9
UNIRAC SOLARHOOKS 004AT1S SOLARHOOK FLAT SIDE MT AT1 004CT1S SOLARHOOK SPANISH SIDE MT CT1 004CT5S SOLARHOOK UNIV SIDE MT CT5 004ST1S SOLARHOOK FLAT SIDE MT ST1 TABLE OF CONTENTS Getting Started Flat Tile Installation W Tile Installation S Tile Installation Sub Flashing Engineering Reports Page 1 2 3 4 5 6

UNIRAC SOLARHOOKS

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNIRAC SOLARHOOKS

UNIRACSOLARHOOKS

004AT1SSOLARHOOK FLAT SIDE MT AT1

004CT1SSOLARHOOK SPANISH SIDE MT CT1

004CT5SSOLARHOOK UNIV SIDE MT CT5

004ST1SSOLARHOOK FLAT SIDE MT ST1

TABLE OF CONTENTSGetting StartedFlat Tile InstallationW Tile InstallationS Tile InstallationSub FlashingEngineering Reports

Page123456

Page 2: UNIRAC SOLARHOOKS

GETTING STARTEDINSTALLATION GUIDE

1

Use Figure 1 to select a lag bolt embedment depth to satisfy your Uplift PointLoad Force (lbs), requirements. It is the installer’s responsibility to verify thatthe substructure and attachment method is strong enough to support themaximum point loads calculated.

NOTES:(1) Thread must be embedded in the side grain of a rafter or other structuralmember integral with the building structure.(2) Lag bolts must be located in the middle third of the structural member.(3) This table does not include shear capacities. If necessary, contact a localengineer to specify lag bolt size with regard to shear forces.(4) Install lag bolts with head and washer flush to surface (no gap). Do notover torque.(5) Withdrawal design values for lag screw connections shall be multiplied byapplicable adjustment factors if necessary. See table 10.3 in the AmericanWood Council NDS for Wood Construction

ROOF HOOK CAPACITIES AND ENGINEERINGRefer to engineering report tables for tested ultimate loads. Refer to local AHJto determine the correct code (ASCE 7-05 or 7-10), wind speed and snowload. It is the responsibility of the installer to ensure these mountingattachments are appropriate for the application. Please contact your 3rd

party engineer for more information.

ENGINEERING GUIDE LIMITATIONS• Flush roof installations only• Roof slope must be 0-45 degrees (0/12 - 12/12 pitch)• Installation must have at least 4 modules grouped together• Module dimensions must be less than 42”x67"• Surrounding ground area must not slope more than 10 degrees• Location must fall into Exposure Category B or C• Building height must be less than or equal to 30’-0"

Please refer to www.unirac.com in the Technical Support section for theSolarmount D&E guide which should be used in installations that do notcomply with the limitations above.

Page 3: UNIRAC SOLARHOOKS

FLAT TILE INSTALLATIONINSTALLATION GUIDE

2

Required tools: • Drill, Impact driver• 3/16” drill bit• Sealant

Optional Tools:• Rafter locater• Chalk• Grinder

Page 4: UNIRAC SOLARHOOKS

Required tools: • Drill, Impact driver• 3/16” drill bit• Sealant

Optional Tools:• Rafter locater• Chalk• Grinder

W TILE INSTALLATIONINSTALLATION GUIDE

3

Fixed or Universal Hooks

Page 5: UNIRAC SOLARHOOKS

Fixed or Universal Hooks

Required tools: • Drill, Impact driver• 3/16” drill bit• Sealant

Optional Tools:• Rafter locater• Chalk• Grinder

S TILE INSTALLATIONINSTALLATION GUIDE

4

Page 6: UNIRAC SOLARHOOKS

COMPRESSIVE ULTIMATE LOAD TEST RESULTS

TENSILE (UPLIFT) ULTIMATE LOAD TEST RESULTS

See 3rd Party Lab Testing Report for detailed test results

004AT1SSOLAROOK FLAT SIDE MT AT1

ENGINEERING REPORTSINSTALLATION GUIDE

5

Page 7: UNIRAC SOLARHOOKS

004CT1SSOLARHOOK SPANISH SIDE MT CT1 COMPRESSIVE ULTIMATE LOAD TEST RESULTS

TENSILE (UPLIFT) ULTIMATE LOAD TEST RESULTS

See 3rd Party Lab Testing Report for detailed test results

ENGINEERING REPORTSINSTALLATION GUIDE

6

Page 8: UNIRAC SOLARHOOKS

004CT5SSOLARHOOK UNIV SIDE MT CT5 COMPRESSIVE ULTIMATE LOAD TEST RESULTS

TENSILE (UPLIFT) ULTIMATE LOAD TEST RESULTS

See 3rd Party Lab Testing Report for detailed test results

ENGINEERING REPORTSINSTALLATION GUIDE

7

Page 9: UNIRAC SOLARHOOKS

004ST1SSOLARHOOK FLAT SIDE MT ST1 COMPRESSIVE ULTIMATE LOAD TEST RESULTS

TENSILE (UPLIFT) ULTIMATE LOAD TEST RESULTS

See 3rd Party Lab Testing Report for detailed test results

ENGINEERING REPORTSINSTALLATION GUIDE

8