April 7th, 2011
UNIT 4 APPENDICES: MECHANICAL REPORT
IPD/BIM TEAM #3 JASON BROGNANO | MICHAEL GILROY | DAVID MASER | STEPHEN KIJAK
Dr. Mistrick | Dr. Jelena Srebric | Dr. John Messner | Dr. Andres Lepage
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-2 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.A: R-VALUE ANALYSIS
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-3
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-4 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-5
APPENDIX 4.B: CHILLED BEAM CUTSHEETS/ SELECTION DATA
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-6 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-7
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-8 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-9
Pro
jec
tR
oo
m-N
o.
Co
mm
en
t
.coolin
gheating
coolin
gheating
Vw
ate
r D
ID1.2
5 G
PM
1.2
5 G
PM
1.0
0 G
PM
0.5
0 G
PM
Un
it l
en
gth
No
zzle
-typ
e
Connection-d
iam
ete
r /
prim
ary
air
Inp
ut
Te
mp
era
ture
s
Tair-p
rim
ary
Room
Heig
ht
(H)
11.0
ft
A12.0
ft
X10.0
ft
Tw
ate
r-flo
wO
ccupie
d Z
one H
eig
ht
6.0
ft
.coolin
gheating
coolin
gheating
Dtw
ate
r-4
.9 °
F5.9
°F
-6.7
°F
14.8
°F
Tw
ate
r-re
turn
62.9
°F
89.1
°F
64.7
°F
80.2
°F
DT
room
- w
ate
r flo
w-1
7.0
°F
25.0
°F
-17.0
°F
25.0
°F
DT
Room
wate
r ave
rage
-14.5
°F
22.0
°F
-13.7
°F
17.6
°F
Qw
ate
r D
ID-3
085 B
TU
H3694 B
TU
H-3
332 B
TU
H3705 B
TU
H
Qair D
ID-3
048 B
TU
H-2
297 B
TU
H-3
048 B
TU
H-2
297 B
TU
H
Q D
ID-6
133 B
TU
H1398 B
TU
H-6
380 B
TU
H1408 B
TU
H
DP
wate
r1.7
ft
WG
2.0
ft
WG
4.8
ft
WG
1.4
ft
WG
DP
air
NC
(In
cl. 1
0 d
B r
oom
absorb
tion)
TR
OX
US
A, In
cvL
2 (
measure
d 2
" from
wall)
91 F
PM
64 F
PM
91 F
PM
64 F
PM
4305 S
ett
ingdow
n C
ircle
vL6 (
measure
d 6
" from
wall)
55 F
PM
38 F
PM
54 F
PM
38 F
PM
N-n
ozzle
s t
ota
l90
Cum
min
g,
GA
30028
vH1
53 F
PM
53 F
PM
Aeff
0.0
46295 ft²
Phone:
(770)
569-1
433
DTL
-1.7
°F
0.1
°F
-1.6
°F
0.1
°F
veff
3024 F
PM
Fax:
(770)
569-1
435
DTH
1-0
.8 °
F0.8
°F
-0.7
°F
0.6
°F
H1
5.0
ft
ww
w.T
RO
XU
SA
.com
DTsupply
-15.8
°F
2.8
°F
-15.1
°F
2.8
°F
L15.0
ft
Vers
ion 1
.8
Connection-d
iam
ete
r /
prim
ary
air
room
air d
ew
poin
t-coolin
g56.7
°F
1/2
1/2
011
Inp
ut
Ro
om
Dim
en
sio
ns
140.0
CF
M
6 i
n
.coolin
gheating
55.0
°F
Re
su
lts
4.0
ft
U
NO
TE
: T
his
ca
lcu
lati
on
pro
gra
m is
on
ly a
pp
lic
ab
le t
o D
ID6
32
be
am
s m
an
ufa
ctu
red
by
TR
OX
US
A.
