43
Page 1 of 43 Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016 1 HO 34 Fargo Drive Acquisition Purchase property that is located in an enclosed basin and suffered severe damage during TS Debby. Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. 2 HP 34 Morningstar Lane Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Property was not funded through 3 FMA submissions. Will try again in July 2016. 3 HQ 34 1st Minnieola Drive Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. 4 HR 34 Ironbark Drive Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Included in TS Debby HMGP Grant. Not funded. 5 HS 33 Tomahawk Street Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Submitted for Hurricane Frances funding. Property owner declined grant. 6 HT 33 Michigan Avenue Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. 7 HU 33 Lee Street Acquisition Purchase property that suffered severe damage during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Included in TS Debby HMGP Grant. Not funded. 8 HV 33 Alcea Street Acquisition Purchase two Alcea Street and one Friedly Avenue property severely damaged during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. 9 HW 33 Grayoak Lane Acquisition Purchase Grayoak Lane property severely damaged during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. 10 HX 33 Passaic Drive Acquisition Purchase Passaic Drive property severely damaged during TS Debby Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health, safety and welfare 05.2 Property acquisition/retrofit repetitive loss properties 12+ mos. Dec-17-2015 Buyout in process. Type Score Project/ Program Name Description City/County Offices Hazard(s) Mitigated Category Funding Source(s) Goal Objective Timel Upda Status

Upda - Pasco County, FL

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Upda - Pasco County, FL

Page 1 of 43

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

1 HO 34 Fargo Drive Acquisition Purchase property that is located in anenclosed basin and suffered severedamage during TS Debby.

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12

+ m

os.

Dec

-17-

20

15 Buyout in process.

2 HP 34 Morningstar LaneAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Property was not funded through 3 FMAsubmissions. Will try again in July 2016.

3 HQ 34 1st Minnieola DriveAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Buyout in process.

4 HR 34 Ironbark Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Included in TS Debby HMGP Grant.Not funded.

5 HS 33 Tomahawk Street AcquisitionPurchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Submitted for Hurricane Frances funding.Property owner declined grant.

6 HT 33 Michigan AvenueAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

7 HU 33 Lee Street Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Included in TS Debby HMGP Grant.Not funded.

8 HV 33 Alcea Street Acquisition Purchase two Alcea Street and oneFriedly Avenue property severelydamaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

9 HW 33 Grayoak Lane Acquisition Purchase Grayoak Lane propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

10 HX 33 Passaic Drive Acquisition Purchase Passaic Drive propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 2: Upda - Pasco County, FL

Page 2 of 43

11 HY 33 Mirage Avenue Acquisition Purchase Mirage Avenue propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12

+ m

os.

Dec

-17-

20

15 Buyout in process.

12 HZ 33 Ella Lane Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Property owner withdrew from grantprogram.

13 IA 31 Second Minnieola DriveAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Included in TS Debby HMGP Grant.Not funded. Property later sold.

14 IB 31 Otis Allen Road Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Buyout in process.

15 IC 31 Elfers Parkway Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

16 ID 31 Harbor Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

17 IE 31 Augustine Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

18 IF 31 Quail Hollow BoulevardAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

19 IG 31 Winsor Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Included in TS Debby HMGP Grant.Not funded.

20 IH 31 Thunderhead StreetAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Included in TS Debby HMGP Grant.Not funded.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 3: Upda - Pasco County, FL

Page 3 of 43

21 II 30 Lake Terrace SubdivisionProject Area (RLA 6)

Elevate 1 RL property built prior toCounty joining NFIP

Pasco County OEM &Stormwater Management

Floods Retrofitting of Structures HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Property acquisition/retrofitrepetitive loss properties

12

+ m

os.

Dec

-17-

20

15 Encourage property owners to elevate,

County will assist as funding becomesavailable.

22 IJ 30 Aurora Drive Project Area(RLA 11), Phase I

Acquire 2 RLs built prior to currentstormwater regulations and prior tothe county joining NFIP

Stormwater Management Floods Property Acquisition HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Encourage property owners to elevate,County will assist as funding becomesavailable.

23 IK 30 Aurora Drive Project Area(RLA 11), Phase II

Expand retention pond storagcapacity to a 10-year storm event

Stormwater Management Floods Stormwater Management HMGP, Stormwater utility fee 08 StormwaterImprovement

Maintain and improve existingdrainage systems to regulatemanagement of stormwater runoff

12+

mos

.

Dec

-17

-20

15

Acquire properties, design and permitconstruction

24 IL 30 Bonita Project Area (RLA14)

Acquire 2 RLs built prior to currentstormwater regulations and prior tothe county joining NFIP

Pasco County OEM &Stormwater Management

Floods Property Acquisition HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Encourage property owners to elevate,County will assist as funding becomesavailable.

25 IM 30 Floramar Project Area (RLA15)

Elevate 1 older RL property builtprior to County joining NFIP

Pasco County OEM &Stormwater Management

Floods Retrofitting of Structures HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Encourage property owners to elevate,County will assist as funding becomesavailable.

26 IN 30 Update FIRMs Add St. Leo and San Antonio to NFIPand encourage FEMA to developFIMs

Stormwater Managementand Cities

Floods Public Education SWFWMD, COOP Funding 01 Protect the health,safety and welfare of thepublic

1.2 Ensure newdevelopment/redevelopmentcomplies with applicable federal,state and local buildingregulations

Est

. 10/

14

Dec

-17-

2015

FIRMS adopted September 2014.

Task completed.

27 IO 30 Holiday Hills Project Area(RLA 16), Phase 2

Elevate 5 RLs, built prior to thecounty joining NFIP

Stormwater Management Floods Flood Proofing HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

201 Encourage property owners to elevate,

County will assist as funding becomesavailable.

28 IP 30 Duck Slough WatershedBMP Implementation (westof Little Road)

Implementation of BMPs identified inthe Duck Slough watershed plan forthe area west of Little Road

Stormwater Management Floods Capital Projects,Infrastructure,Restoration of NaturalFeatures, Retrofitting ofStructures, StormwaterManagement

Stormwater utility fund, SWFWMD,COOP Funding and State appropriations

08 StormwaterImprovement

8.1 Maintain and improve existingdrainage systems to regulatemanagement of stormwater runoff

12+

mos

.

Dec

-17-

2015

BMP 1A & 5A ready for construction;BMP 6 being designed and permitapplication prepared

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 4: Upda - Pasco County, FL

Page 4 of 43

29 IQ 30 Port Richey Watershed BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan - SWFWMD

Stormwater Management Floods Capital Projects,Infrastructure,Stormwater Management

SWFWMD, COOP Funding &Stormwater Utility Fee

08 StormwaterImprovement

8.1 Maintain and improve existingdrainage systems to managestormwater runoff

12

+ m

os.

Dec

-17-

20

15

Review of BMPs underway.

30 IR 30 Zephyrhills Downtown FireStation Wet Floodproofing

Renovate downtown Fire Station toinclude interior/exterior wetfloodproofing

City of Zephyrhills Floods Flood Proofing HMGP

12+

mos

.

Dec

-17

-20

1 OEM putting together application forsubmission to the state.

31 IS 30 Zephyrhills Downtown FireStation Dry Floodproofing

Renovation of downtown Fire Stationto include interior/exterior dryfloodproofing

City of Zephyrhills Floods Flood Proofing HMGP

12+

mos

.

Dec

-17

-20

15

OEM putting together application forsubmission to the state.

32 IT 30 Zephyrhills Downtown FireStation Hardening

Structural reinforcements to hardendowntown Fire Station to meetcurrent Florida Building Codes

City of Zephyrhills Winds Critical Facilities HMGP

12+

mos

.

Dec

-17

-20

15

OEM putting together application forsubmission to the state.

33 IU 30 Zephyrhills 20th StreetStormwater ManagementProject Acquisition

Purchase foreclosed property toconstruct stormwater managementproject/retention pond. Reduceflooding of two primary collectorstreets (20th St & 5th Ave) withimproved emergency ingress/egressand flood protection

City of Zephyrhills Floods Property Acquisition HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application forsubmission to the state.

34 IV 30 Zephyrhills 20th Street (4thAve) StormwaterManagement Project

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City of Zephyrhills Floods Stormwater Management HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application forsubmission to the state.

35 IW 30 Zephyrhills 20th Street (7thAve) StormwaterManagement Project

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City of Zephyrhills Floods Stormwater Management HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application forsubmission to the state.

36 HF 11 Residential Safe Rooms Encourage residents toconstruct/retrofit safe rooms in theirhomes using FEMA criteria.

Countywide Hurricanes/ TropicalStorms, Tornados,Nuclear Power PlantIncident

Retrofitting of Structures EM Preparedness and Assistance TrustFund; HMGP; FMA

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17-

2015

Project costs and benefits will vary byresidence. This is a continuing effort toencourage homeowners to construct saferooms.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 5: Upda - Pasco County, FL

Page 5 of 43

37 BI 28 10th Street and WillinghamAvenue Stormwater Project

Increase retention area and redesignstormwater system.

Dade City Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Awaiting release of new FIRMs determinehow to best redesign project stormwatersystem. This project will be reviewedduring spring 2008 and is possible item forFY 2008-2009 budget. FIRMs should bereleased in 2013.

38 GF 22 Beauchamp Retention PondsStormwater Project

Along with the engineering study forthe City Storm Water ManagementPlan (#055;E-17), conductengineering study with SWFWMD toincrease the depth of the ponds andeffects of pumping to other basins toimprove the #059 Dade Oaks IIProject.

Dade City Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Awaiting release of new FIRMs beforeattempting to determine redesignedstormwater system for this project. Projectwill be evaluated after view of new FIRMs.FIRMs should be released in 2013.

39 GG 22 Howard Avenue StormwaterProject

Resize culverts draining to the liftstation, upgrade lift station andupgrade outfall.

Dade City Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project was divided into two phases. PhaseI was completed by the City and includedinstallation of a 24" RCP along HowardAve and the construction of a retentionpond. Phase II will include the upgrade ofthe stormwater pump station. No change.

40 CN 25 Dade City StormwaterManagement Plan

Engineering study to identifycost-effective stormwaterimprovements necessary to correctexisting problems and policyguidelines to mitigate for potentialflooding.

Dade City andStormwater Management

Floods Management PlanDevelopment andModification

EM Preparedness and Assistance TrustFund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Work underway to develop 5-year capitalimprovement plan. No change.

41 CP 25 Dade Oaks Project, Phase II,10th Street and WhitehouseAvenue IntersectionStormwater Project

Drainage improvements andadditional retention to restore naturalflows and contain flood waters in theDade Oaks Public Housing Project.Cost unavailable. Completiondependent on County project.

Dade City andStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is not active at this time. Awaitingrelease of new FIRM Maps beforeattempting to determine redesignedstormwater system for this project. FIRMsshould be released in 2013.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 6: Upda - Pasco County, FL

Page 6 of 43

42 GB 23 Emergency Generator Install emergency generator atCentennial Elementary School tosupply backup power to the waterwell and waste plant during shelteroperations

District School Board ofPasco County

Hurricanes/ TropicalStorms

Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

20

15

The generator for the well and lift station atCentennial Elementary is scheduled to befunded next fiscal year, 2011-2012. This issubject to change depending on theavailable funding.

43 CY 25 Dunn Retrofit Modified elevation of SLR propertyto eliminate the flood problem

New Port Richey Floods Retrofitting of Structure Repetitive Flood Claims Mitigation Grant05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

< 1

2 m

os.

Dec

-17

-20

15

Completed. Remove from list.

44 GM 21 Elevate the Putnam Dwelling Modified elevation of Putnam Homeat 5422 Bellview Ave., New PortRichey

New Port Richey Floods Elevation of home toeliminate flooding

FMA 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17

-20

1 Construction complete and CO issued1/29/2010.

45 HG 10 Morton Plant North BayHospital External Hardening

Examination of potential hardening toinclude windows and protection offront entrance from flood damage

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG; FMA; HMGP; 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

46 HH 10 Morton Plant North BayHospital MitchellRehabilitation HospitalExternal Hardening

External hardening of windows, roofand walls.

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

47 HI 10 Morton Plant North Bay CathLab External Hardening

External hardening of windows, roofand walls.

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

New project.

