Case Study for 500 kWp PV Plant Ankara Prokon A.Ş. Project

New Enerji Renewable Enerji

Özgür SARPDAĞ Business Development Manager 13th of April, Saturday 6th Solarex Exhibition

Page 2: Untitled

Index

1. About Else Enerji

2. Project References

3. Prokon AS Project

Page 3: Untitled

Company Profile

Our Vision

Need Oriented Solution: To continue providing proper and sustainable solutions to fit the unique needs of our customers.

Standard Exceeding Service: To set the standard of excellence for the Enerji and electrical contracting business by continuing to provide quality service.

First Choice: To become the first choice of customers that seek fast and quality service.

Page 4: Untitled

Company Profile

Our Mission

Providing proper and sustainable solutions to fit the unique needs of our customers.

With our sensibility about Enerji efficiency and carbon emissions, we want to contribute Turkey and world economy.

Page 5: Untitled

Company Profile

Who is Else Enerji?

• Else Enerji focuses on Solar PV business. • Else Enerji is a prominent company in Turkey that

works about consultancy, planning, engineering, procurement, installation execution of Solar PV systems in Turkey, North Africa and Middle East including operation and maintenance.

Page 6: Untitled

Company Profile

Our Experience

• Else Enerji is a dynamic company who provides turnkey solutions.

• Else Enerji has one of the most experienced technical staff about planning, engineering and installation in Turkey.

• Qualified personnel employment and regular training are very important points for Else Enerji.

Page 7: Untitled

Company Profile

Project Management • Thanks to our enterprise resource planning (ERP)

software, we can organise procurement, inventory management, project offers, cost analysis, project planning, service management, logistics, human resources, accountment and finance process faster than usual.

Page 8: Untitled

Company Profile

Turnkey Services

Project Development

Finance Solutions

Engineering Procurement

and Construction

Operation

Project Development

• Land Fixation

• Feasibility Study

• Licence

• Grid Connection

• Lease Agreement

Finance Solutions

• Equity & Debt Financing

• Cost Analysis

• Investment – Finance Analysis

Engineering

• Technical Concept

• Layout

• Power Generation Analysis

Procurement & Construction

• Purchasing

• Supply Chain

• Logistics

• Site supervision

• Quality Assurance

• Commissioning

Operation

• Monitoring

• Maintenance

• Commercial Management

Page 9: Untitled

Company Profile

Solution – Oriented Services • Else Enerji provides solution-oriented services

together with turnkey solutions.

• Regarding the traditional understanding of Else Enerji, we complete the projects via our qualified and rigorous approach

Page 10: Untitled

Company Profile

Solution – Oriented Services

Consultancy Supervision Finance Engineering

Procurement Construction Operation Maintenance

-Investment Analysis -Land Development -Feasibility Study -Technical Analysis -License Application

-Process Management -Engineering, Purchasing and Construction Supervision

-Project Design -Technical Concept -Layout -Power Generation Analysis

-Product Selection -Purchasing Tenders -Procurement -Quality Control -Logistics

-Equity & Debt Financing -Cost Analysis -Investment – Finance Analysis

-Implementation of the Project -Installation -Tests and Commissioning

-Technical Operation -Commercial Operation -Monitoring -Controlling -Security

-Maintenance -Repair -Technical Service

Page 11: Untitled

References Turnkey References

Project Name Location Capacity Completion

Toki Kayaşehir Site / Rooftop Project Istanbul 62,1 kWp 2012

Dülük Baba Park / Free Field Project Gaziantep 40 kWp 2012

Prokon AS Factory / Rooftop Project Ankara 500 kWp 2013

Marka Farm / Free Field Project Sivas 500 kWp 2013*

Maksomer GES / Free Field Project Kayseri 500 kWp 2013*

ELSE GES / Free Field Project Kayseri 500 kWp 2013*

Cumulative Capacity 2102,1 kWp

Page 12: Untitled

References Measurement Station References

Project Name Location

KARAMAN Measurement Station Karaman

KARAMAN Measurement Station Karaman

KONYA Measurement Station Konya

KONYA Measurement Station Konya

NEVŞEHİR Measurement Station Nevşehir

KAHRAMANMARAŞ Measurement Station Kahramanmaraş

MERSİN Measurement Station Mersin

ANTALYA Measurement Station Antalya

KAYSERİ Measurement Station Kayseri

TOTAL STATIONS 9

Page 13: Untitled

Prokon AŞ Project

Development Stage

• Prokon AS wanted to produce own electricity on the factory roof.