0.6
8 i
nch
WG
50.0
%
DID
63
2 T
wo
Wa
y A
cti
ve
Ch
ille
d B
ea
m S
ele
cti
on
Pro
gra
m
4 p
ipe
co
il2
pip
e c
oil
53.0
%70.0
°F
Inp
ut
DID
Vair-p
rim
ary
DID
DID
632-H
CD
ID632-U
S
Te
xt
in r
ed
re
pre
se
nts
a v
alu
e t
ha
t is
no
t g
en
era
lly
re
co
mm
en
de
d (
se
e u
se
r n
ote
s f
or
de
tails
).T
RO
X U
SA
, Inc reserv
es the rig
ht to
change p
roduct desig
ns a
nd their resultant perf
orm
ance c
hara
cte
ristics a
t any
tim
e. T
RO
X U
SA
, Inc a
ssum
es n
o li
abili
ty fo
r th
e a
sso
cia
ted s
yste
m d
esig
n o
r perf
orm
ance. C
opyr
ight T
RO
X U
SA
, Inc 2
010
58.0
°F
95.0
°F
Tro
om
/ r
el. H
um
idity
55.0
°F
75.0
°F
Te
rmin
al
Ve
locit
ies
an
d T
em
pe
ratu
res
Su
pp
ort
Va
lue
s
4 p
ipe
co
il2
pip
e c
oil
30
VH
1, Δ
TH
1H
Beam
Spacin
g (
A)
X VL, Δ
TL
ΔTS
UP
PLY
Occupie
d Z
one H
eig
ht
H1
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-10 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-11
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-12 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.C: NEW PUMP SELECTIONS
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-13
NEW AHU CHW PUMP SELECTION
NEW AHU Pump Selection
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-14 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-15
NEW HW PUMP SELECTION
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-16 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-17
APPENDIX 4.D: NEW AIR HANDLER, EXHAUST FAN SELECTION
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-18 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
NEW AHU SELECTIONS
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-19
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-20 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
NEW EXHAUST FAN SELECTIONS
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-21
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-22 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.E: EXISTING AND UPDATED KEY EQUIPMENT SCHEDULES
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-23
Existing Design - Pump Schedule for Ventilation Heating and AHU Chilled Water Coils
Designation Service Location GPM
Pump Head (ft. of H2O)
Motor HP
Manufacturer Model
Number RPM
CWP-1 Chilled Water
Basement Mezzanine
2780 150 150 Armstrong SG-1010
Horizontal Spilt
1800
CWP-2 Chilled Water
Basement Mezzanine
2780 150 150 Armstrong SG-1010
Horizontal Spilt
1800
CWP-3 Standby
Chilled Water
Basement Mezzanine
2780 150 150 Armstrong SG-1010
Horizontal Spilt
1800
CWP-4 Chilled Water
Low Flow
Basement Mezzanine
800 60 60 Armstrong SG-88
Horizontal Spilt
1800
HWP-5 Ventilation
Heating First Floor 930 100 40 Armstrong
Series 4300
6x6x11.5 Vertical Inline
1800
HWP-6 Ventilation
Heating First Floor 930 100 40 Armstrong
Series 4300
6x6x11.5 Vertical Inline
1800
Existing Design – Basic Lab and Office AHU Schedule
Designation Service Location Capacity
(cfm)
OA Capacity
(cfm)
Heat Recovery Wheel
Supply Motor HP
ACF-1 Lab Mech. Penthouse 50,000 50,000 Y 100
ACF-2 Lab Mech. Penthouse 50,000 50,000 Y 100
ACF-3 Lab Mech. Penthouse 50,000 50,000 Y 100
ACF-4 Lab Mech. Penthouse 50,000 50,000 Y 100
ACF-5 Lab Mech. Penthouse 50,000 50,000 Y 100
ACF-6 Offices Mech. Penthouse 33,000 4,950 N 60
ACF-7 Offices Mech. Penthouse 33,000 4,950 N 60
ACF-8 Offices Mech. Penthouse 33,000 4,950 N 60
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-24 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
Proposed Design - Pump Schedule for Ventilation Heating and AHU Chilled Water Coils
Designation Service Location GPM
Pump Head (ft. of H2O)
Motor HP
Manufacturer Model
Number RPM
CWP-1
Active Chilled Beams
CLG
Basement Mezzanine
2780 150 150 Armstrong SG-1010
Horizontal Split
1800
CWP-2 Standby
Active Chilled Beams
CLG
Basement Mezzanine
2780 150 150 Armstrong SG-1010
Horizontal Split
1800
CWP-3 AHUs + Process
CHW
Basement Mezzanine
2000 150 100 Armstrong 12x10x12.5H
Horizontal Split
1800
CWP-4 Standby
AHUs + Process
CHW
Basement Mezzanine
2000 150 100 Armstrong 12x10x12.5H
Horizontal Split
1800
CWP-5 Chilled Water
Low Flow
Basement Mezzanine
800 60 60 Armstrong SG-88
Horizontal Split
1800
HWP-5
Active Chilled Beams
HTG
First Floor 1400 100 50 Armstrong 8x8x11.5 Vertical Inline
1800
HWP-6 Standby
Active Chilled Beams
HTG
First Floor 1400 100 50 Armstrong 8x8x11.5 Vertical Inline
1800
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-25
Proposed Design – Basic Lab and Office AHU Schedule
Designation Service Location Capacity
(cfm) OA Capacity
(cfm) Enthalpy/Sensible
Supply Motor HP