48 HJ 10 Morton Plant North BayCampus Wide ElectricalPanel Elevation - ExternalHardening

External hardening of all electricalpanels on the medical campus

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

49 HK 10 Morton Plant North BayAmbulatory Surgery CenterExternal Hardening

External hardening of all electricalpanels on the medical campus

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

50 HL 10 New Port Richey Retro Fit ofMunicipal Complex

Add window protection to City Hallto ensure continuation of criticalmunicipal functions.

New Port Richey Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 7: Upda - Pasco County, FL

Page 7 of 43

51 EJ 25 Main Street Drainage Project Construct road and drainageimprovements.

New Port Richey andPasco County ProjectManagement

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mo

s.

Dec

-17

-201

5

Roadway constructed between Congressand Rowen.

52 BM 28 Kitten Trail DrainageImprovements Project

Elevate approximately 1,000 ft. ofroad to keep it out of the 100 yearflood plain.

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

09 Reduce propertydamage caused byflooding

09.1 Identify and correct localflooding conditions

12+

mos

.

Dec

-17

-20

15

Completed.

53 CI 25 Cypress Creek-South LakeWatershed Management PlanImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Implementation of BMP's to concentrate onnon-structural projects. StormwaterManagement Master Plan completed Jan2012.

54 CQ 25 Double Hammock CreekWatershed Management PlanImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed study iscompleted. Stormwater ManagementMaster Plan began in 2012. To becompleted at the end of 2014.

55 CX 25 Duck Lake WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Stormwater Management Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

BMP's 1. Wilson Road - bid review beingconducted. 2. Update to watershed study tobe completed at the end of 2014.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 8: Upda - Pasco County, FL

Page 8 of 43

56 DC 25 East Pasco WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Stormwater Management Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Final Stormwater Management Master Plancompleted. BMPs delivered. First group ofBMPs to be designed and permitted.Property acquisition and easement ongoing.Construction schedule not determined.

57 DU 25 Hammock Creek WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Project is on hold until updated watershedmanagement plan is completed (est. 12/15).

58 EI 25 Lower Coastal WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed study iscompleted. Stormwater ManagementMaster Plan to begin in 2011 and to becompleted at the end of 2014.

59 EP 25 New River WatershedManagement Plan BMPImprovement

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed study iscompleted. Stormwater ManagementMaster Plan underway, to be completed byend of 2014.

60 FD 25 Trout Creek WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

BMP: Birdsong Blvd drainageimprovements under construction.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 9: Upda - Pasco County, FL

Page 9 of 43

61 FE 25 Upper HillsboroughWatershed Management PlanBMP Implementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP.

Pasco County Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Project is on hold until watershed study iscompleted. Stormwater ManagementMaster Plan currently being developed.Scheduled to be completed by the end of2014.

62 GX 18 Pasco County EducationalOutreach Program

Institute or continue public educationprograms that promote risk reduction,the purchase of flood and windinsurance, evacuation procedures andshelter availability, disasterpreparedness and education forcitizens and businesses, and the safestorage an

Pasco County All Hazards Public Education Project EM Preparedness and Assistance TrustFund (EMPATF)

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17

-20

15

Application to be submitted for EMPATFGrant. Received weather radios from DEMat no cost to County; a distribution plan isbeing developed.

63 AQ 31 Tommytown-NeighborhoodTarget Area

Investment of physical developmentin low-income areas. Constructpaved streets, water and sewerfacilities, stormwater improvements,street lights and other amenities.

Pasco CountyCommunityDevelopment

Floods Revitalization Project CDBG; FMA; HMGP; Nonpoint SourceImplementation Grants; SpecialEconomic Development & AdjustmentAssistance Program; WatershedProtection & Flood Prevention

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Pasco County has received a $13 millionloan for this project. Design completed.Final lots needed for drainage are acquired.Construction began April 2007 in areasouth of Lock St. Bid for area north ofLock Street went out in Spring 2008.Southern part of Lock Street completed in2008. Construction is 80% complete. Theproject is complete.

64 GI 21 Aripeka Project Area (RLA12)

Elevation of 8 Repetitive LossProperties, built prior to the Countyjoining the National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

65 GJ 21 Baillies Bluff Project Area(RLA 13)

Elevation of 4 Repetitive LossProperties in an area of older homesbuilt between 1967 and 1977 prior tothe County joining the National FloodInsurance Program.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting of Structures FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in this area will continue as funding is made available for modified elevations.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 10: Upda - Pasco County, FL

Page 10 of 43

66 GK 21 Bass Lake Warrell ProjectDrainage Area Phase I (RLA2)

Elevation of 7 Repetitive LossProperties in an area of propertiesdeveloped prior to the County joiningthe National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mo

s.

Dec

-17-

20

15

To date, 2 repetitive loss properties havebeen mitigated. Pursuit of homeowners toelevate in this area will continue as fundingis made available for modified elevations

67 GO 21 Hudson Project Area (RLA1)

Elevation of 291 Repetitive LossProperties, in an area characterized byolder homes built on canals in the1960's and the 1970's.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

To date, 15 repetitive loss properties havebeen mitigated. Pursuit of homeowners toelevate in this area will continue as fundingis made available for modified elevations.

68 GP 21 Pithlachascotee Project Area(RLA 3)

Elevation of 2 Repetitive LossProperties in an area characterized bythe unmapped division of propertyalong the Pithlachascotee River.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

69 GQ 21 West Port Project Area PhaseI (RLA 9)

Elevation of 12 repetitive LossProperties, in an area of residentialhomes built in the 1970's.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

CDBG; FMA; HMGP; Pre-DisasterMitigation Program

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

70 GR 21 Withlacoochee Project Area(RLA 7)

Elevation of two Repetitive LossProperties, in an area of large lotswith homes built prior to the Countyjoining the National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

71 GN 21 Green Key Project AreaPhase I (RLA 4)

Elevation of 96 Repetitive LossProperties in an area of older homes,the majority were built prior to theCounty joining the National FloodInsurance Program.

Pasco County OEM,Stormwater Mgt andNew Port Richey

Floods Property Protection FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

To date, 3 repetitive loss properties havebeen mitigated. Pursuit of homeowners toelevate in this area will continue as fundingis made available for modified elevations.

72 GH 21 Anclote Project Area (RLA5)

Elevation of 8 Repetitive LossProperties, in an area of older homesbuilt prior to the County joining theNational Flood Insurance Program.

Pasco CountyDevelopment Services,Emergency Management

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

To date, 1 repetitive loss property has beenmitigated. Pursuit of homeowners to elevatein this area will continue as funding ismade available for modified elevations.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 11: Upda - Pasco County, FL

Page 11 of 43

73 GC 23 Post-disaster Redevelopmentfor Business and Industry

Coordinate with business andindustry on the development of a planthat addresses businessinterests/concerns for Post-DisasterRedevelopment.

Pasco County EconomicDevelopment Council

All Hazards Regulatory Initiatives 03 Encourage economicdiversification anddevelopment

03.1 Assist and encourage neweconomic development andpost-disaster redevelopment

12+

mo

s.

Dec

-17-

20

15

Ongoing. Hazard prevention and disasterpreparedness info placed at City Halls.Future program expansion includes addingto selection and types material on display

74 AA 34 Crossbar-Al Bar RanchAcquisition

Purchase Crossbar - Al Bar Ranchproperty because it is located in aCritical Linkage area and it willprotect wildlife and floodplains.

Pasco County ELAMP Floods, Wildfires Restoration of NaturalFeatures

County Sales Tax, Wetland Mitigation,SWFWMD, Florida Forever,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17

-20

15

In progress; working with State partners.

75 AC 33 Horton-Beacon PointAcquisition

Purchase Horton-Beacon Pointproperty because it has rare naturalhabitats in a primarily urban area andit will protect wildlife habitats andwetlands.

Pasco County ELAMP Floods, Wildfires Restoration of NaturalFeatures

Florida Communities Trust, FloridaForever, Conservation and RecreationLands, Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17

-20

15

Deferred - On hold pending alternatefunding

76 AD 33 Mickler Coastal Acquisition Purchase Mickler property locatedalong the Gulf of Mexico to protectwildlife and enhance floodplain

Pasco County ELAMP Coastal Flooding,Coastal/ River Erosion,Hurricanes/ TropicalStorms, Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, SWFWMD, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

On hold

77 AE 32 Cypress Creek Acquisition Purchase Cypress Creek propertylocated in a Critical Linkage toprotect wildlife and floodplains

Pasco County ELAMP Floods, Drought Restoration of NaturalFeatures

County Sales Tax 06 Encourage theprotection of NaturalResources

06.2 Protect and restore wetlandsand critical upland habitats

< 1

2 m

os.

Dec

-17-

2015

Acquired

78 AF 32 Hidden River SouthAcquisition

Purchase Hidden River South locatedin a Critical Linkage (alongHillsborough River) to protectwildlife and floodplains

Pasco County ELAMP Floods, Drought,Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, SWFWMD

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Deferred - Inactive

79 AG 31 Boger Coastal Acquisition Purchase Boger Coastal propertybecause it is located in a coastal highhazard area and it will protect wildlifeand floodplains.

Pasco County ELAMP Coastal Flooding,Hurricanes/ TropicalStorms, Coastal/ RiverErosion, Wildfires

Restoration of NaturalFeatures

County Sales Tax, Wetland Mitigation,SWFWMD, Florida Communities Trust,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

Deferred - Inactive

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 12: Upda - Pasco County, FL

Page 12 of 43

80 AH 31 Castriota Acquisition Purchase Castriota property locatedin a Critical Linkage to protectwildlife and floodplains

Pasco County ELAMP Floods, Wildfires Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mo

s.

Dec

-17

-201

5

Deferred - Inactive

81 AI 31 Dutchmen Key Acquisition Purchase Dutchmen Key propertylocated in a Critical Linkage toprotect wildlife and floodplains

Pasco County ELAMP Coastal Flooding,Hurricanes/ TropicalStorms, Coastal/ RiverErosion, Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.1 Partner with the State andother agencies in the acquisitionof lands and/or developmentrights for environmentalprotection

12+

mos

.

Dec

-17

-20

15

Deferred - Inactive

82 AK 31 Malhotra Acquisition Purchase Malhotra property becauseit is located in a Critical Linkage areaand it will protect wildlife habitats,floodplains, and wetlands.

Pasco County ELAMP Floods, Wildfires Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention, WetlandMitigation

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17

-20

15

Deferred - Inactive

83 AL 31 Morsani Ranch Acquisition Purchase Morsani Ranch propertylocated in a Critical Linkage at theheadwaters of the PithlachascoteeRiver to protect wildlife andfloodplains. Property also includesportion of the Crews Lake Basin

Pasco County ELAMP Floods, Drought,Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, SWFWMD, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Property acquired in 2009.Task completed

84 AP 31 Pasco Palms Acquisition Purchase Pasco Palms propertybecause it is located in a coastal highhazard area and it will protect wildlifeand floodplains.

Pasco County ELAMP Coastal Floods, Coastal/River Erosion,Hurricanes/ TropicalStorms, Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, Conservation and RecreationLands, Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Property acquired in 2009.Task completed

85 AZ 30 Rocky Creek Acquisition Purchase Rocky Creek propertybecause it is located in the coastalhigh hazard area, has rare naturalhabitats in a primarily urban area andit will protect wildlife habitats andwetlands.

Pasco County ELAMP Coastal Flooding, CoastalErosion, Hurricanes/Tropical Storms,Wildfires

Restoration of NaturalFeatures

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

On hold

86 BB 30 Tierra del Sol Acquisition Purchase Tierra del Sol propertybecause it is located in a CriticalLinkage area and it will protectwildlife and floodplains.

Pasco County ELAMP Floods, Wildfires Restoration of NaturalFeatures

County Sales Tax, Wetland Mitigation,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

Acquired

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 13: Upda - Pasco County, FL

Page 13 of 43

87 AW 30 Local Incident ManagementTeam

Develop and maintain a LocalIncident Management Team (L-IMT)to reduce and/or eliminate excessexpenditure costs associated withType-4 incidents, and events.

Pasco County EmergencyManagement

All Hazards Management Plan 05 Reduce the cost ofdisaster response andrecovery

05.4 Efficiently manage all localdisasters

12+

mo

s.

Dec

-17

-20

15

Ongoing project.

