Julian Fox

Auto-upload of data

• Most complex of development options receiving support of UG

• Implementation approach will be to make specification available for external parties

• Specification scheduled for development in future

Page 8: ‘Update on development programme’ Amanda Norris Julian Fox

User notification on data submission

• Already implemented for roll-up as part of the queuing process: user receives e-mail when the quarter is rolled up

• Being developed for authorisation levels: as the quarter moves up levels relevant users will be notified

Page 9: ‘Update on development programme’ Amanda Norris Julian Fox

Trigger Diagram

Enter Data

Rolled-up Data 10

0

Roll-up

Yes

No

Okay this data

Yes

No

Data ReadyFor Review by

LA Admin20

Authorise

Yes

No

Data ReadyFor External

Review

Data Ready forNational Lvl 2

review35

30

National Lvl1approval

Yes

No

National Lvl2approval

Yes

No

Data Ready forNational Lvl 3

review40

Return to level 20 orReturn to level 0

1

2

5

4

3

7

6

8

Page 10: ‘Update on development programme’ Amanda Norris Julian Fox

Report review

• Technical review carried out to find the best way of delivering reports/data from WDF.

• Inputs from User groups, steering group and development team

• Outcome was recommendation to expand the methods used to deliver the BVPI and mass balance reports to deliver all reports

Page 11: ‘Update on development programme’ Amanda Norris Julian Fox

Proposed report mechanism

• Complex equations (such as BVPI) to be pre calculated (known as c-variables in the system)

• Reports are in essence collection of c-variables• Layout and presentation of the data defined in a

Excel spreadsheet, with data from WDF on back tab• Report selection screen allows the user to pick:

– One or many authorities– One or many periods– A group of c-variables (eg BVPI 82a)– An Excel template to push the data onto

Page 12: ‘Update on development programme’ Amanda Norris Julian Fox

Benefits of report mechanism

• Reports allow benchmarking across any number of LAs

• Data in report is in Excel format and so doesn’t require re-entry for further analysis

• Excel template method provides the user with control of final look and feel of the report

Page 13: ‘Update on development programme’ Amanda Norris Julian Fox

Other developments

• The above is a review of the development items from the England user group prioritisation.

• There are several other development tasks competing for time and resources driven by– Core WDF requirements– Wales, Northern Ireland and Scotland needs– WDF system maintenance