1
Rev 01a Sheet 1 of 1 Date: 2016-07-11 Doc Nr: MAN A2 CRM1-COE Unpacking Instructions Name: JPE 1035 dd-mm-yyyy 11-7-2016 4 5 6 7 8 9 10 A B C D E F G H I J 1 2 3 K L M N All rights are reserved. Reproduction in whole or in part is prohibited without the written consent of the copyright owner. JPE disclaims any liability with regard to the accuracy, completeness, and timeliness of the information provided. Step 1 : open the box and carefully remove the inner membrane section that contains the CRM. Remove the CRM carefully from underneath the sheet. Do not cut the membrane sheet! Step 2 : remove the top Transport PCB by unscrewing the M6 nuts on top. Note the fiber underneath this PCB! So lift the PCB carefully. Step 4 : remove the 4 threaded bars. Please take care not to damage the fiber while using handtools to remove the bars. Step 5 : (when installing system in customer setup) unscrew the optical fiber connector from the feedthrough. Unscrew the 6 screws/nuts that keep the CRM fixed to the transport PCB. Step 6 : CRM after unpacking. Note: always use plastic caps to cover fiber outputs and feedtroughs when not in use. Unpacking Instructions CRM1-COE. Read these instructions carefully before further unpacking! Please remove actuator from transport tool only right before mounting in customer setup! [!] Fiber [!] Step 3 : cut the tie-wraps to free the kapton wires. Please take care not to damage the fiber while using handtools to remove the tie- wraps Keep transport tool for actuator storage or as quick test tool (actuator could be operated when mounted in transport tool)

Unpacking Instructions CRM1-COE. Read these instructions ...€¦ · Rev 01a Sheet 1 of 1 Date: 2016-07-11 Doc Nr: MAN A2 CRM1-COE Unpacking Instructions Name: JPE 1035 dd-mm-yyyy

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Unpacking Instructions CRM1-COE. Read these instructions ...€¦ · Rev 01a Sheet 1 of 1 Date: 2016-07-11 Doc Nr: MAN A2 CRM1-COE Unpacking Instructions Name: JPE 1035 dd-mm-yyyy

Rev

01a

Sheet 1 of 1 Date: 2016-07-11 Doc Nr: MAN A2

CRM1-COE

Unpacking Instructions

Name: JPE

1035

dd-mm-yyyy

11-7-2016

4

5

6

7

8

9

10

A B C D E F G H I J

1

2

3

K L M N

All

rig

hts

are

re

serv

ed

. Re

pro

du

ctio

n in

wh

ole

or

in p

art

isp

roh

ibit

ed

wit

ho

ut

the

wri

tte

n c

on

sen

t o

f th

e c

op

yrig

ht

ow

ne

r. J

PE

dis

cla

ims

an

y lia

bili

ty w

ith

re

ga

rd t

o t

he

acc

ura

cy,c

om

ple

ten

ess

, an

d t

ime

line

ss o

f th

e in

form

ati

on

pro

vid

ed

.

Step 1 : open the box and

carefully remove the inner membrane section that

contains the CRM.

Remove the CRM carefully from

underneath the sheet. Do not cut the membrane sheet!

Step 2 : remove the top Transport PCB by unscrewing

the M6 nuts on top.

Note the fiber underneath this

PCB! So lift the PCB carefully.

Step 4 : remove the 4 threaded bars.

Please take care not to damage the fiber while using

handtools to remove the bars.

Step 5 : (when installing system

in customer setup) unscrew the

optical fiber connector from the

feedthrough. Unscrew the 6 screws/nuts that keep the CRM

fixed to the transport PCB.

Step 6 : CRM after unpacking.

Note: always use plastic caps to cover fiber outputs and

feedtroughs when not in use.

Unpacking Instructions CRM1-COE. Read these instructions carefully before further unpacking!

Please remove actuator from transport tool only right before mounting in customer setup!

[!] Fiber [!]

Step 3 : cut the tie-wraps to free the kapton wires.

Please take care not to damage the fiber while using

handtools to remove the tie-wraps

Keep transport tool for actuator storage or as quick test tool

(actuator could be operated when mounted in transport tool)