AHU-EXT-1 Lab/Office Mech. Penthouse 36,000 36,000 Y/N 50
AHU-EXT-2 Lab/Office Mech. Penthouse 36,000 36,000 Y/N 50
AHU-INT-LS1 Interior Lab Life Science
Mech. Penthouse 50,000 50,000 Y/Y 75
AHU-INT-LS2 Interior Lab Life Science
Mech. Penthouse 50,000 50,000 Y/Y 75
AHU-INT-MS1 Interior Lab
Material Science
Mech. Penthouse 50,000 50,000 Y/Y 75
AHU-INT-MS2 Interior Lab
Material Science
Mech. Penthouse 50,000 50,000 Y/Y 75
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-26 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.F: EXISTING WATER FLOW DIAGRAMS
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-27
CPP - 1
HW - HTR HW - HTR HW - HTR
MPR
MPS
V-2
V-5
V-6
WF-1
ET - 1
HTX - 3
HTX - 4
HWP - 5
HWP - 6
VHWR
HW
PRV - 3
PRV - 2
PRV - 1
HW - HTR
VAVN LSBN
Typical Per Floor
HWS
HWR
CSG -1 CSG - 2 CSG - 3
MPR
MPS
CLSTo Lab ACFs
CW
PRV Station
MPS
LPS
HPS from Campus Plant
CPP-2
Legend HW: Hot Water HPS: High Pressure Steam MPS: Medium Pressure Steam LPS: Low Pressure Steam CLS: Clean Steam CW: Cold Water CSG: Clean Steam Generator PRV: Pressure Reducing Valve ET: Expansion Tank HTX: Heat Exchanger CPP: Condensate Power Pump
ACF Units in Mechanical Penthouse
CPP - 3
To Material Science Labs
LPR
MPR
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-28 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
WF-2
ET -3
From Material Science Labs
From Life Science Labs
PCWP - 8
PCWP - 7
PCWR
HTX - 1
HTX - 2
CWS
PCWS
Material Science Labs
To Life Science Labs
To ACF Units in Mechanical Penthouse
CWS from main
CWP - 4
CWP - 3
CWP - 2
CWP - 1
Pump Bypass
ET - 2
CWR to main
Legend
HTX: Heat Exchanger ET: Expansion Tank CWP: Chilled Water Pump PCWP: Process Chilled Water Pump WF: Water Filter PCWS/R: Process Chilled Water
Supply/Return CWS/R: Chilled Water Supply/Return
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-29
APPENDIX 4.G: TRANE TRACE OUTPUTS
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-30 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-31
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-32 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-33
APPENDIX 4.H: LOW FLOW FUME HOOD CUTSHEETS
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-34 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-35
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-36 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-37
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-38 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-39
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-40 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.I: ADDITIONAL CFD DATA
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-41
Detailed Geometries
Element Length Width Height Location
∆x (m) ∆y (m) ∆z (m) x (m) y (m) z (m)
Room 3.3528 3.218 3.3528 - - -
Human 0.5 0.5 1.89 2.48 1.21 0.0
Table 1.0668 0.853 1.0668 0.579997 0.0 0.0
Fume Hood Base 1.4 0.853 1.0668 1.9528 0.0 0.0
Fume Hood Wall1 0.0 0.853 2.0 1.9528 0.0 0.0
Fume Hood Wall2 0.0 0.853 2 3.3528 0.0 0.0
Fume Hood Sash 1.4 0.0 0.48 1.9528 0.853 1.52
Fume Hood Top 1.4 0.853 0.1 1.9528 0.0 2.00
Table (2) 3.3528 0.609759 1.0668 0.0 2.608241 0
Cabinet 0.914630 0.304800 0.914630 2.0 2.9132 1.6
Wallboard 1.544630 0.075 1.15 0.0 3.143 1.429996
General Exhaust 0.609 0.609 0.0 2.0 2.0 3.3528
Ceiling Diffuser (16, locations vary)
0.15225 0.15225 0.15225 Varies
Contaminant Inlet C=1000
0.335280 0.3048 0.0 2.557516 0.49 1.06685
Fume Hood Outlet 1.4 0.853 0.0 1.952800 0.0 2 Surface Temperatures of applicable elements were set at 25
oC
CFD File Results: Residuals
Scenario Mass Residual Temperature
Residual KE Residual EP Residual
Simulation Length
(hr:min)
100 fpm, 18” Sash 1.01% 0.01% 11.6% 0.6% 1:59
80 fpm, 18” Sash 0.63% 0.009% 12.5% 0.1% 2:05
100 fpm, 30” Sash 1.60% 0.01% 12.5% 0.9% 2:04
80 fpm, 30” Sash 1.11% 0.01% 9.8% 0.45% 2:06
Model Parameters
Turbulence Model KECHEN
Differencing Scheme Hybrid
Energy Equation Temperature
Iterations 4,000
Ambient Temperature 25oC
Grid Size 55 x 45 x 42
Inlet Conditions
Scenario Desired Exhaust Flow Total Inlet Diffuser Flow Inlet Velocity/ Cell
CFM CFM m/s
80 FPM, 18” Sash 540 500 0.629
80 FPM, 30” Sash 900 800 1.006
100 FPM, 18” Sash 675 600 0.787
100 FPM, 30” Sash 1125 1000 1.258
April 7, 2011 KGB Maser
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
4-42 KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex
APPENDIX 4.J: LIFE CYCLE COST BREAKDOWN
[UNIT 4: MECHANICAL REPORT] Jason Brognano, Michael Gilroy, Stephen Kijak, David Maser
April 7, 2011 KGB Maser
KGB Maser| IPD/BIM Thesis | PSU Millennium Science Complex 4-43