88 BE 29 Hazardous Incident Team Maintain a Hazardous Incident Teamto respond to and mitigate hazardousmaterial incidents.

Pasco County EmergencyManagement

All Hazards Management Plan 02 Minimize the effectsof Hazardous Materialsincidents

02.2 Maintain a capability torespond to hazardous materialsincidents

12+

mos

.

Dec

-17

-20

15

Ongoing project

89 CF 25 Community EmergencyResponse Teams

Create and support CommunityEmergency Response Teams (CERT)that are capable of performing publiceducation, warning and notification,damage assessment and post-disastercoordination of service delivery

Pasco County EmergencyManagement

All Hazards Public Education Citizen Corps Grant Program 04 Maintain state ofpreparedness/coordination to mitigate and respondto disasters

04.1 Develop the capacity tomitigate, prepare, respond, andrecover from all hazards

12+

mos

.

Dec

-17

-20

15

Ongoing project

90 CG 25 Counter-terrorism Develop and maintain intelligencecollection and disseminationcapabilities to prevent and mitigateterrorism activity/incidents

Pasco County EmergencyManagement

Terrorism Management Plan 12 Minimize the effectsof a terrorist attack

12.1 Continue to enhance thecapacity to aid in the preventionof and response to terror attacks

12+

mos

.

Dec

-17-

2015

Ongoing project.

91 GS 20 Post-disaster TemporaryHousing

Develop a provision in thePost-Disaster Recovery Ordinancethat addresses post-disaster temporaryhousing

Pasco County EmergencyManagement

All Hazards Regulatory Initiatives Funding is not necessary to develop theaddition to the ordinance.

05 Reduce the cost ofdisaster response andrecovery

05.3 Establish and implement aplan for post-disaster temporaryhousing

12+

mos

.

Dec

-17-

2015

Develop a Post Disaster RedevelopmentPlan that includes housing needs.

Plan completed and will be presented toBCC 01/12/2016.

92 GU 20 Special Needs PopulationSoftware

Web-based HIPPA secure program totrack the special needs populationwithin the county.

Pasco County EmergencyManagement

All Hazards Management Plan EMPATF 01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

< 1

2 m

os.

Dec

-17-

2015

Funding has not been determined.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 14: Upda - Pasco County, FL

Page 14 of 43

93 GY 18 Retrofit of Critical Facilities Ensure COOP by retrofitting selectiveCritical Facility Inventory (CFI)structures with window protectionand security enhancements to ensureCOOP

Pasco County EmergencyManagement

Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

EM Preparedness and Assistance TrustFund; HMGP

10 Regulate andprioritize theconstruction and/orenhance critical facilitiesand infrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mo

s.

Dec

-17

-20

15

COOP working group conducting ongoingsecurity surveys of critical facilities andidentifying needed enhancements

94 HB 14 Community Shelter Retrofitsin Recreational Vehicle Parks

Manufactured home communities andRV Parks are encouraged to retrofitcommunity centers & clubhouses foruse as shelters

Pasco County EmergencyManagement

Hurricanes, TropicalStorms

Retrofitting of Structures EM Preparedness and Assistance TrustFund; HMGP; FMA

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17

-20

15

Project costs and benefits will vary bycommunity given the 350+ such parks inPasco. Ongoing initiative stressed duringcommunity outreach

95 GV 19 Pasco County AnimalControl Power Back-Up

Purchase of emergency generator forPasco County Animal Services, acritical facility

Pasco County EmergencyManagement andAnimal Control

Hurricanes/ TropicalStorms

Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17

-20

15

New animal shelter scheduled to comeonline at earliest during 2009. Shelter to bewired for generator, but will not havegenerator included. Portable generator tobe supplied by County when need arises.Will continue to search for funding toinstall permanent generator.

96 EG 25 Lost Lake Restoration ProjectPhase I = Acquire 9 properties.Phase II = Demolish properties.Phase III = Construct additionalretention facilities.

Pasco County EmergencyManagement andStormwater Management

Floods Property Acquisition andStormwater ImprovementProject/

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Received HMGP Award Oct 1999 for ElNino (DR-1195). Properties acquired anddemolished. Phase I and II COMPLETED.Phase III, the construction of additionalretention facilities, has not been scheduledyet, and funding for the project has not beendetermined.

97 EU 25 Public Hurricane ShelterSurvey Project

Survey public buildings throughoutthe County to identify facilities forpossible use as public shelters. (Costper campus.)

Pasco County EmergencyManagement, Dade City,New Port Richey, PortRichey, St. Leo, SanAntonio, Zephyrhills

Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

EM Preparedness and Assistance TrustFund; HMGP

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

Dec

-17-

2015

Pasco County surveys will continue through2010. New regional hurricane shelteropened in December 2009. We have nofacilities in Port Richey.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 15: Upda - Pasco County, FL

Page 15 of 43

98 GZ 18 Public Hurricane ShelterRetrofit Projects

Pasco County surveys public sheltersto Hurricane Evacuation ShelterStandards. Retrofit table structuresare submitted to State Retrofit List.Only those facilities approved onState Retrofit List will be retrofitted.

Pasco County EmergencyManagement, Dade City,New Port Richey, PortRichey, St. Leo, SanAntonio, Zephyrhills

Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

EM Preparedness and Assistance TrustFund; HMGP

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17

-20

15

HB 7121 awarded grants for two generatorsfor Pasco County. The generators arescheduled to be installed at two schools byJune in 2007. Funds are pending foradditional schools to receive generators.Funding fell short and only one schoolWiregrass H

99 EW 25 Regional Hurricane Routeand Signal Timing Study forHurricane Evacuation

Study of each County EvacuationPlan in the Tampa Bay Area todetermine adequacy of evacuationroutes and development of signaltiming plans for computerizedsignals.

Pasco County EmergencyManagement, PinellasCounty, HillsboroughCounty and ManateeCounty

Hurricanes/ TropicalStorms

Feasibility Study EM Preparedness and Assistance TrustFund; Federal Highway Administration;Transportation Efficiency Act of the 21stCentury

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.3 Encourage capitalimprovement expenditures forcritical infrastructure

12+

mos

.

Dec

-17

-20

15

Tampa Bay Regional Planning Councilcompleted and issued results of RegionalHurricane Evacuation Study during 2006.Awaiting the results of the January 2010evacuation study. Signal timing study stillneeds to be done. Pasco County hasinstalled automatic timing for signals.

100 BP 27 Regional Hurricane Shelter Provide wind resistance capabilitiesup to 160 mph and backup power fora regional hurricane shelter. Sheltershould be available to approximately1,000 evacuating citizens of Pasco,Hernando and surrounding counties.

Pasco County Facilitiesand EmergencyManagement

Hurricanes Critical Facilities Project HMGP 01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17-

2015

Task completed. Facility opened in 2010.

101 HD 13 Pasco County FleetMaintenance HazardousWaste Mitigation Project -D&E Maintenance Facility

Development and implementation ofa plan to control and capture thesurface run-off from the D & EMaintenance Facility in New PortRichey.

Pasco County FleetMaintenance

Floods Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

To be scheduled.

102 HE 13 Pasco County HazardousWaste Mitigation Project - CBarn Maintenance Facility

Recycle motor vehicle car washfluids. Purchase and construct aself-contained car wash system atC-Barn Maintenance Facility in theDade City/San Antonio area.

Pasco County FleetMaintenance

Hazard MaterialsIncidents

Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Not currently active, since County isoutgrowing C-Barn facility and iscontemplating moving to a larger facility inthe County. Stopped washing cars and arepursuing a different location at this time

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 16: Upda - Pasco County, FL

Page 16 of 43

103 FX 24 Pandemic Flu Plan A comprehensive plan designed toprotect, prevent, implement andmitigate the effects of a large diseaseoutbreak such as pandemic flu.Focus on prevention, isolation andquarantine, social distancing andtreatment if any major public healthemergency.

Pasco County HealthDepartment

Pandemic Influenza Management Plan Centers for Disease Control 11 Minimize the effectsof pandemic influenza orother disease outbreak

11.1 Continue to enhancemeasures addressing pandemicinfluenza or other diseaseoutbreak

< 1

2 m

os.

Dec

-17

-20

15

Completed. The Pasco County PandemicInfluenza Grant Team and the OEM thePandemic Influenza Plan as the BiologicalThreat Incident Annex (BTIA). Documenthas been reviewed by the HealthDepartment and adopted by allmunicipalities as part of the CEMP.

104 HC 14 Nextel Re-banding Nextel is replacing the EDACS 800trunk Public Safety Radio Systemwith current EDACS site pro GPSsimulcast system. Nextel needed toreplace system due to outdatedtechnology and not being able tore-tune for new frequencies, and FCCmandate

Pasco CountyInformation Technologyand Communications

All Hazards Infrastructure Funding is not necessary 10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17

-20

15

105 BY 25 Bass Lake Drainage AreaPhase II (RLA 2)

Construct improvements inaccordance with Bear Creek MasterPlan (Rocky Sink).

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram; SWFWMD CooperativeFunding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Completed.

106 CW 25 Duck Lake RegionalRetention System

Construct 100+ acre detention systemin the Duck Lake System near HappyHill Road.

Pasco CountyStormwater Management

Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Funding needs to be sourced. StormwaterManagement Master Plan underway. Dueto be completed 2014.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 17: Upda - Pasco County, FL

Page 17 of 43

107 DV 25 Holiday Hills Project Area(RLA 16) Phase 1

Construct gravity outfall fromexisting pond in the DoubleHammock Creek Study Area.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram; CDBG; Stormwater Utilityfunds; SWFWMD COOP Funding

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Completed. Pond major cleaning completed10/08. Review of pump capacity andacquisition of properties along existingretention area underway.

108 DY 25 Jarvis Street Project Storm sewer improvements inPinellas Anclote Study Area.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program; Stormwater Utilityfund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Review of system underway.

109 EB 25 Lake Padgett Estates ProjectArea

Maintenance of culverts and swalesin South Lakes Study Area.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project underway. Project will becontinuing, since this is a continuousmaintenance activity.

110 EE 25 Lake Zephyr WatershedProject

Design Phases I, II, III, IV, and VI.Channel improvements, culvertimprovement/replacement, wetlandcreation, secondary drainage systemimprovements and detention orretention storage off-line.

Pasco CountyStormwater Management

Floods Management PlanDevelopment andModification

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & FloodPrevention; SWFWMD CooperativeFunding

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Phase I redesigned for more cost feasibleproject. Negotiations for necessaryeasement underway.

111 EK 25 Moog Road/Pinehurst DriveProject

Construct new pond outfall and roadimprovements in Lower CoastalStudy Area.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

A large tree that was growing in front of theoutfall was removed. Completed.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 18: Upda - Pasco County, FL

Page 18 of 43

112 EX 25 Riverside Village ProjectArea

Regrade roadside swales, rebuildroadway and clean/repair culverts.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mo

s.

Dec

-17

-201

5

Completed.

113 FB 25 Tampa Downs Project Area Construct box culvert (Creek Drive)and repair road in Trout Creek StudyArea.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

Completed

114 FG 25 West Port Project Area PhaseII

Ditch cleaning and storm sewerimprovements in Double HammockCreek Study Area.

Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Major cleaning of the ditch completed 6/08.Improvements waiting on study.

115 FH 25 Williams Acres Project,Trout Creek, S.R. 54 & C.R.577

Replace failing culverts. Pasco CountyStormwater Management

Floods Stormwater ImprovementProject

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Study due 02/01/09. BMPs delivered.Project to be scheduled in 2013.

116 AU 30 Drainage Improvements -Treadway

Construct drainage and roadwayimprovements on Treadway Drive

City of Port Richey Floods Stormwater Management Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Completed

117 BC 29 Drainage Improvements -River Gulf, Grand & Bay

Construct drainage and roadwayimprovements on River Gulf Dr.,Grand Blvd. & Bay Blvd.

City of Port Richey Floods Stormwater Management Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Completed

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 19: Upda - Pasco County, FL

Page 19 of 43

118 BD 29 Drainage Improvements -Tabor, Papaya, Cormel,Quist, Wilkins, & Berlin

Construct drainage and roadwayimprovements on Tabor, Papaya,Cormel, Quist, Wilkins, & Berlin Dr.

