Unofficial Informal Business Discussion Minutes Tuesday, November 3, 2015 – 3:00 PM Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John Heard, Tommy Hunter 1. Water Resources Pipe Standards Discussion Department of Water Resources’ Director Ron Seibenhener presented proposed revisions to Gwinnett County’s Water, Sewer and Stormwater Pipe Standards. No Official Action Taken.

Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Unofficial Informal Business Discussion Minutes Tuesday, November 3, 2015 – 3:00 PM

Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John Heard, Tommy Hunter

1. Water Resources Pipe Standards Discussion Department of Water Resources’ Director Ron Seibenhener presented proposed revisions to Gwinnett County’s Water, Sewer and Stormwater Pipe Standards. No Official Action Taken.

Page 2: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

WATER RESOURCES

Proposed Revisions Water, Sewer and Stormwater

Pipe Standards

November 3, 2015

Page 3: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Mission and Vision

To Provide Superior Water Service at an Excellent Value

To be widely recognized as a leader in the water industry

Page 4: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Tenets Support our Mission

Continuous Improvement

Superior Asset Management

The Right Asset In the Right Place

Installed in the Right Way

Page 5: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Replacement Value of our Assets

Water Production Facilities

Water Reclamation Facilities

Distribution System

Collection System

Stormwater System

$0.5 Billion

$1.3 Billion

$2.6 Billion

$2.3 Billion

$3.0 Billion

Page 6: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Asset Management Levels

Water & SewerFacilities

Water & SewerPipes

Stormwater Pipe

Providing Fundamental

Services

Optimizing Operations and

Services

Utility of the Future

Page 7: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Objectives of the Revisions to Pipe Standards

Correct Errors

• Governing Standards • Industry Standards • Manufacturer’s Recommendations

Provide Clarity

Between

Include New Industry

Improvements

Streamline & Simplify

Page 8: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

WATER RESOURCES

Proposed Revisions to the Water Main and Sanitary Sewer Standards and Specifications

Page 9: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Document Review

Water Systems

Water Pollution Control

87 Pages

2 Volumes: 163 Pages Combined

76 Pages

Page 10: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Proposed: One Document

Gwinnett County Water Resources

1 Volume: 115 Pages Total Savings of 48 Pages

Page 11: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Example Pipe Installation Diagram

Pipe Zone

Final Backfill

Pipe

Bedding

Initial Backfill

Road Detail

Page 12: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Water and Sewer Pipe Material Pipe Material dictated by Location and Use

Pipe Material Application DIP

(Water Mains)

All Water Mains less than or equal to 64” in diameter*

DIP (Gravity Sewer)

Any Gravity Sewer*

PVC (Gravity Sewer)

Gravity Sewer, when Pipe ≤ 24 inch in diameter and < 16 feet of cover

*Greater than 64” in diameter is a custom design

Page 13: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Water and Sewer Pipe Pipe Zone Requirements based on Pipe Material & Use

Pipe Zone Pipe

Bedding

Initial Backfill

Page 14: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Water and Sewer Pipe Pipe Zone Requirements based on Pipe Material & Use

PVC Gravity Sewer DIP Water Main DIP Gravity Sewer

Page 15: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Pipe Installation – Final Backfill Final Backfill based on Location

Location W&S

Final Backfill Requirement

Shoulder and Under

Pavement* 95% compaction

Outside Pavement in

ROW 90% compaction

Outside of ROW 85% compaction

(unless directed by Engineer)

* Under pavement means all or part of trench is under pavement

Final Backfill

Pipe

Page 16: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Three Problem Areas Identified

Sewer Service Laterals

Pipe Material Transitions

New Development Sewer Connection

Page 17: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

1. Sewer Service Lateral 6” County Stub to 4” House Connection

Current New

Page 18: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Pipe Material Transition Ductile Iron to PVC Connection

Current New

2.

Page 19: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Sewer Connection New Development to Existing Sewer

Current New

3.

Page 20: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Sewer Connection New Development to Existing Sewer 3.