• Prokon AS collected offers from totally 20 local and foregin company

• Prokon AS considered to work with Else Enerji instead of other 19 companies

Page 14: Untitled

Prokon AŞ Project

Application Stage

• Pre-design of plant was completed by Else Enerji and Prokon AS applied to EnerjiSA (local distribution company)

• EnerjiSA approved application and final design studies started

Page 15: Untitled

Prokon AŞ Project

Chosen Brands

• Solar Module Selection criteria: Send different module

brands to test laboratory and use which passed test

Test criteria: Solar module should be passed STC and EL tests

Independent laboratory: PI-Berlin (Germany)

Page 16: Untitled

Prokon AŞ Project

Chosen Brands

• Solar Module Tested Modules: 6 different module brands

picked up

Tested Modules: Modules were purchased from wholesalers randomly

Tested Modules: Modules were delivered to

laboratory by our forwarder

Page 17: Untitled

Prokon AŞ Project

Project Preparation - Requirements MAIN CALCULATIONS

• Statical control of roof • Statical control of mounting structure and

solar modules • Optimization of PV plant • Optimization of fixing materials

Page 18: Untitled

Prokon AŞ Project

Page 19: Untitled

Prokon AŞ Project

Project Preparation - Requirements ELECTRICAL CALCULATIONS

• AC & DC power loss and voltage drop • Current carrying controlling • Inverter min-max voltage input calculations • LV & HV short circiut calculations • Grounding calculations • Lightning protection • …

Page 20: Untitled

Prokon AŞ Project

Page 21: Untitled

Prokon AŞ Project

Project Preparation - Requirements DRAWINGS

• Plant layouts • Single line diagrams (DC and AC sides • DC arrays • Grounding • Lightning • Metering, monitoring and communication • …

Page 22: Untitled

Prokon AŞ Project

Page 23: Untitled

Prokon AŞ Project

Page 24: Untitled

Prokon AŞ Project

Page 25: Untitled

Prokon AŞ Project

Project Preparation - Requirements PERMITS

• Local municipality approvement about PV plant

• Statical report approvement of local municipality

Page 26: Untitled

Prokon AŞ Project

Project Preparation - Requirements PERMITS

• Projects approved by main distribution company (TEDAŞ) First approved 500 kWp PV project of

Turkey! • Agreement signed between Prokon AŞ and

EnerjiSA

Page 27: Untitled

Prokon AŞ Project

Procurement Stage

• Solar Module: Hanwha Q-Cells G.PRO G-2.245 • Inverter: SMA STP20000TL-EE • Mounting: Mounting-Systems On-Roof Alfa • Fixing: EJOT® Solar Fastening System • Cable: Multi-Contact FLEX-SOL-XL 6 • Connectors: Multi-Contact MC4

Page 28: Untitled

Prokon AŞ Project

Modules

Page 29: Untitled

Prokon AŞ Project

Modules

Page 30: Untitled

Prokon AŞ Project

Modules

Page 31: Untitled

Prokon AŞ Project

Modules

Page 32: Untitled

Prokon AŞ Project

Modules

Page 33: Untitled

Prokon AŞ Project

Inverters

Page 34: Untitled

Prokon AŞ Project

Inverters

Page 35: Untitled

Prokon AŞ Project

Inverters

Page 36: Untitled

Prokon AŞ Project

Mounting-Structure

Page 37: Untitled

Prokon AŞ Project

Mounting-Structure

Page 38: Untitled

Prokon AŞ Project

Mounting-Structure

Page 39: Untitled

Prokon AŞ Project

Mounting-Structure

Page 40: Untitled

Prokon AŞ Project

Mounting-Structure

Page 41: Untitled

Prokon AŞ Project

Mounting-Structure

Page 42: Untitled

Prokon AŞ Project

Fixing

Page 43: Untitled

Prokon AŞ Project

Fixing

Page 44: Untitled

Prokon AŞ Project

Fixing

Page 45: Untitled

Prokon AŞ Project

Fixing

Page 46: Untitled

Prokon AŞ Project

Fixing

Page 47: Untitled

Prokon AŞ Project

Cabling

Page 48: Untitled

Prokon AŞ Project

Cabling

Page 49: Untitled

Prokon AŞ Project

Cabling

Page 50: Untitled

Prokon AŞ Project

Installation

Page 51: Untitled

Prokon AŞ Project

Installation

Page 52: Untitled

Prokon AŞ Project

Installation

Page 53: Untitled

Prokon AŞ Project

Installation

Page 54: Untitled

Prokon AŞ Project

Installation

Page 55: Untitled

Prokon AŞ Project

Installation

Page 56: Untitled

Prokon AŞ Project

Installation

Page 57: Untitled

Prokon AŞ Project

Installation

Page 58: Untitled

Prokon AŞ Project

Installation

Page 59: Untitled

Prokon AŞ Project

Installation

Page 60: Untitled

Prokon AŞ Project

Installation

Page 61: Untitled

Prokon AŞ Project

Installation

Page 62: Untitled

Prokon AŞ Project

Installation

Page 63: Untitled

Prokon AŞ Project

Installation

Page 64: Untitled

Prokon AŞ Project

Installation

Page 65: Untitled

Prokon AŞ Project

Completion

Page 66: Untitled

Prokon AŞ Project

Completion

Page 67: Untitled

Prokon AŞ Project

Completion

Page 68: Untitled

Prokon AŞ Project

Completion

Page 69: Untitled
Page 70: Untitled

Thanks for your attention…

www.elseenerji.com