City of Port Richey Floods Stormwater Management Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17

-201

5

Completed

119 BO 27 Portable Generator forUtilities

Purchase of portable generator foroperating lift stations in the event of astorm or hurricane event.

City of Port Richey Floods Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds, HMGP,Pre-Disaster Mitigation Program, Water& Waste Disposal Loans & Grants, WaterPollution Control, Watershed Protectionand Flood Prevention.

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17

-20

15

Completed

120 BR 26 Port Richey Repetitive LossMitigation 2007

Elevate 11 RLs City of Port Richey Floods, Coastal Flooding Property Acquisition 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17

-20

15

Completed

121 BT 26 Port Richey Repetitive LossMitigation 2008

Elevation of 5 RLs at 8352 CarolynDr, 7515 Grand Blvd, 5024 MillerBayou Dr, 5140 Miller Bayou Dr, and4901 Waterside Dr.

City of Port Richey Floods, Coastal Flooding Property Acquisition 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

122 DX 25 Installation of ring guards onmanhole covers

Install ring guards on approximately50 utilities manhole covers

City of Port Richey Floods Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds, CDBG, HMGP,Water and Waste Disposal Loans andGrants.

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

18 completed, 5 planned for 2010.On=going pending funding. 5-10 per year.5 were completed in 2010.

123 ER 25 Port Richey RLP Elevations Elevation of 17 Repetitive LossProperties in an area of older homes,the majority of which were built priorto the City joining the NFIP

City of Port Richey Floods Retrofitting of Structures FMA, HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

124 FU 24 Bay Blvd Lift StationUpgrade

Upgrade of Bay Blvd Lift Station City of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

2015

Project on hold pending adjacentdevelopment project. Ongoing.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 20: Upda - Pasco County, FL

Page 20 of 43

125 FW 24 Oelsner Lift Station Upgrade Upgrade of Oelsner Lift Station City of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17

-201

5

Awaiting funding

126 FZ 24 Port Richey Lift StationFlood Proofing Project PhaseI (48 Lift Stations)

Elevate controls & floodproof 48 liftstations and manholes with three footrings, all are located below BFEs

City of Port Richey Floods Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17

-20

15

10 rings have been installed in themanholes. Completed as funding becomesavailable

127 GA 24 Queener Lift Station UpgradeUpgrade Queener Avenue Lift StationCity of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

2015

Not completed. Expected completion in2012.

128 HA 18 Review Stormwater MasterPlan

Review of Stormwater Master Plan City of Port Richey Floods Management Plan Capitalization Grants for Clean WaterState Revolving Funds, FMA,Pre-Disaster Mitigation (PDM) ProgramWater Pollution Control & WatershedProtection and Flood Prevention,SWFTMD

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Ongoing

129 GT 20 San Antonio StormwaterManagement Plan

City-wide engineering study toidentify cost-effective stormwaterimprovements and prepare policyguidelines that will mitigate forpotential flooding.

City of San Antonio Floods Stormwater Management Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

The required field work for our stormwaterstudy has been completed. Afterrecommendations are compiled by theconsulting engineers San Antonio willprioritize projects and pursue funding toimplement the recommendations.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 21: Upda - Pasco County, FL

Page 21 of 43

130 GW 18 Generators for San AntonioMunicipal Facilities

City of San Antonio Hurricanes/ TropicalStorms

Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mo

s.

Dec

-17

-201

5

Generator purchased and installed at waterplant. Funding not currently available forgenerators at San Antonio City Hall andFire Station next door.

131 GD 23 San Antonio OutreachEducational Program

Public Outreach Program(flyers/informational brochures) toinform residents about all types ofhazards and disaster preparedness.

City of San Antonio andthe Town of St. Leo

Multiple Public EducationProgram

EM Preparedness and Assistance TrustFund; Environmental Education Grant

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17

-20

15

Ongoing. Hazard prevention and disasterpreparedness info placed at City Halls.Future program expansion includes addingto selection and types material on display

Hurricanes/

Tropical Storms

133 DD 25 Flood Insurance Rate Maps Add the Town of St. Leo to the NFIPand to FIRMs (Panel #120230-0275D)

Town of St. Leo Floods Public Education Project EM Preparedness and Assistance TrustFund

01 Protect the health,safety and welfare of thepublic

01.2 Ensure new development andredevelopment complies with allapplicable federal, state and localregulations

12+

mos

.

Dec

-17-

2015

FIRMS adopted September 2014.

Task completed.

134 BQ 27 Zephyrhills DowntownRetention Pond / floodproofing

Expand existing retention pond toincrease capacity and reduce flooding

City of Zephyrhills Floods Stormwater Management Local Government, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Expansion of the retention pond is inprogress.

135 GE 23 Zephyrhills Retrofit ofCritical Facilities

Add window protection to City Hall,two fire stations and the police stationin order to ensure continuation ofcritical municipal functions.

City of Zephyrhills Hurricanes/ TropicalStorms

Critical Facilities RetrofitProject

EM Preparedness and Assistance TrustFund; HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Retroficritical facilities as funding becomesavailable.

136 FR 25 Zephyrhills StormwaterManagement Plan

Identify/develop Master Stormwaterimprovement projects in CityCommunity redevelopment area.

Zephyrhills StormwaterManagement

Floods Management PlanDevelopment andModification

EM Preparedness and Assistance TrustFund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

FY 2000 - Partially funded with EMPATFCompetitive Grant. PROJECTCOMPLETED.

132 BN 27 Generator for Town of St.Leo Town Hall

Purchase of generator for the TownHall.

Town of St. Leo Critical Facilities Project EM Preparedness and Assistance TrustFund

10 Regulate andprioritize the

10.2 Prioritize and retrofit existingcritical facilities and 1

2+ m

Dec

-17

No action taken to date. A generator will bepurchased when funding is available.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 22: Upda - Pasco County, FL

Page 22 of 43

137 IX 25 Bear Creek PithlachascoteeWatershed BMPImplementation

Implementation of BMP's identifiedin the Watershed Master Plan(proposed to be completed end of2014).

Pasco County Floods Capital Projects, PropertyAcquisition, Restorationof Natural Features,Stormwater Management,Management Plan

Stormwater utility fund, SWFWMD,COOP Funding and HMGP

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

New project (as of when? Progress report?)

138 IY 25 Pinellas Anclote WatershedBMP Implementation

Implementation of BMP's identifiedin the Watershed Master Plan(proposed to be completed end of2016).

Pasco County Floods Capital Projects, PropertyAcquisition, Restorationof Natural Features,Stormwater Management,Management Plan

Stormwater utility fund, SWFWMDCOOP Funding and HMGP

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17

-20

15

New project (as of when? Progress report?)

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/16/2017 Submitted to FDEM January 4, 2016

Typ

e

Sco

re Project/Program Name

Description City/County Offices Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 23: Upda - Pasco County, FL

Page 23 of 43

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

1 HO 34 Fargo Drive Acquisition Purchase property that is located in anenclosed basin and suffered severedamage during TS Debby.

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mo

s.

Dec

-17-

2015

Buyout in process.

2 HP 34 Morningstar Lane Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Property was not funded through 3FMA submissions. Will try again inJuly 2016.

3 HQ 34 1st Minnieola DriveAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

4 HR 34 Ironbark Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods PropertyAcquisition

HMGP 01 Protect publichealth, safety andwelfare

05.2 Propertyacquisition/retrofit repetitiveloss properties

12

+ m

os.

Dec

-17

-20

15 Included in TS Debby HMGP Grant.

Not funded.

5 HS 33 Tomahawk Street AcquisitionPurchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods PropertyAcquisition

HMGP 01 Protect publichealth, safety andwelfare

05.2 Propertyacquisition/retrofit repetitiveloss properties

12

+ m

os.

Dec

-17

-20

15 Submitted for Hurricane Frances

funding. Property owner declinedgrant.

6 HT 33 Michigan Avenue Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

7 HU 33 Lee Street Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods PropertyAcquisition

HMGP 01 Protect publichealth, safety andwelfare

05.2 Propertyacquisition/retrofit repetitiveloss properties

12

+ m

os.

Dec

-17

-20

15 Included in TS Debby HMGP Grant.

Not funded.

8 HV 33 Alcea Street Acquisition Purchase two Alcea Street and oneFriedly Avenue property severelydamaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

9 HW 33 Grayoak Lane Acquisition Purchase Grayoak Lane propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

10 HX 33 Passaic Drive Acquisition Purchase Passaic Drive propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

11 HY 33 Mirage Avenue Acquisition Purchase Mirage Avenue propertyseverely damaged during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

12 HZ 33 Ella Lane Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods PropertyAcquisition

HMGP 01 Protect publichealth, safety andwelfare

05.2 Propertyacquisition/retrofit repetitiveloss properties

12

+ m

os.

Dec

-17

-20

15 Property owner withdrew from grant

program.

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 24: Upda - Pasco County, FL

Page 24 of 43

13 IA 31 Second Minnieola DriveAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods PropertyAcquisition

HMGP 01 Protect publichealth, safety andwelfare

05.2 Propertyacquisition/retrofit repetitiveloss properties

12

+ m

os.

Dec

-17

-20

15

Included in TS Debby HMGP Grant.Not funded.

14 IB 31 Otis Allen Road Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

15 IC 31 Elfers Parkway Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

16 ID 31 Harbor Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Buyout in process.

17 IE 31 Augustine Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

201 Buyout in process.

18 IF 31 Quail Hollow BoulevardAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

201 Buyout in process.

19 IG 31 Winsor Drive Acquisition Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

201

Included in TS Debby HMGP Grant.Not funded.

20 IH 31 Thunderhead StreetAcquisition

Purchase property that sufferedsevere damage during TS Debby

Pasco County OEM Floods Property Acquisition HMGP 01 Protect public health,safety and welfare

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

201

5

Included in TS Debby HMGP Grant.Not funded.

21 II 30 Lake Terrace SubdivisionProject Area (RLA 6)

Elevate 1 RL property built prior toCounty joining NFIP

Pasco County OEM &StormwaterManagement

Floods Retrofitting ofStructures

HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mos

.

Dec

-17-

201

5

Encourage property owners to elevate,County will assist as funding becomesavailable.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 25: Upda - Pasco County, FL

Page 25 of 43

22 IJ 30 Aurora Drive Project Area(RLA 11), Phase I

Acquire 2 RLs built prior to currentstormwater regulations and prior tothe county joining NFIP

StormwaterManagement

Floods Property Acquisition HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Property acquisition/retrofitrepetitive loss properties

12+

mo

s.

Dec

-17

-201

5

Encourage property owners to elevate,County will assist as funding becomesavailable.

23 IK 30 Aurora Drive Project Area(RLA 11), Phase II

Expand retention pond storagcapacity to a 10-year storm event

StormwaterManagement

Floods StormwaterManagement

HMGP, Stormwater utility fee 08 StormwaterImprovement

Maintain and improve existingdrainage systems to regulatemanagement of stormwater runoff

12+

mos

.

Dec

-17-

2015

Acquire properties, design and permitconstruction

24 IL 30 Bonita Project Area (RLA 14) Acquire 2 RLs built prior to currentstormwater regulations and prior tothe county joining NFIP

Pasco County OEM &StormwaterManagement

Floods Property Acquisition HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Encourage property owners to elevate,County will assist as funding becomesavailable.

25 IM 30 Floramar Project Area (RLA15)

Elevate 1 older RL property builtprior to County joining NFIP

Pasco County OEM &StormwaterManagement

Floods Retrofitting ofStructures

HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Encourage property owners to elevate,County will assist as funding becomesavailable.

26 IN 30 Update FIRMs Add St. Leo and San Antonio to NFIPand encourage FEMA to developFIMs

StormwaterManagement andCities

Floods Public Education SWFWMD, COOP Funding 01 Protect the health,safety and welfare of thepublic

1.2 Ensure newdevelopment/redevelopmentcomplies with applicable federal,state and local buildingregulations

Est

. 10/

14

Dec

-17-

2015

FIRMS adopted September 2014.

Task completed.

27 IO 30 Holiday Hills Project Area(RLA 16), Phase 2

Elevate 5 RLs, built prior to thecounty joining NFIP

StormwaterManagement

Floods Flood Proofing HMGP 05 Reduce the cost ofdisaster response andrecovery

Advocate retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Encourage property owners to elevate,County will assist as funding becomesavailable.