Manhole with Plugs and Locking Cover

Mechanical Screw (Wing Nut) Plug

Locking Manhole Cover

Page 21: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

W&S Pipe Installation Quality Assurance

Ensuring Qualified Contractors

•Approved contractor list •Construction permits required

Testing During Construction

•Developer tests with County verification •Bedding Materials •Compaction

Inspections Prior to Acceptance •Pressure Tests (Contractor, County verify) •Disinfection of Water Lines (Contractor, County verify) •CCTV, Mandrel, Laser Profiling (County)

Page 22: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

WATER RESOURCES

Proposed Revisions to the Stormwater Systems and Facilities

Installation Standards and Specifications

Page 23: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Asset Management Levels

Water & SewerFacilities

Water & SewerPipes

Stormwater Pipe

Providing Fundamental

Services

Optimizing Operations and

Services

Utility of the Future

Page 24: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Why Such a Low Bar for Stormwater Pipe?

The General View Is

• “It’s just drainage”

The Correct View Is

• It’s a $3 Billion Asset • It’s aging and failing creating a

tremendous liability • It’s under funded • Our standards, specifications and

installation practices do not support its value

Page 25: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Risk Levels, Impacts and Locations

Risk Level Impacts Locations

Many people

Structures

Major Roads

Local Roads Public Access

ROW

Few people

Under pavement of major roads

Passing water from development to development Passing water between public ROW and private property In close proximity to structure Carries a perennial stream

Under pavement of local road

Longitudinal (along roadway)

Under driveways

Lateral (not near structure)

Medium Consequence

of Failure

High Consequence

of Failure

Low Consequence

of Failure

Page 26: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Materials & Pipe Zone Detail Dictated by Location

Location Pipe Material Pipe Zone Detail

Under pavement of major roads RCP High Risk

Passing water from development to development RCP High Risk

Passing water between public ROW and private property RCP High Risk

In close proximity to structure RCP or HPDE High Risk

Carries a perennial stream RCP or HPDE High Risk

Under pavement of local Roads All 3 Materials High Risk

Drainage off roads All 3 Materials High Risk

Under driveways All 3 Materials Low Risk

Laterals (not near structures) All 3 Materials Low Risk

Page 27: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Pipe Material By Location Major (non-local) Roads

Page 28: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Pipe Material by Locations Local (S/D) Roads

Page 29: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Materials & Pipe Zone Detail Dictated by Location

Location Pipe Material Pipe Zone Detail

Under pavement of major roads RCP High Risk

Passing water from development to development RCP High Risk

Passing water between public ROW and private property RCP High Risk

In close proximity to structure RCP or HPDE High Risk

Carries a perennial stream RCP or HPDE High Risk

Under pavement of local Roads All 3 Materials High Risk

Drainage off roads All 3 Materials High Risk

Under driveways All 3 Materials Low Risk

Laterals (not near structures) All 3 Materials Low Risk

Page 30: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Pipe Zone Requirements based on Pipe Material & Risk

Reinforced Concrete Pipe

Higher Risk Locations Lower Risk Locations

Page 31: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Pipe Zone Requirements based on Pipe Material & Risk

Aluminized Steel Pipe

Higher Risk Locations Lower Risk Locations

Page 32: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Pipe Zone Requirements based on Pipe Material & Risk

High Density Polyethylene Pipe

Higher Risk Locations Lower Risk Locations

Page 33: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Pipe Installation – Final Backfill Consistent with W&S and GCDOT Requirements

Location

W&S Final Backfill Requirement

Stormwater Final Backfill Requirement

Shoulder and Under

Pavement*

95% compaction

95% compaction

Outside Pavement in

ROW

90% compaction

90% compaction

Outside of ROW

85% compaction

unless directed by Engineer

85% compaction

unless directed by Engineer

* Under pavement means all or part of trench is under pavement

Final Backfill

Pipe

Page 34: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Stormwater Pipe Installation Quality Assurance

Ensuring Qualified Contractors

•Approved contractor list •Construction permits required

Testing Before Design

•Developer tests with County verification •pH and resistivity (ASP only)

Testing Before and During Construction •Developer tests with County verification •Bedding Materials •Compaction

Inspections Prior to Acceptance •County does inspections •CCTV, Mandrel, Laser Profiling

Page 35: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Asset Management Levels

Water & SewerFacilities

Water & SewerPipes

Stormwater Pipe

Providing Fundamental

Services

Optimizing Operations and

Services

Utility of the Future

Page 36: Unofficial Informal Business Discussion Minutes Tuesday ......Nov 03, 2015  · Tuesday, November 3, 2015 – 3:00 PM . Present: Charlotte J. Nash, Jace Brooks, Lynette Howard, John

Asset Management Levels

Water & SewerFacilities

Water & SewerPipes

Stormwater Pipe

Providing Fundamental

Services

Optimizing Operations and

Services

Utility of the Future