28 IP 30 Duck Slough Watershed BMPImplementation (west of LittleRoad)

Implementation of BMPs identified inthe Duck Slough watershed plan forthe area west of Little Road

StormwaterManagement

Floods Capital Projects,Infrastructure,Restoration ofNatural Features,Retrofitting ofStructures,StormwaterManagement

Stormwater utility fund, SWFWMD,COOP Funding and State appropriations

08 StormwaterImprovement

8.1 Maintain and improve existingdrainage systems to regulatemanagement of stormwater runoff

12+

mos

.

Dec

-17-

201

5

BMP 1A & 5A ready for construction;BMP 6 being designed and permitapplication prepared

29 IQ 30 Port Richey Watershed BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan - SWFWMD

StormwaterManagement

Floods Capital Projects,Infrastructure,StormwaterManagement

SWFWMD, COOP Funding &Stormwater Utility Fee

08 StormwaterImprovement

8.1 Maintain and improve existingdrainage systems to managestormwater runoff

12+

mos

.

Dec

-17-

201

5 Review of BMPs underway.

30 IR 30 Zephyrhills Downtown FireStation Wet Floodproofing

Renovate downtown Fire Station toinclude interior/exterior wetfloodproofing

City of Zephyrhills Floods Flood Proofing HMGP

12+

mos

.

Dec

-17-

201

5 OEM putting together application forsubmission to the state.

31 IS 30 Zephyrhills Downtown FireStation Dry Floodproofing

Renovation of downtown Fire Stationto include interior/exterior dryfloodproofing

City of Zephyrhills Floods Flood Proofing HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application forsubmission to the state.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 26: Upda - Pasco County, FL

Page 26 of 43

32 IT 30 Zephyrhills Downtown FireStation Hardening

Structural reinforcements to hardendowntown Fire Station to meetcurrent Florida Building Codes

City of Zephyrhills Winds Critical Facilities HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application forsubmission to the state.

33 IU 30 Zephyrhills 20th StreetStormwater ManagementProject Acquisition

Purchase foreclosed property toconstruct stormwater managementproject/retention pond. Reduceflooding of two primary collectorstreets (20th St & 5th Ave) withimproved emergency ingress/egressand flood protection

City of Zephyrhills Floods Property Acquisition HMGP

12+

mos

.

Dec

-17-

2015

Moving ahead as funding permits.OEM assisting with funds identification.

34 IV 30 Zephyrhills 20th Street (4thAve) Stormwater ManagementProject

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City of Zephyrhills Floods StormwaterManagement

HMGP

12+

mos

.

Dec

-17-

2015

Moving ahead as funding permits.OEM assisting with funds identification.

35 IW 30 Zephyrhills 20th Street (7thAve) Stormwater ManagementProject

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City of Zephyrhills Floods StormwaterManagement

HMGP

12+

mos

.

Dec

-17-

2015

Moving ahead as funding permits.OEM assisting w/idenifying funds. Therecent demolition of a home in the areapaves the way for a well-situatedretention pond.

36 HF 11 Residential Safe Rooms Encourage residents toconstruct/retrofit safe rooms in theirhomes using FEMA criteria.

Countywide Hurricanes/ TropicalStorms, Tornados,Nuclear Power PlantIncident

Retrofitting ofStructures

EM Preparedness and Assistance TrustFund; HMGP; FMA

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17-

201

5

Project costs and benefits will vary byresidence. This is a continuing effort toencourage homeowners to construct saferooms. The issue is particularlyrelevent during this El Nino year.

37 BI 28 10th Street and WillinghamAvenue Stormwater Project

Increase retention area and redesignstormwater system.

Dade City Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

201

5 Following up now that 2014 FIRMupdates have been released.

38 GF 22 Beauchamp Retention PondsStormwater Project

Along with the engineering study forthe City Storm Water ManagementPlan (#055;E-17), conductengineering study with SWFWMD toincrease the depth of the ponds andeffects of pumping to other basins to

Dade City Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Following up now that 2014 FIRMupdates have been released.

39 GG 22 Howard Avenue StormwaterProject

Resize culverts draining to the liftstation, upgrade lift station andupgrade outfall.

Dade City Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff 12

+ m

os.

Dec

-17-

201 Project was divided into two phases.

Phase I was completed by the City andincluded installation of a 24" RCP alongHoward Ave and the construction of aretention pond. Phase II will include the

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 27: Upda - Pasco County, FL

Page 27 of 43

40 CN 25 Dade City StormwaterManagement Plan

Engineering study to identifycost-effective stormwaterimprovements necessary to correctexisting problems and policyguidelines to mitigate for potentialflooding.

Dade City andStormwaterManagement

Floods Management PlanDevelopment andModification

EM Preparedness and Assistance TrustFund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Work underway to develop 5-yearcapital improvement plan. No change.

41 CP 25 Dade Oaks Project, Phase II,10th Street and WhitehouseAvenue IntersectionStormwater Project

Drainage improvements andadditional retention to restore naturalflows and contain flood waters in theDade Oaks Public Housing Project.Cost unavailable. Completiondependent on County project.

Dade City andStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Following up now that 2014 FIRMupdates have been released.

42 GB 23 Emergency Generator Install emergency generator atCentennial Elementary School tosupply backup power to the waterwell and waste plant during shelteroperations

District School Boardof Pasco County

Hurricanes/ TropicalStorms

Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

2015

The generator for the well and liftstation at Centennial Elementary isscheduled to be funded next fiscal year,2011-2012. This is subject to changedepending on the available funding.

43 CY 25 Dunn Retrofit Modified elevation of SLR propertyto eliminate the flood problem

New Port Richey Floods Retrofitting ofStructure

Repetitive Flood Claims Mitigation Grant05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

< 1

2 m

os.

Dec

-17-

2015

Completed. Remove from list.

44 GM 21 Elevate the Putnam Dwelling Modified elevation of Putnam Homeat 5422 Bellview Ave., New PortRichey

New Port Richey Floods Elevation of home toeliminate flooding

FMA 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Construction complete and CO issued1/29/2010.

45 HG 10 Morton Plant North BayHospital External Hardening

Examination of potential hardening toinclude windows and protection offront entrance from flood damage

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG; FMA; HMGP; 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

46 HH 10 Morton Plant North BayHospital MitchellRehabilitation HospitalExternal Hardening

External hardening of windows, roofand walls.

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

5

New project.

47 HI 10 Morton Plant North Bay CathLab External Hardening

External hardening of windows, roofand walls.

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

5 New project.

48 HJ 10 Morton Plant North BayCampus Wide Electrical PanelElevation - External Hardening

External hardening of all electricalpanels on the medical campus

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 28: Upda - Pasco County, FL

Page 28 of 43

49 HK 10 Morton Plant North BayAmbulatory Surgery CenterExternal Hardening

External hardening of all electricalpanels on the medical campus

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

50 HL 10 New Port Richey Retro Fit ofMunicipal Complex

Add window protection to City Hallto ensure continuation of criticalmunicipal functions.

New Port Richey Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

CDBG, FMA, HMGP, PDM 01 Protect public health,safety and welfare

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

New project.

51 EJ 25 Main Street Drainage Project Construct road and drainageimprovements.

New Port Richey andPasco County ProjectManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Roadway constructed between Congressand Rowen.

52 BM 28 Kitten Trail DrainageImprovements Project

Elevate approximately 1,000 ft. ofroadway to remove it from the SFHA.

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

09 Reduce propertydamage caused byflooding

09.1 Identify and correct localflooding conditions

12+

mos

.

Dec

-17-

2015

Completed.

53 CI 25 Cypress Creek-South LakeWatershed Management PlanImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Implementation of BMP's to concentrateon non-structural projects. StormwaterManagement Master Plan completed Jan2012.

54 CQ 25 Double Hammock CreekWatershed Management PlanImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed studyis completed. Stormwater ManagementMaster Plan began in 2012. To becompleted at the end of 2014.

55 CX 25 Duck Lake WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

StormwaterManagement

Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

BMP's 1. Wilson Road - bid reviewbeing conducted. 2. Update to watershedstudy to be completed at the end of2014.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 29: Upda - Pasco County, FL

Page 29 of 43

56 DC 25 East Pasco WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

StormwaterManagement

Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Final Stormwater Management MasterPlan completed. BMPs delivered. Firstgroup of BMPs to be designed andpermitted. Property acquisition andeasement ongoing. Constructionschedule not determined.

57 DU 25 Hammock Creek WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until updatedwatershed management plan iscompleted (est. 12/15).

58 EI 25 Lower Coastal WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed studyis completed. Stormwater ManagementMaster Plan to begin in 2011 and to becompleted at the end of 2014.

59 EP 25 New River WatershedManagement Plan BMPImprovement

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed studyis completed. Stormwater ManagementMaster Plan underway, to be completedby end of 2014.

60 FD 25 Trout Creek WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

BMP: Birdsong Blvd drainageimprovements under construction.

61 FE 25 Upper Hillsborough WatershedManagement Plan BMPImplementation

Implementation of BMPs identified inthe Stormwater Management MasterPlan-SWMMP.

Pasco County Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood;SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project is on hold until watershed studyis completed. Stormwater ManagementMaster Plan currently being developed.Scheduled to be completed by the end of2014.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 30: Upda - Pasco County, FL

Page 30 of 43

62 GX 18 Pasco County EducationalOutreach Program

Continue public education programsfor households and businesses onissues such as risk reduction, need forflood and wind insurance, evacuationprocedures and shelter availability,and preparedness.

Pasco County All Hazards Public EducationProject

EM Preparedness and Assistance TrustFund (EMPATF)

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17-

2015

Application to be submitted forEMPATF Grant. Received weatherradios from DEM at no cost to County; adistribution plan is being developed.

63 AQ 31 Tommytown-NeighborhoodTarget Area

Investment of physical developmentin low-income areas. Constructpaved streets, water and sewerfacilities, stormwater improvements,street lights and other amenities.

Pasco CountyCommunityDevelopment

Floods Revitalization ProjectCDBG; FMA; HMGP; Nonpoint SourceImplementation Grants; SpecialEconomic Development & AdjustmentAssistance Program; WatershedProtection & Flood Prevention

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Pasco County has received a $13 millionloan for this project. Design completed.Final lots needed for drainage areacquired. Construction began April2007 in area south of Lock St. Bid forarea north of Lock Street went out inSpring 2008. Southern part of LockStreet completed in 2008. Construction

63 AQ 31 Tommytown-NeighborhoodTarget Area

Investment of physical developmentin low-income areas. Constructpaved streets, water and sewerfacilities, stormwater improvements,street lights and other amenities.

Pasco CountyCommunityDevelopment

Floods Revitalization ProjectCDBG; FMA; HMGP; Nonpoint SourceImplementation Grants; SpecialEconomic Development & AdjustmentAssistance Program; WatershedProtection & Flood Prevention

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Pasco County has received a $13 millionloan for this project. Design completed.Final lots needed for drainage areacquired. Construction began April2007 in area south of Lock St. Bid forarea north of Lock Street went out inSpring 2008. Southern part of LockStreet completed in 2008. Constructionis 80% complete. The project iscomplete.

64 GI 21 Aripeka Project Area (RLA12)

Elevation of 8 Repetitive LossProperties, built prior to the Countyjoining the National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

65 GJ 21 Baillies Bluff Project Area(RLA 13)

Elevation of 4 Repetitive LossProperties in an area of older homesbuilt between 1967 and 1977 prior tothe County joining NFIP.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructures

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

201

5

Pursuit of homeowners to elevate in this area will continue as funding is made available for modified elevations.

66 GK 21 Bass Lake Warrell ProjectDrainage Area Phase I (RLA2)

Elevation of 7 Repetitive LossProperties in an area of propertiesdeveloped prior to the County joiningthe National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

To date, 2 repetitive loss properties havebeen mitigated. Pursuit of homeownersto elevate in this area will continue asfunding is made available for modifiedelevations

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 31: Upda - Pasco County, FL

Page 31 of 43

67 GO 21 Hudson Project Area (RLA 1) Elevation of 291 Repetitive LossProperties, in an area characterized byolder homes built on canals in the1960's and the 1970's.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

To date, 15 repetitive loss propertieshave been mitigated. Pursuit ofhomeowners to elevate in this area willcontinue as funding is made availablefor modified elevations.

68 GP 21 Pithlachascotee Project Area(RLA 3)

Elevation of 2 Repetitive LossProperties in an area characterized bythe unmapped division of propertyalong the Pithlachascotee River.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

69 GQ 21 West Port Project Area Phase I(RLA 9)

Elevation of 12 repetitive LossProperties, in an area of residentialhomes built in the 1970's.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

CDBG; FMA; HMGP; Pre-DisasterMitigation Program

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

70 GR 21 Withlacoochee Project Area(RLA 7)

Elevation of two Repetitive LossProperties, in an area of large lotswith homes built prior to the Countyjoining the National Flood InsuranceProgram.

Pasco County OEM &Stormwater Mgt

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Pursuit of homeowners to elevate in thisarea will continue as funding is madeavailable for modified elevations.

71 GN 21 Green Key Project Area PhaseI (RLA 4)

Elevation of 96 Repetitive LossProperties in an area of older homes,the majority were built prior to theCounty joining the National FloodInsurance Program.

Pasco County OEM,Stormwater Mgt andNew Port Richey

Floods Property Protection FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

To date, 3 repetitive loss properties havebeen mitigated. Pursuit of homeownersto elevate in this area will continue asfunding is made available for modifiedelevations.

72 GH 21 Anclote Project Area (RLA 5) Elevation of 8 Repetitive LossProperties, in an area of older homesbuilt prior to the County joining theNational Flood Insurance Program.

Pasco CountyDevelopment Services,EmergencyManagement

Floods Retrofitting ofStructure(s)

FMA; HMGP; Pre-Disaster MitigationProgram

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

201

5

To date, 1 repetitive loss property hasbeen mitigated. Pursuit of homeownersto elevate in this area will continue asfunding is made available for modifiedelevations.

73 GC 23 Post-disaster Redevelopmentfor Business and Industry

Coordinate with business andindustry on the development of a planthat addresses businessinterests/concerns for Post-DisasterRedevelopment.

Pasco CountyEconomicDevelopment Council

All Hazards Regulatory Initiatives 03 Encourage economicdiversification anddevelopment

03.1 Assist and encourage neweconomic development andpost-disaster redevelopment

12+

mos

.

Dec

-17-

2015

Ongoing. Hazard prevention anddisaster preparedness info placed at CityHalls. Future program expansionincludes adding to selection and typesmaterial on display

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 32: Upda - Pasco County, FL

Page 32 of 43

74 AA 34 Crossbar-Al Bar RanchAcquisition

Purchase Crossbar - Al Bar Ranchproperty because it is located in aCritical Linkage area and it willprotect wildlife and floodplains.

Pasco County ELAMP Floods, Wildfires Restoration ofNatural Features

County Sales Tax, Wetland Mitigation,SWFWMD, Florida Forever,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

In progress; working with State partners.

75 AC 33 Horton-Beacon PointAcquisition

Purchase Horton-Beacon Pointproperty because it has rare naturalhabitats in a primarily urban area andit will protect wildlife habitats andwetlands.

Pasco County ELAMP Floods, Wildfires Restoration ofNatural Features

Florida Communities Trust, FloridaForever, Conservation and RecreationLands, Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

Deferred - On hold pending alternatefunding

76 AD 33 Mickler Coastal Acquisition Purchase Mickler property locatedalong the Gulf of Mexico to protectwildlife and enhance floodplain

Pasco County ELAMP Coastal Flooding,Coastal/ River Erosion,Hurricanes/ TropicalStorms, Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, SWFWMD, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

On hold

77 AE 32 Cypress Creek Acquisition Purchase Cypress Creek propertylocated in a Critical Linkage toprotect wildlife and floodplains

Pasco County ELAMP Floods, Drought Restoration ofNatural Features

County Sales Tax 06 Encourage theprotection of NaturalResources

06.2 Protect and restore wetlandsand critical upland habitats

< 1

2 m

os.

Dec

-17-

2015

Acquired

78 AF 32 Hidden River SouthAcquisition

Purchase Hidden River South locatedin a Critical Linkage (alongHillsborough River) to protectwildlife and floodplains

Pasco County ELAMP Floods, Drought,Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, SWFWMD

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Deferred - Inactive

79 AG 31 Boger Coastal Acquisition Purchase Boger Coastal propertybecause it is located in a coastal highhazard area and it will protect wildlifeand floodplains.

Pasco County ELAMP Coastal Flooding,Hurricanes/ TropicalStorms, Coastal/ RiverErosion, Wildfires

Restoration ofNatural Features

County Sales Tax, Wetland Mitigation,SWFWMD, Florida Communities Trust,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

Deferred - Inactive

80 AH 31 Castriota Acquisition Purchase Castriota property locatedin a Critical Linkage to protectwildlife and floodplains

Pasco County ELAMP Floods, Wildfires Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

201

5

Deferred - Inactive

81 AI 31 Dutchmen Key Acquisition Purchase Dutchmen Key propertylocated in a Critical Linkage toprotect wildlife and floodplains

Pasco County ELAMP Coastal Flooding,Hurricanes/ TropicalStorms, Coastal/ RiverErosion, Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.1 Partner with the State andother agencies in the acquisitionof lands and/or developmentrights for environmentalprotection

12+

mos

.

Dec

-17-

2015

Deferred - Inactive

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 33: Upda - Pasco County, FL

Page 33 of 43

82 AK 31 Malhotra Acquisition Purchase Malhotra property becauseit is located in a Critical Linkage areaand it will protect wildlife habitats,floodplains, and wetlands.

Pasco County ELAMP Floods, Wildfires Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention, WetlandMitigation

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

Deferred - Inactive

83 AL 31 Morsani Ranch Acquisition Purchase Morsani Ranch propertylocated in a Critical Linkage at theheadwaters of the PithlachascoteeRiver to protect wildlife andfloodplains. Property also includesportion of the Crews Lake Basin

Pasco County ELAMP Floods, Drought,Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, SWFWMD, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Property acquired in 2009.Task completed

84 AP 31 Pasco Palms Acquisition Purchase Pasco Palms propertybecause it is located in a coastal highhazard area and it will protect wildlifeand floodplains.

Pasco County ELAMP Coastal Floods, Coastal/River Erosion,Hurricanes/ TropicalStorms, Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, Conservation and RecreationLands, Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

< 1

2 m

os.

Dec

-17-

2015

Property acquired in 2009.Task completed

85 AZ 30 Rocky Creek Acquisition Purchase Rocky Creek propertybecause it is located in the coastalhigh hazard area, has rare naturalhabitats in a primarily urban area andit will protect wildlife habitats andwetlands.

Pasco County ELAMP Coastal Flooding, CoastalErosion, Hurricanes/Tropical Storms,Wildfires

Restoration ofNatural Features

County Sales Tax, Florida CommunitiesTrust, Florida Forever, Conservation andRecreation Lands, Watershed Protectionand Flood Prevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

2015

On hold

86 BB 30 Tierra del Sol Acquisition Purchase Tierra del Sol propertybecause it is located in a CriticalLinkage area and it will protectwildlife and floodplains.

Pasco County ELAMP Floods, Wildfires Restoration ofNatural Features

County Sales Tax, Wetland Mitigation,Conservation and Recreation Lands,Watershed Protection and FloodPrevention

06 Encourage theprotection of NaturalResources

06.4 Provide and encouragepreservation of open space

12+

mos

.

Dec

-17-

201

5

Acquired

87 AW 30 Local Incident ManagementTeam

Develop and maintain a LocalIncident Management Team (L-IMT)to reduce and/or eliminate excessexpenditure costs associated withType-4 incidents, and events.

Pasco CountyEmergencyManagement

All Hazards Management Plan 05 Reduce the cost ofdisaster response andrecovery

05.4 Efficiently manage all localdisasters

12+

mos

.

Dec

-17-

2015

Ongoing project.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 34: Upda - Pasco County, FL

Page 34 of 43

88 BE 29 Hazardous Incident Team Maintain a Hazardous Incident Teamto respond to and mitigate hazardousmaterial incidents.

Pasco CountyEmergencyManagement

All Hazards Management Plan 02 Minimize the effectsof Hazardous Materialsincidents

02.2 Maintain a capability torespond to hazardous materialsincidents

12+

mos

.

Dec

-17-

2015

Ongoing project

89 CF 25 Community EmergencyResponse Teams

Create and support CommunityEmergency Response Teams (CERT)that are capable of performing publiceducation, warning and notification,damage assessment and post-disaster

Pasco CountyEmergencyManagement

All Hazards Public Education Citizen Corps Grant Program 04 Maintain state ofpreparedness/coordination to mitigate and respondto disasters

04.1 Develop the capacity tomitigate, prepare, respond, andrecover from all hazards

12+

mos

.

Dec

-17-

2015

Ongoing project

90 CG 25 Counter-terrorism Develop and maintain intelligencecollection and disseminationcapabilities to prevent and mitigateterrorism activity/incidents

Pasco CountyEmergencyManagement

Terrorism Management Plan 12 Minimize the effectsof a terrorist attack

12.1 Continue to enhance thecapacity to aid in the preventionof and response to terror attacks

12+

mos

.

Dec

-17-

2015 Ongoing project.

91 GS 20 Post-disaster TemporaryHousing

Develop a provision in thePost-Disaster Recovery Ordinancethat addresses post-disaster temporaryhousing

Pasco CountyEmergencyManagement

All Hazards Regulatory InitiativesFunding is not necessary to develop theaddition to the ordinance.

05 Reduce the cost ofdisaster response andrecovery

05.3 Establish and implement aplan for post-disaster temporaryhousing

12+

mos

.

Dec

-17-

2015

Develop a Post Disaster RedevelopmentPlan that includes housing needs.

Plan completed and will be presented toBCC 01/12/2016.

92 GU 20 Special Needs PopulationSoftware

Web-based HIPPA secure program totrack the special needs populationwithin the county.

Pasco CountyEmergencyManagement

All Hazards Management Plan EMPATF 01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

< 1

2 m

os.

Dec

-17-

2015 Funding has not been determined.

93 GY 18 Retrofit of Critical Facilities Ensure COOP by retrofitting selectiveCritical Facility Inventory (CFI)structures with window protectionand security enhancements to ensureCOOP

Pasco CountyEmergencyManagement

Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

EM Preparedness and Assistance TrustFund; HMGP

10 Regulate andprioritize theconstruction and/orenhance critical facilitiesand infrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

COOP working group conductingongoing security surveys of criticalfacilities and identifying neededenhancements

94 HB 14 Community Shelter Retrofits inRecreational Vehicle Parks

Manufactured home communities andRV Parks are encouraged to retrofitcommunity centers & clubhouses foruse as shelters

Pasco CountyEmergencyManagement

Hurricanes, TropicalStorms

Retrofitting ofStructures

EM Preparedness and Assistance TrustFund; HMGP; FMA

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17-

201

5

Project costs and benefits will vary bycommunity given the 350+ such parks inPasco. Ongoing initiative stressedduring community outreach

95 GV 19 Pasco County Animal ControlPower Back-Up

Purchase of emergency generator forPasco County Animal Services, acritical facility

Pasco CountyEmergencyManagement andAnimal Control

Hurricanes/ TropicalStorms

Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

5

New animal shelter scheduled to comeonline at earliest during 2009. Shelter tobe wired for generator, but will nothave generator included. Portablegenerator to be supplied by Countywhen need arises. Will continue tosearch for funding to install permanentgenerator.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 35: Upda - Pasco County, FL

Page 35 of 43

96 EG 25 Lost Lake Restoration Project Phase I = Acquire 9 properties.Phase II = Demolish properties.Phase III = Construct additionalretention facilities.

Pasco CountyEmergencyManagement andStormwaterManagement

Floods Property Acquisitionand StormwaterImprovementProject/

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Received HMGP Award Oct 1999 for ElNino (DR-1195). Properties acquiredand demolished. Phase I and IICOMPLETED. Phase III, theconstruction of additional retentionfacilities, has not been scheduled yet,and funding for the project has not beendetermined.

97 EU 25 Public Hurricane ShelterSurvey Project

Survey public buildings throughoutthe County to identify facilities forpossible use as public shelters. (Costper campus.)

Pasco OEM,municipalities.

Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

EM Preparedness and Assistance TrustFund; HMGP

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

Dec

-17-

201 Pasco County surveys will continue

through 2010. New regional hurricaneshelter opened in December 2009. Wehave no facilities in Port Richey.

98 GZ 18 Public Hurricane ShelterRetrofit Projects

Pasco County surveys public sheltersto Hurricane Evacuation ShelterStandards. Retrofit table structuresare submitted to State Retrofit List.

Pasco OEM,municipalities.

Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

EM Preparedness and Assistance TrustFund; HMGP

01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17-

201 HB 7121 awarded grants for two

generators for Pasco County. Thegenerators are scheduled to be installedat two schools by June in 2007. Funds

99 EW 25 Regional Hurricane Route andSignal Timing Study forHurricane Evacuation

Study of each County EvacuationPlan in the Tampa Bay Area todetermine adequacy of evacuationroutes and development of signaltiming plans for computerizedsignals.

Pasco CountyEmergencyManagement, PinellasCounty, HillsboroughCounty and ManateeCounty

Hurricanes/ TropicalStorms

Feasibility Study EM Preparedness and Assistance TrustFund; Federal Highway Administration;Transportation Efficiency Act of the 21stCentury

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.3 Encourage capitalimprovement expenditures forcritical infrastructure

12+

mos

.

Dec

-17-

2015

Tampa Bay Regional Planning Councilcompleted and issued results ofRegional Hurricane Evacuation Studyduring 2006. Awaiting the results of theJanuary 2010 evacuation study. Signaltiming study still needs to be done.Pasco County has installed automatictiming for signals.

100 BP 27 Regional Hurricane Shelter Provide wind resistance capabilitiesup to 160 mph and backup power fora regional hurricane shelter. Sheltershould be available to approximately1,000 evacuating citizens of Pasco,Hernando and surrounding counties.

Pasco County Facilitiesand EmergencyManagement

Hurricanes Critical FacilitiesProject

HMGP 01 Protect the health,safety and welfare of thepublic

01.3 Provide sufficient shelterspace to satisfy in-County demand

12+

mos

.

Dec

-17-

201

5

Task completed. Facility opened in2010.

101 HD 13 Pasco County FleetMaintenance Hazardous WasteMitigation Project - D&EMaintenance Facility

Development and implementation ofa plan to control and capture thesurface run-off from the D & EMaintenance Facility in New PortRichey.

Pasco County FleetMaintenance

Floods Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

5

To be scheduled.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 36: Upda - Pasco County, FL

Page 36 of 43

102 HE 13 Pasco County HazardousWaste Mitigation Project - CBarn Maintenance Facility

Recycle motor vehicle car washfluids. Purchase and construct aself-contained car wash system atC-Barn Maintenance Facility in theDade City/San Antonio area.

Pasco County FleetMaintenance

Hazard MaterialsIncidents

Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Not currently active, since County isoutgrowing C-Barn facility and iscontemplating moving to a largerfacility in the County. Stopped washingcars and are pursuing a different locationat this time

103 FX 24 Pandemic Flu Plan A comprehensive plan designed toprotect, prevent, implement andmitigate the effects of a large diseaseoutbreak such as pandemic flu.Focus on prevention, isolation and

Pasco County HealthDepartment

Pandemic Influenza Management Plan Centers for Disease Control 11 Minimize the effectsof pandemic influenza orother disease outbreak

11.1 Continue to enhancemeasures addressing pandemicinfluenza or other diseaseoutbreak

< 1

2 m

os.

Dec

-17-

2015 Completed. The Pasco County

Pandemic Influenza Grant Team and theOEM the Pandemic Influenza Plan asthe Biological Threat Incident Annex(BTIA). Document has been reviewed

104 HC 14 Nextel Re-banding Nextel is replacing the EDACS 800trunk Public Safety Radio Systemwith current EDACS site pro GPSsimulcast system. Nextel needed toreplace system due to outdated

Pasco CountyInformationTechnology andCommunications

All Hazards Infrastructure Funding is not necessary 10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities and

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

201 Project completed. System upgraded.

105 BY 25 Bass Lake Drainage AreaPhase II (RLA 2)

Construct improvements inaccordance with Bear Creek MasterPlan (Rocky Sink).

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram; SWFWMD Cooperative

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Completed.

106 CW 25 Duck Lake Regional RetentionSystem

Construct 100+ acre detention systemin the Duck Lake System near HappyHill Road.

Pasco CountyStormwaterManagement

Floods Structural Project Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; SWFWMD COOP Funding.

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Funding needs to be sourced.Stormwater Management Master Planunderway. Due to be completed 2014.

107 DV 25 Holiday Hills Project Area(RLA 16) Phase 1

Construct gravity outfall fromexisting pond in the DoubleHammock Creek Study Area.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram; CDBG; Stormwater Utilityfunds; SWFWMD COOP Funding

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

201

5

Completed. Pond major cleaningcompleted 10/08. Review of pumpcapacity and acquisition of propertiesalong existing retention area underway.

108 DY 25 Jarvis Street Project Storm sewer improvements inPinellas Anclote Study Area.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program; Stormwater Utilityfund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Review of system underway.

109 EB 25 Lake Padgett Estates ProjectArea

Maintenance of culverts and swalesin South Lakes Study Area.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Project underway. Project will becontinuing, since this is a continuousmaintenance activity.

110 EE 25 Lake Zephyr WatershedProject

Design Phases I, II, III, IV, and VI.Channel improvements, culvertimprovement/replacement, wetlandcreation, secondary drainage systemimprovements and detention or

Pasco CountyStormwaterManagement

Floods Management PlanDevelopment andModification

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; EMPreparedness and Assistance Trust Fund;Nonpoint Source Implementation Grant;Watershed Protection & Flood

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Phase I redesigned for more costfeasible project. Negotiations fornecessary easement underway.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 37: Upda - Pasco County, FL

Page 37 of 43

111 EK 25 Moog Road/Pinehurst DriveProject

Construct new pond outfall and roadimprovements in Lower CoastalStudy Area.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

A large tree that was growing in front ofthe outfall was removed. Completed.

112 EX 25 Riverside Village Project Area Regrade roadside swales, rebuildroadway and clean/repair culverts.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Completed.

113 FB 25 Tampa Downs Project Area Construct box culvert (Creek Drive)and repair road in Trout Creek StudyArea.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Completed

114 FG 25 West Port Project Area PhaseII

Ditch cleaning and storm sewerimprovements in Double HammockCreek Study Area.

Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; CDBG; FMA;HMGP; Nonpoint Source ImplementationGrants; Watershed Protection & FloodPrevention Program

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Major cleaning of the ditch completed6/08. Improvements waiting on study.

115 FH 25 Williams Acres Project, TroutCreek, S.R. 54 & C.R. 577

Replace failing culverts. Pasco CountyStormwaterManagement

Floods StormwaterImprovement Project

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Study due 02/01/09. BMPs delivered.Project to be scheduled in 2013.

116 AU 30 Drainage Improvements -Treadway

Construct drainage and roadwayimprovements on Treadway Drive

City of Port Richey Floods StormwaterManagement

Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Completed

117 BC 29 Drainage Improvements -River Gulf, Grand & Bay

Construct drainage and roadwayimprovements on River Gulf Dr.,Grand Blvd. & Bay Blvd.

City of Port Richey Floods StormwaterManagement

Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

201

5

Completed

118 BD 29 Drainage Improvements -Tabor, Papaya, Cormel, Quist,Wilkins, & Berlin

Construct drainage and roadwayimprovements on Tabor, Papaya,Cormel, Quist, Wilkins, & Berlin Dr.

City of Port Richey Floods StormwaterManagement

Capital Grants for Clean Water StateRevolving Funds, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Completed

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 38: Upda - Pasco County, FL

Page 38 of 43

119 BO 27 Portable Generator for Utilities Purchase of portable generator foroperating lift stations in the event of astorm or hurricane event.

City of Port Richey Floods Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds, HMGP,Pre-Disaster Mitigation Program, Water& Waste Disposal Loans & Grants, WaterPollution Control, Watershed Protectionand Flood Prevention.

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Completed

120 BR 26 Port Richey Repetitive LossMitigation 2007

Elevate 11 RLs City of Port Richey Floods, Coastal Flooding Property Acquisition 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

121 BT 26 Port Richey Repetitive LossMitigation 2008

Elevation of 5 RLs at 8352 CarolynDr, 7515 Grand Blvd, 5024 MillerBayou Dr, 5140 Miller Bayou Dr, and4901 Waterside Dr.

City of Port Richey Floods, Coastal Flooding Property Acquisition 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

122 DX 25 Installation of ring guards onmanhole covers

Install ring guards on approximately50 utilities manhole covers

City of Port Richey Floods Critical Facilities Capitalization Grants for Clean WaterState Revolving Funds, CDBG, HMGP,Water and Waste Disposal Loans andGrants.

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

18 completed, 5 planned for 2010.On=going pending funding. 5-10 peryear. 5 were completed in 2010.

123 ER 25 Port Richey RLP Elevations Elevation of 17 older RL properties,most of which were built prior to PNjoining NFIP

City of Port Richey Floods Retrofitting ofStructures

FMA, HMGP 05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate propertyacquisition or retro-fitting forrepetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

124 FU 24 Bay Blvd Lift Station Upgrade Upgrade of Bay Blvd Lift Station City of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

201

5

Lift station was rehabbed in summer2015.

125 FW 24 Oelsner Lift Station Upgrade Upgrade of Oelsner Lift Station City of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

201

5

Awaiting funding

126 FZ 24 Port Richey Lift Station FloodProofing Project Phase I (48Lift Stations)

Elevate controls & floodproof 48 liftstations and manholes with three footrings, all are located below BFEs

City of Port Richey Floods Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Conduct research on the most effectiveway to floodproof stations. Continueadding manhole cover rings as fundspermit.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 39: Upda - Pasco County, FL

Page 39 of 43

127 GA 24 Queener Lift Station Upgrade Upgrade Queener Avenue Lift StationCity of Port Richey Floods Infrastructure Capitalization Grants for Clean WaterState Revolving Funds, HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

< 1

2 m

os.

Dec

-17-

2015

Station rehabbed and extensioncompleted in spring 2015.Improvements include making thestation 6' taller and achoring it 5' deeper(from 13-18').

128 HA 18 Review Stormwater MasterPlan

Review of Stormwater Master Plan City of Port Richey Floods Management Plan Capitalization Grants for Clean WaterState Revolving Funds, FMA,Pre-Disaster Mitigation (PDM) ProgramWater Pollution Control & WatershedProtection and Flood Prevention,SWFTMD

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Plan review ongoing. Achievedmilestones included purchseof amini-traphoe and a trailer to cleanswails.

129 GT 20 San Antonio StormwaterManagement Plan

City-wide engineering study toidentify cost-effective stormwaterimprovements and prepare policyguidelines that will mitigate forpotential flooding.

City of San Antonio Floods StormwaterManagement

Capitalization Grants for Clean WaterState Revolving Funds; FMA; HMGP;Nonpoint Source Implementation Grants;Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Study completed. Recommendationscompiled and the north side of OakStreet was identified as the priority.Next steps include drawing up plans,budgeting, and putting the job out to bid.

130 GW 18 Generators for San AntonioMunicipal Facilities

City of San Antonio Hurricanes/ TropicalStorms

Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Generator purchased and installed atwater plant, online and functioning.Identifty funding for small generator toserve City Hall.

131 GD 23 San Antonio OutreachEducational Program

Public Outreach Program(flyers/informational brochures) toinform residents about all types ofhazards and disaster preparedness.

City of San Antonioand the Town of St.Leo

Multiple Public EducationProgram

EM Preparedness and Assistance TrustFund; Environmental Education Grant

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate thepublic about potential hazards andproperty protection measures

12+

mos

.

Dec

-17-

2015

Ongoing. Hazard prevention anddisaster preparedness info placed at CityHall. Future program expansionincludes adding to selection and typesmaterial on display

132 BN 27 Generator for Town of St. LeoTown Hall

Purchase of generator for the TownHall.

Town of St. Leo Hurricanes/TropicalStorms

Critical FacilitiesProject

EM Preparedness and Assistance TrustFund

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

201

5

No action taken to date. A generator willbe purchased when funding is available.

133 DD 25 Flood Insurance Rate Maps Add the Town of St. Leo to the NFIPand to FIRMs (Panel #120230-0275D)

Town of St. Leo Floods Public EducationProject

EM Preparedness and Assistance TrustFund

01 Protect the health,safety and welfare of thepublic

01.2 Ensure new development andredevelopment complies with allapplicable federal, state and localregulations

12+

mos

.

Dec

-17-

2015

FIRMS adopted September 2014.

Task completed.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 40: Upda - Pasco County, FL

Page 40 of 43

134 BQ 27 Zephyrhills DowntownRetention Pond / floodproofing

Expand existing retention pond toincrease capacity and reduce flooding

City of Zephyrhills Floods StormwaterManagement

Local Government, FMA, HMGP,Nonpoint Source Implementation Grants,Watershed Protection & Flood PreventionProgram

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

< 1

2 m

os.

Dec

-17-

2015

Expansion of the retention pond is inprogress.

135 GE 23 Zephyrhills Retrofit of CriticalFacilities

Add window protection to City Hall,two fire stations and the police stationin order to ensure continuation ofcritical municipal functions.

City of Zephyrhills Hurricanes/ TropicalStorms

Critical FacilitiesRetrofit Project

EM Preparedness and Assistance TrustFund; HMGP

10 Regulate andprioritize theconstruction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existingcritical facilities andinfrastructure

12+

mos

.

Dec

-17-

2015

Moving ahead as funding permits.OEM assisting with funds identification.

136 FR 25 Zephyrhills StormwaterManagement Plan

Identify/develop Master Stormwaterimprovement projects in CityCommunity redevelopment area.

ZephyrhillsStormwaterManagement

Floods Management PlanDevelopment andModification

EM Preparedness and Assistance TrustFund

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

Working within a communityredevelopment area, create a master planthat will support development andredevelopment of downtown and, byextension, the city.

137 IX 25 Bear Creek PithlachascoteeWatershed BMPImplementation

Implementation of BMP's identifiedin the Watershed Master Plan(proposed to be completed end of2014).

Pasco County Floods Capital Projects,Property Acquisition,Restoration ofNatural Features,StormwaterManagement,Management Plan

Stormwater utility fund, SWFWMD,COOP Funding and HMGP

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

2015

New project (as of when? Progressreport?)

138 IY 25 Pinellas Anclote WatershedBMP Implementation

Implementation of BMP's identifiedin the Watershed Master Plan(proposed to be completed end of2016).

Pasco County Floods Capital Projects,Property Acquisition,Restoration ofNatural Features,StormwaterManagement,Management Plan

Stormwater utility fund, SWFWMDCOOP Funding and HMGP

08 StormwaterImprovement

08.1 Maintain and improveexisting drainage systems toregulate management ofstormwater runoff

12+

mos

.

Dec

-17-

201

5

New project (as of when? Progressreport?)

139 Post-disaster recovery withmitigation

Adopt post-disaster triage process tocost-effectively use availableresources to fix properties damagedduring the July 2015 Aereal Floodsand in future recovery efforts.

OEM, CommunityDevelopment,StormwaterManagement, PascoRebuilds Together!

All Hazards EmergencyManagement -Recovery

SHIP, HMGP, Pasco Rebuilds Together 01 Protect the health,safety and welfare of thepublic

1.2 Ensure newdevelopment/redevelopmentcomplies with applicable federal,state and local buildingregulations

Est

. 12/

15, >

12+

mos

.

Dec

-17-

2015

FIRMS adopted September 2014.

Task completed.

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 22, 2016

NO

Ty

pe

Sco

re Project/Program Name

Description City/County/Other Office

Hazard(s)Mitigated

Category Funding Source(s) Goal Objective

Tim

elin

e

Up

da

t Status

Page 41: Upda - Pasco County, FL

Pasco County Office of Emergency Management Local Mitigation Strategy: Updated 12/31/2017 Submitted to FDEM January 12, 2016

116 AU 30 Drainage Improvements -Treadway

Construct drainage and roadwayimprovements on Treadway Drive

City of PortRichey

Floods StormwaterManagement

Capital Grants for CleanWater State RevolvingFunds, FMA, HMGP,Nonpoint SourceImplementation Grants,Watershed Protection &Flood Prevention Program

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

< 1

2 m

os.

Dec

-17

-20

15

Completed

117 BC 29 Drainage Improvements -River Gulf, Grand & Bay

Construct drainage and roadwayimprovements on River Gulf Dr.,Grand Blvd. & Bay Blvd.

City of PortRichey

Floods StormwaterManagement

Capital Grants for CleanWater State RevolvingFunds, FMA, HMGP,Nonpoint SourceImplementation Grants,Watershed Protection &Flood Prevention Program

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

< 1

2 m

os.

Dec

-17-

2015

Completed

118 BD 29 Drainage Improvements -Tabor, Papaya, Cormel,Quist, Wilkins, & Berlin

Construct drainage and roadwayimprovements on Tabor, Papaya,Cormel, Quist, Wilkins, & BerlinDr.

City of PortRichey

Floods StormwaterManagement

Capital Grants for CleanWater State RevolvingFunds, FMA, HMGP,Nonpoint SourceImplementation Grants,Watershed Protection &Flood Prevention Program

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

< 1

2 m

os.

Dec

-17-

2015

Completed

119 BO 27 Portable Generator forUtilities

Purchase of portable generator foroperating lift stations in the event ofa storm or hurricane event.

City of PortRichey

Floods CriticalFacilities

Capitalization Grants forClean Water StateRevolving Funds, HMGP,Pre-Disaster MitigationProgram, Water & WasteDisposal Loans & Grants,Water Pollution Control,Watershed Protection andFlood Prevention.

10 Regulate and prioritizethe construction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existing critical facilitiesand infrastructure

12+

mos

.

Dec

-17-

2015

Completed

120 BR 26 Port Richey Repetitive LossMitigation 2007

Elevate 11 RLs City of PortRichey

Floods, Coastal Flooding PropertyAcquisition

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate property acquisition or retro-fittingfor repetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

121 BT 26 Port Richey Repetitive LossMitigation 2008

Elevation of 5 RLs at 8352 CarolynDr, 7515 Grand Blvd, 5024 MillerBayou Dr, 5140 Miller Bayou Dr,and 4901 Waterside Dr.

City of PortRichey

Floods, Coastal Flooding PropertyAcquisition

05 Reduce the cost ofdisaster response andrecovery

05.2 Advocate property acquisition or retro-fittingfor repetitive loss properties

12+

mos

.

Dec

-17-

2015

Completed

129 GT 20 San Antonio StormwaterManagement Plan

City-wide engineering study toidentify cost-effective stormwaterimprovements and prepare policyguidelines that will mitigate forpotential flooding.

City of SanAntonio

Floods StormwaterManagement

Capitalization Grants forClean Water StateRevolving Funds; FMA;HMGP; Nonpoint SourceImplementation Grants;Watershed Protection &Flood Prevention Program

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

< 1

2 m

os.

Dec

-17-

2015

The required field work for our stormwater study has been completed. Afterrecommendations are compiled by the consulting engineers San Antonio willprioritize projects and pursue funding to implement the recommendations.

130 GW 18 Generators for San AntonioMunicipal Facilities

City of SanAntonio

Hurricanes/ Tropical Storms CriticalFacilitiesProject

EM Preparedness andAssistance Trust Fund

10 Regulate and prioritizethe construction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existing critical facilitiesand infrastructure

12+

mos

.

Dec

-17-

2015

Generator purchased and installed at water plant. Funding not currentlyavailable for generators at San Antonio City Hall and Fire Station next door.

131 GD 23 San Antonio OutreachEducational Program

Public Outreach Program(flyers/informational brochures) toinform residents about all types ofhazards and disaster preparedness.

City of SanAntonio and theTown of St. Leo

Multiple PublicEducationProgram

EM Preparedness andAssistance Trust Fund;Environmental EducationGrant

01 Protect the health,safety and welfare of thepublic

01.1 Inform and educate the public about potentialhazards and property protection measures

12+

mos

.

Dec

-17-

2015

Ongoing. Hazard prevention and disaster preparedness info placed at City Halls.Future program expansion includes adding to selection and types material ondisplay

30 IR 30 Zephyrhills Downtown FireStation Wet Floodproofing

Renovate downtown Fire Station toinclude interior/exterior wetfloodproofing

City ofZephyrhills

Floods Flood Proofing HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application for submission to the state.

31 IS 30 Zephyrhills Downtown FireStation Dry Floodproofing

Renovation of downtown FireStation to include interior/exteriordry floodproofing

City ofZephyrhills

Floods Flood Proofing HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application for submission to the state.

32 IT 30 Zephyrhills Downtown FireStation Hardening

Structural reinforcements to hardendowntown Fire Station to meetcurrent Florida Building Codes

City ofZephyrhills

Winds CriticalFacilities

HMGP

12+

mos

.

Dec

-17-

2015

OEM putting together application for submission to the state.

33 IU 30 Zephyrhills 20th StreetStormwater ManagementProject Acquisition

Purchase foreclosed property toconstruct stormwater managementproject/retention pond. Reduceflooding of two primary collectorstreets (20th St & 5th Ave) withimproved emergency ingress/egressand flood protection

City ofZephyrhills

Floods PropertyAcquisition

HMGP

12+

mos

.

Dec

-17-

201

5

Moving ahead as funding permits. OEM assisting with funds identification.

34 IV 30 Zephyrhills 20th Street (4thAve) StormwaterManagement Project

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City ofZephyrhills

Floods StormwaterManagement

HMGP

12+

mos

.

Dec

-17-

2015

Moving ahead as funding permits. OEM assisting with funds identification.

35 IW 30 Zephyrhills 20th Street (7thAve) StormwaterManagement Project

Construct retention pond/piping inprioritized area with flooding toprotect residences and improveemergency ingress/egress

City ofZephyrhills

Floods StormwaterManagement

HMGP

12+

mos

.

Dec

-17

-201

5

Moving ahead as funding permits. OEM assisting w/idenifying funds. Therecent demolition of a home in the area paves the way for a well-situatedretention pond.

134 BQ 27 Zephyrhills DowntownRetention Pond / floodproofing

Expand existing retention pond toincrease capacity and reduceflooding

City ofZephyrhills

Floods StormwaterManagement

Local Government, FMA,HMGP, Nonpoint SourceImplementation Grants,Watershed Protection &Flood Prevention Program

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

< 1

2 m

os.

Dec

-17-

2015

Expansion of the retention pond is in progress.

Typ

e

Sco

re Project/Program Name

Description City/CountyOffices

Hazard(s) Mitigated Category Funding Source(s) Goal Objective

Tim

el

Up

da

Status

Page 42: Upda - Pasco County, FL

135 GE 23 Zephyrhills Retrofit ofCritical Facilities

Add window protection to City Hall,two fire stations and the policestation in order to ensurecontinuation of critical municipalfunctions.

City ofZephyrhills

Hurricanes/ Tropical Storms CriticalFacilitiesRetrofit Project

EM Preparedness andAssistance Trust Fund;HMGP

10 Regulate and prioritizethe construction and/orenhance the protection ofcritical facilities andinfrastructure

10.2 Prioritize and retrofit existing critical facilitiesand infrastructure

12

+ m

os.

Dec

-17

-20

15

Moving ahead as funding permits. OEM assisting with funds identification.

136 FR 25 Zephyrhills StormwaterManagement Plan

Identify/develop Master Stormwaterimprovement projects in CityCommunity redevelopment area.

ZephyrhillsStormwaterManagement

Floods ManagementPlanDevelopmentandModification

EM Preparedness andAssistance Trust Fund

08 StormwaterImprovement

08.1 Maintain and improve existing drainagesystems to regulate management of stormwaterrunoff

12

+ m

os.

Dec

-17

-20

15

Working within a community redevelopment area, create a master plan that willsupport development and redevelopment of downtown and, by extension, thecity.

Page 43: Upda - Pasco County, FL

Need to add:

Town of St. Do a building assessment

CRS Support CRS origran with specific actions